Sturgeon River Plains Bison Management Plan

Size: px
Start display at page:

Download "Sturgeon River Plains Bison Management Plan"

Transcription

1 Sturgeon River Plains Bison Management Plan March 2013

2 ii

3 Approval Page The Bison Management Plan is approved by: Alan Fehr Field Unit Superintendent Prince Albert National Park Parks Canada Agency Date Chuck Lees Director Fish and Wildlife Branch Ministry of Environment Government of Saskatchewan Date iii

4 Acknowledgements The Sturgeon River Plains Bison Stewards, Prince Albert National Park and Ministry of Environment comprise the Coordinating Committee, which oversaw the management plan workshops and writing. The Coordinating Committee is pleased to present the draft management plan to Parks Canada and Ministry of Environment for final review and approval. Acknowledgement is due to all individuals and organizations from the Advisory Committee, workshop presenters, and draft management plan reviewers for their contributions and continuous support through the Sturgeon River Plains Bison Management Plan writing process. iv

5 Abstract The Sturgeon River plains bison herd are descendants of bison from Elk Island National Park of Canada, originally released north of the Thunder Hills region of northern Saskatchewan in The small herd relocated to more southern regions of the Prince Albert National Park of Canada and over the next 40 years grew to approximately 400 animals. Disease, predation and harvest have resulted in the population declining to less than 250 animals in Plains bison are listed as threatened by the Committee on the Status of Endangered Wildlife in Canada which was an important consideration when management goals and actions were developed. Bison have a long cultural history with First Nations and Métis. The Sturgeon River plains bison herd plays an important role in reconnecting bison and First Nations and Métis. One of the goals is to facilitate connecting First Nations and Métis youth and bison. The Sturgeon River plains bison management plan is a multilateral plan designed to involve many organizations, agencies and local stakeholders in implementing management goals and actions, ensuring the Sturgeon River plains bison herd remains a self-sustaining, naturally regulated, and free ranging population. At the time of publication, the genetic analysis of the Sturgeon River herd is not yet available. The genetic work will assist in determining a minimum viable population for the Sturgeon River herd. The bison range overlaps Prince Albert National Park, Provincial Crown land and private land. Their movements bring them into conflict with local landowners. Many of the goals and actions presented in the management plan deal with reducing conflict between landowners and bison while increasing social tolerance. Conflict arises when bison damage crops and infrastructure resulting in economic losses for producers. Some compensation programs exist, but room is available to expand the tools available to landowners to reduce conflict and help meet the overall goal of a self-sustaining, naturally regulated, free-ranging bison population. Increasing the local, national, and international profile of the bison through tourism activity will bring economic benefits to the community. This management plan is intended to be adaptive; evolving as more information becomes available, social tolerance changes, awareness is generated, and goals are met. Going forward, public support of the management plan will be important for the long-term conservation of the Sturgeon River plains bison herd v

6 Table of Contents 1.0 Why Do We Need a Regional Plains Bison Management Plan? Who Manages the Sturgeon River Plains Bison? Goals of the Management Plan Designing the Plan Background and Status of the Sturgeon River Plains Bison Conservation Status Monitoring and Managing Plains Bison Population Demographics Plains Bison Population Demographics Background Information Goals and Corresponding Action for Population Demographics Section Habitat Assessment and Planning Bison Habitat Managed by Prince Albert National Park Bison Habitat Managed by Private Landowners Bison Habitat Managed by Saskatchewan Ministry of Environment Goals and Corresponding Actions for Habitat Assessment and Planning Section Disease Management Background Information for Relevant Diseases National Wildlife Disease Strategy Implementation Goals and Actions Corresponding to Disease Management Managing Human and Plains Bison Interactions Human and Plains Bison Interactions Background Information 18 1

7 8.2 Goals and Actions Corresponding to Human and Plains Bison Interactions Recognizing the Cultural and Economic Importance of the Sturgeon River Plains Bison Cultural Significance of Plains Bison to First Nations People Cultural Significance of Plains Bison to Métis People Plains Bison and the Regional Economy Goals and Actions Corresponding to Cultural and Economic Importance of Sturgeon River Plains Bison Schedule for Periodic Plan Assessment and Review Dispute Resolution Communications Literature Cited 24 List of Figures Figure 1 Sturgeon River Plains Bison Aerial Survey Data 1996 to Figure 2 Sturgeon River Plains Bison Range 12 Appendices Appendix 1 Terms of Reference 25 Appendix 2 Dates and Themes of Advisory Workshops and Open Houses 29 Appendix 3 Prince Albert National Park Anthrax Procedural Guidelines 30 2

8 1.0 Why Do We Need a Regional Plains Bison Management Plan? Managing a free-ranging bison population in the Sturgeon River area is challenging because they travel on or across land administered by different jurisdictions. These lands include Prince Albert National Park of Canada (PANP) administered by Parks Canada, Provincial Crown land administered by Saskatchewan Ministry of Environment (MoE) and Saskatchewan Ministry of Agriculture (MoA), and private land administered by individual landowners. In order to maintain a self-sustaining, naturally-regulated, and free-ranging population, a cooperatively administered management plan is necessary that attempts to meet the requirements of all parties involved and works towards accomplishing common goals. It will be important for all parties involved to focus on the long-term goal of a self-sustaining bison population. The management plan will address the needs and concerns of people impacted, resource users, and Provincial and Federal agencies. The management plan will discuss what is known about plains bison, what needs to be done to better understand the complexities of bison ecology, and what actions will be required by the various parties involved to successfully maintain plains bison on the regional landscape and minimize conflict between humans and bison. PANP, MoE, and the Sturgeon River Plains Bison Stewards (Bison Stewards) have agreed to lead the initial stages of development and implementation of the management plan. There are many additional partners whose participation is required to create and implement a successful management plan, including: ranchers/farmers, wildlife non-government organizations (NGO s), Rural Municipalities and First Nations and Métis communities. 2.0 Who Manages Sturgeon River Plains Bison? Legislative responsibilities for managing the Sturgeon River Plains Bison belong to PANP and MoE. Within PANP the Canada National Parks Act and the National Parks Wildlife Regulations establish protection and conservation for the bison. Parks Canada s mandate is to protect and present nationally significant examples of Canada s natural and cultural heritage and foster public understanding, appreciation and enjoyment in ways that ensure their ecological and commemorative integrity for present and future generations (Parks Canada, 2011). Outside PANP management authority falls to the Provincial Government through the Wildlife Act, The Ministry of Environment manages the province s diverse landscapes and renewable natural resources in a manner that supports a healthy environment, a growing economy and strong, vibrant communities (Ministry of Environment, 2012). Plains bison are designated as big game under the act and a license is required in order to hunt or shoot them. There is presently no open hunting season for bison. 3

9 Management of the Sturgeon River Plains Bison will be most successful if all those affected, or interacting with the bison, participate in their management. These groups include: Landowners - Affected landowners will need to have a voice and be heard in order for the bison management plan to be effective. Progress is being made towards addressing their concerns. Local municipalities (RM s, town councils) Have a management role on behalf of their stakeholders. Wildlife NGO s - Interested in the long-term conservation of the bison population. Local Community - Have an interest in the social, cultural, and economic well-being of those interacting with the bison. First Nations and Métis Bison are of cultural and subsistence importance. The Sturgeon River Plains Bison Stewards The Bison Stewards are a group of concerned ranchers, farmers, and other stakeholders working with PANP and MoE to create an environment where wild plains bison can co-exist with local landowners in a mutually beneficial way. The Bison Stewards will play a significant role in the management outcomes for the bison. 3.0 Goals of the Management Plan The overarching goal of the management plan is for the Sturgeon River plains bison population to be managed as a self-sustaining, naturally regulated, and free-ranging plains bison population that is genetically diverse and able to persist in perpetuity as a natural part of the regional ecosystem. The outcomes envisioned in the plan include: cooperatively managing the plains bison population, achieving long-term plains bison conservation, reducing human-bison conflicts, gathering necessary and relevant information about the population, and promoting the social and cultural importance of the Sturgeon River plains bison. This management plan has been produced by the management planning Coordinating Committee under the direction of the management planning Advisory Committee. The Coordinating Committee is made up of one representative from each of the following organizations: Prince Albert National Park of Canada, Saskatchewan Ministry of Environment, and the Sturgeon River Plains Bison Stewards. Please see Appendix 1 for a list of the stakeholders that participated on the Advisory Committee. 3.1 Designing the Plan In 2006 the Sturgeon River Plains Bison Management Strategy was developed though never fully approved by the involved parties. One goal in the strategy stated, If needed develop a 4

10 long-range Management Plan for the Sturgeon River Plains Bison Population in conjunction with partners and stakeholders (Frandsen, 2006). It became clear very early that a management plan for the Sturgeon River plains bison population was required. In June 2010 an international conference called Bison on the Edge was held in Big River, Saskatchewan. This conference brought together many knowledgeable people who were committed to learning more about this unique bison population. The conference was the kick-off to the management planning process. Shortly after the conference a Coordinating Committee was established consisting of members from the Bison Stewards, PANP and MoE. In January 2011 a public meeting was held in Canwood, Saskatchewan to inform people of the planning process and provide some general timelines on development of the management plan. A list of suggested agencies and candidates to participate in the advisory workshops was developed and discussed. The first workshop with the Advisory Committee was held on March 15, A list of concerns, along with suggested solutions was developed at the first workshop. A total of seven advisory workshops were held in Big River, after which a draft management plan was written by the Coordinating Committee. Each section of the plan has a background piece followed by a series of goals and actions. The Advisory Committee was instrumental in ensuring all aspects of the management plan received sufficient discussion and analysis. The draft management plan was discussed at several open houses throughout various communities allowing stakeholders and affected members to comment on the plan. As a result of the open house discussions, adjustments were made to the draft plan. Please refer to Appendix 2 for a list of Advisory Committee workshop meetings and open houses. 4.0 Background and Status of Sturgeon River Plains Bison In 1969, 50 plains bison (36 female and 14 male) were obtained from the captive herd in Elk Island National Park of Canada and released by the Saskatchewan Department of Natural Resources near Meyakamew Lake, which is located north of the Thunder Hills region approximately 60 km north of PANP. About of these bison moved south and established a home range in the Sturgeon River region in or adjacent to the south-west region of PANP. The other bison that were released in Thunder Hills dispersed to various regions and were either shot or rounded up and trucked to alternate locations. The bison that made their way to the Sturgeon River region established the population that still exists there today. The Sturgeon River plains bison population is currently the only wild population of plains bison within their historic range in Canada. Other important conservation herds exist elsewhere in the country; however, they are either fenced or outside areas where plains bison historically occurred. Sturgeon River plains bison are one of the few bison populations in North America that occupy their traditional niche in a naturally functioning and structurally complete ecosystem. 5

