1 Title Provision and Use of Work Equipment Regulations Policy (PUWER) Reference Number AR-RMD-HSMS38 DOCUMENT HISTORY Review dates Issue Date Issue Date Amendment(s) 0.1 Jan Sept Feb Nov March Oct-15 Annual Review Minor amendments to terminology, formatting, grammar, and hyperlinks 2.0 Jan Jan-08 March 17 Changed support service to professional service. Change of VC name 4.0 Oct May-11 Author Name: P. Varley Reviewer Name: HSPG Authorised by Name: I. Martin Vice Chancellor Issued by Name: Risk Management AR-RMD-HSMS38/Issue 9.0 Page 0 of 16

2 Provision and Use of Work Equipment Regulations Policy (PUWER) AR-RMD-HSMS38 Table of Contents 1. Executive Summary PUWER Policy Application Requirements and Responsibilities Vice Chancellor Health and Safety Policy Group Faculty Deans and Directors of Professional services All Staff References... 6 Appendix 1 - Risk Assessment Form... 7 Appendix 2 - PUWER Guidance... 8 Appendix 3 Equipment Safety Checklist AR-RMD-HSMS38/Issue 9.0 Page 1 of 16

3 1. Executive Summary The Provision and Use of Work Equipment Regulations (PUWER) require risks to people s health and safety, from equipment that they use at work, to be prevented or controlled. In addition to the requirements of PUWER, lifting equipment is also subject to the Lifting Operations and Lifting Equipment Regulations (LOLER). This policy and associated guidance will enable Anglia Ruskin to comply with legislative requirements and staff to use the equipment safely. This will be achieved through risk assessment at the procurement, installation and use of equipment stage. PUWER covers a wide range of equipment such as: machinery, photocopiers, circular saws, laboratory equipment and lifting equipment. Originating Legislation: Health and Safety at Work Act 1974 Provision and Use of Work Equipment Regulations 1998 Lifting Operations and Lifting Equipment Regulations 1998 The Management of Health and Safety at Work Regulations 1999 Other relevant documents: Health and Safety Management System Risk Assessment AR-RMD-HSMS22 AR-RMD-HSMS38/Issue 9.0 Page 2 of 16

4 2. PUWER 2.1 Policy Anglia Ruskin is committed to ensuring that all its employees are consistently provided with a level of competent health and safety management appropriate to the degree of risk associated with their activities. Anglia Ruskin will ensure, so far as is reasonably practicable, that the risks to the health and safety of staff, students and visitors will be managed in compliance with the Health and Safety at Work etc. Act 1974, the Management of Health and Safety at Work Regulations 1999 and other appropriate regulations and guidance. To comply with the relevant legislation and guidance, Anglia Ruskin will: Appoint competent persons, within (RM), to assist Anglia Ruskin in understanding, coming to terms with and complying with the regulations Clearly define the role of all personnel in order to help them to effectively meet their responsibilities within the university health and safety management system (HSMS) Ensure that all staff are suitably trained to deal with the health and safety issues relevant to their position Provide suitable and sufficient information, instruction, training and supervision to all relevant staff, students and visitors Ensure effective liaison with local authorities and other external bodies where appropriate Ensure that faculty deans and directors of professional services have made suitable and sufficient written assessment of risks posed to the health, safety and welfare of members of their staff who are required to drive on work purposes Provide suitable and sufficient information, instruction, training and supervision to staff that use work equipment. 2.2 Application It is the policy of Anglia Ruskin that its health and safety activities will be based on the requirements identified by risk assessments, as per the HSMS chapter on risk assessments (AR-RMD-HSMS22). This includes carrying out risk assessments for the procurement, use and maintenance of work equipment. The assessment process will evaluate the effectiveness of existing risk control measures and, where necessary, require the identification and implementation of additional or alternative controls. These, in turn, must be assessed in order to AR-RMD-HSMS38/Issue 9.0 Page 3 of 16

5 ensure that additional unacceptable risks are not being introduced into Anglia Ruskin s activities. This policy document applies to those in managerial positions (i.e. faculty deans and directors of professional services and their managers and supervisors) as their duties include ensuring that risk assessments are carried out for all tasks involving use of work equipment or machinery within their area of responsibility. 3. Requirements and Responsibilities 3.1 Vice Chancellor The vice chancellor has overall responsibility for the establishment, ongoing development, implementation, monitoring and review of the HSMS. 3.2 Health and Safety Policy Group The health and safety policy group (HSPG) have been delegated operational responsibility for planning and guiding the ongoing development, implementation, monitoring and review of the HSMS, including this procedure. 3.3 Faculty Deans and Directors of Professional services The faculty deans and directors of professional services are responsible for: The implementation of this procedure within their area of responsibility Identifying the required level of general health and safety competency required by their managers Ensuring that there are arrangements in place to provide appropriate information to members of staff, students, visitors etc Ensuring when procuring work equipment it conforms to the relevant legal standards Ensuring that they, provide the right kind of safe equipment for use at work; ensure that it can be used correctly; and keep it maintained in a safe condition. Ensuring that any contractors using their own equipment on any university property provide suitable risk assessments for its use AR-RMD-HSMS38/Issue 9.0 Page 4 of 16

