Service Quality & Performance Report

Size: px
Start display at page:

Download "Service Quality & Performance Report"

Transcription

1 Agenda item A5(ii) Service Quality & Performance Report April January 2017 Healthcare at its very best - with a personal touch

2 Service Quality & Performance Report February EXECUTIVE SUMMARY 1.1. This report outlines a level of detail regarding the Trust s performance for the period April 2016 to January This summary pulls out the key issues and implications An at a glance Performance Summary is provided on page 1 which shows the RAG (Red/Amber/Green) ratings of each indicator and performance trends compared to the previous period. 2. INTRODUCTION 2.1. This Business Delivery & Performance Report is reporting the period April 2016 to January The format and content of the report will continue to evolve, but it is hoped that Directors find the style of reporting useful, informative and straightforward to follow The remainder of the report sets out the activity and key targets the Trust has to deliver in 2016/17. The report will also specify financial penalties where they apply The Appendices give a more detailed breakdown of some of the performance, for example, performance by Directorate and/or site level and additional activity such as critical care, maternity and chemo/radiotherapy. However the report itself will include key figures and graphics to demonstrate the Trust s position and where possible, how it compares to other providers. As always, feedback is most welcome. 3. TRUST WAITING TIMES 3.1. Directors Summary 3.2. This section details the Trust s performance against 18 Weeks, Cancer and Diagnostics standards. As the issues with compliance are increasingly complex, the position is summarised below: The Incomplete (92%) 18 Weeks target was achieved Trust-wide during January The Admitted (90%) 18 Weeks target was achieved Trust-wide during January The Non-Admitted (95%) 18 Weeks target was achieved Trust-wide during January The Trust met the 6 week diagnostic standard in January Page 1 of 23

3 Service Quality & Performance Report February 2017 The Trust met all but one of the Cancer standards in December Weeks Referral to Treatment (RTT) 3.4. Table 1 shows the Trust performance by specialty for the 18 weeks targets in January 2017: 92% of incomplete pathways are under 18 weeks 95% of non-admitted patients are treated within 18 weeks Local 90% of admitted patients are treated within 18 weeks Monitoring Table 1: 18 Weeks Compliance by Speciality January 2017 RTT Specialty (C) Non- Admitted (>95%) Admitted (>90%) Incompletes (>92%) GENERAL SURGERY 95.4% 90.0% 94.8% UROLOGY 100.0% 91.1% 97.7% TRAUMA & ORTHOPAEDICS 82.3% 78.9% 83.0% EAR NOSE & THROAT 96.6% 91.9% 94.9% OPHTHALMOLOGY 98.8% 94.9% 99.0% ORAL SURGERY 87.2% 78.2% 95.3% NEUROSURGERY 97.9% 93.2% 96.0% PLASTIC SURGERY 95.3% 90.8% 92.6% CARDIOTHORACIC SURGERY 100.0% 100.0% 97.5% GENERAL MEDICINE 95.1% 100.0% 95.3% GASTROENTEROLOGY 95.6% 100.0% 95.6% CARDIOLOGY 95.7% 92.3% 92.9% DERMATOLOGY 96.9% 76.0% 92.2% RESPIRATORY MEDICINE 98.1% 100.0% 98.5% NEUROLOGY 97.6% 100.0% 97.7% RHEUMATOLOGY 85.2% 100.0% 94.3% CARE OF THE ELDERLY 98.3% 100.0% 97.6% GYNAECOLOGY 97.1% 91.1% 93.9% X01 TOTAL 94.9% 91.4% 92.2% TOTAL 95.1% 90.1% 93.6% 3.5. Directors will note that the Trust met all of the RTT standards at an aggregate level in January 2017 and this is particularly encouraging when you consider the RTT national position which continues to deteriorate at pace. England s referral to treatment waiting times topped 20 weeks in December; the worst performance since March 2011 and given that the incomplete pathways target was not formally announced until several months later (November 2011), one could argue that the English NHS has returned to the pre-target performance Although the Incompletes target was achieved overall, there was a specialty level breach in Trauma and Orthopaedics (751). In total, the penalty will amount to a fine of 225.3k for January 2017 (Table 2). However, the control Page 2 of 23

4 Penalty per breach Jul-16 Aug-16 Sept-16 Oct-16 Nov-16 Dec-16 Jan-17 Service Quality & Performance Report February 2017 total guidance states that if the provider has been granted access to the general element of the Sustainability and Transformation Fund, no repayment will be required in relation to any breach of the RTT threshold. Discussions are ongoing as per paragraph 1.7. Table 2: 18 Weeks Compliance within T&O January 2017 RTT Specialty (C) Total Backlog % Excess Penalty PTL Breaches TRAUMA & ORTHOPAEDICS % , SPINAL SURGERY ORTHOPAEDICS % , SPINAL SURGERY NEUROSURGERY % 73 21,900 Combined % , Whilst the Admitted target was achieved overall, there were 3 areas where the standard was breached at a specialty level; Trauma & Orthopaedics, Dermatology and Oral Surgery totaling 136 excess breaching patients (an increase of 57 from last month) Whilst the Non-Admitted target was achieved overall, there were 3 areas where the standard was breached at a specialty level; (Trauma & Orthopaedics, Oral Surgery and Rheumatology) totaling 165 excess breaching patients (an increase of 46 from last month) Appendix shows the geographical spread of breaches for January to further clarify for Directors where issues lie. In almost all cases, services experiencing breaches have developed action plans to achieve compliance and in most cases, they are providing additional capacity to treat patients. Table 3 demonstrates the RTT penalties incurred April 2016 to January Table 3: RTT Penalties Indicator Incomplete Penalty 184.8k 185.1k 247.5k 256.5k 206.7k 231k 225k Agreed Reinvestment TBC TBC TBC TBC Penalty Total 184.8k 185.1k 247.5k TBC TBC TBC TBC In January 2017, all Directorates (with the exception of one) reported a reduction of their RTT backlog. Directorates of note are Dental Hospital & School and POD. Page 3 of 23

5 Service Quality & Performance Report February 2017 Table 4: 18 Weeks Backlog by Directorate January 2017 Directorate Backlog Change from previous month Backlog Direction Cancer Services 0 0 Cardiothoracic Services Children s Services Clinical Genetics 17 7 Dental Hospital & School ENT Internal Medicine Musculoskeletal Services Neurosciences P.O.D Peri-op and Critical Care Renal Services Surgical Services Therapy Services 20 Women s Services Trust Total The contract specifies a zero tolerance on over 52 week waiters and the Trust maintained this target in January The legally binding contracts also require a quarterly reduction in over 36 week waiters by specialty. There is no penalty stipulated in the contract but it is good practice to achieve this standard Chart 1 shows that the over 36 week waiters in January 2017 were comparable with December. The sustainable reduction is due to an increased focus and new patient-specific actions to reduce the number of long-waiters. Chart 1: Over 36 week waits (All Specialties) Trend Page 4 of 23

6 Service Quality & Performance Report February As shown in Table 5, Newcastle was ranked 2 nd in the Shelford Group for RTT Incomplete performance in December 2016 and is comfortably above the England average of 89.7%. Table 5: RTT Performance NuTH vs Shelford & England Provider Name Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 England 91.3% 90.9% 90.6% 90.4% 90.5% 89.7% THE NEWCASTLE UPON TYNE HOSPITALS NHS FOUNDATION TRUST CAMBRIDGE UNIVERSITY HOSPITALS NHS FOUNDATION TRUST CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST GUY'S AND ST THOMAS' NHS FOUNDATION TRUST IMPERIAL COLLEGE HEALTHCARE NHS TRUST KING'S COLLEGE HOSPITAL NHS FOUNDATION TRUST OXFORD UNIVERSITY HOSPITALS NHS FOUNDATION TRUST SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST UNIVERSITY COLLEGE LONDON HOSPITALS NHS FOUNDATION TRUST UNIVERSITY HOSPITALS BIRMINGHAM NHS FOUNDATION TRUST 94.7% 94.7% 93.6% 93.7% 94.1% 93.3% 90.8% 90.4% 90.0% 90.1% 90.7% 90.2% 92.1% 92.1% 91.2% 91.0% 91.6% 91.6% 91.5% 90.6% 89.5% 89.6% 89.9% 88.8% 84.6% 83.3% 81.6% 83.4% 83.6% 81.9% 82.0% 82.2% 80.8% 79.3% 78.3% 77.1% 90.0% 89.6% 89.1% 89.5% 89.5% 92.8% 93.0% 93.0% 93.7% 93.9% 93.6% 93.2% 92.9% 93.2% 93.3% 93.4% 92.8% 92.5% 92.1% 92.1% 92.3% 92.7% 92.1% Table 6 shows the number of patients waiting to be seen for a first appointment by length of wait (all current patients regardless of appointment status). The accompanying Chart 2 shows that the total number of patients waiting for a first appointment in January 2017 has decreased by 1,925 (a similar pattern in 2015/16), as has the proportion of patients waiting over 18 weeks (a decrease of circa 0.55%). Table 6: Weeks from Referral to First Seen 2016/17 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 0 to 5 weeks 11,206 11,197 12,227 12,557 11,874 12,086 12,829 11,924 10,024 11, to 11 weeks 17,225 17,568 17,391 18,022 19,850 18,811 18,381 17,352 18,941 16, to 15 weeks 4,599 4,799 4,836 5,542 5,997 5,524 5,140 4,675 5,215 4, to 18 weeks 1,375 1,736 1,781 1,786 2,070 2,348 2,121 1,771 1,892 2,142 Greater than 18 weeks 3,365 3,343 3,131 3,218 3,385 3,424 3,628 3,522 3,838 3,383 Grand Total 37,770 38,643 39,366 41,125 43,176 42,193 42,099 39,244 39,910 37,985 Page 5 of 23

