Improving the Failure Rate of Holding Pressure of Gas Pipeline by 6σ Method 品管控制氣體管路保壓失敗率之研究

Size: px
Start display at page:

Download "Improving the Failure Rate of Holding Pressure of Gas Pipeline by 6σ Method 品管控制氣體管路保壓失敗率之研究"

Transcription

1 Journal of China University of Science and Technology Vol Improving the Failure Rate of Holding Pressure of Gas Pipeline by 6σ Method 品管控制氣體管路保壓失敗率之研究 1 鐘啟榮 2 李世文 3 陳德請 Chung-Chi Jung 1, Shih-Wen Lee2, Der-Chin Chen 3 1 逢甲大學資訊電機碩士在職專班 2 中華科技大學電機工程系助理教授 3 逢甲大學電機工程系教授 1,3 Department of Electrical Engineering, Feng Chia University 2 Department of Electrical Engineering, China University of Science and Technology 摘要 本研究利用 SIPOC 模組建立實驗流程 魚骨圖與矩陣圖來找出管路保壓失敗的原因, 及應用 DMAIC 手法改善管路保壓失敗率, 訂出最佳更換鋼瓶 SOP 及工具選擇 因氣體壓力會受溫度影響, 使用給呂薩克定律來計算出正確壓力值, 以確保管路保壓壓力的正確性, 並進一步使用六標準差分析實驗數據可靠性及直線迴歸分析証實 SOP 流程的改善效果 此方法經實驗測試, 可以使氣體管路保壓失敗率由 30.5% 降低至 8.3% 關鍵字 : 六標準差 迴歸分析 ABSTRACT This research applies SIPOC (suppliers, inputs, process, outputs, and customers) model to build the experimental processes, the fishbone diagram as well as the matrix diagram to find the causes of failure and applies DMAIC method to improve the failure rate of pipeline, respectively. Then, the optimal SOP of the replacement of cylinders and the selection of the tools are established. The gas pressure of pipeline is affected by temperature, and the Gay-Lussac's law is used to calculate the correct pressure value in order to ensure the validity of the holding pressure in the pipeline. Furthermore, Six Sigma tools are applied to analyze the reliability of the data and linear regression analysis, to assure the improvement of SOP. This method is tested by experiment, results show the failure rate of the holding pressure of gas pipeline can be reduced from 33

2 Improving the Failure Rate of Holding Pressure of Gas Pipeline by 6σ Method 30.5% to 8.3%. Keywords: SIPOC, DMAIC, 6 Sigma, SOP, regression analysis 1. INTRODUCTION So far, a variety of dangerous gases in the process of the panel plant are used (such as SiH4, PH3, NH3, CL2... etc.) [1]. Gas has to be replaced when it is used up. Now, the gas cylinder is not replaced through the automatic operation, but through manual work. Replacement of gas cylinder has some certain risks (such as leakages of the poisonous and flammable gases, etc.) [2]. Main factors affecting those risks include the way of operation, the tools to be used, and the surrounding temperature. 2. THE PURPOSES After running out of special gas, it is necessary to do the holding pressure test between the pipe and the gas cylinder while changing the cylinder. There would be generating the risk of leakage if the test is not executed. The pressure of gas will be affected by the temperature within one hour of the holding pressure. During the time, it is hard to judge consistency of pipeline pressure. However, the methods and the tools to change the gas cylinder would be one of the factors for holding pressure test successfully. In this research, the SOP are improved and more efficient. 3. THE PROCEURES AND METHODS The method to be used is SIPOC model [3] which defines the process of a special gas cylinder is provided on the spot. Also, the analytical results of the fishbone diagram [4] and the matrix diagram are used to find out the factors which cause the failure to hold the pressure of pipeline after changing the gas cylinder. Then, DMAIC [5] is applied to improve process. Finally, Gay-Lussac's law, six standard deviation [6] and regression analysis are used to calculate the differences and relevance of the failure rate. 3.1 Introduction 6 Sigma DMAIC DMAIC is a kind of structural and data-based process of improvement on the 34

3 Journal of China University of Science and Technology Vol problems [7] [8]. There are five steps described below: 1. Definition: After replacing the cylinder, there is no leakage at the junction of gas pipeline. 2. Measurement: Why does it often fail when gas pipeline is holding pressure? 3. Analysis: If there is no problem about the pipeline, there may be improper operation procedure and the tools used, or the defective material. 4. Improvement: Build up a set of SOP set and proper tools, and change the supplier. 5. Control: Ask the operators to follow up the SOP procedures. 3.2 The procedure of holding pressure in the gas pipeline The test of leakage of the holding pressure is due to the joint points between the cylinder and the pipeline. Figure 3.1 shows the flowchart of the holding pressure in the pipeline. Holding pressure: providing about 1500psi by the high-pressure to the junction points between cylinder and pipeline Cylinder cabinet (PLC + pressure regulator) New cylind er Joint points between cylinder and pipeline High pressure N 2 cylinders After providing the pressure, shut down High pressure N 2 immediately. Low pressure N 2 cylinders Low pressure N 2 provides positive pressure during the replacement of the cylinder. Figure 3.1 Flowchart of the holding pressure in the pipeline 3.3 The Standard Operation Procedures The standard operation procedures (SOP) of replacing the cylinder are described as follows: 1. Make sure the value of the exhaust has reached the requirement. (Above 0.25 inch for H 2 O). 35

4 Improving the Failure Rate of Holding Pressure of Gas Pipeline by 6σ Method 2. Make sure to replace the gas cylinder cabinets, and then finish the operation of Pre-Purge. 3. Make sure the same name tag of the old cylinder as that of the cylinder cabinet. 4. Wear breathing apparatus (BA) and carry He gas detector, portable gas detectors, torque wrenches, gaskets. It is more necessary to wear fire suit, fire gloves and latex gloves while replacing SiH 4 cylinder. 5. Confirm that the lights on the panel of the gas cabinet are in the normal conditions. 6. Confirm that the pressure of high cylinder He is 1400 psi; the pressures of low pressure and the purge N 2 cylinders are 100 psi. 7. Confirm that the pressure of low pressure transducer (LPT) in the old cylinder is -10 psi. 8. Confirm that the pressure of high pressure transducer (HPT) in the old cylinder is around 110 psi. 9. Confirm that the pneumatic or manual valve of the old cylinder, needing to remove the gas first, is locked and tear off the label of in use. 10. Confirm that the red sleeve in the device of the protection from being removed, so-called Auto Guard, is not retracted. 11. Remove the connector of the cylinder (the instantaneous value after removing the cap of SiH 4 cylinder is 5 ppm). 12. Lock up the caps of the pigtailed connector in the cylinder, and move to the temporary area/frame. 13. Check the exterior of cylinder in good shape. 14. Place the cylinder in a normal position and align it with the pigtail s connector. Check the error is less than 1cm. 15. Remove the film on cylinder while on the shelf and use portable tester to check the every part, including the bottle of the cylinder, and make sure there is no leakage, then record the reading in ppm. 16. Confirm that the new cylinder has torn off the label of "charge the gas tank " or "filling the gas tank". 17. Remove the gaskets and check whether there are any scratches on the surfaces or not. (if they are normal, marked V ; if abnormal, marked X ). 18. Before taking off the gaskets and make sure there are no scratches on the surfaces, loosen the cap of connector with pigtail, replace the gasket, and then 36

