1 100Series Saturation Diving System
2 System Description The 1 CXJ Series Saturation Divhg system is corsoiidated n tt"'ie market, with the largest n.xnber of systems successfully delivered since 2CXJ5. E The 100 Series is rated 300MSW in accordance with the Class certificate, OJ and offers a standard 1 B-rnan occupancy in 2 x 6-man DOCs and 2 x 3-rnan UJ ~ DOC s. The standard configuration of the system includes two diving bells,... and one or two hyperbaric evacuation systems. D ifferent chamber complex configurations are available, from 12 to 24 diver occupancy and a single or 2 twin diving bell configuration. The system is provided as a turnkey solution and I- includes all the necessary equipment for the diving operation. The equipment is fully standardized and interchangeable in all the different configurations. The 100 Series System engineering is fully pre-approved with the Class (O NV) and is provided with a complete set of documentation which is necessary for the integration of the diving system with the vessel. This is not limited to the interface drawings of a ll the diving equipment. D rass data pack includes the moon pools rails design, the bell trolley rails design, the calculation of the maximum chamber static and dynamic loads with reference to the vessel motion and the maximum allowed deck deflections with reference to the chamber complex. The availability of this engineering data in the initial phase of the project is an important contribution to the vessel design ,.. "~'!.'... " '.- '. ; j ~., Tlie Control Panels are provided with extra redundancy of ti-te pressurisation, the comrt"ll..jl'lication, the fire-fighting and the gas analysis systems of each lock, in order to avoid every conceivable single point of failure. Tlie Control P anels are supplied with all ti-te various gas rrixes from 1::tie Gas Pressure R eduction P anel; each section is provided with an individual U PS as an emergency povver supply system and for ti-te purification and filtration of 1::tie electrical current that passes from ti-te ship supply. The Gas R ing partels are provided with ventilation, visual monitoring and analysis for each line. All D rass Gas Panels are completely piped with Tungum piping, Parker fittings, and assembled with D NV Certified materials and compor.ents. Drass OINnS a procedure for 1::tie cleaning of the oxygen piping lines approved by DNv. Record of the D NV fully-approved deliveries for au the equipment. DNV system approval for Gas Reclaim and Environmental Control. Rre Fighting end Fire Detection System for the irlner area of ti-te chambers approved. Insulation and TrerrnaJ B alance for the chamber and for ti-te D iving Bell approved. Extra security of the critical components [Pressure Reducers, Analyzers) in ti-te Saturation C onsoles to avoid single points of failure. Management of the electrical supply [U PS supplied for the system). Availability of optional Transportable Gas Storage System based on Kelly tubes [1 O N Kelly tubes),.avaijability of optional Emergency Generator. made exclusively for the Transportable System. Availability of optional Ufe Support Container for Hyperbaric R escue System (reception spread). The 100 Series is ready for connection with the G lobal Service Program: Automatic M onitoring System of the D iving System, remote reporting for the management team ashore, graph s of performance, e- procurement of spares and components. For more infor mation info@drass.it, O bject: G lobal Service. I The D rass 100 Series Saturation System togetr.er with tr.e D rass 900 Series Saturation System are the only D iving Systems provided with a specialized technical software for a complete remote management of tr.e D ress D iving Systems on the fleet. The software is available as optional and manages the configuration, maintenance, documentation, logistics and the training of the system.
