Technical Committee on Heat Recovery Steam Generators and Other Combustion Turbine Exhaust Systems

Size: px
Start display at page:

Download "Technical Committee on Heat Recovery Steam Generators and Other Combustion Turbine Exhaust Systems"

Transcription

1 Technical Committee on Heat Recovery Steam Generators and Other Combustion Turbine Exhaust Systems Date: March 5, 2010 To: Technical Committee on Heat Recovery Steam Generators and Other Combustion Turbine Exhaust Systems From: Denise Beach, Staff Liaison/Senior Engineer Re: Agenda Package March ROC Meeting Enclosed is the agenda package for the March 25-26, 2010 meeting in Orlando, FL for the Report on Comments (ROC) meeting. Please ensure that you have reviewed the comments in advance, not only for technical merit, but also if you believe there are any other committees to which duplicate comments should be sent. The agenda and comments will be posted on the committee webpage. Some items to bring to the meeting include: Agenda packet with comments; your copy of the NFPA 85 Fall 2010 Report on Proposals; your copy of NFPA 85; any previous copies of NFPA 85 you may wish to reference. Optional items that are sometimes useful include previous ROP/ROCs if handy. If you have any questions or comments, please feel free to reach me at (617) or by at You can reach the HRS TC Chair, John Van Name at (212) or by at Live Meeting Web Access. TC Members participating via Live Meeting should have received a separate with instructions on connecting through the web. If you do not have the , please follow these steps to connect to the meeting:

2 Technical Committee on Heat Recovery Steam Generators and Other Combustion Turbine Exhaust Systems AGENDA DoubleTree Resort Orlando Hotel International Drive Orlando, FL March 25-26, Chair s welcome, call to order, and opening remarks at 8:30 a.m. 2. Self-Introduction of Committee Members and Guests 3. Approval of Minutes from the June 15-16, 2009 ROP Meeting in Quincy, MA. See E- Committee web page to view. 4. Staff Liaison Report A. Committee membership update (For the period May 1, 2009 March 5, 2010) Name Category Change Date Steven Graf M (Alternate to J. Stevens) Appointment 08/05/2009 Miguel Cancelado M (Alternate to P. Souers) Appointment 08/05/2009 (Total Voting Members 21; M=33%, SE=33%, U=24%; I=10%) B. Revision Cycle Review and timeline (Attachment A) 5. Old Business 6. New Business A. NFPA Patent Policy and GE Patent Application (Attachment B) B. Review BCS-HRS Committee Scope and Document Scope (Attachment C) C. Review of public comments (see enclosed Acrobat file) D. Creation of Committee Comments (See Attachment D for TCC Notes) i. Interlock System Initiation - The TCC revised the action on Proposal (25) to include language accepted in Proposal (CP9). The TCC also recommended that the BCS-FUN and BCS-HRS Technical Committees reconsider the language of and (CP105) respectively, in light of the new definition for transmitter. ii. Other Committee Comments 7. Other Items? 8. Date/Location of Next Meeting. (NFPA 85 is currently on a 4-year revision cycle.) 9. Adjournment.

3 ATTACHMENT A: ROP AGENDA NFPA 85 Revision Cycle Fall 2010 NFPA 85 F2010 (last cycle F06) [BCS-AAC] Intent to enter cycle January 9, 2009 Proposal Closing May 8, 2009 (May 29 orig date) ROP Published and Posted December 28, 2009 Comment Closing March 5, 2010 ROC Published and Posted August 27, 2010 ROC TC Meetings (between March 5 and April 9, 2010) FUN ROC (Tampa) 2 days March 18-19, 2010 HRS ROC (Orlando) 2 days March 25-26, 2010 MBB ROC (Tempe) 2 days March 30-31, 2010 FBB ROC teleconference/live Meeting April 5, 2010 PFS ROC teleconference/live Meeting April 2, 2010 SBB ROC teleconference/live Meeting April 6, 2010 STO ROC teleconference/live Meeting April 2, 2010 TCC ROC (Barberton, OH, tentative) June 2-3, 2010 Intent to make motion (ITMAM) closing October 22, 2010 Issuance of standard - NO controversy January 28, 2011 (publ. bit later) NFPA WSCE Meeting with NITMAM June 4-9, 2011 Issuance of Standard with controversy July 29, 2011 (published bit later)

4 The ANSI/NFPA Patent Policy An Introduction to Patents and Standards d for the NFPA Technical Committee Member Patent Policy PPT; M. Brodoff; version 2/24/ ANSI/NFPA Patent Policy ANSI = The American National Standards Institute The NFPA, as an ANSI-accredited consensus standards developer, adheres to the ANSI patent policy. Patent Policy PPT; M. Brodoff; version 2/24/

5 ANSI/NFPA Patent Policy Section 3.0 of the ANSI Essential Requirements: Due process requirements Under the Patent Policy, an NFPA standard can include an essential patent claim if the Technical Committee concludes that technical reasons justify this approach AND the patent holder (or other controller of patent rights) provides NFPA with certain assurances. essential patent claim = a patent claim whose use would be required for compliance with the standard. Patent Policy PPT; M. Brodoff; version 2/24/ ANSI/NFPA Patent Policy If NFPA receives notice that a proposed p or existing NFPA standard requires or may require the use of an essential patent claim, NFPA must receive from the patent holder (or controller), in writing, either: A disclaimer to the effect that the patent holder does not hold and does not currently intend holding any essential patent claim; OR Assurances that a license to the essential patent claim will be made available: Without compensation; OR Under reasonable terms and conditions that are demonstrably free of any unfair discrimination (see the ANSI Patent Policy for further details) Patent Policy PPT; M. Brodoff; version 2/24/

6 ANSI/NFPA Patent Policy Disclosures of essential patent claims should be made by the patent holder, but others may also notify NFPA if they believe that a proposed or existing NFPA standard includes an essential patent claim. Notifications to NFPA should be in writing directed to the NFPA General Counsel and should include as much information as possible, including the basis for the belief that t the patent t is essential i.e. required for compliance with AN NFPA standard. Patent Policy PPT; M. Brodoff; version 2/24/ ANSI/NFPA Patent Policy Participants in the NFPA codes and standards development should disclose essential patent claims. NFPA encourages early disclosure because it provides NFPA Technical Committees with the greatest opportunity to evaluate the propriety of standardizing the patented technology and also to consider alternatives ti to embedding essential patent t claims into the standard. Patent Policy PPT; M. Brodoff; version 2/24/