11 For example, no other plains bison population within their historic range in Canada is part of a natural predator-prey relationship with wolves. Predation and other natural events affecting population size and structure such as resource fluctuations, disease, and mate competition contribute to the long-term sustainability of the population through natural selection and maintenance of genetic variability. The unique and rare wild status of this plains bison population makes it an important environmental, cultural, social, and economic resource both regionally and nationally. In recent years the Sturgeon River plains bison have occupied an area of approximately 750 km 2, 100 km 2 of which is outside the PANP boundary. Even though suitable habitat exists on provincial Crown land, when bison leave PANP they tend to congregate on privately owned agricultural fields and occasionally come into conflict situations with landowners when they trample crops or damage fences. When bison leave PANP it is typically during autumn; however, the precise factors responsible for these cross-boundary movements are not well understood. Currently, research on seasonal migration of bison inside and outside of the park is being conducted through a joint project coordinated by the University of Laval, Bison Stewards, and PANP. Other research initiatives involving bison habitat selection, range expansion, movement patterns, and predator-prey relationships are underway by PANP and the University of Laval. In addition, PANP has been conducting annual aerial surveys of plains bison since 1996 to establish population trends (Figure 1). Annual aerial surveys and local knowledge collected by the Bison Stewards indicate the population peaked between 2006 and 2008 at over 400 individuals. Since that time the population has steadily declined and as of 2012 it is estimated there are between 200 and 250 bison in the Sturgeon River population (Parks Canada, 2012). The recent population decline is likely due to the interactions between disease (anthrax), wolf predation, and harvest. Population Values Observed Sturgeon River Plains Bison Aerial Survey Data Year 6

12 Figure 1. Sturgeon River Plains Bison Aerial Survey Data 1996 to Population values represent the number of bison observed during aerial surveys conducted annually using a consistent search effort. These numbers are considered minimum population counts. 4.1 Conservation Status The Committee on the Status of Endangered Wildlife in Canada lists plains bison as threatened. This designation was given in Status reassessment is expected to begin in November Under the Species at Risk Act plains bison are not considered to be at risk but are under further consideration. The decision not to list Plains bison under the Species at Risk Act is due to the potential economic implications for the Canadian bison industry (Dept. of Justice Canada, 2012). 5.0 Monitoring and Managing Plains Bison Population Demographics 5.1 Plains Bison Population Demographics Background Information In 2012, the Sturgeon River bison population was estimated to be between 200 and 250 animals. From its start in 1969, the population slowly increased over a 37 year period, peaking in 2006 at over 400 animals. Although the biological carrying capacity, based on habitat, was not likely reached, the social carrying capacity, based on tolerance of the bison at the time, was likely reached or may have been exceeded. Social carrying capacity is the maximum number of a species that humans will tolerate in a geographic area. Social carrying capacity is often lower than the biological carrying capacity and is based on human tolerance and society s ability to coexist with a species. In contrast, biological carrying capacity is the maximum population of a species that a particular ecosystem can sustain indefinitely. Social carrying capacity is not static, and may change with increased knowledge regarding best management practices and society s view on the relative importance of a species. In order to address long-term conservation concerns for the Sturgeon River plains bison, both genetic and demographic considerations must be addressed. There are various management recommendations regarding the number of bison that should be maintained in a population to ensure long-term genetic health. The International Union for Conservation of Nature status survey and conservation guidelines for plains bison identify the ideal population number at

13 animals (Gross John.E., N.D. Halbert, and J.N. Derr, 2010). Populations with fewer animals ( ) can maintain genetic diversity, if herd demographics (gender ratio, age structure, and recruitment) are properly managed. The potential effects of low genetic variability are difficult to predict. One possible outcome is that the ability of a population to adapt to environmental change decreases as genetic diversity decreases. Once gone from a population, genetic diversity cannot be increased unless animals from another population are introduced. If the genetic material that is lost is unique to the local population it will never be replaced. A minimum viable population report completed by Elk Island National Park indicates that its plains bison population should exceed 175 animals in order to maintain or improve genetic diversity over a 200 year period (Parks Canada, 2003). PANP is currently completing genetic analysis on the SRPB population. This information will be completed during the first year of plan implementation and will be used to determine the minimum viable population size that is required to maintain or improve the genetic diversity of this population. A SRPB minimum viable population threshold similar to Elk Island National Park should be maintained until the results from the SRPB genetic analysis is complete; however, due to the ongoing threat of anthrax, predation, and an unpredictable harvest level, a general consensus among the Coordinating and Advisory Committees moved that a conservative minimum viable population will be set at 250 for the SRPB herd. Managing for an upper population threshold of 430 is required to accommodate unforeseen environmental changes and/or disease outbreaks (Parks Canada, 2003). This number is based on estimates of the current social carrying capacity combined with recommendations from the Elk Island minimum viable population report. Managing for a population of 430 would also increase the probability of protecting genetic variability (Parks Canada, 2003). The upper threshold of 430 is meant to be viewed in conjunction with landowner conflicts. If the population is > 430 and there is no increase in conflicts, relative to when numbers were lower, then management actions to reduce the population will not be necessary. However, if the population is > 430 and conflicts are increasing, and it is agreed that other options to mitigate these conflicts have been reasonably applied and assessed, then further management actions may be considered. The upper and lower range should be adaptive to changes in social carrying capacity, changes in bison distribution, and refined minimum viable population estimates based on the SRPB genetics analysis. It should be noted that population demographics influence the genetics minimum viable population predications and in recent years harvest field data collected by the Bison Stewards, PANP, and U of Laval have shown subsistence harvest skewed towards breeding females in the SRPB population. 8

14 5.2 Goal and Actions for Population Demographics Goal 1: Maintain bison population numbers and population structure (age/sex) to allow for a self-sustaining and genetically diverse population while ensuring that the social carrying capacity for plains bison is not exceeded. Action 1: Complete a genetic analysis of the SRPB population in order to determine a MVP (PANP). Action 2: PANP will continue to monitor the bison population using aerial survey methods on an annual basis. New methods to refine these surveys will be explored through research studies with the academic community and the MoE. Action 3: If the estimated population numbers are near or below the minimum viable population value, methods to herd bison into PANP will be used to keep them in regions where they receive a higher level of protection (Bison Stewards lead; MoE). Action 4: If the population nears or falls below the minimum threshold a voluntary moratorium on bison harvesting will be requested. First Nations communities involved with harvesting bison, and landowners affected by bison movement will be visited. Information regarding the current status of the bison population, as well as information regarding the effects of the selective harvest of breeding-aged females will also be provided (PANP, Bison Stewards, MoE). Action 5: If the population is below the minimum threshold and a voluntary moratorium on hunting is not successful then the MoE, with support from PANP and the Bison Stewards, will begin the regulatory process necessary to stop bison hunting on provincial lands until population numbers again exceed the minimum threshold. Action 6: Establish a bison harvest protocol to guide management of the bison herd when the upper population threshold is exceeded, and/or conflict with landowners is a concern (MoE). Action 7: Increase social carrying capacity of the Sturgeon River plains bison by promoting the importance of bison to landowners, the local community and the people of Saskatchewan, and by improving best management practises for deterring bison off private land (Bison Stewards mandate with support from PANP and MoE). Action 8: Thresholds will be re-evaluated as new information becomes available (PANP, Bison Stewards, MoE). 9

15 6.0 Habitat Assessment and Planning 6.1 Bison Habitat Managed by Prince Albert National Park The majority of habitat available to the Sturgeon River bison population exists within the southwest corner of PANP. Most of PANP s bison habitat consists of discrete sedge or grassland meadows interspersed within deciduous and conifer forest. Numerous small lakes, fens, and bogs exist throughout this region. Bison spend most of their time during summer in southerly portions of their range foraging in open meadows. During the winter months (December February), bison tend to move further north into coniferous-dominated habitat and some groups may be found foraging along drainages or lake-sides as far north as Bagwa Lake (Figure 2). Solitary adult bulls and bull groups, however, often remain in more southerly locations throughout winter when compared to cows and younger bison. PANP uses prescribed burning to mimic natural fire cycles within bison habitat and throughout the park. The southern, aspen-dominated regions are targeted for managing on a 40 year fire cycle and specific plans are in place to increase or maintain grasslands. The goal of the northern, coniferous-dominated regions of bison habitat, are to be managed on a 100 year fire cycle. At this time, it is unknown how prescribed burns will affect bison habitat use and distribution. It is speculated that forest renewal and increases to the extent of open meadows will improve bison habitat in PANP and may influence bison distribution patterns. 6.2 Bison Habitat Managed by Private Landowners Bison can be found year-round on private land and provincial Crown leased land. During most times of the year, the groups of bison are small and generally comprised of bulls; however, in early August the annual rut begins and bison start to congregate in large groups, venturing daily onto private, agricultural land adjacent to PANP. These large groups have numbered as many as 300 in the past, are known to cover an area over 100 km² and create challenges for agricultural producers during haying and harvesting times. Bison will wallow or make trails in cash crops during the entire growing season and will rub on hay and green-feed bales causing damage. They also prefer to graze newly cut hayfields with fresh growth, tending to choose timothy over other grasses and legumes. Bison will also increase alfalfa consumption in early fall, after a 10

