City of Albany. Bicycle Signage and Wayfinding Strategy JUNE 2013 PREPARED FOR: City of Albany

Size: px
Start display at page:

Download "City of Albany. Bicycle Signage and Wayfinding Strategy JUNE 2013 PREPARED FOR: City of Albany"

Transcription

1 City of Albany Bicycle Signage and Wayfinding Strategy JUNE 2013 PREPARED FOR: City of Albany PREPARED BY: Alta Planning + Design IN ASSOCIATION WITH: Creighton Manning Engineering

2

3 Acknowledgements CITY OF ALBANY Department of Development and Planning Doug Melnick, AICP, Director of Planning Kathleen Bronson, Principal Planner Kate Lawrence, Planner Engineering Division Randy Milano, City Engineer Police Department Bill Trudeau, Coordinator of Traffic Engineering Janet Zalatan ALBANY COUNTY Department of Public Health Charles Welge Suzanne Swan Department of Public Works James Mearkle CAPITAL DISTRICT REGIONAL PLANNING COMMISSION Todd Fabozzi CAPITAL DISTRICT TRANSPORTATION AUTHORITY Carrie Ward CAPITAL DISTRICT TRANSPORTATION COMMITTEE Jason Purvis Jennifer Ceponis NEW YORK STATE DEPARTMENT OF TRANSPORTATION Korie McAllister Susan Olsen ALBANY BICYCLING COALITION Don Odell COLLEGE OF SAINT ROSE Andrew Gravelle STATE UNIVERSITY OF NEW YORK AT ALBANY Mary Ellen Mallia CONSULTANT TEAM Alta Planning + Design Jeff Olson, Principal Phil Goff Lindsay Zefting Shannon Simms Creighton Manning Engineering Mark Sargent Kenneth Davis

4

5 Table of Contents 1 INTRODUCTION EXISTING CONDITIONS INVENTORY RELEVANT PLANNING DOCUMENTS GENERATORS OF BICYCLE TRAFFIC EXISTING BICYCLE CONDITIONS EXISTING WAYFINDING SIGNAGE WAYFINDING SIGNAGE SIGNAGE GUIDANCE ALBANY SIGNAGE IMPLEMENTATION APPENDIX A: PRIORITY ROUTE COST ESTIMATES...19 APPENDIX B: DETAILED PRIORITY ROUTE MAPS...33

6

7 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 1 Introduction The City of Albany Bicycle Signage and Wayfinding Strategy is part of a larger effort to promote bicycling as a healthy and sustainable mode of transportation in Albany. It is a follow-up to the Albany Bicycle Master Plan (2009). A Bike Share Feasibility Study is being produced in tandem with this report. The Bicycle Signage and Wayfinding Strategy included two public workshops. At the first workshop, attendees defined important routes and destinations in the city to be included in wayfinding signage. The Alta team presented a draft of the detailed signage plans for 11 priority routes for feedback at the second workshop. Along with input from the Bicycle Master Plan Implementation Plan Committee, and a review of adopted plans and policies, the feedback from both workshops helped to inform recommendations found in this document. This report includes an existing conditions inventory of relevant planning documents and analysis of bicycle traffic in Albany. The strategy also includes overall guidance on the type and design of proposed signage, as well as the identification of 11 priority wayfinding signage routes. Detailed maps and cost estimates for these routes are included in the Appendices to this report. Figure 1: Jeff Olson from Alta Planning + Design speaks at a public workshop at the College of St. Rose on January 24, P age

8 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 2 Existing Conditions Inventory In preparation for the bicycle-related signage and wayfinding recommendations, Alta reviewed relevant planning documents adopted by the City and conducted an inventory of existing conditions. This inventory included: generators of bicycle traffic (college campuses, parks, retail areas, etc.) existing bike accommodations both on-road (bike lanes and shared lane markings) and off-road (shared use paths and trails) existing signage within city limits 2.1 Relevant Planning Documents City of Albany Bicycle Master Plan (2009) The Bike Master Plan outlines a comprehensive strategy to encourage increased bicycling in the City of Albany. Seven key design ideas are presented to facilitate bicycle movements. These include major bikeways, neighborhood routes, multi-use trails, bike gutters on stairs, bikeable buses, a signage strategy, and bicycle parking in the City of Albany. The signage strategy recommends that bike route guide signs be located at decision points along designated bike routes. Signage should follow guidelines in the 2010 Manual for Uniform Control Devices (MUTCD). Specific recommendations include providing separate signing of bike routes for wayfinding, informational signage on distances and destinations, advanced trail signage, and a coherent and consistent system of signage that is easily identifiable. The Master Plan recommends a 20 Year Bikeway Network Plan that includes both major and neighborhood bikeways, as well as trails and greenways. Major bikeways are identified on major routes through the City. These routes include: Western Avenue, Madison Avenue, Washington Avenue, Central Avenue, New Scotland Avenue, Delaware Avenue, Whitehall Road, Clinton Avenue, Broadway, Green Street/South Pearl Street, Lark Street, Northern Boulevard/Manning Boulevard/Ten Broeck Street, Quail Street, Manning Boulevard, McCarty Avenue/Southern Boulevard, and Holland Avenue/Morton Avenue/Rensselaer Street. A variety of design options are proposed for these major bikeways, including shared lane markings and bike lanes. Albany 2030 Plan On Monday, April 2, 2012 the City of Albany Common Council voted unanimously to adopt the Albany 2030 Comprehensive Plan. This momentous vote officially established the first comprehensive plan in the City's 400 year history. The Albany 2030 Plan will greatly improve local quality of life for generations to come. In a tremendous demonstration of collaboration, thousands of community stakeholders from diverse backgrounds and neighborhoods came together to build consensus about their local priorities for the City of Albany. The Albany 2030 Plan and the City s Bicycle Master Plan are coordinated documents that create a guide for policy makers to make decisions on bicycle amenities, infrastructure and improvements. Albany 2030 built a framework for the City s future based on extensive research and community input. The Albany 2030 Plan identifies the need to promote multi-modal connections. Specific strategies include developing a Complete Streets policy and coordinating transportation investment to support preferred land uses. Improving the pedestrian environment is also a recommendation with strategies including maintaining and improving sidewalk connections and expanding greenways. Encouraging cycling to improve health and reduce 2 P age

9 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY vehicle miles travel is also recommended through promoting and implementing the Bicycle Master Plan, connecting regional trails, and educating cyclists and drivers. This sustainable approach will guide local (re)development and (re)investment in a manner that meets the needs of residents, businesses and stakeholders while maintaining and elevating the City s character, quality of life, and environmental and fiscal health. The interconnection of the various City systems is identified throughout the plan and summarized in Chapter 3.9 of the report. The Albany 2030 Plan identifies the correlations between transportation and other systems such as community form, the economy, natural resources, housing and neighborhoods, utilities and infrastructure, and institutions. City of Albany Neighborhood Plans Several localized neighborhood plans have been completed for areas within the City of Albany, such as the Arbor Hill and South End neighborhoods. The following is a list of the studies reviewed and summaries of the bicycle and wayfinding improvements they recommend. Hudson River Crossing Study (CDTC/NYSDOT, 2008) Bicyclist improvements on the Dunn Memorial Bridge and rehabilitation of the Livingston Avenue walkway. Lawn Avenue Gateway Design Study (Albany Housing Authority/CDTC, 2002) The presence of cyclists is acknowledged as an existing condition. North Swan Street Multi-modal Accessibility Study (City of Albany/Albany Housing Authority/CDTC, 2008) Construction of new sidewalks, street tree plantings, and crosswalks; return to two-way traffic. Pinebush Transportation Study Update (CDTC, 2004) Incorporation of Fuller Road and New Karner Road as part of the bicycle and pedestrian network. Capital South Plan: SEGway to the Future (City of Albany/South End Action Committee, 2007) Conversion of Morton Avenue to a pedestrian and bicycle-friendly boulevard from Lincoln Park to the Hudson River with continuous bike lanes and sidewalks. Create a link to the waterfront under I-787. Albany Education District Enhancement Study (City of Albany/CDTC, 2012) - Improve pedestrian and bicycle connections within the district, to local schools, and to retail centers. In addition to improved crosswalks, the installation of bicycle racks is also recommended. Harriman Campus University at Albany Transportation Linkage Study (CDTC, 2007) Examine potential to stripe a curb-side bicycle lane or shoulder on Fuller Road; improve wayfinding; create bicycle lanes on the Harriman Ring Road; improve non-motorized access at Brevator and Belvedere and along University Drive. 3 P age

