Engineering Technical Report 128. Risk Assessment for BT Operators Working In a ROEP Zone. Draft for Approval

Size: px
Start display at page:

Download "Engineering Technical Report 128. Risk Assessment for BT Operators Working In a ROEP Zone. Draft for Approval"

Transcription

1 Engineering Technical Report Risk Assessment for BT Operators Working In a ROEP Zone Draft for Approval

2 2006 Energy Networks Association All rights reserved. No part of this publication may be reproduced, stored in retrieval or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written consent of Energy Networks Association. Specific enquiries concerning this document should be addressed to: Engineering Directorate Energy Networks Association 18 Stanhope Place Marble Arch London W2 2HH This document has been prepared for use by members of the Energy Networks Association to take account of the conditions which apply to them. Advice should be taken from an appropriately qualified engineer on the suitability of this document for any other purpose.

3 Page 3 CONTENTS Foreword Scope DEFINITIONS ROEP Magnitude Phase to Earth Faults Risk Assessment Procedure Risk Assessment Procedure Proportion of Time in ROEP zone working on a cable Calculation for metallic cables serving third parties within a ROEP zone Probability of heart fibrillation (PFB) Exposure hand to feet Exposure hand to seat/knees Exposure Hand to Hand Probability of Exposure (P E ) Probability of Fault (P F ) Individual Risk Level (IR) Conclusions References Appendix A - DISTRIBUTION SYSTEM FAULT RATES AND DURATIONS Introduction Fault Statistics NAFIRS DNO Fault Records (HV) Impact on ETR 128 (BT Operators) EHV Substations HV Substations Conclusions References FIGURES Figure 1a Illustration of transferred potential hazard within ROEP zone... 4 Figure 1b Plan view of hypothetical substation illustrating ROEP contours... 5 Figure 6.2 Cable terminating within a ROEP zone Figure A1 - Number of earth faults versus the percentage of theoretical maximum ROEP.. 16 TABLES Table Probability threshold voltages hand to feet Table Probability threshold voltages hand to seat/knees Table Probability threshold voltages hand to hand... 11

4 Page 4 RISK ASSESSMENT FOR BT OPERATORS WORKING IN A ROEP ZONE FOREWORD This Report has been prepared by a joint working group of Accenture HR services on behalf of British Telecommunications and the Energy Networks Association (ENA). This report considers hazards to BT operators in the vicinity of electricity company substations and/or generating stations. For the purposes of this report all such sites are referred to as substations. These hazards arise from potential differences (due to ROEP caused by an earth fault in the substation) between metallic service components (conductors, cable sheaths etc) or between these components and ground. The approach adopts the principles established in ITU-T K33 and is consistent with national health and safety legislation, in particular The Management of Health and Safety at Work Regulations This risk assessment is solely for use by members of the ENA and BT and no responsibility is accepted for its use by other parties. 1 SCOPE This report considers hazards to BT operators working on BT services to third parties from transferred potentials in the ROEP zone of an electricity substation. Figure 1a illustrates how a transferred potential hazard can arise and Figure 1b illustrates ROEP contours at a hypothetical substation. NOTE The ROEP contours shown in Figure 1b should not be taken as representative of any particular substation. Figure 1a Illustration of transferred potential hazard within ROEP zone Hazards to BT operators within a substation or hazards associated with cables serving a substation are not considered, since these are managed through the use of appropriate

5 Page 5 equipment and work procedures. Hazards to BT operators within an exchange sited within a ROEP zone are also not considered. Hazards to third parties using equipment connected to BT lines are considered in a separate document. This assessment includes both fast fault clearance and slow fault clearance times. This report considers the hazard to persons arising from electric shock. Secondary risks associated with electric shock, i.e. falls are not considered. Figure 1b Plan view of hypothetical substation illustrating ROEP contours

6 Page 6 2 DEFINITIONS Rise Of Earth Potential or ROEP The voltage set up between substation metalwork and true earth potential due to fault current ROEP Zone The zone within which the ROEP may exceed 650V (fast fault clearance) or 430V (slow fault clearance). Individual Risk Probability of fatality of an individual per annum Electricity Company Companies responsible for electricity transmission, distribution or generation at 33kV and above. Fast fault clearance <200ms on average Slow fault clearance >200ms and on average 500ms P FB Probability of heart fibrillation P E Probability of exposure P F Probability of an earth fault which gives rise to significant ROEP

7 Page 7 3 ROEP MAGNITUDE ROEPs quoted are rms values. However, a maximum initial offset of 2.8 times the rms value will occur where the fault is initiated very close to current zero, and where the electrical system inductive reactance is very much greater than its resistance. Statistically, the likelihood of a fully offset waveform is therefore low. However, in this assessment, a maximum electrical system resistance/inductive reactance ratio (X/R) of 14 is used for this assessment. This corresponds to an initial offset current of 2.74 times the rms value, i.e. approaching the maximum value. Insulation breakdown voltages used in this assessment are rms values i.e. the peak withstand is 1.42 times the rms value. Therefore to allow for the offset the quoted breakdown voltages are reduced by a factor 2.74/1.42 = Since the probabilities of heart fibrillation are based on the energy content of a symmetrical current waveform, it is necessary to establish an equivalent rms value of the asymmetrical current waveform. IEEE 80 provides a means of calculating a decrement factor Df by which the rms value can be multiplied to account for asymmetry as follows: Df = Ta 1+ tf 2tf [ 1 e ] Ta where Ta is the offset time constant i.e. X/2πfR in seconds tf is the time duration of the fault in seconds For a fault duration of 200ms and an X/R ratio of 14, Df is approximately equal to 1.2. This factor is therefore taken into account in the determination of the probability of heart fibrillation.

8 Page 8 4 PHASE TO EARTH FAULTS For substations with equipment having fast clearance times, the probability of a fault (P F ) is estimated to be 0.5 faults per year for substations having fast fault clearance times and 1.0 fault per year for substations having slow fault clearance times. It is recognised that fault rates will vary depending on substation size, location, feeding arrangements etc. but it is considered sufficiently representative for the purposes of this assessment. It is also necessary to consider the average fault clearance time. It is estimated that for slow fault clearance the average clearance time is 500ms and for fast fault clearance the average clearance time is 200ms.

