2 INTRODUCTION The Cameroonian regulation on pressure equipment (PE) is based on a set of official laws especially : Act N 98/020 dated 24/12/1998 regulating gas pressure operated equipments (APG) and water vapor pressure equipment (APE). Decree N 99/817/PM dated 9 November 1999 on the methods of construction, operation and control for gas pressure operated equipment (GAS) and vapor pressure equipment (VPE), as well as pipes; The enforcement of these regulations is under the control of MINIMIDT (Ministry of Industry, Mines and Technological Development).
3 1 General Provisions The Cameroonian regulation differentiates: two categories of equipment : (In-built, semi-in-built or mobile) pressure equipment. Pipes. the types of fluids contained: gas, Water vapor, Any liquid other than water, Vapor other than water vapor,
4 Equipments submitted and submission thresholds Submission thresholds depend on maximum allowable pressure (MAP). Any PV whose maximum service pressure (MSP) is higher than 1 actual Bar is submitted SP > 1 Bar Note: Unlike other regulations, the maximum allowable temperature (MAT), the volume (V), the nominal diameter (ND), or the combination of these parameters, and the fluid contained, do not affect submission.
5 Regulations relating to new equipments The development of a new equipment, regardless of its volume, should comply with the existing development codes and specifications in relation to: - the design - the manufacture - and equipment inspections The equipment should be delivered alongside technical product documentation.
6 Regulations relating to new equipments SAFETY DEVICES The regulation on in-built UPE, with cabinets or a group of related cabinets having the same operational maximum Pressure including pressure excess guarantee for one or many safety devices whose operation is maintained under operating conditions. No order has been issued in relation to the intervals of visits. At SONARA, all valves are subject to periodic monitoring : Valve setting: 3 years for suppression valves, 5 years for non-suppression valves Lifting testing: Every six months 6 for vapor valves.
7 Declaration on Start-up Equipment from abroad: Before starting up, the operator must declare it to the Office of Mines. The declaration file will consist of: The declaration of equipment operation, Product description (technical specifications) Development plans, Certificates of tests of origin Request of receipt. An acknowledgement of receipt for this declaration coupled with a certificate of performance test shall be issued by the Office of Mines within 15 days. Should this time limit be exceeded, this declaration shall be deemed to be existing.
8 Declaration on Start-up Equipment constructed in Cameroon : Before starting the equipment, the operator shall declare it to the Office of Mines. The declaration file is the same except as to: Certificates for original performance test
9 Precontrol to operation start-up Operational inspection is required by existing regulations. The inspection shall be carried out by the relevant staff of SONARA. It relates to : compliance with rules for equipment installation and operation, the operation of safety and regulatory supplies, Qualified personnel in charge of operations, existing safety rules.
10 PERIODIC INSPECTIONS Equipment under pressure will be subject to compulsory periodic inspection by sworn officers from the Office of Mines: - As often as required, - The interval between 2 inspections cannot exceed 6 months (semi-annual visits).
11 PERIODIC REQUALIFICATION Equipment under pressure will be subject to a compulsory periodic requalification by an inspector from the Office of Mines: Before operating any new equipment After a major repair At the behest of the Office in charge of pressure equipment
12 PERIODIC REQUALIFICATION This will include in principle : An in-house inspection, An outside inspection, Inspection of safety supplies Alternative equipment testing. NOTE: Periodic requalification entail the issuance of a certificate
13 REQUALIFICATION INTERVALS The interval between two requalifications should not exceed : Ten (10) years for : VPE GPE containing non-corrosive fluids specifically defined Copper containers of GPEs Five (5) years for all other GPEs; One (1) year in the case of GPEs, in-built or semi-in-built steel containers containing or having contained gas by way of solid fuel distillation; Two (2) years any equipment containing the following gases : Fluorine, hydrochloric acid, hydrogen sulphide, dinitrogen tetraoxide
14 TEST CONDITIONS GPE: Test Pressure TP = 1.5 X PMS (MSP : maximum service pressure). Special cases TP 60 bars for dissolved container acetylene, TP 200 bars for in-built or semi-in-built containers with fluorine, TP 20 bars for in-built or semi-in-built containers with phosgene.
