Appendix H. Traffic Analysis

Similar documents

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

Truck Climbing Lane Traffic Justification Report

6.14 Traffic and Circulation

3.9 - Transportation and Traffic

5.3 TRAFFIC, CIRCULATION AND PARKING

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

6060 North Central Expressway Mixed-Use Site Dallas, Texas

TRAFFIC IMPACT ANALYSIS

V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

TENW Transportation Engineering NorthWest

Transportation Impact Study for Abington Terrace

CITY OF SASKATOON COUNCIL POLICY

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California

Traffic Impact Analysis

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

TRAFFIC IMPACT ANALYSIS. For CHABAD LA JOLLA. Prepared for. Rabbi Baruch Ezagui. and. Edwin L. Laser, AIA. May 1, 2008

TRAFFIC STUDY GUIDELINES Clarksville Street Department

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Route 7 Corridor Study

Henderson Avenue Mixed-Use Development

#!! "$% ##! &! # '#! % $ #!

THIS PAGE LEFT BLANK INTENTIONALLY

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

CIRCULATION ELEMENT ADOPTED 1980 REPUBLISHED APRIL 2014 County of Santa Barbara Planning and Development 123 E. Anapamu Street Santa Barbara, CA 93101

SELECTED ROADWAY CAPACITY ANALYSIS

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

TRAFFIC IMPACT STUDY CRITERIA

Subject: Use of Pull-off Areas in Work Zones Page: 1 of 13. Brief Description: Guidance for the use and placement of pull-off area in work zones.

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Include autoturn exhibits of WB-67 trucks at each roundabout.

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

POLICY: TRAFFIC CALMING

3.13 TRANSPORTATION AND TRAFFIC

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

ROUNDABOUTS/TRAFFIC CIRCLES

3.0 PROJECT DESCRIPTION

TRAFFIC IMPACT STUDY FOR OFFICE, COMMERCIAL AND CULTURAL USE PROJECT AT 2000 AVENUE OF THE STARS, CENTURY CITY

TABLE TRAFFIC ANALYSIS SCENARIOS

Focused Traffic Analysis for the 200 Nellen Avenue Project

CHAPTER 3. Transportation and Circulation

August 30, Don Grigsby Travis County Transportation.and Natural Resources 411 West 13th Street, 9th Floor Austin, TX 78701

Traffic Impact Statement

A plan for improved motor vehicle access on Railroad Avenue in Provincetown

TRAFFIC SIGNAL WARRANT STUDY

Overland Traffic Consultants, Inc. October 15, Mr. Bruce McBride Project Delivery Analysts, LLC Shawnee Street Moorpark, CA 93021

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

D.13 Transportation and Traffic

Section 3.5 Transportation and Traffic

IV. Environmental Impact Analysis B.1 Transportation

SECTION 1 - TRAFFIC PLANNING

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

B. TRANSPORTATION, CIRCULATION AND PARKING

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

Troutbeck Farm Development

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

MEMORANDUM. To: 1.0 PURPOSE

4.11 TRANSPORTATION 4.11 TRANSPORTATION Environmental Setting Intersection, Roadway, and Freeway Evaluation Methodology

Chapter 5 FUNCTIONAL CLASSIFICATION

P HA Transportation Consultants

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC.

SANTA MONICA BOULEVARD CORRIDOR

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

Glenn Avenue Corridor Traffic Operational Evaluation

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

Highway 111 Corridor Study

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

Los Coyotes Country Club Development Plan Traffic Impact Analysis

Multifamily Development on Preston Road at Northwest Highway in Dallas, Texas

K 2: Los Angeles Department of Transportation (LADOT) Approval Letter

TRAFFIC SIGNAL WARRANT SUMMARY

Figure shows the existing roadway network in Daly City.

