This paper was prepared for presentation at the SPE Offshore Europe Oil and Gas Conference and Exhibition held in Aberdeen, UK, 6 8 September 2011.

Size: px
Start display at page:

Download "This paper was prepared for presentation at the SPE Offshore Europe Oil and Gas Conference and Exhibition held in Aberdeen, UK, 6 8 September 2011."

Transcription

1 SPE SPE "Learning the lessons - retrospective HAZOPs" Mr Ian L Herbert, ABB Consulting Copyright 2011, Society of Petroleum Engineers This paper was prepared for presentation at the SPE Offshore Europe Oil and Gas Conference and Exhibition held in Aberdeen, UK, 6 8 September This paper was selected for presentation by an SPE program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE copyright. Abstract This paper provides operators of up-stream oil and gas assets an over view of some of the lessons leant from a range of retrospective full Hazard and operability studies (HAZOPs). The Baker report into the Texas City incident highlighted the need for robust Process Hazard Analysis. This strengthened an already growing understanding for the need to re-validate the hazard identification for existing assets. HAZOP is recognized as a systematic methodology for the identification and initial assessment of process hazards. As a result full retrospective HAZOPs have now been undertaken for a number of upstream oil and gas facilities over the past few years. This paper aims to share the learning from these retrospective HAZOPs of existing installations. Key areas are a) How to do it better: taking into consideration that HAZOP fits into a wider Process Safety Structure, need for plant /process experience, preparation and the raising of recommendations/actions, close out of recommendations/actions, etc and b) Some common themes identified from the HAZOP exercise: such as with, losses in knowledge, flare systems, Level instrumentation, Drainage/effluent systems, utility systems, methanol systems, redundant equipment, MOC failures, reliance on operators and procedure failures, aging equipment (isolation). This paper also details potential what next for PHA Hazard identification, as the effort and commitment to periodic full retrospective HAZOPs is considerable. However, the consequences for organizations in not remaining vigilant on changes to their asset Hazards can be significant. Introduction Full retrospective HAZOPs have been undertaken for a number of up (and down) stream oil and gas assets in order to revalidate the safe operation of an asset. The importance of adequate Process Hazard analysis has been indicated in the Baker 1 report following the Texas City incident. The need to revalidate process hazard analyses has also been identified and is detailed in the CCPS book on revalidating Process Hazard Analysis 2, which includes HAZOP as a suitable methodology. HAZOP provides a structured approach to process hazard analysis, as indicated in the Mogford report 3, which if carried out correctly should ensure that hazard scenarios and their associated safeguarding measures are identified. The main reason for revalidation is that Hazards change and in general the understanding of Hazards also increases. The acceptability of the associated hazard risks also decrease over time. The following factors can all lead to a requirement to revisit the Process hazard analysis of an asset: Operational learning the original design and/or operational basis is shown, in practice, to be incorrect. Incidents both directly on the installation, but also in similar/ third party operations Process changes changes in composition/ concentration, Pressure/ temperature/ flow, new equipment (new modules / tie-backs, etc, start up / shut down rates, etc Management changes Reduced manning, move to automatic operation, move to man-u-matic (as a result of instrument failures for example), Increased maintenance requirements, Change in ownership, etc New Knowledge New corrosion knowledge, new environmental knowledge, revised fire/explosion knowledge, Hydrate modelling. MOC/ previous PHA failures too specific without reviewing wider implications, incomplete coverage, etc Regulatory changes the need for through reviews, new regulations (risk based), changes in public perception.

2 2 SPE SPE The interaction of Revalidation HAZOPs is showing in Figure 1. The rest of this paper looks at areas in which revalidation HAZOP exercises can be improved, to ensure that the best can be obtained from the considerable revalidation HAZOP effort. The bigger picture HAZOP is no longer a standalone exercise It used to be the case that HAZOPs used to be standalone exercises, comprised of knowledgeable teams reviewing the design and operation of proposed process operations. These used to throw out a massive list of HAZOP actions ranging from minor uncertainties and design queries through to significant design concerns and the identification of previously unaware Hazards or operational issues. No structured prioritization was given to these actions. Details of the Hazardous situation and the various safeguards was usually at a high level, with little attempt at any quantification of the risk associated with the identified scenarios (risk ranking). Acceptability of the safeguarding measures was qualitative based on the judgment of the HAZOP team. In addition there was little linkage between the HAZOP and follow up activities. As a result large numbers of HAZOP actions were quickly closed out or even forgotten. The linkage between safety cases and quantified risk assessments to HAZOP studies was also very general. The fact that the HAZOP studies had not disproved the safety case scenarios was in part used to validate the safety case. Use of risk matrices, should be made in all HAZOPs now undertaken. This provides a good semi-quantified assessment of the identified Hazard scenarios, which in turn provides an initial and more quantified assessment of the suitability of the safeguards. In addition it provides a basis for prioritisation of recommendations. Ideally the risk matrix should be of the order of 5 consequence categories by 6 or 7 likelihood categories. Matrices with fewer categories have been applied, but the coarseness of these tables and the pessimism in the HAZOP meetings, results in significantly high numbers of high risk scenarios. Preparation of these risk matrices and their use is required and is covered in the following section. Links to Safety Instrument System (SIL) assessments, safety case updates, and other post HAZOP exercises also need to be taken into consideration when undertaking and recording revalidation HAZOPs. As such fuller details of the discussions and plant items/processes need to be included in the HAZOP records. This should include full tag numbers for safeguard measures (instrument trips/alarms, PSVs, Etc), SOP numbers and revisions (where standards/ procedures are referenced a check of these documents to ensure that they do cover the areas detailed by the HAZOP), full details of the consequences, etc. The most significant linkage from revalidation HAZOPs has been into the determination of integrity levels for safety instrument systems (SISs). Where both the safety instrument function (SIF) and other protective systems should be reviewed and detailed. Revalidation HAZOPs should review the function of SISs to ensure that they cover the identified scenario in which they are highlighted as providing protection. This should look at trip set points and speed and types of response. The revalidation HAZOP should also, as far as possible, provide details on other (independent) layers of protection and should record these in the HAZOP minutes. Details on the HAZOP team determination on the scale of potential consequences for each scenario should also be recorded. This additional information is invaluable to later Integrity Level (SIL / LOPA) studies. Preparation, team composition, experience and running The fundamental difference between project HAZOPs and operational revalidation HAZOPs is that the revalidation HAZOPs are based on actual operating experience. The initial project HAZOPs will have focused on trying to get the design and initial operation right. The revalidation HAZOP looks at where this initial design and operation has been shown to be incorrect or no longer suitable for the current operation. As such the revalidation HAZOP relies much more on the operating knowledge of the team and the supporting records from the asset. This means that team composition, competency and supporting records are of greater importance. A list of documentation used to support revalidation HAZOPs is listed in Table 1. Because of the scale of such information commonly referenced material should be available are hard copies, where as minor referenced documentation should be available as electronic versions. To ensure that there is knowledge of the actual operation of the asset the revalidation HAZOP team must include direct operational experience of the area under consideration, and process knowledge of the reasons behind any design and operational changes. The operational knowledge should be fulfilled by having an experienced operator (or supervisor) with direct experience of operating, or having recently operated, the area under consideration. The process knowledge should be provided by a member from the asset projects or engineering support team. This should be someone who is again familiar with the area under review and is knowledgeable of any previous projects, past and current design/operational issues, and any improvement/ previous action plans that are still outstanding (asset integrity, production limits, etc). Other key revalidation team members include specialist area knowledge when required. Examples such as E/I engineers on systems where there are complex trip systems, mechanical/rotating machines engineer on turbines and compressors, third party engineers, etc. These do not need to be permanent team members, but are required to ensure that there is a high level of knowledge in the team when reviewing these specialist areas. An independent process engineer should also be present in revalidation HAZOPs. This should be someone who can play the process devils advocate and should have a good degree of personnel operational and design experience.