3 Forecastle Deck Twin Bell Handli ng System The Forecastle Deck hosts the complete handling system with the exception of the umbilical winches. Based on stsndard vessel motion parameters, the shock absorbers allow operation up to 4.5 meters of significant wave, which can be improved to 6 meters with specific design. The trolley is hydraulically moved and automatically limits vessel motion. The proximity of the hydraulic power packs reduces the oil piping routing to the minimum. " " I "~I,I Single Bell Handling System
4 Shelter Deck c;._., '"_.""~... ~.~~~~~~~~'. ::::=~.,.,., Twin Bell Control Room and Bells Horizontal Run... The Shelter Deck hosts the horizontal bell run from the moon pools to the chamber complex mating and the bell control room. The area is available for the additional installation of the 700 Series Surface D iving System Chambers and Control Room. 5J I Bell Control Room and Bells Horizontal Run
5 Main Deck B Man System Twin Bell Configuration ,~" The Main Deck hosts the chamber complex, saturation control room and the inner area fire fighting system [including ancillary equipment and access to the evacuation system). The chamber complex is available in different layouts. 1 B Man System S ingle Bell Configuration 24 Man System Twin Bell Configuration with Wet Pot, Living and Sleeping Compartment for each 6 divers
6 Tween Deck... ::::::::::"'.~ =..",-< ".,q~'''"'''n " ~., ~~.::::~::::.~::.....~. The Tween Deck hosts the high pressure gas ring, which includes gas storage, gas transfer, gas recovery and gas management. The life support system is located directly below the chamber This is r;nade up of the environmental control units and ancillary equipment. ~omplex. tt". '" "" " '" ",
7 System Features The System is equipped with a trolley system for deployment from the moon pool(s). The trolley system is equipped with a shock absorber system for both the dmng bell and the anchor weight in order to minimize the impact on the mechanical components and extend the life cycle of the handling system. The shock absorber system a lso produces a positive effect on heave compensation. The 100 Series System is provided with a P L C - to uch screen con trolled - Bell H andling Console which manages the synchronized operation of the system. The recovery operation can be: fully automatic with operator consent at delivery points manual A complete set of alarms and sensors are connected to the Bell H andling Console to ensure safe operation. The 100 Series System is equipped with an additional Emergency Portable B ell H andling Console and with a remote control of the handling system directly located on the winches. Constant tensioning is available and adjustable to different weather and stream conditions. The Chamber Complex can be delivered in various standard configuration for occupancy from 12 to 24 divers. The DOCs can be provided in two different versions: - twin lock chambers with main lock (sleeping compartment) and entry lock (toilet and bell mating) - twin lock chambers with main lock (sleeping compartment) and extended lock (lmng compartment); the toilet and bell mating are available in a separate lock. The 100 Series DMng System is provided with the complete vessel interface engineering, including the moon pool design, the chamber complex load calculation and the maximum allowed deck deflection among other deliverables Drass - Galeazzi Certifications The Management System of Drass Group of Companies and all D rass Systems, Equipment and Components are fully DNV~ertified. The 100 Series Saturation Diving System is fully preapproved by the Class as a complete system. ABS and LRS Certifications are available on demand. ; :... IMeA Drass is active member of the International Maritime Contractor Association. Drass Systems, Equipment and Components are designed and built in compliance with the IMCA Recommendations.
8 VIA N. MAGRI, LlVORNO -ITALY PHONE: FAX: WINW.drass.it info@drass.it
Drass. 700 Series Surface Diving System
Drass Tecnologie Sottomarine Surface Diving System The Surface Diving System is a complete range of equipment which provides the widest solution for air and gas mix diving. The trolley and A-Frame recovery
More informationMODULAR SATURATION DIVING SYSTEM
MODULAR SATURATION DIVING SYSTEM The Modular Saturation system is rated to 305 MSW (1,000 ) and provides for 12-diver occupancy in two six-man twin lock chambers. The system is designed in accordance with
More informationGo further, go deeper
Go further, go deeper Small footprint 13X16 m Deck layout reduced on minimum 46-9 1/2 From 6 to 12 divers Easily modifiable 1 to 3 chambers can be set up 43-11 Less expensive than a DSV Mobilized in 4
More informationIMCA Competence Assessment Portfolio June 2013
IMCA Competence Portfolio June 2013 Name: Start Date in Current Self- Checklist Entry Level Criteria Acceptance Criteria Attained Certification 500 GRT or more: Valid certificate of competency or certificate
More informationSurface Supplied Mixed Gas Diving Operations
