1 GUIDELINES Pressure Systems Guidelines Pressure Systems Safety Regulations SI 2000 No 128 In-service Examination Requirements in Written Schemes of Examination Document Reference: PSG 07 Issue 01 Dated 1 st May 2009 The Safety Assessment Federation Ltd

2 TABLE OF CONTENTS 1. INTRODUCTION AND DEFINITIONS GUIDELINES Requirement for an Out of Service examination Requirement for an In-Service examination to complete an Out of Service examination Requirement for an Intermediate In-Service examination SCOPE OF THE IN-SERVICE AND INTERMEDIATE IN-SERVICE EXAMINATION FREQUENCY OF INTERMEDIATE IN-SERVICE EXAMINATIONS EXISTING WRITTEN SCHEME OF EXAMINATION REPORTING OF EXAMINATIONS...5 PSG 07 Issue Dated 1 st May 2009 Page 2 of 5

3 1. INTRODUCTION AND DEFINITIONS SAFed member companies are changing the terminology used for Written Schemes of Examination (WSE) and examination reports for pressure systems to reflect the terms used within the Pressure Systems Safety Regulations. These will comprise Out of Service and In-Service examinations and are defined below. In-Service examinations are included in Written Schemes of Examination produced by SAFed member companies and other organisations with various requirements for the frequency and scope of inspection. A number of these In-Service examinations have been included in WSE s for contractual purposes or to continue custom and practice rather than for a technical reason in ensuring the integrity of the plant. In some cases inspection is carried out as part of an annually renewable insurance and/or inspection contract so in those years that an Out of Service examination is not carried out an In-Service examination is undertaken. For convenience this contractual examination has often been included in the WSE but this inclusion makes it a statutory requirement under PSSR. Different frequencies of In-Service inspections are specified in WSE s, e.g. 12, 13, 26 months or none at all. Some WSE s give the competent person the discretion to carry out the examination whilst not under pressure whilst others require it under working conditions. These guidelines have been produced to provide a more consistent approach to the requirements for In-Service examinations in WSE s. In-Service examinations should only be included in WSE s where they complete an examination in accordance with a WSE, or where intermediate In-Service examinations are specifically required by the competent person. WSE s for pressure systems require an examination by the Competent Person. The WSE will typically indicate: Out of Service examination: An examination with the system/vessel out of service and stripped down so that the structural integrity can be confirmed. In-Service examination: An examination under normal working conditions to verify the function of controls and protective devices. It is essential that the competent person carrying out the examination is aware of the requirements of the WSE, particularly when using another company s WSE, so that it can be ensured that the requirements have been completed. DEFINITIONS Out of Service Examination: An examination with the relevant parts of the system stripped down to a level necessary to determine the condition and fitness for continued use. In-Service Examination: An examination of the relevant parts of the system under pressure (usually under normal operating conditions) to determine the condition and fitness for continued use and to confirm that the protective devices, especially any safety valves, have been tested and set correctly. Intermediate In-Service Examination: An intermediate examination, between Out of Service/In Service examinations, carried out under normal working conditions to verify the function of controls/protective devices and/or the examination of the external surface where there is a possible deterioration mechanism. Note: With some pressure systems a non-invasive examination is carried out to determine the structural integrity of the pressure equipment. Where the system is operational this will be termed an In-Service examination. Examples include refrigeration systems and expansion/pressurising vessels in heating systems. PSG 07 Issue Dated 1 st May 2009 Page 3 of 5