3 SPE SPE The revalidation HAZOP chairman needs to have, in addition to knowledge and experience in running HAZOPs, a wider understanding of Process safety and Process risk assessment. The Chair is now critical in ensuring that the findings from the revalidation HAZOP link in with other process safety assessments. For example they should have knowledge of SIS assessment methods (LOPA), general risk assessment (particularly as they will be required to lead the team through the consequence and likelihood rankings for the risk matrix determination), Safety Case requirements, Human factors, etc. As detailed in the previous section, semi-quantified risk assessment through the use of the risk matrices should be part of revalidation HAZOPs (and also project HAZOPs). In order to aid this use of risk matrices it has been found that an initial high level HAZID exercise is a useful starting point for the core team members (Chair, operator(s), asset process engineer(s), independent process engineer, E/I engineer). In particular this helps to define the Consequence determinations and can be seen as a means for calibrating the risk matrix. The asset is broken down into a number of operational sections and a set of high level HAZID guidewords applied to these areas. This is then used to define and understand the potential scale of consequences, e.g. size of fires/ explosions, financial losses (asset damage and business interruption), and environmental consequences. Reference to safety case (QRA) and other process safety assessments at this stage also helps to ensure that the consequences detailed in the HAZOP are in line with these assessments and more importantly where scenarios may differ for example where a new scenario is identified. In addition to this initial HAZID calibration exercise a table of resultant consequence categories should also be developed to aid the revalidation HAZOP team in defining the appropriate category level in the main HAZOP. Due to the requirement to record greater amounts of information in the HAZOP minutes, it has been found that running the revalidation HAZOPs with a scribe (needs good technical understanding and good typing skills, a good HAZOP scribe is one that records the main issues being discussed and does not require the team to dictate the discussion) is best. The HAZOP minutes have also been recorded as the meetings progress, with the minutes being shown via a projector or on a large screen. Recommendations (Actions) arising from HAZOP Improved control over the raising and handling of HAZOP recommendations has also been included in revalidation HAZOPs. This is because increased focus has been placed on the findings from the revalidation HAZOP exercise. In some cases the numbers of outstanding HAZOP recommendations/action has been included in management KPIs. This has lead to the following changes in the rising and handling of HAZOP recommendations / actions. The first is that in order to control the number of overall HAZOP recommendations raised minor areas of concern have been recorded as HAZOP Observations rather than formal HAZOP recommendations. Leaving formal HAZOP recommendations as those that the team has identified as of justifiable concern and which could affect the risk profile of the scenario (a basic ALARP argument). The observations have been recorded in a separate spreadsheet and for example have covered the following areas: Minor drawing check/ changes Minor design check/change Minor procedure update Locked valve register (inclusion/ exclusion/ upgrade) SRD check / change Dead leg register (usually inclusion of potential new deadlegs) HP/LP interface register (inclusion/ exclusion) C&E issues / checks Alarm rationalization (issues/ potential areas for improvement) PSV list (confirmation of suitability) Single re-validation HAZOP recommendation actions have then been raised to ensure that the observations identified for particular areas are reviewed and actioned. It has also been possible to classify the main HAZOP recommendations. An example of the categories used is given in table 2. This is helpful as it can provide some linking of multiple recommendations into a single HAZOP action. It is also useful in determining the areas in which the asset has the most issues and can be used to identify overall weaknesses in the asset operation. Using the risk matrix also allows for prioritisation to be given to the HAZOP recommendations. High risk recommendations can be feed back to the asset management for immediate action (should be referred back within one week of the recommendation being identified). Lower risk level recommendations should have a longer time scale for feeding back and for closure. For example medium level risk recommendations are usually reported after the completion of the section/unit in which they are identified and low level risk recommendations are held until the completion of the full HAZOP. Some organisations are also combining the risk ranking with additional recommendation prioritisations. Such that newly identified hazards even at medium risk levels are given a high priority. The revalidation HAZOP should establish with the asset management the means for prioritising revalidation HAZOP recommendations. This should ensure that these