10 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 2.2 Generators of Bicycle Traffic The City of Albany has a variety of institutions, schools, parks, commercial centers, and cultural destinations that generate existing bike traffic, or create the latent demand for future bicycling. One of the largest generators in the city is the Empire State Plaza and surrounding Capital buildings. Thousands of people travel to and from these buildings every day. Albany Medical Center and St. Peter s Hospital, both located in midtown Albany, are large generators, as are the few other large office complexes located around the City of Albany, specifically on Western Avenue Extension. There are also several colleges located within the City of Albany that become large generators during the school year. The University at Albany has its large main campus in the western portion of the city and a downtown campus near. The College of St Rose is located along Madison Avenue and Sage College is located near the Albany Medical Center. There are also several other significant open-space destinations within the City of Albany., Lincoln Park, 6 Mile Waterworks, the and the Pinebush Preserve are all popular recreational destinations. Retail centers are located throughout the City of Albany. There are several retail districts in the downtown area; along Lark Street, State Street, and N Pearl Street. Several other large retail centers are located along Central Avenue, Madison Avenue, and Washington Avenue Extension. In aggregate, the Generators of Bicycle Traffic are shown on the map on the following page. They are illustrated to help Alta and the project team understands areas of the city where bicyclists are currently riding and to indicate where future demand exists. This, in turn, helps to inform recommendations for bicycle wayfinding signage and other improvements. The map also includes existing locations of bike racks throughout the city. This too helps the project team comprehend where current demand exists for bicycle-related improvements and hints at areas where future use can be expected. 4 P age

11

12 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 2.3 Existing Bicycle Conditions There are several multi-use trails and bicycle accommodations throughout the City of Albany (see map on page 7). Multi-use trails are prevalent in both Washington and Lincoln parks, as well as the Pinebush Preserve. The Mohawk-Hudson Bike-Hike Trail is located along the Hudson River waterfront; the 10 wide asphalt trail starts near the Dunn Memorial Bridge and runs north through the city. An additional multi-use trail is located on the north side of Hackett Boulevard. The University at Albany has also created a greenway around the main campus. On-road bicycle accommodations are present on several roadways within the City. Shared lanes with sharrow markings exist on Washington Ave, Main St, Western Ave, Madison Ave, Delaware Ave, Academy Rd, New Scotland Ave and Lark Street. There are 5 foot bike lanes in either direction on Clinton Ave between Ten Broeck St and Lexington Avenue. There are several roadways that have been reconstructed to provide a wide 14 foot outside lane that provides some breathing room for bicyclists. These roadways include: Central Ave (Everett Rd to City line); Whitehall Rd (New Scotland to Cardinal); Western Ave (Manning to Brevator); Washington Ave (Jemain to ); and New Scotland Ave (I-87 to City line). There are two New York State Bike Routes (NYSBR) that transverse the City of Albany. NYS BR5 runs east to west from the Dunn Memorial Bridge, along Madison Ave and Western Ave to the City line. NYS BR9 runs north to south extending from the northern City line on Broadway to the Dunn Memorial Bridge. 2.4 Existing Wayfinding Signage A range of wayfinding signage is located throughout the City of Albany. Route information and vehicle signage is prevalent throughout the City. This includes regulatory signage, route markers, and both route and destination directional signage. Small bicycle markers are also located along the NYS Bike Routes. Additional on-road bicycle signage (such as share the road signs) are minimal throughout the city. In addition to wayfinding signage that is oriented to motor vehicles, there is pedestrian scale wayfinding signage located throughout the downtown district, specifically on North Pearl St and State St. These blue signs are located on the sidewalk (roughly 8 feet in height) and provide directions to local businesses and destinations, such as the. Various wayfinding and historic information signage is also located sporadically throughout the rest of the city. 6 P age

13

14 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 3 Wayfinding Signage The section begins with an introduction to bicycle wayfinding and its benefits, guidelines for bicycle wayfinding signage as outlined in the Manual for Uniform Control Devices (MUTCD), as well as the New York State Supplement to the MUTCD and the National Association of City Transportation Officials (NACTO) Urban Bikeway Design Guide. Further on, a summary of the eleven priority signage routes are included with detailed maps. A signage inventory and cost estimates are included for the routes in the appendix of this report. Signage can serve both wayfinding and safety purposes, including: Helping to familiarize users with the bikeway system; Helping users identify the best routes to significant destinations; Directing bicyclists to preferred routes; Helping to address misperceptions about time and distance; and Helping to overcome a barrier to entry for people who do not bicycle often, but who want to get started. Placing signs throughout the city indicating to bicyclists their direction of travel, the location of destinations, and the riding distance to those destinations will make the bicycle system more accessible to all users. To be most effective, wayfinding signage should be coupled with other bike-facility improvements along a given roadway, either striped bike lanes or, at a minimum, shared lane markings in the travel lane. Wayfinding signs also provide visual cues to motorists that they are driving along a bicycle route and should use caution. Signs are typically placed at key locations leading to and along bicycle routes, including the intersection of multiple routes. Choosing the right number of signs is important, since having too many road signs can clutter the right-of-way. It is recommended that bikeway signs be posted at a level most visible to bicyclists and pedestrians. 3.1 Signage Guidance Uniformity, legibility and adherence to existing standards are among the elements to consider when determining the appropriate wayfinding sign design for Albany. National, state, and local standards, along with local input, should guide the development of signage design. Specifically, the 2009 MUTCD and the New York State Supplement to the 2009 MUTCD provide the most relevant standards, while additional guidelines can be found in the NACTO Urban Bikeway Design Guide Signage Types Confirmation Signage: The purpose of confirmation signage is to indicate to cyclists and drivers that the roadway is a designated bikeway. Directional arrows should not be included on this type of signage. Placement should be every ¼ to ½ mile on off-street accommodations and every 2 to 3 blocks along onstreet bicycle accommodations, unless another type of sign is used (e.g., within 150 feet of a turn 8 P age Figure 2: Variety of Confirmation Signage

15 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY or destination sign). Confirmation signage should also be placed soon after turns to confirm destination(s). Pavement markings can also act as confirmation that a bicyclist is on a preferred route. The images in Figure 2 are examples of existing confirmation signage from different communities. Destination Signage: Turn Signs: The purpose of turn signs is to indicate a change in the bicycle route; where the bicycle route turns from one street onto another. Information should include destinations and arrows. Placement of turn signs should be located on the near-side of intersections where bike routes turn (e.g., where the street ceases to be a bicycle route or does not go through). Pavement markings can also indicate the need to turn to the bicyclist. Examples of turning signs from a few sources that conform to standards and guidelines are shown in Figure 3. Decision Signs: Figure 3: Turn Signs The purpose of decision signs is to mark the junction of two or more bikeways and to inform bicyclists of correct designated bike routes to access key destinations. It is recommended that decision signs include destinations, arrows, distances, and travel times. Placement of decision signs should be located on the near-side of intersections in advance of a junction with another bicycle route and along a route to indicate a nearby destination. The following are examples of decision signs that conform to standards and guidelines. Figure 5 exemplifies the placement of these types of signage locations at an intersection as outlined by the MUTCD. Figure 4: Decision Signs 9 P age

16 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY Design Guidance Bicycle Route Signage Figure 5: Example of Bicycle Guide Signing, Figure 9B-6 from the MUTCD The bicycle route signage standard contains a route destination and a green background with a retroreflective white legend and border. The signage shall also include a pictograph or words that are associated with the route or agency that has jurisdiction over the route, for example, the route name or identification as a New York State or City of Albany bicycle route. Bicycle route signage should establish continuous routing, and can be used with various types of bikeways. Auxiliary plaques indicate additional information about the bicycle route. Colors need to match the associated bicycle route sign. Junction, cardinal direction, and alternative route plaques should be mounted above the bicycle route sign, while advanced turn arrows and direction arrows should be mounted below the bicycle route sign. Auxiliary plaques with word legends should be a minimum of 12 x 6 inches and plaques with arrow symbols should be a minimum of 12 x 9 inches. Destination signs may also be mounted below the bicycle route signs. Figure 6 Figure 7 10 P age