16 heavy frost. This grazing behaviour can reduce the available biomass for a second cut of hay or fall grazing for cattle. Bison also cause damage to infrastructure such as cattle fences. 6.3 Bison Habitat Managed by the Saskatchewan Ministry of Environment Adjacent to PANP, and north of the private agricultural land, is Provincial Forest. The landscape is comprised of a gently undulating glacial till plain. It is predominately forested, consisting of jack pine, white spruce, and aspen. Dotted throughout are numerous open and closed fens, bogs, meadows, small water bodies and lakes. A number of commercial and recreational activities occur throughout including cattle grazing, trapping, big game outfitting, hunting, angling, camping, and berry picking. This portion of the Provincial Forest is part of the Prince Albert Forest Management Agreement (FMA). Timber harvesting, both commercial and private-use, occurs under the guidance of the Forest Service Branch of the MoE. Occasionally bison utilize the Provincial Forest north of agricultural land. At this time, numbers of bison in this region are small consisting of single bulls or small cow/calf groupings. It is unknown if the habitat has sufficient meadows with preferred food types to support bison year-round. 11

17 Figure 2 Sturgeon River Plains Bison Range 12

18 6.4 Goal and Actions for Habitat Assessment and Planning Goal 1: Ensure that sufficient habitat is available to maintain a self-sustaining and wild plains bison population in the Sturgeon River region while mitigating negative impacts to local agriculture. Action 1: Explore opportunities with universities, government agencies and NGO s to develop forage alternatives that will deter bison from grazing, while still meeting the needs of the cattle industry (Bison Stewards). Evaluate what crops are attractants to bison Evaluate current crop science research to determine if there are alternate crops that may be suitable for cattle but will not attract bison Action 2: Augment the free ranging expansion of plains bison by attempting to purchase private property that contains suitable bison habitat (Bison Stewards/NGO s). Action 3: Explore opportunities for land easements on private land to protect important bison habitat (Bison Stewards/MoE/NGOs). Action 4: Assess adjacent Crown Provincial Forest for plains bison habitat suitability and explore the potential for increasing habitat suitability on Provincial Crown land (MoE, Universities). Action 5: Support ongoing research pertaining to bison food preference and habitat preference throughout the current Sturgeon River plains bison range (Bison Stewards/Universities/PANP). Action 6: Augment bison habitat within PANP with prescribed burning during spring season to promote the expansion of meadows and to prevent aspen suckering (PANP). Action 7: Evaluate the use of prescribed burns in meadows within PANP during late summer for reducing bison landowner conflicts (PANP). Action 8: Increase the use of diversionary fences on private land to steer the bison to more preferable locations. These locations may include land acquired through land easements (Bison Stewards). Action 9: Explore payment for use of second-cut crops in areas and times when bison use is high (Bison Stewards). 13

19 7.0 Disease Management 7.1 Background Information for Relevant Diseases The diseases presented in this section have been identified by the Sturgeon River Plains Bison Management Plan Coordinating and Advisory Committees, in consultation with wildlife veterinarians, as being potentially relevant to the Sturgeon River plains bison population. Some diseases can be transmitted between wild and domestic populations as well as to humans. Therefore, the committees also recommend an official disease risk assessment be conducted by wildlife veterinarians at the Canadian Cooperative Wildlife Health Centre to verify the relevance of these diseases and identify any other potential diseases of concern. Anthrax (Bacillus anthraci) Anthrax is a naturally occurring disease caused by the bacterium Bacillus anthracis, which is known to infect bison and other herbivores. Anthrax bacteria exist as resistant spores in soil and develop into a vegetative form when they enter an animal s body. Anthrax can infect an animal when spores enter open wounds or are ingested or inhaled. Once spores have entered an animal the vegetative form of the bacteria multiplies rapidly and causes a blood-borne infection that usually results in death within a few days. After death, vegetative bacteria may exit a carcass via blood oozing from the mouth, nostrils, or anus. Additionally, vegetative anthrax bacteria may escape in large quantities if the carcass is opened by scavengers. Anthrax bacteria that exit the carcass will form resistant spores and contaminate surrounding soil, which may result in future anthrax outbreaks. The only known anthrax outbreak to occur in the Sturgeon River plains bison population was in July/August of During the 2008 outbreak, a total of 29 bison were found dead. However, many carcasses were likely not discovered due to the remote location of some meadows frequented by bison and the dense foliage at that time of year. Bovine Tuberculosis (Mycobacterium bovis) Bovine tuberculosis is caused by the bacterium Mycobacterium bovis and is not a naturally occurring disease in wild animals. Wildlife species such as deer, elk, and bison may act as reservoirs (i.e. perpetuate it indefinitely under natural conditions) and transmit bovine tuberculosis to cattle and other wildlife species. Bovine tuberculosis is transmitted via ingestion (contaminated food and water) or inhalation (contaminated air-borne dust particles). After entering the host animal, bacteria may spread through blood or lymph nodes and create lesions in any part of the body, which can lead to reduced fertility, weakness, and/or death. 14

20 Currently there is no sign of bovine tuberculosis in the Sturgeon River bison population and the plains bison released in 1969 were from the Elk Island plains bison herd that was and is considered to be free of this disease. Bovine Brucellosis (Brucella abortus) Bovine brucellosis is caused by the bacteria Brucella abortus and most commonly affects cattle, bison, and elk. Bison and cattle are primary hosts, where as elk are considered secondary hosts because elk-to-elk transmission does not typically occur under natural conditions, except where elk are fed in large numbers on feed grounds. Bovine brucellosis is most commonly transmitted when animals ingest feed/water contaminated by infected tissues or otherwise come into direct oral contact with tissues/fluids of infected animals or aborted foetuses. Subsequent to infection, brucellosis bacteria spread through the blood and lymph nodes and most commonly affect reproductive organs, mammary glands, and joints. Abortions, infertility, and weak offspring are common effects of brucellosis infections. Currently there is no sign of bovine brucellosis in the Sturgeon River bison population. Bovine Viral Diarrhoea (Bovine Viral Diarrhoea Virus) Bovine viral diarrhoea is a viral disease that affects cattle, sheep, goats, and wild ruminants such as bison. Bison and cattle are the primary hosts of the disease but other species may act as secondary hosts and play a key role in disease transmission. Transmission occurs through contact with bodily secretions of infected animals, such as saliva, feces, urine, and nasal discharge. Symptoms of the disease include fever, diarrhoea, decreased white blood cell count, and loss of appetite. In some cases infection may result in abortions and/or death. Currently there is no sign of bovine viral diarrhoea in the Sturgeon River bison population. Malignant Catarrhal Fever (Ovine Herpesvirus 2) Sheep are known to be carriers of the OHV-2 virus (ovine herpesvirus 2) which causes Malignant Catarrhal Fever (MCF). Transmission from sheep to sheep is due to direct contact of eye and nasal secretions. Bison are very susceptible to this virus if bison and infected sheep interact and cases are always fatal. MCF does not spread from bison to bison. Some symptoms of the virus are separation from herd mates, fever, nasal discharge, respiratory problems, and difficult urination. Currently there are no known cases of MCF in the region. 15

21 7.2 National Wildlife Disease Strategy Implementation Canada s National Wildlife Disease Strategy coordinates disease response and management at a national level with the overall goal of minimizing negative impacts of wildlife disease. The Strategy is meant to be integrated into disease management mandates and plans for various government agencies at national and provincial/territorial levels. The Coordinating and Advisory Committees for the Sturgeon River Plains Bison Management Plan have recommended that the Strategy be used as a template to guide monitoring and management actions for diseases of concern relative to the local plains bison population. The committees also recommended that a disease risk assessment be conducted to determine which diseases are of high enough priority in this region to be examined under the Strategy guidelines. However, given that anthrax has already occurred in this population, an immediate implementation of the Strategy for this disease is necessary. The Strategy provides a framework to address a number of issues related to wildlife diseases, including prevention, detection, response, effective management, education, and communication. Management options under the Strategy typically aim to reduce the rate of disease transmission, contain the disease to a geographic area, or eradicate the disease. Efforts are usually focussed on diseases that have the potential to negatively impact society, the environment, or the economy. 7.3 Goals and Corresponding Actions for Disease Management The following goals and corresponding actions provide a summary of the path necessary to adequately assess and implement relevant disease monitoring and management for the Sturgeon River plains bison population: Goal 1: Conduct a disease risk assessment for plains bison in the Sturgeon River area to determine which diseases should be addressed using the National Wildlife Disease Strategy guidelines. Action 1: Outline the parameters for a risk assessment and establish necessary contracts/agreements with the Canadian Cooperative Wildlife Health Centre to complete the assessment (PANP, MoE). Note: the Canadian Cooperative Wildlife Health Centre has already completed a similar risk assessment for plains bison in Grasslands National Park. Action 2: Use the risk assessment to identify which (if any) additional diseases should be monitored and managed using the National Wildlife Disease Strategy guidelines (PANP, MoE). 16