4 4 SPE SPE recommendations are correctly fed into the Process safety management system and are actioned within the appropriate time scales. The revalidation HAZOP recommendation wording has also been the subject of review. The recommendations, a far as possible, need to apply SMART principals (Specific, Measurable, Achievable, Realistic and Timely) when wording. In particular avoid use of consider in the recommendation wording. The number of recommendations raised and the effort required closing out recommendations, particularly for low risk recommendations, means that consideration may be limited and insufficient. It has also been found that individual recommendation sheets should be generated. These sheets should containing not only the recommendation wording, but also details of the causes, consequences, section in which it was identified and even the identifying guide words in order to retain the context of the recommendation and assist those that may be called upon to close the recommendation. Care should be taken with some HAZOP recording software that extracts the recommendations only, as this loses the context in which the recommendation was raised and makes later response to the recommendation more difficult. Asset management should also ensure that they know how they will handle the recommendations arising from the HAZOP. For large revalidation HAZOP exercises, given the number of recommendations that can be generated, a separate HAZOP recommendation close out project has proved to be the most successful means for ensuring timely close out of HAZOP recommendations. Areas that have generated common findings The previous sections have covered general areas where revalidation HAZOPs have improved the way in which the HAZOPs have been undertaken and carried out. This section highlights some areas where common (cross asset) issues have been identified during revalidation HAZOPs. Loss of knowledge. In particular of the original basis of design/ basis of safety. A number of operations have been reviewed where the current operation differs considerably from the original design intent. This has been the result of creeping changes, process condition changes, original design failures and equipment failures. In some cases a commissioning operation has been then adopted as the current mode of operation. Without the original basis of design (BOD) it has been difficult to a) determine where changes in operation have occurred, as the current operation is accepted as the original design basis, and b) where changes have occurred (and these are known) it is difficult to sometimes understand the reason for the change and/or any original operating concerns. Asset management (particularly where ownership changes) should ensure that they maintain a history of changes in the basis of design, with details on the reason for changes and some linkage to show where these changes were reviewed. Flare systems. Design, HP-LP interfaces and temperature concerns. Many issues have been identified with flare systems. These have resulted from additional units being added to existing systems with failures to monitor HP/LP interfaces (introduction of isolation valves, etc), two phase flow issues and high liquid levels in KO drums, mixing of wet and dry flare systems with potential cold gas mixing and ice potential formation, high pressure let down with cold JT effects potentially below design conditions of the flare materials, and alternative discharge routes due to back pressures particularly on LP flare systems. Level instrumentation and control. Level instrumentation on vessels (separators, KO vessels, suction scrubbers, etc) has been found to be unreliable and subject to failures. These have included blockages of instrument bridles, interface monitoring difficulties, effects of foaming, effects of containments, reliance on single type of level detection and control means and unreliability due to process (material concentration/composition) changes. This has increased the potential for loss of level control on vessels. Drainage systems and effluent systems. Increased loading on systems due to increased produced water. Additional drainage points from additional equipment and failure to ensure that drainage routes do not introduce new HP/LP interface points or possible release points in the event of gas break through to the drains systems. Failures in the capacity and effectiveness of effluent disposal systems have also been found, with failures of caisson pump out systems and oil water separation systems. Utility systems. Failure with Pneumatic air and power supplies have been found. Main failure is insufficient capacity and unreliably of the systems. Additional equipment has been added to processes without an increase to the capacity of supporting utility systems. Stand-by compressors and generators are commonly now required for routine operations e.g. start-up. In addition the reliability of these systems has been decreasing. The effects of utility system failures although not resulting in significant life safety hazards has been identified as a significant business hazard. Methanol systems. Additions of sub-sea tie backs and increased water content has increased hydrate potentials. This has increased the extent and reliance on methanol systems. Hazards identified have been increased methanol inventories (not considered in safety cases), increased pressure ratings on existing systems and introduction of new HP/LP interface points

5 SPE SPE including pressurisation of process system from methanol systems, and unsafe disposal routes from methanol PSV discharges (open lines to hazardous drains). Redundant equipment. With changes to operation a number of units are no longer operational, particularly where they are associated with redundant production. This has resulted in a number of potential deadlegs which may be suffering increased / unmonitored corrosion and potential failures. Isolation of redundant equipment has also been identified as a concern, particularly where a temporary isolation of equipment then turns into long term isolation. The potential for the redundant equipment to still contain a hazardous inventory and failure to maintain inspection and maintenance increases loss of containment risks on these items. MOCs. Many MOCs have been found to have been incompletely closed out. Many failures to update Process Safety Information (PSI), including up-dating of P&IDs have been found. In addition a number of MOCs, when fully reviewed, have been found to have introduced potentially new concerns up/down stream of the area of the MOC. This has been as a result of the reviews in MOCs focusing on the direct MOC area. The potential for knock on issues further afield is sometimes incompletely assessed. This is also true where there have been a number of minor MOCs and other small creeping changes, where the overall effect is greater than the sum of the parts. Large reliance on procedures and operator competency. Failures to ensure that procedures are kept up to date / reflect changes etc have been found. In addition increased reliance on operators has been found to cope with equipment failures workarounds e.g. level control on vessels as detailed above, and additional workloads from changed production, e.g. changes from original basis of design. Some operating shift teams have made minor changes to operating procedures, keeping their own notes on some operations. These have not been reviewed or incorporated into up-dated procedures. In addition in some operations the operating HAZOP team members have reported on the need for increased vigilance to avoid potential issues. However, these operational human factor concerns have not been picked up in management reviews. For example the question which operations give you the greatest concern and required the greatest concentration and workload may not have been asked of the various shift teams. This should be part of the Human factors consideration when undertaking the revalidation HAZOPs. Aging equipment and equipment failures. In additional to increased equipment failures resulting in increased numbers of operator controlled workarounds (see reliance on operators above), the main concern identified with aging equipment has been operation of valves. In particular it has been the operation of isolation valves and the ability to ensure positive isolation. Performance standards on safety critical isolation valves (ESD and EBD valves) have been able to maintain the required level of integrity for these valves. However, poor isolation of maintenance valves has been found to result in requirements to isolate larger sections of plant in order to undertaken maintenance and testing, including that required to test safety critical isolation valves. Larger section isolation leads to greater business losses and increased human error in incorrect isolation, particularly where the isolation may be some distance from the item requiring isolation. What next should full HAZOP be repeated? But why carry out full HAZOPs for revalidation? Is it needed in all cases of PHA revalidation? The need for full revalidation HAZOP should be based on some form of assessment of the nature of hazards and associated risks presented by an operation. Although a number of operators have adopted full HAZOPs as the main revalidation exercise, as the methodology providing the greatest structure and depth. Full HAZOPs of a platform can take of the order of 100 to 120 meeting days and can generate 100s to 1000 s of recommendations depending on the age of the asset, the nature of the Hazards and the complexity of the processes. This is both an expensive exercise, but more importantly takes a considerable amount of critical (operational) manpower commitment. As such full Retrospective HAZOPS cannot be run at high frequencies. Frequencies of the order of once every 5 to 10 years have been put forward. Another problem in repeating full revalidation HAZOPs at regular frequencies is where there are only minor changes between the revalidation exercises. When undertaking the repeat HAZOP a significant amount is unchanged from the previous review. As such the HAZOP team gets buried by the lack of any new issues that it can lose focus on any minor or creeping changes. If a full HAZOP is to be undertaken it should not be done by comparison to avoid getting caught in the no significant change circle. However, full revalidation HAZOPs should be undertaken on systems where there are a significant number of changes, including where there have been MOCs. This should extend to systems slightly up and down stream of the location of the changes. This is to ensure that the effects of the changes, in total, have been considered. This can be a good verification of the MOC process, which could be the sole means for reviewing and assessing changes between the periodic PHA revalidations. The means to identify where full revalidation HAZOPs are required should be determined via a top level HAZID type exercise. Similar to the Risk matrix calibration, this review exercise breaks the asset into a number of operation units/systems. It then applies a set of guidewords to identify change issues and any other Hazard concerns. These guidewords can include