7 Waiting list size Service Quality & Performance Report February 2017 Chart 2: Outpatient Waiters (All Specialties) Trend 50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 Trust OPWL by wait group '0 to 5 weeks '06 to 11 weeks '12 to 15 weeks '16 to 18 weeks 'Greater than 18 weeks Table 7 shows the top 5 Directorates/Specialties (based on volume of patients waiting for a first outpatient appointment). Whilst Maxillofacial/Oral Surgery is showing an increasing trend, ENT s outpatient waiting list continues to reduce. Table 7: Top 5 all patients awaiting a 1st Outpatient Appointment Directorate Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Ophthalmology ENT Maxillofacial/Oral Surger Cardiothoracic Medicine and COE Diagnostic Waits Whilst the Trust met the 99% diagnostic target in January 2017, achieving 99.1%, there are still significant workforce pressures within Radiology (including cardio exams), Paediatric Sleep Studies (respiratory physiology), Echocardiography and Urodynamics. Furthermore, this will continue to be exacerbated by winter pressures which, in itself, could create further capacity constraints. The departmental action plans continue to progress at pace and this is reflected within the January performance, although the Trust s position will remain vulnerable whilst the issues around MRI remain unresolved on a recurrent basis. Page 6 of 23

8 Service Quality & Performance Report February 2017 Table 8: Diagnostic Breaches (15 Key Diagnostic Tests) Jul-16 Aug-16 Sept-16 Oct-16 Nov-16 Dec-16 Jan-17 Number of Breaches Number of Excess Breaches Penalty 2.6k 14.4k 10.6k 5.8k - 6k - Number of Patients Waiting 9,637 9,039 8,552 8,802 9,108 8,996 9,036 Compliance 98.9% 98.2% 98.4% 98.7% 99.01% 98.7% 99.1% 4. Cancer Waits 4.1. Due to the timing of submissions, cancer data runs one month behind the majority of performance data, this paper therefore reports the December 2016 and Quarter 3 position. Appendix 1 shows the Directorate cancer compliance. All breaching services are flagged to ensure that Directors have full view of the high risk areas The Breast Symptomatic Two Week Wait target and the 2WW Suspected Cancer target continue to be achieved. Whilst the numbers of 2WW Suspected Cancer referrals reduced significantly, this pattern fits with historical data suggesting this to be seasonal. Further analysis of the data against November figures showed decreases predominantly in Head and Neck (-69) and Skin (-63). The breaches equated to 5% and were all as a result of patient choice. The projected outturn for 2WW Suspected Cancer referrals in 2016/17 shows an overall increase of 3% in comparison to 2015/16. Whilst the volume of 2WW Suspected Cancer referrals for Quarter 3 reduced in comparison to Quarters 1 and 2, the Breast Symptomatic referrals showed a growth for the same period. The Quarterly target was achieved across both standards The 62 day target for December and Quarter 3 were achieved (achieving 88.1% and 87.9% respectively). Whilst performance is nationally reported at Trust level, internal reporting by tumour group shows the same areas consistently falling below the 85% standard. Furthermore, several tumour groups have failed every quarter; Lung, Hepatobiliary & Pancreatic (HPB), Upper GI, Head & Neck and Cancer of Unknown Primary (CUP). The numbers of CUP are small so one breach can result in a failure of the standard Across NESCN, 2 of the 9 Trusts, South Tees (77.9%) and Durham & Darlington (83.2%), failed the 62 day standard for Quarter 3. The national average was reported at 82.1%. Page 7 of 23

9 Service Quality & Performance Report February The Trust failed the screening standard for December, reporting performance at 88.4% against the 90% standard. The breaches attributed to this were in Bowel Screening. Although patient choice was a factor, analysis has identified a number of areas for improvement which are being addressed with the tumour site team. The standard was achieved for Quarter 3 at 92.4% The Trust achieved the 31 day standard to first treatment for December (98%) and Quarter 3 (98.3%) against the 96% standard. Treatment numbers show a slight fluctuation each month and the projected outturn for 2016/17 currently shows minimal growth in number of treatments The Subsequent treatment target for all treatment modalities was achieved for December and Quarter 3. The Subsequent Drug Treatment numbers continue to be reviewed to ensure the administering of drugs is captured in a robust and timely way Looking forward to January 2017, data is currently undergoing validation, but reports show all cancer standards, with the exception of the 62 day standard, on target to achieve. The 62 day standard is currently showing performance at 83.9% against the 85% standard. Whilst the volume of breaches is higher than usual, this is most likely due to patient initiated delays around the Christmas period. The breaches are predominantly within Lung, Colorectal and Urology and Root Cause Analyses (RCAs) are underway to better understand the delay reasons The Corporate Cancer Team continues to work with all tumour groups to establish robust processes to support the new breach re-allocation guidance. The national IT system will not be available until April 2017 so in the interim, providers must work together to implement local solutions for reporting. A breach re-allocation policy has been drafted by the Cancer Alliance with input from all stakeholders and the Corporate Cancer Team continues to work with Directorates to ensure robust processes are in place for receiving and recording accurate dates when patients are transferred to the Trust Whilst applying the breach re-allocation methodology in November 2016 showed an overall improvement in Trust performance, unfortunately, this is not the case for December. Using the same methodology results in deterioration of the 62 day standard at a Trust level and, in some tumour groups, there is a significant shift in compliance (Table 9). Page 8 of 23

10 Service Quality & Performance Report February 2017 Table 9: Breach Re-allocation Summary NUTH performance - December 2016 Prior to breach After breach reallocation re-allocation Position Brain/CNS u Breast u Gynae q Haem (exc AL) u Head & Neck p Lower GI p Lung q Other q Sarcoma q Skin u Upper GI q Uro (exc testes) p All q As reported previously, the Backstop policy requires review and weekly reporting to the CCG of any long waiters (patients classified as waiting 104 days or more). Patients are often delayed because of medical fitness or diagnostic uncertainty. In all cases, the patients are being actively tracked and clinical teams are aware of their pathway status. The pathway of any patient who has waited more than 104 days to be treated is reviewed by the Trust Cancer Clinician and assessed for harm. Since implementation in October 2015, none of the long wait patients have been identified as coming to harm The Corporate Cancer Team continues to review and discuss cancer pathways with each Directorate to ensure that cancer remains a high priority. It is crucial that each site specific tumour group continue to engage and take a pro-active approach to identifying any bottlenecks in the pathway and making improvements As reported previously, the Northern Cancer Alliance have submitted a bid on behalf of the 3 STPs, Northumberland, Tyne and Wear, and North Durham (NTWND), West, North and East Cumbria and Durham, Darlington, Tees, Hambleton, Richmondshire and Whitby (DDTHRW). They are asking for funding to implement a transformation programme focussing on early diagnosis of cancer, the cancer recovery package and a stratified follow up model. Feedback is expected in March Page 9 of 23

11 Quarter 1 16/17 Quarter 2 16/17 Oct-16 Nov-16 Dec-16 Quarter 3 16/17 Service Quality & Performance Report February 2017 Table 10: Cancer Targets as at December 2016 Cancer All cancers: 2 week wait (C,M) (Target 93.0%) 2 Week Wait for Symptomatic Breast Patients (Cancer Not initially Suspected) (C,M) (Target 93.0%) All cancers: 1 month diagnosis to first treatment (C,M) (Target 96.0%) All cancers: 1 month diagnosis to subsequent treatment surgery (C,M) (Target 94.0%) All cancers: 1 month diagnosis to subsequent treatment drug (SS,M) (Target 98.0%) All cancers: 1 month diagnosis to subsequent treatment radiotherapy (SS,M) (Target 94.0%) All cancers: 2 month urgent referral to treatment (C,M) (Target 85.0%) Percentage patients referred from cancer screening service treated within 62 days (C,M) (Target 90.0%) 95.9% 95.6% 94.2% 94.6% 94.9% 94.5% 96.4% 95.1% 97.0% 95.0% 94.4% 95.5% 97.9% 98.4% 99.3% 97.5% 98.0% 98.3% 96.8% 95.8% 96.5% 94.8% 96.9% 96.0% 100% 99.2% 96.6% 99.4% 100% 98.6% 98.7% 98.6% 98.5% 98.9% 99.0% 98.8% 85.1% 87.9% 87.2% 88.8% 88.1% 87.9% 95.2% 95.7% 96.3% 93.1% 88.4% 92.4% Page 10 of 23