17 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY Destination Signage Destination, or wayfinding, signage directs bicyclists to stay on bicycle routes or other routes. Wayfinding signage also directs users to different types of destinations such as commercial centers, schools, parks, and hospitals. Primary destinations, such as the downtown area, should be included on signage up to five miles away from the location. Secondary destinations may be included up to two miles away, while tertiary destinations that are more local in nature may be included on signage up to one mile way. In the future, signage can also help direct people to nearby bike share stations, if a system were to be implemented. Neighborhood Bikeway Signage & Pavement Markings Neighborhood bikeways are low-volume streets where motorists and bicyclists share the same space and generally travel at the same speed. There are several techniques for identifying and signing neighborhood bikeways. Street sign modification such as color coding or adding a bicycle symbol is an unobtrusive way of identifying a neighborhood greenway without adding new signage to the roadway. Traditional bicycle route signs as described above can also be used. Additional or different symbols are recommended to differentiate the neighborhood bikeway from other higher traffic bicycle routes. Pavement markings can be used in tandem with signage. Pavement markings are another way to identify routes and alert vehicles to the presence of bicyclists. Pavement markings can range from shared lane markings to small dots that measure a foot across to identify that the street is a designated neighborhood bikeway. These markings can also vary by route. Any signage or pavement markings that are non-standard require permission from New York State Department of Transportation and the Federal Highway Administration. Other Bicycle Route Signs There are other bicycle route signs that can be used to identify roadways as bicycle routes and warn drivers of the presence of bicyclists. The NYS supplement to the MUTCD does not allow for the use of "Bikes May Use Full Lane" signage. The preference is given to shared lane markings and "Share the Road" signage (MUTCD W16-1), which should be used when there is a need to warn motorists to watch for bicyclists, such as sharp curves or narrow lanes. "Share the road" signs must accompany a bicycle warning sign (MUTCD W11-1), as shown in Figure 8, and should be installed at least 50 feet prior to the condition that would warrant this additional alert to drivers. The "Share the road" signs can be used on their own, or in conjunction with the bicycle sign, as shown. Mile Markers Figure 8 Shared use paths should include mile markers that indicate direction or distance to the trail terminus, a trailhead or other access point. Mile markers are also helpful when providing locational information to maintenance crews or for emergency response. Mile markers are typically good locations to also post signs with phone number or addresses where someone can report any maintenance, security or safety issues along the path. 11 P age

18 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY Pavement Markings There are several options for bicycle pavement markings. Bicycle lane markings are used to designate a portion of the roadway for preferential use by bicyclists. According to MUTCD guidelines, longitudinal pavement markings must be used to define these bicycle lanes. Bicycle lane markings should be placed at the beginning of a bicycle lane, and at periodic intervals, based on engineering judgment. Markings and designations can be used approximately every 250 feet, and should be located prior to intersections and crossings. Bicycle lanes must not be positioned to the right of a right turn only lane or to the left of a left turn only lane, to avoid conflicts with turning vehicles. Shared lane markings are road markings used to indicate a shared lane environment for bicyclists and automobiles. According to the AASHTO Guide for the Development of Bicycle Facilties (2012), these markings are intended to alert all road users to the lateral position bicyclists are likely to occupy within the traveled way, therefore encouraging safer passing practices. The NACTO Urban Bikeway Design Guide additionally states that shared lane markings may be configured to offer directional or way finding guidance. Shared lane markings (SLM) cannot Figure 9 be used on shoulders or in designated bicycle lanes and should not be placed on roadways with a speed limit above 35 mph. Shared lane markings should be placed immediately after an intersection and spaced no greater than 250 feet thereafter. If used in a shared lane with parallel parking, shared lane markings should be placed so that the center of the markings are at least 11 feet from the face of the curb or the edge of the pavement. If the shared lane that sits adjacent to the parallel parking is less than 14 in width, one option is to place the SLM in the center of the travel lane. This configuration places the SLM between most vehicles wheel-wells and can therefore reduce wear and tear on the roadway marking. If no on-street parking is present, the center of the SLM should be at least 4 feet from the face of curb or edge of pavement. 12 P age Figure 10

19 3.2 Albany Signage This Strategy report recommends that Albany implement bicycle route signage along wayfinding routes throughout the City of Albany and identify priority destinations for cyclists. Signage design should include the identification of the bicycle route name (such as "Washington") and a list of key destinations along each route with directional arrows. The addition of mileage readings is intended to help bicyclists understand the approximate distance to each destination. ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY The Strategy also recommends that wayfinding signage should be coordinated in conjunction with other safety and accessibility improvements for bicyclists along the particular roadway. The wayfinding signage, therefore, should be considered one item within a toolbox of potential enhancements including shared lane markings ("sharrows"), bike lanes or other, more innovative facilities such as bicycle signals, cycle tracks and bike boxes. Figure 11 Ultimately, some type of signage should identify all of the routes indicated in the Albany Bike Master Plan. However, priority routes and destinations for wayfinding signage are identified below Wayfinding Routes Eleven priority wayfinding routes were identified through comments made at the September community workshop and in conversation with the study advisory committee. These routes run along a handful of key streets throughout the city, some with existing or planned bike facilities, some with low volumes and speeds, and some on busier streets without existing/planned shared lane markings or bike lanes. Signage is recommended at or near the City line wherever possible to help cyclists transition to or from Albany s adjacent communities. The priority routes are described below and identified on Map 3. Priority Routes 1. Western Avenue, Madison Avenue, Lark Street, Washington Avenue and State Street from University at Albany to the 2. Washington Avenue from University at Albany to Lark Street 3. Western Avenue from Madison Avenue to Washington Avenue 4. Broadway from City Line to State Street 5. Central Avenue from the City Line to Clinton Avenue 6. New Scotland Avenue from City Line to Madison Avenue 7. Manning Boulevard from New Scotland Avenue to Clinton Avenue 8. Clinton Avenue from Manning Boulevard to Broadway 9. Delaware Avenue from City Line to Madison Avenue 10. Lark Street from Washington Avenue to Livingston Ave 11. South Pearl Street from State Street to City Line 13 P age

20 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY If and when a bicycle route map is developed, this study recommends that the map be incorporated into public kiosks installed in key locations in the city, primarily at the intersections of the priority routes or at important destinations such as the University at Albany campus or City Hall (see Map 3 for proposed locations). QR codes can also be included on map kiosks and linked to an online interactive bicycle route and destination map Priority Destinations A number of priority destinations were also identified by participants in the community workshop. Priority destinations are those that should be highlighted by Figure 12: In key locations throughout Madison, wayfinding signage, on maps and directional signs. WI, map kiosks show the city-wide bicycle These included:, University at Albany network along with primary destinations (main and downtown campus), Empire State Plaza, Lark Street, miscellaneous grocery stores,, Albany Medical Center, College of Saint Rose and Central Avenue. These destinations are also highlighted in Map 1 on the following page. Other key destinations that should be noted include area hospitals, city schools, parks, government buildings, and other universities. Each destination that is identified should be given a hierarchy level to determine at what distance signage begins. 14 P age