15 TEST CONDITIONS VPE : TP = safe working pressure (PC) + overload (high or reduced) Condition of operation for high overload : Equipment undergoing the test for the first time, Equipment that has undergone major modifications or significant repairs ; These equipments whose test is imposed by the Authority in charge of PEs. Condition for operation of overloads : All conditions. High overloaded value: Safe working pressure if PC 6 6 bars if 6 bars PC 12 bars Half of safe working pressure if PC 12 bars Reduced overloaded value : equals one third of high overloaded values
16 TEST CONDITIONS NOTE : A test deferment may be granted by the Authority in charge of pressure equipment for a period that will not exceed one (1) year whenever it comes to production equipment (in good working order) where needed.
17 PIPING General regulations relating to the design and operation of piping systems are identical to cabinet under pressure : - Developed according to generally accepted practices, - Guarantees against pressure excess from safety devices, There are two (2) major categories of piping systems: Piping systems generally meant for plants and installed within the right-of-way of industrial concerns, Transmission lines (pipelines, gas pipeline, etc.), installed in the public domain.
18 PERIODIC INSPECTIONS Piping systems are inspected as often as required by the personnel of the Office of Mines without any compulsory interval, specifically before restarting any equipment following a prolonged period of idleness. The inspection of buried or heat-insulated piping systems involves checking some parts deemed to be vulnerable by means of boring.
19 PERIODIC REQUALIFICATION Piping is subject to an hydrostatic testing : At least once every ten (10) years. After a major modification or repair Test Pressure: 1,5 X maxi P service
Summary of the MRA LPG Codes of Practice
Summary of the MRA LPG Codes of Practice COP A1 DESIGN and INSTALLATION Code COP A1 deals with above ground installations where LPG is stored under pressure at ambient temperatures in fixed vessels larger
More informationO&M MANUAL HIGHLIGHTS
O&M MANUAL HIGHLIGHTS GENERAL PROVISIONS Each pipeline must be operated according to this SUBPART 192.603(a) RECORDS 192.603(b) Keep records necessary to administer the procedures of 192.605 RECORDS Life
More informationCAST IRON SAFETY VALVE TYPE 6301
CHARACTERISTICS The 6301 safety valve is dedicated to protect the equipment from potential overpressure. This is an automatic device that closes when the pressure conditions are back to normal. It is a
More informationInstallation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914
Installation, Operating and Maintenance Instructions V914 Cast Iron Flanged Swing Check Valve V914 THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC and CE MARKING The Pressure Equipment Regulations 1999 (SI 1999/2001)
More informationRegulated Oil and Gas Companies under National Energy Board Jurisdiction
File 185-A000-41 8 August 2003 Regulated Oil and Gas Companies under National Energy Board Jurisdiction Dear Sir / Madam: Guidance Notes for Pressure Equipment under National Energy Board Jurisdiction
More informationPURPOSE OF THE POLICY
Title: Safe Storage, Handling, Use and Disposal Procedures of Compressed Gas Cylinders Effective Date: November 2005 Revision Date: March 1, 2017 Issuing Authority: Responsible Officer: VP, Capital Projects
More informationGUIDE YVL 3.7 / 26 Se p t e m b e r 2008
GUIDE YVL 3.7 / 26 Se p t e m b e r 2008 Pressure equipment of nuclear facilities Commissioning inspection 1 Ge n e r a l 3 2 Contents of the commissioning inspection 3 3 First phase of the commissioning
More informationSubpart E. Pressure Testing
Subpart E Pressure Testing 195.300 Scope This subpart prescribes minimum requirements for pressure testing of steel pipelines. However, this subpart does not apply to movement of pipe covered by 195.424.