AB The International Marine Contractors Association Surface Supplied Mixed Gas Diving Operations www.imca-int.com IMCA D 030 Rev. 1 August 2005 AB The International Marine Contractors Association (IMCA)
More informationDocument Title : Air Diving Procedures Manual. Asia Divers Limited. Air Diving Procedures Manual DIV-MA Copyright
Asia Divers Limited Document Title : Air Diving Procedures Manual Doc. No : DIV-MA-0002 Page : 1 of 43 Rev : 0 Date : 06 th July 2001 Asia Divers Limited Air Diving Procedures Manual DIV-MA-0002 Copyright
More informationULMATEC LAUNCH AND RECOVERY SYSTEMS
M L U NC LAU MS ERY V ECO DR N HA C E AT TE SYS S R LA ULMATEC LAUNCH AND RECOVERY SYSTEMS Ulmatec develops efficient, safe and robust solutions for handling remotely operated vehicles (ROVs) from ships
More informationCentre of Excellence for Subsea Safety
Centre of Excellence for Subsea Safety Departments nhc training nhc testing nhc consulting nhc emergency Medical Equipment Hyperbaric Welding 07 09 13 15 17 11 Welcome to nhc National Hyperbaric Centre
More informationHRF Brochure HYPERBARIC RECEPTION FACILITY
HRF Brochure 200 msw / 15 Man Hyperbaric Reception Facility HYPERBARIC RECEPTION FACILITY The Hyperbaric Reception Facility has been built in accordance with American Bureau of Shipping rules and International
More informationHyperbaric Testing Testing and trials for the subsea industry. jfdglobal.com
Hyperbaric Testing Testing and trials for the subsea industry jfdglobal.com About JFD Our vision is to be the unrivalled, first choice partner to commercial operators and global defence forces within the
More informationSelf Propelled Hyperbaric Lifeboats. 12, 18 & 24-man
Self Propelled Hyperbaric Lifeboats 12, 18 & 24-man Introduction JFD combines the capability, experience and history of Divex, James Fisher Defence, National Hyperbaric Centre and LEXMAR positioning itself
More informationDelivery and Deployment of the U.S. Navy s Submarine Rescue System
Delivery and Deployment of the U.S. Navy s Submarine Rescue System Andrew DeSpirito Advanced Undersea Systems Program Office (PMS394) Naval Sea Systems Command Agenda Submarine Rescue Diving and Recompression
More informationSATURATION SYSTEM II COMPONENTS
SATURATION SYSTEM II COMPONENTS SAT II is a 6-man saturation diving system designed with a two man top mate side launch bell. The system is certified to 850 fsw and is equipped with a 10-man Self-Launch
More informationConfidence Under Pressure
Confidence Under Pressure Commercial jfdglobal.com Introduction Our vision is to be the unrivalled, first choice partner to commercial, international underwater operators and global defence forces in our
More informationAn Ocean of Possibility
An Ocean of Possibility SPM Offloading Buoy CALM Buoy Orwell Offshore s Catenary Anchor Leg Mooring (CALM) Buoy offers a reliable state-of-the-art solution for loading and offloading crude oil, refined
More informationIMCA Competence Assessment Portfolio June 2013
IMCA Competence Portfolio June 2013 Name: Start Date in Current Self- Checklist Entry Level Criteria Acceptance Criteria Attained Certification 500 GRT or more: Valid certificate of competency or certificate
More informationfrom Thames Cryogenics Ltd Total Cryogenic Solutions Cryogenic Cluster Day 22/09/2010
from Thames Cryogenics Ltd Total Cryogenic Solutions Cryogenic Cluster Day 22/09/2010 Dewar vessel noun. A container with an evacuated space between two walls, capable of maintaining its contents at a
More informationIMCA Competence Assessment Portfolio June 2013
Self- Checklist Entry Level Criteria Acceptance Criteria Attained Completed diver training to IMCA-recognised closed bell Valid training/competence certificate or surface-supplied diver qualification*
More informationCommon Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits
Common Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits Ways to Set Your Company or School Up For Success on ADCI Audits and Reduce Costs In most instances, all discrepancies
More informationDynamic Positioning: Method for Disaster Prevention and Risk Management
Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and
More informationSATURN EVO COLOR A N A E S T H E S I A S Y S T E M. Manufacturer of high quality anaesthesia products
Saturn Evo SATURN EVO COLOR A N A E S T H E S I A S Y S T E M i n t e l l i g e n t s i m p l i c i t y Manufacturer of high quality anaesthesia products SATURN EVO COLOR PATIENT SAFETY AND USER PATIENT
More informationLNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN
LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN Fabrice Dumortier 1, Jean-Pierre Queau 1, Jean-Robert Fournier 2 1. SBM Offshore 2. SBM Offshore Keywords: 1. LNG;
More informationSBM Installer. Diving Support & Construction Vessel
Diving Support & Construction Vessel New, all-in-one, state-of-the-art installer Safety, versatility and redundancy are the three key concepts to have driven the design of SBM Offshore installation vessels.