5 Journal of China University of Science and Technology Vol use hand to tighten up the connector. After the supervisor confirms HPT is more than 60 psi, then lock up with a torque wrench tight twice. 19. Complete the automatic packing procedures, record the pressure in the primary transducer when the procedures of holding pressure begin. 20. Record the pressure in the primary transducer when the procedures of holding pressure finish, and compare with the value recorded in item 19. When the error between them is within 3 psi, it is normal. 3.4 Applications of fishbone and matrix diagrams At present, the failure rate of holding pressure in the gas pipeline is extremely high. So, it is the goal to find solutions and reduce the failure rate. The fishbone diagrams are applied and the factors are collected to analyze by the matrix data analysis chart [9]. Score each factor by its importance. The higher score means it is more important. Finally, choose the highest eight scores to experiment and analyze [10]. Figure 3-2 shows the fishbone diagram of gas pipeline holding pressure; Table 3-1 shows the results of matrix data analysis. Figure 3-2 Fishbone diagram of gas pipeline holding pressure Table 3-1 Results of the matrix data analysis 37

6 Improving the Failure Rate of Holding Pressure of Gas Pipeline by 6σ Method Item Various factors Failure to SOP process operation Temperature effect Latex gloves dirty Gasket Positioning is not installed The use of a magnifying glass Security (Prevent gas leakage) Feasibility (Effectively reduce the leakage rate) Timeliness (Persistency) Total Weight ratio ( confirm the importance of the individual experiment) Uneven ground Pounds of torque wrench Table 3-1 Results of the matrix data analysis (continued) 8 Gasket brands Gas retention period has expired 10 Dust No regular maintenance of equipment 12 Cylinder itself abnormal joints Parameter setting error Pigtail Connector Specifications 15 Cylinder Head Specifications Application of DMAIC approach 38

7 Journal of China University of Science and Technology Vol packing [11] [12]. The DMAIC approach is applied to improve the failure rate of pipeline (1) The phase of Define After replacing the cylinder, there is no leakage at the junction of gas pipeline. (2) The phase of Measure Why does the holding pressure of gas pipeline fail so often? If there are defects of the cylinder when purchasing, ask thee suppliers to replace new one in order to reduce the problem of poor quality of the cylinders. However, the main reasons of the failure are the workers do not follow up the SOP or the SOP is incorrect. Those are the issues to be revised now. (3) The phase of Analyze Digressing from the problem of cylinder, the other is the problem occurred in the worker s operation according to the current SOP. In order to verify the pressure in one hour without leakage and change with the temperature, Gay-Lussac's law [5] can be applied, in a given volume, the pressure is proportional to the temperature. The higher the temperature is, the greater the gas pressure is. P 1/ T 1 = P 2 /T 2 (3-1) It can make sure that the pressures before and after the holding pressure test are not the same. This problem is affected by temperature. There is really no leak. In Table 3-2, the gas under the tests is SiH 4 and there are the notations of the columns described below: A: Temperature before regulation ( ). B: Pressure after regulation (psi). C: Temperature after holding pressure ( ). D: Pressure affected by Temperature after holding pressure (psi), (Pressure is computed by using P 1 /T 1 = P 2 /T 2.) E: Pressure after holding pressure (psi) F: Pass (Y) or Fail (N). G: The difference between C and A. (G=C-A) H: The difference between D and E. (H=D-E) The pressure after regulation of the first example in the tests is psi, the 39

8 Improving the Failure Rate of Holding Pressure of Gas Pipeline by 6σ Method temperatures before and after the test are around 29 degrees. According to the eq.(3-1), P 1 /T 1 = P 2 /T 2, then P 2 = (psi); the calculated value(in column D) is almost the same as the value of P 2 = ; However, the actual recorded value(in column E) is (psi), and the difference value of the pressures between them is -4.3 (= ). From above computation, there is a little leakage in the pipeline. If the setting error in a company is within ± 3 psi, the holding pressure test is Fail. Table 3-2 Temperature effect of holding pressure item A B C D E F G H N N N Y N Y Y Y Y Y Y Y N N N Y Y Y Y N Y Y Y N

9 Journal of China University of Science and Technology Vol Table 3-2 Temperature effect of holding pressure (continued) Y Y Y Y N Y Y N Y Y Y Y From the calculations, there are totally 36 times of the test, 25 times of Pass and 11 times of Fail. Through the conversion of Table 3-2, there are still 7 times of Fail in the 19 times of test. The 4 th and 18 th procedures in the SOP are the focal points to be discussed. In the 4 th procedure, although there are safe apparatuses to wear, there are still no tools to check the source of pollution. Therefore, it will cause to increase the failure rate severely. As to the 18 th procedure, the problem about whether the gaskets are properly aligned is still mostly considered. (4) The phase of Improve: As to the 4th procedure in the SOP, some inspection tools are required, such as, level instrument, flashlight, magnifying glass, clean cloth inspection tools, etc. The horizontal ruler can check out the tilt angle with the ground when the cylinder is connected. Use the flashlight and magnifying glass to examine the interior of the pigtail on which there are dirty points or scratches, and then remove them with a clean cloth after taking off the gasket. As for the 8 th procedure in the SOP, replace latex gloves before taking gasket. Make sure the gaskets to be replaced have no scratches. Then, loosen the cap of the pigtailed connector to change the gaskets. After changing gaskets, connect it with torque wrench tightly twice after the pressure at the high pressure transducer is in access of 60 psi. The newly added tools and their applications are denoted as follows in Table 3-3. (5) The phase of Control 41