12 Service Quality & Performance Report February EMERGENCY CARE (INCLUDING A&E INDICATORS) 5.1. Directors will note that the Trust failed to meet the A&E 4hr target in January 2017 at 91.0% which is the lowest performance this fiscal year (Table 11). Unfortunately, the A&E performance for Type 1 (main RVI ED) missed meeting the standard at 85.8% for the 6 th consecutive month. The department are citing beds waits, patient flow issues as well as significant Delays to Be Seen (DTBS) as the main breach reasons. This is being further exacerbated by significant medical staffing pressures, particularly the junior and middle grade gaps in the ED rota. Looking forward, the February performance is currently at 92.9% (as at 13 th February) Despite the significant pressures in ED, the staff continues to maintain a safe department; they are currently piloting the use of the observation lounge as an ambulance handover assessment area. Furthermore, the performance is well above the NHS England average (all types) of 86.2%. When national performance is assessed purely for Type 1 EDs, the national performance is lower still at 79.3% Whilst the year to date A&E performance (all types) is currently at 94.6%, it will be extremely challenging to recover the annual position (a maximum allowance of 15 breaches per day from 7th February 2017). This is particularly important now that the Trust has agreed control totals as Sustainability & Transformation Funding (STF) can be earned back if providers are able to recover the A&E performance on a cumulative basis As reported previously, NHS Improvement recently announced that hospitals will be rated against a new A&E standard in This will combine the waiting time target with clinical standards and data on staff and patient experience. Whilst the four hour target will remain the headline indicator, the new metrics will be designed to give a clearer picture of the health of A&E departments. Whilst the metrics are still to be finalised, initial work has commenced within the Trust to demonstrate performance against waiting times for conditions such as stroke PCI and the sepsis 6 bundle From April 2017, NHS Trusts will have to report how quickly they are treating patients experiencing mental health crisis in A&E or hospital wards as part of new NHS England standards. Liaison psychiatry is one of nine priority areas as set out in the 2 year planning guidance for and NHS England recently announced a transformation fund which A&E delivery boards could bid against to extend liaison psychiatry services (as per paragraph 5.12). Whist the Psychiatric Liaison Service for Newcastle currently operates 8am to 9pm 7 days a week (with Older Peoples service Monday-Friday 9am-5pm), Northumberland Tyne & Wear NHS Trust has requested funding to recruit Page 11 of 23

13 Jul-16 Aug-16 Sept-16 Oct-16 Nov-16 Dec-16 Jan-16 Service Quality & Performance Report February 2017 additional staff into the team to meet core 24 standards and to ensure the service is provided on a 24/7 basis accordingly. Table 11: Emergency (A&E) Indicators Emergency Indicators Percentage of A & E attendances where the patient was admitted, transferred or discharged within 4 hours of their arrival at an A&E department (CCG,M) (Target: 95.0%) Trolley waits in A&E >12 hours (CCG) (Target: Nil) All handovers between ambulance and A & E must take place within 15 minutes Handovers >30 minutes (CCG) (Target: Nil) Handover breaches >60 minutes (CCG) (Target: Nil) 97.4% 96.8% 96.5% 95.5% 92.9% P lty 41.6k 91.4% P lty 72.8k 91.0% P lty 76.32K P lty P lty 1k 3 P lty P lty 1,400 5 P lty 1k 21 P lty 4.2k 37 P lty 7.4k The Trust reported 37 ambulance handover delays in January 2017; the highest number reported since April However, all but one delay was due to the administrative process of handing over the patient on the IT system with the other due to competing pressures. Whilst these breaches could incur a penalty of 7.4k for the Trust, this indicator is included within the A&E bundle linked to the control total and the suspension of financial penalties in the Quality Schedule. Chart 3: Ambulance Handover Breaches Rate per 1000 > 30 Minutes Page 12 of 23

14 Jul-16 Aug-16 Sept-16 Oct-16 Nov-16 Dec-16 Jan-17 Service Quality & Performance Report February NSECH continues to show very high numbers of ambulance breaches and this shows no signs of easing; in fact their reportable ambulance breaches increased by circa 73% (190) in January 2017 compared to the average reported from April to December Furthermore, North Durham, Darlington and City Hospitals Sunderland are also reporting a high number of breaches in recent months, all of which increases the risk of ambulance deflections to the RVI ED The contract also contains a number of local indicators around A&E, with associated figures for items 1-4 located in Appendix 2. 1) Unplanned re-attendance rate - 7 days <5% 2) Left department without being seen rate <5% 3) Time to initial triage/assessment (95th percentile <15 minutes) 4) Time to treatment in department (median <60 minutes) 5) % of patients presenting at type 1 and 2 (major) A & E sites in certain high risk categories who are reviewed by an emergency medicine consultant before being discharged (95% at site level) 6) A & E service experience - qualitative description of what has been done to assess the experience of patients using A&E services, their carers and staff Table 12 shows that the Trust achieved both the unplanned re-attendance rate and the left department without being seen rate in January Further detail about these indicators, as well as a site breakdown of A&E performance is provided in Appendix 2. Table 12: Local A&E Indicators Local A&E Indicators Unplanned re-attendance rate (CCG) (Target: <5.0%) Left department without being seen rate (CCG) (Target: <5.0%) RVI Main ED 3.8% 4.5% 3.7% 3.2% 3.6% 3.5% 2.4% Eye Casualty 4.1% 2.1% 2.9% 0.6% 0.7% 0.3% 0.0% RVI Main ED 3.4% 3.9% 4.2% 3.6% 4.2% 5.4% 4.5% Eye Casualty 0.5% 0.6% 0.3% 0.5% 0.3% 0.4% 0.4% The time to initial triage/assessment in ED (Table 13) has consistently failed to achieve the 15 minute target throughout 2016/17. Whilst there has previously been a health warning against this data, the A&E paperlite system (implemented on 9 th November) has improved real-time data capture and will allow the department to clearly identify the bottlenecks in the department. Page 13 of 23

15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Service Quality & Performance Report February 2017 Table 13: Time to Initial Triage/Assessment in Department 95 th percentile A&E Key Performance Indicators RVI - Main Emergency Department Target <15 mins Jul- 16 Aug- 16 Sep- 16 Oct- 16 Nov- 16 Dec- 16 Jan :19 00:42 00:48 00:42 01:19 00:44 01: The median arrival to treatment time in main ED has improved from a high of 1 hour 32 minutes in December to 30 minutes in January (Table 14). However, eye casualty just missed meeting the 60 minute target at 62 minutes. Table 14: Time to Treatment in Department Median A&E Key Performance Indicators Target 15/16 Jul- 16 Aug- 16 Sept- 16 Oct- 16 Nov- 16 Dec- 16 RVI - Main <60 00:36 00:54 00:56 00:58 01:17 01:32 00:30 Eye Casualty <60 00:57 01:11 01:01 01:09 00:56 00:50 01:02 Walk-in Centre <60 00:11 00:10 00:20 00:10 00:12 00:10 00:10 Molineux Street <60 00:18 00:17 00:24 00:31 00:33 00:37 00: The Trust reported a reduction in delayed bed days to 1,060 in December 2016 (Chart 4). However, the number of patients awaiting assessment significantly increased in December although may be due to the Christmas holiday period. Repatriation to other hospitals is still a major cause for concern and whilst broad principles have been agreed (linked to the accepting of deflected or diverted patients) this is yet to be finalised. Chart 4: Trust reported Delayed Bed Days Jan- 17 1,400 No. of Days Delayed (NHS) 1,200 1, Non-acute NHS Care Community equipment Assessment Care package Patient choice Total days delayed Page 14 of 23

16 Service Quality & Performance Report February Directors will note that the Divert indicator remained within contracts in 2016/17. Table 15 shows the ambulance diverts for 2016/17 and whilst this equates to a financial incentive for the Trust of 172.5k, the pressure this creates within A&E and the wider Trust is more of a concern. Table 15: A&E Ambulance Diverts OTHER EXTERNAL PERFORMANCE REQUIREMENTS Appendix 3 reports the other contractual and Monitor targets that have not yet been discussed There were no reported cases of MRSA in January 2017, meaning a year to date total of 5 (post successful appeals) In January 2017, the Trust reported 4 cases of C-Difficile infections against a trajectory of 6. The infections were reported in Medicine (2) and Surgery (2). Taking into account 16 successful appeals, the year to date total is 52, 12 below the cumulative trajectory of There were no reportable breaches of the urgent cancelled operation, with one breach of the 28 day standard in Paediatric Surgery due to lack of beds (Table 16) in January Table 16: Reportable Cancelled Operations Reportable Cancelled Operations Q1 Q2 Q3 Jan-17 Total number of cancelled operations Number of 28 day breaches Urgent operations cancelled for a 2 nd or subsequent time Penalty Amount 6.3k 12.3k 2.3k TBC Page 15 of 23