7 Standards and Patents: Its not just about the ANSI/NFPA Patent Policy Patent Policy aside, NFPA encourages participants to inform Technical Committees concerning patent claims, essential or otherwise, that they are aware of that would be helpful for Technical Committees to know about in deciding how to write and revise standards. Why? As with any commercial or financial interests, disclosure concerning interests in relevant patents may be necessary for others to accurately evaluate the proposals, arguments and information you provide to the Technical Committee(s). ( (See, esp., Guide for Participants in the NFPA Process at 3.1(e): In order that the points of view and information participants contribute to the NFPA Codes and Standards Development Process can be accurately evaluated by others, participants should always endeavor to make known their business, commercial, organizational, or other affiliations that might affect their interests or points of view. (Cont.) Patent Policy PPT; M. Brodoff; version 2/24/ Standards and Patents: Its not just about the ANSI/NFPA Patent Policy Knowledge concerning patents helps Technical Committees to develop, as far as practicable, flexible, performance-based standards that meet user needs. (See Regulations Governing Committee Projects at Each TC shall, as far as practicable, prepare Documents in terms of required performance, avoiding specifications of materials, devices, or methods so phrased as to preclude obtaining the desired results by other means. ) Patent Policy PPT; M. Brodoff; version 2/24/

8 Some Final Thoughts Consider any available information about patents in your committee discussions and actions. Before embedding patented technology in standards, consider alternatives to requiring use of essential patent claims. Document your actions and reasoning in your Committee Reports/minutes. For more information, consult with your staff liaison and/or contact NFPA General Counsel. Patent Policy Powerpoint; M. Brodoff; version 2/24/

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46 ATTACHMENT C: ROC AGENDA BCS-HRS TC Scope Review At the BCS-AAC ROP Meeting, the TCC requested that the Technical Committees review their respective scopes and consider modifying them to exactly match the document scope. [NFPA Staff Note: Section of the Regulations Governing Committee Projects states that The responsibilities of a TCC are recommending changes to existing Scopes of TCs. Therefore it will be the responsibility of the TCC to recommend any changes in TC scope to the NFPA Standards Council.] BCS-HRS Committee Scope: This Committee shall have primary responsibility for documents covering the operation of heat recovery steam generators and other combustion turbine exhaust systems, and the related reduction of combustion system hazards and prevention of explosions. This includes all fuels at any heat input rate. BCS-HRS Document Responsibility (as published in the F2010 ROP): 1.1* Scope. This code applies to (3) Fired or unfired steam generators used to recover heat from combustion turbines [heat recovery steam generators (HRSGs)], and to other combustion turbine exhaust systems at any heat input rate.

47 Report on Comments November 2010 NFPA Log #6a BCS-HRS Dale P. Evely, Southern Company Services, Inc Revise text to read as follows: An HRSG, heat exchanger, or emissions control system, alone or in combination, and their associated ductwork All ductwork from the combustion turbine exhaust to the stack inlet., including any emission control systems contained within the exhaust flow path. This definition was proposed to be revised by the BCS-HRS Technical Committee during their ROP meeting but the proposed wording was a bit ambiguous. The above proposed revision for this definition needs to be reviewed by both the BCS-HRS TC as well as the BCS-FUN TC. 85- Log #22 BCS-HRS Technical Correlating Committee on Boiler Combustion System Hazards, The TCC instructs the BCS-HRS Technical Committee to review paragraph in light of the new definition for transmitter. This is a direction from the Technical Correlating Committee on Boiler Combustion System Hazards in accordance with and of the Regulations Governing Committee Projects. Printed on 3/11/2010 1

48 Report on Comments November 2010 NFPA Log #12 BCS-HRS Gordon G. Gaetke, The Dow Chemical Company Revise text: * System 2 Gaseous Fuels with pressurized pipe section. Triple Block and Double Vent valve arrangement filled with an inert gas or air and maintained at a pressure that prevents gaseous fuel from entering the Combustion Turbine or duct burner in accordance with the following requirements: (1)* Combustion turbine normal shutdown. (2) Air or inert gas shall be introduced to create and maintain a pressurized pipe section between the middle and most downstream block valves. (3) Fuel gas block and vent valve positions shall be continuously monitored. If continuous monitoring is lost or any valve deviates from its assigned position, Purge Credit is lost and subsequent start of the Combustion Turbine requires a Combustion Turbine Purge prior to light-off in accordance with (4) Pressures in the two double block and vent pipe sections shall be continuously monitored. If the continuous monitoring is lost or the differential pressure downstream of across the middle block valve decreases increases to less more than 3 psid above the upstream pressure, Purge Credit is lost and subsequent start of the Combustion Turbine requires a Combustion Turbine Purge prior to light-off in accordance with (5) Combustion Turbine Purge Credit period is maintained as long as the conditions in (2), (3), and (4) are met. (6) Provisions shall be made to ensure that fuel cannot enter the air or inert gas supply line at any time When establishing a combustion turbine purge credit in accordance with , the following procedure shall be implemented for gaseous fuels (System 2): (A) Open both vent valves of the combustion turbine and duct burner fuel supply. (B) Admit the blocking medium to purge any remaining fuel until the fuel level is less than 25% of the LEL. (C) Close both vent valves and the middle block valve creating high pressure plugs the downstream (header) vent valve. (D) Close the air or inert gas supply. Establish and maintain the required blocking pressure (E) Monitor the differential pressure across the middle block valve and the pressure between the upstream and middle block valves. If air or inert gas pressure is maintained between the middle and downstream block valves, differential pressure monitoring will not detect a leak, assuming air or inert gas pressure was established upstream of the middle block valve. By charging up the system from the upstream through downstream block valves, then closing the middle block valve and isolating the air or inert gas; two high pressure plugs are created and valve integrity can be monitored. Text was modified to portray this arrangement. From the original text of (4) it is not clear what the intended pressure is, during the Purge Credit, between the upstream and middle block valves (between V1 and V2 in diagram). Whether that cavity is vented down to atmospheric pressure or at air or inert gas pressure. If atmospheric pressure, the accuracy of detecting a change from atmospheric pressure would be difficult with a transmitter that also has to measure full line pressure to the combustion turbine. Also, DPT would be a large value and difficult to detect a deviation. If established at air or inert gas pressure, then the DPT could detect a leaking vent valve (V4). However, the text says to monitor pressure downstream of the middle block valve for a decrease to less than 3 psid above the upstream pressure (??). If the high pressure plug is only created but not maintained, text in (5) would be changed by deleting a reference to (2). In reference to the combustion turbine should be added. System 2 is intended for both the combustion turbine and duct burner as stated in Other proposed text revisions are intended to avoid ambiguity to An option for the committee is to move to the appendix suggesting a possible means to setup and monitor the high pressure plug with clear step-by-step references to the diagram in a similar manner as done for System 1. Printed on 3/11/2010 2