9 Page 9 5 RISK ASSESSMENT PROCEDURE A review of the work activities undertaken by BT operators was carried out. However, rather than subject all these to specific assessment, it was decided to chose an activity resulting in the greatest exposure to ROEP hazards, i.e. cable termination. An estimate of circuit resistances/breakdown voltages for the cable termination activity was made. The circuit current is determined by dividing the ROEP by the total circuit resistance. The probability of fibrillation (P FB ) is determined according to IEC The probability of exposure (P E ) is estimated from a knowledge of operator working practices. Using this information along with the probability of a fault (P F ) it is possible to estimate the level of individual risk. The calculations assume the worst case combination of potentials e.g. at a cable joint, remote earth potential is assumed to appear on the cable and the ground local to the cable is assumed to be at ROEP. The intolerable risk threshold level used is 1 in 10,000, which is 10 times lower than that advocated by the HSE for workers.

10 Page 10 6 RISK ASSESSMENT PROCEDURE 6.1 Proportion of Time in ROEP zone working on a cable It is necessary to consider the proportion of time a BT operator may spend working within a ROEP zone (excluding within a substation itself or on cables serving the substation). It is assumed that all substations (33kV and above) have ROEP zones extending to 100m i.e. an area of approximately 31,416m 2. It is also assumed that the total number of substations at 33kV and above is 3,000. The total area affected by ROEP is therefore 3,000 x 31,416m 2 = 9.4 x10 7 m 2. According to the Department for the Environment the total land area for the UK is 24,093,000 hectares (1 hectare = 10,000m 2 ). Therefore the proportion of land affected by ROEP is 32, x = 0.04% (approximately). 6.2 Calculation for metallic cables serving third parties within a ROEP zone ROEP zone Third Party Property Exchange Metallic cable Figure 6.2 Cable terminating within a ROEP zone The situation where a cable terminates within a ROEP zone is illustrated in Figure 6.2. Here the cable supplies a third party property within the zone and an operator is required to work on the cable at or near to the property Probability of heart fibrillation (PFB) Exposure hand to feet It is assumed that the operator is standing and wearing work boots or shoes with elastomer sole. The resistance of dry footwear is taken to be 2MOhms under dry conditions and 30kOhms under wet conditions. The resistance of 30kOhms dominates the exposure circuit and hence no additional resistances need be considered. The threshold levels of voltage corresponding to heart fibrillation can be determined from IEC Figure 14, for a heart current factor 1.0, a circuit resistance of 30kOhms and an offset factor of 20% and these are summarised in Table

11 Page 11 % Probability of fibrillation 200ms fast fault clearance threshold (V) 500ms slow fault clearance threshold (V) 0 8,750 2, ,000 5, ,750 12,500 Table Probability threshold voltages hand to feet The threshold voltages in Table 1 are relatively high and therefore the risks are considered negligible. The exposure scenario hand to feet can therefore be eliminated from the assessment Exposure hand to seat/knees For the current path hand to knees or hand to seat, the threshold levels of voltage corresponding to heart fibrillation can be determined from IEC Figure 14, for a heart current factor 0.7, a circuit resistance of 650Ohms and an offset factor of 20% and these are summarised in Table % Probability of fibrillation 200ms fast fault clearance threshold (V) 500ms slow fault clearance threshold (V) Table Probability threshold voltages hand to seat/knees Since the threshold voltages in Table are relatively low, the probability of heart fibrillation is pessimistically assumed to be 100% irrespective of voltage level. NOTE This analysis assumes no insulating layer between seat/knees and the inducing potential. In reality this is unlikely for two reasons: Firstly many work sites will be on hardstanding e.g. tarmac or concrete which will provide considerable insulation and secondly operators will be using suitable work equipment i.e. wearing appropriate clothing and may be using stools or mats Exposure Hand to Hand For the current path hand to hand, the threshold levels of voltage corresponding to heart fibrillation can be determined from IEC Figure 14, for a heart current factor 0.4, a circuit resistance of 650Ohms and an offset factor of 20% and these are summarised in Table % Probability of fibrillation 200ms fast fault clearance threshold (V) 500ms slow fault clearance threshold (V) Table Probability threshold voltages hand to hand The threshold voltages in Table 3 are significantly higher than those in Table 2 indicating a lower likelihood of fibrillation for this condition. Furthermore, for hand hand exposure to occur there would have to be ROEP on one side of the termination and remote earth on the other which is unlikely to happen. This is because of the inherent isolation provided by third

12 Page 12 party equipment between the incoming line and local LVAC supply. For more information on this aspect see BS EN Probability of Exposure (P E ) The probability of exposure (P E ) is therefore equal to 4 x 10-4 x 0.25 x 7.6 x 10-3 = 7.6 x Probability of Fault (P F ) The probability of a fault (P F ) is estimated to be 0.5 faults per year for substations having fast fault clearance times and 1.0 fault per year for substations having slow fault clearance times (see Section 4) Individual Risk Level (IR) The individual risk level is determined as follows: IR = P F x P E x P FB 0.5 x 7.6 x 10-7 x 1.0 = 3.8 x 10-7 or 1 in 2,600,000 approx (fast clearance). 1.0 x 7.6 x 10-7 x 1.0 = 7.6 x 10-7 or 1 in 1,300,000 approx (slow clearance).

13 Page 13 7 CONCLUSIONS The calculated risk level for a BT operator working on a metallic cable serving a third party within a ROEP zone is approximately 1 in 2,600,000 (fast clearance) and 1 in 1,300,000 approx (slow clearance). These risk levels lie in the Acceptable Region as defined by the HSE and therefore additional control measures are not justifiable. There are however a number of additional aspects which should be taken into account: Where an operator has to undertake a task requiring a long period of time spent in a ROEP zone, for example to repair a trunk cable passing through a zone, the exposure may be increased. However, the number of metallic trunk cables are few and reducing in number which helps to offset the increased exposure. Also, the proportion of land affected by ROEP may, in some geographical areas, be greater than that calculated in Section 6.1. For example, high ground resistivity in areas such as North Wales may result in larger ROEP zones, which could increase operator exposure. On the other hand, the risk assessment is pessimistic in that the protective effect of insulation between seat/knees and the ground provided by work equipment has not been included in the assessment. This would normally be some form of waterproof clothing, waterproof sheet or stool etc. Use of this equipment is expected to substantially reduce the individual risk level.