10 Improving the Failure Rate of Holding Pressure of Gas Pipeline by 6σ Method On the phase of Control, there are many concerns about the operations of replacing cylinder, data analysis about the holding pressure of the pipeline, modifications of the SOP, setting up Check Lists to comply with the operation requirements and holding the regular program about the education and training for the operators. Table 3-3 The applications of the new tools Tool level instrument flashlight, magnifying glass cleaning clothes latex gloves Application Observe the tilt angle between the connector of the cylinder and the ground. Observe interior dirt or scratches in the pigtail. Wipe the inside to prevent dirt in the pigtail Prevent the pollution before taking the gloves to replace the gaskets. 4. IMPROVEMENTS AND EXPERIMENTAL RESULTS Gay-Lussac's law is applied to calculate the holding pressure which is affected by temperature. And check whether the pressure is the same as that before the holding test. In order to eliminate the effect of the temperature, the effectiveness of improvement of SOP is still valid. In the 4 th procedure of SOP, there are, originally, level instrument is not used to observe the displacement of the connector. As well, magnifying glass and flashlight are not used to observe the damage of the pigtail, and also, the clean cloth is not used to wipe the pigtail after removing gasket. In this step, it is easily to cause contamination. And only one small particle source is easily to bring into a leakage. Replacement of latex gloves is a necessary operation, although there are a lot of people may think it is not necessary. Even if there is a small source of pollution in the attached gasket, it will cause the leakage. And new latex gloves are also the sources of pollution. Lock the cylinder and the pigtail of the connector with hands and let the hands not leave the connector is to avoid the misplacement caused by the relaxation of hands after finishing the alignment. Experiments are executed through step-by-step analysis of the process. In SOP, the procedures from the 3 rd to the 8 th are improved one by one. The matrix analysis is statistically applied to each improvement to assure the effectiveness after computing the 42

11 Journal of China University of Science and Technology Vol failure rate. The improvements of procedures and the experimental results are recorded. Six-Sigma analysis is used to calculate the reliability of each improvement and linear regression analysis is applied to the relationship of failure rate in the holding pressure. After 36 times of experiments, if the data of failure rate is within the standard deviation and there are no abnormal effects, it represents the data can be adapted. By Six-Sigma analysis and linear regression analysis to compute the percentage of failure rate in holding pressure, it reduces 3.37% for each improvement. Table 4-1 shows the values of means and standard deviations before and after improvements by means of Six Sigma analysis. Table 4-2 shows the information between the times of SOP improvement and failure rate. Figure 4-1 shows the plots of the regression line and the residual values. By the above analysis of the improvement of SOP, there are only three times of failure in the 36 times of replacement of the cylinders. The improvements in SOP are valid for the procedures in the replacement of cylinders. Finally, the defective ratio is applied to compare the results before and after improvement. The ratio is calculated as follows: defective ratio = Number of the defective products/total number of the products 100% Before the improvements, there are 11 times of failure in the 36 times of tests, defective ratio = (11/36) 100% = 30.5 %. After the improvements, there are 3 times of failure in the 36 times of tests, defective ratio = (3/36) 100% = 8.3 %. From above computations, failure rate after improvements of the DMAIC in SOP, ugh has been significantly reduced from 30.5% to 8.3%. Table 4-1 Means and standard deviations of the pressure difference before and after improvements by Six-Sigma analysis Case A(*) B(*) C(*) D(*) E(*) F(*) G(*) parameters Mean σ Mean +3 σ Mean-3σ *: 43

12 Improving the Failure Rate of Holding Pressure of Gas Pipeline by 6σ Method A: Before improvement. B: After improvement of the 3 rd item in SOP. C: After improvements of the 3 rd and the 4 th items in SOP. D: After improvements of the 3 rd ~ the 5 th items in SOP. E: After improvements of the 3 rd ~ the 6 th items in SOP. F: After improvements of the 3 rd ~ the 7 th items in SOP. G: After improvements of the 3 rd ~ the 8 th items in SOP. Table 4-2 Relationship between failure rate (%) and the number of improvements number of improvements failure rate in 36 times of test (%) Estimated value (%) Residuals (%) SOP process improvement dwell gas pipeline failure rate regression analysis chart Experiment 36 times the failure rate(%)y y = x Process Improvement times (times)x 6 Figure 4-1 Regression line 5. CONCLUSION In this study, experimental processes by SIPOC model are established. And the fish bone diagram and matrix diagram are also used to identify the causes of failure in the holding pressure of pipeline. DMAIC is applied to improve failure rate in SOP, and also Six-Sigma analysis and regression analysis are used to estimate the relationship between the improvements in SOP and failure rate. Because the gas pressure will be affected by 44

13 Journal of China University of Science and Technology Vol temperature, Gay-Lussac's law is used to calculate the correct pressure value and finally use defective rate to confirm the achievements in SOP improvements. In the past, we get lessons from the failure of SOP and discuss the contents about how to improve it. Special gas, such as, SiH 4, is a kind of high degree of dangerous material, as long as there is an explosion or leakage, it will cause very significant casualties and damages to the environment. Now, the stringent SOP processes are built in order to avoid the accidents. From the experiences of operations, the SOP processes are learned and modified gradually. So we could achieve the ultimate goal of no gas leaks. Although the SOP process has been set, it does not represent one hundred percent of safe procedures. The operators still need to continue and seek improvements to reach zero percent of leak rate. The failure rate was significantly reduced from 30.5% and 8.3% when comparing it with the procedures before and after improvements, As long as the operator obeys the SOP, the risk can be reduced, the failure rate is also decreased and the cylinder on-line time can be shortened. In order to achieve the goal of simplicity and security in the same time, the current SOP procedures still have room to be improved. 6. REFERENCES [1] Boppana V. Ramabrahmam and G. Swaminathan, 2000, Disaster management plan for chemical process industries. Case study: investigation of release of chlorine to atmosphere, Journal of Loss Prevention in the process industries, vol. 13, pp [2] Ko Chun Mou, and Guang Hann Chen, Risk management in semiconductor industry, Semiconductor Manufacturing, Technology Workshop Proceedings, [3] SIPOC (Suppliers, Inputs, Process, Outputs, Customers) Diagram". Milwaukee, Wisconsin: American Society for Quality, [4] Randy Rothwell. successful industrial innovation: Critical Factors for the 1990s. R&D management, [5] Eckes, G.., Making Six Sigma last: managing the balance between cultural and technical change, New York: John Wiley, [6] Mast, Jeroen De., Quality Improvement from the Viewpoint of Statistical Method, Quality and Reliability Engineering International, Vol. 16, 2003, pp [7] Harold, Dave, Jan.," Design for Six Sigma Capability "Control Engineering", 1999, pp.62~70. [8] Andrew, T. &; Barton, R., &; Okafor, C. C., Applying lean six sigma in a small 45