More informationOperating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Brass Check Valve RDL
Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU FAS Brass Check Valve RDL Please read these operating instructions carefully to ensure a safe operation and keep the same
More informationFLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS
CHAPTER 35 FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS SECTION 3501 GENERAL 3501.1 Scope. The storage and use of flammable gases shall be in accordance with this chapter. Compressed gases shall also
More informationPressure Equipment Directive (PED) 97/23/EC Page 033 of 124
Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124 13.7 Pressure Equipment Directive (PED) 97/23/EC 1 The Pressure Equipment Directive (PED) 97/23/EC applies to the design, manufacturing and conformity
More informationTP1 and TP2 Temporary Cone Shaped Strainers
1698051/2 IM-P169-07 ST Issue 2 TP1 and TP2 Temporary Cone Shaped Strainers Installation and Maintenance Instructions TP1 1. Safety information 2. General product information 3. Installation and commissioning
More informationWHEATLEY Series 822/820 Swing Check Valve
Document Number: TC003001-12 Revision: 02 WHEATLEY Series 822/820 Swing Check Valve Installation, Operation, and Maintenance Manual TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...4 INSTALLATION AND OPERATION
More informationCITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard
CITY AND COUNTY OF DENVER CR&CF RISK UNIT 65.5.11 Compressed Gas Safety Standard 1.0 Introduction 2.0 Scope This standard has been developed to protect all City and County of Denver employees and contractors
More informationEXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR ) 1. GRANTEE: Structural Composites Industries (SCI) Pomona, CA
East Building, PHH-30 1200 New Jersey Avenue S.E. U.S. Department of Transportation Washington, D.C. 20590 Pipeline and Hazardous Materials Safety Administration DOT-SP 13583 (NINTH REVISION) EXPIRATION
More informationInstallation, operation & maintenance manual - original version
Installation, operation & maintenance manual - original version AVK gate valves for water and wastewater Series 01, 02, 06, 12, 15, 18, 20, 26, 32, 33, 36, 38, 50, 55 and 636 COPYRIGHT AVK GROUP A/S 2018
More informationWHEATLEY Series 500 Swing Check Valve
Document Number: TC003001-13 Revision: 02 WHEATLEY Series 500 Swing Check Valve Installation, Operation, and Maintenance Manual TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...5 INSTALLATION AND OPERATION
More informationSUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland
SUP 15 Health & Safety Management Pressure Systems Unified procedures for use within NHS Scotland September 2015 Contents Page Acknowledgements... 3 1. Introduction... 4 2. Purpose of this Procedure...
More informationMSC Guidelines for Pressure Vessels
References: a. 46 CFR Part 54 Pressure Vessels S. T. Brady, CDR, Chief, Engineering Division b. ASME Boiler and Pressure Vessel Code (BPVC), Section VIII, Division 1, (1998 Edition) c. Navigation and Inspection
More informationGAS SAFETY Information Bulletin
GAS SAFETY Information Bulletin June 2016 G-03-11-ABSA [Rev2] Page 1 of 7 Fuel Gas Pressure Piping in Plants This bulletin has been jointly developed by Safety Services, the Pressure Equipment Sub- Council,
More informationSOUTH AFRICAN NATIONAL STANDARD
ISBN 978-0-626-25419-3 SANS 347:2012 SOUTH AFRICAN NATIONAL STANDARD Categorization and conformity assessment criteria for all pressure equipment Published by SABS Standards Division 1 Dr Lategan Road
More informationEast Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TWENTY-THIRD REVISION)
East Building, PHH-30 U.S. Department 1200 New Jersey Avenue S.E. of Transportation Washington, D.C. 20590 Pipeline and Hazardous Materials Safety Administration DOT-SP 11054 (TWENTY-THIRD REVISION) EXPIRATION
More informationOperating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Straight-Way Valve with Packing Gland
Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU FAS Straight-Way Valve with Packing Gland Please read these operating instructions carefully to ensure a safe operation
More informationFAQs about Directive 017