14 Page 14 8 REFERENCES ITU-T K33 Limits for people safety related to coupling into telecommunications system from ac electric power and ac electrified railway installations in fault conditions 1996 The Management of Health and Safety at Work Regulations 1999 ETR129, ROEP risk assessment for third parties using equipment connected to BT lines, Joint Working Group of Energy Networks Association and Accenture HR Services (on behalf of British Telecommunications). ISIS Practice Cabling and Wiring at Electricity Stations EPT/PPS/B013, issue 2, British Telecommunications, 1996 IEEE Standard 80 Guide for safety in AC substation grounding 2000 NGC document - Risk Assessment associated with Ground Potential Rise at National Grid Substation Sites, draft issue 2. IEC Effects of current on human beings and livestock Reducing Risks, Protecting People, HSE Digest of Environmental Statistics, Department for Environment, June 2003 ISIS Practice Working Practices at Electricity Stations EPT/PPS/B014, issue 1, British Telecommunications, 1992 BS EN Specification for safety of information technology equipment, including electrical business equipment.

15 Page 15 APPENDIX A - DISTRIBUTION SYSTEM FAULT RATES AND DURATIONS Introduction The analysis within this document and Engineering Technical Report 129 uses fault rates of 0.5 and 1.0 faults per year corresponding to fast and slow average fault clearance times of 200ms and 500ms respectively. It is recognised that the latter fault rate of 1.0 per year is not necessarily typical of UK Distibution Networks. It could therefore be argued that the resultant voltage thresholds for Rise of Earth Potential (ROEP) are not strictly applicable to DNO Distribution Systems. However, the following analysis provides justification that the threshold of 1150V determined within the ETRs can be applied to Distribution Networks to provide safe working for BT (Telecom) operatives and third parties using BT (Telecom) equipment to define safe working zones around substations. The rationale for this reasoning is as follows. Fault Statistics NAFIRS NAFIRS fault data shows the overhead line five year average fault rate up to 2003/2004 for all DNOs as HV (up to 11kV) = 8.2 Faults/100km/Year EHV (above 11kV) = 3.3 Faults/100km/Year Ofgem Information and Incentives (IIP) Benchmark Data shows that the average HV feeder length for the UK DNOs = 30km. This information is not available under IIP for EHV circuits but it is reasonable to use the Southern Electric figure which is = 20km. Per feeder this then equates to HV = 8.2x0.3 = 2.5 Faults/Year EHV = 3.3x0.2 = 0.66 Faults/Year We must also account for the possibility that these feeders will go through an auto-reclose sequence before lockout. If we assume on average 3 reclosures per fault the number of faults per feeder become HV = 4x2.5 = 10 Faults/Year EHV = 4x0.66 = 2.64 Faults/Year Of course not all faults will be to earth. DNO figures suggest that as many as 80% of overhead line faults are to earth and this means that the number of faults with possible ROEP impact are HV = 0.8x10 = 8 Faults/Year EHV = 0.8x2.64 = 2.11 Faults/Year For the total earth faults affecting an individual substation we must multiply this value by the average number of feeders connected to it. It is reasonable to assume there are on average 2 EHV Feeders and 3 HV Feeders connected. HV = 8x3 = 24 Faults/Year EHV = 2x2.11 = 4.22 Faults/Year

16 Page 16 DNO Fault Records (HV) A fault monitor at a typical DNO HV substation recorded 34 HV earth faults during a year, which is of the same order as the foregoing NAFIRS derived result. Analysis of these faults gave an average fault clearance time of 715ms. Although longer than the fault duration used in the analysis in this document and ETR 129, it is not high enough to significantly affect the outcome. Figure A1 shows the number of earth faults versus the percentage of theoretical maximum ROEP. The theoretical maximum corresponds to that which would be calculated by the distribution company following an earthing assessment at the site. It should be borne in mind that in determining the ROEP at a particular substation, the earth resistance or impedance (found by measurement and/or modelling) is multiplied by the theoretical maximum earth return current (often with an additional safety factor). This calculated ROEP will be compared against the new 1150V recommended safety threshold voltage and mitigation applied where this is exceeded. The residual risk therefore arises from ROEP events having voltage magnitudes within a statistical fault distribution which cannot exceed 1150V. From figure A1 it can be seen that 94% (32 out of 34) of faults do not exceed 40% of the maximum theoretical value. The average percentage of the maximum theoretical ROEP is 26%, which corresponds to a 50% Probability of Heart Fibrillation in ETR 128 (see section ). This means that rather than using a 100% Probability of Fibrillation as pessimistically adopted in the ETR, it is justifiable to use 50% Number of Faults % of Theoretical Max ROEP Figure A1 - Number of earth faults versus the percentage of theoretical maximum ROEP Impact on ETR 128 (BT Operators) In section the determined quantified Individual Risk (IR) level is 1 in 1,300,000 which is based on a Probability of Heart Fibrillation of 100% and a fault frequency of 1 per annum.

17 Page 17 EHV Substations Assuming a similar statistical fault distribution for EHV substations as for HV substations results in a reduction in the probability of heart fibrillation to 50% rather than 100%, which reduces the IR level to 1 in 2.6m. This partly counteracts the increased fault frequency of 4.22 faults per year compared with 1 fault per year used in the ETR, and results in an IR level of 1 in 600,000. This IR level lies in the lower ALARP region, where mitigation measures are unlikely to be justifiable. HV Substations A reduction in the probability of heart fibrillation to 50% rather than 100%, reduces the IR level to 1 in 2.6m. The fault frequency determined from the statistics is 24 (using the NAFIRS data as opposed to the DNO data as being more representative of the distribution system), which is well in excess of that used in the analysis in the ETR. Application of this factor to the assessment results in an Individual Risk level of 1 in 108,000. However, this IR level is within the ALARP Region as defined by HSE, and importantly below the 1 in 100,000 action threshold and therefore mitigation measures are unlikely to be justifiable. Note Conclusions This is still likely to be a pessimistic outcome, since the beneficial effect of an insulating layer provided by work equipment is not wholly taken into account. The fault rate for DNO EHV substations (4.22 faults per year) compared with that used in the body of this document and ETR 129 (1 per year) does increase the determined Individual Risk levels, and these now lie in the lower ALARP region where mitigation measures are unlikely to be justifiable. The fault rate for HV substations (24 faults per year) compared with that used in the body of this document and ETR 129 (1 per year) does increase the determined Individual Risk levels, but these remain below the 1 in 100,000 action threshold where mitigation measures are unlikely to be justifiable. It is therefore concluded that the calculated threshold value of 1150 volts for fault clearance times greater than 200ms for the DNO Distribution Networks can be adopted in place of the current 430V threshold. References (1):- Energy Networks Association National Fault and Interruption Reporting Scheme 2003/2004.