21 Pine Ln Guilderland Legend Access Rd Rensselaer Lake Park & Preserve Access Rd Ramp New Scotland Rd Seneca Pl Fuller Rd Ramp Sawyer Pl Capital Hills Golf Course W Carillon Dr Glynn St Woodville Ave Priority Wayfinding Routes (with Detailed Signage Plans on following pages) Additional Major Bikeways or Trails/Greenways (per 2009 Albany Bicycle Master Plan) Potential Location for City-wide Bike Route Map Kiosk Key Destinations Oneil Rd I 90 I 87 Tudor Rd Cottage Ave I 90 Washington Ave Krumkill Rd State Hwy 85 Hurst Ave Bethlehem 1 2 Harriman Campus Oxford Rd Albany Buckingham Lake Park 7 S Main Ave Whitehall Rd I 87 Central Ave Manning Blvd Maria College Albany Public Library - Bach St. Peter s Hospital 6 I 87 Normanskill Farm Ramp 5 New Scotland Ave Helderberg Ave Hackett Blvd Ramp Westland Hills Park Pine Hills Library College of St. Rose Watervliet Ave 3 Albany Public Library - Delaware Graceland Cemetery 2nd Ave 1 9 Hoffman Park Colonie Anderson Dr Clinton Ave 1 8 3rd St Historic Cherry Hill 11 Southern Blvd 11 9 Albany Medical Center Sage College Albany Law School S Pearl St 8 I 90 Swinburne Park/ Bleecker Stadium Albany High School 12 I 90 Tivoli Preserve Lincoln Park/ City Pool Schuyler Mansion Albany Public Library - Howe I 787 Rail Trail Smith Blvd YMCA/Albany Public Library - North Albany Ramp Ramp 4 Ten Broeck Mansion Albany Bus Station Rensselaer US Hwy 9 Port of Albany Hackett Park Tivoli St N 3rd St Mohawk-Hudson Bike-Hike Trail USS Slater/ Dutch Apple Cruises 1. Palace Theater 2. Visitors Center/ Quackenbush Square 3. Capital Repertory Theater 4. Hudson River Walkway 5. City Hall 6. NYS Capitol 7. Albany Public Library - Main 8. Lark Street Central Ave Commercial Corridor 11. Downtown Campus 12. Albany Public Library - Arbor Hill/West Hill 13. Times Union Center 14. Empire State Plaza 15. Boys & Girls Club North Greenbush East Greenbush Map 3: Priority Routes for Wayfinding Signage City of Albany Bicycle Master Plan Implementation Source: Data obtained from City of Albany Author: Shannon Simms Date: 1/18/13 Port St I Miles

22 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 3.3 Implementation Wayfinding plans for the 11 priority routes have been developed to illustrate how and where bicycle wayfinding should be implemented on key bicycle routes throughout the city. The signage plans are shown in Appendix B. In addition, cost estimates were developed for materials and installation of the routes. Approximate quantities for each type of bicycle wayfinding signage have been developed based on bicycle route mileage proposed. Table 1 summarizes the cost for each route, and detailed cost estimates are included in Appendix A. Table 1: Cost Estimates for Materials and Installation of Priority Routes Route Description Endpoint 1 Endpoint 2 Number of Signs Total cost 1 Western Ave. / Madison Ave. / Lark St. / Washington Ave. / State St. University at Albany 28 $11,200 2 Washington Ave. University at Albany Lark St. 13 $5,400 3 Western Ave. Madison Ave. Washington Ave. 9 $3,800 4 Broadway City Line State St. 15 $6,000 5 Central Ave. City Line Clinton Ave. 3 $1,400 6 New Scotland Ave. City Line Madison Ave. 13 $5,400 7 Manning Blvd. New Scotland Ave. Clinton Ave. 8 $3,400 8 Clinton Ave. Manning Blvd. Broadway 10 $4,200 9 Delaware Ave. City Line Madison Ave. 13 $5, Lark St. Washington Livingston Ave. 6 $2, South Pearl St. State St. City Line 9 $3,800 TOTAL 127 $52, P age

23 Appendix A: Priority Route Cost Estimates 19 P age

24 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013 Albany Bicycle Linkage 28-Jun-13 Summary of Cost Estimates 28-Jun-13 Route # Description Segment Length Construction Cost Total Cost 1 to via. Western, Madison, Lark, Washington/State 5.0 $ 11, $ 11, Washington Ave: SUNY to Lark St 4.0 $ 5, $ 5, Western Ave: Madison Ave to Washington Ave 1.4 $ 3, $ 3, Broadway: City Line to End 1.3 $ 6, $ 6, Central Ave: City Line to Clinton Ave 1.6 $ 1, $ 1, New Scotland Ave: City Line to Madison Ave 4.2 $ 5, $ 5, Manning Blvd: New Scotland Ave to Clinton Ave 1.9 $ 3, $ 3, Clinton Ave: Manning Blvd to Broadway 2.0 $ 4, $ 4, Delaware Ave: City Line to Madison Ave 2.1 $ 5, $ 5, Lark St: Washington Ave to Livingston Ave 0.8 $ 2, $ 2, S.Pearl St: State St to City Line 2.3 $ 3, $ 3, TOTALS: $52, $52, Summary Page 1

25 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 1: to via. Western, Madison, Lark, Washington/State *Approximately 5.0 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ 4, Sign Posts - Type A w/ knockouts EA $ $ 4, All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $9, ROUNDED SUBTOTAL: $ 9,100 CONTINGENCY (10%) $ 1,000 MAINT.AND PROT. OF TRAFFIC (4%) $ 400 SURVEY AND STAKEOUT (2%) $ 200 MOBILIZATION (4%) $ 500 CONSTRUCTION TOTAL: $ 11,200 SOFT COSTS: DESIGN ENGINEERING (0%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 11,200 UAlb- Page 2

26 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 2: Washington Ave: SUNY to Lark St *Approximately 4.0 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ 1, Sign Posts - Type A w/ knockouts EA $ $ 2, All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $4, ROUNDED SUBTOTAL: $ 4,300 CONTINGENCY (10%) $ 500 MAINT.AND PROT. OF TRAFFIC (4%) $ 200 SURVEY AND STAKEOUT (2%) $ 100 MOBILIZATION (4%) $ 300 CONSTRUCTION TOTAL: $ 5,400 SOFT COSTS: DESIGN ENGINEERING (10%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 5,400 Washington Page 3

27 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 3: Western Ave: Madison Ave to Washington Ave *Approximately 1.4 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ 1, Sign Posts - Type A w/ knockouts EA $ $ 1, All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $2, ROUNDED SUBTOTAL: $ 3,000 CONTINGENCY (10%) $ 300 MAINT.AND PROT. OF TRAFFIC (4%) $ 200 SURVEY AND STAKEOUT (2%) $ 100 MOBILIZATION (4%) $ 200 CONSTRUCTION TOTAL: $ 3,800 SOFT COSTS: DESIGN ENGINEERING (10%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 3,800 Western Page 4

28 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 4: Broadway: City Line to End *Approximately 1.3 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ 2, Sign Posts - Type A w/ knockouts EA $ $ 2, All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $4, ROUNDED SUBTOTAL: $ 4,900 CONTINGENCY (10%) $ 500 MAINT.AND PROT. OF TRAFFIC (4%) $ 200 SURVEY AND STAKEOUT (2%) $ 100 MOBILIZATION (4%) $ 300 CONSTRUCTION TOTAL: $ 6,000 SOFT COSTS: DESIGN ENGINEERING (10%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 6,000 Broadway Page 5

29 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 5: Central Ave: City Line to Clinton Ave *Approximately 1.6 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ Sign Posts - Type A w/ knockouts EA $ $ All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $ ROUNDED SUBTOTAL: $ 1,000 CONTINGENCY (10%) $ 100 MAINT.AND PROT. OF TRAFFIC (4%) $ 100 SURVEY AND STAKEOUT (2%) $ 100 MOBILIZATION (4%) $ 100 CONSTRUCTION TOTAL: $ 1,400 SOFT COSTS: DESIGN ENGINEERING (10%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 1,400 Central Page 6

30 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 6: New Scotland Ave: City Line to Madison Ave *Approximately 4.2 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ 1, Sign Posts - Type A w/ knockouts EA $ $ 2, All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $4, ROUNDED SUBTOTAL: $ 4,300 CONTINGENCY (10%) $ 500 MAINT.AND PROT. OF TRAFFIC (4%) $ 200 SURVEY AND STAKEOUT (2%) $ 100 MOBILIZATION (4%) $ 300 CONSTRUCTION TOTAL: $ 5,400 SOFT COSTS: DESIGN ENGINEERING (10%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 5,400 New Scotland Page 7

31 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 7: Manning Blvd: New Scotland Ave to Clinton Ave *Approximately 1.9 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ 1, Sign Posts - Type A w/ knockouts EA $ $ 1, All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $2, ROUNDED SUBTOTAL: $ 2,600 CONTINGENCY (10%) $ 300 MAINT.AND PROT. OF TRAFFIC (4%) $ 200 SURVEY AND STAKEOUT (2%) $ 100 MOBILIZATION (4%) $ 200 CONSTRUCTION TOTAL: $ 3,400 SOFT COSTS: DESIGN ENGINEERING (10%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 3,400 Manning Page 8