14 Improving the Failure Rate of Holding Pressure of Gas Pipeline by 6σ Method engineering company - a model for change, Manufacturing Technology Management, Vol. 20(1), 2009, pp17. [9] Saaty, T. L., The Analytic Hierarchy Process, McGraw-Hill, New York, [10] Hammer, M. Process management and the future of Six Sigma. MIT Sloan Management Review, Vol. 43(2), 2002, pp26~32. [11] Martin, W. F.(2007). Quality models: Selecting the best model to deliver results. Physician Executive, Vol. 33(3), 2007, pp24~31. [12] Saaty, T. L., The Analytic Hierarchy Process, McGraw-Hill, New York,

Comparison between QuikSCAT and Ocean Tower Wind Measurements in Taiwan Strait. Min-Chih Huang 1 Yueh-Hao Liu 2 ABSTRACT

Comparison between QuikSCAT and Ocean Tower Wind Measurements in Taiwan Strait. Min-Chih Huang 1 Yueh-Hao Liu 2 ABSTRACT 第 屆海洋工程研討會論文集國立台灣海洋大學民國 92 年 1 月 Proceedings of the th Ocean Engineering Conference in Taiwan, Republic of China National Taiwan Ocean University October, 23 Comparison between QuikSCAT and Ocean Tower

More information

Compressed Gas Cylinders - Guideline

Compressed Gas Cylinders - Guideline Environmental Health and Safety Compressed Gas Cylinders - Guideline Date of Issuance: 1/10/18 Revision Number: Initial Revision Date: Prepared by: EH&S 1. Purpose Carnegie Mellon University has developed

More information

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION Exercise 2-2 Second-Order Interacting Processes EXERCISE OBJECTIVE Familiarize yourself with second-order interacting processes and experiment with the finer points of controller tuning to gain a deeper

More information

Effect of Humidification on Fraction of Inspired Oxygen

Effect of Humidification on Fraction of Inspired Oxygen Chuhsien Wang et al. Effect of Humidification on Fraction of Inspired Oxygen with Nasal Oxygen Therapy Chuhsien Wang 1, Chin-Hsing Li 2 Abstract We incorporated the Michigan Dual Adult Training & Test

More information

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2 Serial No. H-V024-E-7 Needle valve User s Manual Contents (1) Be sure to read the following warranty clauses of our product 1 (2) General operating instructions 2 (3) General instructions for transportation,

More information

no peaks missing peaks too small peaks increasing retention decreasing retention

no peaks missing peaks too small peaks increasing retention decreasing retention GC Troubleshooting We can help you. 1. Observation: no peaks no peaks missing peaks too small peaks increasing retention decreasing retention declining baseline rising baseline bleeding plateaus interfering

More information

零售債券風險程度一覽表 (2018 年 4 月 2 日更新 ) Retail Bond Risk Rating (Updated on 2 Apr 2018)

零售債券風險程度一覽表 (2018 年 4 月 2 日更新 ) Retail Bond Risk Rating (Updated on 2 Apr 2018) 零售債券風險程度一覽表 (2018 年 4 月 2 日更新 ) Retail Bond Risk Rating (Updated on 2 Apr 2018) 發債機構 Issuer / 證券編號 Sec ID 信貸評級 1 Credit Rating 1 年票面息率 Coupon (%per annum) 到期日 Maturity 產品風險程度 2 Product Risk Level 2 (as

More information

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL 2 54 ROTATING DISC GATE VALVE OPERATION & MAINTENANCE MANUAL Rel. 5/27/16 1 TABLE OF CONTENTS 3 General 3 Receipt & Inspection 4 Gate Valve Storage & Handling 5 6 Installation 7 Operation 8 Field Testing

More information

承 (Cherng G. Ding) 論文著作目錄

承 (Cherng G. Ding) 論文著作目錄 丁 承 (Cherng G. Ding) 論文著作目錄 (A) 期刊論文 1. Ding, C. G. and Bargmann, R. E. (1991), Evaluation of the Distribution of the Square of the Sample Multiple-Correlation Coefficient, Journal of the Royal Statistical

More information

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1 Serial No. H-V066-E-3 Wafer Check Valve User s Manual Contents (1) Be sure to read the following description of our product warranty 1 (2) General operating instructions 2 (3) General instructions for

More information

台北縣立江翠國民中學九十八學年度第二學期第三次定期考查七年級英語科試卷 P1 七年 ˍˍ 班座號 ˍˍ 姓名 :ˍˍˍˍˍˍ

台北縣立江翠國民中學九十八學年度第二學期第三次定期考查七年級英語科試卷 P1 七年 ˍˍ 班座號 ˍˍ 姓名 :ˍˍˍˍˍˍ 台北縣立江翠國民中學九十八學年度第二學期第三次定期考查七年級英語科試卷 P1 測驗說明 : ( 一 ) 範圍 : 翰林版第二冊 Unit 7 至 Review 3 ( 二 ) 本試卷含答案卷共 4 頁 ( 雙面印製 ) ( 三 )1-35 題為單一選擇題, 請以 2B 鉛筆將正確答案的代碼劃在答案卡上 ( 四 )36-50 題為非選擇題, 請在答案卷上作答 第一部分聽力測驗 (30 % ) 聽力測驗分為三大題,

More information

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10 LK product no: PCS 1-10 Article no: 74503 Revision:8 Article no: 74503 Revision: 8 2 (23) Contents 1. General information... 5 2. Safety precautions... 5 2.1 Significance of symbols... 5 2.2 Explanatory

More information

MoveRoll Conveyor Operating and Maintenance Manual

MoveRoll Conveyor Operating and Maintenance Manual MoveRoll Conveyor Operating and Maintenance Manual 1. Read this first! This manual contains information for protection of personnel in the roll handling area from possible injury and/or equipment damage.

