Fourth International Symposium on Tunnel Safety and Security, Frankfurt am Main, Germany, March 17-19, 2010

Size: px
Start display at page:

Download "Fourth International Symposium on Tunnel Safety and Security, Frankfurt am Main, Germany, March 17-19, 2010"

Transcription

1 Application of a system-based and a scenario-based risk analysis to the Driskos tunnel Reflections about accuracy of collected data and uncertainties of risk analysis methods Raphaël Defert, BG Bonnard & Gardel Ingénieurs Conseils, France Ioannis Rentzeperis, Egnatia Odos, Greece Konstantinos Koutsoukos, Egnatia Odos, Greece Philippe Pons, BG Bonnard & Gardel Ingénieurs Conseils, France Didier Lacroix, CETU, France ABSTRACT Application of European Directive 2004/54/EC to road tunnels (over 500 m length on the trans- European road network) makes it necessary to perform risk analysis. Such risk analysis is also part of the safety documentation which is submitted to Administrative Authority for the operational approval of each tunnel. The Directive specifies a number of cases where risk analysis is required, and requires a Specific Hazard Investigation for all tunnels. Scenario-based and system-based risk analyses are the two main methodologies of risk analysis used for road tunnels. For the Driskos tunnel, situated near Ioannina in Greece in Egnatia Odos motorway, both methodologies have been applied: A scenario-based method has been used for the Specific Hazard Investigation (which aims at studying all kinds of risks); A system-based risk analysis has been performed to support the decision about restrictions or not of the transport of Dangerous Goods (DG) in the Driskos tunnel. The compared advantages and limitations of each type of methodology have been widely discussed. This paper focuses on, using the Driskos tunnel risk analyses as reference, relevance and limits of each type of methodology, taking into account the unavoidable uncertainties of the collected data and the risk analyses themselves. KEYWORDS: uncertainties, risk analysis, European Directive 2004/54/EC, quantitative risk assessment, Dangerous Goods INTRODUCTION As a result of the Article 13 of European Directive 2004/54/EC requirements, the French Tunnel Study Centre (CETU) and the consultant BG have been mandated by Egnatia Odos SA to jointly carry out risk analyses for the Driskos tunnel. The risk analyses have been carried out based on the French methodology (Guide to Road Tunnel Safety Documentation from CETU): 1. Risk analysis according to article 13 of the European Directive: a Specific Hazard Investigation has been carried out according to the French methodology described in the booklet 4 (Guide to Road Tunnel Safety Documentation - SHI). 2. Risk analysis due to the transport of DG, according to Annex I article 3.7 of the European Directive in 2 steps (booklet 3 (Guide to Road Tunnel Safety Documentation Risk analyses relating to dangerous goods transport): Calculation of Intrinsic Risk of the Driskos tunnel, as a first step to check if it's necessary or not to perform a complete comparative risk analysis in a second step. Comparative risk analysis between Driskos route (EO) and an alternative route through Ioannina. 113

2 From a methodological point of view, these risk studies are based on two different methodologies: Specific Hazard Investigation (scenario-based risk analysis): the method consists in applying a transversal approach (incorporating the tunnel s safety devices, operation and intervention resources, traffic volumes, etc.). The aim of this method is to analyse the development of some fire scenarios and their consequences (with the help of simulation software), in order to evaluate whether the tunnel measures ensure safe conditions or not. Comparative risk analysis (system-based risk analysis): it is supported by the use of a software (QRA model for this case) that fully quantifies the risks on the base of input data. Indeed, quantification of the frequency and severity components of the risks make it possible to determine the frequency/severity curves, which allows comparison of different possible choices. Egnatia Odos motorway is the Greek part of the European transportation route E90. It is a major motorway, that extends from the western port of Igoumenitsa to the eastern Greek-Turkish border at Kipoi. It is part of the trans-european network (TEN). The Driskos tunnel, operated by Egnatia Odos SA, is located near the city of Ioannina, in Epirus. It is a twin bores tunnel with a length of m. Figure 1 Egnatia Odos motorway and Driskos tunnel This article covers the following topics successively: Presentation of the Specific Hazard Investigation of the Driskos tunnel; Presentation of the Comparative Risk Analysis of the Driskos tunnel; Discussion about uncertainties of these risk analysis methods; Conclusions. SPECIFIC HAZARD INVESTIGATION OF DRISKOS TUNNEL The Specific Hazard Investigation (SHI) is based on a reference condition. For Driskos tunnel, it corresponds to the current state of the tunnel, excluding additional ventilation measures (shaft) in the middle of the tunnel, which was not considered in the risk analysis. In a first step, the SHI describes the characteristics of the tunnel, its operation and environment, and takes into account the traffic forcasts for the 2020 target year. The safety provisions of the tunnel are compared with the minimum requirements of Directive 2004/54/EC. A functional description of the tunnel is made to analyse and check how the main structural facilities, equipment, operational and emergency measures contribute to the safety functions. Within the SHI, the objectives are to identify the hazards and to choose representative scenarios to be investigated in details. For that purpose, the following steps have been carried out: Taking into account, in an exhaustive way, the dangerous events that may occur; Prioritizing these dangerous events as a function of their frequency and potential severity; Selecting a few number of scenarios for an in-depth analysis. 114

3 The frequency/severity matrix below is a representation of the considered dangerous events with their 2 components (frequency and severity), as a support for the selection of scenarios: Frequency Breakdown of car Frequency-Severity Matrix of Driskos Tunnel A B Breakdown of HGV Breakdown of coach Material accident of HGV Material accident of car Material accident of coach Car accident with injury HGV accident with injury Fire of car under control or not Coach accident with injury C Fire of HGV under control Fire of HGV not controlled D Fire of coach under control Fire of coach not controlled E Fire of DG-HGV under control Fire of DG-HGV not controlled F Figure 2 I II III IV V Severity Frequency/Severity matrix of the Driskos tunnel The frequencies are classified according to different categories, from "Very frequent A" (return period < 1 year) to "Extremely rare F" (return period > years). The severities are classified according to different categories, from "Minor I" (material damages) to "Major catastrophe - V" (> 50 fatalities). For the in-depth analysis, 3 fires of different heat release rates have been chosen: 30 MW (fire of an unladen HGV/HGV loaded with materials of low combustibility), 100 MW (full burning of a HGV loaded with combustible materials), 200 MW (fire of a tank of flammable liquids, classified as DG). Associated scenarios, with their contextual parameters, are presented below: Scenario Heat release (MW) Bore Position DeltaP (Pa) 1 30 Left bore PM Right bore PM Right bore PM Left bore Right bore Figure 3 List of fire scenarios Zone 4 These three fire scenarios have been analysed in the framework of very severe scenarios including a fully developed fire, adverse weather conditions and the worst possible location in the tunnel. Moreover, sensitivity studies have been performed to assess the influence of several parameters on the possible consequences of fires. 115