Applications and Considerations Section 11

Applications and Considerations Section 11 11 Applications and Considerations Section 11 www.hubbellpowersystems.com E-mail: hpsliterature@hps.hubbell.com Phone: 573-682-5521 Fax: 573-682-8714 210 North Allen Centralia, MO 65240, USA Copyright

More information

Reference Number PDS 10 (RIC Standard: EP SP)

Reference Number PDS 10 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 10 (RIC Standard: EP 00 00 00 08 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS

CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS Title: Circuit Breaker Testing Purpose and Scope: Provide guidelines for testing of Circuit Breakers. Staffing Resources: Staff will have the minimum requirement of an Electrical Fitter/Mechanic Licence

More information

KMU SUBSTATION WORKSHOP

KMU SUBSTATION WORKSHOP Rick Aguilar, Director of Job Training & Safety KMU SUBSTATION WORKSHOP JUNE 29-30, 2016 OTTAWA, KS Hazards & Safety Rules Qualified Personnel & Task-Based Hazard Mitigation Worksite Applications & Considerations

More information

Inspection and Testing Pocket Notes

Inspection and Testing Pocket Notes Inspection and Testing Pocket Notes of Initial Verification Periodic Inspection Purpose of Information required by inspector 1. All equipment is correct type and complies with relevant British Standard

More information

This Procedure details the procedures to be followed in order to achieve Safety from the System when:

This Procedure details the procedures to be followed in order to achieve Safety from the System when: 1 SCOPE This Procedure details the procedures to be followed in order to achieve Safety from the System when: using Insulated Tools within the Vicinity Zone or the Live Zone, when carrying out Tree Work

More information

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 Simon J Brown Technology Division, Health & Safety Executive, Bootle, Merseyside L20 3QZ, UK Crown Copyright

More information

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National Grid, on or near to its electricity apparatus. National

More information

Nordel GRID DISTURBANCE AND FAULT STATISTICS

Nordel GRID DISTURBANCE AND FAULT STATISTICS Nordel GRID DISTURBANCE AND FAULT STATISTICS Table contents Table contents Page 1 Introduction... 3 1.1 Contact persons... 4 1.2 Guidelines the statistics... 4 1.3 Voltage levels in the Nordel network...

More information

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations C&G 2395-01 Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations Test instruments and recommended testing sequence 1 Outcomes of this Session describe the different

More information

A study on the relation between safety analysis process and system engineering process of train control system

A study on the relation between safety analysis process and system engineering process of train control system A study on the relation between safety analysis process and system engineering process of train control system Abstract - In this paper, the relationship between system engineering lifecycle and safety

More information

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd Australasian College of Road Safety Conference A Safe System: Making it Happen! Melbourne 1-2 September 2011 Reduction of Speed Limit at Approaches to Railway Level Crossings in WA Radalj T 1, Kidd B 1

More information

VI.D AIR DISCONNECT SWITCHES

VI.D AIR DISCONNECT SWITCHES VI.D AIR DISCONNECT SWITCHES DMS #568451 Page 1 of 20 Revised: 02/01/2011 GUIDE FOR DETERMINATION OF DISCONNECT SWITCH RATINGS PJM INTERCONNECTION Heritage MAAC Group A task force of the Transmission and

More information

Electrical Shore Connections

Electrical Shore Connections RULES FOR CLASSIFICATION OF Ships / High Speed, Light Craft and Naval Surface Craft PART 6 CHAPTER 29 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Electrical Shore Connections JULY 2014

More information

Electrical Safety in Hospitals

Electrical Safety in Hospitals Electrical Safety in Hospitals Safety in Clinical Environment Electrical hazards Electrical shocks (micro and macro) due to equipment failure, failure of power delivery systems, ground failures, burns,

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance LOW VOLTAGE EQUIPMENT Copyright National Grid plc 2016, all rights reserved. No part of this publication may be reproduced,

More information

Leakage Current Testing Is it right for your application?

Leakage Current Testing Is it right for your application? Leakage Current Testing Is it right for your application? Introduction The Leakage Current test (LCT for short) is most often specified to be performed as a type test in a design or engineering laboratory

More information

FIRE PREVENTION METHOD FOR 275KV OIL-FILLED CABLE IN TEPCO

FIRE PREVENTION METHOD FOR 275KV OIL-FILLED CABLE IN TEPCO FIRE PREVENTION METHOD FOR 275KV OIL-FILLED CABLE IN TEPCO Atsushi Toya, Tokyo Electric Power Company, (Japan), toya.atsushi@tepco.co.jp Shinsuke Nasukawa, Tokyo Electric Power Company, (Japan), nasukawa.shinsuke@tepco.co.jp

More information

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows: Electrical Safety Guidance Note 1 - General Guidance Competent Person The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows: "A person in the possession

More information

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National Grid, on or near to its electricity apparatus. National

More information

Power Unit 075. Maintain Substation Circuit Breakers

Power Unit 075. Maintain Substation Circuit Breakers Power Unit 075 Maintain Substation Circuit Breakers The specification details the required skills, knowledge and behaviours to establish competence to carry out the maintenance of high voltage power circuit

More information

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations. C&G 2395 Exam Paper April 2013 Section A - All questions carry equal marks. Answer all three questions. Show all calculations. Q.1 The electrical installation in a small food retail outlet is scheduled

More information

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2014

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2014 NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2014 21.10.2015 REGIONAL GROUP NORDIC 1 INTRODUCTION... 4 1.1 DESCRIPTION OF THE REPORT... 4 1.2 CONTACT PERSONS... 5 1.3 VOLTAGE LEVELS IN THE NORDIC AND

More information

Definitions found in several locations:

Definitions found in several locations: Definitions found in several locations: NFPA 70 - National Electric Code NFPA 70B Recommended Practice for Electrical Equipment Maintenance. NFPA 70E Electrical Safety in the Workplace OSHA 1910 Subpart

More information

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. 2.7 Safety Requirements When Working from an EWP Purpose The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. Scope The scope of this

More information

Electrical Safety Program

Electrical Safety Program Electrical Safety Program For Adopted LC-1005 Rev. 06/16 Page 1 I. Introduction As part of Organization s overall safety and health program, an

More information

Using Perfluorocarbon Tracers (PFT) for detecting oil leakages in LPOF cable systems. J.C.M. VAN ROSSUM * Prysmian Group NL The Netherlands

Using Perfluorocarbon Tracers (PFT) for detecting oil leakages in LPOF cable systems. J.C.M. VAN ROSSUM * Prysmian Group NL The Netherlands 21, rue d Artois, F-75008 PARIS CIGRE US National Committee 2012 Grid of the Future Symposium http : //www.cigre.org Using Perfluorocarbon Tracers (PFT) for detecting oil leakages in LPOF cable systems

More information

This presentation provides an overview of modern methods for minimizing the arc-flash hazard.