32 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 8: Clinton Ave: Manning Blvd to Broadway *Approximately 2.0 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ 1, Sign Posts - Type A w/ knockouts EA $ $ 1, All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $3, ROUNDED SUBTOTAL: $ 3,300 CONTINGENCY (10%) $ 400 MAINT.AND PROT. OF TRAFFIC (4%) $ 200 SURVEY AND STAKEOUT (2%) $ 100 MOBILIZATION (4%) $ 200 CONSTRUCTION TOTAL: $ 4,200 SOFT COSTS: DESIGN ENGINEERING (10%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 4,200 Clinton Page 9

33 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 9: Delaware Ave: City Line to Madison Ave *Approximately 2.1 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ 1, Sign Posts - Type A w/ knockouts EA $ $ 2, All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $4, ROUNDED SUBTOTAL: $ 4,300 CONTINGENCY (10%) $ 500 MAINT.AND PROT. OF TRAFFIC (4%) $ 200 SURVEY AND STAKEOUT (2%) $ 100 MOBILIZATION (4%) $ 300 CONSTRUCTION TOTAL: $ 5,400 SOFT COSTS: DESIGN ENGINEERING (10%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 5,400 Delaware Page 10

34 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 10: Lark St: Washington Ave to Livingston Ave *Approximately 0.8 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ Sign Posts - Type A w/ knockouts EA $ $ 1, All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $1, ROUNDED SUBTOTAL: $ 2,000 CONTINGENCY (10%) $ 200 MAINT.AND PROT. OF TRAFFIC (4%) $ 100 SURVEY AND STAKEOUT (2%) $ 100 MOBILIZATION (4%) $ 100 CONSTRUCTION TOTAL: $ 2,500 SOFT COSTS: DESIGN ENGINEERING (10%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 2,500 Lark Page 11

35 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013 Albany Bicycle Linkage 28-Jun-13 Description of Major Improvements: Route 11: S.Pearl St: State St to City Line *Approximately 2.3 miles Approximate ROW required: SF Acres ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL Signs EA $ $ 1, Sign Posts - Type A w/ knockouts EA $ $ 1, All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $2, ROUNDED SUBTOTAL: $ 3,000 CONTINGENCY (10%) $ 300 MAINT.AND PROT. OF TRAFFIC (4%) $ 200 SURVEY AND STAKEOUT (2%) $ 100 MOBILIZATION (4%) $ 200 CONSTRUCTION TOTAL: $ 3,800 SOFT COSTS: DESIGN ENGINEERING (10%) $ - CONSTRUCTION INSPECTION (0%) $ - PROJECT TOTAL: $ 3,800 S.Pearl Page 12

36 Appendix B: Detailed Priority Route Maps 33 P age

37 5 Tudor Road State Campus Road Harriman Campus mi. Harriman Campus Western Avenue 5 Harriman Campus 0.8 mi. 4.9 mi. 4.4 mi. Magazine Street Russell Road mi. 3.7 mi. Harriman Campus Daytona Avenue Route 85 Belvidere Avenue Western Avenue Winthrop Avenue Manning Boulevard mi. Pine Hills Library Pine Hills Library North Main Avenue 5 College of St. Rose 2.1 mi. College of St Rose Colonial Avenue Euclid Avenue Manning Boulevard 5 College of St Rose 0.2 mi. 3.0 mi. 2.5 mi. Pine Hills Library mi. 1.8 mi. College of St Rose Route 1: Western Ave./Madison Ave./Lark St./Washington Ave./State St./ from to City of Albany Bicycle Master Plan Implementation Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Match Line Destinations Feet

38 Partridge Road uail S Lake Street Avenue Quail Stree Road mi. College of Saint Rose mi. Albany Medical Center 0.3 mi. LARK STREET Albany Medical Center 1.0 mi. 3.5 mi. Q t Madison Avenue Delaware Avenue mi. 2.0 mi. Lark Street 0.9 mi mi. Albany Medical Center 0.3 mi. N ew Scotland 5 Lark Street 1.4 mi. Albany Public Library - Delaware 0.9 mi. WASHINGTON Lark Street 3.9 mi. Albany Public Library - Main Lark Street LARK STREET Empire State Plaza 0.4 mi. 1.1 mi. 0.6 mi. Albany Public Libary - Main Branch LARK STREET NYS Capitol 0.3 mi. 1.1 mi. 0.6 mi. Washington Avenue State Street South Swan Street NYS Capitol CAPITOL HILL / Waterfront 0.6 mi. CAPITOL HILL Route 1 (con t): Western Ave./Madison Ave./Lark St./Washington Ave./State St./ from to City Hall / Waterfront 0.6 mi. City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet Eagle Street CAPITOL HILL NYS Capitol 4.5 mi. City Hall CAPITOL HILL 0.4 mi. Times Union Center South End 2.2 mi. CAPITOL HILL NYS Capitol 0.3 mi. South End 2.2 mi. State Street South Pearl Street 9 Albany Bus Station 0. 2 mi. NYS Capitol 0. 3 mi. M ain Campus 4. 7 mi. CAPITOL HILL Corning Prese rve/ Waterfront 0.3 mi. Albany Bus Station 0.2 mi. NYS Capitol 0.4 mi. M ain Campus 4. 8 m i. 9 / Waterfront 0.2 mi. Broadway 0.6 mi. 5.0 mi. Town of Menands 3 mi. City of Troy 6 mi.

39 Brevator Street Hawthorne Street North Allen Street I - 90 WASHINGTON Rensselaer Lake Park and Preserve 0.8 mi. Washington Avenue Campus Access Road WASHINGTON Harriman Campus 0.4 mi. 4.2 mi. Downtown Campus 3.1 mi. WASHINGTON 3.6 mi. Downtown Campus 2.7 mi. Harriman Campus Harriman Campus WASHINGTON 1.3 mi. Rensselaer Lake Park and Preserve 2.1 mi. Harriman Campus 0.3 mi. Colvin Avenue Lincoln Avenue WASHINGTON 1.8 mi. St. Peter s Hospital 1.2 mi. Swinburne Park / Bleeker Stadium 0.6 mi. Manning Boulevard Washington Avenue Harriman Campus WASHINGTON 2.9 mi. Downtown Campus 1.8 mi. 2.1 mi. WASHINGTON Downtown Campus 1.3 mi. Swinburne Park / Bleeker Stadium 0.6 mi. St. Peter s Hospital 1.2 mi. M anning Boulevard Route 2: Washington Avenue City of Albany Bicycle Master Plan Implementation Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Match Line Destinations Feet

40 Partridge Street Robin Street Quail Street Kent Street WASHINGTON Harriman Campus 1.1 mi. 2.4 mi. West Street Central Avenue WASHINGTON Rensselaer Lake Park and Preserve 4.1 mi. 3.1 mi. Downtown Campus WASHINGTON Downtown Campus 0.2 mi. 3.3 mi. Washington Avenue Downtown Campus WASHINGTON 1.7 mi. Downtown Campus 0.7 mi. / Waterfront 2.3 mi. Western Avenue WASHINGTON / NYS Capitol 0.8 mi. 0.2 mi. Downtown Campus WASHINGTON / NYS Capitol 1.0 mi. / Waterfront 1.8 mi. 0.1 mi. Route 2 (con t): Washington Avenue City of Albany Bicycle Master Plan Implementation Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Match Line Destinations Feet

41 Belvidere Avenue Winthrop Avenue WESTERN 1.9 mi. Pine Hills Library WESTERN Pine Hills Library 2.0 mi. Western Avenue Pine Hills Library Western Avenue Colonial Avenue Euclid Avenue Manning Boulevard WESTERN 2.6 mi. 1.0 mi. / NYS Capitol 1.8 mi. Madison Avenue Washington Avenue Central Avenue Quail Street WESTERN 3.0 mi. WESTERN 3.2 mi. Central Avenue Commercial Corridor WESTERN Rensselaer Lake Park & Preserve 5.0 mi. 3.4 mi. Western Avenue Ontario Street Quail Street South Lake Street WESTERN / NYS Capitol 0.8 mi. Englewood Place WESTERN NYS Capitol 0.6 mi. Central Avenue Commercial Corridor WESTERN / NYS Capitol 0.5 mi. 1.3 mi. Lark Street Route 3: Western Ave. City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