4 The theoretical frequency for an HGV fire in Driskos tunnel is about 1 fire every 75 years (all types of fires, fully developed or under control). Frequency of scenarios 1, 2 and 3 above (fig. 3) is much lower, because: Scenario are fully developed fires; - 50 Pa is an adverse difference of pressure, associated to a very limited frequency; Worst location (according to the ventilation design), in terms of possible effects, has been selected for scenario 2 & 3; Scenario 3 concerns a very limited number of HGV (HGV conveying flammable DG). For every scenario, space-time diagrams are computed. The following parameters are studied: visibility, temperature and CO concentration. These graphs are used to describe the evacuation conditions of the users. As an example, the following graph shows temperature conditions for scenario 2: Figure 4 Space-time diagram for temperature (scenario 2) The space-time diagram above shows the temperatures varying with space (abscissas) and time (ordinates). In this example, some transitory smokes upstream fire can be observed before jet fans are fully operated. However, this effect is only transitory in the first minutes, when fire is not fully developed. On the basis of all the results and analysis, it appears that in all cases, the longitudinal ventilation is able to push all the smoke towards the exit of the tunnel, so that the vehicles blocked behind the fire are finally kept in a safe atmosphere. However, in a few cases, when the traffic is low and the difference of pressure between portals is important and adverse, there is a risk of transitory smokes upstream during a few minutes. During this first phase, road users that are in the traffic jam could then be into smokes as long as jet fans are not fully operational. The consequences (especially temperature) would then depend on: Initial conditions (traffic and difference of pressure); Time to activate appropriated actions (especially jet fans activation); Heat release rate; Number and behaviour of the users; Location of fire. It must be highlighted that this kind of situation occurs in all tunnels with longitudinal ventilation and is considered acceptable in non-urban tunnels, given the very low probability of a fully-developed fire under such very unfavourable conditions. 116

5 Fourth International Symposium on Tunnel Safety and Security, Frankfurt am Main, Germany, March 17-19, 2010 COMPARATIVE RISK ANALYSIS OF DRISKOS TUNNEL Directive 2004/54/EC requires that a risk analysis is performed prior to the choice of a regulation regarding the transportation of DG through a tunnel. Such regulation must additionally comply with the provisions of the European Agreement concerning the International Carriage of DG by Road (ADR). According to ADR, any restriction to the transportation of DG through a tunnel must be made by assigning the tunnel to a category from A to E and by installing the corresponding signs. The principle of these categories is as follows: Figure 5 ADR categories for the transport of DG in tunnel In a first step, the Intrinsic Risk (IR) of the Driskos tunnel has been calculated with the help of the QRA model (PIARC). IR is an indicator of the risks due to the whole DG traffic in the tunnel. As the value of IR for the Driskos tunnel is higher than the threshold 10-3 fatalities/year, a complete Comparative Risk Analysis is compulsory. For the Driskos tunnel, the Comparative Risk Analysis (CRA) aimed at comparing the various possible regulations (A to E), considering that if all or part of the DG are banned from the tunnel, they will use one or several alternative routes which may be more or less dangerous than the tunnel route. Therefore, two routes have been considered: "Driskos route": it is the route (Egnatia Odos motorway) which pass through Driskos tunnel, from Arachthos-Zagori interchange (point A on the map below) to Ioannina interchange (point B). This route includes the Driskos tunnel as well as two short cut-and-cover tunnels. "Alternative route": the alternative route is the old national road that was used for the transport of Heavy Good Vehicles (HGV) before the construction of the Egnatia Odos motorway. This route is longer and partly urban, and includes a 430 m long cut-and-cover. The points A and B are the interchanges where DG-HGV would leave the motorway if Driskos tunnel was forbidden to DG. Cut and cover A Cut and cover Driskos tunnel Cut and cover Alternative route Driskos route Figure 6 B Routes considered in the Comparative Risk Analysis 117

6 This study has been carried out using a QRA Model developed under auspices of PIARC and OECD. It is dedicated to road transport of DG. For the two routes, the input data are: Characteristics of routes (number of lanes, speed limit, etc.); Characteristics of tunnels (safety devices, operation); Global traffic; Traffic of DG and repartition of different goods (flammable liquids, LPG, etc.); Accident rates; Population: on open air sections, a 2D model has been used for the description of the population; Meteorological data. A prospective investigation has been performed up to year In order to take into consideration more realistic input data, a DG traffic counting has been carried out for five days on the alternative route because DG were forbidden in Driskos tunnel at the time the study was carried out. The calculated risks are characterized by two components: The severity (in terms of number of victims); The frequency. The severity is assessed by means of probit equations establishing the correlations between the physical consequences of the scenarios (heating effects, toxic effects, shock wave, etc.) and the physiological consequences of these effects on the exposed people. The calculated severities are the consequences of the scenarios, during the few minutes which follow the accident. In addition, the results obtained should not be considered in an absolute way, but only by comparison (one route with the other), due to uncertainties of that sort of modelling. The risk indicators considered are: F/N curves, that plot the frequency F(N) of accidents with N or more fatalities; "Expected Value" (EV) which represents the average number of fatalities per year. For each regulatory hypothesis (A to E), EV are calculated to characterize the total risk on the network consisting of the two routes. For the Driskos tunnel, due to the nature of the DG found during the counting and the risk analysis methodology, the risk indicators are the same for categories B and C on the one hand, and for categories D and E on the other hand. As a consequence, the risk analysis can only differentiate three solutions for the regulations: A; B/C (i.e. B or C); D/E (i.e. D or E). Global Risk (tunnel route + alternative route) associated to the 5 categories in tunnel Cumulated Frequency (per year) 1.E+00 1.E-01 1.E-02 1.E-03 Itinéraire tunnel : Driskos_route_11 Itinéraire alternatif : alternatif Catégorie A - EV = 2.282E-2 Catégorie B/C - EV = 4.995E-3 Catégorie D/E - EV = 4.630E-3 1.E-04 1.E-05 1.E-06 1.E-07 1.E Figure 7 Number of fatalities Comparison of the different regulations (F/N curves and EV) 118

7 The results show that the category A entails a slightly higher overall EV ( ) than the other categories ( ). However, this difference is not sufficient to base a decision on this only criterion, because of the uncertainties and the results of the sensitivity studies. Due to these results, other criteria have been considered. The other criteria proposed in Booklet 3 are: Decider's "risk aversion" (gives a higher weight to accidents which result in many fatalities, even if they are very rare); DG-HGV accidents not involving DG (considers the fatalities due to accidents involving DG- HGV in which the DG are not released and play no role); Route vulnerability to a DG-HGV accident from economic and environmental points of view; Economic considerations. The table below presents a synthesis of the 4 criteria by the 3 groups of ADR regulation: Table 1 Comparative analysis on the other criteria Decider's "risk aversion" DG-HGV accidents not involving DG Route vulnerability to a DG-HGV accident Economic considerations Category A Category B/C Category D/E From this table, it appears that categories A, B and C are the most appropriated restrictions regimes for the transport of DG. The overall comparison gives some advantage to categories A and especially B/C, so that the risk analysis suggests choosing category B (allowing only certain DG through the Driskos tunnel). However it is important to point out that this decision should be taken by considering not only the above four criteria and also the greek policy for the passage of DG through major highways. In addition, traffic data (whole traffic and DG traffic) for an extended period should be collected in order to fully analyse the issues of categorization. DISCUSSION ABOUT ACCURACY OF COLLECTED DATA AND UNCERTAINTIES OF RISK ANALYSES METHODS The two risk analyses that have been carried out for Driskos tunnel are based on two different methodologies that can be compared from the point of view of uncertainties: Specific Hazard Investigation (SHI) is a scenario-based risk analysis, which can be considered as a semi-quantitative method, because the work of quantification is not completely carried out. For example, the number of fatalities for scenarios studied is of few importance for analysis and not explicitly given, and the frequencies of each scenario (with contextual parameters) are not calculated (deterministic approach). Comparative Risk Analysis (CRA) is a system-based risk analysis, for which the components "Frequency" et "Severity" are completely quantified, but in a rougher way regarding the physical consequences of a scenario. This method allows calculating risk indicators (e.g. EV and F/N curves) given a tunnel, its environment, traffic, accident and other data. The calculation are carried out by means of a QRA methodology which can be considered as a "black box", in which data are entered, and from which risk indicators are produced. 119