6 6 SPE SPE process condition changes (Temperature/Pressure/Flow), Human factors as well as asset integrity issues (long term weakening, fatigue failures, etc). Reference to the inputs to a validation HAZOP see left hand side of Figure 1 and in the initial section, can also be undertaken. The conclusions from this HAZID review can then be used to determine the number and scale of the sections requiring full revalidation HAZOP. This HAZID (operational / process hazard review) review, does not require a significant amount of time and manpower, and can be undertaken for offshore assets in a period of a few weeks. As such this HAZID review can be undertaken on a higher frequency basis. A 5 year period between major PHA revalidations is in the life and rate of change to up-stream oil and gas assets a significant duration. Many changes and significant learning can, and have, occurred within a 5 year period. Undertaking a more regular (yearly or bi-annual) operational hazard review is a means for reviewing the changes and other potential risk acceptance factors on the process safety of an operating asset. Regular Hazard reviews should be considered by operating companies to ensure that any changes to operating hazards, not picked up by or outwith the MOC are suitably managed. Reference List 1. Baker, et al, The Report Of The BP U.S. Refineries Independent Safety Review Panel, USA (January 2007). 2. CCPS, Revalidating Process Hazard Analysis, Centre for Chemical Process Safety, USA (2001). 3. BP p.l.c., John Mogford, Fatal Accident Investigation Report, Isomerization Unit Explosion Final Report, (December 2005), P 64.

7 SPE SPE Figures Figure 1: Operational learning Incident s Regulatory change Risk acceptance change New knowledge Previous PHA/ MOC failure Process/ management Change Data preparation Risk Matrix Re validation HAZOP Team competency Team composition MOC process SIS Assessment (LOPA/SIL) Safety Case revision Asset management Procedure review/ update KPIs review / update/ new PSI update Table 1: Revalidation HAZOP supporting documentation Information Required Process P&IDs, inc P&ID legend sheet (including instrumentation legend and SPE details) Vendor P&IDs Piping class specifications, and Materials of construction, inc vessel design details PFDs - Heat and Material Balances, Inventory Safe upper and lower operating limits, operating envelopes Previous PHAs. HAZID, what if, HAZOP or LOPA reports Alarm and trip settings (including Interlock/trip activation and response descriptions), Plus ESD /EBD philosophy. Control system philosophy and description Shutdown matrices (cause and effect diagrams) Pressure relief, flare, vent and depressurising information a) Relief valve data sheets b) Scenarios considered for sizing of devices c) Flare/disposal systems design and sizing information, including comprehensive list of common failure scenarios (i.e. power failure) and effects on flare loadings and flare system backpressure. Also valve capacities where gas breakthrough can occur. Changes to design since the last HAZOP or PHA Operating procedures (start-up, operating, shutdown, emergency) (required for a procedural HAZOP). Previous process safety accident/incident/near miss reports Process description (BOD) and process chemistry Facility plot plan/unit layout drawings. General arrangement and elevation drawings, including electrical area classification and drainage Pump and compressor operating curves and dead head pressures Fire protection design philosophy and basis Inspection and testing results, maintenance records, operational history and current condition of process equipment MSDSs (material safety datasheets) Design codes and standards employed Locked Valve Registers SRD Registers Deadleg Register HP/LP Interface Hose Register Format EITHER EITHER EITHER EITHER

8 8 SPE SPE Table 2: ABB HAZOP recommendation classification 1. Information need (further information required to full assess) 2. Procedure review/update 3. Design/operation check 4. Hardware changes including instrumentation 5. SIS - IL determination 6. Maintenance procedures, inspection & testing 7. Risk assessment or specialist review 8. P&ID check/update 9. Training

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011 AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF SEMS HAZARD ANALYSIS TRAINING September 29, 2011 Purpose The purpose of this meeting is to provide guidelines for determination of hazard

More information

THE BAKER REPORT HOW FINDINGS HAVE BEEN USED BY JOHNSON MATTHEY TO REVIEW THEIR MANUFACTURING OPERATIONS

THE BAKER REPORT HOW FINDINGS HAVE BEEN USED BY JOHNSON MATTHEY TO REVIEW THEIR MANUFACTURING OPERATIONS THE BAKER REPORT HOW FINDINGS HAVE BEEN USED BY JOHNSON MATTHEY TO REVIEW THEIR MANUFACTURING OPERATIONS Colin P. Lynas, Elizabeth Campbell and Hendrik J. Koornhof Johnson Matthey Catalysts This paper

More information

PSM TRAINING COURSES. Courses can be conducted in multi-languages

PSM TRAINING COURSES. Courses can be conducted in multi-languages Courses can be conducted in multi-languages One set of hardcopy course notes will be sent to client for printing and distribution to course participants. The courses will be held at the client s training

More information

BROCHURE. Pressure relief A proven approach

BROCHURE. Pressure relief A proven approach BROCHURE Pressure relief A proven approach 2 PRESSURE RELIEF A PROVEN APPROACH Pressure relief Pressure relief systems are a vital layer of protection for your processes. To provide this protection, systems

More information

SAFETY SEMINAR Rio de Janeiro, Brazil - August 3-7, Authors: Francisco Carlos da Costa Barros Edson Romano Marins

SAFETY SEMINAR Rio de Janeiro, Brazil - August 3-7, Authors: Francisco Carlos da Costa Barros Edson Romano Marins SAFETY SEINAR Rio de Janeiro, Brazil - August 3-7, 2009 Using HAZOP and LOPA ethodologies to Improve Safety in the Coke Drums Cycles Authors: Gilsa Pacheco onteiro Francisco Carlos da Costa Barros Edson

More information

Every things under control High-Integrity Pressure Protection System (HIPPS)

Every things under control High-Integrity Pressure Protection System (HIPPS) Every things under control www.adico.co info@adico.co Table Of Contents 1. Introduction... 2 2. Standards... 3 3. HIPPS vs Emergency Shut Down... 4 4. Safety Requirement Specification... 4 5. Device Integrity

More information

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 Simon J Brown Technology Division, Health & Safety Executive, Bootle, Merseyside L20 3QZ, UK Crown Copyright

More information

Title of Paper Interpretation of IP15 in Process Plant Design: a Commonsense Approach ---------------------------------------------------------------------------------------------------------------------------

More information

Risks Associated with Caissons on Ageing Offshore Facilities

Risks Associated with Caissons on Ageing Offshore Facilities Risks Associated with Caissons on Ageing Offshore Facilities D. Michael Johnson, DNV GL, Peter Joyce, BG Group, Sumeet Pabby, BG Group, Innes Lawtie, BG Group. Neil Arthur, BG Group, Paul Murray, DNV GL.