6 Ensuring that no personal equipment is used on university property without permission of the dean/director of professional services and where appropriate without PAT testing by Estates and Facilities Services. Ensuring that suitable and sufficient risk assessments are carried out for all items of machinery or machinery based activities within their area(s) of responsibility, as per the risk assessment chapter of the HSMS (AR-RMD-HSMS22), with each assessment being assigned a unique identification number and recorded on the risk assessment form (Appendix 1). Ensuring that those responsible for carrying out risk assessments have been appropriately trained Note: No person will be considered as competent to undertake risk assessments unless they have been trained to do so. This can be arranged through RM Ensuring that all documents are subject to the requirements of the control of health and safety documents chapter of the HSMS (AR- RMD-HSMS12) Providing a report each semester to the HSPG, in order to aid their review of the HSMS Note: The faculty deans/directors of professional services may delegate the above tasks to specific managers, within their area of authority, as appropriate. Note: A permit is required for any hazardous activities, such as working from height, electrical work, confined space entry and excavation. The control and monitoring of a permit to work system and ensures; A permit is required for any hazardous activities, such as working from height, electrical work, confined space entry and excavation. The permit to work system operates effectively in each location The permit to work system is monitored to confirm compliance and identify deficiencies or shortcomings Corrective action is taken to address deficiencies or shortcomings. A copy of the permit to work procedure document is available from Estates and Facilities Services. 3.4 All Staff All staff that use machinery for work purposes are responsible for: AR-RMD-HSMS38/Issue 9.0 Page 5 of 16

7 Regularly refreshing their knowledge of the equipment and procedures associated with its safe use Using any PPE as per defined instructions for safe use of the equipment Ensuring that they only use work equipment they are trained to use 3.5 RM is responsible for: Providing support to all staff required to carry out risk assessments, if requested and appropriate Provide support and guidance for staff in the use and maintenance of work equipment (appendix 2) Carrying out risk assessment training, if requested and appropriate Monitoring the quality of individual assessments via a random sampling process Carrying out internal audits on compliance with all HSMS documents, as per the document on health and safety management system audits (AR-RMD-HSMS08) 4. References The Health and Safety at Work Act 1974 The Management of Health and Safety at Work Regulations 1999 Provision and Use of Work Equipment Regulations 1998 Lifting Operations and Lifting Equipment Regulations 1998 Personal Protective Equipment Regulations 2002 AR-RMD-HSMS38/Issue 9.0 Page 6 of 16

8 Appendix 1 - Risk Assessment Form Subject of assessment (May be an activity, hazard or relate to an individual) RA conducted by. Date. RA ref. no. List the risk/s involved or describe the hazard List the current control measures in place. Please check the RM website for help and advice available at; Current risk level. High / Medium / Low (See risk matrix) (Delete as appropriate) List the actions required to reduce the risk, include reference to any written safety procedures. Please check the RM website for help and advice available at; Date actioned Actioned by Revised risk level. High / Medium / Low (See risk matrix) (Delete as appropriate) RA verified by (usually dean/director of professional service/line manager) Date. Risk assessment issued to the following; Date. Risk assessment review date. (Usually annually) Risk assessment reviewed by. AR-RMD-HSMS38/Issue 9.0 Page 7 of 16

9 Appendix 2 - PUWER Guidance Scope of PUWER In general terms, the regulations require that equipment provided for use at work is: Suitable for the intended use. Safe for use, maintained in a safe condition and inspected to ensure this remains the case. Used only by people who have received adequate information, instruction and training. Accompanied by suitable safety measures, e.g. protective devices, markings, warnings. Examples of the uses of equipment which are covered by the regulations include starting or stopping the equipment, repairing, modifying, maintaining, servicing, cleaning and transporting. The regulations covers factories, offices, shops, hospitals, hotels, colleges, universities, places of entertainment, etc. Requirement of the Regulations Work equipment must meet the requirement of PUWER and this can be achieved by ensuring it is: Suitable for use, and for the designed purpose and conditions in which it is used. Maintained in a safe condition for use so that people s health and safety are not at risk Inspected in certain circumstances to ensure that it is, and continues to be, safe for use. Any inspection should be carried out by a competent person this could be an employee if they have the competence to perform the task) and a record kept until the next inspection (see Appendix 3). Any risks created by the use of the equipment should be eliminated where possible or controlled by: Taking appropriate hardware measures, e.g. providing suitable guards, protection devices, marking and warning devices, system control devices (such as emergency stop buttons) and personal protective equipment. Taking appropriate software measures such as following safe systems of work (e.g. ensuring maintenance is only undertaken when the equipment is shut down, etc) and providing adequate information, instruction and training. Dependant upon the risk assessment a combination of these measures may be necessary depending on the requirements of the work. People using work AR-RMD-HSMS38/Issue 9.0 Page 8 of 16