FAQs about Directive 017 General What measurement points are covered in this directive? The requirements in this directive cover all measurement points required by the Oil and Gas Conservation Regulations
More informationSPECIFICATIONS - DETAILED PROVISIONS Section Butterfly Valves C O N T E N T S
SPECIFICATIONS - DETAILED PROVISIONS Section 15103 - Butterfly Valves C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 VALVE MANUFACTURER... 1 1.03 GUARANTEE... 1 PART 2 - PRODUCT... 1
More informationPressure Systems Safety Regulation
Pressure Systems Safety Regulation Introduction This document informs Faculty of the key requirements of the UK and Chinese Pressure Systems Safety regulations. The aim of these regulations is to prevent
More informationRECERTIFICATION GUIDELINES FOR HIGH PRESSURE CYLINDERS TD 30/18/E
RECERTIFICATION GUIDELINES FOR HIGH PRESSURE CYLINDERS MIDDLE EAST GASES ASSOCIATION (MEGA) Dubai World Trade Centre, Sheikh Rashid Tower, Office No. ESO 20,7 th Floor, P.O. Box 9204 Dubai, UAE. Tel:+971
More informationGENERAL SAFETY INSTRUCTION GSI-M-2 STANDARD PRESSURE EQUIPMENT
GENERAL SAFETY INSTRUCTION GSI-M-2 STANDARD PRESSURE EQUIPMENT Publication date: 09-06-2015 All CERN Safety Rules are available on the web site: https://www.cern.ch/safety-rules Page 1 of 8 1 INTRODUCTION
More informationFAQs about Directive PNG017: Measurement Requirements for Oil and Gas Operations
FAQs about Directive PNG017: Measurement Requirements for Oil and Gas Operations General Is it acceptable to report no gas production? All associated gas (gas produced from an oil well) or non-associated
More informationManual winch MANISTOR 100 and 200
Manual wall winch Manual winch MANISTOR 100 and 200 Instruction manual UK 173-192.10-3 PRODUCT DEVELOPED AND MANUFACTURED ACCORDING TO NF EN 13157 STANDARD REGISTERED DESIGN To ensure the constant improvement
More information2017 LGA 191/192 & 195 Pipeline Safety Conference
2017 LGA 191/192 & 195 Pipeline Safety Conference Presented by: Wallace Jones Director, Gas Pipeline Safety Division Alabama Public Service Commission Issues that GPS/PSC Staff are having with Pipeline
More informationManagement Plan for Compressed Gas
IEA, INC. N E W P R A G U E A R E A S C H O O L S I S D # 7 2 1 A Service-Disabled Veteran-Owned Small Business Contact Us: BROOKLYN PARK OFFICE 9201 W. BROADWAY, #600 BROOKLYN PARK, MN 55445 763-315-7900
More informationSECTION PRESSURE TESTING OF PIPING
SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01
More informationHandling and Storage of Gases
Handling and Storage of Gases Learning Outcome When you complete this module you will be able to: Describe the procedures for safe storage and handling of cylinders containing gases. Learning Objectives
More informationCONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM
CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM 1.0 REGULATORY AUTHORITY Code of Federal Regulations, 29 CFR 1910.147; California Code of Regulations, Title 8, Sections 2320.1 and 3314; CSU, Fullerton
More informationUser Information Sheet 015
User Information Sheet 015 Formerly LPGA Guidance NO.84 March 2007 Inspection and Maintenance of LPG Pipework at Commercial and Industrial Premises 1. Introduction LPG pipework may, under certain conditions,
More informationNatural Gas Connection Policy and Procedures
s Updated on: 1 April 18 Table of Contents 1. General Information... 1 1.1 Purpose of this Document... 1 1.2 Singapore Gas Transportation System... 1 1.3 Definitions... 2 1.4 Codes of Practices and Regulatory
More informationPeriodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels
(Jan 2017) Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels CONTENTS 1. Application 2. Special Survey 2.1 Schedule 2.2 Scope
More informationISO INTERNATIONAL STANDARD. Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves
INTERNATIONAL STANDARD ISO 21013-1 First edition 2008-06-15 Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves Récipients cryogéniques Dispositifs
More informationEast Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C EXPIRATION DATE: June 30, 2015
November 14, 2014 East Building, PHH-30 U.S. Department 1200 New Jersey Avenue S.E. of Transportation Washington, D.C. 20590 Pipeline and Hazardous Materials Safety Administration DOT-SP 16219 EXPIRATION
More informationSpilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.