More informationSLOP RECEPTION AND PROCESSING FACILITIES
RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 8 SLOP RECEPTION AND PROCESSING FACILITIES JANUARY 2011 CONTENTS PAGE Sec. 1 General Requirements...
More information100 SERIES SATURATION DIVING SYSTEM
100 SERIES SATURATION DIVING SYSTEM CLUMP WEIGHT TECHNICAL OVERVIEW FD36-0006 Rev Date Issued Controlled Authorized Notes 0 21/09/2012 A. Baselice M. Pucci M. Bellomo Rev Date Reason for revision C Confidential
More informationControl & Maintenance. INT69 Diagnose INT69 TM Diagnose. Protect the heart of your system
Control & Maintenance INT69 Diagnose INT69 TM Diagnose Protect the heart of your system R INT69 DIAGNOSE The widely known protective system INT69 and INT69 TM present on all Frascold compressors is now
More informationHumiSys HF High Flow RH Generator
HumiSys HF High Flow RH Generator Designed, built, and supported by InstruQuest Inc. Versatile Relative Humidity Generation and Multi-Sensor System The HumiSys HF is a high flow version of the previously
More informationCommercial Diving Products and Services. jfdglobal.com
Commercial Diving Products and Services jfdglobal.com Introduction Our vision is to be the unrivalled, first choice partner to commercial, international underwater operators and global defence forces in
More informationGuidelines on Surveys for Dynamic Positioning System
Guidelines on Surveys for Dynamic Positioning System (2002) BEIJING 1 CONTENTS Chapter 1 GENERAL 1.1 General requirements 1.2 Class notation 1.3 Definitions 1.4 Plans and documents 1.5 Failure mode and
More informationHYPOXIC AIR FIRE PREVENTION SYSTEM TECHNICAL SPECIFICATION
HYPOXIC AIR FIRE PREVENTION SYSTEM TECHNICAL SPECIFICATION Introduction: Hypoxic Air Fire Prevention System is a revolutionary fire prevention technology. It has the unique ability to create a breathable
More informationAUTOMATIC HOSE TEST UNIT, TYPE SPU
VALVES AND FITTINGS UP TO 14,000 BAR TEST AND CONTROL EQUIPMENT H IGH PRESSURE TECHNOLOGY AUTOMATIC HOSE TEST UNIT, TYPE SPU Pressure range from 1 up to 10,000 bar User-friendly touch panel operation HIGH-PRESSURE
More informationThe HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.
The HumiSys RH Generator Designed, built, and supported by InstruQuest Inc. Versatile Relative Humidity Generation and Multi-Sensor System The new HumiSys with single or dual RH probes capabilities is
More informationIMCA Competence Assessment Portfolio June 2013
Self- Checklist Entry Level Criteria Acceptance Criteria Attained Undertaken IMCA approved training course completed on Valid certificate of training IMCA approved ALST training course OR Possesses IMCA-recognised
More informationTIGHTNESS. Glass sealing Thanks to our glass-sealing technology, ODU products can meet the most demanding tightness requirements.