10 equipment must have received adequate training, instruction and information for the particular equipment. Procuring Work Equipment Before you buy it, think about: where and how it will be used; what it will be used for; who will use it (skilled employees, trainees); what risks to health and safety might result; comparing how well health and safety risks are controlled by different manufacturers. This can help you to decide which machine may be suitable, particularly if you are buying a standard machine 'off the shelf'. If you are buying a more complex or custom-built machine you should discuss your requirements with potential suppliers. They can often advise you on the options available. For a custom-built machine, you can use the opportunity to work with the supplier to design out the causes of injury and ill health. Some of the items you can cover are in the checklist on Appendix 3. Time spent now on agreeing the necessary safeguards, to control health and safety risks, could save you time and money later. Note: Sometimes machinery is supplied via another organisation, e.g. an importer, rather than direct from the manufacturer, so this organisation is referred to as the supplier. When you place the order, specify in writing that the machine should be safe. When you have bought it, look for CE marking, check that you have a copy of the declaration of conformity and a set of instructions in English on how the machine should be used and most important of all, check to see if you think that it is safe. Maintenance Work equipment must be maintained in an efficient state, working order and repair. The term efficient relates to how the condition of the equipment may affect health and safety; it is not concerned with productivity. Guards, emergency stops, etc. have to be maintained to fulfil their function at all times. The necessity to maintain other components may not be as obvious, but as an example, failure to lubricate bearings or replace a clogged filter might lead to danger because of seized parts or overheating. Equipment must be maintained so that its performance does not deteriorate to the extent that it puts people at risk. The extent and complexity of maintenance will vary enormously, from simple checks on hand tools (e.g. loose head on a hammer or AR-RMD-HSMS38/Issue 9.0 Page 9 of 16

11 splayed mushroom head on a chisel) to a substantial integrated programme for complex process plant. Maintenance work should only be carried out by persons who have received adequate information, instruction and training. Routine maintenance including lubrication, inspection and testing should be based on manufacturer s recommendations and any other legislative requirements. When inadequate maintenance could cause equipment, guards and other protective devices to fail in a dangerous way, a formal system of planned, preventative maintenance will be necessary. Where necessary, maintenance should be achieved through a system of written instructions to initiate inspection, testing and periodic replacement or refurbishment of components or equipment before they reach the end of their useful life. Although not a legal requirement always ensure that a maintenance log is kept and updated regularly. Training Employees must receive appropriate training prior to the use of any work equipment. The content of the training will include: 1. The conditions in which and the methods by which the equipment may be used. 2. The foreseeable abnormal situations and the action to be taken if such a situation was to occur. 3. The results of any experience in the use of the equipment. This must include an overview of relevant statutory requirements, e.g. noise emission levels, dangerous parts of equipment, etc WHAT RISKS ARE THERE FROM USING WORK EQUIPMENT? Many things can represent a hazard, for example: Using the wrong equipment for the job, e.g. ladders instead of access towers for an extended job at high level; Not fitting adequate guards on machines, leading to accidents caused by entanglement, shearing, crushing, trapping or cutting; Not fitting adequate controls, or the wrong type of controls, so that equipment cannot be turned off quickly and safely, or starts accidentally; Not properly maintaining guards, safety devices, controls etc so that machines or equipment become unsafe; Not providing the right information, instruction and training for those using the equipment; Not fitting roll-over protective structures (ROPS) and seat belts on mobile work equipment where there is a risk of roll over Not maintaining work equipment or carrying out regular inspections and thorough examinations; AR-RMD-HSMS38/Issue 9.0 Page 10 of 16

12 Not providing the personal protective equipment needed to use certain machines safely, e.g. chainsaws, angle grinders. Identifying the risks When identifying the risks, think about: All the work which has to be done with the equipment during normal use and also during setting-up, maintenance, repair, breakdowns and removal of blockages; Who will use the equipment, including inexperienced workers, workers with language difficulties, new starters, people who have changed jobs within the company or those who may have particular difficulties, e.g. those with impaired mobility or poor readers; young people, who may be inexperienced and lack knowledge or awareness of existing or potential risks; Staff who may act foolishly or carelessly or are likely to make mistakes; Whether guards or safety devices are poorly designed and inconvenient to use or are easily defeated (this could encourage workers to risk injury); The type of power supply, e.g. electrical, hydraulic or pneumatic - each type has different risks and ways to control them. WHAT CAN I DO TO REDUCE THE RISKS? Use the right equipment for the job Many accidents happen because people have not chosen the right equipment for the work to be done. Controlling the risk often means planning ahead and ensuring that suitable equipment or machinery is available. Guard dangerous parts of machines Controlling the risk often means guarding the parts of machines and equipment that could cause injury. Remember: Use fixed guards wherever possible, properly fastened in place with screws or nuts and bolts which need tools to remove them; If employees need regular access to parts of the machine and a fixed guard is not possible, use an interlocked guard for those parts. This will ensure that the machine cannot start before the guard is closed and will stop if the guard is opened while the machine is operating; In some cases, e.g. on guillotines, devices such as photoelectric systems or automatic guards may be used instead of fixed or interlocked guards; Check that guards are convenient to use and not easy to defeat, otherwise they may need modifying; think about the best materials for guards - plastic may be easy to see through, but can be easily scratched or damaged. If wire mesh or similar materials are used, make sure the holes are not large enough to allow access to the danger area. As well as preventing such access, a guard may also be used to prevent harmful fluids, dust etc from escaping; Make sure the guards allow the machine to be cleaned and maintained safely; where guards cannot give full protection, use jigs, holders, push sticks etc to move the work piece. AR-RMD-HSMS38/Issue 9.0 Page 11 of 16