49 Report on Comments November 2010 NFPA Log #13 BCS-HRS Gordon G. Gaetke, The Dow Chemical Company Revise text: * System 3 Liquid Fuels with pressurized pipe section. Triple Block and Double Drain valve arrangement filled with an inert gas or air and maintained at a pressure that prevents liquid fuel from entering the Combustion Turbine or duct burner in accordance with the following requirements: (1)* Combustion turbine normal shutdown. (2) Air or inert gas shall be introduced to create and maintain a pressurized pipe section between the middle and most downstream block valves. (3) Liquid fuel block and drain valve positions shall be continuously monitored. If continuous monitoring is lost or any valve deviates from its assigned position, Purge Credit is lost and subsequent start of the Combustion Turbine requires a Combustion Turbine Purge prior to light-off in accordance with (4) Pressures in the two double block and drain pipe sections shall be continuously monitored. If the continuous monitoring is lost or the differential pressure downstream of across the middle block valve decreases increases to less more than 3 psid above the upstream pressure, Purge Credit is lost and subsequent start of the Combustion Turbine requires a Combustion Turbine Purge prior to light-off in accordance with (5) Combustion Turbine Purge Credit period is maintained as long as the conditions in (2), (3), and (4) are met. (6) Provisions shall be made to ensure that fuel cannot enter the air or inert gas supply line at any time When establishing a combustion turbine purge credit in accordance with , the following procedure shall be implemented for liquid fuels (System 3) after scavenging in accordance with section : (A) Open both drain valves of the combustion turbine and duct burner fuel supply. (B) Admit the blocking medium to purge any remaining fuel. (C) Close both drain valves and the middle block valve creating high pressure plugs the downstream (header) vent valve. (D) Close the air or inert gas supply. Establish and maintain the required blocking pressure (E) Monitor the differential pressure across the middle block valve and the pressure between the upstream and middle block valves. If air or inert gas pressure is maintained between the middle and downstream block valves, differential pressure monitoring will not detect a leak, assuming air or inert gas pressure was established upstream of the middle block valve. By charging up the system from the upstream through downstream block valves, then closing the middle block valve and isolating the air or inert gas; two high pressure plugs are created and valve integrity can be monitored. Text was modified to portray this arrangement. From the original text of (4) it is not clear what the intended pressure is, during the Purge Credit, between the upstream and middle block valves (between V1 and V2 in diagram). Whether that cavity is vented down to atmospheric pressure or at air or inert gas pressure. If atmospheric pressure, the accuracy of detecting a change from atmospheric pressure would be difficult with a transmitter that also has to measure full line pressure to the combustion turbine. Also, DPT would be a large value and difficult to detect a deviation. If established at air or inert gas pressure, then the DPT could detect a leaking drain valve (V4). However, the text says to monitor pressure downstream of the middle block valve for a decrease to less than 3 psid above the upstream pressure (??). If the high pressure plug is only created but not maintained, text in (5) would be changed by deleting a reference to (2). In reference to the combustion turbine should be added. System 2 is intended for both the combustion turbine and duct burner as stated in Other proposed text revisions are intended to avoid ambiguity to An option for the committee is to move to the appendix suggesting a possible means to setup and monitor the high pressure plug with clear step-by-step references to the diagram in a similar manner as done for System 1. Printed on 3/11/2010 3

50 Report on Proposals F2010 Copyright, NFPA NFPA 85 to the duct burner fuel train. The combustion turbine purge credit can reduce the required start-up time and thermally-induced stress on the HRSG by not requiring a full HRSG/ exhaust system purge immediately prior to start-up. Three psid provides a measurable differential without excessive blocking gas consumption. In addition, the three psid threshold has been evaluated and is not sensitive to gas entering the exhaust. This threshold has been successfully deployed in the field by at least one manufacturer. Committee Meeting Action: Accept Number Eligible to Vote: 21 Ballot Results: Affirmative: 18 Ballot Not Returned: 3 Balsbaugh, R., Lefton, S., Souers, P Log #CP105 BCS-HRS Final Action: Accept ( (1)) TCC Action: The TCC instructs the BCS-HRS Technical Committee to review paragraph in light of the new definition for transmitter. Submitter: Technical Committee on Heat Recovery Steam Generators, Recommendation: Revise text to read as follows: Interlock functions shall be initiated by one or more of the following: (1) A switches or transmitter independent of control functions and signals. Substantiation: The TC added the phrase or transmitter to clarify the provision in light of (Log #CP203) and (Log #CP204) which will add definitions for switch and transmitter to Chapter 3. It is the intent of the TC to allow a single transmitter to be used if independent of control functions. Editorially, the terminology was changed to singular to clarify the intent of the provision that a single switch or transmitter is adequate. Committee Meeting Action: Accept Number Eligible to Vote: 21 Ballot Results: Affirmative: 18 Ballot Not Returned: 3 Balsbaugh, R., Lefton, S., Souers, P Log #67 BCS-HRS Final Action: Accept in Principle ( and ) Submitter: Randy J. Kleen, General Electric Company Recommendation: Combustion turbine exhaust system per definition depicts the duct work of HRSG and/or SCR exhaust systems up to the stack shall be purged. No problem here Combustion Turbine Exhaust Systems. All ductwork from the combustion turbine exhaust to the stack, including any emission control systems contained within the exhaust flow path. However, when reading the section in GT purge with HRSG or SCR systems, it depicts that the entire duct work - inclusive of stack exit shall be purged. Recommend removing the stack exit In no case shall the volume in (2) be less than the volume of the HRSG enclosure between the combustion turbine outlet and the outlet of the first evaporator section in the HRSG. For other combustion turbine exhaust systems without heat recovery, the purge volume shall extend to the stack exit. Substantiation: Gas turbine users and OEMs with HRSG or SCR systems should not need to factor in the exhaust stack for purge volume calculations per intended definition Committee Meeting Action: Accept in Principle Revise text to read as follows: In no case shall the volume in (2) be less than the volume of the HRSG enclosure between the combustion turbine outlet and the outlet of the first evaporator section in the HRSG. For other combustion turbine exhaust systems without heat recovery, the purge volume shall extend to the stack exit. Committee Statement: The TC accepts the proposal of the submitter, noting that the only change proposed is to delete the word exit from section Number Eligible to Vote: 21 Ballot Results: Affirmative: 18 Ballot Not Returned: 3 Balsbaugh, R., Lefton, S., Souers, P Log #73 BCS-HRS Final Action: Accept in Principle in Part ( (4)) Submitter: Randy J. Kleen, General Electric Company Recommendation: Revise text as follows: * 4) Pressures in the two double block and vent pipe sections shall be continuously monitored. If the continuous monitoring is lost or the pressure downstream of the middle block valve decreases to less than 25 3 to 5 psi, in accordance to Manufactures, above the upstream pressure, purge credit is lost and subsequent start of the Combustion Turbine requires a Combustion Turbine Purge prior to light-off in accordance with Substantiation: Request: Revise the language in this section to monitor the downstream cavity High, where instruments have adequate resolution and also to monitor the Low pressure cavity Low sufficient to prove that the low pressure is below the high pressure. Reason 1: The Heavy duty GT team has proposed that the low cavity protection be at 3 to 5 psi based on experience with the transmitters provided and documented Design practices. And has set the high cavity pressure to accommodate GE required proving of blocking medium flow during purge credit formation. Reason 2: Manufactures use highly accurate pressure transmitters that have the ability to close the loop accurately on pressure monitoring points and prove the pressure is maintained 3 to 5 psi continuously. Transmitter accuracy and deployment has been proven based on manufactures experience. Committee Meeting Action: Accept in Principle in Part This proposal has been incorporated into (Log #CP101). Committee Statement: This proposal was in response to action taken during the pre-rop meeting on (Log #CP101), not to any existing text in the 2007 edition of NFPA 85. The TC agrees with the submitter that the threshold pressure should be 3 psid, but did not accept the phrase in accordance with manufacturer s guidance. The TC feels that specifying the minimum differential pressure in the Code is sufficient and all users should defer to manufacturer s instructions if a higher differential pressure is needed for the equipment design. This proposal was incorporated into (Log #CP101). Number Eligible to Vote: 21 Ballot Results: Affirmative: 18 Ballot Not Returned: 3 Balsbaugh, R., Lefton, S., Souers, P Log #83 BCS-HRS Final Action: Accept in Principle ( ) Submitter: Christopher J. Lech, ALSTOM Power Inc., Don Bairley Recommendation: Revise text to read as follows: Fired HRSG A purge of both the HRSG enclosure and the bypass system shall be completed as required in prior to the admission of combustion turbine exhaust gas into HRSG Where HRSG isolation is continuously maintained, the combustion turbine shall be permitted to purge and operate with combustion turbine exhaust through the bypass stack When HRSG isolation is removed, a purge of the HRSG enclosure shall be performed as required by , except as permitted in In the event that the HRSG isolation is disabled and the combustion turbine can continue to be operated with an exhaust temperature at least 56oC (100oF) lower than the auto ignition temperature of fuels designed for use in the specific combustion turbine and duct burner, the combustion turbine exhaust gas at this lower temperature shall be permitted to be used to purge the HRSG If damper(s) operation or other cause(s) results in the exhaust mass flow through the HRSG falling below the purge rate required in 8.8.5, a repurge as required in shall be performed prior to lighting the duct burner When it is desired to bypass the HRSG for a period of time and then return the HRSG to service by means of damper positioning without a power interruption, one of the following conditions shall be met A continuous flow of at least the purge rate of exhaust or fresh air shall be maintained through the HRSG when the combustion turbine is operating The combustion turbine is in operation without trips or misfires and either of the following systems is incorporated and monitored. Option 1. Triple Block/Bleed Fuel System with following on line checks : (1) Continuously monitor position of fuel gas stop and vent valves by an operating control system, if any valve deviates from its assigned position, a re-purge as required in shall be performed. (2) Continuously monitor pressure in the two double block and bleed cavities by an operating control system and if pressure increases above x, burner purge credit is cancelled, a re-purge as required shall be performed. (3) Perform a gas leak test (Bottle Test) prior to each burner start and following each normal shutdown. Test the two gas block valves and the gas vent valve closest to burner element for high leakage during start-up and shutdown by monitoring pressure in gas vent line. Option 2: Triple Block/Bleed valve system with the cavity closest to burner element filled with an inert gas and maintained at a pressure that prevents gas from entering the HRSG (two pressure measurements): (1) Continuously monitor position of fuel gas stop and vent valves by an operating control system and if any valve deviates from its assigned position, a re-purge as required in shall be performed. (2) Pressure inside double block and bleed cavities are monitored continuously by an operating control system and if the pressure in the upstream cavity increases above x or the pressure in the inert gas filled cavity decreases below y, a re-purge as required in shall be performed. Option 3: Triple Block/Bleed valve system with the cavity closest to burner element filled with an inert gas and maintained at a pressure that prevents gas from entering the HRSG (differential pressure measurement): (1) Continuously monitor position of fuel gas stop and vent valves by an operating control system and if any valve deviates from its assigned position, a re-purge as required in shall be performed. (2) Differential pressure between inert gas cavity and vented cavity is