17 Jul Aug Sep Oct Nov Dec Jan Service Quality & Performance Report February Whilst NHS England has removed the national financial sanctions relating to VTE risk assessment and formulary publication from the Contract for 2016/17, it remains essential that providers continue to meet these (particularly as this indicator is included as a quality/safety measure in the Single Oversight Framework). Due to significant pressures in coding, performance is reported one month behind. The Trust was compliant in December 2016, achieving 95.6% against the 95% standard Whilst the Psychological Therapies line in the community contract rolled over into 2016/17, the joint clinical model with NuTH and NTT commenced in April Table 17 shows current performance for the new joint service Talking Helps Newcastle (THN). Whilst the moving to recovery performance showed a slight drop in January 2017, the service have agreed a robust action plan to ensure sustained delivery against the standard as they move into 2017/18. Table 17: IAPT Progress towards targets Joint Model IAPT Indicators Target 2016/17 National target: Paired assessment scores for completed episodes (CCG) Penalty: 10 per breach below threshold) Nationally Published Data 90% Have raised a query with NHS Digital regarding data The proportion of people who have depression and/or anxiety disorders who receive psychological therapies (% against trajectory) (CCG) Local Data The proportion of people who complete treatment who are moving to recovery (CCG) Local Data % of patients seen within 6 weeks Nationally Published Data % of patients seen within 18 weeks Nationally Published Data 1.25% 1.22% 1.28% 1.18% 1.50% 1.47% 0.90% 1.19% 50% 40.4% 32.1% 55.0% 45.9% 43.6% 48.0% 46.8% 75% 97.3% 96.1% 96.4% 98.3% 98.2% 97.4% 97.6% 95% 99.2% 98.3% 99.0% 99.5% 99.5% 99.5% 99.6% There is a data quality penalty for NHS number completeness within inpatient/ outpatient and A&E submitted commissioning datasets. The standard needs to be maintained on an individual monthly basis to avoid a 10 penalty per excess missing number. For 16/17, this target has been consistently achieved. Table 18: SUS Data Quality SUS Data Quality Target Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Completion of a valid NHS Number field in acute (Admitted/Non-Admitted Care) (C) Completion of a valid NHS Number field in acute (A&E) (CCG) 99% 99.2% 99.1% 99.2% 99.1% 99.1% 99.1% 95% 97.8% 97.1% 97.7% 96.9% 97.4% 97.9% Page 16 of 23

18 Service Quality & Performance Report February RECOMMENDATIONS 6.1. Directors are asked to: 1) receive this report; 2) note the areas of compliance and non-compliance, particularly the risk this poses to high quality patient care and the Trust, both financially and reputationally and; 3) note the actions ongoing to address areas of underperformance and any key risks for 2017/18. Jo McCallum Senior Business Development Manager (Performance) Helen Byworth Assistant Director of Contracting & Performance Louise Robson Executive Director of Business and Development 15 th February 2016 Page 17 of 23

19 Day of Surgery Arrival Referral Growth Admitted Waiting OP Waiting Non-Admitted Clock Stops (>95%) Admitted Clock Stops (>90%) Incompletes (>92%) Backlog Backlog direction Relative Risk Length of Stay Outpatient DNA Rates against Peer Outpatient N:R ratio - against peer Cancelled Operations 28 day Breaches Cancelled Operations Cancer Service Quality & Performance Report February 2017 Appendix 1: Directorate Level Performance Directorate Cancer Services 59% -1.3% % 100% 100% % m Cardiothoracic 61% 14.0% 1,187 2, % 91.3% 96.4% % m Services Children s Services 88% 46.0% 1,210 2, % 99.7% 97.4% % w Clinical Genetics 99.4% 98.3% Dental Hospital &School 100% 4.1% 884 4, % 92.0% 98.8% % ENT 94% -3.4% 940 4, % 90.3% 96.7% % m Internal Medicine 60% 0.3% 1,103 3, % 97.9% 93.4% % Musculoskeletal 90% -1.3% 4,036 3, % 83.7% 84.9% % m Neurosciences 84% 0.4% 1,344 2, % 94.3% 93.1% % P.O.D. 92% -4.6% 4,005 7, % 92.6% 97.4% % w Peri-op and Critical Care 100% 25.6% % 87.5% 89.7% % Renal Services 95% -8.6% 1,010 1, % 99.0% % w, 1m Surgical Services 86% 2.8% 1,707 1, % % 90.6% 92.3% % m, 2m, Scr Therapy Services 1.6% % 95.8% 20 Women s Services 96% 5.6% 558 2, % 90.7% 94.9% % m Indicator Tolerance Data period Day of Surgery Arrival - January 2017 Referral Growth - All referrals <0% Red, Amber 0-5%, Green >5% January 2017 compared to January 2016 Admitted Waiting (includes planned and suspended - patients) December 2016 New Outpatients Waiting List - December 2016 Risk Adjusted Length of Stay - Source HED Outpatient DNA Rates against Shelford - Source HED Outpatient New to Review Ratio - against Shelford - Green = Performance is below (better) than Shelford, RED = Performance is above (worse) than Shelford October 2015 September 2016 Page 18 of 23

20 Service Quality & Performance Report February 2017 Source HED Cancelled Operations - Source Patient Services Red >0.8% FFCEs January 2017 Cancelled Operations Breaches 28 days - Source Patient Services Red >=1 January 2017 Cancer tbc December 2016 Page 19 of 23

21 Service Quality & Performance Report February 2017 Appendix 2: A&E Performance A&E Key Performance Indicators Threshold Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Unplanned re-attendance rate - 7 days RVI - Main Emergency Department 5% 1.8% 2.3% 3.0% 3.8% 4.5% 3.7% 3.2% 3.6% 3.5% 2.4% Total time spent in A&E department (All Attendances) Eye Casualty 5% 1.4% 0.6% 2.8% 4.1% 2.1% 2.9% 0.6% 0.7% 0.3% 0.0% Walk-in Centre 5% 0.2% 0.2% 0.3% 0.4% 0.0% 0.6% 0.3% 0.2% 0.1% 0.1% Molineux Street 5% 0.0% 0.0% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.1% 0.0% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% All Emergency Departments (Combined performance) 95% 94.2% 94.7% 96.4% 97.4% 96.8% 96.5% 95.5% 92.9% 91.4% 91.0% RVI - Main Emergency Department 95% 91.3% 92.0% 94.5% 96.0% 94.7% 94.7% 93.4% 89.2% 86.6% 85.8% Left department without being seen rate Eye Casualty 95% 97.9% 97.5% 98.5% 99.0% 98.1% 99.0% 96.2% 98.0% 98.7% 98.1% Walk-in Centre 95% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% Molineux Street 95% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% RVI - Main Emergency Department 5% 3.6% 4.6% 2.9% 3% 3.9% 4.2% 3.6% 4.2% 5.4% 4.5% Eye Casualty 5% 0.3% 0.5% 0.1% 0.5% 0.6% 0.3% 0.5% 0.3% 0.4% 0.4% Walk-in Centre 5% 1.3% 0.9% 1.8% 0.8% 0.0% 1.1% 1.1% 1.2% 1.4% 0.9% Molineux Street 5% 1.2% 1.6% 1.4% 1% 0.0% 1.0% 1.5% 1.9% 2.6% 1.3% Time to initial assessment - 95th percentile (Emergency Ambulance arrivals only) RVI - Main Emergency Department <15 mins 01:21 00:48 01:02 01:19 00:42 00:48 00:42 01:29 00:44 01:31 Time to treatment in department - Median Eye Casualty <15 mins # # # # # # # # # # RVI - Main Emergency Department <60 mins 00:40 00:40 00:37 00:36 00:24 00:56 00:58 01:17 01:32 00:30 Note: # Not provided as minimal data available 2016/17 Eye Casualty <60 mins 00:53 00:50 00:56 00:57 01:27 01:01 01:09 00:56 00:50 01:02 Walk-in Centre <60 mins 00:11 00:12 00:15 00:11 00:10 00:20 00:10 00:12 00:10 00:10 Molineux Street <60 mins 00:20 00:24 00:20 00:18 00:17 00:24 00:31 00:33 00:37 00:31 Page 20 of 23

22 Actual 15/16 Target Monthly Target Quarter 1 July August Sept Oct Nov Dec Jan Service Quality & Performance Report February 2017 Appendix 3: Additional Targets (not covered above) Key Performance Indicators Mixed Sex Accommodation Breaches (c) Sleeping Accommodation Breach Cancelled Operations (c) Those not admitted within 28 days No urgent operation should be cancelled for a second time Delayed Transfers of Care Delayed Discharges 1,088 Minimal n/a HCAI (c) Zero tolerance MRSA Rates of Clostridium difficile < (cumulative & appeals removed) Duty of Candour (c) Failures to notify the Relevant Person of a suspected or actual Reportable Patient Safety Incident VTE Assessments Proportion of Patients who have had a VTE Risk Assessment on Admission 96.1% 95% 95% 96.9% 95.2% 96.0% 96.3% 95.7% 98.8% 95.6% Page 21 of 23

23 Admitted Non-Admitted General Surgery Urology Trauma & Orthopaedics ENT Ophthalmology Oral Surgery Neurosurgery Plastic Surgery Cardiothoracic Surgery General Medicine Gastroenterology Cardiology Dermatology Respiratory Medicine Neurology Rheumatology Geriatric Medicine Gynaecology Bucket Service Quality & Performance Report February 2017 Appendix 4: RTT Compliance by Specialty and Commissioner, January 2017 Commissioner The Newcastle upon Tyne Hospitals n/a NHS NEWCASTLE GATESHEAD CCG n/a 0 n/a n/a 0 n/a n/a NHS NORTH TYNESIDE CCG n/a n/a n/a n/a n/a n/a n/a 0 n/a 0 0 n/a NHS NORTHUMBERLAND CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 0 n/a NHS SUNDERLAND CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 6 NHS SOUTH TYNESIDE CCG n/a n/a n/a 0 n/a n/a n/a n/a n/a n/a n/a n/a 0 n/a n/a n/a n/a 1 7 NHS NORTH DURHAM CCG n/a n/a n/a 0 0 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 8 NHS DURHAM DALES, EASINGTON AND SEDGEFIELD CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 4 NHS DARLINGTON CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 NHS HARTLEPOOL AND STOCKTON-ON-TEES CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 3 NHS SOUTH TEES CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 NHS CUMBRIA CCG n/a n/a n/a n/a 0 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 6 Specialised n/a n/a 0 n/a n/a 66 0 n/a n/a n/a n/a n/a n/a n/a 0 n/a n/a n/a 0 The Newcastle upon Tyne Hospitals n/a n/a 0 0 n/a 0 0 NHS NEWCASTLE GATESHEAD CCG n/a n/a 1 n/a n/a n/a 0 22 n/a n/a 0 n/a 0 0 NHS NORTH TYNESIDE CCG n/a n/a n/a 1 n/a n/a n/a 1 9 n/a n/a n/a n/a 0 2 NHS NORTHUMBERLAND CCG n/a n/a n/a 1 n/a n/a n/a 0 14 n/a n/a n/a n/a 1 0 NHS SUNDERLAND CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 NHS SOUTH TYNESIDE CCG n/a n/a 2 n/a n/a n/a n/a n/a n/a n/a n/a n/a 4 n/a n/a n/a n/a n/a 5 NHS NORTH DURHAM CCG n/a n/a n/a n/a 0 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 NHS DURHAM DALES, EASINGTON AND SEDGEFIELD CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 NHS DARLINGTON CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a NHS HARTLEPOOL AND STOCKTON-ON-TEES CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 NHS SOUTH TEES CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 NHS CUMBRIA CCG n/a 1 n/a n/a 0 n/a n/a n/a n/a n/a n/a 3 n/a n/a n/a n/a n/a n/a 0 Specialised n/a n/a 7 n/a n/a 26 0 n/a n/a n/a n/a n/a n/a n/a 0 n/a n/a n/a 0 Page 22 of 23