This presentation provides an overview of modern methods for minimizing the arc-flash hazard. Electricity is all around us. An uncontrolled release of electric energy is extremely dangerous, posing a threat to human life, causing equipment damage, and jeopardizing the manufacturing process that

More information

CITB Construction site safety update

CITB Construction site safety update D: High risk activities Underground and overhead services This text replaces the text from the current GE700 2015, Section D, Chapter D08, Underground and overhead services, pages 133 to 136. 8.6 Overhead

More information

CS10 # Network Safety Performance Objectives (2016)

CS10 # Network Safety Performance Objectives (2016) CS10 #4384287 Network Safety Performance Objectives (2016) Context & Purpose The Horizon Power Network Safety Objectives (2016) (Objective Statement) has been prepared for each of network safety performance

More information

Code of Practice for Electrical Safety in Beer Dispense in Licensed Premises Appendices

Code of Practice for Electrical Safety in Beer Dispense in Licensed Premises Appendices Fourth Edition April 2011 Code of Practice for Electrical Safety in Beer Dispense in Licensed Premises 2011 - Appendices Issued by the British Beer and Pub Association 1 APPENDICES - Contents Appendix

More information

CS ENERGY PROCEDURE FOR ELECTRIC SHOCK TREATMENT AND REPORTING CS-OHS-05

CS ENERGY PROCEDURE FOR ELECTRIC SHOCK TREATMENT AND REPORTING CS-OHS-05 CS-OHS-05 10/04/2012 CS ENERGY PROCEDURE FOR ELECTRIC SHOCK TREATMENT AND REPORTING CS-OHS-05 Responsible Officer: Group Manager Health and Safety Responsible Executive: Executive General Manager Corporate

More information

CHAPTER 2: ELECTRICAL SAFETY

CHAPTER 2: ELECTRICAL SAFETY Contents: CHAPTER 2: ELECTRICAL SAFETY 2.1 Physiological Effects of Electricity 2.2 Macroshock and Microshock 2.3 Approaches Towards Protection Against Shock 2.4 Medical Safety Test 2.5 Medical Equipment:

More information

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls Recommendations for the Risk Assessment of Buffer Stops and End Synopsis This document gives details of a recommended method which, if followed, would meet the requirements of section 11, Buffer Stops

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC TS 61245 Edition 2.0 2015-03 Artificial pollution tests on high-voltage ceramic and glass insulators to be used on d.c. systems INTERNATIONAL ELECTROTECHNICAL COMMISSION ICS

More information

ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017

ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017 ELECTRICITY INDUSTRY (NETWORK QUALITY AND RELIABILITY OF SUPPLY) CODE 2005 ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017 SEPTEMBER 2017 Page 1 of 81 Contents 1 Purpose...

More information

ES18 Security Theory/Regulations Answer Schedule

ES18 Security Theory/Regulations Answer Schedule ES18 Security Theory/Regulations Answer Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions. The marker

More information

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures SAFETY QUALITY TECHNOLOGY Guidance on Safe Isolation Procedures Introduction Every year, people working on construction sites suffer electric shock and burn injuries some of which, tragically, are fatal.

More information

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work. 10.6 Management Work Purpose This instruction outlines the minimum requirements for all Horizon Power workers who undertake Management Work. Scope The scope of this instruction is to inform all Horizon

More information

PSSI 3 High Voltage Metal-Enclosed Switchgear

PSSI 3 High Voltage Metal-Enclosed Switchgear 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical) and Company Safety Instructions to achieve Safety from the System for personnel

More information

HV RUBBER GLOVE WORKING

HV RUBBER GLOVE WORKING 1 SCOPE This section of the Live Working Manual sets out further justification for HV Rubber Glove Working and defines the principles, authorisation requirements and precautions to be taken both before

More information

ISO INTERNATIONAL STANDARD. Ergonomics Manual handling Part 1: Lifting and carrying

ISO INTERNATIONAL STANDARD. Ergonomics Manual handling Part 1: Lifting and carrying INTERNATIONAL STANDARD ISO 11228-1 First edition 2003-05-15 Ergonomics Manual handling Part 1: Lifting and carrying Ergonomie Manutention manuelle Partie 1: Manutention verticale et manutention horizontale

More information

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations. C&G 2395 Exam Paper June 2013 Section A-All questions carry equal marks. Answer all three questions. Show all calculations. 1. The electrical installation in an industrial unit is scheduled for a periodic

More information

SUBSTATION EXPLOSION BARRY GASS HIGH VOLTAGE TRAINING. Barry Gass Training Manager High Voltage Training South Africa

SUBSTATION EXPLOSION BARRY GASS HIGH VOLTAGE TRAINING. Barry Gass Training Manager High Voltage Training South Africa High Voltage Training Barry Gass Training Manager High Voltage Training South Africa BARRY GASS HIGH VOLTAGE TRAINING INTRODUCTION An authorised person closed an 11kV Oil Circuit Breaker (OCB) onto a fault

More information

COMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS

COMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS COMMISSIONING TESTS FOR NEW HV CABES (UP TO 33 KV) JOB SAFETY ANAYSIS Title: Carry Out Field Testing Purpose and Scope: To identify the hazards and control measures associated with testing and commissioning

More information

PRODUCT SPECIFICATION

PRODUCT SPECIFICATION MINI-FIT SR. SERIES 1.0 SCOPE This specification covers the 10.00 mm / (.394 in.) centerline tin and gold plated connector series, single and dual row versions in wire to wire and wire to printed circuit

More information

REPORTING AND TREATMENT REQUIRED AS A RESULT OF AN ELECTRICAL INCIDENT CS-OHS-5

REPORTING AND TREATMENT REQUIRED AS A RESULT OF AN ELECTRICAL INCIDENT CS-OHS-5 Form S1745 (Amd 7/97) CS ENERGY PROCEDURE FOR REPORTING AND TREATMENT REQUIRED AS A RESULT OF AN ELECTRICAL INCIDENT CS-OHS-5 Responsible Officer: Authorised Person Approved : GM Production Contents 1.