22 Action 3: Develop a timeline to have the risk assessment periodically reviewed and updated by the Canadian Cooperative Wildlife Health Centre (PANP, MoE). Goal 2: Apply National Wildlife Disease Strategy guidelines as they pertain to anthrax and the Sturgeon River bison population. There is no need to wait for the completion of a disease assessment to implement the NWDS guidelines for anthrax because the risk of this disease is already relatively well understood. Prevention of Emergence Action 1: Promote vaccination of cattle in proximity to wild bison (Bison Stewards). Early Detection Action 2: Routine opportunistic surveillance and monitoring for bison carcasses during late summer and early fall (PANP, MoE, Bison Stewards, and local landowners). Action 3: Heightened monitoring such as air surveillance and targeted ground patrols when a suspected or confirmed anthrax case occurs regionally in wild or domestic animals (PANP, MoE, Bison Stewards). Environmental conditions suspected of increasing likelihood of anthrax outbreaks could also trigger heightened monitoring and surveillance. Action 4: Test all suspected carcasses using field test kits. Additionally, sample other biological specimens for further confirmation of positive case (blood, tissues or soil soaked with blood, and turbinate bones) (PANP, MoE). Rapid Response Action 5: Immediately treat suspected carcasses using treatment plans specific to the jurisdiction in which the carcass is located (PANP, MoE). Carcasses that cannot be immediately disposed of will be treated with formalin to prevent scavengers from opening the carcass and spreading anthrax bacteria. Effective Disease Management Action 6: PANP and MoE will develop and maintain anthrax carcass treatment plans in accordance to the most recent information regarding effective carcass disposal/treatment. Efforts will be made to strive for consistency in carcass treatment methods regardless of the jurisdiction that a given suspected or confirmed anthrax cases occurs. For additional information on anthrax response guidelines see Appendix 3, or contact PANP or MoE for details regarding each agency s current Anthrax Response Strategy. 17

23 Education and Training Action 7: An information brochure will be distributed annually to relevant landowners. The brochure will provide details regarding the signs and symptoms of anthrax in wild bison and domestic livestock (Bison Stewards). Phone numbers will be provided so the public knows who to call when a suspected anthrax cases is discovered. Communication Action 8: Rapid communications between PANP or MoE and the Bison Stewards will occur regarding all suspected or confirmed anthrax cases in wild bison and domestic livestock. Bison Stewards will then facilitate communications between landowners, First Nations communities, and government agencies for the duration of the outbreak. A contact list for all relevant landowners and First Nations communities will be maintained by the Bison Stewards. 8.0 Managing Human and Plains Bison Interactions 8.1 Human and Plains Bison Interactions Background As noted in the section on habitat, there are a number of issues that local landowners contend with in regards to bison movements outside PANP. The primary concern facing landowners is that plains bison leave PANP and move onto private land which leads to fence, crop, hay, and pasture damage. This damage can result in economic losses for landowners. A bi-annual survey of landowners has identified many of these issues. In some cases organizations, such as the Sturgeon River Plains Bison Stewards and Saskatchewan Crop Insurance Corporation, have provided short-term support and funding for projects and damages to help alleviate landowner concerns. Saskatchewan Crop Insurance Corporation administers a Wildlife Damage Compensation Program which is available to all producers who suffer crop or livestock losses due to wildlife. But not all damages caused by plains bison are currently covered by the compensation program, such as infrastructure damage. The University of Laval and the Bison Stewards continue to gather information necessary to determine plains bison migration routes and forage preferences. This research helps landowners, government, and partner agencies make decisions on how to manage plains bison when they exit PANP. 18

24 Other concerns identified by landowners and the Coordinating and Advisory Committees include: public safety; disease transmission between bison and cattle, and sheep and bison; genetic transfer between wild and domestic bison herds, and to a lesser extent between wild bison and domestic cattle; the additional cost and work load faced by several government agencies; and finally increased conflict between landowners in the area immediately surrounding PANP. For a more detailed description of issues, considerations, and possible actions discussed during the advisory committee meetings, see the interaction matrix located on the Bison Stewards website ( 8.2 Goals and Corresponding Action Goal 1: To minimize the time bison spend on private land. Action 1: Fence key fords where bison cross onto private land strategic fencing (PANP, Bison Stewards). Action 2: Request Saskatchewan Crop Insurance Corporation add additional funding package to move bison back into the National Park (Bison Stewards). Action 3: Manage bison habitat inside park and/or outside park (PANP, Bison Stewards, MoE). Goal 2: To reduce conflict between bison and private landowners. Action 1: Request Saskatchewan Crop Insurance Corporation add additional compensation package relating specifically to bison (fencing, labour, hay, trampling) (Bison Stewards). Action 2: Research and test different fence types utilizing new fence technology such as stronger fencing, lay down fencing, electric fencing, virtual fencing, 3D fencing (Bison Stewards, Academic Community). Action 3: Develop a plan to utilize subsistence hunting and big game management licenses as a management tool (MoE). Action 4: Work with ENGO s to offer easements or to purchase critical bison habitat near PANP (Bison Stewards, PANP, MoE). Action 5: Create a page within the Bison Stewards website with up to date funding programs available to farmers and ranchers. Lobby for new programs and funding to help landowners reduce bison interaction incidents (Bison Stewards, PANP, MoE). 19

25 Action 6: Establish a volunteer fencing crew to assist producers with repair of damaged fences, and round up and return of escaped livestock (Bison Stewards). Action 7: Develop protocols that will guide the actions of the volunteer fencing crew (Bison Stewards). Goal 3: To prevent genetic transfer from domestic bison and cattle to the Sturgeon River plains bison. Action 1: Prepare risk assessment on the potential for genetic transfer between domestic bison and/or cattle and the Sturgeon River Plains Bison (Academic Institution). Action 2: Develop a memorandum of understanding with the Canadian Prairie Bison Cooperative, the Canadian Bison Association, and local bison ranchers concerning domestic bison escapes within 50 km of PANP (Bison Stewards). Goal 4: To ensure public safety with free-ranging plains bison. Action 1: Develop brochures, presentations, articles, signage, and other relevant educational information related to safety precautions and educational awareness when near wild plains bison (Bison Stewards, MoE, PANP). Action 2: Develop a protocol concerning the approval process for issuing special permits to destroy aggressive or dangerous bison (MoE, PANP). 9.0 Recognizing the Economic and Cultural Importance of the Sturgeon River Plains Bison 9.1 Cultural Significance of Plains Bison to First Nations People Prior to European settlement, plains bison were a primary source of sustenance for First Nations people living throughout the Canadian prairies. In addition to using bison for food, First Nations people also used parts from harvested bison to make tools, clothing, medicine and shelter. Bison were often incorporated into ceremonial rituals and First Nations people traditionally had strong spiritual ties with plains bison. Despite the traditional relationship that First Nations people had with bison, few contemporary First Nations communities continue to maintain a formal connection with the historical and cultural significance of bison (Danette Starblanket, Federation 20

26 of Saskatchewan First Nations, pers. comm.). The near extirpation of plains bison subsequent to European settlement was a significant cultural and economic loss for First Nations people and resulted in a permanent change to their way of life. The Sturgeon River bison population area provides an ideal opportunity for First Nations communities to reunite with their past and again benefit from the presence of bison on the regional landscape. In recent years, local First Nations hunters have been able to harvest wild plains bison as a means of providing a nutritious food source to their community. Furthermore, First Nations people have been able to carry out spiritual ceremonies associated with the bison hunt (Gordon Vaadeland, Sturgeon River Plains Bison Stewards, pers. comm.). The establishment of the Sturgeon River plains bison population has also resulted in a tremendous opportunity to connect people and bison through youth education programs within local First Nations schools and communities. 9.2 Cultural Significance of Plains Bison to Métis People Plains bison feature prominently in Métis culture across the prairies. Bison were of great economic and cultural importance for Métis people during the fur trade and Prairie settlement when bison meat, hides, and pemmican could be traded or sold to European fur trade companies. Bison were also an important source of sustenance for Métis families and all parts of the bison were typically used for food, clothing, or tools. Currently Métis are not legally permitted to hunt plains bison in Saskatchewan; however, the Métis Nation Saskatchewan has shown interest and support for the long-term conservation of the Sturgeon River plains bison population and recognizes plains bison as a significant part of Canada s heritage that must be preserved for future generations. 9.3 Plains Bison and the Regional Economy Conservation efforts surrounding the Sturgeon River plains bison may have a positive impact on the economy of the region. Geotourism, tourism that sustains or enhances the geographical character of a place its environment, culture, aesthetics, heritage, and the well-being of its residents (travel.nationalgeographic.com) is growing in popularity as a sustainable form of tourism. Wildlife viewing, one type of geotourism activity, is the second most popular activity that nature lovers will participate in when visiting a destination. In Canada, 6% of the population can be identified as a nature lover, which translates to over 600,000 potential tourists (Research Resolutions and Consulting LTD, 2009). Saskatchewan, and in particular destination tourist locations, such as the Sturgeon River area, face challenges when drawing a portion of this group to the area. However, research has shown that 25% of nature lovers consider Saskatchewan a 21

27 prime destination for wildlife viewing (Research Resolutions and Consulting LTD, 2009). When tourists visit an area, the primary tourism-based business see the economic return; however the benefits spread to the service industry and the entire community. 9.4 Goals and Corresponding Actions Goal 1: Promote the cultural importance of plains bison as it pertains to local First Nations and Métis communities while focusing on historical context and modern-day reconnection between bison and people. Action 1: The Coordinating Committee will regularly contribute an article to Landscape (the newsletter for Métis Nation-Saskatchewan) to distribute information regarding the current status of the Sturgeon River plains bison population and relevant updates to the management plan (PANP, Bison Stewards, MoE). Action 2: The Coordinating Committee will regularly contribute to the FSIN Executive Communiqué to distribute information regarding the current status of the Sturgeon River plains bison population and updates regarding the management plan (PANP, Bison Stewards, MoE). Action 3: Develop youth outreach programs that raise awareness regarding the Sturgeon River plains bison population and discuss the cultural and historical significance of bison to First Nations and Métis cultures (Bison Stewards). Goal 2: Promote the economic importance of plains bison with a focus on tourism opportunities. Action 1: Provide information to the Waskesiu Wilderness Region Destination Marketing Organization on a regular basis and through various means to promote tourism opportunities associated with the Sturgeon River plains bison herd (PANP, Bison Stewards, MoE). Action 2: Provide information regarding the status of the population and tourism opportunities associated with the Sturgeon River plains bison to all regional tourism websites (PANP, Bison Stewards, MoE) Management Plan Assessment and Review The Sturgeon River Plains Bison Management Plan is meant to be a dynamic, useable document. As new technology is developed or new science is learned, it will be incorporated into the management plan. Action items will be initiated and delivered through work plans developed by the lead agency or organization responsible for the action. The Coordinating Committee will meet annually to review progress on action items within the plan. Advisory Committee responsibilities will terminate at the point when the plan is signed off by officials from PANP 22