8 The main difference between the two approaches is that for SHI, the aim is not to calculate precise numbers of fatalities and their frequencies of occurrence for some scenarios (which anyway cannot be precise due to the large uncertainties), as it is done in the CRA. The aim of the SHI is to analyse and understand, with the help of simulation models (software), the development of scenarios and their consequences on road users. This allows appreciating whether the tunnel measures ensure safe conditions or not, in the few but representative situations described in the scenarios. The figure below summarises these principles: Specific Hazard Investigation Input data + assumptions about circonstancies of specific scenarios Analyse of the consequences, with the help of a simulation model Semi-quantified risk results, that are interpreted by the risk manager Comparative Risk Analysis Input data + assumptions about generic circonstancies Risk assessment model Quantified risks results To + 2 minutes : fermeture du tunnel Cumulated frequency 1/(100m*year) 1.E-03 1.E-04 1.E-05 1.E-06 Catégorie A - EV = 1.324E-5 Catégorie B - EV = 1.188E-5 Catégorie C - EV = 8.349E-6 Catégorie D/E - EV = 0 1.E-07 1.E-08 1.E-09 1.E-10 Figure 8 Comparison of CRA and SHI principles 1.E EV = Expected Value = Fatalities / year Number of fatalities The SHI process involves important analysis work by the risk manager, such as: Decision choices at every step of the study (what scenarios, what contextual parameters, etc.); Step by step calculations and evaluation of the results; Conclusions, interpretations of results and finally recommendations. On the other hand, the CRA process generates automatically the above two tasks by a risk assessment model. The above methods present 3 different sources of uncertainties: Using a model, which necessitates a more or less major simplification of the real conditions, induces some uncertainties. Simplifications are a necessity regarding the complexity of a real case. Those methodological simplifications induce intrinsic approximations that contribute to uncertainties at a basic level; Data used for assessment of the risks are more or less uncertain (time to launch ventilation, traffic data, etc.); Tools/software that are used to calculate the severity of dangerous events, e.g. fire simulation models (used to calculate ambient conditions in case of fire in a tunnel), are based on intrinsic simplifications. It is very difficult to know how large the uncertainties are, because they are generally not quantified themselves. As a matter of fact, such an evaluation would even not be possible in most cases, due to the number of data and models used in a risk analysis, especially a system-based risk analysis. For further examination of the uncertainties in general and beyond any consideration of the Driskos case study, a comparison of the two processes SHI and CRA was performed. The common situation considered was a scenario of a fuel tanker fire: 120

9 In SHI, scenario 3 is a 200 MW fire (standardised Heat Release Rate), which is considered to be representative of a fuel tanker fire; In CRA, a scenario of pool fire, associated to flammable liquid (fuel tanker), is considered. The two different ways to assess the risks associated to this scenario, and the related uncertainties, will then be compared in the following. Uncertainties in the simplification of the reality The table below compares the simplifications of the reality for each study: Table 2 Simplification of the reality for each study Choice of contextual factors Source term Behaviour of road users Assessment of the consequences on road users Assessment of the frequencies SHI process CRA process For the 200 MW fire, several contextual For fuel tanker, a scenario of pool fire is factors have been selected: included in the QRA model. Calculations are carried out for: 3 traffic conditions (hourly traffic) 3 different configurations of traffic 3 positions of the fire in the tunnel 5 positions of fire in each bore Several ΔP between portals 1 ΔP between portals (sensitivity study) Several kinetics of operating Possibly 3 kinetics of operating conditions (closure of the tunnel, conditions (according to periods of time ventilation, etc.) in the day) Standardized source term (Heat Release Rate, CO production, etc.) for a 200 MW fire, which correspond to a simplification of the reality taking into account all the possible pool fire surface according to the geometric characteristics of the tunnel Some parameters are standardized (velocity, time to react, etc.) / Several behaviours have been considered in the SHI: Users stay or not in their vehicles Users take or not cross-passages Users walk or not in the right direction Hypotheses are taken into account concerning the lethality thresholds for people. These thresholds are compared with the physical effects calculated by the simulation model, but no number of fatalities is calculated. Frequencies are assessed for families of events (fires, accidents, etc.), and are only used to select scenarios. Heat Release Rate and other parameters roughly calculated according to the geometry of the pavement (slope, cant) and the capacity of the drainage system (surface of the pool fire). Standardized hypotheses are made in the QRA model concerning the behaviour of road users (velocity, time to react, etc.), according to the different alert safety devices in the tunnel (radio, signalling, etc.). Hypotheses are taken into account concerning the lethality thresholds for 3 percentages of lethality. These thresholds are compared with the physical effects calculated by the QRA model, and the number of fatalities for each configuration is deduced. This is a simplification in that the percentage of lethality is a continuous value. Moreover, it is supposed a repartition of the categories of road users inside the tunnel: Pedestrians Road users in their vehicles with closed windows, etc. Probability distributions are assigned in QRA model for each parameter (e.g. probability for each position of fire in the tunnel). These distributions (range of values that the parameters can assume with associated probability) induce uncertainties 121

10 From this table, it appears a priori that uncertainties linked to the simplified representation of the reality are not fundamentally different for consequences (except for the use of different softwares, if they have not the same level of accuracy, see thereafter). Actually, they are probably higher for CRA because the calculation of number of fatalities requires a more detailed discretization of the reality. In CRA, uncertainties related to the assessment of frequencies have to be considered in addition. Indeed, it must be considered that simplifications induce 2 sources of uncertainties for CRA: Uncertainties on severities (discrete values of parameters having an influence on severity); Uncertainties on frequencies (probability distribution of these discrete values). On the contrary, only 1 source of uncertainties exist in a scenario-based approach. Indeed, SHI is more a deterministic approach and the uncertainties concern mainly severity component. In addition, it should be noticed that for SHI, the risk manager has the possibility to choose all the contextual elements that seem necessary, until he estimates that the set of scenarios is sufficiently representative of all cases that could happen in the tunnel. In any case, these simplifications introduce an important level of uncertainties that remain very difficult to quantify. Uncertainties in the input data The table below compares the level of detail of input data for each method: Table 3 Level of details of input data for each study SHI Geometric Length characteristics Cross-section area of the tunnel Slope Cant Number of lanes Safety devices Closure devices Detection/operation devices (CCTV, radio, signalling, etc.) Ventilation system (number, localisation, power of jet fans, etc.) and ventilation scenarios Water mist system and its technical characteristics (if any) Delays Delay to close the tunnel Delay to launch ventilation and/or water mist system Delay to inform users Delay to inform emergency services Traffic data Hourly traffic (+ other traffic parameters of lower influence) CRA Length Cross-section area Slope Cant Number of lanes Closure devices Detection/operation devices (CCTV, radio, signalling, etc.) Ventilation system (number, localisation, power of jet fans, etc.) and ventilation scenarios Specifications of drainage system Delay to close the tunnel Delay to launch ventilation Delay to inform users Hourly traffics for 3 periods of time AADT of fuel tanker traffic Average length of vehicles Average number of people in vehicles (cars, coaches, etc.) Speed of vehicles Not taken into account Emergency services Possibility to take account, in a qualitative way, of intervention of emergency services Fire rates Fire rates are considered to have an idea of Fire rates are considered to calculate all the the frequency of occurrence frequency of occurrence Environment Difference of pressure between portals Difference of pressure between portals 122