13 Select the right controls Make sure stop and start buttons are readily accessible; Ensure control switches are clearly marked to show what they do Make sure operating controls are designed and placed to avoid accidental operation, e.g. by shrouding start buttons and pedals Interlocked or trapped key systems for guards may be necessary to prevent operators and maintenance workers from entering the danger areas before the machine has stopped Where appropriate, have emergency stop controls within easy reach, particularly on larger machines so they can be operated quickly in an emergency; ensure that a machine can only be re-started following a stoppage by use of the start control. It should not be possible to re-start the machine simply by re-setting a device such as an interlock guard or trip bar AR-RMD-HSMS38/Issue 9.0 Page 12 of 16

14 Appendix 3 Equipment Safety Checklist This checklist should be copied and used for all machinery. Location and Description of Equipment Major Hazards Precautions against these Hazards Where the answer is No to any of the following questions, spaces for notes of remedial action is provided at the bottom of the form. These should be listed in the summary in order of priority. Information, Instruction and Safe Use Yes No N/A 1. Have all users of the equipment been given adequate training in correct use, risks and precautions? 2. Is there a list of authorised users or a training record that verifies this? 3. Have any written instructions provided by the manufacturer/supplier been passed on to the users? 1. Are there written instructions covering: - i. Any unusual hazards of complicated features? ii. Where appropriate, emergency shutdown? 6. Is the equipment being used in accordance with the instructions given in accordance with Q1 7. If it has been adapted, is the adaptation suitable and safe? 8. Is the equipment used ion an appropriate environment? (Consider ventilation, damp, flammable atmosphere) 9. Are control switches, other operating controls, and the contents of any containers, marked? 10. Are there clear warning notices or markings (to wear PPE, restrictions on use, list of authorised users) where appropriate?) AR-RMD-HSMS38/Issue 9.0 Page 13 of 16

15 Maintenance Yes No N/A 1. What are the appropriate intervals for checking: Electrical safety? Any safety devices? 2. If inadequate maintenance could cause the equipment, guards or other protection to fail in a dangerous way, is there a system of planned preventive maintenance, including where appropriate the periodic replacement of refurbishing of items before the end of their useful life? 3. Is the equipment and system of maintenance designed to minimise any risks that may arise during maintenance? 4. Have clear maintenance instructions been given to those responsible for maintaining the equipment? Specific Hazards Yes No N/A 1. Is the protection adequate in relation to: - Items being ejected or falling from the equipment? Overturning or collapse? Overheating or fire Disintegration or explosion? 2. Is the equipment made stable where appropriate by bolting, clamping or tying? 3. Is there sufficient general and, where necessary, local lighting? 4. Is there protection against contact with hot or very cold temperature, so far as appropriate? 5. If the possibility of hot/cold contact is unavoidable, has appropriate instruction and training been given? 6. In the case of pressurised equipment, is there a written scheme of examination? 7. If gas, fume or dust is released when the equipment is used, AR-RMD-HSMS38/Issue 9.0 Page 14 of 16

16 is there: Local exhaust ventilation, tested annually? A specific COSHH risk assessment? Machinery Y N N/A 1. Are all parts of dangerous machinery guarded? 2. Are all guards sound, and in good working order 3. Do they permit an adequate view of the operation where this is necessary? 4. Is it difficult to bypass or disable them? 5. Can the machinery only be started when a specific labeled start device is used? (NB the normal cycle of automated machinery is exempt from this requirement) 6. Is it impossible to start the machine just by resetting a safety device? 7. Is there a readily accessible stop device that stops the machinery in a safe way? 8. Where appropriate (i.e. where in a foreseeable emergency it could help) is there a prominent easily accessible emergency stop device? 9. Can controls be operated safety and easily? 10. Is there a system of work that ensures that nobody is in a dangerous position when machinery is about to start? 11.Does the start device need to be activated to restart the machine if: The power fails A control or safety device fails to trip out? 12. If the power is isolated, does the machinery come to rest safely without the possibility of access to dangerous parts? AR-RMD-HSMS38/Issue 9.0 Page 15 of 16

17 13. Can the equipment be securely isolated from power to prevent inadvertent reconnection: By removing a plug from a socket that is easily visible to the person at risk By locking it off? 14. If the machinery was put on the market after does it carry the European CE mark? Remedial Action Date of Completion Signature Date Date for review (<2 years) AR-RMD-HSMS38/Issue 9.0 Page 16 of 16

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Key word(s) : Work equipment. Using, maintaining and repairing. Information, instruction and supervision. Risk Assessment.