Bison Management Plan Advisory Committee Meeting May 16, 2011 Big River Community Centre. Minutes

Bison Management Plan Advisory Committee Meeting May 16, 2011 Big River Community Centre. Minutes Bison Management Plan Advisory Committee Meeting May 16, 2011 Big River Community Centre Workshop / Meeting started at 10:06 AM Minutes List of participants: Robin Fremont Facilitator Rob Tether Saskatchewan

More information

H. R. To provide for the protection of the last remaining herd of wild and genetically pure American Buffalo. IN THE HOUSE OF REPRESENTATIVES A BILL

H. R. To provide for the protection of the last remaining herd of wild and genetically pure American Buffalo. IN THE HOUSE OF REPRESENTATIVES A BILL F:\M\HINCHE\HINCHE_0.XML... (Original Signature of Member) TH CONGRESS ST SESSION H. R. To provide for the protection of the last remaining herd of wild and genetically pure American Buffalo. IN THE HOUSE

More information

H. R To provide for the protection of the last remaining herd of wild and genetically pure American buffalo. IN THE HOUSE OF REPRESENTATIVES

H. R To provide for the protection of the last remaining herd of wild and genetically pure American buffalo. IN THE HOUSE OF REPRESENTATIVES I TH CONGRESS 1ST SESSION H. R. To provide for the protection of the last remaining herd of wild and genetically pure American buffalo. IN THE HOUSE OF REPRESENTATIVES NOVEMBER, 00 Mr. HINCHEY (for himself

More information

DMU 452 Northern Multi-County Deer Management Unit

DMU 452 Northern Multi-County Deer Management Unit DMU 452 Northern Multi-County Deer Management Unit Area Description The Core TB Zone Deer Management Unit is in the Northern Lower Peninsula Region (NLP) and covers portions of Alcona, Alpena, Montmorency,

More information

Frequently Asked Questions Reintroduction of Bison to Banff National Park

Frequently Asked Questions Reintroduction of Bison to Banff National Park Frequently Asked Questions Reintroduction of Bison to Banff National Park Background For thousands of years, vast herds of plains bison roamed the prairies and the eastern slopes of the Continental Divide,

More information

Alberta Conservation Association 2016/17 Project Summary Report. Primary ACA staff on project: Stefanie Fenson, Jeff Forsyth and Jon Van Dijk

Alberta Conservation Association 2016/17 Project Summary Report. Primary ACA staff on project: Stefanie Fenson, Jeff Forsyth and Jon Van Dijk Alberta Conservation Association 2016/17 Project Summary Report Project Name: Recreational Opportunity Enhancement Land Management Program Manager: Darren Dorge Project Leader: Stefanie Fenson Primary

More information

Policy Position Statement on Wild Boar (Sus scrofa) and hybrids in Ireland and Northern Ireland

Policy Position Statement on Wild Boar (Sus scrofa) and hybrids in Ireland and Northern Ireland Status: Final Date issued: 18/11/2011 Issue number: 1.0 Executive Summary This Policy Position Statement (PPS) was prepared by Invasive Species Ireland on behalf of the Invasive Species Ireland Steering

More information

Wood Bison Management Strategy for the Northwest Territories

Wood Bison Management Strategy for the Northwest Territories Wood Bison Management Strategy for the Northwest Territories 2 0 1 0-2 0 2 0 Minister s Message The Wood Bison Management Strategy for the Northwest Territories (Strategy) provides long-term vision, goals

More information

THE WOLF WATCHERS. Endangered gray wolves return to the American West

THE WOLF WATCHERS. Endangered gray wolves return to the American West CHAPTER 7 POPULATION ECOLOGY THE WOLF WATCHERS Endangered gray wolves return to the American West THE WOLF WATCHERS Endangered gray wolves return to the American West Main concept Population size and makeup

More information

MODULE 2. Conservation needs of cheetah and wild dogs and related threats to their survival. Notes:

MODULE 2. Conservation needs of cheetah and wild dogs and related threats to their survival. Notes: The previous module provided some key information regarding the conservation biology of cheetah and African wild dog, which is the basis for this evaluation of their conservation needs and what is threatening

More information

CHECKS AND BALANCES. OVERVIEW Students become managers of a herd of animals in a paper-pencil, discussionbased

CHECKS AND BALANCES. OVERVIEW Students become managers of a herd of animals in a paper-pencil, discussionbased CHECKS AND BALANCES 5 OVERVIEW Students become managers of a herd of animals in a paper-pencil, discussionbased activity. BACKGROUND White Tailed Deer White-tailed deer have always been a part of the forest

More information

Minnesota Deer Population Goals. East Central Uplands Goal Block

Minnesota Deer Population Goals. East Central Uplands Goal Block Minnesota Deer Population Goals East Central Uplands Goal Block Minnesota DNR Section of Wildlife, 2015 Final Deer Population Goals Block 4: East Central Uplands The following pages provide a description

More information

Bison: National Treasure or Pernicious Vector?

Bison: National Treasure or Pernicious Vector? Bison: National Treasure or Pernicious Vector? A brief history of Bison in the GYE Yellowstone herd - genetically and behaviorally unique - the only herd with continuously wild ancestry from the days when

More information

Full summaries of all proposed rule changes, including DMU boundary descriptions, are included in the additional background material.

Full summaries of all proposed rule changes, including DMU boundary descriptions, are included in the additional background material. The Florida Fish and Wildlife Conservation Commission (FWC) implemented a public outreach and input process in 2013 and 2014 in management Zones A, B and C. The goal of this process was to present the

More information

Claimed statutory authorities and roles in the Bison Management Plan for the State of Montana and Yellowstone National Park

Claimed statutory authorities and roles in the Bison Management Plan for the State of Montana and Yellowstone National Park Claimed statutory authorities and roles in the Bison Management Plan for the State of Montana and Yellowstone National Park When bison leave Yellowstone National Park and enter Montana, the management

More information

EXECUTIVE SUMMARY Feasibility Study on the Reintroduction of Gray Wolves to the Olympic Peninsula

EXECUTIVE SUMMARY Feasibility Study on the Reintroduction of Gray Wolves to the Olympic Peninsula EXECUTIVE SUMMARY Feasibility Study on the Reintroduction of Gray Wolves to the Olympic Peninsula Prepared by U.S. Fish and Wildlife Service Western Washington Office Introduction Historical records indicate

More information

DMU 487 Northern Multi-County Deer Management Unit

DMU 487 Northern Multi-County Deer Management Unit DMU 487 Northern Multi-County Deer Management Unit Area Description Deer Management Unit (DMU) 487 is a multi-county DMU created to address bovine tuberculosis (btb) in the Northern Lower Peninsula Region

More information

Hunting, Fishing, Recreational Shooting, and Wildlife Conservation Opportunities and Coordination with States, Tribes, and Territories

Hunting, Fishing, Recreational Shooting, and Wildlife Conservation Opportunities and Coordination with States, Tribes, and Territories THE SECRETARY OF THE INTERIOR WASHINGTON ORDER NO. 3356 Subject: Hunting, Fishing, Recreational Shooting, and Wildlife Conservation Opportunities and Coordination with States, Tribes, and Territories Sec.

More information

Mountain Caribou Recovery Implementation Plan. Predator/Prey Component. Terms of Reference

Mountain Caribou Recovery Implementation Plan. Predator/Prey Component. Terms of Reference Mountain Caribou Recovery Implementation Plan Predator/Prey Component Terms of Reference These Terms of Reference (ToR) support the October 2007 BC Mountain Caribou Recovery Implementation Plan. They are

More information

APPENDIX 2.1 Lake Sturgeon - Mitigation and Enhancement

APPENDIX 2.1 Lake Sturgeon - Mitigation and Enhancement APPENDIX 2.1 Lake Sturgeon - Mitigation and This page is intentionally left blank. Lake Sturgeon Mitigation and As a provincial crown corporation providing electric energy and natural gas service, Manitoba

More information

Status Report on the Yellowstone Bison Population, August 2016 Chris Geremia 1, Rick Wallen, and P.J. White August 17, 2016

Status Report on the Yellowstone Bison Population, August 2016 Chris Geremia 1, Rick Wallen, and P.J. White August 17, 2016 Summary: Status Report on the Yellowstone Bison Population, August 2016 Chris Geremia 1, Rick Wallen, and P.J. White August 17, 2016 The bison population is estimated near 5,500 (range = 5,200-5,800),

More information

Early History, Prehistory

Early History, Prehistory History of Management of Large Mammals in North America What experience and history teach us is this that nations and governments have never learned anything from history, or acted upon any of the lessons

More information

Job Title: Game Management, Subsection B Game Management Mountain Lion. SPECIES: Mountain Lion

Job Title: Game Management, Subsection B Game Management Mountain Lion. SPECIES: Mountain Lion SPECIES: Goal: Manage the mountain lion population, its numbers and distribution, as an important part of Arizona s fauna and to provide mountain lion hunting recreation opportunity while maintaining existing