11 From this table, it appears that the number of input data is of the same order of magnitude for both methodologies. The main difference concerns traffic data necessary to calculate frequencies of occurrence (proportional to the fuel tanker traffic) and number of fatalities (length of the traffic jam, number of road users, etc.): they are more detailed in the CRA. For both methods, it should be noticed that the risk manager has the possibility to carry out sensitivity studies for all these parameters. For example, the variations of the results according to different values of a parameter (detection times, traffic levels, etc.) allow to determine the impact of each of these parameters and to define a severity range associated to each scenario. The uncertainties of these families of data are very various between them. The table below gives a qualitative appreciation of their level of accuracy, and of their level on influence on the results: Input data Order of magnitude of uncertainties Influence on results (from *: low influence to ***: high influence) Geometric characteristics of the tunnel * Safety devices ** Delays *** Traffic data *** Fire rates (1) ** Environment ** Figure 9 Order of magnitude of uncertainties for each input data (1) In contrast to traffic accidents on open roads, there is relatively little data on incidents in road tunnels and published statistics for few countries only (information on tunnel fires is still quite sparse). Uncertainties in the modelling tools The table below compares the uncertainties of each method for modelling tools: Table 4 Modelling tools for each study Simulation model SHI For SHI, 1D or 3D simulation models can be used according to the ventilation system. CRA In CRA, some rough models are used to assess distances of effect inside the tunnel. For fires, a 1D model is used, which cannot take account of stratification phenomena. Then uncertainties are much higher when a 3D model should be used. From this point of view, it clearly appears that SHI makes it possible to choose adapted simulation models, even if they include some unavoidable uncertainties. On the contrary, in system-based methods, modelling tools that are used have to be adapted to all the different configuration of tunnels (geometry, ventilation system, etc.). For this reason, these models are generally more simple and rougher than specific software that can be used by a risk manager, which has the possibility to adapt the sophistication of the model used to the complexity of the tunnel studied. In scenarios-based methods, it is therefore possible to reduce uncertainties linked with modelling tools. 123

12 CONCLUSION From the analysis above, the following conclusions can be drawn: As system-based methods aims at quantifying every component of the risk (frequency and severity components), related uncertainties are higher than for scenario-based methods. For scenario-based methods, uncertainties only affect the consequences of the examined scenarios. For system-based risk analysis, uncertainties affect the whole F/N curve. Moreover, system-based methods are generally based on dedicated software for the calculation of consequences. This model has to be adapted to all the different systems, and is most of the time simpler and rougher than specific software that can be used by a risk manager. Indeed, a risk manager has the possibility to adapt the sophistication of the model to the complexity of the tunnel. In scenario-based methods, it is therefore possible to reduce uncertainties linked with modelling tools. To reduce uncertainties, whenever possible, it is more appropriated to use specific data than generic data or default values. If the use of specific data is not possible, it is at least necessary to check the origin of the data used (are the conditions relating to infrastructure, traffic, etc. similar to the case studied?). In any case, there are many sources of uncertainties. Consequently, the results (space-time diagrams, risk indicators, etc.) may be more pertinent in a comparative approach (e.g. of various routes, or of an existing state to a reference state of a tunnel). Indeed, the best way to reduce the uncertainty is to compare situations in which you only modify one parameter at a time. In a comparative approach, the uncertainty is certainly lower than in an absolute approach, because there are fewer differing data and models. It could appear that some uncertainties are larger than the differences between the values you wish to compare: in these cases, it is therefore difficult to conclude whether the alternative measures ensure an equivalent protection or not. Results coming from risk studies must be interpreted as an order of magnitude and not as absolute values. For these reasons, risk analysis should only be performed by specialists with sufficient experience and understanding of the methods they use and their intrinsic limitations. ACKNOWLEDGMENT: The author would like to thank Mr. Athanasios Tsantsanoglou, supervisor of EOAE for the Risk Analysis study of Driskos tunnel, for his valuable support and assistance throughout the duration of the study. 124

Road transportation of dangerous goods quantitative risk assessment and route comparison

Road transportation of dangerous goods quantitative risk assessment and route comparison Road transportation of dangerous goods quantitative risk assessment and route comparison Philippe Cassini, Nelson Rodrigues To cite this version: Philippe Cassini, Nelson Rodrigues. Road transportation

More information

AUSTRIAN RISK ANALYSIS FOR ROAD TUNNELS Development of a new Method for the Risk Assessment of Road Tunnels

AUSTRIAN RISK ANALYSIS FOR ROAD TUNNELS Development of a new Method for the Risk Assessment of Road Tunnels - 204 - ABSTRACT AUSTRIAN RISK ANALYSIS FOR ROAD TUNNELS Development of a new Method for the Risk Assessment of Road Tunnels Kohl B. 1, Botschek K. 1, Hörhan R. 2 1 ILF, 2 BMVIT In Austria, in the past

More information

Quantitative risk assessment and risk-based decision making

Quantitative risk assessment and risk-based decision making Norwegian Tunnel Safety Conference 2018 «Connecting Tunnels and Communities» Quantitative risk assessment and risk-based decision making Bernhard KOHL, ILF 18.06.2018 OUTLINE Background Tools for risk-based

More information

AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR

AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR - 9 - AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR O Gorman S., Nuttall R., Purchase A. Parsons Brinckerhoff, Australia ABSTRACT Recent fire tests for tunnels

More information

Tools for safety management Effectiveness of risk mitigation measures. Bernhard KOHL

Tools for safety management Effectiveness of risk mitigation measures. Bernhard KOHL Tools for safety management Effectiveness of risk mitigation measures Bernhard KOHL Contents Background Tools for risk-based decision making Safety measures Illustration of methodical approach Case studies

More information

NUMERICAL INVESTIGATION OF THE FLOW BEHAVIOUR IN A MODERN TRAFFIC TUNNEL IN CASE OF FIRE INCIDENT

NUMERICAL INVESTIGATION OF THE FLOW BEHAVIOUR IN A MODERN TRAFFIC TUNNEL IN CASE OF FIRE INCIDENT - 277 - NUMERICAL INVESTIGATION OF THE FLOW BEHAVIOUR IN A MODERN TRAFFIC TUNNEL IN CASE OF FIRE INCIDENT Iseler J., Heiser W. EAS GmbH, Karlsruhe, Germany ABSTRACT A numerical study of the flow behaviour

More information

Appendix FRANCE Lyon Croix-Rousse Tunnel

Appendix FRANCE Lyon Croix-Rousse Tunnel Appendix 2.9 - FRANCE Lyon Croix-Rousse Tunnel 1. SUMMARY A NEW MULTIMODAL TUNNEL The Croix-Rousse tunnel is located in Lyons (France). The City of Lyons has about 475.000 inhabitants with 1,31 million

More information

LONGITUDINAL AIR VELOCITY CONTROL IN A ROAD TUNNEL DURING A FIRE EVENT

LONGITUDINAL AIR VELOCITY CONTROL IN A ROAD TUNNEL DURING A FIRE EVENT - 27 - LONGITUDINAL AIR VELOCITY CONTROL IN A ROAD TUNNEL DURING A FIRE EVENT R. Borchiellini, V. Ferro, V. Giaretto Energy Department Politecnico di Torino Italy ABSTRACT Ventilation equipment is used

More information

RISK ANALYSES OF THE SAFETY LEVEL OF GALLERIES

RISK ANALYSES OF THE SAFETY LEVEL OF GALLERIES - 34 - RISK ANALYSES OF THE SAFETY LEVEL OF GALLERIES Mayer G. 1, Sistenich C. 2, Zimmermann U. 3, Zulauf C. 4 1 PTV AG, Germany 2 Bundesanstalt für Straßenwesen (BASt), Germany; 3 BUNG Ingenieure AG,

More information

The Science of Quantitative Risk Assessment for Explosives Safety

The Science of Quantitative Risk Assessment for Explosives Safety The Science of Quantitative Risk Assessment for Explosives Safety By John Tatom (Manager, Explosives Safety Group, A-P-T Research, Inc. Quantitative risk assessment (QRA) tools, as described in the QRA

More information

Appendix FRANCE Annecy Tunnel Courier

Appendix FRANCE Annecy Tunnel Courier Appendix 2.7 - FRANCE Annecy Tunnel Courier 1. TRANSIT TUNNEL AND ACCESS TO UNDERGROUND PARKING LOTS The Courier tunnel is located in Annecy (France), a city of about 55,000 inhabitants and the centre