More information

Suitability of Work Equipment

Suitability of Work Equipment These regulations came into effect on the 5th December 1998 and replace PUWER 1992. They cover almost all equipment used at work, including tool box tools such as hammers, knives etc. They also cover machinery

More information

LONE WORKING HEALTH AND SAFETY GUIDANCE

LONE WORKING HEALTH AND SAFETY GUIDANCE LONE WORKING HEALTH AND SAFETY GUIDANCE Revised March 2017: Version 3.1 Name of Policy: Purpose of the Policy: Policy Applies to: Approved by: Responsible for its Updating: Final Approval by: Lone Working

More information

LEV GUIDANCE FOR SAFE USAGE, TESTING AND MAINTENANCE OF LOCAL EXHAUST VENTILATION SYSTEMS WITHIN ANGLIA RUSKIN UNIVERSITY RISK MANAGEMENT

LEV GUIDANCE FOR SAFE USAGE, TESTING AND MAINTENANCE OF LOCAL EXHAUST VENTILATION SYSTEMS WITHIN ANGLIA RUSKIN UNIVERSITY RISK MANAGEMENT 2016 LEV GUIDANCE FOR SAFE USAGE, TESTING AND MAINTENANCE OF LOCAL EXHAUST VENTILATION SYSTEMS WITHIN ANGLIA RUSKIN UNIVERSITY RISK MANAGEMENT This guidance is in addition to AR-RMD-HSMS38 ANGLIA RUSKIN

More information

USING WORK EQUIPMENT SAFELY

USING WORK EQUIPMENT SAFELY USING WORK EQUIPMENT SAFELY Introduction 3 What is work equipment? 4 What do I need to do? 4 What risks are there from using work equipment? 4 Identifying the risks 5 What can I do to reduce the risks?

More information

Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version

Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version Policy No: RM13 Version: 7.0 Name of Policy: Provision and Use of Work Equipment Policy Effective From: 26/04/2016 Date Ratified 10/03/2016 Ratified Health and Safety Committee Review Date 01/03/2018 Sponsor

More information

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 PERSONNEL DIVISION REVIEWED AUTUMN 1999 CONTENTS Page 1 INTRODUCTION 1

More information

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE 1. INTRODUCTION The University uses substances hazardous to health in many of its operations, and accepts that it has a duty of care to reduce exposure

More information

Lifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016

Lifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016 Title of Standard Operation Procedure: Lifting Equipment Procedure ocedure: Person(s) responsible for the Health and Safety Manager production of report e Reference Number: H&S Procedure 16 Version No:

More information

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASONS FOR INCLUSION 3 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 APPENDIX

More information

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure Health, Safety and Environment Management System HSE-PRO-008 HSE Responsibilities Procedure 1 Table of Contents 1 Intent... 3 2 Scope... 3 3 Definitions... 3 4 Duty, Obligations and Responsibilities...

More information

Working Alone Safety Program

Working Alone Safety Program Facilities Operations and Development Environmental Health and Safety 1314 Kinnear Road #106 Columbus, OH 43212-1168 614-292-1284 Phone 614-292-6404 Fax www.ehs.osu.edu Working Alone Safety Program Prepared

More information

2.25 Work Equipment Policy and Procedure Table of Contents

2.25 Work Equipment Policy and Procedure Table of Contents Table of Contents Section 1 - Policy... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 Requirements... 3 1.4 Responsibilities... 3 Section 2 - Procedure... 4 Section 3 - References... 5 3.1 Statutory Documents...

More information

SOAS LONE WORKING GUIDANCE

SOAS LONE WORKING GUIDANCE SOAS LONE WORKING GUIDANCE Introduction This guidance is intended to assist managers and heads of department in assessing the risks associated with lone working and their staff. While there are no specific

More information

Policy Redesign Project. Plant Safety Policy. Table of Contents

Policy Redesign Project. Plant Safety Policy. Table of Contents Policy Redesign Project All policies and procedures are being reviewed as part of this project. This document is pending review, but remains in effect until the review is carried out. Plant Safety Policy

More information

To comply with the OHS Act, the responsible manager must carry out and document the following:

To comply with the OHS Act, the responsible manager must carry out and document the following: Owner: Manager Health, Wellbeing and Safety Last Update: 10 January 2018 Contents 1. Purpose... 1 2. Minimum Compliance Requirements... 1 3. Definitions... 2 4. Legislative requirements under the OHS Act

More information

Assessment Checklist. Project. Name: Created: Machine Details. Serial Number: Type: Model: Manufacturer: Power Supply: Location: Building: Area:

Assessment Checklist. Project. Name: Created: Machine Details. Serial Number: Type: Model: Manufacturer: Power Supply: Location: Building: Area: Project Name: Created: Machine Details Serial Number: Type: Model: Manufacturer: Power Supply: Location: Building: Area: Date Assessed: Team: tes: Printed on: 0 July 0 Powered by mcom So ware from TÜV