4 2. GUIDELINES 2.1 Requirement for an Out of Service examination This should be clearly set out in the WSE with details of what type of examination needs to be carried out together with any special safety precautions necessary. 2.2 Requirement for an In-Service examination to complete an Out of Service examination An In-Service examination will be required following an Out of Service examination in order to comply with the Written Scheme of Examination and should be completed as soon as practicable after an Out of Service examination. Note: An In-Service examination may be completed at the same time as the Out of Service examination where the competent person determines that there is no perceived benefit in seeing the system under working conditions and the protective devices have been certified separately or there are no protective devices fitted. 2.3 Requirement for an Intermediate In-Service examination An Intermediate In-Service examination between Out of Service/In Service examinations should be considered under the following circumstances: Where a steam boiler is given an extended period between Out of Service/In Service examinations i.e. 26 months Where an Out of Service examination is postponed Where protective devices require to be tested more frequently than the boiler/vessel on which they are fitted. In this case the date of next examination in accordance with Regulation 9(5) (c) specified in the examination report would be the date of the examination for the protective devices and under these circumstances it may be preferable to identify and report on the protective devices as a separate item Where there is aggressive wastage or other forms of external physical damage likely to occur that could be monitored at an In-Service examination. This examination will be used to establish whether deterioration has occurred and may include the use of other techniques such as NDT when specified in the WSE. The situations detailed in 3.1 to 3.4 are not an exhaustive list and there may be other situations where Intermediate In-Service examinations should be considered for inclusion in the WSE. Whenever Intermediate In-Service Examinations are included in the WSE they must be carried out within the timescales specified. 3. SCOPE OF THE IN-SERVICE AND INTERMEDIATE IN-SERVICE EXAMINATION 3.1 Carry out the examination under normal working pressure. 3.2 Check the external condition of the pressure system for leakage, physical damage, wastage, damage to insulation etc. This may include suitable NDT techniques when deemed necessary by the competent person. 3.3 Witness the functional tests of pressure, temperature, level or other controls and gauges where appropriate. 3.4 Witness the setting and function of safety valves where appropriate. 3.5 Confirm that safety valves have been replaced with suitably certified replacements when required by the WSE. 3.6 Witness the function of door safety devices and interlocks where appropriate/practical 3.7 Check the working conditions for possible adverse effects. e.g. vibration, excess pressure or temperature cycling, excessive temperature, water hammer, etc. where appropriate/practical. 3.8 Check that the plant operator testing controls and protective devices performs the testing in a satisfactory manner and check the currency of any testing logs. PSG 07 Issue Dated 1 st May 2009 Page 4 of 5

5 3.9 Confirm that normal maintenance such as cleaning, draining of air receivers etc. is being carried out. 4. FREQUENCY OF INTERMEDIATE IN-SERVICE EXAMINATIONS When an Intermediate In-Service examination is required as determined from para 3 it will be necessary to determine the frequency based on the plant operating conditions. For most pressure systems operating for extended periods this examination would normally be carried out around the mid point between Out of Service/In-Service examinations as deemed necessary by the competent person. 5. EXISTING WRITTEN SCHEME OF EXAMINATION The Written Scheme of Examination should only contain examinations as required by PSSR. This includes Intermediate In-Service examinations when considered necessary under section 3 of this guidance. To reflect this existing WSE s may need to be modified or re-issued following the next scheduled examination. Modification can generally be achieved by hand annotating the WSE, signing/dating the amendment page and documenting accordingly. This change should be brought to the attention of the company and a copy of the amended WSE left with them. The following points should be noted: 5.1 Any contractual annual examinations should still be carried out but these will no longer be part of the WSE and should be reported on non-statutory forms. 5.2 The agreement of the owner of the WSE should be obtained before the amendment is made. It should be pointed out that this will not change the work carried out but will ensure that only examinations required by PSSR are recorded on the WSE. 5.3 A written scheme review and amendment can be conducted at any time. However any amendments cannot remove examinations due without that examination being carried out and cannot extend the date by which the next examination is due to take place as specified in the last written report. 5.4 Before the WSE is amended the terms used in the scheme for Out of Service, In-Service and Intermediate In-Service examinations need to be noted so that the amendment is consistent with the rest of the scheme. 6. REPORTING OF EXAMINATIONS Only those examinations specified in the WSE should be reported on Pressure Systems Safety Regulations report forms. Other examinations, including those removed from the WSE, should be reported on non-statutory forms. When Pressure Systems Safety Regulations report forms are used it is important that the date of the next examination specified in the report as required in Regulation 9(5) (c) refers to the next examination required by the WSE. When In-Service and Intermediate In-Service examinations are reported on Pressure Systems Safety Regulations report forms it is important that the protective devices in the pressure system are identified in the report. Terms such as associated protective devices are not considered to be good reporting practice and details of the protective devices and the testing carried out should be included in the report. PSG 07 Issue Dated 1 st May 2009 Page 5 of 5

PRESSURE SYSTEMS POLICY

PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY 1. Introduction 2. Policy Statement 3. Scope 4. Background 5. Roles & Responsibilities 6. Training 7. Contractors 8. Policy Review 1. Introduction The Kilmarnock

More information

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service GUIDELINES Pressure Systems Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service Document Reference: PSG 16 Issue 04 Dated 13/09/16 The Safety Assessment Federation

More information

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd Estates Operations and Maintenance Practice Guidance Note Management of Pressure Systems V01 Date Issued Planned Review PGN No: Issue 1 - Nov 2015 Issue 2 Nov 2017 Author / Designation Responsible Officer