24 Incompletes General Surgery Urology Trauma & Orthopaedics ENT Ophthalmology Oral Surgery Neurosurgery Plastic Surgery Cardiothoracic Surgery General Medicine Gastroenterology Cardiology Dermatology Respiratory Medicine Neurology Rheumatology Geriatric Medicine Gynaecology Bucket Service Quality & Performance Report February 2017 Commissioner The Newcastle upon Tyne Hospitals n/a n/a 0 0 n/a 0 0 NHS NEWCASTLE GATESHEAD CCG n/a n/a n/a n/a 0 n/a 0 n/a 0 0 n/a n/a 0 n/a 0 0 NHS NORTH TYNESIDE CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 3 n/a n/a n/a n/a n/a 0 NHS NORTHUMBERLAND CCG n/a n/a 78 0 n/a n/a n/a n/a n/a n/a n/a 0 1 n/a n/a n/a n/a n/a 0 NHS SUNDERLAND CCG n/a n/a 15 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 NHS SOUTH TYNESIDE CCG n/a n/a 44 n/a n/a n/a n/a n/a n/a n/a n/a n/a 5 n/a n/a n/a n/a n/a 0 NHS NORTH DURHAM CCG n/a n/a 29 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 NHS DURHAM DALES, EASINGTON AND SEDGEFIELD CCG n/a n/a 14 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 NHS DARLINGTON CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a NHS HARTLEPOOL AND STOCKTON-ON-TEES CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a NHS SOUTH TEES CCG n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a NHS CUMBRIA CCG n/a n/a 23 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 Specialised n/a n/a 72 n/a n/a 0 0 n/a n/a n/a n/a n/a n/a n/a 0 n/a n/a n/a 0 n/a x Underline Target does not apply/trust level target Target does not apply, < 20 cases in month Target applies and was met Target breached and number of 'excess' breaches Patients subject to a penalty Page 23 of 23

Business Delivery & Performance Report

Business Delivery & Performance Report Agenda item: A5(vi) Business Delivery & Performance Report May 2017 Healthcare at its very best - with a personal touch 1. EXECUTIVE SUMMARY 1.1. This report outlines the Trust s performance for the period

More information

SAS Quality Scorecard August 2011

SAS Quality Scorecard August 2011 SAS Quality Scorecard August 2011 Access & Referral Unscheduled AR1: Cat A Performance AR2: Cat A Cardiac Arrest Performance AR3: Cat B Performance AR4: Islands Emergency Performance AR5: 1Hr Urgents In

More information

Outcomes of an Innovative Outpatient Monitor Service for Gynaecological Patients The Case Study of the Royal Free Hospital

Outcomes of an Innovative Outpatient Monitor Service for Gynaecological Patients The Case Study of the Royal Free Hospital Outcomes of an Innovative Outpatient Monitor Service for Gynaecological Patients The Case Study of the Royal Free Hospital Dr Michela Tinelli November 2017 LSE Enterprise Limited London School of Economics

More information

NURSE STAFFING REPORT

NURSE STAFFING REPORT NURSE STAFFING REPORT INTRODUCTION This paper fulfills the nationally mandated, post Francis II requirement for monthly Board Reports detailing achievement against required nurse staffing levels. This

More information

Cancer Diagnostic Demand & Capacity Workshop SPH Workshop Presentation

Cancer Diagnostic Demand & Capacity Workshop SPH Workshop Presentation Cancer Diagnostic Demand & Capacity Workshop SPH Workshop Presentation 10 th March 2016 Aims of Project Identify areas of improvement required across the cancer pathway focussing on cancer diagnostics

More information

N U R S E S T A F F I N G R E P O R T

N U R S E S T A F F I N G R E P O R T N U R S E S T A F F I N G R E P O R T INTRODUCTION This paper fulfills the nationally mandated, post Francis II requirement for monthly Board Reports detailing achievement against required nurse staffing

More information

N U R S E S T A F F I N G R E P O R T

N U R S E S T A F F I N G R E P O R T N U R S E S T A F F I N G R E P O R T INTRODUCTION This paper fulfills the nationally mandated, post Francis II requirement for monthly Board Reports detailing achievement against required nurse staffing

More information

NHS SPENDING ENGLAND Question 1. a) What is the Annual net expenditure on the NHS from 1997/98 to 2007/08 in England?

NHS SPENDING ENGLAND Question 1. a) What is the Annual net expenditure on the NHS from 1997/98 to 2007/08 in England? NHS SPENDING ENGLAND Question 1. a) What is the Annual net expenditure on the NHS from 1997/98 to 2007/08 in England? Net NHS Expenditure in England in bn bn 100 80 60 40 20 0 1997/98 1998/99 1999/00 2000/01

More information

Company A Company A. Company A Board Meeting Presentation 12 th May 20XX

Company A Company A. Company A Board Meeting Presentation 12 th May 20XX Board Meeting Presentation 12 th May 20XX Table of Contents CEO Overview Business Dashboard Quarterly Financials & forecasts Sales and Marketing Quarter specific items Strategic update: D2C Risk and Underwriting

More information

Key statistics from the National Cardiac Arrest Audit 2016/17

Key statistics from the National Cardiac Arrest Audit 2016/17 Key statistics from the National Cardiac Arrest Audit 216/17 Supported by Resuscitation Council (UK) and Intensive Care National Audit & Research Centre (ICNARC) Data collection scope (NCAA Version 1.3)

More information

Cancer Outcomes and Services Dataset An update. Lung workshop September 2013 Trish Stokes

Cancer Outcomes and Services Dataset An update. Lung workshop September 2013 Trish Stokes Cancer Outcomes and Services Dataset An update Lung workshop September 2013 Trish Stokes The National Cancer Intelligence Network will be hosted by Public Health England from 1 st April 2013 A recap -

More information

EVects of seasonal change in rugby league on the incidence of injury

EVects of seasonal change in rugby league on the incidence of injury 144 Department of Orthopaedic and Accident Surgery, Centre, University Hospital, Nottingham NG7 2UH, United Kingdom L Hodgson Phillips Department of Learning Disabilities, University Hospital, Centre,

More information

Primary Care Commissioning Committee

Primary Care Commissioning Committee Primary Care Commissioning Committee 28 June 2017 Details Part 1 X Part 2 Agenda Item No. 5 Title of Paper: Board Member: Author: Presenter: Primary Care Workstream Update Dr J Schryer, Primary Care Clinical

More information

Regional Spread of Inbound Tourism

Regional Spread of Inbound Tourism Regional Spread of Inbound Tourism Foresight issue 157 VisitBritain Research 1 Contents Introduction Summary Key metrics by UK area Analysis by UK area Summary of growth by UK area Scotland Wales North

More information

MPTS Committee meeting, 19 September Annex A: MPTS Performance Dashboard

MPTS Committee meeting, 19 September Annex A: MPTS Performance Dashboard Annex A: MPTS Performance Dashboard MPTS Performance Dashboard KPIs Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec To commence 100% of Interim Orders Tribunal (IOT) hearings within 3 weeks of referral

More information

GROWING THE GAME FOR THE FUTURE

GROWING THE GAME FOR THE FUTURE GROWING THE GAME FOR THE FUTURE THE CHILDREN AND YOUNG PEOPLE S PLAN FOR GOLF 2017 2021 INTRODUCTION As pressure on young people s time continues to increase and the pace of life moves quicker, young people

More information

MAR DASHBOARD MAR. Compliant % Breakdown Mar % Late % On-time MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

MAR DASHBOARD MAR. Compliant % Breakdown Mar % Late % On-time MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Positive Response Compliance 215 Compliant 215 Non-Compliant 216 Compliant 216 Non-Compliant 1% 87% 96% 86% 96% 88% 97% 89% 89% 88% 86% 92% 93% 94% 96% 94% 8% 6% 4% 2% 13% JAN 4% 14% FEB 4% 12% 3% 11%