More information

Plant Isolation Lock out/tag out Procedure

Plant Isolation Lock out/tag out Procedure Plant Isolation Lock out/tag out Procedure Related Policy Responsible Officer Approved by Work Health and Safety Policy Approved and commenced November, 2014 Review by November, 2017 Responsible Organisational

More information

Hampstead Hill School Health and Safety Policy: Confined Spaces

Hampstead Hill School Health and Safety Policy: Confined Spaces All Hampstead Hill School Policies are always to be read and considered in conjunction with Equal Opportunities, Race Equality and Inclusion Policies. This Policy of Hampstead Hill School applies to all

More information

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition WHS

More information

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors Appendix 1 Health & Safety Declaration, Roles and Responsibilities Each exhibitor and Informa appointed contractor must complete the Health and Safety Declaration form provided below to confirm they have

More information

4.1 The Vice-Chancellor and University Executive Committee

4.1 The Vice-Chancellor and University Executive Committee UON Key Risk Area: KRA 1.4 Plant and Equipment 1. Purpose This procedure describes how the University meets its obligation to ensure the health and safety of people, through the processes of selection,

More information

WADKIN OVER HEAD ROUTER RISK ASSESSMENT (U002ra)

WADKIN OVER HEAD ROUTER RISK ASSESSMENT (U002ra) Task Being Carried Out: Area: Persons at Risk: Operation of Over Head Router Brindle Mill Operatives, Maintenance engineers Description of Equipment: Wadkin Over Head Router Serial No.: LS 3891 Location

More information

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019 Livewell Southwest Lifting Operations and Lifting Equipment Regulations (LOLER) Policy Version No. 2 Review: May 2019 Notice to staff using a paper copy of this guidance The policies and procedures page

More information

Health & Safety Policy & Plan. Rightway Roofing.

Health & Safety Policy & Plan. Rightway Roofing. Health & Safety Policy & Plan. Rightway Roofing. Valid: 02/2012-02/2013 Contents ( 1 ) Policy Statement. ( 2 ) Hazard Identification. ( 3 ) Hazard Management. ( 4 ) Induction & Training. ( 5 ) Monitoring

More information

LO/TO LOCKOUT/TAGOUT PROGRAM

LO/TO LOCKOUT/TAGOUT PROGRAM LO/TO LOCKOUT/TAGOUT PROGRAM April 2017 CONTENTS Section 1: Introduction...1 Section 2: Purpose... 1 Section 3: Application... 1 Section 4: Definitions... 2 Section 5: Roles and Responsibilities... 4 Section

More information

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010) (Ref. SOP QMS-080; EHS-010) Form-445 Inspected by: Date of inspection Date of Report Report # Pages Area Manager: Area Inspected: General This EHS Workplace Inspection was conducted by: Scope of the Inspection:

More information

University Safety Policy Supplement

University Safety Policy Supplement Occupational Health and Safety Service, Kings Gate Newcastle upon Tyne NE1 7RU Tel 0191 208 6274 Document History University Safety Policy Supplement Lone working Approved October 2006 Re-ratified October

More information

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) WAC Page 296-307-320 Control of hazardous energy (lockout-tagout). 1 296-307-32001 What does this section cover? 1 296-307-32003 When does this section

More information

Lifting Operation & Lifting Equipment Procedure

Lifting Operation & Lifting Equipment Procedure SRSS Lifting Equipment Procedure 1. DOCUMENT CONTROL Management System Element Title SRSS SMS PROCEDURE Lifting Operation & Lifting Equipment Procedure SMS_HS_PR_033_ Version # & V1 10/08/2016 Lifting

More information

LADDERS FIXED AND PORTABLE

LADDERS FIXED AND PORTABLE CONTRACTOR WHS HAZARD STANDARD LADDERS FIXED AND PORTABLE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office

Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office Introduction Lone working is not covered by any specific piece of legislation and, indeed, there is no

More information

LOCKOUT/TAGOUT PLAN August 2015

LOCKOUT/TAGOUT PLAN August 2015 LOCKOUT/TAGOUT PLAN August 2015 Office of Environmental Health and Safety 423-354-5224 TABLE OF CONTENTS Purpose and Intended Use... 2 A. Types of Energy Sources... 2 B. Activities Requiring Lockout/Tagout

More information

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw PLANT HAZARD REPORT Plant Description: Circular Saw PLEASE NOTE This plant information has been prepared to assist the purchaser in identifying hazards associated with the plant prior to the purchaser

More information

Compliance with Health & Safety legislation

Compliance with Health & Safety legislation Compliance with Health & Safety legislation The following is a brief description of some of the main duties required by the more generic safety legislation applicable to businesses, which the employers

More information

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR Volunteer State Community College Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR 1910.147 The information contained in this maual documents the policies and procedures

More information

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015 5 WHS PROCEDURE P29-02 Page 1 of 7 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment within the mission