TIGHTNESS Glass sealing Thanks to our glass-sealing technology, ODU products can meet the most demanding tightness requirements. ODU has the necessary expertise for developing and manufacturing connectors
More informationTechnical Diving Equipment
POMMEC LARS SYSTEM EASILY CONVERTED TO WET BELL SYSTEM POMMEC 2 DIVER LAUNCH AND RECOVERY SYSTEM WITH DIVING BASKET This Launch and Recovery System is specifically designed to provide a compact option
More informationValve test benches. Systems overview
Valve test benches Systems overview About us In the past few years WIKA has successfully integrated renowned manufacturers of calibration equipment into the group. With these established brands within
More informationDIVER COMMUNICATIONS: DIVE PANEL: EMERGENCY BREATHING APPARATUS: DIMENSIONS: ANALYSIS: ACCESS: DECK & VESSEL COMMUNICATIONS: GAS PIPEWORK:
Dive Control The Vertech containerised Dive Control unit provides a complete solution to managing every aspect for the ongoing dive operation. The dive control is split into two sections allowing for separate
More informationRESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS
INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING
More informationPart 7 Fleet in service Chapter 2 Inclining test and light weight check
RULES FOR CLASSIFICATION Inland navigation vessels Edition December 2015 Part 7 Fleet in service Chapter 2 Inclining test and light weight check The content of this service document is the subject of intellectual
More informationFlexible hoses - Non-metallic materials
CLASS PROGRAMME Type approval DNVGL-CP-0183 Edition December 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD
More informationBIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL
BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL Saturation & Air Diving Support Structure Installation Flexible, Flowline & Umbilical Installation Inspection, Repair & Maintenance
More informationUNDERWATER SERVICES COMPANY PROFILE
UNDERWATER SERVICES COMPANY PROFILE irov Underwater Services is an Italian Independent H i g h l y S p e c i a l i z e d C o m p a n y p r o v i d i n g underwater technology and ROV assistance to Salvage
More informationApollo Safety Features
Overview of Emergency Start Mains Power Failure Gas Supply Failure Ventilator Failure Fresh Gas Delivery Failure Ventilator and Fresh Gas Delivery Failure Display Failure User Interface Failure System
More informationCompletion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk
Completion Workover Riser System Enabling efficient operations by reducing interface complexities and minimizes operational risk Well integrity with fatigue management were key drivers for our system design
More informationIMCA Competence Assessment Portfolio April 2016
Self- Checklist Entry Level Criteria Acceptance Criteria Attained Completed diver training to IMCA-recognised air diver qualification Passed medical examination for fitness to dive Passed offshore survival
More informationANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS
Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This
More informationPile Gripper Systems
Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +
More informationGENERAL SAFETY INSTRUCTION GSI-M-2 STANDARD PRESSURE EQUIPMENT
GENERAL SAFETY INSTRUCTION GSI-M-2 STANDARD PRESSURE EQUIPMENT Publication date: 09-06-2015 All CERN Safety Rules are available on the web site: https://www.cern.ch/safety-rules Page 1 of 8 1 INTRODUCTION
More informationSWS Option: Well Pressures. SWS Option: Stretch Correction (Corrected depth) SWS Option: MMD (Magnetic Marks Detection) ASEP Products
SWS Option: Well Pressures PART NUMBER L-8531039779 The SmartMonitor can simultaneously measure, display and record depth and up to four different well pressures (for example, Control Line Pressure, Tubing
More informationNOAA DIVING PROGRAM MINIMUM STANDARD FOR DECOMPRESSION DIVING USING OPEN-CIRCUIT SCUBA EQUIPMENT
NOAA DIVING PROGRAM MINIMUM STANDARD FOR DECOMPRESSION DIVING USING OPEN-CIRCUIT SCUBA EQUIPMENT NOAA Diving Center 7600 Sand Point Way, N.E. Seattle, WA 98115-0070 NOAA DIVING PROGRAM MINIMUM STANDARD
More informationTARPON A Minimal Facilities Platform
TARPON A Minimal Facilities Platform Contents Introduction TARPON Description TARPON Features TARPON Benefits TARPON Proofs TARPON Typical Installation Options Design Codes & Certification Novel Application
More informationDrilling Efficiency Utilizing Coriolis Flow Technology
Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities
More informationMONOPLACE HYPERBARIC CHAMBER FOR DIVERS TRANSPORT MODEL OXICAB MO-BZ-TR TECHNICAL OFFER
TECHNICAL OFFER MONOPLACE HYPERBARIC CHAMBER FOR DIVERS TRANSPORT Supplied by HYPERBARIC S.A.C. LIMA - PERÚ hyperbaric@hyperbaricsac.com ***The images and illustration included are in some cases for reference.