More information

UK Integrated Behaviour Change Programmes

UK Integrated Behaviour Change Programmes UK Integrated Behaviour Change Programmes 17 th November 2009 ACT TDM Summit Conference Daniel Johnson, Transport for London Nicky Ward, Steer Davies Gleave Structure 1. UK travel behaviour change 2. An

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun Jul

More information

COMMUNITY SUPPORT PROGRAM

COMMUNITY SUPPORT PROGRAM COMMUNITY SUPPORT PROGRAM Providers contracted for this level of care or service will be expected to comply with all requirements of these service-specific performance specifications. Additionally, providers

More information

MEMORANDUM. City Constituents. Leilani Schwarcz, Vision Zero Surveillance Epidemiologist, SFDPH

MEMORANDUM. City Constituents. Leilani Schwarcz, Vision Zero Surveillance Epidemiologist, SFDPH MEMORANDUM TO: FROM: CC: City Constituents Leilani Schwarcz, Vision Zero Surveillance Epidemiologist, SFDPH Megan Wier, Co-Chair, San Francisco Vision Zero Task Force, SFDPH Commander Ann Mannix, Traffic

More information

Analysis of 2015 Trail Usage Patterns along the Great Allegheny Passage

Analysis of 2015 Trail Usage Patterns along the Great Allegheny Passage Analysis of 2015 Trail Usage Patterns along the Great Allegheny Passage Prepared for the Allegheny Trail Alliance, August 2016 By Dr. Andrew R. Herr Associate Professor of Economics Saint Vincent College

More information

A review of 2015 fatal collision statistics as of 31 December 2015

A review of 2015 fatal collision statistics as of 31 December 2015 A review of fatal collision statistics as of 31 December This report summarises the main trends in road fatalities that have emerged in. This has been prepared by the Road Safety Authority following analysis

More information

STAFF REPORT ACTION REQUIRED. Public Works and Infrastructure Committee. General Manager, Transportation Services

STAFF REPORT ACTION REQUIRED. Public Works and Infrastructure Committee. General Manager, Transportation Services STAFF REPORT ACTION REQUIRED Revised PW9.13 Street Sweeper Evaluation Results and Operational Considerations Date: October 21, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Vancouver 2010 Medical Services Presentation to EMS Chiefs Conference Dr. Jack Taunton May 2008

Vancouver 2010 Medical Services Presentation to EMS Chiefs Conference Dr. Jack Taunton May 2008 Vancouver 2010 Medical Services Presentation to EMS Chiefs Conference Dr. Jack Taunton May 2008 VANOC 2010 Games by the Numbers Number of Olympic athletes and team officials 5,500 Number of Paralympic

More information

Outcome-based payment schemes: government s use of payment by results

Outcome-based payment schemes: government s use of payment by results Report by the Comptroller and Auditor General Cross-government Outcome-based payment schemes: government s use of payment by results HC 86 SESSION 2015-16 19 JUNE 2015 Outcome-based payment schemes: government

More information

MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY

MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY Version: 4 Date issued: April 2018 Review date: April 2021 Applies to: All staff (excluding office and clerical staff) This document is

More information

Data-Driven Justice Case Studies

Data-Driven Justice Case Studies Data-Driven Justice Case Studies Data provided by the Cambridge Police Department Mary M.* Mary M., a homeless woman with chronic alcoholism, cycles through the Cambridge Police Department so frequently

More information

Environmental Health & Safety

Environmental Health & Safety Environmental Health & Safety Oklahoma State University AUTOMATED EXTERNAL DEFIBRILLATOR (AED) MANAGEMENT PROGRAM Environmental Health and Safety University Health Services Suite 002 Stillwater, OK 74078

More information

SUMMARY REPORT Q1/2015

SUMMARY REPORT Q1/2015 SUMMARY REPORT Q1/2015 IDH, the Sustainable Trade Initiative (IDH), together with Dell, HP, Philips, Apple, Microsoft, ELEVATE, ERI and civil society organizations, has developed a program to improve the

More information

Hospital Admissions in the Northern Territory

Hospital Admissions in the Northern Territory Hospital Admissions in the Northern Territory 1976-28 www.healthynt.nt.gov.au Hospital Admissions in the Northern Territory, 1976 to 28 Shu Qin Li Sabine Pircher Steve Guthridge John Condon Jo Wright Acknowledgements

More information

WINNIPEG AAA HOCKEY CONCUSSION PROTOCOL SUMMARY

WINNIPEG AAA HOCKEY CONCUSSION PROTOCOL SUMMARY 2017-18 WINNIPEG AAA HOCKEY CONCUSSION PROTOCOL SUMMARY The following is a summary of the WINNIPEG AAA HOCKEY CONCUSSION PROTOCOL. 1.) All athletes participating in Winnipeg AAA Hockey and their parents

More information

MERTON CLINICAL COMMISSIONING GROUP PRIMARY CARE COMMISSIONING COMMITTEE

MERTON CLINICAL COMMISSIONING GROUP PRIMARY CARE COMMISSIONING COMMITTEE MERTON CLINICAL COMMISSIONING GROUP PRIMARY CARE COMMISSIONING COMMITTEE Date of Meeting: 25 th May 2017 Agenda No: 4 Attachment: 3 Title of Document: Primary Care Commissioning Update Purpose of Report:

More information

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK September 2015

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK September 2015 THOMAS P. DiNAPOLI COMPTROLLER STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 GABRIEL F. DEYO DEPUTY COMPTROLLER DIVISION OF LOCAL GOVERNMENT AND SCHOOL ACCOUNTABILITY

More information

Racecourse Operations Manager. Position Description

Racecourse Operations Manager. Position Description Racecourse Operations Manager Position Description Position Discription Racecourse Operations Manager Position Title: Reports To: Business Unit: Department: Racecourse Operations Manager CEO Pakenham Racing

More information

DEC DASHBOARD. Positive Response Compliance DEC. Compliant Tickets : On-Time Performance Analysis. December % Late.

DEC DASHBOARD. Positive Response Compliance DEC. Compliant Tickets : On-Time Performance Analysis. December % Late. Positive Response Compliance 215 Compliant 215 Non-Compliant 216 Compliant 216 Non-Compliant 1% 87% 96% 86% 96% 88% 97% 89% 97% 89% 98% 88% 97% 86% 96% 92% 97% 93% 97% 94% 97% 96% 97% 94% 97% 8% 6% 4%

More information

JAN DASHBOARD. Positive Response Compliance JAN. Compliant Tickets : On-Time Performance Analysis. January % Late.

JAN DASHBOARD. Positive Response Compliance JAN. Compliant Tickets : On-Time Performance Analysis. January % Late. Positive Response Compliance 216 Compliant 216 Non-Compliant 217 Compliant 217 Non-Compliant 1% 96% 97% 8% 6% 4% 2% 4% 3% FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 8% Late Compliant Tickets : On-Time

More information

b Number issued 200,000 (marked with * in the attached appendix) Exercise price is as set out in the appendix

b Number issued 200,000 (marked with * in the attached appendix) Exercise price is as set out in the appendix www.sli-systems.com Level 1, EPIC 78 106 Manchester Street Christchurch New Zealand Phone: 0800 754 797 Fax:03 961 3262 22 May 2018 Client Market Services NZX Limited WELLINGTON By NZ MAP NOTIFICATION

More information

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings.

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings. PUBLIC MEETINGS Citizens are welcome and encouraged to attend all City of Geneva public meetings. Public meeting guests are also urged to participate in any of the City s many public meetings that take

More information

Provider ICD 10 Compliant Release A S K E S I S W E B I N A R F E B R U A R Y 1 9,

Provider ICD 10 Compliant Release A S K E S I S W E B I N A R F E B R U A R Y 1 9, Provider 7.2.6 ICD 10 Compliant Release A S K E S I S W E B I N A R F E B R U A R Y 1 9, 2 0 1 4 Agenda ICD 10 overview Application development path to compliance Objectives Components CMS 1500 Documentation

More information

Wirral DAAT Hep C Strategy

Wirral DAAT Hep C Strategy Wirral DAAT Hep C Strategy August 2008 The National Treatment Agency s (NTA) aspirational target is for each DAAT partnership to achieve 100% of their previous/current injecting drug user (IDU) population

More information

The expenditure exceeds the income generated, creating an annual shortfall of around 17,447 per annum.

The expenditure exceeds the income generated, creating an annual shortfall of around 17,447 per annum. Dear Parents, 24th January 2018 It is with a heavy heart that we have to inform you that the swimming pool, based at Mundesley Infant school will close at the end of this term (March 28th 2018). Throughout

More information

2018 HR & PAYROLL Deadlines

2018 HR & PAYROLL Deadlines th (by payment date) EPAF 3rd PARTY FEEDS WTE Approval 2018 HR & PAYROLL s Normal Payroll day s 2017 B1-26 3 * 13-Dec-17 15-Dec-17 n/a n/a n/a 28-Dec-17 29-Dec-17 11:00 AM 16-Dec-2017 29-Dec-2017 JAN 2018

More information

Principles of Planning. F.P.Furniss

Principles of Planning. F.P.Furniss Principles of Planning Learning Outcomes Understand the principals in why Planning and Periodization is important to deliver successful performances Understand the concept of Macro/ Meso and Micro cycle

More information

2. ATHLETE NUMBERS PODIUM AND PODIUM POTENTIAL LEVEL INVESTMENT

2. ATHLETE NUMBERS PODIUM AND PODIUM POTENTIAL LEVEL INVESTMENT 1. INTRODUCTION 1.1. The British Swimming World Class Swimming Programme (WCSP) aims to identify, develop and support talented athletes in winning medals on the world stage in 2018 and beyond. Through

More information

REPORT. RECOMMENDATION: 1. That the report on Pilot Results Free Transit for Seniors, dated October 25, 2012, from Oakville Transit be received.