More information

GUIDANCE IN-SERVICE INSPECTION PROCEDURES. Status: Issue: 01 Date: 05/12/07

GUIDANCE IN-SERVICE INSPECTION PROCEDURES. Status: Issue: 01 Date: 05/12/07 GUIDANCE IN-SERVICE INSPECTION PROCEDURES Number: PEC08 Prepared by: Pressure Equipment Committee (TC1) Status: Issue: 01 Date: 05/12/07 Reference: Guidance PSG04. Guidelines for the Production of Written

More information

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland SUP 15 Health & Safety Management Pressure Systems Unified procedures for use within NHS Scotland September 2015 Contents Page Acknowledgements... 3 1. Introduction... 4 2. Purpose of this Procedure...

More information

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

GUIDANCE IN-SERVICE INSPECTION PROCEDURES GUIDANCE IN-SERVICE INSPECTION PROCEDURES Number: PEC 13 Prepared by: Pressure Equipment Committee (TC1) Status: Issue: 07 Date: 16 th January 2018 Reference: Guidance for safety valve examination. SITUATION:

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

GUIDELINES. Systems. Pressure. Guidelines for Competent Person In-service examination of pressure systems pipework

GUIDELINES. Systems. Pressure. Guidelines for Competent Person In-service examination of pressure systems pipework GUIDELINES Pressure Systems Guidelines for Competent Person In-service examination of pressure systems pipework Document Reference: PSG 05 Issue 01.3 Dated 10/04/19 The Safety Assessment Federation Ltd

More information

Accreditation for In-Service Inspection of Pressure Systems/Equipment

Accreditation for In-Service Inspection of Pressure Systems/Equipment RG 2 Edition 5 November 2018 - Draft for consultation Accreditation for In-Service Inspection of Pressure Systems/Equipment RG 2 / Edition: 5 Page 1 of 10 Contents 1. Introduction 2 2. Scope - Inspection

More information

Pressure Systems Safety Regulation

Pressure Systems Safety Regulation Pressure Systems Safety Regulation Introduction This document informs Faculty of the key requirements of the UK and Chinese Pressure Systems Safety regulations. The aim of these regulations is to prevent

More information

GUIDELINES. Systems. Pressure

GUIDELINES. Systems. Pressure GUIDELINES Pressure Systems Guidelines Pressure Systems Safety Regulations SI 2000 No 128 Examination Requirements for LPG Systems on Fork Lift Trucks Document Reference: PSG 12 Issue 2.1 Dated 30/01/12

More information

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Key word(s) : Work equipment. Using, maintaining and repairing. Information, instruction and supervision. Risk Assessment.

More information

Examples of pressure systems and equipment are:

Examples of pressure systems and equipment are: Pressure systems Safety and you Introduction If pressure equipment fails in use, it can seriously injure or kill people nearby and cause serious damage to property. Each year in Great Britain, there are

More information

Procedure: Pressure equipment safety

Procedure: Pressure equipment safety Procedure: Pressure equipment safety Purpose The purpose of this procedure is to define the method for safe operation and inspection of pressure equipment and the collection and recording of associated

More information

BCGA GUIDANCE NOTE 17

BCGA GUIDANCE NOTE 17 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF

More information

Guidelines for the Production of Written Schemes of Examination and the Examination of Pressure Vessels Incorporating Openings to

Guidelines for the Production of Written Schemes of Examination and the Examination of Pressure Vessels Incorporating Openings to Pressure GUIDELINES Guidelines Guidelines for the Production of Written Schemes of Examination and the Examination of Pressure Vessels Incorporating Openings to Facilitate Ready Internal Access Document

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure C. ASSEMBLIES Guideline C-03 Guideline related to: Article 4 paragraph 2 The effect of the derogation in Article 4 paragraph 2 from the introductory paragraph in the same article is not clear. In the circumstances,

More information

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine Release: 1 UEPOPL002A Licence to operate a reciprocating steam engine UEPOPL002A Licence to operate a reciprocating steam engine Modification History Not applicable. Unit Descriptor Unit Descriptor 1)

More information

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys (Feb 2010) PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys Contents 1 Introduction 2 Preparations for Survey 2.1 General 2.2 Conditions for survey 2.3 Access to structures 2.4 Survey

More information

User Information Sheet 015

User Information Sheet 015 User Information Sheet 015 Formerly LPGA Guidance NO.84 March 2007 Inspection and Maintenance of LPG Pipework at Commercial and Industrial Premises 1. Introduction LPG pipework may, under certain conditions,