More information

Instruction manual. for. high purity gas pigtails 200 bar / 300 bar

Instruction manual. for. high purity gas pigtails 200 bar / 300 bar Instruction manual for high purity gas pigtails 200 bar / 300 bar Contents Contents... 2 1. Preface... 3 1.1 Overview... 3 1.2 General... 3 1.3 Intended use... 4 1.4 Personnel requirements... 4 2. For

More information

DIVER. Construct of Your Imagination

DIVER. Construct of Your Imagination DIVER Construct of Your Imagination Safety Guideline Important notes: This toy is not intended for children under age 3. This toy contains small parts. Keep away from children under 3 years old of age

More information

Instruction Manual - Diaframless TM Ejector Chlorine, Sulfur Dioxide and Ammonia

Instruction Manual - Diaframless TM Ejector Chlorine, Sulfur Dioxide and Ammonia Instruction Manual - Diaframless TM Ejector Chlorine, Sulfur Dioxide and Ammonia - 1-122.6010.6 These instructions describe the installation, operation and maintenance of the subject equipment. Failure

More information

September 2018 Pressure Test

September 2018 Pressure Test September 2018 Pressure Test The requirements for a pressure test are found in NFPA 54, Chapter 8, Sections 8.1-8.1.53 of the 2012 edition. A pressure test shall not be confused with a leak check. The

More information

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following: TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE For technical questions, please contact the following: Engineering Department 1537 Grafton Road Millbury, MA 01527 Phone: (508) 887-9400

More information

SF SERIES CNG COMPRESSOR MODEL HF-4MH. 4 Nm3/Hour Displacement OPERATION MANUAL

SF SERIES CNG COMPRESSOR MODEL HF-4MH. 4 Nm3/Hour Displacement OPERATION MANUAL SF SERIES CNG COMPRESSOR MODEL HF-4MH 4 Nm3/Hour Displacement OPERATION MANUAL 1 Content 1. General Description...3 2. Main technical parameters...3 3. Structural principle...4 3.1Main structure...4 3.2Compressor

More information

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Cover Page for Lab Report Group Portion. Head Losses in Pipes Cover Page for Lab Report Group Portion Head Losses in Pipes Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 February 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section

More information

The 3rd Hong Kong Games Dynamic Moments Photo Contest. Prospectus

The 3rd Hong Kong Games Dynamic Moments Photo Contest. Prospectus The 3rd Hong Kong Games Dynamic Moments Photo Contest Organised by the Sports Commission Co-ordinated by the Community Sports Committee Co-organised by the 18 District Councils, the Leisure and Cultural

More information

METHOD 25A - DETERMINATION OF TOTAL GASEOUS ORGANIC CONCENTRATION USING A FLAME IONIZATION ANALYZER

METHOD 25A - DETERMINATION OF TOTAL GASEOUS ORGANIC CONCENTRATION USING A FLAME IONIZATION ANALYZER 1250 METHOD 25A - DETERMINATION OF TOTAL GASEOUS ORGANIC CONCENTRATION USING A FLAME IONIZATION ANALYZER 1.0 Scope and Application. 1.1 Analytes. Analyte CAS No. Sensitivity Total Organic Compounds N/A

More information

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Engineered Solutions, Guaranteed Results.

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Engineered Solutions, Guaranteed Results. Laboratory Hardware Custom Gas Chromatography Solutions Engineered Solutions, Guaranteed Results. WASSON - ECE INSTRUMENTATION Laboratory Hardware Wasson-ECE Instrumentation offers hardware-only solutions

More information

DC5A. Cyclone Separator Trap for Air. Copyright 2015 by TLV Co., Ltd. All rights reserved ISO 9001/ ISO MA-03 (DC5A) 19 June 2015

DC5A. Cyclone Separator Trap for Air. Copyright 2015 by TLV Co., Ltd. All rights reserved ISO 9001/ ISO MA-03 (DC5A) 19 June 2015 172-65205MA-03 (DC5A) 19 June 2015 ISO 9001/ ISO 14001 Manufacturer Kakogawa, Japan is approved by LRQA LTD. to ISO 9001/14001 Cyclone Separator Trap for Air DC5A Copyright 2015 by TLV Co., Ltd. All rights

More information

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Custom solutions for your analytical needs.

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Custom solutions for your analytical needs. Laboratory Hardware Custom Gas Chromatography Solutions Custom solutions for your analytical needs. Laboratory Hardware Wasson-ECE Instrumentation offers hardware-only solutions for advanced chromatography

More information

Title: Standard Operating Procedure for R&R Environmental Devices Model MFC201 Gas Dilution Calibrator

Title: Standard Operating Procedure for R&R Environmental Devices Model MFC201 Gas Dilution Calibrator Procedure No: SOP-029 Revision No: 1.1 (December 29, 2010) Page No.: 1 of 7 1. INTRODUCTION AND SCOPE To obtain timely data for the purpose of air quality assessment, air quality trend reporting, air quality

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves Instruction Manual PE-25/32/37 Tapping Machines & POLYTAPP Valves Nov 2016, Revision 2 Document Number 3000111 2 M.T. Deason Company, Inc. PO Box 101807 Birmingham, AL 35210 Phone: 205 956 2266 Fax: 205

More information

FLANGED TWO-PIECE BALL VALVES

FLANGED TWO-PIECE BALL VALVES INTRODUCTION This instruction manual includes installation, operation, and maintenance information for FNW flanged split-body ball valves. This manual addresses lever operated ball valves only. Please

More information

零售債券風險程度一覽表 (2015 年 9 月 14 日更新 ) Retail Bond Risk Rating (Updated on 14 Sep 2015)

零售債券風險程度一覽表 (2015 年 9 月 14 日更新 ) Retail Bond Risk Rating (Updated on 14 Sep 2015) 零售債券風險程度一覽表 (2015 年 9 月 14 日更新 ) Retail Bond Risk Rating (Updated on 14 Sep 2015) 發債機構 Issuer / 證券編號 Sec ID 信貸評級 1 Credit Rating 1 annum) 到期日 Maturity (as of 14 Sep 2015) (as of 8 Jun 2015) Hutchison Whampoa

More information

CP10 Sensor Installation and Maintenance Instructions

CP10 Sensor Installation and Maintenance Instructions 4030150/9 IM-P403-26 EMM Issue 9 CP10 Sensor Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Maintenance 5. Spare parts Copyright 2017

More information

Operating instruction

Operating instruction Operating instruction MV, XV, HG, HP, RKO, D2G, TV, BV, WB & SLV 1 Introduction 2 2 Stafsjö s knife gate valves 2 3 Technical information 2 3.1 Pressure test 2 3.2 Labelling 2 4 Storage 3 5 Transportation

More information

ACCU-PULSE Installation and Operation Instructions

ACCU-PULSE Installation and Operation Instructions ACCU-PULSE Installation and Operation Instructions Pump Discharge Installation: Chargeable Models Step 1: Mounting Position Mount ACCU-PULSE as close to the pump discharge as possible to absorb the pulse

More information

INTENDED USE TECHNICAL SPECIFICATIONS

INTENDED USE TECHNICAL SPECIFICATIONS 1/2IN. HEAVY-DUTY AIR IMPACT WRENCH OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result

More information

256 Pneumatic Pressure Indicator

256 Pneumatic Pressure Indicator 256 Pneumatic Pressure Indicator 51425699 Copyright 2002 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any

More information

Equipment Operating Procedure Glove Box

Equipment Operating Procedure Glove Box Equipment Operating Procedure Glove Box Page 1 0.0 Changing the Compressed Gas Cylinder 1. Complete Compressed Gas Cylinder training from EHS website before manually exchanging gas cylinders. In order

More information

HONG KONG SWIMMING COACHES ASSOCIATION

HONG KONG SWIMMING COACHES ASSOCIATION HONG KONG SWIMMING COACHES ASSOCIATION To : Members 17 July, 2015 HKSCA Coach Accreditation Programme - Level 1 Coaching Course 2015-2016 Three HKSCA Level 1 Coaching Courses are now open for application.