REPORT. RECOMMENDATION: 1. That the report on Pilot Results Free Transit for Seniors, dated October 25, 2012, from Oakville Transit be received. REPORT MEETING DATE: NOVEMBER 15, 2012 FROM: Oakville Transit DATE: October 25, 2012 SUBJECT: Pilot Results - Free Transit for Seniors LOCATION: Town Wide WARD: Town wide Page 1 RECOMMENDATION: 1. That

More information

NORS Mobilisation Single Process

NORS Mobilisation Single Process This document has been developed to support stakeholders involved in NORS mobilisation. This is a highlevel description of the process referred to in SOP4574 - Logistics & NORS Mobilisation Manual - Hub

More information

Assessor Report. IMCA Specific Review VoiceAbility

Assessor Report. IMCA Specific Review VoiceAbility Assessor Report IMCA Specific Review VoiceAbility April 2012 Contents IMCA Specific Review... 1 Contents... 2 Executive Summary... 3 IMCA Specific Review... 4 IMCA Review Checklist... 7 Action for Advocacy

More information

PUBLIC AGENDA STREET ACTIVITY STEERING COMMITTEE

PUBLIC AGENDA STREET ACTIVITY STEERING COMMITTEE PUBLIC AGENDA STREET ACTIVITY STEERING COMMITTEE Wednesday, March 16, 2016, 12:00 p.m. Committee Room E, Ground Floor, City Hall Members Ms. S. Marchildon, Chair Ms. V. Charles Inspector R. Friesen Mr.

More information

Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009

Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009 Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009 February 4, 2010 Prepared by: BIKES ONboard Project San Francisco Bicycle Coalition Prepared by the San Francisco Bicycle Coalition

More information

Bluetongue Disease (BT)

Bluetongue Disease (BT) Bluetongue Disease (BT) Analysis of ADNS data since 01/2018 Reporting period: 2018-01-01 2018-12-09 Data query: 2018-12-10 AGES DSR Austrian Agency for Health and Food Safety www.ages.at Parameters Data

More information

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION 1 PURPOSE 1.1 To provide the following information and supporting evidence for the Member decision (reference

More information

The Chartered Society of Physiotherapy Charitable Trust RESEARCH STRATEGY CSP Charitable Trust Registered Charity No.

The Chartered Society of Physiotherapy Charitable Trust RESEARCH STRATEGY CSP Charitable Trust Registered Charity No. The Chartered Society of Physiotherapy Charitable Trust RESEARCH STRATEGY 2015-2019 CSP Charitable Trust Registered Charity No. 279882 Contents Foreword 1 Foreword 2 2 Introduction 2 3 Where are we now?

More information

National Renewable Energy Laboratory. Wind Resource Data Summary Guam Naval Ordnance Annex Data Summary and Retrieval for November 2009

National Renewable Energy Laboratory. Wind Resource Data Summary Guam Naval Ordnance Annex Data Summary and Retrieval for November 2009 National Renewable Energy Laboratory Wind Resource Data Summary Guam Naval Ordnance Annex Data Summary and Retrieval for November 2009 Prepared for: National Renewable Energy Laboratory 1617 Cole Boulevard

More information

REGULATIONS FOR THE ESTABLISHMENT AND OPERATION OF THE WOMEN S FOOTBALL PYRAMID AND GIRLS FOOTBALL

REGULATIONS FOR THE ESTABLISHMENT AND OPERATION OF THE WOMEN S FOOTBALL PYRAMID AND GIRLS FOOTBALL 192 REGULATIONS FOR THE ESTABLISHMENT AND OPERATION OF THE WOMEN S FOOTBALL PYRAMID AND GIRLS FOOTBALL 1. DEFINITIONS In the interpretation of these Regulations, the following words and expressions, unless

More information

Drowning Deaths at Public Swimming Pools. Dr Bernadette Matthews Principal Research Associate Aquatic Risk and Research Life Saving Victoria

Drowning Deaths at Public Swimming Pools. Dr Bernadette Matthews Principal Research Associate Aquatic Risk and Research Life Saving Victoria Drowning Deaths at Public Swimming Pools Dr Bernadette Matthews Principal Research Associate Aquatic Risk and Research Life Saving Victoria http://www.cvent.com/d/yvqzhg SURVEY DROWNING DEATHS IN VICTORIA

More information

Communications Plan for 150th Anniversary Celebrations

Communications Plan for 150th Anniversary Celebrations Communications Plan for 150th Anniversary Celebrations Summary In 2019 the Amateur Swimming Association will mark its 150th Anniversary. This provides Swim England with the opportunity to celebrate past

More information

Auckland Transport Monthly Indicators Report 2018/19

Auckland Transport Monthly Indicators Report 2018/19 Attachment 1 Auckland Transport Monthly Indicators Report 218/19 August 218 Table of Contents Page 2. 1. Summary of indicators 1.1 SOI performance measures 1.2 AT Metro patronage breakdown 2. Monthly indicators

More information

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016 Severn Trent Water Forum DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016 The Water Forum is a multi-stakeholder panel created in 2012 to challenge Severn Trent as it developed its business

More information

Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018

Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, 2018 BEFORE: Larry Ring, Q.C., Panel Chair Marilyn Kapitany, B.Sc.(Hon), M.Sc., Vice Chair Carol Hainsworth, C.B.A., Member Susan

More information

Policy on Meal and Rest Break

Policy on Meal and Rest Break Policy on Meal and Rest Break Policy on Meal & Rest Break Page: Page 1 of 8 Recommended by Approved by A&E Consultative Group A&E Consultative Group Approval date 17/07/2012 Version number 11.4 Review

More information

UNIVERSITY OF CALIFORNIA Economics 134 DEPARTMENT OF ECONOMICS Spring 2018 Professor David Romer

UNIVERSITY OF CALIFORNIA Economics 134 DEPARTMENT OF ECONOMICS Spring 2018 Professor David Romer UNIVERSITY OF CALIFORNIA Economics 134 DEPARTMENT OF ECONOMICS Spring 2018 Professor David Romer LECTURE 2 OVERVIEW OF THE GREAT DEPRESSION January 22, 2018 I. THE 1920S A. GDP growth and inflation B.

More information

September 2016 Financial Results

September 2016 Financial Results September 2016 Financial Results Unaudited financial results for the one months ending 30 September 2016 Contents Executive Summary......... 1 Statement of Activities (Budget).. 3 Statement of Activities

More information

RFU AASE LEAGUE COMPETITION REGULATIONS

RFU AASE LEAGUE COMPETITION REGULATIONS RFU AASE LEAGUE 2017-2018 COMPETITION REGULATIONS 1. Description and Form 1.1 The Competition shall be called the RFU AASE League. 1.2 All matches must be played in accordance with these Regulations, World

More information

Danish gambling market statistics Third quarter, 2017

Danish gambling market statistics Third quarter, 2017 Danish gambling market statistics Third quarter, Third Quarter, 7. december Third Quarter, Danish gambling market statistics 1 Indhold A. Introduction... 2 B. Quarterly market statistics for the Danish

More information

Reviewing Hyperbaric Oxygen Services: Consultation Guide

Reviewing Hyperbaric Oxygen Services: Consultation Guide Information Reader Box (IRB) to be inserted on inside front cover for documents of 6 Reviewing Hyperbaric Oxygen Services: Consultation Guide NHS England INFORMATION READER BOX Directorate Medical Operations

More information

Disciplinary Policy and Procedures

Disciplinary Policy and Procedures Disciplinary Policy and Procedures Applicable to: Stoolball England Volunteer Workforce Date of Origination: January 2009 Originator: Welfare Officer Status: CURRENT Approved by the Management Committee:

More information

Introduction. 1 Policy

Introduction. 1 Policy Policies for the Commissioning of Healthcare Policy for the commissioning of arthroscopic shoulder decompression surgery for the management of Pure Subacromial Shoulder Impingement Policy Number 48 (Pan

More information

Paper prepared by the Secretariat

Paper prepared by the Secretariat COMMISSION FOURTEENTH REGULAR SESSION Manila, Philippines 3 7 December 2017 REFERENCE DOCUMENT FOR REVIEW OF CMM 2005-03 AND FOR THE DEVELOPMENT OF HARVEST STRATEGIES UNDER CMM 2014-06 North Pacific Albacore

More information

ROCK STARS CURLING The OCC Competitive Youth Program

ROCK STARS CURLING The OCC Competitive Youth Program OVERVIEW OF ROCK STARS CURLING The Oshawa Curling Club Competitive Youth Program ROCK STARS CURLING - is designed to identify and develop youth curlers in an effort for them to reach their full potential.

More information

Compression Study: City, State. City Convention & Visitors Bureau. Prepared for

Compression Study: City, State. City Convention & Visitors Bureau. Prepared for : City, State Prepared for City Convention & Visitors Bureau Table of Contents City Convention & Visitors Bureau... 1 Executive Summary... 3 Introduction... 4 Approach and Methodology... 4 General Characteristics

More information

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK September 2015

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK September 2015 THOMAS P. DiNAPOLI COMPTROLLER STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 GABRIEL F. DEYO DEPUTY COMPTROLLER DIVISION OF LOCAL GOVERNMENT AND SCHOOL ACCOUNTABILITY

More information

The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG)

The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG) The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG) Summary. The Berwick-upon-Tweed Conservation Area Advisory Group (CAAG) is a Forum that comprises a number of organisations and representatives

More information

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years).