More information

Analyses and statistics on the frequency and the incidence of traffic accidents within Dolj County

Analyses and statistics on the frequency and the incidence of traffic accidents within Dolj County UNIVERSITY OF PITESTI SCIENTIFIC BULLETIN Faculty of Mechanics and Technology AUTOMOTIVE series, year XXIV, no. 28 Analyses and statistics on the frequency and the incidence of traffic accidents within

More information

OPTIMISATION OF VENTILATION IN THE CASE OF A FIRE IN ROAD TUNNELS

OPTIMISATION OF VENTILATION IN THE CASE OF A FIRE IN ROAD TUNNELS - 51 - OPTIMISATION OF VENTILATION IN THE CASE OF A FIRE IN ROAD TUNNELS ABSTRACT Stosch R. 1, Wehner M. 1, Brandt R. 2 HBI HAERTER AG, Tunnel Ventilation Heidenheim 1, D and Zurich 2, CH The control of

More information

Study on fatal accidents in Toyota city aimed at zero traffic fatality

Study on fatal accidents in Toyota city aimed at zero traffic fatality Study on fatal accidents in Toyota city aimed at zero traffic fatality Toru Kiuchi, Yoshihisa Kanno, Makoto Shiota Toyota Motor Corporation, 1 Toyota-cho, Toyota-shi, Aichi 471-8571, Japan Abstract - Since

More information

A COMPARATIVE RISK ANALYSIS FOR SELECTED AUSTRIAN TUNNELS

A COMPARATIVE RISK ANALYSIS FOR SELECTED AUSTRIAN TUNNELS - 242 - A COMPARATIVE RISK ANALYSIS FOR SELECTED AUSTRIAN TUNNELS ABSTRACT Knoflacher H., Pfaffenbichler P. C. Institute for Transport Planning and Traffic Engineering Vienna University of Technology Public

More information

Determination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside

Determination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside Determination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside Migyeong Kim a, Gyusung Kim a, *, Jongjin Jung a and Wooseung Sim a a Advanced Technology Institute,

More information

VENTILATION AND ESCAPE FACILITIES FOR SHORT CUT-AND- COVER URBAN TUNNELS

VENTILATION AND ESCAPE FACILITIES FOR SHORT CUT-AND- COVER URBAN TUNNELS - 213 - VENTILATION AND ESCAPE FACILITIES FOR SHORT CUT-AND- COVER URBAN TUNNELS M. Bettelini, S. Rigert Amberg Engineering Ltd., Regensdorf-Watt, Switzerland ABSTRACT Cut and cover tunnels or enclosures

More information

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios Yunlong (Jason) Liu, PhD, PE HNTB Corporation Sean Cassady, FPE HNTB Corporation Abstract Extraction

More information

METRO System Design. Witt&Sohn AG Aug-11

METRO System Design. Witt&Sohn AG Aug-11 METRO System Design Content Purpose Comparison Metro Road tunnel Ventilation Types/ Systems Operation Modes Pre-/ Detailed Design Summary Purpose Presentation: Degree of Complexity of Metro Systems No

More information

Introducing STAMP in Road Tunnel Safety

Introducing STAMP in Road Tunnel Safety Introducing STAMP in Road Tunnel Safety Kostis Kazaras National Technical University of Athens, Mechanical Engineering School, Greece Contact details: kkazaras@gmail.com kkaz@central.ntua.gr Problem illustration

More information

Assessment of retaining levels of safety barriers

Assessment of retaining levels of safety barriers Safety and Security Engineering V 319 Assessment of retaining levels of safety barriers K. Jung & J. Markova Department of Structural Reliability, Klokner Institute of the Czech Technical University in

More information

PRAGMATIC ASSESSMENT OF EXPLOSION RISKS TO THE CONTROL ROOM BUILDING OF A VINYL CHLORIDE PLANT

PRAGMATIC ASSESSMENT OF EXPLOSION RISKS TO THE CONTROL ROOM BUILDING OF A VINYL CHLORIDE PLANT PRAGMATIC ASSESSMENT OF EXPLOSION RISKS TO THE CONTROL ROOM BUILDING OF A VINYL CHLORIDE PLANT L.P. Sluijs 1, B.J. Haitsma 1 and P. Beaufort 2 1 Vectra Group Ltd. 2 Shin-Etsu (contact details: Vectra Group

More information

Safety Analysis: Event Classification

Safety Analysis: Event Classification IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Safety Analysis: Event Classification Lecturer Lesson IV 1_2 Workshop Information IAEA Workshop City, Country XX - XX Month,

More information

Pedestrian traffic flow operations on a platform: observations and comparison with simulation tool SimPed

Pedestrian traffic flow operations on a platform: observations and comparison with simulation tool SimPed Pedestrian traffic flow operations on a platform: observations and comparison with simulation tool SimPed W. Daamen & S. P. Hoogendoorn Department Transport & Planning, Delft University of Technology,

More information

Evaluation and Improvement of the Roundabouts

Evaluation and Improvement of the Roundabouts The 2nd Conference on Traffic and Transportation Engineering, 2016, *, ** Published Online **** 2016 in SciRes. http://www.scirp.org/journal/wjet http://dx.doi.org/10.4236/wjet.2014.***** Evaluation and

More information

VENTILATION OF PROTECTED AREAS IN ROAD TUNNELS

VENTILATION OF PROTECTED AREAS IN ROAD TUNNELS - 187 - VENTILATION OF PROTECTED AREAS IN ROAD TUNNELS ABSTRACT Zumsteg F., Steinemann U. US+FZ Beratende Ingenieure, CH-5600 Lenzburg P. Wildi Civil Eng. Dept. Canton Grisons, CH-7000 Chur During the

More information

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER DIGITAL SOLUTIONS TRAINING CATALOGUE QRA and CFD simulation Phast, Safeti and KFX SAFER, SMARTER, GREENER 02 PHAST, SAFETI AND KFX Training catalogue Global training Our increased focus on global training,

More information

Marine Risk Assessment

Marine Risk Assessment Marine Risk Assessment Waraporn Srimoon (B.Sc., M.Sc.).) 10 December 2007 What is Risk assessment? Risk assessment is a review as to acceptability of risk based on comparison with risk standards or criteria,

More information

Pedestrian crossings survey in Europe

Pedestrian crossings survey in Europe Pedestrian crossings survey in Europe Introduction The issue of accidents on pedestrian crossings is highly emotional and raises a very strong interest within the public opinion and the media, mainly because

More information

Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators

Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators Second International Symposium on Marine Propulsors smp 11, Hamburg, Germany, June 2011 Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the

More information

AIRFLOW GENERATION IN A TUNNEL USING A SACCARDO VENTILATION SYSTEM AGAINST THE BUOYANCY EFFECT PRODUCED BY A FIRE

AIRFLOW GENERATION IN A TUNNEL USING A SACCARDO VENTILATION SYSTEM AGAINST THE BUOYANCY EFFECT PRODUCED BY A FIRE - 247 - AIRFLOW GENERATION IN A TUNNEL USING A SACCARDO VENTILATION SYSTEM AGAINST THE BUOYANCY EFFECT PRODUCED BY A FIRE J D Castro a, C W Pope a and R D Matthews b a Mott MacDonald Ltd, St Anne House,

More information

Scaling up of ADAS Traffic Impacts to German Cities

Scaling up of ADAS Traffic Impacts to German Cities 10th ITS European Congress, Helsinki, Finland 16 19 June 2014 TP 0220 Scaling up of ADAS Traffic Impacts to German Cities Judith Geßenhardt 1*, Oliver Fakler 2, Tobias Schendzielorz 3, Fritz Busch 1 1.