More information

Job Title: Game Management, Subsection B Game Management Mountain Lion. SPECIES: Mountain Lion

Job Title: Game Management, Subsection B Game Management Mountain Lion. SPECIES: Mountain Lion SPECIES: Goal: Manage the mountain lion population, its numbers and distribution, as an important part of Arizona s fauna and to provide mountain lion hunting recreation opportunity while maintaining existing

More information

Street Edmonton, AB T6K 1T8. Alberta Fish and Game Association (AFGA) Position On Game Farming In Alberta February 2004

Street Edmonton, AB T6K 1T8. Alberta Fish and Game Association (AFGA) Position On Game Farming In Alberta February 2004 Alberta Fish & Game Association 6924 104 Street Edmonton, AB T6K 1T8 Phone: (780) 437-2342 Fax: (780) 438-6872 email: office@afga.org Website: www.afga.org Alberta Fish and Game Association (AFGA) Position

More information

Chagrin River TMDL Appendices. Appendix F

Chagrin River TMDL Appendices. Appendix F Appendix F The following are excerpts from the Eastern Brook Trout Joint Venture s Conservation Strategy (Working Draft v.6), Conserving the Eastern Brook Trout: Strategies for Action Found at: http://www.easternbrooktrout.org/constrategy.html

More information

A GUIDE TO UNDERSTANDING CHRONIC WASTING DISEASE

A GUIDE TO UNDERSTANDING CHRONIC WASTING DISEASE A GUIDE TO UNDERSTANDING CHRONIC WASTING DISEASE Prion Disease affects the central nervous system Prions are abnormal proteins that attack brain cells and leave holes in the tissue Prion Disease affects

More information

Mining & Petroleum Focus Group Southern Rocky Mountain Management Plan. Synopsis of Focus Group Key Issues

Mining & Petroleum Focus Group Southern Rocky Mountain Management Plan. Synopsis of Focus Group Key Issues Southern Rocky Mountain Management Plan Page 1 of 6 Synopsis of Focus Group Key Issues Sectors who brought forth issues are listed after the issue in brackets. I. Timeline Completing the plan by June,

More information

Chronic Wasting Disease in Southeast Minnesota. Drs. Michelle Carstensen and Lou Cornicelli Preston Public Meeting December 18, 2018

Chronic Wasting Disease in Southeast Minnesota. Drs. Michelle Carstensen and Lou Cornicelli Preston Public Meeting December 18, 2018 Chronic Wasting Disease in Southeast Minnesota Drs. Michelle Carstensen and Lou Cornicelli Preston Public Meeting December 18, 2018 Agenda Opening Remarks Brief overview of Chronic Wasting Disease (CWD)

More information

Province of Alberta Rat Control Plan

Province of Alberta Rat Control Plan Province of Alberta Rat Control Plan Appendix I - Rat Control Plan Objective Alberta s rat free status is important to Alberta s Agricultural Industry and to the urban communities economically. This protocol

More information

Mammal Management and Diseases In Delaware

Mammal Management and Diseases In Delaware Mammal Management and Diseases In Delaware Emily Boyd Deer & Furbearer Biologist Delaware Division of Fish & Wildlife We Bring you Delaware s Great Outdoors Through science and Service Era of Abundance

More information

Job Title: Game Management, Subsection B Game Management Mountain Lion

Job Title: Game Management, Subsection B Game Management Mountain Lion Job Title:, Subsection B Goal: Manage the mountain lion population, its numbers and distribution, as an important part of Arizona s fauna and to provide mountain lion hunting recreation opportunity while

More information

Cariboo-Chilcotin (Region 5) Mule Deer: Frequently Asked Questions

Cariboo-Chilcotin (Region 5) Mule Deer: Frequently Asked Questions Harvest Cariboo-Chilcotin (Region 5) Mule Deer: Frequently Asked Questions A number of questions and concerns have been expressed from resident hunters about the change in the mule deer hunting regulations

More information

National Park Service, Yellowstone National Park, Bison Management Team. Reformatting the Annual Report to Improve Readability and Lessen Redundancy

National Park Service, Yellowstone National Park, Bison Management Team. Reformatting the Annual Report to Improve Readability and Lessen Redundancy July 17, 2015 MEMORANDUM To: From: Subject: Managers of the Interagency Bison Management Plan National Park Service, Yellowstone National Park, Bison Management Team Reformatting the Annual Report to Improve

More information

a) Case Study: North American Bison/Wood Buffalo b) Species Diversity/Richness

a) Case Study: North American Bison/Wood Buffalo b) Species Diversity/Richness ENSC 320 Tutorial #2 Critiques due! a) Case Study: North American Bison/Wood Buffalo b) Species Diversity/Richness a) CASE STUDY: North American Bison The Demise of the Bison. Bison antiqua appear in the

More information

Grizzly Bear Management Plan for the Gwich in Settlement Area

Grizzly Bear Management Plan for the Gwich in Settlement Area 1 Grizzly Bear Management Plan for the Gwich in Settlement Area Diana Campbell 2 Introduction Many of our Aboriginal communities have negotiated land claim, resource, or self-government agreements with

More information

Dauphin Lake Fishery. Status of Walleye Stocks and Conservation Measures

Dauphin Lake Fishery. Status of Walleye Stocks and Conservation Measures Dauphin Lake Fishery Status of Walleye Stocks and Conservation Measures Date: December, 21 Dauphin Lake Fishery Status of Walleye Stocks and Conservation Measures Background: Walleye stocks in Dauphin

More information

WILD HOGS IN MISSISSIPPI

WILD HOGS IN MISSISSIPPI WILD HOGS IN MISSISSIPPI Emerging Issues and Potential Problems Wild hogs are not native to North America and are not classified as wildlife. In the late 1980s, established populations of wild hogs in

More information

Controlled Take (Special Status Game Mammal Chapter)

Controlled Take (Special Status Game Mammal Chapter) Controlled Take (Special Status Game Mammal Chapter) Background of issue: The current Plan contains standards including the use of controlled take as a management response tool to assist in some situations

More information

Management of Canada Geese

Management of Canada Geese Management of Canada Geese Erika Lok, Canadian Wildlife Service Union of BC Municipalities Convention - Urban Wildlife Workshop September 27, 2011 Historical and current distribution of southern breeding

More information

Minnesota Deer Population Goals

Minnesota Deer Population Goals This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota Deer Population

More information

Reduction in Biological Diversity Section 4.1 p Section 4.3 p

Reduction in Biological Diversity Section 4.1 p Section 4.3 p Reduction in Biological Diversity Section 4.1 p. 57-65 Section 4.3 p. 72-78 Review Ecological Diversity A variety of ecosystems (mountains, forests, deserts) and how they interact together. Community Diversity

More information

TWA Public Values of Wildlife on Private Lands Initiative. FAQ Information Sheet

TWA Public Values of Wildlife on Private Lands Initiative. FAQ Information Sheet TWA Public Values of Wildlife on Private Lands Initiative FAQ Information Sheet 1. What prompted TWA to initiate its Public Values of Wildlife on Private Lands Initiative? TWA has always been an advocacy

More information

Rural Ontario s Hidden Sector: The Economic Importance of the Horse Industry Final Report

Rural Ontario s Hidden Sector: The Economic Importance of the Horse Industry Final Report Rural Ontario s Hidden Sector: The Economic Importance of the Horse Industry Final Report - 2009 Photo Credit: J.W. Wilton Dr. Bronwynne Wilton and Dr. Wayne Caldwell University of Guelph 1 Executive Summary

More information

Peace Region Wildlife Regulations Proposed Changes for Comment ( )

Peace Region Wildlife Regulations Proposed Changes for Comment ( ) Peace Region Wildlife Regulations Proposed Changes for Comment (2010-11) INTRODUCTION This document summarizes changes to hunting regulations currently under consideration in the Peace Region. These changes,

More information

IMPLEMENTING REGULATIONS OF THE WILDLIFE CONSERVATION LAW. Authorized by the Republic of China Wildlife Conservation Law, amended October 29, 1994.

IMPLEMENTING REGULATIONS OF THE WILDLIFE CONSERVATION LAW. Authorized by the Republic of China Wildlife Conservation Law, amended October 29, 1994. IMPLEMENTING REGULATIONS OF THE WILDLIFE CONSERVATION LAW Authorized by the Republic of China Wildlife Conservation Law, amended October 29, 1994. CHAPTER I: INTRODUCTION Section 1. The following regulations

More information

REPUBLIC OF LITHUANIA LAW ON WILDLIFE. November 6, 1997 No. VIII-498. Vilnius CHAPTER I GENERAL PROVISIONS

REPUBLIC OF LITHUANIA LAW ON WILDLIFE. November 6, 1997 No. VIII-498. Vilnius CHAPTER I GENERAL PROVISIONS Official Translation REPUBLIC OF LITHUANIA LAW ON WILDLIFE November 6, 1997 No. VIII-498 Vilnius CHAPTER I GENERAL PROVISIONS ARTICLE 1. The Basic Definitions in this Law 1. Wildlife denotes vertebrate

More information

NATIONAL PARKS CONSERVATION ASSOCIATION Protecting Parks for Future Generations

NATIONAL PARKS CONSERVATION ASSOCIATION Protecting Parks for Future Generations NATIONAL PARKS CONSERVATION ASSOCIATION Protecting Parks for Future Generations Testimony of, Program Manager Re: "Yellowstone National Park Bison" before the House Subcommittee on National Parks, Forests

More information

Memorandum of Understanding concerning. Conservation, Restoration and Sustainable Use of the Saiga Antelope (Saiga tatarica tatarica)

Memorandum of Understanding concerning. Conservation, Restoration and Sustainable Use of the Saiga Antelope (Saiga tatarica tatarica) Memorandum of Understanding concerning Conservation, Restoration and Sustainable Use of the Saiga Antelope (Saiga tatarica tatarica) Memorandum of Understanding concerning Conservation, Restoration and

More information

Re: Polar Bear Total Allowable Harvest in the Labrador Inuit Settlement Area 2017

Re: Polar Bear Total Allowable Harvest in the Labrador Inuit Settlement Area 2017 December 13 th, 2016 Honourable Perry Trimper Minister of Environment of Conservation Government of Newfoundland and Labrador P.O. Box 8700 St. John s, NL, Canada A1B 4J6 Re: Polar Bear Total Allowable

More information

Management History of the Edwards Plateau

Management History of the Edwards Plateau Management History of the Edwards Plateau Eco regions of Texas Edwards Plateau 24,000,000 acres About 15,000 years ago, the Edwards Plateau was much cooler and was more forested than today. Pollen counts

More information

Marker, L. (2005). Aspects of ecology, biology and conservation strategies of Namibian farmland cheetahs. Animal Keeper's Forum 7/8.