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Heat Recovery Steam Generators Jeanne Moreau DATE: April 23, 2010 SUBJECT: NFPA 85 F10 ROC Letter Ballot The ROC letter ballot

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Pulverized Fuel Systems Jeanne Moreau-Correia DATE: August 5, 2009 SUBJECT: NFPA 85 ROP Letter Ballot The ROP letter ballot

More information

Permitted MSS Emissions Tracking, Recordkeeping, and Reporting. Presented by ACES April 24, 2008

Permitted MSS Emissions Tracking, Recordkeeping, and Reporting. Presented by ACES April 24, 2008 Permitted MSS Emissions Tracking, Recordkeeping, and Reporting Presented by ACES April 24, 2008 1 Agenda Introductions Overview of Current MSS Permitting Program Status Discussion of Model MSS Permit Requirements

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Electrical Equipment

More information

First Revision No. 16-NFPA [ Global Input ] Supplemental Information. Submitter Information Verification. Committee Statement

First Revision No. 16-NFPA [ Global Input ] Supplemental Information. Submitter Information Verification. Committee Statement of 152 2/9/2016 10:48 AM First Revision No. 16-NFPA 87-2015 [ Global Input ] Change document title to: Standard for Fluid Heaters See Word file for changes related to converting the document from a recommended

More information

Thank You for Attending Today s Webinar. Today s Featured Speaker

Thank You for Attending Today s Webinar. Today s Featured Speaker Thank You for Attending Today s Webinar Your Host Mike DeLacluyse President Lesman Instrument Company miked@lesman.com Today s Featured Speaker A.J. Piskor Combustion & Controls Specialist Lesman Instrument

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants the pressure equipment safety authority Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants AB-528 Edition 2, Revision 1 Issued 2016-09-12 Table of

More information

Automatic Valve Proving Control

Automatic Valve Proving Control ISO 9001 Automatic Valve Proving Control 7 696 LDU11 UL recognized FM approved Features Performs leak test of the gas shut-off valves before start-up and/or immediately after burner shut-down No inlet

More information

Valve Proving System VDK 200 A S02

Valve Proving System VDK 200 A S02 Valve Proving System VDK 200 A S02 Valve proving system with the following approvals. UL Recognized File # MH17004 CSA Certified File # 1637485 CSA Requirement No. 4-01 (USA) Technical Information Letter

More information

NBIC Committee Action Block

NBIC Committee Action Block NBIC Committee Action Block Subject File Number Change of Service NB 08 0321 (Inspec) NB 08 0320 (Install) NB 08 0322 (R & A) Prop. on Pg. Proposal Explanation Part 2: Add a new Supplement 9, Requirements

More information

High-Pressure Boiler Inspection Procedures: A Complete Checklist

High-Pressure Boiler Inspection Procedures: A Complete Checklist High-Pressure Boiler Inspection Procedures: A Complete Checklist Inspecting high-pressure boilers is a complex process requiring preparation, planning, and a multitude of safety precautions. Regular inspections

More information

Valve Proving System VDK 200 A S06*

Valve Proving System VDK 200 A S06* Valve Proving System VDK 200 A S06* Valve proving system with the following approvals. UL Recognized File # MH17004 CSA Certified File # 1637485 CSA Requirement No. 4-01 (USA) Technical Information Letter

More information

Inerting System Design for Medium Speed Vertical Spindle Coal Pulverizers TABLE OF CONTENTS

Inerting System Design for Medium Speed Vertical Spindle Coal Pulverizers TABLE OF CONTENTS Inerting System Design for Medium Speed Vertical Spindle Coal Pulverizers The PRB Coal Users Group plans to develop a Design Guide for Mill Inerting as an aid to users when designing a mill inerting system.