More information

EXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT

EXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT EXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT OVERVIEW ASSESSING THE RISK RELATIONSHIP BETWEEN FIRES AND EXPLOSIONS CLASSIFYING HAZARDOUS AREAS INTO ZONES

More information

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways.

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways. INTERIM ADVICE NOTE 150/12 Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the approach

More information

Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed)

Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed) Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed) ICAO MID Seminar on Aerodrome Operational Procedures (PANS-Aerodromes) Cairo, November 2017 Avner Shilo, Technical officer

More information

Forewarned is Forearmed Highways Agency approach to quantifying network safety risk

Forewarned is Forearmed Highways Agency approach to quantifying network safety risk Forewarned is Forearmed Highways Agency approach to quantifying network safety risk The Highways Agency Safety Risk Model 17 th May 2012 Elizabeth Mathie, Safety Risk Modelling Manager The Highways Agency

More information

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd Australasian College of Road Safety Conference A Safe System: Making it Happen! Melbourne 1-2 September 2011 Reduction of Speed Limit at Approaches to Railway Level Crossings in WA Radalj T 1, Kidd B 1

More information

Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES

Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES 5.1 PURPOSE (1) The purpose of the Traffic Safety Studies chapter is to provide guidance on the data collection requirements for conducting a

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS E Economic and Social Council Distr. GENERAL TRANS/WP.1/2003/3/Rev.4 23 April 2004 ENGLISH Original: ENGLISH, FRENCH and RUSSIAN ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE

More information

At each type of conflict location, the risk is affected by certain parameters:

At each type of conflict location, the risk is affected by certain parameters: TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.

More information

OPTIMIZING THE LENGTH OF AIR SUPPLY DUCT IN CROSS CONNECTIONS OF GOTTHARD BASE TUNNEL. Rehan Yousaf 1, Oliver Scherer 1

OPTIMIZING THE LENGTH OF AIR SUPPLY DUCT IN CROSS CONNECTIONS OF GOTTHARD BASE TUNNEL. Rehan Yousaf 1, Oliver Scherer 1 OPTIMIZING THE LENGTH OF AIR SUPPLY DUCT IN CROSS CONNECTIONS OF GOTTHARD BASE TUNNEL Rehan Yousaf 1, Oliver Scherer 1 1 Pöyry Infra Ltd, Zürich, Switzerland ABSTRACT Gotthard Base Tunnel with its 57 km

More information

Hazardous material transport accidents: analysis of the D.G.A.I.S. database

Hazardous material transport accidents: analysis of the D.G.A.I.S. database Environmental Health Risk II 131 Hazardous material transport accidents: analysis of the D.G.A.I.S. database S. Bonvicini & G. Spadoni Department of Chemical, Mining Engineering and Environmental Technologies,

More information

CLEARED AND GRADED AREA (CGA): CRITICAL ANALYSIS AND PROPOSAL OF A CRITERION FOR GRADING ITS BEARING CAPACITY

CLEARED AND GRADED AREA (CGA): CRITICAL ANALYSIS AND PROPOSAL OF A CRITERION FOR GRADING ITS BEARING CAPACITY CLEARED AND GRADED AREA (CGA): CRITICAL ANALYSIS AND PROPOSAL OF A CRITERION FOR GRADING ITS BEARING CAPACITY Ranieri V. Assistant professor, Polytechnic University of Bari, Italy v.ranieri@poliba.it D

More information

A quantitative risk analysis method for the natural gas pipeline network

A quantitative risk analysis method for the natural gas pipeline network PI-195 A quantitative risk analysis method for the natural gas pipeline network Y.-D. Jo1, K.-S. Park1, H.-S. Kim1, J.-J. Kim1, J.-Y. Kim2 & J. W. Ko3 1 Institute of Gas Safety Technology, Korea Gas Safety

More information

THE SIGNIFICANCE OF HAZARD ENDPOINTS IN QUANTITATIVE RISK ANALYSIS

THE SIGNIFICANCE OF HAZARD ENDPOINTS IN QUANTITATIVE RISK ANALYSIS THE SIGNIFICANCE OF HAZARD ENDPOINTS IN QUANTITATIVE RISK ANALYSIS John B. Cornwell and Jeffrey D. Marx Presented At 6 Process Plant Safety Symposium Houston, Texas April -2, 6 Presented By Quest Consultants

More information

Aspects Regarding Priority Settings in Unsignalized Intersections and the Influence on the Level of Service

Aspects Regarding Priority Settings in Unsignalized Intersections and the Influence on the Level of Service Aspects Regarding Priority Settings in Unsignalized Intersections and the Influence on the Level of Service Dumitru Ilie, Matei Lucian, Vînatoru Matei, Racilă Laurențiu and Oprica Theodor Abstract The

More information

Guide to Road Tunnel Safety Documentation

Guide to Road Tunnel Safety Documentation Centre d'études des Tunnels Tunnel Study Centre Reference Points Guide to Road Tunnel Safety Documentation Booklet 4 Specific Hazard Investigations September 2003 Guide to road tunnel safety documentation

More information

INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION

INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION Proceedings of COBEM 2009 Copyright 2009 by ABCM 20th International Congress of Mechanical Engineering November 15-20, 2009, Gramado, RS, Brazil INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION Helena

More information

The calibration of vehicle and pedestrian flow in Mangalore city using PARAMICS

The calibration of vehicle and pedestrian flow in Mangalore city using PARAMICS Urban Transport XX 293 The calibration of vehicle and pedestrian flow in Mangalore city using PARAMICS S. K. Prusty, R. Phadnis & Kunal National Institute Of Technology Karnataka, India Abstract This paper

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

CFD SIMULATIONS OF GAS DISPERSION IN VENTILATED ROOMS

CFD SIMULATIONS OF GAS DISPERSION IN VENTILATED ROOMS CFD SIMULATIONS OF GAS DISPERSION IN VENTILATED ROOMS T. Gélain, C. Prévost Institut de Radioprotection et de Sûreté Nucléaire (IRSN), Saclay, France Abstract In order to better understand the risks due

More information

On the design and control of complex tunnel ventilation systems applying the HIL tunnel simulator

On the design and control of complex tunnel ventilation systems applying the HIL tunnel simulator On the design and control of complex tunnel ventilation systems applying the HIL tunnel I. R. Riess and P. Altenburger HBI Haerter Ltd Consulting Engineers, Switzerland P. Sahlin Equa Simulation AB, Sweden

More information

TUNNEL KASTELEC - PLANING, REALISATION, TESTING, EXPERIENCES

TUNNEL KASTELEC - PLANING, REALISATION, TESTING, EXPERIENCES - 212 - TUNNEL KASTELEC - PLANING, REALISATION, TESTING, EXPERIENCES ABSTRACT prof.dr. Jurij MODIC dr. S. Muhič, dr. C. Arkar Faculty of Mechanical Engineering Ljubljana, Slovenia Slovenia is among the

More information

INFLUENCE OF TRAFFIC FLOW SEPARATION DEVICES ON ROAD SAFETY IN BRAZIL S MULTILANE HIGHWAYS

INFLUENCE OF TRAFFIC FLOW SEPARATION DEVICES ON ROAD SAFETY IN BRAZIL S MULTILANE HIGHWAYS INFLUENCE OF TRAFFIC FLOW SEPARATION DEVICES ON ROAD SAFETY IN BRAZIL S MULTILANE HIGHWAYS Gabriel Andrade Lanzaro Universidade de Brasília Departamento de Engenharia Civil e Ambiental, Faculdade de Tecnologia,

More information

Measurements of the grip level and the water film depth for real accidents of the German In-Depth Accident Study (GIDAS).