More information

Guidelines for the Production of Written Schemes of Examination and the Examination of Pressure Vessels Incorporating Openings to

Guidelines for the Production of Written Schemes of Examination and the Examination of Pressure Vessels Incorporating Openings to Pressure GUIDELINES Guidelines Guidelines for the Production of Written Schemes of Examination and the Examination of Pressure Vessels Incorporating Openings to Facilitate Ready Internal Access Document

More information

Guidance on the maintenance and inspection of fixed CO 2 fire-extinguishing systems

Guidance on the maintenance and inspection of fixed CO 2 fire-extinguishing systems Translation. Only the Danish document has legal validity. Guidance no. 9514 of 9 July 2014 issued by the Danish Maritime Authority Guidance on the maintenance and inspection of fixed CO 2 fire-extinguishing

More information

TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems

TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems ILEVE -Institute of LEV Engineers CPD & Information Day TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems Jane Bastow CMIOSH Chartered Safety and Health Practitioner OSCHR Registered

More information

HS26 Working at Height Policy and Procedure

HS26 Working at Height Policy and Procedure HS26 Working at Height Policy and Procedure HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 1 of 8 1. Scope This policy applies to all staff, students and visitors to The Shared Learning

More information

OPERATING CODE NO. 8 APPENDIX 2

OPERATING CODE NO. 8 APPENDIX 2 OPERATING CODE NO. 8 APPENDIX 2 (OC8B) SAFETY CO-ORDINATION IN RESPECT OF THE SCOTTISH TRANSMISSION SYSTEMS OR THE SYSTEMS OF SCOTTISH USERS Paragraph No/Title CONTENTS (This contents page does not form

More information

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE Government of Bermuda Department of Maritime Administration 2015 027 BERMUDA SHIPPING NOTICE Maintenance and Inspection of Fixed Carbon Dioxide Fire Extinguishing Systems Ref: SOLAS 74/88 as amended, Regulation

More information

NATIONAL TRACTION ENGINE TRUST Preserving our heritage with steam on the road ENGINE OWNER S CODES OF PRACTICE PART 4

NATIONAL TRACTION ENGINE TRUST Preserving our heritage with steam on the road ENGINE OWNER S CODES OF PRACTICE PART 4 NATIONAL TRACTION ENGINE TRUST Preserving our heritage with steam on the road ENGINE OWNER S CODES OF PRACTICE PART 4 NTET WRITTEN SCHEME OF EXAMINATION PART 4 WSE NTET WRITTEN SCHEME OF EXAMINATION As

More information

RULES PUBLICATION NO. 119/P

RULES PUBLICATION NO. 119/P RULES PUBLICATION NO. 119/P PERIODIC SURVEYS OF FUEL INSTALLATIONS ON SHIPS OTHER THAN LIQUEFIED GAS CARRIERS UTILIZING GAS OR OTHER LOW FLASH POINT FUELS 2019 January Publications P (Additional Rule Requirements)

More information

Fire Safety Hot Work Permit Policy/ Procedures

Fire Safety Hot Work Permit Policy/ Procedures Fire Safety Hot Work Permit Policy/ Procedures INTRODUCTION Serious fires frequently occur during maintenance and construction operations, where work is proceeding on either machinery, plant or the fabric

More information

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 PERSONNEL DIVISION REVIEWED AUTUMN 1999 CONTENTS Page 1 INTRODUCTION 1

More information

FV Flash Vessel Installation and Maintenance Instructions

FV Flash Vessel Installation and Maintenance Instructions 4041050/5 IM-P404-10 EMM Issue 5 FV Flash Vessel Installation and Maintenance Instructions 1. Safety information 2. Specific product safety information 3. Product information 4. Installation 5. Commissioning

More information

LEGIONELLA MANAGEMENT PROCEDURE

LEGIONELLA MANAGEMENT PROCEDURE LEGIONELLA MANAGEMENT PROCEDURE This procedure sets out the aims and objectives of the school and outlines responsibilities for managing the risk of exposure to legionella. General Statement of Intent

More information

Annex B To Loughborough University Facilities Management Health and Safety Policy

Annex B To Loughborough University Facilities Management Health and Safety Policy Annex B To Loughborough University Facilities Management Health and Safety Policy Pressure Systems Safety Procedures 1. General a. The following aspects relating to safety are covered in these procedures:-

More information

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels (Jan 2017) Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels CONTENTS 1. Application 2. Special Survey 2.1 Schedule 2.2 Scope