More informationInnovative Pressure Testing Equipment
Innovative Pressure Testing Equipment Oil & Gas Subsea Universities Nuclear Materials Science Supporting Industry and Research Worldwide www.kwdesign.co.uk Who are KW Designed Solutions? We are industry
More informationEuropean Diving Technology Committee EDTC
European Diving Technology Committee EDTC Goal-setting Principles for Harmonized Diving Standards in Europe EDTC-GS-001-1/15 27th March 2015 1 CONTENTS EXECUTIVE SUMMARY INTRODUCTION PURPOSE OF THIS DOCUMENT
More informationDP Station Keeping Event Bulletin
DP Station Keeping Event Bulletin IMCA DP Station Keeping Event Bulletin 04/17 October 2017 The following event trees have been compiled from recent reports received by IMCA. The originators granted IMCA
More informationEdit this text for your title
Edit this text for your title MEK 4450 Marine Operations Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2013 Lesson 2/3 Lift phases Load out Transportation
More informationThe swimming pool brand
CATALOGUE The swimming pool brand Our products can be found in over 170 countries. We have over 40 years of experience. Over 40,000 professionals and 2,000,000 swimming pools use one of our 15,000 products.
More informationRESOLUTION MSC.94(72) (adopted on 22 May 2000) PERFORMANCE STANDARDS FOR NIGHT VISION EQUIPMENT FOR HIGH-SPEED CRAFT (HSC)
MSC 72/23/Add.1 RESOLUTION MSC.94(72) EQUIPMENT FOR HIGH-SPEED CRAFT (HSC) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning
More informationHeat Engine. Reading: Appropriate sections for first, second law of thermodynamics, and PV diagrams.
Heat Engine Equipment: Capstone, 2 large glass beakers (one for ice water, the other for boiling water), temperature sensor, pressure sensor, rotary motion sensor, meter stick, calipers, set of weights,
More informationADCI Consensus Standards - GAP Analysis Rev. 6 and 6.1 April 2, 2014
ADCI CS Rev. 6 (2011) ADCI CS Rev. 6.1 (2014) Section 1.0 General Provisions IMPLEMENTATION OF CERTIFICATION AND EQUIPMENT REQUIREMENTS Superscripts 1- Compliance within 6 mos. 2- Compliance within 12
More informationHigh Pressure Breathing Air Compressors
High Pressure Breathing Air Compressors [ Full variety for different applications] MSA offers a comprehensive range of high pressure breathing air compressors for both the firefighting and diving market,
More informationNOBLE REV 02 FPSO MOORING SYSTEM INTEGRITY STUDY
DENTON INTEGRITY STUDY APPENDIX C INCIDENT REPORTS Incident One FPSO Questionnaire Failure of gripper used to rotate turret Several months after installation This FPSO has an internal partially rotating
More informationBIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL
BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL Saturation & Air Diving Support Structure Installation Flexible, Flowline & Umbilical Installation Inspection, Repair & Maintenance
More informationIsis Deployment. TMS and Live Boating. Inmartech08. Dave Turner Operations Co-ordinator.
Isis Deployment TMS and Live Boating Inmartech08 Dave Turner Operations Co-ordinator TMS Operations Why Why do do we we have have aa TMS? TMS? ItIt was was deemed deemed an an essential essential part
More informationOriginal URI Scanfish MKII
Scanfish MKII URI s Scanfish MKII Sensors include CTD, Fluorometer, Dissolved Oxygen and Seabird Fast Temperature and Conductivity Sensors logging at 400 Hz and sending 50 Hz data via 9600 Baud uplink
More informationNGP-250/500 Nitrogen Generator Quick Start Guide
NGP-250/500 Nitrogen Generator Quick Start Guide Version: A July 2013 Potter Electric Signal Company, LLC 5757 Phantom Dr., Suite 125 P. O. Box 42037 Hazelwood, MO 63042 Phone: (314) 595-6900 Document
More informationDYNAMIC POSITIONING SYSTEMS
Guide for Dynamic Positioning Systems GUIDE FOR DYNAMIC POSITIONING SYSTEMS NOVEMBER 2013 (Updated July 2014 see next page) American Bureau of Shipping Incorporated by Act of Legislature of the State of
More informationSubsea Tooling Services Range of Dredgers
Subsea Tooling Services Range of Dredgers Subsea Tooling Services UK Ltd (STS) has a large selection of ROV / Diver operated dredgers. The range includes 3 4 6 8 10 and 12 dredgers. We are confident we
More informationRVSS Appendix A Overview
RVSS Appendix A Overview Presented at RVTEC 2008 by Rich Findley rfindley@rsmas.miami.edu Definitions WINCH OWNER: The party or their representative who is normally responsible for the operation, inspection,
More informationRisers for Deepwater FPSO s
Risers for Deepwater FPSO s John Bob-Manuel Senior Engineer 2H Offshore Engineering Ltd. March 2013 Agenda 2H overview Challenges of Deepwater Operations Freestanding Riser Overview Riser Configurations
More informationRe-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008
Re-usable Riser and Flowline System for Deep Water Application C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Table of Contents Flexible Pipe Technology Deep Water Challenges for Riser, Flowline and Umbilical
More informationM-06 Nitrogen Generator (Nitrogen Making Machine)
Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains
More informationROLE DESCRIPTIONS BY COMPETENCY LEVEL
UNIVERSITY OF NORTH CAROLINA WILMINGTON Scientific Diving Specialist DESCRIPTION OF WORK: These positions execute research protocols in accordance with input from scientists or members of the mission team.