Measurements of the grip level and the water film depth for real accidents of the German In-Depth Accident Study (GIDAS). Measurements of the grip level and the water film depth for real accidents of the German In-Depth Accident Study (GIDAS). Henrik Liers*, Pierre Fevrier**, Christian Mignot**, Frédéric Sarazin** *Verkehrsunfallforschung

More information

MICROSIMULATION USING FOR CAPACITY ANALYSIS OF ROUNDABOUTS IN REAL CONDITIONS

MICROSIMULATION USING FOR CAPACITY ANALYSIS OF ROUNDABOUTS IN REAL CONDITIONS Session 5. Transport and Logistics System Modelling Proceedings of the 11 th International Conference Reliability and Statistics in Transportation and Communication (RelStat 11), 19 22 October 2011, Riga,

More information

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision J.Linortner & R.Faber Pöyry Energy GmbH, Turkey-Austria E.Üzücek & T.Dinçergök General Directorate of State Hydraulic

More information

Queue analysis for the toll station of the Öresund fixed link. Pontus Matstoms *

Queue analysis for the toll station of the Öresund fixed link. Pontus Matstoms * Queue analysis for the toll station of the Öresund fixed link Pontus Matstoms * Abstract A new simulation model for queue and capacity analysis of a toll station is presented. The model and its software

More information

Road Accident Analysis and Identify the black spot location On State Highway-5 (Halol-Godhra Section)

Road Accident Analysis and Identify the black spot location On State Highway-5 (Halol-Godhra Section) Road Accident Analysis and Identify the black spot location On State Highway-5 (Halol-Godhra Section) 1 Shah Dhruvit, 2 Shah Pranay M. 1 M.E civil(transportation), 2 M.E civil, P.h.d.(pursuing) 1 Tatva

More information

Application for diminishing or avoiding the unwanted. effects of traffic congestion

Application for diminishing or avoiding the unwanted. effects of traffic congestion Application for diminishing or avoiding the unwanted effects of traffic congestion Explanation of process Traffic congestions occur mainly through lack of consideration for the driver from the traffic

More information

The Willingness to Walk of Urban Transportation Passengers (A Case Study of Urban Transportation Passengers in Yogyakarta Indonesia)

The Willingness to Walk of Urban Transportation Passengers (A Case Study of Urban Transportation Passengers in Yogyakarta Indonesia) The Willingness to Walk of Urban Transportation Passengers (A Case Study of Urban Transportation Passengers in Yogyakarta Indonesia) Imam Basuki 1,a 1 Civil Engineering Program Faculty of Engineering -

More information

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT Kieran J Glynn, Advisor Major Accident Risk, BP, UK The exceedance curve approach was developed following the issue of the 2003

More information

SAMPLE MAT Proceedings of the 10th International Conference on Stability of Ships

SAMPLE MAT Proceedings of the 10th International Conference on Stability of Ships and Ocean Vehicles 1 Application of Dynamic V-Lines to Naval Vessels Matthew Heywood, BMT Defence Services Ltd, mheywood@bm tdsl.co.uk David Smith, UK Ministry of Defence, DESSESea-ShipStab1@mod.uk ABSTRACT

More information

SMART CITIES & MOBILITY AS A SERVICE

SMART CITIES & MOBILITY AS A SERVICE , SMART CITIES & MOBILITY AS A SERVICE EFFECTIVENESS OF INTELLIGENT SPEED ADAPTATION, COLLISION WARNING AND ALCOLOCK SYSTEMS ON DRIVING BEHAVIOUR AND SAFETY ATHANASIOS THEOFILATOS 1, RICARDO NIEUWKAMP

More information

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS Authors: Randhir Karma NDip: Eng (Civil) B. Tech Eng (Civil) M Eng (Hons) (Transportation) Auckland Traffic Service Group Manager

More information

NMT SAFE STUDY APPROACH

NMT SAFE STUDY APPROACH 24 May 2017 ADVOCATING THE NON MOTORISED TRANSPORT AGENDA CONTENT Content NMT road safety study approach NMT road safety study process NMT SAFE STUDY APPROACH THE NEED FOR NMT SAFETY STUDIES Is there is

More information

Operation and safety of tramways in interaction with public space. COST Action TU1103 «STATE OF THE ART» On behalf of the action: Matus Sucha

Operation and safety of tramways in interaction with public space. COST Action TU1103 «STATE OF THE ART» On behalf of the action: Matus Sucha Operation and safety of tramways in interaction with public space COST Action TU1103 «STATE OF THE ART» On behalf of the action: Matus Sucha Introduction The COST Action TU1103 deals with the improvement

More information

Aerodynamic study of a cyclist s moving legs using an innovative approach

Aerodynamic study of a cyclist s moving legs using an innovative approach Aerodynamic study of a cyclist s moving legs using an innovative approach Francesco Pozzetti 30 September 2017 Abstract During a period of four weeks in September, I completed a research project in fluid

More information

An Assessment of FlowRound for Signalised Roundabout Design.

An Assessment of FlowRound for Signalised Roundabout Design. An Assessment of FlowRound for Signalised Roundabout Design. 1.0 Introduction This critique is based upon recent use by White Young Green signal engineering staff. The comments made do not cover all of

More information

The Effect of Pavement Marking on Speed. Reduction in Exclusive Motorcycle Lane. in Malaysia

The Effect of Pavement Marking on Speed. Reduction in Exclusive Motorcycle Lane. in Malaysia Contemporary Engineering Sciences, Vol. 3, 2010, no. 3, 149-155 The Effect of Pavement Marking on Speed Reduction in Exclusive Motorcycle Lane in Malaysia Seyed Farzin Faezi PhD student in highway and

More information

Analysis of hazard to operator during design process of safe ship power plant

Analysis of hazard to operator during design process of safe ship power plant POLISH MARITIME RESEARCH 4(67) 2010 Vol 17; pp. 26-30 10.2478/v10012-010-0032-1 Analysis of hazard to operator during design process of safe ship power plant T. Kowalewski, M. Sc. A. Podsiadło, Ph. D.

More information

A preliminary analysis of in-depth accident data for powered two-wheelers and bicycles in Europe

A preliminary analysis of in-depth accident data for powered two-wheelers and bicycles in Europe International Research Council on Biomechanics of Injury IRCOBI 2018 Athens, Greece, 12 September 2018 A preliminary analysis of in-depth accident data for powered two-wheelers and bicycles in Europe Ziakopoulos

More information

Lighting of short tunnels

Lighting of short tunnels Lighting of short tunnels The lighting of short tunnels poses problems that are specific to each tunnel, even more so than for long tunnels, with geometry, the approach road, the surrounding environment

More information

Autodesk Moldflow Communicator Process settings

Autodesk Moldflow Communicator Process settings Autodesk Moldflow Communicator 212 Process settings Revision 1, 3 March 211. Contents Chapter 1 Process settings....................................... 1 Profiles.................................................