More information

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows: Electrical Safety Guidance Note 1 - General Guidance Competent Person The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows: "A person in the possession

More information

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

Regulated Oil and Gas Companies under National Energy Board Jurisdiction File 185-A000-41 8 August 2003 Regulated Oil and Gas Companies under National Energy Board Jurisdiction Dear Sir / Madam: Guidance Notes for Pressure Equipment under National Energy Board Jurisdiction

More information

LIFT MAINTENANCE POLICY

LIFT MAINTENANCE POLICY LIFT MAINTENANCE POLICY Originator: Policy and Strategy Team Approval date: August 2018 Review date: August 2019 1 Introduction 1.1 1.2 Pine Court Housing Association (PCHA) treats the health and safety

More information

Installation & Operation Manual Proven Quality since 1892

Installation & Operation Manual Proven Quality since 1892 Content 1. ERIKS operating companies 2. Product description 3. Requirements for maintenance staff 4. Transport and storage 5. Function 6. Application 7. Installation 8. Maintenance 9. Service and repair

More information

Significant Change to Dairy Heat Treatment Equipment and Systems

Significant Change to Dairy Heat Treatment Equipment and Systems Significant to Dairy Heat Treatment September 2008 Page 1 Significant to Dairy Heat Treatment Equipment and Systems September 2008 1 Background Requirements for the assessment of dairy heat treatment equipment

More information

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books 1. SCOPE OF BOILER LOGBOOK PROGRAM In all cases, there are minimum tasks and functions for an operator to perform

More information

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE 1. INTRODUCTION The University uses substances hazardous to health in many of its operations, and accepts that it has a duty of care to reduce exposure

More information

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014. Working Together Contractor Control Procedures November 2014 Borders College 24/11/2014 1 Working Together 1. Introduction This procedure aims to control the health and safety of contractors working on

More information

Overview. SEMEMI211 SQA Unit Code HF4E 04 Carrying out modifications or rewiring electrical circuits

Overview. SEMEMI211 SQA Unit Code HF4E 04 Carrying out modifications or rewiring electrical circuits Overview This standard identifies the competences you need to modify or rewire electrical circuits and equipment, in accordance with approved procedures. This will involve modifying or rewiring electrical

More information

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10 LK product no: PCS 1-10 Article no: 74503 Revision:8 Article no: 74503 Revision: 8 2 (23) Contents 1. General information... 5 2. Safety precautions... 5 2.1 Significance of symbols... 5 2.2 Explanatory

More information

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS) GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS) Local Exhaust Ventilation Inspection & Maintenance 1 LOCAL EXHAUST AND OTHER VENTILATION Contents 1. Introduction 2. Design specifications

More information

Moor, Tend Mooring And Unmoor Ship - Supervisor Level -

Moor, Tend Mooring And Unmoor Ship - Supervisor Level - Marine Terminal Operations Competency Standard Moor, Tend Mooring And Unmoor Ship - Supervisor Level - Industry : Oil, Chemical and Gas Industry Competency Category : 2.0 Moor, tend mooring and unmoor

More information

PLANT INTEGRITY MANAGEMENT

PLANT INTEGRITY MANAGEMENT PLANT INTEGRITY MANAGEMENT IGC Doc 190/14 EUROPEAN INDUSTRIAL GASES ASSOCIATION AISBL AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel: +32 2 217 70 98 Fax: +32 2 219 85 14 E-mail: info@eiga.eu Internet: www.eiga.eu

More information

This standard comprises the following:

This standard comprises the following: Overview in accordance with approved procedures and practices. This standard comprises the following: 1 Complete and check the initiation circuit 2 Clear and secure the danger zone 3 Sound warning and

More information

7 th January to 4 th March 2018

7 th January to 4 th March 2018 FROSTBITE SERIES 2018 Sponsored by Fox s Marine and Country 7 th January to 4 th March 2018 SAILING INSTRUCTIONS 1.0 RULES 1.1 These series will be governed by the Racing Rules of Sailing (RRS), and the

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

Geotechnics, Face and Stockpile Operations

Geotechnics, Face and Stockpile Operations Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face and Stockpile Operations Information Sheet 4 October 2012 Duties of the Operator This information sheet has been developed by the Quarries

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure F. INTERPRETATION OF THE ESSENTIAL SAFETY REQUIREMENTS ON MANUFACTURING Guideline F-01 Guideline related to: Annex 1 Section 3.1.2 According to section 3.1.2 (permanent joining) of Annex I, the third party