Marker, L. (2005). Aspects of ecology, biology and conservation strategies of Namibian farmland cheetahs. Animal Keeper's Forum 7/8. Marker, L. (2005). Aspects of ecology, biology and conservation strategies of Namibian farmland cheetahs. Animal Keeper's Forum 7/8. Keywords: 1NA/Acinonyx jubatus/biology/cheetah/conservation/ecology/human-wildlife

More information

Research Status. Management Problems

Research Status. Management Problems ARIZONA STATUS REPORT T.L. Britt and J. O1Neil Arizona Game and Fish Department By the late 1800's native elk (Cervus canadensis merriami) were believed to have been extirpated from Arizona. Consequently,

More information

ALBERTA FISH & GAME ASSOCIATION 2015 ANNUAL GENERAL MEETING PASSED RESOLUTIONS FEBRUARY 21, 2015

ALBERTA FISH & GAME ASSOCIATION 2015 ANNUAL GENERAL MEETING PASSED RESOLUTIONS FEBRUARY 21, 2015 ALBERTA FISH & GAME ASSOCIATION 2015 ANNUAL GENERAL MEETING PASSED RESOLUTIONS FEBRUARY 21, 2015 GENERAL RESOLUTION NUMBER G-1-2015 and Sustainable Resource Development permit the use of crossbows during

More information

BRENT N. LONNER, Montana Fish, Wildlife & Parks, Fish & Wildlife Division, PO Box 488, Fairfield, MT 59436, USA

BRENT N. LONNER, Montana Fish, Wildlife & Parks, Fish & Wildlife Division, PO Box 488, Fairfield, MT 59436, USA History of Bighorn Sheep in the Sun River Area, Montana BRENT N. LONNER, Montana Fish, Wildlife & Parks, Fish & Wildlife Division, PO Box 488, Fairfield, MT 59436, USA Abstract: The Sun River bighorn sheep

More information

Eastern Brook Trout. Roadmap to

Eastern Brook Trout. Roadmap to Eastern Brook Trout Roadmap to CONSERVATION Our Brook Trout heritage he wild Brook Trout is an American symbol of persistence, adaptability, and the pristine wilderness that covered North America prior

More information

DMU 065 Ogemaw County Deer Management Unit

DMU 065 Ogemaw County Deer Management Unit DMU 065 Ogemaw County Deer Management Unit Area Description Ogemaw County Deer Management Unit is in the Northern Lower Peninsula Region (NLP). It has roughly 99,000 acres of public land which is about

More information

City of Santa Cruz Interim Tarplant Management

City of Santa Cruz Interim Tarplant Management City of Santa Cruz Interim Tarplant Management 1995-2011 In 2002 65 acres of Arana Gulch was designated as critical habitat for the Santa Cruz tarplant by the U.S. Fish and Wildlife Service (USFWS). The

More information

Report to the Joint Standing Committee on Inland Fisheries and Wildlife

Report to the Joint Standing Committee on Inland Fisheries and Wildlife Report to the Joint Standing Committee on Inland Fisheries and Wildlife As Required by 12 Section 10107-A White-tailed Deer Population Management Written By: Wildlife Management Staff, Inland Fisheries

More information

Frequently Asked Questions and Answers Regarding the Draft Northern Continental Divide Ecosystem (NCDE) Conservation Strategy

Frequently Asked Questions and Answers Regarding the Draft Northern Continental Divide Ecosystem (NCDE) Conservation Strategy Frequently Asked Questions and Answers Regarding the Draft Northern Continental Divide Ecosystem (NCDE) Conservation Chris Servheen, USFWS, chris_servheen@fws.gov 5/1/13 Q1. What is the NCDE Conservation?

More information

WILDLIFE RESEARCH PERMIT APPLICATION MACKENZIE BISON POPULATION MONITORING

WILDLIFE RESEARCH PERMIT APPLICATION MACKENZIE BISON POPULATION MONITORING WILDLIFE RESEARCH PERMIT APPLICATION MACKENZIE BISON POPULATION MONITORING 2019-2024 1. APPLICANT: Dr. Terry Armstrong Bison Ecologist Department of Environment and Natural Resources Government of the

More information

Population Dynamics and Adaptive Management of Yellowstone Bison

Population Dynamics and Adaptive Management of Yellowstone Bison August 1, 2015 Population Dynamics and Adaptive Management of Yellowstone Bison Chris Geremia, Rick Wallen, and P.J. White, Yellowstone National Park Executive Summary During June and July 2015, up to

More information

AFWA Best Management Practices for Prevention, Surveillance, and Management of Chronic Wasting Disease

AFWA Best Management Practices for Prevention, Surveillance, and Management of Chronic Wasting Disease AFWA Best Management Practices for Prevention, Surveillance, and Management of Chronic Wasting Disease INTRODUCTION The Association of Fish and Wildlife Agencies (AFWA) Best Management Practices (BMPs)

More information

Federal Aid in Wildlife Restoration Annual Performance Report of Survey-Inventory Activities 1 July June IS 0 N

Federal Aid in Wildlife Restoration Annual Performance Report of Survey-Inventory Activities 1 July June IS 0 N Alaska Department of Fish and Game Division of Wildlife Conservation Federal Aid in Wildlife Restoration Annual Performance Report of Survey-Inventory Activities 1 July 1991-30 June 1992 8 IS 0 N Susan

More information

2010 to Kootenay Elk Management Plan. Ministry of Environment Province of British Columbia Cranbrook, BC July 2010

2010 to Kootenay Elk Management Plan. Ministry of Environment Province of British Columbia Cranbrook, BC July 2010 2010 to 2014 Kootenay Elk Management Plan Ministry of Environment Province of British Columbia Cranbrook, BC July 2010 www.env.gov.bc.ca/kootenay/emp/emp.htm Table of Contents Executive summary... 3 Introduction...

More information

Summary Report: Built Environment, Health and Obesity

Summary Report: Built Environment, Health and Obesity Research and education Built Environment Edmonton Project Summary Report: Built Environment, Health and Obesity Introduction In 2007 the Canadian Institutes of Health Research and the Heart and Stroke

More information

Other Relevant International Standards OIE Global Conference on Rabies Control 7-9 September 2011, Incheon, Korea

Other Relevant International Standards OIE Global Conference on Rabies Control 7-9 September 2011, Incheon, Korea Other Relevant International Standards OIE Global Conference on Rabies Control 7-9 September 2011, Incheon, Korea Willam B. Karesh, DVM President, OIE Working Group on Wildife Diseaeses Executive Vice

More information

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort Maryland Chapter Trout Unlimited Brook Trout Conservation Effort Photo by Matt Kline Portfolio of Recent Work MDTU Brook Trout Conservation Coordinator: Scott C. Scarfone, ASLA sscarfone@oasisdesigngroup.com

More information

Invasive Species Act, Jeremy Downe Invasive Species Program/Policy Advisor Ministry of Natural Resources and Forestry February 8, 2017

Invasive Species Act, Jeremy Downe Invasive Species Program/Policy Advisor Ministry of Natural Resources and Forestry February 8, 2017 Invasive Species Act, 2015 Jeremy Downe Invasive Species Program/Policy Advisor Ministry of Natural Resources and Forestry February 8, 2017 Invasive Species in Ontario 1 440 180 39 10 Ontario has more

More information

Competition. Competition. Competition. Competition. Competition. Competition. Competition. Long history in ecology

Competition. Competition. Competition. Competition. Competition. Competition. Competition. Long history in ecology Two species use the same limited resource or harm one another while seeking a resource Resource Organisms use common resources that are in short supply Resource Interference Interference Organisms seeking

More information

Population Ecology Yellowstone Elk by C. John Graves

Population Ecology Yellowstone Elk by C. John Graves Population Ecology Yellowstone Elk by C. John Graves Group Names: Hour Date: Date Assignment is due: end of class Score: + - Day of Week Date Rocky Mountain elk (Cervus elaphus) living in Yellowstone National

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

Ministry of Forests, Lands and Natural Resource Operations

Ministry of Forests, Lands and Natural Resource Operations For Immediate Release 2015FLNR0004-000035 January 15, 2015 INFORMATION BULLETIN Government acting to save endangered caribou VICTORIA - The Ministry of Forests, Lands and Natural Resource Operations is

More information

RESOURCE BOOKLET N10/4/ENVSO/SP2/ENG/TZ0/XX/T ENVIRONMENTAL SYSTEMS AND SOCIETIES PAPER 2. Wednesday 3 November 2010 (morning) 2 hours

RESOURCE BOOKLET N10/4/ENVSO/SP2/ENG/TZ0/XX/T ENVIRONMENTAL SYSTEMS AND SOCIETIES PAPER 2. Wednesday 3 November 2010 (morning) 2 hours N10/4/ENVSO/SP2/ENG/TZ0/XX/T 88106303 ENVIRONMENTAL SYSTEMS AND SOCIETIES Standard level PAPER 2 Wednesday 3 November 2010 (morning) 2 hours RESOURCE BOOKLET INSTRUCTIONS TO CANDIDATES Do not open this

More information

COSEWIC Assessment and Status Report for Grizzly Bear Western population (Ursus arctos) in Canada SUMMARY

COSEWIC Assessment and Status Report for Grizzly Bear Western population (Ursus arctos) in Canada SUMMARY 1 COSEWIC Assessment and Status Report for Grizzly Bear Western population (Ursus arctos) in Canada SUMMARY The COSEWIC Assessment and Status Report for grizzly bears assess the status of Western and Ungava

More information

Iroquoia Heights Conservation Area White-tailed Deer Management Strategy

Iroquoia Heights Conservation Area White-tailed Deer Management Strategy Iroquoia Heights Conservation Area White-tailed Deer Management Strategy Public Engagement Workshops May 31 st and June 1 st, 2011 Hosted by Hamilton Conservation Authority (HCA) and the Deer Management

More information

Targeted Wild Pig Feeder by WPF, Inc.