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

A STUDY ON GAP-ACCEPTANCE OF UNSIGNALIZED INTERSECTION UNDER MIXED TRAFFIC CONDITIONS

A STUDY ON GAP-ACCEPTANCE OF UNSIGNALIZED INTERSECTION UNDER MIXED TRAFFIC CONDITIONS A STUDY ON GAP-ACCEPTANCE OF UNSIGNALIZED INTERSECTION UNDER MIXED TRAFFIC CONDITIONS S.Siva Gowri Prasad 1, Ramesh Surisetty 2, Suresh Kumar ch 3 1 Assistant professor, Department, of Civil Engineering,

More information

ESTIMATION OF THE EFFECT OF AUTONOMOUS EMERGENCY BRAKING SYSTEMS FOR PEDESTRIANS ON REDUCTION IN THE NUMBER OF PEDESTRIAN VICTIMS

ESTIMATION OF THE EFFECT OF AUTONOMOUS EMERGENCY BRAKING SYSTEMS FOR PEDESTRIANS ON REDUCTION IN THE NUMBER OF PEDESTRIAN VICTIMS ESTIMATION OF THE EFFECT OF AUTONOMOUS EMERGENCY BRAKING SYSTEMS FOR PEDESTRIANS ON REDUCTION IN THE NUMBER OF PEDESTRIAN VICTIMS Toshiyuki, Yanaoka Yukou, Takahashi Honda R&D Co.,Ltd. Automobile R&D Center

More information

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment Naser Badri 1, Farshad Nourai 2 and Davod Rashtchian

More information

Appendix ITALY Valsassina Tunnel near Lecco (Lombardy)

Appendix ITALY Valsassina Tunnel near Lecco (Lombardy) Appendix 2.12 - ITALY Valsassina Tunnel near Lecco (Lombardy) 1. SUMMARY The Valsassina tunnel is located along the National Road 36 (SS36), from Milan towards Valsassina in the town of Lecco with about

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Risk assessment study of the mutual interactive influence of working procedures on terminals handling dangerous goods in port of Koper (Slovenia) L. Battelino Water Management Institute, Maritime Engineering

More information

INF.41/Add.1/Rev.1. Economic Commission for Europe Inland Transport Committee

INF.41/Add.1/Rev.1. Economic Commission for Europe Inland Transport Committee Economic Commission for Europe Inland Transport Committee Working Party on the Transport of Dangerous Goods INF.41/Add.1/Rev.1 Joint Meeting of the RID Committee of Experts and the Working Party on the

More information

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Hao Xu (Corresponding Author) Research Associate Department of Civil & Environmental Engineering Texas

More information

Modelling of French High Speed Train Evacuation

Modelling of French High Speed Train Evacuation ISBN 978-81-933894-1-6 International Conference on Studies in Disaster Management, Civil and Architectural Engineering (SDMCAE-17) Kyoto (Japan) April 18-19, 2017 Modelling of French High Speed Train Evacuation

More information

Assessing Level of Service for Highways in a New Metropolitan City

Assessing Level of Service for Highways in a New Metropolitan City Assessing Level of Service for Highways in a New Metropolitan City Ganesh Pawar Civil Engineering Department G. H. Raisoni College of Engineering Nagpur, India,4416 Dr. Bhalachandra Khode Civil Engineering

More information

Analysing the Effects of Stop-&-Go Conditions in Traffic Assignment Models

Analysing the Effects of Stop-&-Go Conditions in Traffic Assignment Models Analysing the Effects of Stop-&-Go Conditions in Traffic Assignment Models Neeraj Saxena * ; Vinayak Dixit 1 ; Travis S. Waller 2 * Corresponding author: E-mail address: n.saxena@unsw.edu.au ; Tel: (+61

More information

The model of thermal response of Liquefied Petroleum Gas Tanks subjected to accidental heat input

The model of thermal response of Liquefied Petroleum Gas Tanks subjected to accidental heat input Economic Commission for Europe Inland Transport Committee Working Party on the Transport of Dangerous Goods Joint Meeting of the RID Committee of Experts and the Working Party on the Transport of Dangerous

More information

Quantification of the Effects of Turbulence in Wind on the Flutter Stability of Suspension Bridges

Quantification of the Effects of Turbulence in Wind on the Flutter Stability of Suspension Bridges Quantification of the Effects of Turbulence in Wind on the Flutter Stability of Suspension Bridges T. Abbas 1 and G. Morgenthal 2 1 PhD candidate, Graduate College 1462, Department of Civil Engineering,

More information

INTERIM ADVICE NOTE 150/14 Revision 02. Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways

INTERIM ADVICE NOTE 150/14 Revision 02. Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways INTERIM ADVICE NOTE 150/14 Revision 02 Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways Summary Guidance for temporary traffic management (TTM),

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

23 RD INTERNATIONAL SYMPOSIUM ON BALLISTICS TARRAGONA, SPAIN APRIL 2007

23 RD INTERNATIONAL SYMPOSIUM ON BALLISTICS TARRAGONA, SPAIN APRIL 2007 23 RD INTERNATIONAL SYMPOSIUM ON BALLISTICS TARRAGONA, SPAIN 16-20 APRIL 2007 AN INVESTIGATION INTO THE INTERRELATION BETWEEN THE INTERNAL AND EXTERNAL BALLISTICS OF FIRING A TP-T TANK AMMUNITION M. H.

More information

Safety When Using Liquid Coatings

Safety When Using Liquid Coatings Page 1 of 14 Contents: 1. Object 2. System requirements 3. Safety concept structure 4. The explosion protection concept 5. Using the tools 6. Sample explosion protection documents 7. Creating the explosion

More information

MAPPING OF RISKS ON THE MAIN ROAD NETWORK OF SERBIA

MAPPING OF RISKS ON THE MAIN ROAD NETWORK OF SERBIA MAPPING OF RISKS ON THE MAIN ROAD NETWORK OF SERBIA Krsto LIPOVAC 1, Dragan JOVANOVIĆ 2, Svetlana BAŠIĆ 2 1 Academy of Criminalistic and Police Studies, Belgrade, SERBIA 2 Faculty of Technical Sciences,

More information

Road design and Safety philosophy, 1 st Draft

Road design and Safety philosophy, 1 st Draft Head Office SWEDEN www.vv.se Textphone: +46 243-750 90 Roger Johansson International Secretariat roger.johansson@vv.se Direct: +46 243 75880 Mobile: +46 70 6327373 Date: 2006-08-17 Reference: Road design

More information

Merging Traffic at Signalled Junctions

Merging Traffic at Signalled Junctions Chris Kennett August 2015 Merging Traffic at Signalled Junctions Introduction Back in 2012, at the JCT Symposium, I presented a paper Modelling Merges at Signalled Junctions. In that paper I showed that

More information

Sea-going vessel versus wind turbine

Sea-going vessel versus wind turbine Collision risk at high sea Sea-going vessel versus wind turbine Offshore wind power: Wind turbines off the German coast generally represent obstacles in the traffic routes of ships. What if a large sea-going

More information

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Introduction Transport for London (TfL) operates the most frequent

More information

Sensitivity of Equilibrium Flows to Changes in Key Transportation Network Parameters

Sensitivity of Equilibrium Flows to Changes in Key Transportation Network Parameters Sensitivity of Equilibrium Flows to Changes in Key Transportation Network Parameters Sara Moridpour Department of Civil Engineering Monash University, Melbourne, Victoria, Australia 1 Introduction In transportation

More information

Managed Motorways All Lanes Running

Managed Motorways All Lanes Running Managed Motorways All Lanes Running All-Purpose Trunk Roads (APTR)/Dual 3- lane Motorway (D3M) Analysis and Hazard Assessment 1039092-ATA-035 Date: 8 May 2012 Version: 1.0 MMFD-ATA-035 - Issue 1 0 08-05-12.doc

More information

Weather and Cycling in Dublin : Perceptions and Reality

Weather and Cycling in Dublin : Perceptions and Reality Author : Keegan, O P 1. Abstract It is generally accepted that weather conditions and especially rainfall have an impact on cycling patterns in Dublin. For individuals who regularly cycle to work poor

More information

Traffic Parameter Methods for Surrogate Safety Comparative Study of Three Non-Intrusive Sensor Technologies

Traffic Parameter Methods for Surrogate Safety Comparative Study of Three Non-Intrusive Sensor Technologies Traffic Parameter Methods for Surrogate Safety Comparative Study of Three Non-Intrusive Sensor Technologies CARSP 2015 Collision Prediction and Prevention Approaches Joshua Stipancic 2/32 Acknowledgements

More information