More information

Title: INSTRUMENT AND EQUIPMENT DOCUMENTATION AND RECORDS

Title: INSTRUMENT AND EQUIPMENT DOCUMENTATION AND RECORDS Page 1 of 7 Sections Included in this Document and Document History 1. Purpose 2. Scope 3. Responsibilities 4. Background 5. References/(Deleted date) 6. Procedure 7. Definitions 8. Records 9. Supporting

More information

Conduct and Discipline

Conduct and Discipline Conduct and Discipline 100. Complaints of misconduct Any person wishing to make a complaint of misconduct by a member must do so in writing to the Chief Executive who will refer it to the Disciplinary

More information

Wilkins Safety Group

Wilkins Safety Group H & S Guidance - Pressure Systems and Gas Cylinders INTRODUCTION If pressure systems fail, they can seriously injure or kill people. Every year there are about 150 dangerous occurrences (reported to the

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure H. INTERPRETATION OF OTHER ESSENTIAL SAFETY REQUIREMENTS Guideline H-02 Guideline related to: Annex I Section 3.2.2 and 7.4 Final assessment (Annex I Section 3.2.2) of pressure equipment must include a

More information

Safety Services Guidance. Guidance on Statutory Inspections

Safety Services Guidance. Guidance on Statutory Inspections Guidance on Statutory Inspections Key word(s): Inspections, written scheme of examinations, pressure systems, lifting equipment, local exhaust ventilation Target audience: Heads of School, Directors, Technical

More information

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary? What is Lockout? Lockout means to physically neutralize all energies in a piece of equipment before beginning any maintenance or repair work. Lockouts generally involve: Stopping all energy flows (for

More information

Maintenance handbook

Maintenance handbook Maintenance handbook ontents HPU IDENTIFIATION SHEET... 4 1. MAINTENANE... 5 1.1 Filling level... 5 1.2 Fluid top-up... 5 1.3 Fluid replacing... 5 1.4 Fluid temperature control... 6 1.5 Functional control...

More information

SIL explained. Understanding the use of valve actuators in SIL rated safety instrumented systems ACTUATION

SIL explained. Understanding the use of valve actuators in SIL rated safety instrumented systems ACTUATION SIL explained Understanding the use of valve actuators in SIL rated safety instrumented systems The requirement for Safety Integrity Level (SIL) equipment can be complicated and confusing. In this document,

More information

Health and Safety Guidance Note No 37

Health and Safety Guidance Note No 37 Health and Safety Guidance Note No 37 THE SAFE USE AND STORAGE OF GAS CYLINDERS Accidents involving gas cylinders can cause serious injury or even death. The legal term for gas cylinders is transportable

More information

XXth IAU 24H WORLD CHAMPIONSHIP 2017

XXth IAU 24H WORLD CHAMPIONSHIP 2017 EVENT ORGANISATION AGREEMENT XXth IAU 24H WORLD CHAMPIONSHIP 2017 LOCATION - COUNTRY version 20150101 I n t e r n a t i o n a l A s s o c i a t i o n o f U l t r a r u n n e r s u n d e r t h e P a t r

More information

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) WAC Page 296-307-320 Control of hazardous energy (lockout-tagout). 1 296-307-32001 What does this section cover? 1 296-307-32003 When does this section

More information

Life Extension of Mobile Offshore Units

Life Extension of Mobile Offshore Units Life Extension of Mobile Offshore Units Operation of classified aging units Sigmund Røine DNV Mobile Offshore Units in Operation Presentation content MOU integrity during operation Survey Principles for

More information

The Boiler Test Code 2018

The Boiler Test Code 2018 The Boiler Test Code 2018 VOLUME 2 - Boilers under 3 bar litres Effective from 1 st May 2018 Prepared by: 10¼ Gauge Railway Society, 7¼ Gauge Society, Association of 16mm Narrow Gauge Modellers, Gauge

More information

CONFLICT OF INTEREST POLICY

CONFLICT OF INTEREST POLICY Page 1 of 9 Version V01 10 December 2015 Page 2 of 9 Conflict of Interest Policy Version 01 Short description Relevant to Authority Responsible Unit/Department Policy on conflict of interests for IRB Barcelona

More information

SEMEM3-65 Servicing anaesthetic and ventilation equipment

SEMEM3-65 Servicing anaesthetic and ventilation equipment Overview This unit identifies the competences you need to carry out servicing activities on anaesthetic and ventilation equipment, in accordance with approved procedures. You will be required to service

More information

SLOP RECEPTION AND PROCESSING FACILITIES

SLOP RECEPTION AND PROCESSING FACILITIES RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 8 SLOP RECEPTION AND PROCESSING FACILITIES JANUARY 2011 CONTENTS PAGE Sec. 1 General Requirements...