APPENDIX I: ROADWAY CLASSIFICATION SYSTEM AND PROJECT CONSISTENCY STANDARDS

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

MASER ASSOCIATES. Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY SEA GULL VILLAGE TOWNSHIP OF COLTS NECK

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Traffic Engineering and Operations for BRT in Los Angeles

4.11 Transportation and Traffic

Transport Assessment. Curtis Street Plan Change

Appendix B Transportation Report

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Transcription:

Appendix H Traffic Analysis

Allyn D. Rifkin PE Los Feliz Towers E-mail allynrifkin@gmail.com 4455 Los Feliz Boulevard Suite 1403 Telephone and fax -- (323) 664-2805 Los Angeles, CA 90027 Mobile phone (323) 697-1594 May 18, 2007 Wendy Lockwood Sirius Environmental 1478 N. Altadena Drive Pasadena, CA 91107 TRAFFIC ANALYSIS NEW LEAF, WOODSTOCK HOMES, MT. OLYMPUS As you have requested, I have completed a traffic analysis of the construction and occupancy of the proposed 16-unit hillside residential project. The project is located in the City of Los Angeles, along Woodstock Road, Leicester Drive and Thames Street in the Hollywood Hills proximate to the existing Mt. Olympus development. The analysis has been prepared in conformance to procedures consistent with the current City of Los Angeles Department of Transportation (LADOT) Traffic Study Policies and Procedures (March 2002). SITE LOCATION AND REGIONAL ACCESS Exhibit 1 is a map showing the location of the proposed development site and access to the street system. There are two principal access routes to the site: from the west, via Laurel Canyon Boulevard and Willow Glen Road; and from the east, via Hollywood Boulevard, Nichols Canyon Road and Willow Glen Road. Access to the north and the south from the site can be made via either of these routes. Additional access is available via Woodstock Road to Woodrow Wilson/Mulholland Drive and via Apollo/Hercules/Oceanus/Mt. Olympus Drive to Laurel Canyon Boulevard. According to the Hollywood Community Plan, Laurel Canyon Boulevard is designated a Secondary Highway. This route serves as a cross-mountain route for traffic between the San Fernando Valley and the Hollywood area of the City of Los Angeles. Laurel Canyon, due to topographic constraints, has not been developed to Secondary Highway standards for much of the route between Hollywood Boulevard and Mulholland Drive, with predominately one through lane in each direction and left turn chanelization. Hollywood Boulevard is designated a Major Highway, Class II, with an important connection to Hollywood Freeway (US Route 101). In the vicinity of the project, Hollywood Boulevard is mostly a residential street, and not developed to ultimate Major Highway standards.

May 18, 2007 Page 2 Both Willow Glen Road and Nichols Canyon Road are designated Collector Routes. The City of Los Angeles public works database, Navigate LA, indicates that portions of both of these routes are less than 20 feet wide. Field checks verified this condition. In addition, it was also observed that on Willow Glen Road, there are sections of horizontal curves with sub-standard sight distance. These conditions occur mostly between the project site and Laurel Canyon Boulevard.

May 18, 2007 Page 3 Alternate access routes (along Woodstock Road to Wilson Drive or along Apollo Drive to Mt Olympus Drive and to Laurel Canyon) involve additional travel on designated local streets. PROJECT GENERATED TRAFFIC According to nationally accepted data (and pursuant to LADOT procedures) contained in the Institute of Transportation Engineers Trip Generation Handbook, the project when occupied can be expected to result in additional traffic as follows (Table 1): Table 1 Project Generated Traffic LANDUSE Single Family Detached Housing UNITS 16 houses ITE TRIP GENERATION CATEGORY ITE Land Use: 210 TRIP FACTOR (24 HOUR) 15.0 vehicle trips per d.u. TRIP FACTOR (PM PEAK HOUR) 1.7 vehicle trips per d.u. / pm peak hour DAILY VEHICLE TRIPS 240 vehicle trips per day PM PEAK HOUR VEHICLE TRIPS (WEEKDAY) 27 vehicle trips per hour (See Exhibit 2 for calculations) ANALYSIS OF IMPACTS A. Local Traffic Impacts Pursuant to LADOT guidelines, a traffic study may be required if: 1. The project is likely to add 500 or more daily trips or likely to add 43 or more PM peak hour trips and, 2. The project is likely to significantly impact nearby intersection(s) that are presently believed to be operating at LOS C, D, E or F. These thresholds were chosen to correspond to the likelihood of significant impact at the most extreme instances (LOS F). By not exceeding these thresholds, it may be concluded that the project is not expected to have a significant impact relative to traffic. Thus, since the project is not likely to add 500 or more daily trips and not likely to add 43 or more PM peak hour trips, the project is not expected to have a significant impact relative to traffic. Additional consideration of impacts may be warranted when site-specific conditions may involve safety issues. The restricted sight lines on Willow Glen Road fall into this category. The local traffic authorities, LADOT, have installed safety warning devices, such as curve hazard warnings and posting of reduced speed limits to address the existing traffic hazards along this route. Additional safety measures, such as warning beacons or additional signage could be installed by LADOT if determined to be necessary. From my field observations, local drivers have adapted to the limited conditions under existing traffic volumes. The addition of 27 vehicle trips (both