More informationMobile Breathing Air Systems
FAMA BUYER S GUIDE TC053 Prepared by the FAMA Body Subcommittee This guide does not endorse any manufacturer or product Page 1 of 14 Contents Introduction... 3 Overview... 4 Mobile Breathing Air System
More informationVariable Area Flow Meters
Variable Area Flow Meters Over sixty years of variable area meter expertise Brooks started designing and manufacturing variable area (VA) meters, also referred to as rotameters, in 1946. Now, with more
More informationUser Manual 1 P a g e Rev. V1.6-EN 11/08/2014
User Manual 1 P a g e Rev. V1.6-EN 11/08/2014 Copyright Disclaimer Trademarks and patents Intended use Contact info 2011 Inflotrolix, Inc. This document may not be copied in whole or in part or otherwise
More informationCLIENT NAME: LOCATION: CALM BUOY INSPECTION:
INSPECTOR REVIEWED INSPECTION OF CALM BUOY OVERALL PHOTO REVISION DESCRIPTION: Preliminary / Final Page: 1 TABLE OF CONTENT 1. MANAGEMENT SUMMARY... 3 1.1. SCOPE OF WORK:... 3 1.2. CORRECTIVE ACTIONS...
More informationV8600 Ventilator. Integrated Invasive & Noninvasive Ventilation
V8600 Ventilator Integrated Invasive & Noninvasive Ventilation 0123 V8600 Ventilator Invasive Ventilation With state-of-the-art turbine technology, V8600 helps achieve sequential ventilation in various
More informationTURBINE SEAL: AXIAL TYPE DESIGN
TURBINE SEAL: AXIAL TYPE DESIGN Our axial type seals are specifically designed for application to hydroelectric turbines and large water pumps for sewage handling, filtration, irrigation, and more. Our
More informationPERFORM Operating Document
PERFORM Operating Document Use and Maintenance of CO 2 Incubator PC-POD-CA-007-v02 Revision History Version Reason for Revision Date 01 New POD 30-Sep-13 02 Minor revisions for section 2.3, 3.1, 4.3. 14-April-16
More informationPanther 5 Acute Care Ventilator
1 HIGHLIGHTS High performance and advanced features target the ICU environment Utilizes an internal blower with a specially designed flow control valve removing the need for using compressed air without
More informationN2 Membrane+ Nitrogen Production Systems for Offshore. Where you are. Where you need to be. We are here too.