More information

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING Revised August 2017 CONTENTS PAGE 2017 Updated Code of Practice 3 UKA Health & Safety Policy 4 Definitions 5 Hazard identification

More information

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance

More information

SEMME2135 Assisting in modifying and adding electrical circuits in yachts and boats

SEMME2135 Assisting in modifying and adding electrical circuits in yachts and boats Assisting in modifying and adding electrical circuits in yachts and boats Overview This standard identifies the competences you need to assist with the modification or addition of electrical circuits in

More information

SOP #: Pressure Vessels

SOP #: Pressure Vessels Page #: Page 1 of 7 Last Reviewed/Update Date: 5/18/11 Pressure Vessels 1. Purpose / Background This document describes the procedures the Massachusetts Institute of Technology (MIT) follows to ensure

More information

Introduction. Legal Duties. Risk Assessment

Introduction. Legal Duties. Risk Assessment All Hampstead Hill School Policies are always to be read and considered in conjunction with Equal Opportunities, Race Equality and Inclusion Policies. This Policy of Hampstead Hill School applies to all

More information

Boating Activity Minimum Standard. January 2015

Boating Activity Minimum Standard. January 2015 Boating Activity Minimum Standard January 2015 Contents 1 Executive Summary... 2 2 More Information... 2 3 Using this Standard... 2 4 Minimum Standard requirements... 2 4.1 Legislation... 2 4.1.1 Requirements

More information

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents Facilities and Estates Natural Gas: Standard Operating Procedure Document Control Summary Status: Version: Author/Title: Owner/Title: Approved by: Ratified: Related Trust Strategy and/or Strategic Aims

More information

Drum / cylinder handling

Drum / cylinder handling Page 1 of 8 Drum / cylinder handling This Technical Measures Document covers the storage and handling of toxic and flammable substances in drums and cylinders and refers to relevant codes of practice and

More information

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS ISSN 1172-3416 NZ GCP 2 : 1993 NEW ZEALAND GAS CODE OF PRACTICE for MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS Issued by the Secretary of Commerce in accordance with the Gas Act 1992 THE GAS ACT

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3788:2006 AS/NZS 3788:2006 Australian/New Zealand Standard Pressure equipment In-service inspection AS/NZS 3788:2006 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee

More information

SERIES SAFETY VALVE

SERIES SAFETY VALVE R Manufactured by Conbraco Industries, Inc. 10-600 SERIES SAFETY VALVE INSTALLATION, OPERATION, & MAINTENANCE Part I Document Number: ES-1325 Revision Level: B Issued By: T.HAMILTON Date: 3/3/16 Approved

More information

Control of Legionella

Control of Legionella OHSS Control of Legionella Guidance 103.1 Control of Legionella This guidance supports the Control of Legionella Health and Safety Management Standard. Contents 1 Introduction 2 2 Responsible and Appointed

More information

Pressure Vessel Program

Pressure Vessel Program Pressure Vessel Program 1. PURPOSE 1.1 This program provides guidance to University employees that work with or are responsible for pressure vessels. Conformance to this Program aids the University in

More information

Allowances, Assessment Requests and Incentive Payments. U pdated - 3 rd October 2016

Allowances, Assessment Requests and Incentive Payments. U pdated - 3 rd October 2016 Allowances, Assessment Requests and Incentive Payments U pdated - 3 rd October 2016 Allowances, Assessment Requests and Incentive Payments Why The wholesale Allowances, Assessment Requests and Incentive

More information

Buggy Policy Document Date: 10 November 2017

Buggy Policy Document Date: 10 November 2017 Buggy Policy Document Date: 10 November 2017 Cavendish Golf Club recognises that it has a duty of care to the staff, members and guest users of the golf course. The topography and nature of the course

More information

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE Page: 1 of 5 5.1. PURPOSE To ensure that: The vessel, as applicable, meets MARPOL requirements; There is adequate trim and the propeller is immersed; Stress conditions are within allowable limits during

More information

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) December 5, 1994 TM Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on

More information

PSSI 6 Demarcation of Work Areas in Substations

PSSI 6 Demarcation of Work Areas in Substations 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical), setting down the requirements in those situations where it is necessary