More information

Control of Hazardous Energy Lockout / Tagout Program

Control of Hazardous Energy Lockout / Tagout Program Control of Hazardous Energy Lockout / Tagout Program August 2016 Table of Contents Purpose... 1 Scope and Application... 1 Responsibilities... 1 Environmental Health and Safety Personnel (EH&S)... 1 Directors

More information

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY Approved by the Trustees: November 2016 Health and Safety Policy Introduction The main piece of health and safety legislation is the Health and Safety

More information

Health and Safety Inspection Procedure

Health and Safety Inspection Procedure Template v4 WILTSHIRE POLICE FORCE PROCEDURE Health and Safety Inspection Procedure Effective from: 25.03.2012 Last Review Date: 10.05.2015 Version: 2.0 Next Review Date: 10.05.2018 TABLE OF CONTENTS PROCEDURE

More information

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN). Purpose To provide guidance in controlling the risks associated with confined spaces including identifying confined spaces, working in a confined space and issuing confined space entry permits. Scope This

More information

unable to summon help as a result of injury, ill health or an emergency. unable to carry out a task safely while alone.

unable to summon help as a result of injury, ill health or an emergency. unable to carry out a task safely while alone. Lone Working Scope 1. This standard applies to anyone working; studying or taking part in any activity managed by UCL and includes staff, graduate students, contractors and visitors.. Undergraduate students

More information

Hazardous Energy Control

Hazardous Energy Control Lockout Tagout This program has been prepared to provide assistance in compliance with USA OSHA standards and/or Best Management Practices. It should not be used without consideration of the unique conditions

More information

University College Dublin Machinery/Equipment Risk Assessment Template

University College Dublin Machinery/Equipment Risk Assessment Template 1. General Information Name of Person(s) carrying out assessment and their position Principal Investigator / Supervisor / Head of School or Unit (Person responsible for ensuring safety) Date of assessment

More information

Safety Manual: Hazardous Energy. January, 2017

Safety Manual: Hazardous Energy. January, 2017 Safety Manual: Hazardous Energy January, 2017 9.0 Hazardous Energy Introduction Energized equipment in the workplace pose a significant risk of injury and death. If the unexpected energization or start-up

More information

Lockout / Tag out Program

Lockout / Tag out Program Lockout / Tag out Program Presented by DOSHTI www.doshti.com You will learn Purpose of Lockout- Tag out Requirements for LOTO Types of Hazardous Energy Procedures for LOTO The OSHA Standard for the Control

More information

Pressure Systems Safety Regulation

Pressure Systems Safety Regulation Pressure Systems Safety Regulation Introduction This document informs Faculty of the key requirements of the UK and Chinese Pressure Systems Safety regulations. The aim of these regulations is to prevent

More information

HS329 Risk Management Procedure

HS329 Risk Management Procedure HS329 Risk Management Procedure Work Health and Safety Act 2011 Policy hierarchy link Work Health and Safety Regulation 2011 Work Health and Safety Policy Code of Practice How to Manage Work Health and

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1 Safety Guidelines for Live Entertainment and Events Part 2. Hazard Identification and Risk Management Contents Disclaimer... 1 1. Principles of Risk Management... 2 2. The Risk Management Process... 2

More information

HAZARD MANAGEMENT PROCEDURE

HAZARD MANAGEMENT PROCEDURE TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk

More information

HEALTH AND SAFETY RISK ASSESSMENT POLICY Harmer Street Gravesend Kent DA12 2AX

HEALTH AND SAFETY RISK ASSESSMENT POLICY Harmer Street Gravesend Kent DA12 2AX HEALTH AND SAFETY RISK ASSESSMENT POLICY 42 44 Harmer Street Gravesend Kent DA12 2AX CONTENTS 1. General Policy on Health and Safety Risk Assessment... 1 2. Scope... 1 3. Authorisation... 1 4. Responsibility...

More information

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER) SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER) 1.0 INTRODUCTION The purpose of this procedure is to give direction on the responsibilities and requirements related to UK legislation covering

More information

Health and Safety Policy

Health and Safety Policy Snowflake School Policy Reviewed September 2018 To be reviewed September 2019 Roy English Health and Safety Policy 1. STATEMENT OF INTENT The Trustees of Snowflake School will take steps to meet their

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

in Australian Workplaces

in Australian Workplaces Copyright 2011 - OnGuard Safety Training Pty Ltd 1 of 7 in Australian Workplaces Introduction Part 2 Part 3 Part 4 Part 5 SafeWork SA Introduction Hazard identification is the process used to identify

More information

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM 1.0 REGULATORY AUTHORITY Code of Federal Regulations, 29 CFR 1910.147; California Code of Regulations, Title 8, Sections 2320.1 and 3314; CSU, Fullerton

More information

LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM LOCKOUT/TAGOUT PROGRAM HOW CLIMATE ENGINEERS INC. COMPLIES WITH THELO/TO STANDARD It is the intent of Climate Engineers Inc. to comply with OSHA s Control of Hazardous Energy Standard (1910.147). The following

More information

Conformity with Relevant Standards and CE Marking

Conformity with Relevant Standards and CE Marking SELECTION Suitability for Task and Environment The Provision and Use of Work Equipment Regulations 1998 (PUWER), Regulation 4, requires the employer to ensure that work equipment is designed or adapted