More information

Introduction to HAZOP Study. Dr. AA Process Control and Safety Group

Introduction to HAZOP Study. Dr. AA Process Control and Safety Group Introduction to HAZOP Study Dr. AA Process Control and Safety Group A scenario You and your family are on a road trip by using a car in the middle of the night. You were replying a text message while driving

More information

The Risk of LOPA and SIL Classification in the process industry

The Risk of LOPA and SIL Classification in the process industry The Risk of LOPA and SIL Classification in the process industry Mary Kay O Connor Process Safety Center International Symposium Beyond Regulatory Compliance, Making Safety Second Nature October 28-29,

More information

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT Purpose Scope Process flow This operating procedure supports SMS-07-SP-3067 Manage Safety Change and establishes the

More information

Engineering Safety into the Design

Engineering Safety into the Design Engineering safety into the design Peter Scantlebury P.Eng Technical Safety Manager Amec Foster Wheeler, Oil & Gas Canada Abstract Safety by design is Amec Foster Wheeler s systematic approach to engineering

More information

A large Layer of Protection Analysis for a Gas terminal scenarios/ cause consequence pairs

A large Layer of Protection Analysis for a Gas terminal scenarios/ cause consequence pairs A large Layer of Protection Analysis for a Gas terminal 2000+ scenarios/ cause consequence pairs Richard Gowland European process Safety Centre The scope of the study was a large gas terminal handling

More information

COMMON MISUNDERSTANDINGS ABOUT THE PRACTICAL APPLICATION OF IEC 61508

COMMON MISUNDERSTANDINGS ABOUT THE PRACTICAL APPLICATION OF IEC 61508 COMMON MISUNDERSTANDINGS ABOUT THE PRACTICAL APPLICATION OF IEC 61508 Helen Pearce, James Catmur and Geoff Stevens The use of IEC 61508 for determination of the Safety Integrity Level (SIL) of Safety Interlock

More information

Understanding safety life cycles

Understanding safety life cycles Understanding safety life cycles IEC/EN 61508 is the basis for the specification, design, and operation of safety instrumented systems (SIS) Fast Forward: IEC/EN 61508 standards need to be implemented

More information

Knowledge, Certification, Networking

Knowledge, Certification, Networking www.iacpe.com Knowledge, Certification, Networking Page :1 of 71 Rev 01 Sept 2016 IACPE No 19, Jalan Bilal Mahmood 80100 Johor Bahru Malaysia The International of is providing the introduction to the Training

More information

USING HAZOP TO IDENTIFY AND MINIMISE HUMAN ERRORS IN OPERATING PROCESS PLANT

USING HAZOP TO IDENTIFY AND MINIMISE HUMAN ERRORS IN OPERATING PROCESS PLANT USING HAZOP TO IDENTIFY AND MINIMISE HUMAN ERRORS IN OPERATING PROCESS PLANT Chris Lyth, Tracerco, Billingham, Cleveland, UK Ian Bradby, ABB Engineering Services, Billingham Cleveland, UK This joint paper

More information

SIL explained. Understanding the use of valve actuators in SIL rated safety instrumented systems ACTUATION

SIL explained. Understanding the use of valve actuators in SIL rated safety instrumented systems ACTUATION SIL explained Understanding the use of valve actuators in SIL rated safety instrumented systems The requirement for Safety Integrity Level (SIL) equipment can be complicated and confusing. In this document,

More information

Inherently Safer Design Analysis Approaches

Inherently Safer Design Analysis Approaches Inherently Safer Design Analysis Approaches There are a number of ways inherent safety can be analyzed. In any case, the intent is to formalize the consideration of inherent safety rather than to include

More information

Process Safety Journey

Process Safety Journey Process Safety Journey Agenda The Status in early 2000s The Journey to improvement in Process Safety management Managing risks and barriers How has this impacted Kwinana? The Status in early 2000s Focus

More information

Using LOPA for Other Applications

Using LOPA for Other Applications 10 Using LOPA for Other Applications 10.1. Purpose LOPA is a tool used to perform risk assessments. Previous chapters described its use in assessing the risk level of process hazards scenarios and in evaluating

More information

Combining disturbance simulation and safety analysis techniques for improvement of process safety and reliability

Combining disturbance simulation and safety analysis techniques for improvement of process safety and reliability 17 th European Symposium on Computer Aided Process Engineering ESCAPE17 V. Plesu and P.S. Agachi (Editors) 2007 Elsevier B.V. All rights reserved. 1 Combining disturbance simulation and safety analysis

More information

OPERATING PROCEDURES

OPERATING PROCEDURES OPERATING PROCEDURES 1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is

More information

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI Identification and Screening of Scenarios for LOPA Ken First Dow Chemical Company Midland, MI 1 Layers of Protection Analysis (LOPA) LOPA is a semi-quantitative tool for analyzing and assessing risk. The

More information

"Although a good start with a good project, others are as much a hostage of the "human factor".

Although a good start with a good project, others are as much a hostage of the human factor. IBP1151_13 PIG LAUNCHERS AND RECEIVERS OPERATIONAL SECURITY Eduardo de Oliveira 1 IBP1151-13 PIG Launchers and receivers operational security Copyright 2013, Brazilian Petroleum, Gas and Biofuels Institute

More information

Risk reducing outcomes from the use of LOPA in plant design and operation

Risk reducing outcomes from the use of LOPA in plant design and operation Risk reducing outcomes from the use of LOPA in plant design and operation Paul Feltoe Safety Solutions Ltd Background Layer of Protection Analysis (LOPA) has been traditionally applied to assess scenario

More information

Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries

Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries Focus Area: Automation HMI Title: Author: Shared Field Instruments in SIS: Incidents Caused by Poor Design

More information

Proposal title: Biogas robust processing with combined catalytic reformer and trap. Acronym: BioRobur

Proposal title: Biogas robust processing with combined catalytic reformer and trap. Acronym: BioRobur Proposal title: Biogas robust processing with combined catalytic reformer and trap Acronym: BioRobur Initiative: Fuel Cells and Hydrogen Joint Undertaking (FCH-JU) Funding scheme: Collaborative project

More information

Best Practice RBI Technology Process by SVT-PP SIMTECH

Best Practice RBI Technology Process by SVT-PP SIMTECH Best Practice RBI Technology Process by SVT-PP SIMTECH We define the best practice in RBI as a proactive technology process which is used to formally and reliably optimise the inspection efforts for each

More information

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR 1910.119 PSM - Definition Not all refining hazards are caused by the same factors or involve ve the same degree of potential damage.