More information

Tools for safety management Effectiveness of risk mitigation measures. Bernhard KOHL

Tools for safety management Effectiveness of risk mitigation measures. Bernhard KOHL Tools for safety management Effectiveness of risk mitigation measures Bernhard KOHL Contents Background Tools for risk-based decision making Safety measures Illustration of methodical approach Case studies

More information

HEALTH TECHNICAL MEMORANDUM Authorised persons logbook STATUS IN WALES APPLIES

HEALTH TECHNICAL MEMORANDUM Authorised persons logbook STATUS IN WALES APPLIES HEALTH TECHNICAL MEMORANDUM 06-03 Authorised persons logbook 2006 STATUS IN WALES APPLIES This document should be read in conjunction with HTM 00 Best practice guidance for healthcare engineering and HTM

More information

Type MMV Medium Power Cable

Type MMV Medium Power Cable 7-05 Type MMV Medium Power Cable Single Conductor: 5kV 5kV, 00% & % Insulation Levels. Rated 90 C Multi-Conductor: 5kV 5kV, 00% & % Insulation Levels. Rated 90 C Conductors Soft annealed flexible stranded

More information

Health and Safety Briefing

Health and Safety Briefing May 2013 Health and Safety Briefing SHEQ Notice No. 255 Read in conjunction with NR Safety Bulletin NRS 278 and Letter of Instruction This SSL SHEQ Notice applies to all staff, contractors, agency staff

More information

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY 1. CONTROL OF HAZARDOUS ENERGY POLICY AND PROCEDURES A. OSHA References: 29 CFR 1910.147, 29 CFR 1910.332, 29 CFR 1910.333, 29 CFR 1926.417 B.

More information

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition NORTHERN POWERGRID Distribution Safety Rules 2015 Edition These rules shall be read in conjunction with the Operational Practice Manual and/or indicated Operational Guidance. Refer to the index for supplementary

More information

PSSI 6 Demarcation of Work Areas in Substations

PSSI 6 Demarcation of Work Areas in Substations 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical), setting down the requirements in those situations where it is necessary

More information

Innovative Techniques for Mitigating Arc Flash Exposure

Innovative Techniques for Mitigating Arc Flash Exposure Innovative Techniques for Mitigating Arc Flash Exposure Presented at MEMSA 2009 Annual Meeting & Technical Symposium 2007 Eaton Corporation. All rights reserved. INTRODUCTION. As more and more industries

More information

GUIDE FOR IMPLEMENTING DIRECTIVE 2013/35/EU ON ELECTROMAGNETIC FIELDS

GUIDE FOR IMPLEMENTING DIRECTIVE 2013/35/EU ON ELECTROMAGNETIC FIELDS GUIDE FOR IMPLEMENTING DIRECTIVE 2013/35/EU ON ELECTROMAGNETIC FIELDS Implementation of the Directive 2013/35/EU on the minimum health and safety requirements regarding the exposure of workers to the risks

More information

Evaluation of Ground Ring vs. Equipotential Mat at a Swimming Pool in Buford, Georgia

Evaluation of Ground Ring vs. Equipotential Mat at a Swimming Pool in Buford, Georgia Evaluation of Ground Ring vs. Equipotential Mat at a Swimming Pool in Buford, Georgia NEETRAC Project -132 August, 2 A Research Center of the Georgia Institute of Technology Requested by: Reuben Clark

More information

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy Annex I To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance 1. Introduction a. These Safety

More information

Infrared Thermography Inspection Guidelines. Date Issued:

Infrared Thermography Inspection Guidelines. Date Issued: Infrared Thermography Inspection Guidelines Date Issued: 2002 01 29 Created By: Approved By: L. Henderson G. Durnford Table Of Contents Table Of Contents...i POLICY STATEMENT...1 APPLICABLE INTERNATIONAL

More information

An Update on IEC TC 81 (Lightning Protection)

An Update on IEC TC 81 (Lightning Protection) An Update on IEC TC 81 (Lightning Protection) Mitchell Guthrie Consulting Engineer Blanch, NC IEC 62305 Protection Against Lightning Part 1 General Principles Part 2 Risk Management Part 3 Physical Damage

More information

Health and Safety Executive Memorandum of guidance on the Electricity at Work Regulations 1989

Health and Safety Executive Memorandum of guidance on the Electricity at Work Regulations 1989 Health and Safety Executive Memorandum of guidance on the Electricity at Work Regulations 1989 on Regulations Health and Safety Executive Memorandum of guidance on the Electricity at Work Regulations 1989

More information

Ground Fault Circuit Interrupter(GFCI) Policy

Ground Fault Circuit Interrupter(GFCI) Policy NewStar Netronics, LLC American Products for the World Ground Fault Circuit Interrupter(GFCI) Policy 3926 East 3 rd Street Tulsa, OK 74112 Phone (918)894-5006 Fax (918)836-9909 tech@newstarnetronics.com

More information

Rigel 601 CHECKBOX. Instruction Manual. 348A551 Issue 2.0. April Seaward Electronic Ltd. Issue 2.0

Rigel 601 CHECKBOX. Instruction Manual. 348A551 Issue 2.0. April Seaward Electronic Ltd. Issue 2.0 Rigel 601 CHECKBOX Instruction Manual 348A551 Issue 2.0 April 2006 2006 Seaward Electronic Ltd. Issue 2.0 Limited Warranty & Limitation of Liability Rigel Medical guarantees this product for a period of

More information

Protection of motor circuits

Protection of motor circuits Protection of motor circuits Circuit breaker/contactor coordination A circuit supplying a motor may include one, two, three or four switchgear or When a number of devices are used, they must be coordinated

More information

Vacuum Excavation in the vicinity of the Wellington Electricity Network

Vacuum Excavation in the vicinity of the Wellington Electricity Network Vacuum Excavation in the vicinity of the Network. Document no: ENG-116 Document Rev: 1 Issue Status: Final Issue Date: 14/05/2015 Page 1 of 9 Contents 1. PURPOSE... 3 2. POLICY... 3 3. SCOPE... 3 4. REFERENCES...