More information

Copyright MAY, 2008 By Grizzly Industrial, Inc. Warning: No portion of this manual may be reproduced in any shape or form without the written

Copyright MAY, 2008 By Grizzly Industrial, Inc. Warning: No portion of this manual may be reproduced in any shape or form without the written MODEL G5789/G5790 13-PIECE 3 4" IMPACT WRENCH KIT INSTRUCTION MANUAL Copyright MAY, 2008 By Grizzly Industrial, Inc. Warning: No portion of this manual may be reproduced in any shape or form without the

More information

Manual Actuated Boiler Blowdown Valves

Manual Actuated Boiler Blowdown Valves Manual Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Operation 5. Maintenance 6. Spare parts p.1 1. Safety

More information

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL SAFE -14 Page 1 of 8 U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL FUNCTION Safety TOPIC Hotwork Permit Program OBJECTIVE(S): GENERAL POLICY: To provide a work atmosphere that is conducive to

More information

Gases&Technology. Measurement of Impurities in Helium Using the Dielectric Barrier Discharge Helium Ionization Detector. FEATURE.

Gases&Technology. Measurement of Impurities in Helium Using the Dielectric Barrier Discharge Helium Ionization Detector. FEATURE. Gases&Technology FEATURE Measurement of Impurities in Helium Using the Dielectric Barrier Discharge Helium Ionization Detector. B Y M A T T H E W M O N A G L E Abstract Bulk gases are often delivered to

More information

Installation & Operation Manual Proven Quality since 1892

Installation & Operation Manual Proven Quality since 1892 Content 1. ERIKS operating companies 2. Product description 3. Requirements for maintenance staff 4. Transport and storage 5. Function 6. Application 7. Installation 8. Maintenance 9. Service and repair

More information

ACCESSORY KIT INSTALLATION MANUAL

ACCESSORY KIT INSTALLATION MANUAL ACCESSORY KIT INSTALLATION MANUAL LP (PROPANE) CONVERSION KIT 1NP0366 FOR USE WITH MODELS: G8C & GF8 This conversion kit shall be installed by a qualified service agency in accordance with these instructions

More information

Rejuvenation Instructions

Rejuvenation Instructions Rejuvenation Instructions #401 Air Systems UPR This NRI covers the following: Understanding the applications and operation of flow meters. Understand the application and operation of test pressure gauges.

More information

Pressure Regulators. Operating Instructions. Instrumentation

Pressure Regulators. Operating Instructions. Instrumentation Pressure Regulators Operating Instructions FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THIS PRODUCT CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY DAMAGE. This document and other information from the

More information

Instruction Manual O-Ring Ejector Chlorine & Sulfur Dioxide to 500 PPD (10 kg/h)

Instruction Manual O-Ring Ejector Chlorine & Sulfur Dioxide to 500 PPD (10 kg/h) Instruction Manual O-Ring Ejector Chlorine & Sulfur Dioxide to 500 PPD (10 kg/h) 100 PPD (2 kg/h) Maximum 250 PPD (5 kg/h) Maximum 500 PPD (10 kg/h) Maximum - 1-122.6006.9 These instructions describe the

More information

Maintenance and Troubleshooting of Pneumatic Conveying Systems for Sand in a Foundry

Maintenance and Troubleshooting of Pneumatic Conveying Systems for Sand in a Foundry Maintenance and Troubleshooting of Pneumatic Conveying Systems for Sand in a Foundry Article Takeaways: Chris Doerschlag President ALB Klein Technology Group www.albkleinco.com 1. Troubleshooting Guide

More information

Nitrogen Advantage. Better Tire Pressure Retention. Improved Fuel Economy. Extended Tread Life. Elimination of Oxidation. Reduction in Tire Failures

Nitrogen Advantage. Better Tire Pressure Retention. Improved Fuel Economy. Extended Tread Life. Elimination of Oxidation. Reduction in Tire Failures Nitrogen Advantage nitrogen tire inflation system, 4/7/14/21 CFM Better Tire Pressure Retention Improved Fuel Economy Extended Tread Life Elimination of Oxidation Reduction in Tire Failures 2 The Nitrogen

More information

Protocol Switchover Station

Protocol Switchover Station ADI 3215-B Certified ISO 9001 Protocol Switchover Station INSTALLATION AND OPERATION INSTRUCTIONS Before Installing or Operating, Read and Comply with These Instructions Controls Corporation of America

More information

CHARACTERISTICS OF LEAK DETECTION BASED ON DIFERENTIAL PRESSURE MEASUREMENT

CHARACTERISTICS OF LEAK DETECTION BASED ON DIFERENTIAL PRESSURE MEASUREMENT CHARACTERISTICS OF LEAK DETECTION BASED ON DIFERENTIAL PRESSURE MEASUREMENT Harus L.G..*, Maolin CAI**, Kenji KAWASHIMA** and Toshiharu KAGAWA** * Graduate student of Mechano-Micro Engineering Dept., Tokyo

More information

Cover Page for Lab Report Group Portion. Pump Performance

Cover Page for Lab Report Group Portion. Pump Performance Cover Page for Lab Report Group Portion Pump Performance Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 March 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section number:

More information

AUTOVENT 4000 VENTILATOR

AUTOVENT 4000 VENTILATOR OVERVIEW AUTOVENT 4000 Only properly trained and approved Escambia County Bureau of Public Safety Paramedics are to use the AutoVent 4000 ventilator manufactured by LSP to transport patients already on

More information

Model: 43T. Bermad Pressure Relief Valve

Model: 43T. Bermad Pressure Relief Valve Model: 43T Bermad Pressure Relief Valve Installation Operation Maintenance Manual () Rev.C1_01.08.17 Page 1 of 10 Safety First BERMAD believes that the safety of personnel working with and around our equipment

More information

Full Internal Relief Valves Instruction Manual

Full Internal Relief Valves Instruction Manual Full Internal Relief Valves Instruction Manual MEV200FIR & MEV300FIR Application: Designed for use in mobile LPG & NH 3 containers as a primary pressure relief valve for bobtail and transport trailer installations.