More information

Understanding safety life cycles

Understanding safety life cycles Understanding safety life cycles IEC/EN 61508 is the basis for the specification, design, and operation of safety instrumented systems (SIS) Fast Forward: IEC/EN 61508 standards need to be implemented

More information

ST 18 Aluminium Gas Model

ST 18 Aluminium Gas Model ST 18 Aluminium Gas Model Operators Manual Issue 5 For correct operation of this autoclave it is essential that the chamber be filled with water up to the height of the studs before every use. DIXONS SURGICAL

More information

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 Copyright 2018 by British Compressed

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Heat Recovery Steam Generators Jeanne Moreau DATE: April 23, 2010 SUBJECT: NFPA 85 F10 ROC Letter Ballot The ROC letter ballot

More information

Instruction Manual Contact Pressure Vacuum Gauge

Instruction Manual Contact Pressure Vacuum Gauge MS10 Instruction Manual Contact Pressure Vacuum Gauge Table of Contents 1. Safety Instructions 2. Intended Applications 3. Product Description and Functions 4. Installation 5. Commissioning 6. Maintenance

More information

ST 18 Aluminium Gas Model

ST 18 Aluminium Gas Model DIXONS SURGICAL INSTRUMENTS LTD, 1 ROMAN COURT HURRICANE WAY, WICKFORD BUSINESS PARK WICKFORD, ESSEX, SS11 8YB, UK TEL: +44 (0)1268 764614 - FAX: +44 (0)1268 764615 EMAIL: info@dixons-uk.com - WEB: http://www.dixons-uk.com

More information

WAHSA PGN02 Practical Guidance Note 02 (formerly TGN03) GUIDANCE ON INSPECTING PERSONAL FALL PROTETION EQUIPMENT

WAHSA PGN02 Practical Guidance Note 02 (formerly TGN03) GUIDANCE ON INSPECTING PERSONAL FALL PROTETION EQUIPMENT WAHSA PGN02 Practical Guidance Note 02 (formerly TGN03) GUIDANCE ON INSPECTING PERSONAL FALL PROTETION EQUIPMENT A series of informative notes for all industries involved with work at height or rescue.

More information

Introduction to the NRA Design Manual for Roads and Bridges

Introduction to the NRA Design Manual for Roads and Bridges Volume 0 Section 0 Part A 0.0.A Introduction to the NRA Design Manual for Roads and Bridges July 2011 St. Martin s House, Waterloo Road, Dublin 4. Tel:+353 1 660 2511 Fax +353 1 668 0009 Email : info@nra.ie

More information

CALIBRATION SYSTEM REQUIREMENTS. ESCC Basic Specification No

CALIBRATION SYSTEM REQUIREMENTS. ESCC Basic Specification No Page 1 of 8 CALIBRATION SYSTEM REQUIREMENTS ESCC Basic Specification Issue 4 February 2014 Document Custodian: European Space Agency see https://escies.org PAGE 2 LEGAL DISCLAIMER AND COPYRIGHT European

More information

METHODS TO PREVENT THE PREMATURE ACTIVATION OF RELIEF DEVICES ON TRANSPORT TANKS

METHODS TO PREVENT THE PREMATURE ACTIVATION OF RELIEF DEVICES ON TRANSPORT TANKS METHODS TO PREVENT THE PREMATURE ACTIVATION OF RELIEF DEVICES ON TRANSPORT TANKS IGC Doc 184/14/E EUROPEAN INDUSTRIAL GASES ASSOCIATION AISBL AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel: +32 2 217 70 98 Fax:

More information

The routine maintenance and inspection of local exhaust ventilation (LEV)

The routine maintenance and inspection of local exhaust ventilation (LEV) The routine maintenance and inspection of local exhaust ventilation (LEV) This document details the standards for inspection and maintenance that should be achieved for all local exhaust ventilation owned

More information

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018 University Policy Volume E2: Environment, Health, Safety and Security E2.14 Control of Hazardous Energy Responsible Office: Facilities Management Responsible Officer: Safety Officer POLICY STATEMENT All

More information

CONTINUING REVIEW CRITERIA FOR RENEWAL

CONTINUING REVIEW CRITERIA FOR RENEWAL 1. POLICY Steering Committee approved / Effective Date: 9/2/15 The IRB conducts continuing review of research taking place within its jurisdiction at intervals appropriate to the degree of risk, but not

More information

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

SEMEM3-73 Maintaining medical gas pipeline systems and equipment Maintaining medical gas pipeline systems and equipment Overview This unit identifies the competences you need to carry out maintenance activities on medical gas pipeline systems and equipment, in accordance

More information