More information

Department of Electrical Engineering & Computer Science. Electrical Safety. for Staff and Students in EECS Instructional Laboratories

Department of Electrical Engineering & Computer Science. Electrical Safety. for Staff and Students in EECS Instructional Laboratories NEVER WORK ALONE Department of Electrical Engineering & Computer Science Electrical Safety for Staff and Students in EECS Instructional Laboratories If you will be working with energized circuits or equipment

More information

MANAGING ARC FLASH RISKS: A Strategic Approach. Steve Williams Rockwell Automation TechED March 2016, Auckland

MANAGING ARC FLASH RISKS: A Strategic Approach. Steve Williams Rockwell Automation TechED March 2016, Auckland MANAGING ARC FLASH RISKS: A Strategic Approach Steve Williams Rockwell Automation TechED 2016 23 March 2016, Auckland 1 ARC FLASH RELEVANCE? Higher Safety Awareness & OHS Legislation Statistics Less Electrocutions;

More information

Florida Building Code 6 th Edition (2017) Residential. Broward County Edition Loose-leaf Supplement

Florida Building Code 6 th Edition (2017) Residential. Broward County Edition Loose-leaf Supplement Board of Rules and Appeals FBC 6 th Edition (2017)- Residential - Supplement No. 1 January 1, 2018 Florida Building Code 6 th Edition (2017) Residential File removed pages for reference. Broward County

More information

Inspection and Testing

Inspection and Testing Chapter 16 Inspection and Testing 16.1 INTRODUCTION The Purpose of Inspection, Testing and Certification or Reporting The fundamental reason for inspecting and testing an electrical installation is to

More information

Gas density monitor With integrated transmitter Model GDM-100-TI

Gas density monitor With integrated transmitter Model GDM-100-TI SF 6 gas solutions Gas density monitor With integrated transmitter Model GDM-100-TI grid Products WIKA data sheet SP 60.05 for further approvals see page 5 Applications Gas density monitoring of closed

More information

Arc flash versus arc resistant; different concerns

Arc flash versus arc resistant; different concerns Technical Collection Technical paper N PCIC Middle-East -78 Arc flash versus arc resistant; different concerns Didier FULCHIRON, Schneider Electric France. Abstract "Arc flash" and "arc resistant" terms

More information

SCHNEIDER AUTOMATIC CIRCUIT RECLOSER JOB SAFETY ANALYSIS

SCHNEIDER AUTOMATIC CIRCUIT RECLOSER JOB SAFETY ANALYSIS Title: Schneider Automatic Circuit Recloser Job Safety Analysis Purpose and Scope: This document describes the tests to be carried out before accepting a new or repaired N and W series Schneider Automatic

More information

Please print or type all responses except where a signature is required. DESIGN PROJECT TITLE: SEMESTER AND COURSE REFERENCE NUMBER: STUDENT NAME:

Please print or type all responses except where a signature is required. DESIGN PROJECT TITLE: SEMESTER AND COURSE REFERENCE NUMBER: STUDENT NAME: ENGR 196, 296, 396 PROJECT FORM (Circle the correct course number) Prior to signing up for an ENGR 196, 296, 396 hands on project, the student must acquire the signature of the faculty member who will

More information

CURRENT leakage from directional coupler (DC) railway

CURRENT leakage from directional coupler (DC) railway 722 IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, VOL. 54, NO. 2, MARCH 2005 Stray Current Control in DC Mass Transit Systems Ian Cotton, Member, IEEE, Charalambos Charalambous, Pete Aylott, and Petra Ernst

More information

Design Considerations for Power Supplies in High-Altitude Applications. Kevin Parmenter, VP of Applications, USA, Excelsys Technologies

Design Considerations for Power Supplies in High-Altitude Applications. Kevin Parmenter, VP of Applications, USA, Excelsys Technologies Design Considerations for Power Supplies in High-Altitude Applications Kevin Parmenter, VP of Applications, USA, Excelsys Technologies Altitude Environments in Power Applications Effects of Altitude on

More information

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES Industry Guidelines Part 2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES ISSUE 5.1 Ref: POP10B 15 MAR 2010 Disclaimer In formulating this guideline PIPA has relied

More information

Code of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT)

Code of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT) Code of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT) Reviews and Revisions Action Date Reason Reviewer Updated details of External PAT Contractor 17/02/16 New contract

More information

2017 NWHA TECHNICAL SEMINAR. Arc Flash Hazard Awareness MIKE BRENDLE LLC

2017 NWHA TECHNICAL SEMINAR. Arc Flash Hazard Awareness MIKE BRENDLE LLC 2017 NWHA TECHNICAL SEMINAR Arc Flash Hazard Awareness WHAT IS ARC FLASH Arc Flash is a short circuit that flashes from one exposed live part to another, or to ground The result is ionized air that creates

More information

UNIVERSITY OF HONG KONG LIBRARY. Hong Kong Collection

UNIVERSITY OF HONG KONG LIBRARY. Hong Kong Collection UNIVERSITY OF HONG KONG LIBRARY Hong Kong Collection CODE OF PRACTICE ON WIND EFFECTS HONG KONG-1983 BUILDING DEVELOPMENT DEPARTMENT HONG KONG PRINTED AND PUBLISHED BY THE GOVERNMENT PRINTER, HONG KONG

More information

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO Disclaimer: This document is for general guidance and awareness purposes

More information

NZQA Expiring unit standard version 7 Page 1 of 8. Demonstrate knowledge of safe working practices in telecommunications.