N2 Membrane+ Nitrogen Production Systems for Offshore Where you are. Where you need to be. We are here too. www.airliquide.com OVERVIEW AIR LIQUIDE OIL AND GAS SERVICES is dedicated to the supply of products
More informationAutomatic Isokinetic Sampler. ST5 Evo
Automatic Isokinetic Sampler ST5 Evo Automatic Isokinetic Sampler ST5 Evo Moreover, in case of pump failure, the CU can work with a spare Dado PU unit or with any pump capable to supply the needed flowrate,
More informationIntroduction MEDICAL HYPERBARIC SYSTEM FOR OXYGEN THERAPY
Introduction Your body s tissues need an adequate supply of oxygen to function. When tissue is injured, it requires even more oxygen to survive. Hyperbaric oxygen therapy increases the amount of oxygen
More informationSchilling Robotics TITAN 4 Manipulator
PRODUCT DATASHEET SUBSEA TECHNOLOGIES Schilling Robotics TITAN 4 Manipulator We put you first. And keep you ahead. Thousands of our manipulator systems are in use worldwide every day. TITAN manipulators
More information0TMS Design and analysis of ITB ultra deep ROV
0TMS Design and analysis of ITB ultra deep ROV Muljowidodo K. 1, Nico Prayogo 2 & Sapto Adi Nugroho 3 1 Faculty of Mechanical and Aerospace Engineering, Institut Teknologi Bandung (ITB) Jl. Ganesha 10,
More informationAn intuitive and innovative answer to your anaesthesia challenges
An intuitive and innovative answer to your anaesthesia challenges Dameca AX500 anaesthesia machine Meeting your needs today and tomorrow As an expert in anaesthesia care, you are looking to continuously
More informationINTRODUCTION DELTA GROUP
INTRODUCTION Gulf Marine contracting FZE (GMC) is a turnkey Contractor providing Oil Field Services and comprises of a team of outstanding professional marine experts having built a solid reputation around
More informationSubj: USE OF DYNAMIC POSITIONING (DP) BY OFFSHORE SUPPLY VESSELS (OSVs) FOR OIL AND HAZMAT TRANSFERS
Commander 501 Magazine Street Eighth Coast Guard District New Orleans, LA 70130-3396 Hale Boggs Federal Bldg. Staff Symbol: (mvs) Phone: (504) 589-6271 FAX: (504) 589-4999 MEMORANDUM 16711/DP OSVs D8(m)
More informationHYPERBARIC INTERVENTION IN SUBMARINE RESCUE SUT June 8 th Doug Austin Director, Asia Pacific
HYPERBARIC INTERVENTION IN SUBMARINE RESCUE SUT June 8 th 2016 Doug Austin Director, Asia Pacific INTRODUCTION Technologies and techniques developed for human survival in the ocean depths required to support
More informationRULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS
RULES FOR CLASSIFICATION Naval vessels Edition January 2016 Part 1 Classification and surveys Chapter 5 The content of this service document is the subject of intellectual property rights reserved by ("DNV
More informationFlexible Engineered Solutions International CALM Buoy Swivels
Flexible Engineered Solutions International CALM Buoy Swivels Merchant Court, North Seaton Industrial Estate, Ashington, Northumberland, NE63 0YH, England Telephone: +44 (0) 1670 524 960 I Fax: +44 (0)
More informationJORDAIR/BAUER Service Manual
JORDAIR/BAUER Service Manual Breathing Air Compressor Maintenance Log Doc. ServiceManual Page - 1 SAFETY RELEASE-2016 The following document is prepared to ensure safety of operators and service technicians.
More informationExhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)
1 APPLICABILITY Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) Definitions common to all certification and test procedures
More informationMilitary & Submarine Rescue Systems. [Intro] Engineering Your Subsea Solutions. Overview. OceanWorks Intervention Systems
Military Solutions Military & Submarine Rescue Systems Submarine Rescue - Intervention Systems [Intro] Engineering Your Subsea Solutions Overview OceanWorks International is an internationally recognized
More informationRAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs
RAMS 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs Introduction to RAMS Tritech s RAMS is a 360 anchor-chain and riser integrity monitoring system for Floating Production Storage and Offloading
More information35 years of unparalleled support to the offshore oil and gas industry.
35 years of unparalleled support to the offshore oil and gas industry. Offshore Construction Commercial Diving Cable Laying Remotely Operated Vehicles (ROV s) Marine Services I.R.M. ABOUT US CCC (Underwater
More informationOTTO CANDIES, L.L.C Hwy. 90 Des Allemands, LA M/V WYATT CANDIES. God Bless America
17271 Hwy. 90 Des Allemands, LA 70030 504 469 7700 WWW.OTTOCANDIES.COM M/V WYATT CANDIES Made in the U.S.A. God Bless America Classification and Flag U.S. Flagged Jones Act Compliant Class society: Class
More informationAn airbag was attached to the WCR tool and inflated to allow the WCR tool to rotate on the pipeline and free the diver.
AB Safety Flash IMCA Safety Flash 03/09 March 2009 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learnt from them. The information below has been provided
More information