More information

Flexibility Enhancements for Gas Turbines

Flexibility Enhancements for Gas Turbines Flexibility Enhancements for Gas Turbines 7/11/2016 Situation Renewable Energy installed capacity is still increasing currently >13% of US total installed capacity. Wind and Solar with their characteristic

More information

HYDROSTATIC LEAK TEST PROCEDURE

HYDROSTATIC LEAK TEST PROCEDURE This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics

More information

RECOMMENDED GOOD PRACTICE

RECOMMENDED GOOD PRACTICE RECOMMENDED GOOD PRACTICE EMERGENCY SHUTDOWN PROCEDURE (ESP) AND PROCEDURE FOR TESTING ESP SYSTEM FOR BLACK LIQUOR RECOVERY BOILERS THE BLACK LIQUOR RECOVERY BOILER ADVISORY COMMITTEE October 2009 Table

More information

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books 1. SCOPE OF BOILER LOGBOOK PROGRAM In all cases, there are minimum tasks and functions for an operator to perform

More information

Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment

Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment The Standard Governing the Storage & Use of Silane: Compressed Gas Association s Publication CGA G-13 2015: Storage

More information

Vortex flowmeters. Product family introduction Principle of operation Product review Applications Key product features

Vortex flowmeters. Product family introduction Principle of operation Product review Applications Key product features Vortex flowmeters introduction Product review s Key product features This document should not be duplicated, used, distributed, or disclosed for any purpose unless authorized by Siemens. Page 1 Vortex

More information

TABLE OF CONTENTS PART 2 - CONFINED SPACES

TABLE OF CONTENTS PART 2 - CONFINED SPACES May 11, 2006 TABLE OF CONTENTS PART 2 - CONFINED SPACES Page DEFINITIONS... 2-1 GENERAL... 2-2 RESPONSIBILITIES... 2-2 HAZARD ASSESSMENT AND WORK PROCEDURES... 2-3 IDENTIFICATION AND ENTRY PERMITS... 2-3

More information

Committee Input No. 59-NFPA [ Section No. 5.9 ]

Committee Input No. 59-NFPA [ Section No. 5.9 ] Committee Input No. 59-NFPA 54-2012 [ Section No. 5.9 ] 5.9 Overpressure Protection Devices. 5.9.1 General 1 Where required. Overpressure Where the serving gas supplier delivers gas at a pressure greater

More information

Lockout/Tagout Training Overview. Safety Fest 2013

Lockout/Tagout Training Overview. Safety Fest 2013 Lockout/Tagout Training Overview Safety Fest 2013 Purpose of Lockout/Tagout The standard covers the servicing and maintenance of machine and equipment in which the unexpected energization or start up of

More information

PGM PREPIPED GAS MANIFOLD

PGM PREPIPED GAS MANIFOLD INSTRUCTIONS PGM PREPIPED GAS MANIFOLD WARNING These instructions are intended for use only by experienced, qualified combustion start-up personnel. Adjustment of this equipment and its components by unqualified

More information

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the 1151 METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS 1.0 Scope and Application. 1.1 Analytes. Analyte Volatile Organic Compounds (VOC) CAS No. No CAS number assigned 1.2 Scope. This method

More information

Instruction Manual Dräger MSI P7 and MSI P7 plus

Instruction Manual Dräger MSI P7 and MSI P7 plus Dräger MSI GmbH Rohrstraße 32 58093 Hagen Tel.: +49-2331 / 9584-0 Fax: +49-2331 / 9584-29 e-mail: info@draeger-msi.de D 923; Edition 2011-01-01 Content 1. General Hints Page 4 2. The Instrument 2.1 Front

More information

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW AC 2010-2145: MEASUREMENT OF HYDROGEN IN HELIUM FLOW Randy Buchanan, University of Southern Mississippi Christopher Winstead, University of Southern Mississippi Anton Netchaev, University of Southern Mississippi

More information

Proposed Uniform Standards for Equipment Leaks

Proposed Uniform Standards for Equipment Leaks 12 th LDAR Symposium May 15-16, 2012 New Orleans, LA Proposed Uniform Standards for Equipment Leaks Standards Certification Education & Training Publishing Conferences & Exhibits 1 Proposed LDAR Uniform

More information

Chapter 2.7 Bylaw sport governance and management

Chapter 2.7 Bylaw sport governance and management Chapter 2.7 Bylaw sport governance and management 2010 International Paralympic Committee Adenauerallee 212-214 Tel. +49 228 2097-200 www.paralympic.org 53113 Bonn, Germany Fax +49 228 2097-209 info@paralympic.org

More information

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard) Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard) APPLICABILITY: This EH&S Instruction applies to UTAS sites worldwide, including contractors working at UTAS facilities. The document

More information

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime CASE STUDY CS15-02 >> Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime What s Inside:» Explore Double Block & Monitor» Increase Operational Safety» Achieve Double

More information

North American Orifice Metering System

North American Orifice Metering System Combustion North American Orifice Metering System 8697 and M8697 Metering Orifices accurately measure gas flows to industrial burners. They are compact, inexpensive, and can be installed in individual

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 30-2013 [ Section No. 21.4.1.1 ] 21.4.1.1 The materials of construction for tanks and their appurtenances shall be compatible with the liquid to be stored. In case of doubt about

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge]

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge] PAGE : 1 / 9 5. CONTAINMENT PURGE (EBA [CSVS]) The Reactor Building purge system comprises the following: A high-capacity EBA system [CSVS] [main purge] A low-capacity EBA system [CSVS] [mini-purge] 5.1.

More information

BASIC OXYGEN FURNACES

BASIC OXYGEN FURNACES GAP.17.4.1 A Publication of Global Asset Protection Services LLC BASIC OXYGEN FURNACES INTRODUCTION Most steelmaking facilities use basic oxygen furnaces (BOFs) to produce molten steel. GAP.17.4.0 describes

More information

FUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016

FUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016 INTRODUCTION Fired equipment such as Heaters and Boilers, normally have to comply with either NFPA 85/86 or API 556 for North America and some other countries which apply such standards, or EN 746-2 for

More information

O.K. Safety first CDN USA. Table of Contents. Approvals. Attention IFGC CSA UL ANSI NFPA

O.K. Safety first CDN USA. Table of Contents. Approvals. Attention IFGC CSA UL ANSI NFPA S06 & S02 Valve Proving System Installation Instructions USA CDN Table of Contents Table of Contents... Page 1 Approvals... Page 1 Attention... Page 1 Specification... Page 2 Mounting.... Page 3 Wiring...