42 9 Town of Menands Broadway 9 YMCA/ Library 0.4 mi. Hackett Park 0.5 mi. 2.1 mi. Lawn Avenue YMCA / Library mi. YMCA/ Library/ Hackett Park Erie Street Tivoli Street Broadway 9 YMCA/ Library/ Hackett Park 1.0 mi. Ten Broeck Mansion 0.2 mi. North 1st Street 9 Town of Menands 0.5 mi. YMCA/ Library/ Hackett Park 0.1 mi. Route 4: Broadway Hackett Park Loundonville Road Tivoli Street mi. Ten Broeck Mansion 0.2 mi. Ten Broeck Mansion City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet Livingston Avenue

43 9 North Albany Palace Theatre 0.1 mi. Swimburne Park 2.0 mi. Broadway 9 NYS Capitol 0.4 mi. 1.5 mi. 9 / Waterfront mi. NYS Capitol 0.3 mi. 1.5 mi mi. Albany Bus Station Dunn Memorial Bridge mi. Palace Theatre 0.1 mi. Swinburne Park 2.1 mi. Palace Theatre Clinton Avenue mi. / Waterfront 0.2 mi. 9 Albany Bus Station 0.2 mi. NYS Capitol 0.3 mi. 1.5 mi. State Street 9 USS Slater/ Dutch Apple Cruises 0.5 mi. Albany Bus Station Albany Bus Station Route 4 (con t): Broadway City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

44 North Manning Boulevard Central Avenue C ENTRAL AVE Westland Hills Park Road Everett Avenue Austain Westland Hills Park CENTRAL AVE Swinburne Park/ Bleeker Stadium 1.1 mi. Westland Hills Park Avenue Colvin 2nd Street CLINTON AVE Westland Hills Park Swinburne Park / Bleeker Stadium CLINTON AVE Swinburne Park / Bleeker Stadium Clinton Avenue Central Avenue CENTRAL AVE Swinburne Park / Bleeker Stadium 0.2 mi. Route 5: Cental Ave. and Route 8: Clinton Ave. Manning Boulevard CLINTON AVE Palace Theatre 1.6 mi. Swinburne Park / Bleeker Stadium Quail Street Central Avenue City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

45 Route 85 Wood Terrace New Scotland Avenue McCormack Road NEW SCOTLAND St. Peter s Hospital 1.9 mi. 3.7 mi. 5.4 mi. Buckingham Drive NEW SCOTLAND Capital Hills Golf Course 2.5 mi. 4.6 mi. NYS Thruway (I-87) New Scotland Avenue NEW SCOTLAND Capital Hills Golf Course 0.8 mi. Capital Hills Golf Course Whitehall Road Hurst Avenue Route 6: New Scotland Rd. City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

46 Maria College NEW SCOTLAND Albany Medical Center 1.5 mi. Swinburne Park 1.8 mi. St Peter s Hospital/ Maria College Manning Boulevard NEW SCOTLAND Capital Hills Golf Course 1.2 mi. St. Peter s Hospital/ Maria College Swinburne Park 1.8 mi. St. Peter s Hospital New Scotland Avenue South Main Avenue South Main Avenue Albany Public Library - Bach Branch NEW SCOTLAND Albany Medical Center 1.0 mi. 1.3 mi. Albany Public Library - Bach NEW SCOTLAND St. Peter s Hospital 0.5 mi. Capital Hills Golf Course 1.4 mi. Albany Public Library - Bach Hollywood Avenue Parkwood Street NEW SCOTLAND Albany Medical Center 0.8 mi. 1.1 mi. 2.6 mi. Myrtle Avenue Washington Park Quail Street NEW SCOTLAND South Lake Avenue New Scotland Avenue St. Peter s Hospital 1.0 mi. Sage College Albany Medical Center NEW SCOTLAND St. Peter s Hospital 1.5 mi. Albany Law School Albany Medical Center Madison Avenue Grove Avenue Route 6 (con t): New Scotland Rd. Sage College Albany Law School City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet Holland Avenue Myrtle Avenue NEW SCOTLAND 3.2 mi. 1.4 mi. Lark Street NEW SCOTLAND Albany Medical Center 0.3 mi. 0.6 mi. Sage College NEW SCOTLAND 0.3 mi. Albany Medical Center Albany Law School

47 Maria College MANNING BLVD St Peter s Hospital/ Maria College Albany Medical Center 1.5 mi. Manning Boulevard Marion Avenue MANNING BLVD St. Peter s Hospital 0.8 mi. 2.5 mi. 2.5 mi. St Peter s Hospital MANNING BLVD Swinburne Park 1.8 mi. Albany Medical Center 1.5 mi. Road N ew Scotland Bower Street MANNING BLVD St Peter s Hospital 1.2 mi. 1.8 mi. Mercer Street Myrtle Avenue MANNING BLVD Swinburne Park / Bleeker Stadium 1.0 mi. 1.8 mi. 2.5 mi. Western Avenue Manning Boulevard MANNING BLVD Swinburne Park / Bleeker Stadium 0.6 mi. 1.8 mi. Manning Boulevard Washington Avenue North Allen Street Central Avenue MANNING BLVD St Peter s Hospital 1.8 mi. Capital Hills Golf Course 3.1 mi. North Manning Boulevard Swinburne Park / Bleeker Stadium Lancaster Street MANNING BLVD Swinburne Park / Bleeker Stadium Route 7: Manning Blvd. City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

48 Henry Johnson Boulevard CLINTON AVE Swinburne Park 1.5 mi. CLINTON AVE Swinburne Park 1.9 mi. Albany Public Library - Main 0.3 mi. Albany Medical Center 1.7 mi. Lark Street 2nd Street Ten Broeck Street Palace Theatre Palace Theatre CLINTON AVE Swinburne Park/ Bleeker Stadium 2.0 mi. Broadway Clinton Avenue Clinton Avenue CLINTON AVE Palace Theatre 1.0 mi. 1.4 mi. Avenue Lexington CLINTON AVE Palace Theatre 0.6 mi. 1.0 mi. Albany Medical Center 1.7 mi. Lark Street South Swan Street CLINTON AVE 0.4 mi. 0.2 mi. Palace Theatre CLINTON AVE Mohawk-Hudson Bike-Hike Trail 0.6 mi. 0.4 mi. Route 8 (con t): Clinton Ave. City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

49 DELAWARE Normanskill Farm DELAWARE Town of Delmar Normanskill Farm DELAWARE Normanskill Farm 0.2 mi. Graceland Cemetey Delaware Avenue Graceland Cemetery 0.6 mi. Albany School of Humanities 0.3 mi. Myers Middle School 0.5 mi. DELAWARE Federal Street Albany Public Library - Delaware Branch DELAWARE Albany Medical Center 0.9 mi. Albany Public Library - Delaware Graceland Cemetary 0.2 mi. 2.0 mi. Normanskill Farm DELAWARE Graceland Cemetery 1.0 mi. Town of Delmar 1.2 mi. Albany Public Library - Delaware DELAWARE Albany Medical Center 1.9 mi. 2.0 mi. Graceland Cemetery Graceland Cemetery DELAWARE 0.8 mi. Albany Medical Center 0.5 mi. Boys & Girls Club/ Lincoln Park 0.5 mi. DELAWARE Albany Public Library - Delaware 0.4 mi. Boys & Girls Club/ Lincoln Park 0.5 mi. Albany Medical Center 0.5 mi. Holland Avenue McAlpin Street Albany Medical Center / Albany Law School / Sage College of Albany Delaware Avenue Myrtle Avenue DELAWARE DELAWARE Myrtle Avenue Lincoln Park & City Pool Myrtle Avenue Lincoln Park & City Pool DELAWARE Albany Medical Center 1.3 mi. Albany School of Humanities 0.3 mi. Myers Middle School 0.5 mi. DELAWARE Madison Avenue 3.5 mi. Second Avenue LARK STREET Albany Medical Center 1.0 mi. 3.5 mi. Lark Street Route 9: Delaware Ave. and Route 10: Lark St. City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