Spilt body Flange ball valve TC-205MFF-PN1640 Series PED Category I,II TC-205MFF-PN1640 User Manual English Version Use for company in Europe who will place the product on the market, please amend which
More informationPRESSURE EQUIPMENT: REGULATIONS AND INSPECTIONS CODE NSH 222 Date: July 2003 Revision: 00 Page: 1 of 7
CODE NSH 222 Date: July 2003 Revision: 00 Page: 1 of 7 A SUMMARY OF REGULATIONS AND OF PRESSURE APPLICABLE REGULATIONS Equipment in which pressure builds up (no complementary technical instruction) From
More information6301 TYPE CAST IRON SAFETY VALVES
Pressure (bar) 6301 TYPE CAST IRON SAFETY VALVES FEATURES The 6301 type safety valve is a device designed to protect installations against possible overpressure. It operates automatically and closes when
More informationPressure Equipment Directive (PED) Directive 97/23/EC. Pressure Equipment (PED) --- Baltic Pressure Equipment Workshop Riga, November 2003
Directive 97/23/EC on Pressure Equipment (PED) --- Baltic Pressure Equipment Workshop Riga, 27-28 November 2003 1 Fundamentals Roots at the times of the Industrial revolution Technically one of most complex
More information12/22/ CHG 124 VOLUME 3 GENERAL TECHNICAL ADMINISTRATION
VOLUME 3 GENERAL TECHNICAL ADMINISTRATION CHAPTER 57 MAINTENANCE REQUIREMENTS FOR HIGH-PRESSURE CYLINDERS INSTALLED IN U.S.-REGISTERED AIRCRAFT CERTIFICATED IN ANY CATEGORY Section 1 Maintenance Requirements
More informationWHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual
WHEATLEY SERIES 500 SWING CHECK VALVE STANDARD INTEGRAL SEAT & OPTIONAL REMOVABLE SEAT 2" FP - 6" FP 150# - 1500# 8" FP - 12" FP 150# - 900# API 6D and B16.34 2" FP - 4" FP 5000# DRILLING PRODUCTION VALVE
More informationAccreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)
RG 3 Edition 4 December 2018 Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs) RG 3 / Edition: 4 Page 1 of 8 Contents 1. Introduction 2 2. Scope - Inspection Services
More informationRULE 36 & H 2 S SAFETY
OUTLINE OF RULE 36 RULE 36 & H 2 S SAFETY RULE 36 IS A SAFETY RULE DESIGNED TO PROTECT THE GENERAL PUBLIC FROM THE HAZARDS OF H 2 S RESULTING FROM INTENTIONAL AND ACCIDENTAL RELEASES. PROPERTIES OF H 2
More informationS1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions
PREVIOUS REFERENCE NO. IMP02355 0231150/13 IMF0501ENISS2 CMGT S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions 1. Safety information 2. General product information
More informationSAFETY DIRECTIVE 3.0 REFERENCES. 3.1 See Appendix B
SAFETY DIRECTIVE Title: Hot Work Issuing Department: Town Manager s Safety Office Effective Date: September 1, 2014 Approved: Gilbert Davidson, Town Manager Type of Action: New 1.0 PURPOSE To provide proper
More informationHealth & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY
SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY 1. CONTROL OF HAZARDOUS ENERGY POLICY AND PROCEDURES A. OSHA References: 29 CFR 1910.147, 29 CFR 1910.332, 29 CFR 1910.333, 29 CFR 1926.417 B.
More informationType 2000 INOX. Quickstart. English Deutsch Français. 2/2-way angle seat valve 2/2-Wege Schrägsitzventil Vanne à siège incliné 2/2 voies
Type 2000 INOX 2/2-way angle seat valve 2/2-Wege Schrägsitzventil Vanne à siège incliné 2/2 voies Quickstart English Deutsch Français Contents 1 QUICKSTART... 2 2 CONTACT ADDRESS... 2 3 INTENDED USE...