More information

ISO INTERNATIONAL STANDARD. Small craft Liquefied petroleum gas (LPG) systems

ISO INTERNATIONAL STANDARD. Small craft Liquefied petroleum gas (LPG) systems INTERNATIONAL STANDARD ISO 10239 Second edition 2008-02-15 Small craft Liquefied petroleum gas (LPG) systems Petits navires Installations alimentées en gaz de pétrole liquéfiés (GPL) Reference number ISO

More information

EDUCATION DEPARTMENT ACCU-TEST

EDUCATION DEPARTMENT ACCU-TEST ABN 17 100 208 964 EDUCATION DEPARTMENT ACCU-TEST GAS SAFETY SHUT OFF SYSTEM Operating & Installation Manual Head Office (Melbourne) Sydney Brisbane (Distributor) 1/5 Samantha Court 2/14 Welder Road 17

More information

Model PDT Dewpoint Transmitter

Model PDT Dewpoint Transmitter Model PDT Dewpoint Transmitter Instruction Manual Alpha Moisture Systems Alpha House 96 City Road Bradford BD8 8ES England Tel: +44 1274 733100 Fax: +44 1274 733200 email: mail@amsytems.co.uk web: www.amsystems.co.uk

More information

G REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED SYSTEM PROTECTIVE DEVICES

G REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED SYSTEM PROTECTIVE DEVICES LAST REVIEW DATE: REVIEW CYCLE: 6/22/11 5 Years SPECIFICATION: TITLE: VOLUME: G-2040-9 REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED 4 and Gas Blue Book REVISIONS: (See

More information

Energy Control Procedures Lockout/Tagout 29 CFR

Energy Control Procedures Lockout/Tagout 29 CFR Energy Control Procedures Lockout/Tagout 29 CFR 1910.147 Paul Schlumper, PE, CSP Georgia Tech Research Institute What is covered? Servicing and maintenance Normal production operations where: Employees

More information

CONTROL VALVE SEAT LEAKAGE

CONTROL VALVE SEAT LEAKAGE ANSIIFCI 70-2-2006 AMERICAN NATIONAL STANDARD CONTROL VALVE SEAT LEAKAGE \D o N I N I o ~ H U ~ H [/) ~ Fluid Controls Institute, Inc. Spo~sor: Fluid Controls institute, inc. 1300 Sumner Ave Cleveland,

More information

Job Number Plant Location 123 Roadrunner Avenue, Tombstone, AR Fuel Devices

Job Number Plant Location 123 Roadrunner Avenue, Tombstone, AR Fuel Devices Combustion Services Safety Survey ETRO SERVICES Incorporated Customer Acme Incorporated Contact Name W. E. Coyote Job Number 5380 Plant Location 23 Roadrunner Avenue, Tombstone, AR 56884 Plant Name Test

More information

JOSOP 603 flaring and venting Standard

JOSOP 603 flaring and venting Standard JOSOP 603 flaring and venting Standard Dec, 2010 Approved December 29, 2010 Version 01 Posted February 3, 2011 Table of Contents 1.0 Purpose, Objectives and Scope... 3 1.1 Purpose... 3 1.2 Objective...

More information

Temperature Controllers

Temperature Controllers IM0004 April 2013 CONTENTS T-12 Thermostat PAGE Introduction 1 Scope 1 Description 1 Specification 1 Temperature Controllers 2 INTRODUCTION CAUTION Prior to installing, the instructions provided herein

More information

TEST SPECIFICATION NYT-909-C

TEST SPECIFICATION NYT-909-C 748 Starbuck Ave, Watertown, NY 13601 Phone: +1-315-786-5200 Engineering Fax: +1-315-786-5673 TEST SPECIFICATION NYT-909-C CODE OF TESTS FOR TESTING "AB" TEST RACK P/N 702546 & 702612 ISSUE NO. 5 1.0 THE

More information

INSTALLATION & OPERATION MANUAL FOR Stockpot Range

INSTALLATION & OPERATION MANUAL FOR Stockpot Range INSTALLATION & OPERATION MANUAL FOR Stockpot Range MODELS MLS VSP100 ML-052822 VSP200 ML-052823 VSP200F ML-769292 www.vulcanhart.com MODELS MLS WSPR1 ML-760600 WSPR2 ML-760601 WSPR2F ML-769292 www.wolfrange.com

More information

I am transmitting to you herewith the following decision of the Standards Council.

I am transmitting to you herewith the following decision of the Standards Council. August 8, 2006 Joseph Sternola Permagas, Inc. 2317 N. Machias Road Lake Stevens, WA 98258 Re: IAPMO Standards Council Decision TIA UPC-016-06 Decision Date: August 8, 2006** Uniform Plumbing Code Dear

More information

NFPA 1124, Code for the Manufacture, Transportation, Storage, and Retail Sales of Fireworks and pyrotechnic Articles, 2006 edition.

NFPA 1124, Code for the Manufacture, Transportation, Storage, and Retail Sales of Fireworks and pyrotechnic Articles, 2006 edition. NFPA 5000-2012 and Proposed 2015 Edition Building Construction and Safety Code TIA Log No. 1139 Reference: Various Comment Closing Date: May 16, 2014 Submitters: Gary Keith, FM Global TIA language for

More information

To ensure compliance to WorkSafeBC Regulation Part 9 Confined Space Entry which states:

To ensure compliance to WorkSafeBC Regulation Part 9 Confined Space Entry which states: Manufacturing SS No. 4 Safety Standard Confined Space Purpose: These procedures were developed to protect employees from the serious hazards associated with.entering and working within confined spaces.

More information

Industrial furnaces and associated processing equipment Safety. Part 3: Generation and use of protective and reactive atmosphere gases

Industrial furnaces and associated processing equipment Safety. Part 3: Generation and use of protective and reactive atmosphere gases Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 13577-3 First edition 2016-09-15 Industrial furnaces and associated processing equipment Safety Part 3: Generation and use of protective and reactive

More information

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING

More information

September 2018 Pressure Test

September 2018 Pressure Test September 2018 Pressure Test The requirements for a pressure test are found in NFPA 54, Chapter 8, Sections 8.1-8.1.53 of the 2012 edition. A pressure test shall not be confused with a leak check. The

More information

Frequently Asked Questions Directive 056 Facilities Technical

Frequently Asked Questions Directive 056 Facilities Technical Frequently Asked Questions Directive 056 Facilities Technical October 2017 This document clarifies and supports some of the technical requirements related to Directive 056: Energy Development Applications

More information

SEMS II: BSEE should focus on eliminating human error

SEMS II: BSEE should focus on eliminating human error SEMS II: BSEE should focus on eliminating human error How US companies can prevent accidents on start-ups and shut-downs by using valve interlocks The proposed changes to BSEE s SEMS (Safety and Environmental

More information

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY Page 1 of 9 ISSUED: 5/00 REVISED: 08/06 Introduction Purpose: In accordance with applicable regulations and Temple University, this policy was developed to minimize exposure to Ethylene Oxide. Applicability

More information

Avoiding Short Term Overheat Failures of Recovery Boiler Superheater Tubes

Avoiding Short Term Overheat Failures of Recovery Boiler Superheater Tubes Avoiding Short Term Overheat Failures of Recovery Boiler Superheater Tubes Dr. Andrew K. Jones International Paper Tim Carlier Integrated Test and Measurement 2017 International Chemical Recovery Conference

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Respiratory

More information

IS YOUR FLAP VALVE IN COMPLIANCE WITH NFPA ?