50 Lark Street LARK STREET Albany Medical Center 1.4 mi. Albany Pubic Library - Main NYS Capitol 0.3 mi. LARK STREET Palace Theatre 0.6 mi. Albany Medical Center 1.7 mi. Swinburne Park/ Bleeker Stadium 1.9 mi. N. M anning Boulevard LARK STREET Arbor Hill 0.7 mi. Empire State Plaza 0.4 mi. 1.1 mi. LARK STREET Arbor Hill 0.7 mi. NYS Capitol 0.3 mi. 1.1 mi. Washington Avenue Albany Public Library - Main Branch LARK STREET Swinburne Park / Bleeker Stadium 1.9 mi. Palace Theatre 0.6 mi. Clinton Avenue 2nd Street Lark Street Livingston Avenue Route 10 (con t): Lark St. City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

51 Broadway SOUTH PEARL NYS Capitol 0.2 mi. 1.0 mi. 0.4 mi. South Mall Arterial SOUTH PEARL Times Union Center 0.1 mi. 0.7 mi. Empire State Plaza 0.4 mi. Westerlo Street South Pearl Street Rensselaer Street SOUTH PEARL / Albany Public Library - Howe Schuyler Mansion 0.1 mi. Albany Public Library - Howe Branch 4th Avenue Broad Street I State Street Times Union Center SOUTH PEARL Schuyler Mansion 0.4 mi. Rail Trail 1.6 mi. Empire State Plaza 0.4 mi. Madison Avenue SOUTH PEARL Albany Public Library - Howe Rail Trail 1.3 mi. Schuyler Mansion 0.1 mi. Morton Avenue Schuyler Mansion 3rd Avenue SOUTH PEARL Rail Trail 0.7 mi. Historic Cherry Hill 1st Avenue Port of Albany South Port Road SOUTH PEARL I SOUTH PEARL / Historic Cherry Hill Schuyler Mansion 0.7 mi. Historic Cherry Hill 1.1 mi. / Port of Albany Corning Hill Road Historic Cherry Hill McCarty Avenue SOUTH PEARL Rail Trail South Pearl Street Rail Trail South Pearl Street SOUTH PEARL Port of Albany Route 11: South Pearl St. SOUTH PEARL Rail Trail City of Albany Bicycle Master Plan Implementation - Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line Source: Imagery obtained from NYS GIS Clearinghouse Author: Lindsay Zefting Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

Appendix C. Bicycle Route Signage

Appendix C. Bicycle Route Signage Appendix C Bicycle Route Signage This page intentionally left blank. APPENDIX C - BICYCLE ROUTE AND WAYFINDING SIGNAGE Bicycle route signs are wayfinding signs that guide bicyclists along preferred, designated

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

Appendix F: Wayfinding Protocol and Best Practices

Appendix F: Wayfinding Protocol and Best Practices Appendix F: Wayfinding Protocol and Best Practices Table of Contents Introduction... 259 Current Practice... 259 Policy and Regulatory Framework... 260 Best Practices... 262 Chicago, IL... 262 Seattle,

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

BIKE PLAN CONTENTS GATEWAY

BIKE PLAN CONTENTS GATEWAY CONTENTS Acknowledgments...vii Great Rivers Greenway District Board of Directors... vii Great Rivers Greenway District Staff... vii Project Consultants... vii Committees... viii Citizens Advisory Committee

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan Appendix A Knoxville TPO Greenway Signage Guidelines 75 Overview: Adequate signing and marking are essential on shared-use paths, especially to alert bicyclists to potential conflicts and to convey regulatory

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed

More information

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet

More information

Appendix D. City of Fort Collins Bicycle Wayfinding System Guidance. Appendix D: Bicycle Wayfinding System Guidance Final Draft 11/20/2014 1

Appendix D. City of Fort Collins Bicycle Wayfinding System Guidance. Appendix D: Bicycle Wayfinding System Guidance Final Draft 11/20/2014 1 Appendix D City of Fort Collins Bicycle Wayfinding System Guidance Appendix D: Bicycle Wayfinding System Guidance Final Draft 11/20/2014 1 1 -- Introduction A network of signed bicycle routes will contribute

More information

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST. VISION, MISSION, AND GOALS AND OBJECTIVES Chapter 3 The Plan s vision, mission, and goals and objectives were developed through a series of interactive exercises with the Citizens Advisory Committee (CAC)

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

FEDERAL HIGHWAY ADMINISTRATION APPLICATION FEDERAL HIGHWAY ADMINISTRATION APPLICATION REQUEST FOR PERMISSION TO EXPERIMENT WITH A BICYCLE BOX INTERSECTION TREATMENT Submitted by: City of Columbus Department of Public Service Date: June 26, 2009

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

Chapter 9: Pedestrians and Bicyclists

Chapter 9: Pedestrians and Bicyclists Chapter 9: Pedestrians and Bicyclists Walking and bicycling are essential modes of transportation. These modes allow people to travel without contributing to congestion and air pollution, to access other

More information

Broad Street Bicycle Boulevard City Council Study Session Summary

Broad Street Bicycle Boulevard City Council Study Session Summary Broad Street Bicycle Boulevard City Council Study Session Summary Overview: On August 15 th, 2017, a City Council Study Session was held to invite community input and request City Council guidance on a

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

ACTIVE TRANSPORTATION

ACTIVE TRANSPORTATION ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE G AT E WAY PLAN GATEWAY BIKE Community BRIEFING KIT PLAN August 2016 TABLE OF CONTENTS INTRODUCTION... 1 THE BENEFITS OF A BIKEABLE COMMUNITY... 2 ECONOMY...2 SAFETY...3 HEALTH...3 HOUSEHOLD SPENDING...3

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements 1836 Blake Street Denver, CO 80202 720.524.7831 ww.altaplanning.com MEMO 3 Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements Based on field reconnaissance, best practices

More information

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

Connecting cyclists to work. Syracuse Metropolitan Transportation Council Connecting cyclists to work Syracuse Metropolitan Transportation Council Overview Prepared at request: NYS Department of Transportation (NYSDOT) Project Achievements Target group Purpose Process Recommendations

More information

On Road Bikeways Part 1: Bicycle Lane Design

On Road Bikeways Part 1: Bicycle Lane Design On Road Bikeways Part 1: Bicycle Lane Design Presentation by: Nick Jackson Bill Schultheiss, P.E. September 04, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar

More information

Section 9A.07 Meaning of Standard, Guidance, Option, and Support

Section 9A.07 Meaning of Standard, Guidance, Option, and Support 2012 Edition Page 895 PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES CHAPTER 9A. GENERAL Section 9A.01 Requirements for Bicyclist Traffic Control Devices 01 General information and definitions concerning

More information

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:

More information

Perryville TOD and Greenway Plan

Perryville TOD and Greenway Plan Perryville TOD and Greenway Plan Greenway Glossary Pathway: A bicycle and pedestrian path separated from motorized vehicular traffic by an open space, barrier or curb. Multi-use paths may be within the

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Chapter Table of Contents THE 2017 HOUSTON BIKE PLAN 1-1 HOUSTON BIKEWAYS PROGRAM 1-2 HISTORY OF BICYCLE PLANNING IN HOUSTON 1-3 BICYCLE LEVEL OF COMFORT 1-3 EXISTING PLANS, PROGRAMS

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

Bowman-Melton Associates, Inc. june 2011

Bowman-Melton Associates, Inc. june 2011 2011 dallas bike plan ADDENDUM Bowman-Melton Associates, Inc. Complete Streets Initiative Design and policy guidance june 2011 2 2011 Dallas Bike Plan Complete Streets Initiative Design and Policy Guidance

More information

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Sarah Rocchi, Vice-President, Projects, Opus International Consultants (Main Presenter) Catherine Mohoruk,

More information

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017 Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we

More information

Appendix C 3. Bicycle / Pedestrian Planning

Appendix C 3. Bicycle / Pedestrian Planning Appendix C 3. Bicycle / Pedestrian Planning BICYCLE/PEDESTRIAN PLANNING 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city-wide

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

(This page left intentionally blank)

(This page left intentionally blank) (This page left intentionally blank) 2011 Edition- Revision 2 Page 813 CHAPTER 9A. GENERAL Section 9A.01 Requirements for Bicyclist Traffic Control Devices 01 General information and definitions concerning

More information

TRAFFIC CONTROLS FOR BICYCLE FACILITIES

TRAFFIC CONTROLS FOR BICYCLE FACILITIES PART IX. TRAFFIC CONTROLS FOR BICYCLE FACILITIES A. GENERAL 9A-1 Requirements for Bicyclist Traffic Control Devices Traffic control devices, whether they are intended for motorists or bicyclists, must

More information

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation

More information

Planning Guidance in the 2012 AASHTO Bike Guide

Planning Guidance in the 2012 AASHTO Bike Guide Planning Guidance in the 2012 AASHTO Bike Guide Presentation by: RJ Eldridge Peter Lagerwey August 22, 2012 WEBINAR 2: PLANNING GUIDANCE IN THE 2012 AASHTO BIKE GUIDE Today s Webinar Significant Updates

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN Americans Want Choices 55% of Americans would rather drive less & walk more. Transit use is growing faster than population or highway travel.