More information

Shatin Tsung Tsin Secondary School Geography S1 Teaching Schedule Topics

Shatin Tsung Tsin Secondary School Geography S1 Teaching Schedule Topics Geography S1 Teaching Schedule 2017-2018 Teaching Cycles (lesson) Topics 1 Bridge Programme: Induction: What is Geography? 2 Unit 1.1: What are urban areas and rural areas? 3 Unit 1.2: What are the major

More information

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap 1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY Page 1 of 9 ISSUED: 5/00 REVISED: 08/06 Introduction Purpose: In accordance with applicable regulations and Temple University, this policy was developed to minimize exposure to Ethylene Oxide. Applicability

More information

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator. PRS(TC)4,8 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to

More information

Preparation of high precision standards (with ± 1 ppm) using a gravimetric method for measuring atmospheric oxygen

Preparation of high precision standards (with ± 1 ppm) using a gravimetric method for measuring atmospheric oxygen Preparation of high precision standards (with ± 1 ppm) using a gravimetric method for measuring atmospheric oxygen Nobuyuki Aoki 1, Takuya Shimosaka 1 Shigeyuki Ishidoya 2, Shohei Murayama 2 1.National

More information

FLANGED TWO-PIECE BALL VALVES

FLANGED TWO-PIECE BALL VALVES INTRODUCTION This instruction manual includes installation, operation, and maintenance information for FNW flanged split-body ball valves. This manual addresses lever operated ball valves only. Please

More information

INSTALLATION, OPERATION & MAINTENANCE MANUAL

INSTALLATION, OPERATION & MAINTENANCE MANUAL INSTALLATION, OPERATION & MAINTENANCE MANUAL AWWA C500 SOLID WEDGE GATE VALVE 2 72 NRS and OS&Y Series 100 and Series 105 TABLE OF CONTENTS SECTION PAGE # Equipment List 2 General 3 Receipt and Inspection

More information

Coiling Tube with Twist-Proof Fitting

Coiling Tube with Twist-Proof Fitting http://www.pisco.co.jp FITTING CONTROLLER VALVE TUBE MAKE-TO-ORDER PRODUCTS Push-In Fitting Type Anti-Twisting Coiling Tube for Air Tool Coiling Tube with Twist-Proof Fitting 306 Avoid Twisted Tube Problem

More information

Safe Work Instructions For Oxygen Acetylene Equipment

Safe Work Instructions For Oxygen Acetylene Equipment Safe Work Instructions For Oxygen Acetylene Equipment Policy Sponsor: Assistant Vice President Facilities Management Responsible Unit: Trade Services Approval Date: September 2010 Revisions: January 2018

More information

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848 Cal/OSHA Gas Systems for Welding GAS WELDING Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848 When performing gas welding, the following precautions, work procedures,

More information

Hong Kong Football Club Junior Squash Open 2018

Hong Kong Football Club Junior Squash Open 2018 Hong Kong Football Club Junior Squash Open 2018 Tournament Status 比賽規格 Tournament Information 比賽資料 The Hong Kong Football Club Junior Squash Open 2018 is an Asian Squash Federation (ASF) Asian Junior Super

More information

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series Introduction Powerex manifolds are cleaned, tested and prepared for the indicated gas service and are built in accordance with the Compressed Gas Association guidelines. The manifold consists of a regulator

More information

Lab Cock. Contents. User s Manual (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Lab Cock. Contents. User s Manual (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2 Serial No. H-V005-E-6 Lab Cock Contents User s Manual (1) Be sure to read the following warranty clauses of our product 1 (2) General operating instructions 2 (3) General instructions for transportation,

More information

for the of and the EM55-1

for the of and the EM55-1 Operating Manua al for the Tapping Points of the EM55-1/EM55-2/EM55-3/ /EM55-4 series and the EE55-1/EE55-2/EE55-3/EE55-4 series EM55-1 Contents Contents... 2 1. Introduction... 3 1.1 General... 3 1.2

More information

Technical Service Bulletin March 2015 TSB142.01

Technical Service Bulletin March 2015 TSB142.01 Technical Service Bulletin March 2015 TSB142.01 Commissioning Procedure for HYDRAcap This Technical Service Bulletin provides information for commissioning of a HYDRAcap membrane system in a water treatment

More information

3/8" Dr. Air Butterfly Impact Wrench

3/8 Dr. Air Butterfly Impact Wrench 8192106 3/8" Dr. Air Butterfly Impact Wrench Owner s Manual Read and understand all instructions before use. Retain this manual for future reference. Specifications Construction: Polished aluminum and

More information

Product Information News

Product Information News Product Information News MMR SECOND STAGE REGULATOR VALVE CORE MSA has changed its recommended rebuilding of the MMR Second Stage Regulator s bypass sleeve assembly during the annual inspection. Based

More information

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility,

More information

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS READ ALL INSTRUCTIONS PRIOR TO INSTALLATION AND OPERATION TO AVOID POSSIBLE INJURY Warning: Always consider any accumulator to contain pressure until proven

More information

Single Pressure/ vacuum decay leak rate, loss, rate of loss, or occlusion tests with standard Cv valves.

Single Pressure/ vacuum decay leak rate, loss, rate of loss, or occlusion tests with standard Cv valves. Application Bulletin: #167 Date: November 2009 BLACKBELT PRINCIPALS OF OPERATION INSTRUMENT CONFIGURATIONS Depending on the types of tests required and resolution and repeatability desired, the Sentinel

More information

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity WATER HEATER THERMAL EXPANSION TANKS Owner s Manual Safety Instructions Installation Maintenance Warranty Models: 2-5 Gallon Capacity Thank You for purchasing this Thermal Expansion Tank. Properly installed

More information

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL Index 1. List of components / General arrangement 2. Description 3. Handling 4. Installation 5. Actuators / Operation 6. Maintenance a. Changing

More information

BGA244 Binary Gas Analyzer

BGA244 Binary Gas Analyzer Quick Start Guide Revision 1.0 Certification Warranty Service certifies that this product met its published specification at the time of shipment. This product is warranted against defects in materials