More information

Marine Risk Assessment

Marine Risk Assessment Marine Risk Assessment Waraporn Srimoon (B.Sc., M.Sc.).) 10 December 2007 What is Risk assessment? Risk assessment is a review as to acceptability of risk based on comparison with risk standards or criteria,

More information

Process Safety and the Human Factor

Process Safety and the Human Factor Process Safety and the Human Factor INTRODUCTION The increasing lifetime of industrial processing plants creates a growing challenge for plant owners/operators to continue to run in a safe and efficient

More information

Quantitative Risk Analysis (QRA)

Quantitative Risk Analysis (QRA) Quantitative Risk Analysis (QRA) A realistic approach to relief header and flare system design Siemens AG 2017, All rights reserved 1 Quantitative Risk Analysis Introduction Most existing pressure relief

More information

Hazard Identification

Hazard Identification Hazard Identification Most important stage of Risk Assessment Process 35+ Techniques Quantitative / Qualitative Failure Modes and Effects Analysis FMEA Energy Analysis Hazard and Operability Studies HAZOP

More information

QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS

QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS Steve Sherwen Senior Consultant, ABB Engineering Services, Daresbury Park,

More information

Solenoid Valves used in Safety Instrumented Systems

Solenoid Valves used in Safety Instrumented Systems I&M V9629R1 Solenoid Valves used in Safety Instrumented Systems Operating Manual in accordance with IEC 61508 ASCO Valves Page 1 of 7 Table of Contents 1 Introduction...3 1.1 Terms and Abbreviations...3

More information

Delayed Coker Automation & Interlocks

Delayed Coker Automation & Interlocks Delayed Coker Automation & Interlocks a Presented by Mitch Moloney of ExxonMobil @ coking.com April-2005 MJ Moloney - ExxonMobil April-2005 coking.com 0 Automation & Interlocks @ ExxonMobil - Background

More information

PREDICTING HEALTH OF FINAL CONTROL ELEMENT OF SAFETY INSTRUMENTED SYSTEM BY DIGITAL VALVE CONTROLLER

PREDICTING HEALTH OF FINAL CONTROL ELEMENT OF SAFETY INSTRUMENTED SYSTEM BY DIGITAL VALVE CONTROLLER PREDICTING HEALTH OF FINAL CONTROL ELEMENT OF SAFETY INSTRUMENTED SYSTEM BY DIGITAL VALVE CONTROLLER Riyaz Ali FIELDVUE Business Development Manager Fisher Controls Int'l., LLC. Marshalltown, IA 50158

More information

Module No. # 01 Lecture No. # 6.2 HAZOP (continued)

Module No. # 01 Lecture No. # 6.2 HAZOP (continued) Health, Safety and Environmental Management in Petroleum and Offshore Engineering Prof. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute Of Technology, Madras Module No. # 01

More information

INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM

INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM Volton Edwards bptt Angus Lyon DNV Energy Alastair Bird DNV Energy INTRODUCTION A term now in common usage within the oil & gas

More information

Major Hazard Facilities. Hazard Identification

Major Hazard Facilities. Hazard Identification Major Hazard Facilities Hazard Identification Overview This seminar has been split into two sections 1. Hazard Identification 2. Major Accident Identification and Risk Assessment The seminar has been developed

More information

Transient Analyses In Relief Systems

Transient Analyses In Relief Systems Transient Analyses In Relief Systems Dirk Deboer, Brady Haneman and Quoc-Khanh Tran Kaiser Engineers Pty Ltd ABSTRACT Analyses of pressure relief systems are concerned with transient process disturbances

More information

REPEATED ACCIDENT CAUSES CAN WE LEARN?

REPEATED ACCIDENT CAUSES CAN WE LEARN? REPEATED ACCIDENT CAUSES CAN WE LEARN? Peter Waite Technical Director, Entec UK Limited Over the last twenty years major process industry accidents have continued to occur despite the introduction of new

More information

The Bowtie Methodology

The Bowtie Methodology The BowTie Pro Westhill Business Centre Arnhall Business Park Westhill, Aberdeenshire, AB32 6UF, UK Tel: +44 (0) 1224 51 50 94 enquiries@bowtiepro.com www.bowtiepro.com Introduction This bowtie method

More information

SEMS II: BSEE should focus on eliminating human error

SEMS II: BSEE should focus on eliminating human error SEMS II: BSEE should focus on eliminating human error How US companies can prevent accidents on start-ups and shut-downs by using valve interlocks The proposed changes to BSEE s SEMS (Safety and Environmental

More information

Risk Management Qualitatively on Railway Signal System

Risk Management Qualitatively on Railway Signal System , pp. 113-117 The Korean Society for Railway Ya-dong Zhang* and Jin Guo** Abstract Risk management is an important part of system assurance and it is widely used in safety-related system. Railway signal

More information

Major Hazard Facilities. Control Measures and Adequacy

Major Hazard Facilities. Control Measures and Adequacy Major Hazard Facilities Control Measures and Adequacy Overview The seminar has been developed to provide: Context with MHF Regulations An overview of what is required An overview of the steps required

More information

Looking Beyond Relief System Design Standards

Looking Beyond Relief System Design Standards Looking Beyond Relief System Design Standards M. Reilly & T. Craddock Introduction A correctly designed relief system is key to safe plant design and operation, ensuring the ability to handle any potential

More information

SIL Allocation. - Deterministic vs. risk-based approach - Layer Of Protection Analysis (LOPA) overview

SIL Allocation. - Deterministic vs. risk-based approach - Layer Of Protection Analysis (LOPA) overview SIL Allocation - Deterministic vs. risk-based approach - Layer Of Protection Analysis (LOPA) overview Origin and causes of accidents involving control system failure 44% Specification 20% Changes after

More information

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications Application Description AG/266PILD-EN Rev. C 2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic Pressure Measurement Engineered solutions for all applications Increase plant productivity

More information

Reliability of Safety-Critical Systems Chapter 4. Testing and Maintenance

Reliability of Safety-Critical Systems Chapter 4. Testing and Maintenance Reliability of Safety-Critical Systems Chapter 4. Testing and Maintenance Mary Ann Lundteigen and Marvin Rausand mary.a.lundteigen@ntnu.no RAMS Group Department of Production and Quality Engineering NTNU

More information

Safety Engineering - Hazard Identification Techniques - M. Jahoda

Safety Engineering - Hazard Identification Techniques - M. Jahoda Safety Engineering - Hazard Identification Techniques - M. Jahoda Hazard identification The risk management of a plant 2 Identification of the hazards involved in the operation of the plant, due to the

More information

Process Safety Value and Learnings Central Valley Chemical Safety Day March 20, 2014

Process Safety Value and Learnings Central Valley Chemical Safety Day March 20, 2014 Process Safety Value and Learnings Central Valley Chemical Safety Day March 20, 2014 Randy Bennett Sr. Staff Health & Safety Engineer Process Safety Management Group Aera Energy LLC Key Points Process

More information

Safe Work Practices and Permit-to-Work System

Safe Work Practices and Permit-to-Work System CHAPTER 24 Safe Work Practices and Permit-to-Work System 24.1 INTRODUCTION OSHA s Process Safety Management (PSM) Standard (OSHA, 1992) requires employers to develop and implement safe work practices (SWPs)

More information

Preventive Maintenance

Preventive Maintenance A Health and Safety Guideline for Your Workplace Why? Preventive maintenance is predetermined work performed to a schedule with the aim of preventing the wear and tear or sudden failure of equipment components.