Targeted Wild Pig Feeder by WPF, Inc. Targeted Wild Pig Feeder by WPF, Inc. There are only two types of people in Texas, those who have pigs and those who re goin to get em. Is this an exaggeration or an overstatement? Texas A&M University

More information

Management Plan for. Elk in Yukon

Management Plan for. Elk in Yukon Management Plan for Elk in Yukon 2016 For additional copies of this management plan please contact: Environment Yukon P.O. Box 2703 (V-5R) Whitehorse, Yukon Y1A 2C6 Phone: 867-667-5652 Toll free (in Yukon):

More information

CWD 102 for Managers. Chronic Wasting Disease - the beginnings Colorado Univ. of Wyoming

CWD 102 for Managers. Chronic Wasting Disease - the beginnings Colorado Univ. of Wyoming CWD 102 for Managers Bryan Richards CWD Project Leader USGS U.S. Department of the Interior U.S. Geological Survey Chronic Wasting Disease - the beginnings 1967 Colorado Mule deer research facility Loss

More information

SP-472 AUGUST Feral Hog Population Growth, Density and Harvest in Texas

SP-472 AUGUST Feral Hog Population Growth, Density and Harvest in Texas SP-472 AUGUST 2012 Feral Hog Population Growth, Density and Harvest in Texas Photo courtesy Jared Timmons, Texas AgriLife Extension Service Feral hogs (Sus scrofa) are non-native, highly adaptable, and

More information

Keywords: 7SI/Brown bear/harvest/harvest quota/hunting/malme/management/ mortality/population size/trend/ursus arctos

Keywords: 7SI/Brown bear/harvest/harvest quota/hunting/malme/management/ mortality/population size/trend/ursus arctos Ministry of the Environment and Spatial Planning. Management with the brown bear population in Slovenia. Report: 1-6. 2006. Republic of Slovenia, Ministry of the Environment and Spatial Planning. Keywords:

More information

Canon Envirothon Wildlife Curriculum Guidelines

Canon Envirothon Wildlife Curriculum Guidelines Canon Envirothon Wildlife Curriculum Guidelines Please note: the resources in this document are web links and require an internet connection to access them. Key Point 1: Knowledge of Wild Birds, Mammals

More information

EXHIBIT C. Chronic Wasting Disease

EXHIBIT C. Chronic Wasting Disease EXHIBIT C Chronic Wasting Disease What is CWD? Fatal neurological disease similar to mad cow disease, but only found in cervids (deer, elk, moose and caribou). Not spread by a virus, bacteria or fungus,

More information

Sustainable use of wildlife in the context of the GIZ Regional Programme in Central Asia

Sustainable use of wildlife in the context of the GIZ Regional Programme in Central Asia Sustainable use of wildlife in the context of the GIZ Regional Programme in Central Asia Stakeholder Meeting on the Conservation of Large Mammals in Central Asia 23-25 September 2014, Bishkek, Kyrgyzstan

More information

COUNCIL DIRECTIVE 79/409/EC. of 2 April on the conservation of the wild birds

COUNCIL DIRECTIVE 79/409/EC. of 2 April on the conservation of the wild birds EN COUNCIL DIRECTIVE 79/409/EC of 2 April 1979 on the conservation of the wild birds THE COUNCIL OF THE EUROPEAN COMMUNITIES, Having regard to the Treaty establishing the European Economic Community, and

More information

Bison Conservation in Canada

Bison Conservation in Canada Bison Conservation in Canada Shelley Pruss Parks Canada Agency Greg Wilson Environment and Climate Change Canada 19 May 2016 1 Canada is home to two subspecies of bison Key morphological differences between

More information

FINAL ENVIRONMENTAL IMPACT STATEMENT ON RESIDENT CANADA GOOSE MANAGEMENT Questions and Answers

FINAL ENVIRONMENTAL IMPACT STATEMENT ON RESIDENT CANADA GOOSE MANAGEMENT Questions and Answers FINAL ENVIRONMENTAL IMPACT STATEMENT ON RESIDENT CANADA GOOSE MANAGEMENT Questions and Answers The following document answers some common questions about the issue of overabundant resident Canada goose

More information

Notice of Intent to Prepare an Environmental Impact Statement and Management

Notice of Intent to Prepare an Environmental Impact Statement and Management This document is scheduled to be published in the Federal Register on 07/10/2015 and available online at http://federalregister.gov/a/2015-16851, and on FDsys.gov 4310-MA DEPARTMENT OF THE INTERIOR National

More information

NEWS RELEASE. Harvest allocation ensures certainty for hunting sector

NEWS RELEASE. Harvest allocation ensures certainty for hunting sector For Immediate Release 2015FLNR0009-000152 February 6, 2015 NEWS RELEASE Harvest allocation ensures certainty for hunting sector VICTORIA Forests, Lands and Natural Resource Operations Minister Steve Thomson

More information

Big Game Allocation Policy Sub-Committee Recommendations to AGPAC

Big Game Allocation Policy Sub-Committee Recommendations to AGPAC Big Game Allocation Policy Sub-Committee Recommendations to AGPAC Hunting provides important social, economic and environmental benefits to all Albertans, with approximately 130,000 resident and non-resident

More information

Black Sturgeon Regional Plan

Black Sturgeon Regional Plan Black Sturgeon Regional Plan This is one of twenty Regional Plans that support implementation of the Lake Superior Biodiversity Conservation Strategy (Strategy). The Strategy, prepared and overseen by

More information

Invasive Species. 1. What do you think might happen if a species is moved out of its native habitat and into a new environment?

Invasive Species. 1. What do you think might happen if a species is moved out of its native habitat and into a new environment? Name Date Hr Invasive Species Every animal and plant species has a native habitat, or environment where it naturally and normally lives and grows. Humans sometimes relocate a species, either by accident

More information

Update on Columbia Basin Partnership Task Force

Update on Columbia Basin Partnership Task Force Update on Columbia Basin Partnership Task Force June 25, 2018 Marla Harrison Port of Portland M A F A C C B P T A S K F O R C E Overview of Today s Presentation: Background on Columbia Basin & why we need

More information

Big Game Season Structure, Background and Context

Big Game Season Structure, Background and Context To: Members of the Colorado Parks and Wildlife Commission From: Danielle Isenhart, Regulations Manager Date: April 16, 2018 Re: 2020-2024 Big Game Season Structure, Background and Context At the May Commission

More information

Contact for service: Lindsay Fung Deer Industry New Zealand P O Box Wellington Phone:

Contact for service: Lindsay Fung Deer Industry New Zealand P O Box Wellington Phone: Proposed Ōpōtiki District Plan Chapter 8 Rural Zone Hearing Statement on behalf of the New Zealand Deer Farmers Association, Bay of Plenty Branch 27 July 2017 Contact for service: Lindsay Fung Deer Industry

More information

Implementing the New Fisheries Protection Provisions under the Fisheries Act

Implementing the New Fisheries Protection Provisions under the Fisheries Act Implementing the New Fisheries Protection Provisions under the Fisheries Act Discussion Paper Fisheries and Oceans Canada April 2013 Contents 1. Introduction 2. Managing Threats to Canada s Fisheries 3.

More information

2015 Deer Population Goal Setting

2015 Deer Population Goal Setting Deer advisory team recommendations Block 4: East Central Uplands The following pages represent deer population goals recommended by the 2015 deer advisory team for Block 4: East Central Uplands (permit

More information

Minnesota Elk Past and Present. Minnesota Department of Natural Resources Division of Wildlife Thief Lake Wildlife Management Area

Minnesota Elk Past and Present. Minnesota Department of Natural Resources Division of Wildlife Thief Lake Wildlife Management Area Minnesota Elk Past and Present Minnesota Department of Natural Resources Division of Wildlife Thief Lake Wildlife Management Area Original elk range in Minnesota Remainder of state caribou country 1860

More information

Draft Wild Horse Management Plan

Draft Wild Horse Management Plan Draft Wild Horse Management Plan Each year, Kosciuszko National Park provides thousands of visitors with experiences that are not available anywhere else. Maintaining the balance between protecting the

More information

IMPROVING POPULATION MANAGEMENT AND HARVEST QUOTAS OF MOOSE IN RUSSIA

IMPROVING POPULATION MANAGEMENT AND HARVEST QUOTAS OF MOOSE IN RUSSIA IMPROVING POPULATION MANAGEMENT AND HARVEST QUOTAS OF MOOSE IN RUSSIA Vladimir M. Glushkov Research Institute of Game Management and Fur Farming, Kirov, Russia. ABSTRACT: Annual harvest quotas for moose

More information