More information

UsER manual for Watersens ph -REDOX

UsER manual for Watersens ph -REDOX UsER manual for Watersens -REDOX Cl 8 1 2 6 3 3 7 7 4 4 4 4 Parts List 1 Redox Probe 1 x 2 PH Probe 1 x 5 Tube Weight 2 x 6 Connection Valve 1 x chlorine 3 Chlorine and Pumps 2 x 7 Dosing Valve 2 x 5 5

More information

with O 2 Controller Instruction Manual

with O 2 Controller Instruction Manual 14500 Coy Drive, Grass Lake, Michigan 49240 734-475-2200 E-mail: sales@coylab.com www.coylab.com Hypoxic Cabinets (In-Vivo / In-Vitro) with O 2 Controller Instruction Manual Index Page Warranty 2 Warnings

More information

6900 Maintenance Instruction System Flush

6900 Maintenance Instruction System Flush Equipment Required FA74005 Damper Drain Tube FA16005 Cover Removal Tool FA900005 Beaker 0.25 Litre FA900003 Solvent Cleaning Bottle FA940021 Syringe Polypropylene 50 ml as required FA999045 Gloves Latex

More information

Sam: I joined a basketball camp and learned some useful skills.

Sam: I joined a basketball camp and learned some useful skills. 1 (On the street) Carl: Hey, Sam. How was your summer? 夏天過得怎麼樣啊? Sam: It was great. 很好 Carl: What did you do? 你 ( 夏天 ) 做什麼? Sam: I joined a basketball camp and learned some useful skills. 我參加籃球營, 學了一些有用的技巧

More information

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler. Exercise 5-2 Bubblers EXERCISE OBJECTIVE Learn to measure the level in a vessel using a bubbler. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Bubblers How to measure

More information

PURPOSE OF THE POLICY

PURPOSE OF THE POLICY Title: Safe Storage, Handling, Use and Disposal Procedures of Compressed Gas Cylinders Effective Date: November 2005 Revision Date: March 1, 2017 Issuing Authority: Responsible Officer: VP, Capital Projects

More information

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors 0862050/1 IM-P086-18 MI Issue 1 Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors Installation and Maintenance Instructions 1. Safety Information 2. General product information 3. Installation 4.

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 5-3 Wet Reference Leg EXERCISE OBJECTIVE Learn to measure the level in a vessel using a wet reference leg. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Measuring

More information

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual Bray/ VAAS Knife Gate Valve 770/780 Series Operations and Maintenance Manual Table of Contents Definition of Terms 1 Safety Instructions 1 Introduction 2 Unpacking 2 Storage 2 Installation 2 Commissioning

More information

Fisher DVI Desuperheater Venturi Inline

Fisher DVI Desuperheater Venturi Inline Instruction Manual DVI Desuperheater Fisher DVI Desuperheater Venturi Inline Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 3 Operating Instructions...

More information

Piped Air SCBA Refilling System Standard

Piped Air SCBA Refilling System Standard WALT WHITE Fire Chief 5770 Freeport Blvd., Suite 200 Sacramento, CA 95822-3516 Ph: (916) 808-1300 Fax: (916) 808-1629 www.sacfire.org Piped Air SCBA Refilling System Standard SCOPE: This specification

More information

Oxygen Usage Best Practice Guide

Oxygen Usage Best Practice Guide Oxygen Usage Best Practice Guide 1. Introduction Oxygen enriched systems possess a risk of fire and explosion since ignition and combustion hazards are present in all oxygen systems, and oxygen related

More information

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions RAM 4021 Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS RAM 4021 For Your Safety... 2 Description.... 2 Setup Mode.... 2 Lights/Alarms.... 3 Operation.... 4 Calibration....

More information

GCMSD-Headspace Analysis SOP

GCMSD-Headspace Analysis SOP Before you start GCMSD-Headspace Analysis SOP Method and Sequences names are restricted to 50 characters (MSD program will crash otherwise) The GC oven and Injection Ports need to be cooled to 50 oc to

More information

O&M Receiving and Inspection. Storage of Water Treatment Media

O&M Receiving and Inspection. Storage of Water Treatment Media O&M 105.1 Receiving and Inspection 1. Equipment should be checked against the Bill of Lading to verify that the number of pieces received matches those shipped. 2. Equipment should be carefully inspected

More information

CanNeed-DSST-100 Digital Secure Seal Tester --- To evaluate the secure seal quality of PET bottles, glass bottles and cans

CanNeed-DSST-100 Digital Secure Seal Tester --- To evaluate the secure seal quality of PET bottles, glass bottles and cans CanNeed-DSST-100 Digital Secure Seal Tester --- To evaluate the secure seal quality of PET bottles, glass bottles and cans New piercing mode Traditional Piercing Mode The CanNeed -DSST-100 Digital Secure

More information

Statistics for Process Validation Training Master Handbook

Statistics for Process Validation Training Master Handbook Statistics for Process Validation Training Master Handbook Presented By Eoin Hanley Page 1 of 11 pages How to use this handbook The handbook is organized to focus on particular skills and revisions. These

More information

Dear Colleagues, In this HKUST Staff Association News, we would like to bring to you:

Dear Colleagues, In this HKUST Staff Association News, we would like to bring to you: 第 1 頁, 共 5 頁 11/12/2014 9:32 主旨 : Re: Staff Association News - 24 Nov 2014 香港科技大學教職員協會會訊 (2014 年 11 月 24 日 ) 從 : HKUST Staff Association 日期 : 25/11/2014 9:46 到 : HKUST Staff Association

More information

Related Products: Auto Drain Valve. Model/Specifications. Model

Related Products: Auto Drain Valve. Model/Specifications. Model Related Products: Auto Drain Valve /600 Drainage is automatically discharged in a reliable manner, without requiring human operators. Highly resistant to dust and corrosion, operates reliably, and a bowl

More information

Instruction Manual Recovery Station

Instruction Manual Recovery Station ENVIRO 4684593 Instruction Manual Recovery Station Instruction Manual ENVIRO English OPERATING INSTRUCTIONS ENVIRO Table of Contents 1. General Information 1 2. Safety 3 2.1 Personnel Qualifications 3

More information

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions RAM 4021-PR Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS RAM 4021-PR For Your Safety... 2 Description.... 2 Setup Mode.... 2 Lights/Alarms.... 3 Operation.... 4

More information

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator. RS(H)10,15 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to

More information

RH800 & 2000 BASIC OPERATIONS

RH800 & 2000 BASIC OPERATIONS RH800 & 2000 BASIC OPERATIONS 2 General information This manual contains technical information regarding Bayer SeedGrowth Equipment. Please read and understand these instructions completely before proceeding

More information