NZQA Expiring unit standard version 7 Page 1 of 8. Demonstrate knowledge of safe working practices in telecommunications. Page 1 of 8 Title Demonstrate knowledge of safe working practices in telecommunications Level 2 Credits 4 Purpose This unit standard covers basic instruction in safe working practices in the telecommunications

More information

Karandikar Laboratories Pvt. Ltd., Gat No. 142, Boisar Chilhar Road, At Betegaon, Boisar (E), Taluka Palghar, Maharashtra

Karandikar Laboratories Pvt. Ltd., Gat No. 142, Boisar Chilhar Road, At Betegaon, Boisar (E), Taluka Palghar, Maharashtra Last Amended on - Page 1 of 41 1 SAFETY 1. Safety Testing IEC 61010:2010 Single Fault Conditions IEC 61010-1 Cls. 4.4 And Similar Visual checks Verification of electrical parameters given on label IEC

More information

Questions & Answers About the Operate within Operate within IROLs Standard

Questions & Answers About the Operate within Operate within IROLs Standard Index: Introduction to Standard...3 Expansion on Definitions...5 Questions and Answers...9 Who needs to comply with this standard?...9 When does compliance with this standard start?...10 For a System Operator

More information

Electrical Safety. Hazard Awareness

Electrical Safety. Hazard Awareness Electrical Safety Hazard Awareness What does Hazard mean? Hazard means: any potential or actual threat to the wellbeing of people, machinery or environment Electrical hazard safety means: taking precautions

More information

Quarries National Joint Advisory Committee (QNJAC) Occupational Health. Information Sheet 7. October Whole Body Vibration

Quarries National Joint Advisory Committee (QNJAC) Occupational Health. Information Sheet 7. October Whole Body Vibration Quarries National Joint Advisory Committee (QNJAC) Occupational Health Information Sheet 7 October 2012 Whole Body Vibration This information sheet has been developed by the Quarries National Joint Advisory

More information

ALIGNING MOD POSMS SAFETY AND POEMS ENVIRONMENTAL RISK APPROACHES EXPERIENCE AND GUIDANCE

ALIGNING MOD POSMS SAFETY AND POEMS ENVIRONMENTAL RISK APPROACHES EXPERIENCE AND GUIDANCE ALIGNING MOD POSMS SAFETY AND POEMS ENVIRONMENTAL RISK APPROACHES EXPERIENCE AND GUIDANCE R. L. Maguire MIMechE MSaRS RS2A Limited Swindon, UK 07505 743 725 rlm@rs2a.com Keywords: POSMS, POEMS, Alignment,

More information

CEER Benchmarking Report 6.1 on the Continuity of Electricity and Gas Supply Data update 2015/2016

CEER Benchmarking Report 6.1 on the Continuity of Electricity and Gas Supply Data update 2015/2016 Energy Quality of Supply Work Stream (EQS WS) CEER Benchmarking Report 6.1 on the Continuity of Electricity and Gas Supply Data update 2015/2016 Ref: C18-EQS-86-03 26-July-2018 Council of European Energy

More information

Code of Practice for Electrical Safety in Beer Dispense in Licensed Premises 2011 Guidance for Landlords. Fourth Edition April 2011

Code of Practice for Electrical Safety in Beer Dispense in Licensed Premises 2011 Guidance for Landlords. Fourth Edition April 2011 Fourth Edition April 2011 Code of Practice for Electrical Safety in Beer Dispense in Licensed Premises 2011 Guidance for Landlords Issued by the British Beer and Pub Association 1 Contents Preface 3 1.

More information

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT Kieran J Glynn, Advisor Major Accident Risk, BP, UK The exceedance curve approach was developed following the issue of the 2003

More information

CASE STUDY. Elvington To Brayton Barff Air valve replacement Program

CASE STUDY. Elvington To Brayton Barff Air valve replacement Program CASE STUDY Elvington To Brayton Barff Air valve replacement Program Vent-O-Mat Anti-Shock Air valves have helped Yorkshire Water reduce maintenance costs, reduces surge and improve flows in their trunk

More information

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines Communication 1779 Assessing the risks from high pressure Natural Gas pipelines Founded 1863 Royal Charter 1929 Patron: Her Majesty the Queen Communication 1779 Assessing the risks from high pressure Natural

More information

London Underground - Section 12 approved Switch Disconnectors

London Underground - Section 12 approved Switch Disconnectors Introduction Following the Kings Cross fire of 1987, the resulting Fennell enquiry prompted the introduction of additional fire precautions for Sub-surface Railway Stations. These additional requirements

More information

6 lockout operations every electrician MUST perform and respect

6 lockout operations every electrician MUST perform and respect 6 lockout operations every electrician MUST perform and respect 6 lockout operations to respect when working in power substation (on photo: Lockout arm for ACTI9 MCB; credit: cirlock.com.au) Lockout operations

More information

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission SP Transmission Ltd Scottish

More information

Sharing practice: OEM prescribed maintenance. Peter Kohler / Andy Webb

Sharing practice: OEM prescribed maintenance. Peter Kohler / Andy Webb Sharing practice: OEM prescribed maintenance Peter Kohler / Andy Webb Overview 1. OEM introduction 2. OEM maintenance: pros and cons 3. OEM maintenance: key message 4. Tools to help 5. Example 6. Takeaway

More information

Manuscript of paper published in Accident and Analysis and Prevention, Volume 41 (2009), 48-56

Manuscript of paper published in Accident and Analysis and Prevention, Volume 41 (2009), 48-56 Manuscript of paper published in Accident and Analysis and Prevention, Volume 41 (2009), 48-56 INTERACTIONS BETWEEN RAIL AND ROAD SAFETY IN GREAT BRITAIN Andrew W Evans Department of Civil and Environmental

More information

MAKING ELECTRICAL A GUIDE ON HOW TO INSPECT AND TEST PORTABLE APPLIANCES SAFELY AND EFFECTIVELY

MAKING ELECTRICAL A GUIDE ON HOW TO INSPECT AND TEST PORTABLE APPLIANCES SAFELY AND EFFECTIVELY MAKING ELECTRICAL A GUIDE ON HOW TO INSPECT AND TEST PORTABLE APPLIANCES SAFELY AND EFFECTIVELY 'Published in consultation with The Health & Safety Executive' TECHNOLOGY WORK - SAFELY The Electrical Contractors'

More information

Product Technical Bulletin #48

Product Technical Bulletin #48 AN INTEGRATED SOLUTIONS PROVIDER Product Technical Bulletin #48 Current-Carrying Capacity of R-Series Connectors AirBorn Proprietary Page 1 AN INTEGRATED SOLUTIONS PROVIDER R-Series Current-Carrying Capacity

More information

PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION

PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION For explanatory notes relating to software endorsement, see Notes for Recipients A. DETAILS OF THE CLIENT Client: PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION Issued in accordance with British

More information

Why do I need to do an Arc-Flash Analysis?

Why do I need to do an Arc-Flash Analysis? Why do I need to do an Arc-Flash Analysis? Presented By Tom Norwood for Alexander Nizov, P.E. Principal/Manager Electrical Engineering Division TRAINING INSTITUTE, INC. A SUBSIDIARY OF MEGGER Hazards Analysis

More information