More information

AGENDA ITEM G-2 Public Works

AGENDA ITEM G-2 Public Works AGENDA ITEM G-2 Public Works STAFF REPORT City Council Meeting Date: 12/6/2016 Staff Report Number: 16-214-CC Regular Business: Approve the Oak Grove University Crane Bike Improvement Concept Plan, authorize

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

2.0 Existing Conditions

2.0 Existing Conditions 20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural

More information

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process Bicycle Transportation Plan Summary Madison Urban Area and Dane County Introduction September 2000 Bicycling is an important mode of transportation in the Madison urban area and countywide that is available

More information

Community Bicycle Planning

Community Bicycle Planning Community Bicycle Planning City of Mentor s Bicycle Facility Plan Allen E. Pennington, P.E. Civil Engineer - Traffic Office of the Mentor City Engineer Why has Mentor participated in bicycle planning?

More information

Construction Specifications Manual

Construction Specifications Manual Isle of Wight County Pedestrian and Bicycle Master Plan Construction Specifications Manual Adopted August 20, 2009 Introduction The Isle of Wight County Pedestrian and Bicycle Facilities Master Plan was

More information

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan... BICYCLE AND This plan was created through a grant from the Healthy Communities Program with the cooperation of the City of Cynthiana, Cynthiana Main Street, Cynthiana-Harrison County-Berry Joint Planning

More information

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements Recommendations on Pedestrian and Bicycle Infrastructure Improvements July 2017 Plan Development: Our committee consisted of seven individuals appointed by the Mayor and Village Board. Those members included:

More information

Shifting Gears for a Healthier City

Shifting Gears for a Healthier City Shifting Gears for a Healthier City Mississauga s Cycling Master Plan is an ambitious strategy that sets out to transform Mississauga into a city that is conducive to cycling for daily transportation needs.

More information

INDOT Complete Streets Guideline & Policy

INDOT Complete Streets Guideline & Policy INDOT Complete Streets Guideline & Policy INTRODUCTION The Complete Streets guidelines build upon multiple efforts and promote a multimodal transportation system that is integrated and sustains land use

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

LANCASTER CITY BICYCLE NETWORK

LANCASTER CITY BICYCLE NETWORK LANCASTER CITY BICYCLE NETWORK Downtown Merchants Meeting Wednesday, July 19, 2017 http://www.lancasteratp. DOWNTOWN WALKABILITY ANALYSIS What changes can be made, in the least amount of time, and for

More information

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists Cyclists and Bikeways: What s your match? guide to bikeway options for a variety of cyclists The workshop and this resource were made possible by funding from the Province of Ontario via the Ministry of

More information

TRAFFIC CONTROLS FOR BICYCLE FACILITIES

TRAFFIC CONTROLS FOR BICYCLE FACILITIES Part 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS Chapter 9A. GENERAL Page Section 9A.1 Requirements for Bicyclist Traffic Control Devices............................. 9A-1 9A.2 Scope.................................................................

More information

Hennepin County Bicycle and Pedestrian Planning

Hennepin County Bicycle and Pedestrian Planning Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion

More information

Dowling/Beaty Cycling Route

Dowling/Beaty Cycling Route Public Meeting #2 Dowling/Beaty Cycling Route May 17, 2017 6:00 p.m. 8:00 p.m. Parkdale Public Library - Auditorium 1303 Queen Street West How to Participate Share your questions, ideas and concerns We

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN WELCOME! PLEASE FEEL FREE TO REVIEW THE EXHIBITS THE PRESENTATION WILL BEGIN AT 6:00 PM VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT EXISTING CONDITIONS REPORT AND PUBLIC MEETING WELCOME!

More information

MnDOT Implementation of Complete Streets Policy. January 2014

MnDOT Implementation of Complete Streets Policy. January 2014 MnDOT Implementation of Complete Streets Policy January 2014 1 Prepared by Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000 Toll-Free:

More information

Safe Routes to School Action Plan Aberdeen, Idaho

Safe Routes to School Action Plan Aberdeen, Idaho Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community

More information

TABLE OF CONTENTS. Executive Summary

TABLE OF CONTENTS. Executive Summary Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting

More information

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES December 2018 TABLE OF CONTENTS I. Executive Summary 3 II. When Is A Bicycle Pedestrian Transit Assessment (BPTA) Required? 4 III.

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Goodlettsville Bicycle and Pedestrian Plan Executive Summary Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities

More information

Ulster County Non-motorized Transportation Plan

Ulster County Non-motorized Transportation Plan Ulster County Non-motorized Transportation Plan NTAC Meeting NOTES Ulster County Community College Date 08.29.07 Time: 1:00 p.m. - 3:00 p.m. Agenda Welcome /Intro Project Status Report o Project is on

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

Chapter PERFORMANCE MEASURES AND ACCOUNTABILITY. Introduction

Chapter PERFORMANCE MEASURES AND ACCOUNTABILITY. Introduction PERFORMANCE MEASURES AND ACCOUNTABILITY Introduction Performance measures are helpful in evaluating the progress being made toward achieving the goals and objectives of the Gateway Bicycle Plan. The Plan

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Coweta Community Overview Coweta Coweta, a residential community located in Wagoner County, is a suburb of Tulsa situated southeast of the metropolitan area

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

Bicycling Routes on Provincial Roads Policy

Bicycling Routes on Provincial Roads Policy Bicycling Routes on Provincial Roads Policy Policy Statement Rationale To support bicycling in Nova Scotia, the Department of Transportation and Infrastructure Renewal (TIR) may designate some portions

More information

The 2012 AASHTO Bike Guide: An Overview

The 2012 AASHTO Bike Guide: An Overview The 2012 AASHTO Bike Guide: An Overview Presentation by: Jennifer Toole, AICP, ASLA Peter Lagerwey August 10, 2012 {Enter Module Name on Master Slide} WEBINAR #1: OVERVIEW OF 2012 AASHTO BIKE GUIDE Today

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,

More information

Appendix A: Crosswalk Policy

Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework

More information

PROJECT BACKGROUND/DESCRIPTION

PROJECT BACKGROUND/DESCRIPTION SCOPE OF SERVICES St. Charles Parish Comprehensive Pedestrian and Bicycle Master Plan (CPBP) St. Charles Parish, Louisiana State Project No. H. 012462 RPC Project No. SCPBMP1 PROJECT BACKGROUND/DESCRIPTION

More information

OBJECTIVE: Improve safety by designing all bicycle facilities to the latest AASHTO bicycle guidelines and 2009 MUTCD Standards.

OBJECTIVE: Improve safety by designing all bicycle facilities to the latest AASHTO bicycle guidelines and 2009 MUTCD Standards. DESIGN AND APPLICATION OF GUIDELINES AND STANDARDS The Citizen Advisory and Technical Advisory Committees identified improving safety by providing consistent bicycle facilities throughout the region as

More information

Multimodal Through Corridors and Placemaking Corridors

Multimodal Through Corridors and Placemaking Corridors 68 Multimodal Through Corridors and Placemaking Corridors Corridors have different functions in a region. Some corridors are used to get smoothly and rapidly through a region or to get quickly to major

More information

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another. Non-Motorized Transportation Plan (NMTP) Draft Vision, Goal and,, Tri-County Regional Planning Commission (TCRPC) Purpose The purpose of the Tri-County Regional Planning Commission (TCRPC) Non-Motorized

More information

Monroe Street Reconstruction

Monroe Street Reconstruction Total participants: 45+ Monroe Street Reconstruction Cross Section Workshop Notes September 29, 2016, Wingra School Workshop Orientation, Technical and Functional Considerations: The workshop began with

More information