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years). Bicycle Crashes The City of Fort Collins is well known for its bike culture, and there is a strong focus on encouraging increased riding. Bike safety is an important component of supporting these efforts.

More information

Appendix ELP El Paso, Texas 2003 Annual Report on Freeway Mobility and Reliability

Appendix ELP El Paso, Texas 2003 Annual Report on Freeway Mobility and Reliability (http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix ELP El Paso, Texas 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement to: Monitoring

More information

Congestion Reduction in Europe: Advancing Transport Efficiency. MG Tackling urban road congestion D3.4

Congestion Reduction in Europe: Advancing Transport Efficiency. MG Tackling urban road congestion D3.4 Congestion Reduction in Europe: Advancing Transport Efficiency MG-5.3-2014 Tackling urban road congestion D3.4 Patterns of congestion in European cities Multiple-indicator analysis using real-time GPS

More information

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1. County of Orange Resources and Development Management Department Harbors, Beaches and Parks Strategic Plan HBP Strategic Plan Workshop 1 v18 PRESENTATION OUTLINE Harbors, Beaches & Parks (HBP) History

More information

WIM #37 I-94, MP OTSEGO, MN APRIL 2012 MONTHLY REPORT

WIM #37 I-94, MP OTSEGO, MN APRIL 2012 MONTHLY REPORT WIM #37 I-94, MP 200.1 OTSEGO, MN APRIL 2012 MONTHLY REPORT In order to understand the vehicle classes and groupings the Mn/DOT Vehicle Classification Scheme and the Vehicle Classification Groupings for

More information

The London 2012 Olympic and Paralympic Games: The Medical Challenge and lessons learnt Dr Richard Budgett Chief Medical Officer LOCOG

The London 2012 Olympic and Paralympic Games: The Medical Challenge and lessons learnt Dr Richard Budgett Chief Medical Officer LOCOG The London 2012 Olympic and Paralympic Games: The Medical Challenge and lessons learnt Dr Richard Budgett Chief Medical Officer LOCOG 1 History of 2012 bid Olympic and Paralympic delivery Health legacy

More information

Sony Centre for Performing Arts

Sony Centre for Performing Arts CAPITAL PROGRAM SUMMARY Highlights Overview I: 10-Year Capital 6 II: Issues for Discussion 15 Sony Centre for Performing Arts 2016 2025 CAPITAL BUDGET AND PLAN OVERVIEW The Sony Centre for the Performing

More information

Colorado River Drought Response and System Sustainability. Chuck Cullom July 16, 2014

Colorado River Drought Response and System Sustainability. Chuck Cullom July 16, 2014 Colorado River Drought Response and System Sustainability Chuck Cullom July 16, 2014 Study Structure and Schedule Summary of Key Activities Upcoming Meetings Further Discussion, Follow-up Colorado River

More information

OTM Patent Coordinator. Biomedical and Health Information Sciences Lauren Segal Anne Burkhart Architecture, School of Mark Krivchenia Anne Burkhart

OTM Patent Coordinator. Biomedical and Health Information Sciences Lauren Segal Anne Burkhart Architecture, School of Mark Krivchenia Anne Burkhart College of Applied Health Science College of Architecture, Design, and the Arts Biomedical and Health Information Sciences Lauren Segal Anne Burkhart Architecture, School of Mark Krivchenia Anne Burkhart

More information

2009 Forecast for the Chicago CBD

2009 Forecast for the Chicago CBD TR Mandigo & Company 2009 Forecast for the Chicago CBD Presented to: Council of Chicago Hotel General Managers By Ted Mandigo Director of TR Mandigo & Company 8/4/2009 Let s cut to the chase. There s a

More information

Location Publication / Responsible And Number. Controller Standards Australia

Location Publication / Responsible And Number. Controller Standards Australia Document Title Location Publication / Update Responsible And Number Issue Date Control Controller Standards Australia AS 2500 Guide to the safe use of electricity in patient care AS2896 Medical Gas systems

More information

Policy for the commissioning of arthroscopic shoulder decompression surgery for the management of Pure Subacromial Shoulder Impingement

Policy for the commissioning of arthroscopic shoulder decompression surgery for the management of Pure Subacromial Shoulder Impingement Policy for the commissioning of arthroscopic shoulder decompression surgery for the management of Pure Subacromial Shoulder Impingement Version of: December 2018 Version Number: V 0.1 Changes Made: Policy

More information

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( ) Wisconsin 511 Traveler Information 211 Annual Usage Summary January 3, 212 Overall to-date Summary 36 months of operation 1,16,63 total calls the 1 Million mark was passed on December 3, 212 3,627,527

More information

6 th Meeting of the Scientific Committee Puerto Varas, Chile, 9-14 September 2018

6 th Meeting of the Scientific Committee Puerto Varas, Chile, 9-14 September 2018 6 th Meeting of the Scientific Committee Puerto Varas, Chile, 9-14 September 218 SC6-Doc24 China s Annual Report, part II (Jumbo squid) Gang Li, Bilin Liu, Luoliang Xu & Xinjun Chen Annual Report of China

More information

Health & Safety Executive & QCF Regulated First Aid Training Courses To Meet All Your First Aid Requirements.

Health & Safety Executive & QCF Regulated First Aid Training Courses To Meet All Your First Aid Requirements. Crystal Clear 1 st Aid Training Ltd Unit 4D, Parkway Business Centre Parkway Rise Sheffield S9 4WQ Tel:- 07899033444 Email:- info@crystalclear1staidtraining.co.uk Web:- Health & Safety Executive & QCF

More information

FedRAMP Continuous Monitoring Performance Management Guide. Version 2.0

FedRAMP Continuous Monitoring Performance Management Guide. Version 2.0 FedRAMP Continuous Monitoring Performance Management Guide Version 2.0 January 31, 2018 DOCUMENT REVISION HISTORY DATE VERSION PAGE(S) DESCRIPTION AUTHOR 07/22/2015 1.0 All Initial document FedRAMP PMO

More information

10-CM Field Testing Project

10-CM Field Testing Project ICD-10 10-CM Field Testing Project National Committee on Vital and Health Statistics September 23, 2003 Nelly Leon-Chisen, RHIA American Hospital Association Sue Prophet-Bowman, RHIA American Health Information

More information

HEALTH CARE SYSTEMS RESEARCH NETWORK

HEALTH CARE SYSTEMS RESEARCH NETWORK IRB APPROVAL OF HCSRN MULTI-SITE RESEARCH: FREQUENTLY ASKED QUESTIONS (AND ANSWERS) The goal of SOP HCSRN-001,, is to make human subjects review as efficient and timely as possible, while still recognizing

More information

Safer Roads Humber Annual Safety Camera Progress Report April 2010 March 2011

Safer Roads Humber Annual Safety Camera Progress Report April 2010 March 2011 Safer Roads Humber Annual Safety Camera Progress Report April 2010 March 2011 www.saferroadshumber.com Published March 2012 CONTENTS Safer Roads Humber Camera Performance Summary... 1 Safer Roads Humber

More information

Suburban Friendship League

Suburban Friendship League 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Suburban Friendship League Frequently Asked Questions Regular Season Scheduling (February 1, 00) The following are a list of Frequently Asked Questions relating to regular season

More information

Review of Fatal Collisions

Review of Fatal Collisions Review of Fatal Collisions January to July 1 st 16 Review of 16 fatal collision statistics as of 1st July 16 Overview This report summarises the main trends in road fatalities that have emerged up to the

More information

Archery Australia Inc High Performance Committee

Archery Australia Inc High Performance Committee Policy Name: National High Performance Program (NHPP) - Recurve 2014 Responsibility Archery Australia Inc High Performance Committee Effective 1 st April 2014 Policy Number 1060 Version Version 3 CONTENTS

More information

British Rowing Report

British Rowing Report British Rowing Report Northern Rowing Council James Andrews & Jacqui Johnston March 2016 1 For Consideration at the meeting of the Northern Rowing Council to be held on 21st March 2016 Report of the Area

More information

Atlantic Striped Bass Draft Addendum V. Atlantic Striped Bass Board May 9, 2017

Atlantic Striped Bass Draft Addendum V. Atlantic Striped Bass Board May 9, 2017 Atlantic Striped Bass Draft Addendum V Atlantic Striped Bass Board May 9, 2017 Timeline May 2017: Consider Approval of Draft Addendum V for Public Comment May July 2017: Public Comment period August 2017:

More information

July 2015 Sept Cork City Pedestrian Counter Report

July 2015 Sept Cork City Pedestrian Counter Report July 2015 Sept 2015 Cork City Pedestrian Counter Report Disclaimer Cork City Council has produced this report based on information extracted from our Pedestrian Counter Monitoring System. Although care

More information

At each type of conflict location, the risk is affected by certain parameters:

At each type of conflict location, the risk is affected by certain parameters: TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.

More information

RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT

RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT September 218 RTC TRANSIT OPERATING STATISTICS REPORT TABLE OF CONTENTS RTC Transit Highlights... Page ii RTC Transit Summary...

More information