IS YOUR FLAP VALVE IN COMPLIANCE WITH NFPA ? IEP Technologies 417-1 South Street, Marlborough, MA, 01752 ph 855.793.8407 fax 508.485.3115 www.ieptechnologies.com IS YOUR FLAP VALVE IN COMPLIANCE WITH NFPA 69-2014? Introduction Dust explosions can

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure C. ASSEMBLIES Guideline C-03 Guideline related to: Article 4 paragraph 2 The effect of the derogation in Article 4 paragraph 2 from the introductory paragraph in the same article is not clear. In the circumstances,

More information

GAS FUEL VALVE FORM AGV5 OM 8-03

GAS FUEL VALVE FORM AGV5 OM 8-03 ALTRONIC AGV5 OPERATING MANUAL GAS FUEL VALVE FORM AGV5 OM 8-03 WARNING: DEVIATION FROM THESE INSTALLATION INSTRUCTIONS MAY LEAD TO IMPROPER ENGINE OPERATION WHICH COULD CAUSE PERSONAL INJURY TO OPERATORS

More information

An Urgent Bulletin from CSA Group

An Urgent Bulletin from CSA Group An Urgent Bulletin from CSA Group Gas Products No. 335 (Supersedes Notice Gas Products No. 270, Ref No: N12-055) Effective Date: October 1, 2015 Date: July 21, 2014 Apply Before February 2, 2015 Announcing:

More information

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel TANK MANAGER FOR TWO TANKS OPERATING MANUAL 10/31/11 C-More T6C L color touch panel 1 TABLE OF CONTENTS GENERAL...3 INSTALLATION...4 STONE TEST PROCEDURE...7 OPERATIONAL SUMMARY...7 AUTO CARBONATION...10

More information

Tank Blanketing. Application Jordan Valve Product Offering Competition

Tank Blanketing. Application Jordan Valve Product Offering Competition Tank Blanketing Application Jordan Valve Product Offering Competition What is Tank Blanketing? Padding the process of filling the empty space of a liquid storage tank with an inert gas, most likely Nitrogen

More information

SPECIFICATIONS ATTENTION

SPECIFICATIONS ATTENTION VPS 504 S06 Installation Manual - P/N 80122 - Ed. 01/09 VPS 504 S06 and S05 Valve Proving System Installation Instructions VPS 1 6 Gases Natural gas, air and other inert gases. NOT suitable for butane

More information

Ventam 85 Installation & Commissioning Instructions

Ventam 85 Installation & Commissioning Instructions Ventam Systems Ltd Unit D4 Seedbed Business Centre Vanguard Way Shoeburyness Essex SS3 9QY Phone 01702 382 307 Fax 01702 382 340 Ventam 85 Installation & Commissioning Instructions 1 General The Ventam

More information

Supplementary Operator s Manual 42/24-14 EN Rev. 3

Supplementary Operator s Manual 42/24-14 EN Rev. 3 Advance Optima Continuous Gas Analyzers AO2000 Series with Uras26, Magnos206, Caldos25, Caldos27 Designed per Category 3G for Measurement of Flammable Gases ( Safety Concept ) and Non-flammable Gases Supplementary

More information

DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES

DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES NOTE: Each proposed Denver amendment to the International Codes must be justified. In order to be considered, the amendment proposal must address climate,

More information

Safe Work Practices (SWP) SWP (3) CONFINED SPACE ENTRY

Safe Work Practices (SWP) SWP (3) CONFINED SPACE ENTRY SWP (3) CONFINED SPACE ENTRY The below information has been derived from BC WSBC OHS Regulations, standards and guidelines. If working outside of BC in a confined space, the work jurisdictions OHS Regulations/Codes

More information

MSC Guidelines for Carbon Dioxide Fire Suppression Systems

MSC Guidelines for Carbon Dioxide Fire Suppression Systems C. J. Robuck, LCDR, Chief, Engineering Division References a. Title 46 CFR 34.15 (Subchapter D) b. Title 46 CFR 76.15 (Subchapter H) c. Title 46 CFR 95.15 (Subchapter I) d. Title 46 CFR 108.431 (Subchapter

More information

Confined Space for Construction

Confined Space for Construction Confined Space for Construction 1926 New Standard This standard will be effective on August 3, 2015. OSHA estimated adherence to the standard will annually prevent 780 lost workday injuries and 5.2 fatalities,

More information

FV Flash Vessel Installation and Maintenance Instructions

FV Flash Vessel Installation and Maintenance Instructions 4041050/5 IM-P404-10 EMM Issue 5 FV Flash Vessel Installation and Maintenance Instructions 1. Safety information 2. Specific product safety information 3. Product information 4. Installation 5. Commissioning

More information

Pressure and/or Temperature Pilot Operated Steam Regulators Series 2000

Pressure and/or Temperature Pilot Operated Steam Regulators Series 2000 Hoffman Specialty Regulators Regulators Pressure and/or Temperature Operated Regulators Series 2000 The Hoffman Specialty Series 2000 consists of main valves, pilot valves, wells and hardware kits. They

More information

Confined Space Entry Safety Program

Confined Space Entry Safety Program Confined Space Entry Safety Program Table of Contents SCOPE...2 DEFINITIONS..2 PROGRAM ELEMENTS...3 SPACE EVALUATION...4 IDENTIFICATION AND CLASSIFICATION...4 POSTING...4 RECLASSIFICATION OF PERMIT SPACE...4

More information

American National Standard

American National Standard American National Standard ANSI/AAMI/ ISO 10079-1:1999 Medical Suction Equipment Part I: Electrically Powered Suction Equipment Safety Requirements This document was approved and published when the U.S.