More informationMeasurement accessories METPOINT OCV for the measurement in systems up to 40 bar
EN - english Instructions for installation and operation Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar Dear customer, Thank you for deciding in favour of the METPOINT
More informationAmerican Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM
American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1003 - REVISED: 2009 Water Pressure Reducing Valves for Domestic Water Distribution Systems MANUFACTURER: CONTACT
More informationTSS21 Sealed Thermostatic Steam Tracer Trap
1255050/4 IM-P125-10 ST Issue 4 TSS21 Sealed Thermostatic Steam Tracer Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationUSER MANUAL. 1. Principle of operation. 2. Delivery condition. SPRING-LOADED SAFETY VALVES zarmak. Edition: 07/2016 Date: V (ex.
ZETKAMA Sp. z o.o. ul. 3 Maja 12 PL 57-410 Ścinawka Średnia SPRING-LOADED SAFETY VALVES zarmak USER MANUAL 782V (ex. 782) Edition: 07/2016 Date: 01.07.2016 TABLE OF CONTENTS 1. Principle of operation 2.
More informationStandards of Practice Emergency Shower/Eyewash Installation, Use, Testing & Maintenance
Standards of Practice Emergency Shower/Eyewash Installation, Use, Testing & Maintenance Document Authority: EHS Coordinator Document Custodian: EH&S Coordinator Effective Date: 09.01.15 Issuing Dept: College
More information4.0 DOT CYLINDERS 17
4.0 DOT CYLINDERS 17 18 4.0 DOT CYLINDERS DOT CYLINDERS Most cylinders in propane service today are manufactured according to DOT specifications and therefore, are commonly referred to as DOT cylinders.
More information6.6 Relief Devices. Introduction
6.6 Relief Devices Introduction Relief devices are used to help prevent a catastrophic failure of equipment and/or minimize the effects of any unanticipated or uncontrolled events. As such, relief devices
More informationOperating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Manual Brass Shut-Off Valve DN10 through DN22
Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU FAS Manual Brass Shut-Off Valve DN10 through DN22 Please read these operating instructions carefully to ensure a safe operation
More informationProject Specific Information Package Kakwa Expansion Pipeline Project
3800, 525 8th Avenue S.W. Calgary, Alberta T2P 1G1 Project Specific Information Package Kakwa Expansion Pipeline Project Pembina Pipeline Corporation ( Pembina ) plans to make an application to the Alberta
More informationCVS10 Sanitary Check Valves
0299050/4 IM-P029-11 ST Issue 4 CVS10 Sanitary Check Valves Installation and Maintenance Instructions 1. Safety information CVS10 with soft seat 2. General product information 3. Operation 4. Installation
More informationRequirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants
the pressure equipment safety authority Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants AB-528 Edition 2, Revision 1 Issued 2016-09-12 Table of
More informationSection 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General B Compressed Air and Gas Systems
Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems Section: Page 20.A General... 20-1 20.B Compressed Air and Gas Systems... 20-4 20.C Boilers and Systems... 20-7 20.D Compressed Gas Cylinders...
More informationPVC Quick Drain Valve
PVC Quick Drain Valve LVW Series Complies to JIS standard for polyvinyl chloride piping (JIS K 6742) Applicable fluids: Deionized water, Chemical liquids Application Example Cleaning Equipment Process
More informationMST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap
1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation
More informationDifferential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN
Differential Pressure Regulator Type 45-6 Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN Edition March 2008 Contents Contents Page 1 Design and principle of operation...................