More information

Challenges in Relief Design for Pilot Plants

Challenges in Relief Design for Pilot Plants Challenges in Relief Design for Pilot Plants Published on July 5, 2017 Michael Trainor Relief system design at the pilot scale presents unique challenges that don t always apply at the commercial scale.

More information

Advanced LOPA Topics

Advanced LOPA Topics 11 Advanced LOPA Topics 11.1. Purpose The purpose of this chapter is to discuss more complex methods for using the LOPA technique. It is intended for analysts who are competent with applying the basic

More information

Eutectic Plug Valve. SIL Safety Manual. SIL SM.015 Rev 0. Compiled By : G. Elliott, Date: 19/10/2016. Innovative and Reliable Valve & Pump Solutions

Eutectic Plug Valve. SIL Safety Manual. SIL SM.015 Rev 0. Compiled By : G. Elliott, Date: 19/10/2016. Innovative and Reliable Valve & Pump Solutions SIL SM.015 Rev 0 Eutectic Plug Valve Compiled By : G. Elliott, Date: 19/10/2016 Contents Terminology Definitions......3 Acronyms & Abbreviations...4 1. Introduction..5 1.1 Scope 5 1.2 Relevant Standards

More information

A study on the relation between safety analysis process and system engineering process of train control system

A study on the relation between safety analysis process and system engineering process of train control system A study on the relation between safety analysis process and system engineering process of train control system Abstract - In this paper, the relationship between system engineering lifecycle and safety

More information

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER DIGITAL SOLUTIONS TRAINING CATALOGUE QRA and CFD simulation Phast, Safeti and KFX SAFER, SMARTER, GREENER 02 PHAST, SAFETI AND KFX Training catalogue Global training Our increased focus on global training,

More information

Lessons Learned from the Texas City Refinery Explosion Mike Broadribb

Lessons Learned from the Texas City Refinery Explosion Mike Broadribb Lessons Learned from the Texas City Refinery Explosion Mike Broadribb Mary Kay O Connor Process Safety Center Symposium, College Station, Texas October 24, 2006 Texas City Refinery Texas City refinery

More information

Gas Sweetening Units Risk Assessment Using HAZOP Procedure

Gas Sweetening Units Risk Assessment Using HAZOP Procedure 011 International Conference on Biology, Environment and Chemistry IPCBEE vol.4 (011) (011)IACSIT Press, Singapoore Gas Sweetening Units Risk Assessment Using HAZOP Procedure Mahdi Goharrokhi 1,+, Fateme

More information

Implementing IEC Standards for Safety Instrumented Systems

Implementing IEC Standards for Safety Instrumented Systems Implementing IEC Standards for Safety Instrumented Systems ABHAY THODGE TUV Certificate: PFSE-06-607 INVENSYS OPERATIONS MANAGEMENT What is a Safety Instrumented System (SIS)? An SIS is designed to: respond

More information

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including:

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including: By Phil Smith, Project Manager and Chen-Hsiang Su, PE, Senior Consultant, Lincolnshire, IL, JENSEN HUGHES A hydraulic model is a computer program configured to simulate flows for a hydraulic system. The

More information

Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process

Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process 29CFR1910.119 Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process hazards to protect employees, facility assets

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

The modern, fast and easy to use risk analysis tool. Advanced Features. Using HAZID in BowTie Pro

The modern, fast and easy to use risk analysis tool. Advanced Features. Using HAZID in BowTie Pro The modern, fast and easy to use risk analysis tool Advanced Features Using HAZID in BowTie Pro Enterprise Business Centre Admiral Court Poynernook Road Aberdeen, AB11 5QX, UK Tel: +44 (0) 1224 51 50 94

More information

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime CASE STUDY CS15-02 >> Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime What s Inside:» Explore Double Block & Monitor» Increase Operational Safety» Achieve Double

More information

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart Technical Standards and Legislation: Risk Based Inspection Presenter: Pierre Swart Agenda Change in Legislation. Where RBI fits in. Application to implement RBI. RBI concepts. Elements of an RBI analysis.

More information

Impact on People. A minor injury with no permanent health damage

Impact on People. A minor injury with no permanent health damage Practical Experience of applying Layer of Protection Analysis For Safety Instrumented Systems (SIS) to comply with IEC 61511. Richard Gowland. Director European Process Safety Centre. (Rtgowland@aol.com,

More information

Health and Safety Executive. Key aspects of HS(G) 253. Andrew Hall HID CI 1G. HM Specialist Inspector (Mechanical)

Health and Safety Executive. Key aspects of HS(G) 253. Andrew Hall HID CI 1G. HM Specialist Inspector (Mechanical) Health and Safety Executive Key aspects of HS(G) 253 Andrew Hall HID CI 1G HM Specialist Inspector (Mechanical) Human Factors Human Failures can be grouped into: Errors And Violations Errors are not intended

More information

Reliability Assessment of the Whistler Propane Vaporizers

Reliability Assessment of the Whistler Propane Vaporizers Reliability Assessment of the Whistler Propane Vaporizers Prepared for: Terasen & Fransen Engineering Prepared by: ClearSky Risk Management Inc. 815 23 rd Ave East Vancouver, BC V6B 5Z3 Phone: 604.899.1470

More information

PI MODERN RELIABILITY TECHNIQUES OBJECTIVES. 5.1 Describe each of the following reliability assessment techniques by:

PI MODERN RELIABILITY TECHNIQUES OBJECTIVES. 5.1 Describe each of the following reliability assessment techniques by: PI 21. 05 PI 21. 05 MODERN RELIABILITY TECHNIQUES OBJECTIVES 5.1 Describe each of the following reliability assessment techniques by: ~) Stating its purpose. i1) Giving an e ample of where it is used.

More information

Expert System for LOPA - Incident Scenario Development -

Expert System for LOPA - Incident Scenario Development - Expert System for LOPA - Incident Scenario Development - Adam Markowski a, Jaffee Suardin b, and M.Sam Mannan b a Process and Ecological Safety Division, Technical University of Lodz, Poland b Mary Kay

More information

Safety in Petroleum Industry

Safety in Petroleum Industry Chemical ( Industrial ) Disaster Management Conference, Bangalore 30 January 2014 Safety in Petroleum Industry Refineries and Petrochemical plants are highly energyintensive Handle highly inflammable and

More information

MAHB. INSPECTION Process Hazard Analysis

MAHB. INSPECTION Process Hazard Analysis Number 5 2016 seveso common MAHB INSPECTION s e r i e s criteria Process Hazard Analysis Major Accident Hazards Bureau Security Technology Assessment Unit This publication of the European community on

More information

Hazard Operability Analysis

Hazard Operability Analysis Hazard Operability Analysis Politecnico di Milano Dipartimento di Energia HAZOP Qualitative Deductive (search for causes) Inductive (consequence analysis) AIM: Identification of possible process anomalies