May 18, 2007 Page 4 directions) per hour represents one additional car per 133 seconds (or every 2 minutes). Traffic volumes would be reduced to the extent that project traffic chose to use the alternate local routes discussed above. The project would not significantly change existing hazards in the area. In my opinion, the project-generated traffic would not be a significant safety impact along Willow Glen Road. B. Regional Traffic Impacts To determine regional traffic impacts, a Congestion Management Program Traffic Impact Assessment (CMP TIA) is required for all projects required to prepare an Environmental Assessment based on local determination. The geographic area examined in the CMP TIA must include at a minimum the following locations: All CMP arterial monitoring intersections, including freeway on- and off-ramp intersections, where a proposed project will add 50 or more trips during either the AM or PM weekday peak hours (of adjacent street traffic). Mainline freeway monitoring locations where a project will add 150 or more trips, in either direction, during either the AM or PM weekday peak hours. Because the project is projected to add fewer than 50 trips during the PM weekday peak hour it is determined that the project is not expected to have a significant impact to the regional transportation system. C. Construction Traffic Impacts Construction traffic impacts are evaluated primarily from the necessity of exporting soil and bringing building material to the site. It is estimated that 19,000 cubic yards of soil will be required to be removed in order to develop the project. Because of the roadway geometry and topology, the developer proposes to use 7 cubic yard (single barrel) trucks for the removal of dirt. It is proposed that the hours of export will be between 9 am and 3 pm to avoid peak hour traffic conditions. Further it is proposed that no more than 20 trucks per day would be dispatched. Under those assumptions, the soil exporting process would take approximately 7 to 7 ½ months. Delivery of construction material and construction employees to the site is expected to require fewer truck movements (total and daily) than the soil import task. The expected truck traffic (20 trucks per day on average) represents 40 truck trips over a 6-hour period. This would represent 7 trucks per hour, or 514 seconds (8 minutes) between trucks. With implementation of mitigation measures below, the construction traffic is not expected to have significant congestion or safety impacts on the local or regional street systems. The site distance conditions noted on Willow Glen Road can be addressed for safety concerns by two measures:

Exhibit 2 NEW LEAF - WOODSTOCK HOMES (TOTAL 16 SINGLE FAMILY HOMES) TRIP GENERATION CALCULATIONS ITE LAND USE 210 - DETACHED SINGLE FAMILY HOMES LN (T) = 0.92 LN (X) + 2.71 DAILY X=# OF UNITS; T = TRIP ENDS X = 16 NUMBER OF UNITS LN (X) = 2.77 LN (T) = 5.48 T= 240 TRIPS RATE = 15.0 TRIPS PER UNIT 16 HOMES 240 DAILY VEHICLE TRIPS LN(T) = 0.90 LN (X) +0.53 PM PEAK HOUR OF STREETS X=# OF UNITS; T = TRIP ENDS 63% INBOUND 37% OUTBOUND X = 16 NUMBER OF UNITS LN (X) = 2.77 LN (T) = 3.30 T= 27 TRIPS RATE = 1.7 TRIPS PER UNIT 1.1 INBOUND TRIPS PER UNIT 0.6 OUTBOUND TRIPS PER UNIT 16 HOMES 27 TOTAL VEHICLES PER HOUR 17 INBOUND VEHICLES PER HOUR 10 OUTBOUND VEHICLES PER HOUR source: ITE Trip Generation - 7th Edition