More informationINTER PLANT STANDARD STEEL INDUSTRY SAFETY PROCEDURE FOR GAS CUTTING BY REGULAR/CONTRACTOR S WORKERS. Corresponding IS 818:1968
INTER PLANT STANDARD STEEL INDUSTRY IPSS SAFETY PROCEDURE FOR GAS CUTTING BY REGULAR/CONTRACTOR S WORKERS Corresponding IS 818:1968 IPSS:1-11-017-12 0. FOREWORD 0.1 This Inter Plant Standard, formulated
More informationOIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply
OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions
More informationBRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS
BRITISH STANDARD BS 341-4:2004 Transportable gas container valves Part 4: Pressure relief devices ICS 23.060.40 This British Standard, having been prepared under the direction of the Standards Policy and
More informationPROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES
NB16 0603 NR Task Group 1 9 16 1. One update by NR task group page 3: 7/17/19 2. Two updates to S6.1 and S6.3 on page 1: 7/19/17 SUPPLEMENT 6 PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES
More informationEast Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (FOURTH REVISION)
East Building, PHH-30 U.S. Department 1200 New Jersey Avenue S.E. of Transportation Washington, D.C. 20590 Pipeline and Hazardous Materials Safety Administration DOT-SP 15260 (FOURTH REVISION) EXPIRATION
More informationDK46 - DK800 Supplementary instructions
DK46 - DK800 Supplementary instructions Variable area flowmeter Device category II2G with electrical internals Additional Ex manual KROHNE CONTENTS DK46 - DK800 1 Safety instructions 3 1.1 General... 3
More informationHealth and Safety Executive. Key aspects of HS(G) 253. Andrew Hall HID CI 1G. HM Specialist Inspector (Mechanical)
Health and Safety Executive Key aspects of HS(G) 253 Andrew Hall HID CI 1G HM Specialist Inspector (Mechanical) Human Factors Human Failures can be grouped into: Errors And Violations Errors are not intended
More informationAVC32 Carbon Steel Air Vent for Steam Systems
1234050/4 IM-P123-14 ST Issue 4 AVC32 Carbon Steel Air Vent for Steam Systems Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationPV4 and PV6 Piston Valves
1181250/1 IM-P118-05 ST Issue 1 PV4 and PV6 Piston Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6.
More informationKWA. Evaluation of the MassTech 001 Tank Integrity Test System. EPA Forms Obtained From
Evaluation of the MassTech 001 Tank Integrity Test System EPA Forms Obtained From http://www.kwaleak.com PREPARED FOR MassTech International Limited KWA February 26, 1995 Ken Wilcox Associates, Inc. 1125
More informationSpiratec ST14, ST16 and ST17 Sensor Chambers and sensors
0862050/1 IM-P086-18 MI Issue 1 Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors Installation and Maintenance Instructions 1. Safety Information 2. General product information 3. Installation 4.
More informationCP10 Sensor Installation and Maintenance Instructions
4030150/9 IM-P403-26 EMM Issue 9 CP10 Sensor Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Maintenance 5. Spare parts Copyright 2017
More informationUIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors
1130050/4 IM-P113-02 ST Issue 4 UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors Installation and Maintenance Instructions 1. Safety information 2. General product information
More informationProducts for Cryogenic Applications
Products for Cryogenic Applications Cryogenic valves, self-operated regulators, differential pressure meters SMART IN FLOW CONTROL. Designed for cryogenic service Industry, medicine, supply engineering
More informationPressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"
I. MISCELLANEOUS Guideline I-01 Guideline related to: Article 4 paragraph 3 What is to be understood by "sound engineering practice"? Sound engineering practice means, without prejudice to Article 5, paragraph
More informationPressure Relief Device Investigation Testing Lessons Learned
Pressure Relief Device Investigation Testing Lessons Learned 2018 General Meeting Presentation Prepared by: Joseph F. Ball, P.E. Overview National Board Investigation Testing Process Summary of Results
More informationHazardous Energy Control