More information

SPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main

SPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main SPE 102831 Online Water-Injection Optimization and Prevention of Reservoir Damage Bjørn Øyvind Bringedal, Svein Arne Morud, Nicolas Alexander Hall, ABB; Gary Huseman, Shell Copyright 2006, Society of Petroleum

More information

CHEMICAL ENGINEEERING AND CHEMICAL PROCESS TECHNOLOGY Vol. IV - Process Safety - R L Skelton

CHEMICAL ENGINEEERING AND CHEMICAL PROCESS TECHNOLOGY Vol. IV - Process Safety - R L Skelton PROCESS SAFETY R L Skelton University of Cambridge UK Keywords: Process safety, hazard terminology, safety assurance techniques, safety in design, HAZOP, quantitative risk assessment, safety in operation,

More information

A GUIDE TO RISK ASSESSMENT IN SHIP OPERATIONS

A GUIDE TO RISK ASSESSMENT IN SHIP OPERATIONS A GUIDE TO RISK ASSESSMENT IN SHIP OPERATIONS Page 1 of 7 INTRODUCTION Although it is not often referred to as such, the development and implementation of a documented safety management system is an exercise

More information

The Best Use of Lockout/Tagout and Control Reliable Circuits

The Best Use of Lockout/Tagout and Control Reliable Circuits Session No. 565 The Best Use of Lockout/Tagout and Control Reliable Circuits Introduction L. Tyson Ross, P.E., C.S.P. Principal LJB Inc. Dayton, Ohio Anyone involved in the design, installation, operation,

More information

DeZURIK. KGC Cast Knife Gate Valve. Safety Manual

DeZURIK. KGC Cast Knife Gate Valve. Safety Manual KGC Cast Knife Gate Valve Safety Manual Manual D11036 August 29, 2014 Table of Contents 1 Introduction... 3 1.1 Terms... 3 1.2 Abbreviations... 4 1.3 Product Support... 4 1.4 Related Literature... 4 1.5

More information

Verification and validation of computer codes Exercise

Verification and validation of computer codes Exercise IAEA Safety Assessment Education and Training (SAET) Programme Joint ICTP- IAEA Essential Knowledge Workshop on Deterministic Safety Assessment and Engineering Aspects Important to Safety Verification

More information

Point level switches for safety systems

Point level switches for safety systems Point level switches for safety systems By: Bill Sholette Level Products Business Manager Northeast US - Endress+Hauser Point level switches are often used in applications designed to prevent accidents.

More information

Nitrogen System Contamination

Nitrogen System Contamination Nitrogen System Contamination Lessons Learned Volume 05 Issue 03 2005 USW Nitrogen System Contamination Purpose To conduct a small group lessons learned activity to share information gained from incident

More information

Session One: A Practical Approach to Managing Safety Critical Equipment and Systems in Process Plants

Session One: A Practical Approach to Managing Safety Critical Equipment and Systems in Process Plants Session One: A Practical Approach to Managing Safety Critical Equipment and Systems in Process Plants Tahir Rafique Lead Electrical and Instruments Engineer: Qenos Botany Site Douglas Lloyd Senior Electrical

More information

Designing to proposed API WHB tube failure document

Designing to proposed API WHB tube failure document Designing to proposed API WHB tube failure document Dennis H. Martens Consultant and Technical Advisor (martensdh@pm-engr.com) Porter McGuffie Inc. Lon Stern Consultant (lhstern@earthlink.net) Stern Treating

More information

Lockout/Tagout Training Overview. Safety Fest 2013

Lockout/Tagout Training Overview. Safety Fest 2013 Lockout/Tagout Training Overview Safety Fest 2013 Purpose of Lockout/Tagout The standard covers the servicing and maintenance of machine and equipment in which the unexpected energization or start up of

More information

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT Kieran J Glynn, Advisor Major Accident Risk, BP, UK The exceedance curve approach was developed following the issue of the 2003

More information

Hazard Management Making your workplace safer

Hazard Management Making your workplace safer Hazard Management Making your workplace safer A Guide to Hazard Identification, Risk Assessment, Control and Reviewing 1 What is a hazard? A hazard is something which has the potential to harm the health,

More information

A Generic Model To Assess Major Incident Frequencies For Offshore Assets

A Generic Model To Assess Major Incident Frequencies For Offshore Assets A Generic Model To Assess Major Incident Frequencies For Offshore Assets Richard Emery, MMI Engineering Ltd, The Brew House, Wilderspool Park, Greenall s Avenue, Warrington, WA4 6HL. Quantitative risk

More information

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland SUP 15 Health & Safety Management Pressure Systems Unified procedures for use within NHS Scotland September 2015 Contents Page Acknowledgements... 3 1. Introduction... 4 2. Purpose of this Procedure...

More information

Proof Testing A key performance indicator for designers and end users of Safety Instrumented Systems

Proof Testing A key performance indicator for designers and end users of Safety Instrumented Systems Proof Testing A key performance indicator for designers and end users of Safety Instrumented Systems EUR ING David Green BEng(hons) CEng MIET MInstMC RFSE Ron Bell OBE BSc CEng FIET Engineering Safety

More information

Simplicity in VRU by using a Beam Gas Compressor

Simplicity in VRU by using a Beam Gas Compressor Simplicity in VRU by using a Beam Gas Compressor By Charlie D. McCoy and Mark Lancaster Abstract: Vapor Recovery Units are often expensive, complicated to operate and unable to deal with High H2S and liquids.

More information

Operational Risk Using BowTie Methodology

Operational Risk Using BowTie Methodology Operational Risk Using BowTie Methodology Richard Emery, MMI Engineering Ltd, The Brew House, Wilderspool Park, Greenall s Avenue, Warrington, WA4 6HL. Management of risk on COMAH sites relies on diverse

More information

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 Copyright 2018 by British Compressed

More information

The Protection of Silos From Over. Pressurisation During Filling

The Protection of Silos From Over. Pressurisation During Filling SHAPA Technical Bulletin No.11 The Protection of Silos From Over Pressurisation During Filling Page 1 of 8 August 2005 The Protection of Silos From Over Pressurisation During Filling By James Duggleby,

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC)

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC) PAGE : 1 / 11 1. PASSIVE SINGLE FAILURE ANALYSIS The aim of the accident analysis in Chapter P is to demonstrate that the safety objectives have been fully achieved, despite the most adverse single failure.

More information

WELL TEST HAZOP CAPABILITY STATEMENT

WELL TEST HAZOP CAPABILITY STATEMENT WELL TEST HAZOP CAPABILITY STATEMENT INTRODUCTION Hazard and Operability (HAZOP) is a hazard analysis method used to identify hazards and operational problems. The standard HAZOP methodology is process-based

More information