More information

Confined Space Entry

Confined Space Entry Confined Space Entry Purpose The purpose of this document is to establish methods to identify confined spaces, classify them according to their risks, and establish guidelines necessary for the safe preparation,

More information

T 2523 EN Type 2406 Excess Pressure Valve Self-operated Pressure Regulators ANSI version

T 2523 EN Type 2406 Excess Pressure Valve Self-operated Pressure Regulators ANSI version T 2523 EN Type 2406 Excess Pressure Valve Self-operated Pressure Regulators ANSI version Application Excess pressure valve for set points from 0.075 to 150 psi (5 mbar to 10 bar) Valve size NPS ½ to 2

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Piping Systems

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

API Piping Plan 62: A Reliable Quench System

API Piping Plan 62: A Reliable Quench System MAY05PUMPS&SYSp24-33 4/19/05 4:04 PM Page 24 It s one of the few methods you have to control the environment outside a mechanical seal. By Keith Schindler, PE, Schindler Engineering, Inc., and Paul McMahan,

More information

Ocean Observatories Initiative. Coastal & Global Scale Nodes. Hydrogen Safety. OOI Surface Mooring Hydrogen Safety Review

Ocean Observatories Initiative. Coastal & Global Scale Nodes. Hydrogen Safety. OOI Surface Mooring Hydrogen Safety Review Ocean Observatories Initiative Coastal & Global Scale Nodes Hydrogen Safety CP01 Mooring Timeline: 21 November 2013: CP01CNSM was deployed and transitioned to shore controlled operations. 17 Feb. 2014:

More information

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Operating Procedures for the NPDGamma Liquid Hydrogen Target V0.03 11/26/05 1 DRAFT Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Version 0.03 November 26, 2005

More information

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00 D R A F T Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13 Version 1.00 October 06, 2010 Operating Procedures for the NPDGamma Liquid Hydrogen Target V1.00 6/10/10 2 Table of Content

More information

Petro-Chemical & Analyzer Sampling Systems

Petro-Chemical & Analyzer Sampling Systems Petro-Chemical & Analyzer Sampling Systems Pressure control solutions for your industry. The Tescom brand offers a comprehensive range of regulators, valves and changeover systems that are ideal for analyzer

More information

SUMMARY STEPS TO CERTIFY ACOUSTIC DUCT SILENCER PERFORMANCE UNDER AMCA INTERNATIONAL S CERTIFIED RATINGS PROGRAM

SUMMARY STEPS TO CERTIFY ACOUSTIC DUCT SILENCER PERFORMANCE UNDER AMCA INTERNATIONAL S CERTIFIED RATINGS PROGRAM AMCA International Member Logo cannot be used in catalogs containing performance data. AMCA International Corporate Identity Logo can only be used by AMCA International, Inc. SUMMARY STEPS TO CERTIFY ACOUSTIC

More information

Transport of gas tanks for motor vehicles

Transport of gas tanks for motor vehicles United Nations Secretariat ST/SG/AC.10/C.3/2016/51 Distr.: General 30 August 2016 Original: English Committee of Experts on the Transport of Dangerous Goods and on the Globally Harmonized System of Classification

More information

ISO INTERNATIONAL STANDARD. Hydraulic fluid power Filter elements Determination of resistance to flow fatigue using high viscosity fluid

ISO INTERNATIONAL STANDARD. Hydraulic fluid power Filter elements Determination of resistance to flow fatigue using high viscosity fluid INTERNATIONAL STANDARD ISO 23181 First edition 2007-08-15 Hydraulic fluid power Filter elements Determination of resistance to flow fatigue using high viscosity fluid Transmissions hydrauliques Éléments

More information

Petro-Chemical & Analyzer Sampling Systems

Petro-Chemical & Analyzer Sampling Systems Petro-Chemical & Analyzer Sampling Systems Pressure control solutions for your industry. The Tescom brand offers a comprehensive range of regulators, valves and changeover systems that are ideal for analyzer

More information

Mooney * Noise Controller Installation, Operation, and Maintenance Manual

Mooney * Noise Controller Installation, Operation, and Maintenance Manual GE Oil & Gas Mooney * Noise Controller Installation, Operation, and Maintenance Manual imagination at work Scope This manual provides instructions for installation, operation and maintenance of the Mooney

More information

TECHNICAL DATA Q= C. Table 1 - Specifications

TECHNICAL DATA Q= C. Table 1 - Specifications September 25, 2013 Pressure Regulation 537a 1. Description The Model B-3 Pilot Operated Pressure Control Valve is a factory assembled unit. The unit consists of a Model J-2 Halar coated Flow Control Valve,

More information

2012 Fall Revision Cycle. Report on Proposals. A compilation of NFPA Technical Committee Reports on Proposals for public review and comment

2012 Fall Revision Cycle. Report on Proposals. A compilation of NFPA Technical Committee Reports on Proposals for public review and comment 2012 Fall Revision Cycle Report on Proposals A compilation of NFPA Technical Committee Reports on Proposals for public review and comment Public Comment Deadline: March 2, 2012 NOTE: The proposed NFPA

More information

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology Jim Woodard Vice President of Sales Bryant Woods Lead Project Engineer 4/3/18 Page 1 Objectives Impact

More information

Eclipse Extern-A-Therm Recuperators

Eclipse Extern-A-Therm Recuperators Design Guide 540 3/9/2009 Eclipse Extern-A-Therm Recuperators Models 300 MA - 2500 MA Copyright Copyright 2007 by Eclipse, Inc. All rights reserved worldwide. This publication is protected by federal regulation

More information

IRB MEETING ADMINISTRATION

IRB MEETING ADMINISTRATION 1. POLICY Steering Committee approved / Effective date: 9/11/15 Except when an expedited review procedure is appropriate or an exemption determination may be made, the IRB will review proposed research

More information

ISO INTERNATIONAL STANDARD. Flow-metering devices for connection to terminal units of medical gas pipeline systems

ISO INTERNATIONAL STANDARD. Flow-metering devices for connection to terminal units of medical gas pipeline systems INTERNATIONAL STANDARD ISO 15002 Second edition 2008-07-01 Flow-metering devices for connection to terminal units of medical gas pipeline systems Dispositifs de mesure de débit pour raccordement aux prises

More information

SB AXIAL FLOW VALVES

SB AXIAL FLOW VALVES SB9509.3 AXIAL FLOW VALVES The improved technology for pressure regulation The American Axial Flow Valve provides pressure and flow control in high capacity pipelines. It can be used for pressure regulation,

More information

TEST SPECIFICATION NYT-677-C

TEST SPECIFICATION NYT-677-C TEST SPECIFICATION NYT-677-C CODE OF TESTS FOR TESTING KM-2 VENT VALVE PORTION, PC. 748715 (DWG. VV-389) (AB TEST RACK) ISSUE NO. 2 WARNING: HIGH PRESSURE AIR IS PRESENT IN THE TEST RACK AND ASSEMBLY BEING

More information

Incorrect installation, adjustment, or misuse of this burner could result severe personal injury, or substantial property damage.

Incorrect installation, adjustment, or misuse of this burner could result severe personal injury, or substantial property damage. Operating instructions GB VD Burners Incorrect installation, adjustment, or misuse of this burner could result severe personal injury, or substantial property damage. To the Equipment Owner: Please read

More information