Lockout Tagout This program has been prepared to provide assistance in compliance with USA OSHA standards and/or Best Management Practices. It should not be used without consideration of the unique conditions
More informationDCV10 Stainless Steel Disc Check Valve for use with Condensate Pumps
6018050/1 IM-P601-33 ST Issue 1 DCV10 Stainless Steel Disc Check Valve for use with Condensate Pumps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation
More informationS1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators
0231150/8 IM-P023-55 ST Issue 8 S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationPRESSURIZED EQUIPMENT AND SYSTEMS
SECTION 20 PRESSURIZED EQUIPMENT AND SYSTEMS 20.A GENERAL 20.A.01 Inspections and tests - general. a. Pressurized equipment and systems shall be inspected and performance tested before being placed in
More informationCast iron swing check valve. BS EN 12334:2001 PN16
Cast iron swing check valve. BS EN 12334:2001 PN16 V914 Size Pattern No. Pack 1 Qty Pack 2 Qty Code Barcode Price ( ) ex VAT 65mm V914 1 0 15378 5022050079664 223.32 80mm V914 1 0 15379 5022050079824 247.60
More informationSTANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)
STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) TEE (HOT TAPPING MATERIAL) S-04-02-040 Page 1 of 7 1.0 SCOPE This specification covers the basic requirements for the design, manufacture and supply
More informationMFP14-PPU (Vented) Automatic Packaged Pump Units
681060/2 IM-P681-02 ST Issue 2 MFP14-PPU (ented) Automatic Packaged Pump Units Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Single MFP14 - PPU installation
More informationCompressed Gas Cylinders - Guideline
Environmental Health and Safety Compressed Gas Cylinders - Guideline Date of Issuance: 1/10/18 Revision Number: Initial Revision Date: Prepared by: EH&S 1. Purpose Carnegie Mellon University has developed
More informationPERFORMANCE SPECIFICATION PROPELLANT, HYDROGEN
METRIC 17 May 2013 SUPERSEDING MIL-PRF-27201D 07 February 2007 PERFORMANCE SPECIFICATION PROPELLANT, HYDROGEN This specification is approved for use by all Departments and Agencies of the Department of
More informationSAFETY BULLETIN 01/05
SAFETY BULLETIN 01/05 ASIA INDUSTRIAL GASES ASSOCIATION 3 HarbourFront Place, #09-04 HarbourFront Tower 2, Singapore 099254 www.asiaiga.org Safe use of acetylene This document is for people who use acetylene
More informationStandard Pneumatic Test Procedure Requirements for Piping Systems
the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 1 Issued 2016-10-24 Table of Contents FOREWORD... 1 1.0 INTRODUCTION...
More informationWorkplace Safety and Health (Major Hazard Installations) Regulations 2017 S 202/2017
Workplace Safety and Health (Major Hazard Installations) Regulations 2017 S 202/2017 THE SCHEDULES FIRST SCHEDULE DANGEROUS SUBSTANCES Regulation 2(1) and Second and Fifth Schedules PART 1 NAME OF DANGEROUS
More informationPeriodical surveys of cargo installations on ships carrying liquefied gases in bulk
(June 1999) (Rev.1 Mar 2006) (Rev.2 May 2007) (Rev.3 Mar 2010) (Corr.1 Feb 2011) (Rev.4 Oct 2013) Periodical surveys of cargo installations on ships carrying liquefied gases in bulk 1 General 1.1 Scope
More informationDCV6 Disc Check Valve
1342050/6 IM-P134-22 ST Issue 6 DCV6 Disc Check Valve Installation and Maintenance Instructions Printed IM-P134-22 in the UK ST Issue 6 Copyright 20101 Safe operation of this product can only be guaranteed
More informationInstallation of Ballast Water Management Systems
(Sept 2015) (Rev.1 May 2016) Installation of Ballast Water Management Systems 1. Application In addition to the requirements contained in BWM Convention (2004), the following requirements are applied to
More informationHANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1
HANDBOOK Ed. 2017 DS-ED 01/2017 - ENG 1 CHAPTER 9 BURSTING DISC DEVICES IN SERIES 3070 SCOPE Use: protection against possible overpressure of the apparatuses listed below, with regard to the operating
More informationUSM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions
6250250/1 IM-P625-03 ST Issue 1 USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions 1. General safety information 2. General product information
More information