More information

Safe Work Method Statement Tasks

Safe Work Method Statement Tasks Safe Work Method Statement Tasks SWMS Venue: Date Created: Address: Contact: Adelaide and surrounding suburbs 23 rd August 2017 27 Valetta Rd Kidman Park SA 5025 Daniel Renshaw CONTROLLED DOCUMENT Page

More information

Project & Task Work Health and Safety Risk Management Procedure

Project & Task Work Health and Safety Risk Management Procedure Project & Task Work Health and Safety Risk Management Procedure Related Policy Work Health and Safety Policy Responsible Officer Executive Director Human Resources Approved by Executive Director Human

More information

Work Equipment: LOCAL EXHAUST VENTILATION

Work Equipment: LOCAL EXHAUST VENTILATION Health & Safety Services Safety Code of Practice 46: Part 4 2 nd Edition, September 2014 Work Equipment: LOCAL EXHAUST VENTILATION University of Reading 2015 Page 1 Contents 1 Scope... 3 2 Introduction...

More information

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers Working at Height 1. PURPOSE 1.1 To ensure that any work at height is carried out in accordance with the legal requirements and associated guidance. This includes the use of scaffolds, towers, ladders,

More information

Elements of a Lockout/Tagout Program OSHA

Elements of a Lockout/Tagout Program OSHA September 15, 2015 Elements of a Lockout/Tagout Program OSHA 1910.147 Dayna Noble Industrial Safety Consultant Specialist Ohio BWC 567-204-8917 Dayna.noble@bwc.state.oh.us Top 10 most frequently cited

More information

Hazard Management Making your workplace safer

Hazard Management Making your workplace safer Hazard Management Making your workplace safer A Guide to Hazard Identification, Risk Assessment, Control and Reviewing 1 What is a hazard? A hazard is something which has the potential to harm the health,

More information

Facilities Management

Facilities Management Facilities Management Policy Number: 700.6 Title: Lockout/Tag Out Policy Implementation Date: 2004 Last Audited: July 2 nd, 2018 Last Revised: March 25 th, 2015 Introduction This policy contains the necessary

More information

GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT. Lifting Operations and Lifting Equipment Regulations 1998

GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT. Lifting Operations and Lifting Equipment Regulations 1998 GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT Lifting Operations and Lifting Equipment Regulations 1998 (LOLER 98) Prepared by Mike Heath. Community Supply Manager/Bath

More information

Preventive Maintenance

Preventive Maintenance A Health and Safety Guideline for Your Workplace Why? Preventive maintenance is predetermined work performed to a schedule with the aim of preventing the wear and tear or sudden failure of equipment components.

More information

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

Lockout/Tagout Plan Environmental Health & Safety Office July 2017 July 2017 Table of Contents Acronyms... iii Foreword... iv Document History... iv 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Scope... 1 1.3 Lockout/Tagout Program... 1 2.0 Roles and Responsibilities...

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

Lockout/Tagout Safety Policy

Lockout/Tagout Safety Policy University of North Carolina Wilmington Environmental Health & Safety Workplace Safety Lockout/Tagout Safety Policy GENERAL The UNCW Environmental Health & Safety Department (EH&S) is authorized by UNCW

More information

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM INTRODUCTION Mariposa County ( County ) facilities have equipment and systems that must be deenergized to allow for safe cleaning, repairing, servicing, setting-up,

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2 PO Box 50, Hornsby, NSW 2077 Phone: 1800 643 853 Web: www.bobcat.com.au RISK ASSESSMENT For Bobcat Excavator Models 322 341, (Series D & G) CONTENTS Applicability Standards referenced in the preparation

More information

B S Glass Ltd Safety procedures- outsourced Workplaces

B S Glass Ltd Safety procedures- outsourced Workplaces B S Glass Ltd Jan 17 B S Glass Ltd Safety procedures- outsourced Workplaces Index - - - - - - - - Page No On Site safety - - - - - - - - - - - - - - - - - - - Content 3. 1.00 Health and Safety Mission

More information

Accident/Incident Reporting and Investigation Procedures

Accident/Incident Reporting and Investigation Procedures Accident/Incident Reporting and Investigation Procedures Policy reference Workplace Health and Safety Policy Procedure reference Workplace Health and Safety Risk Assessment Procedures Procedure It is imperative

More information

Health, Safety and Welfare Policy

Health, Safety and Welfare Policy Health, Safety and Welfare Policy This Policy is prepared in accordance with section 2(3) the Health and Safety at work etc. Act 1974, with the intention of promoting a safe working environment that will,

More information

Lockout Tagout Program

Lockout Tagout Program Lockout Tagout Program Table of Contents INTRODUCTION... 2 FORWARD... 2 OBJECTIVE... 2 APPLICABILITY... 2 RESPONSIBILITIES... 3 PROGRAM ENFORCEMENT... 4 RECORDKEEPING... 4 LOCKOUT TAGOUT EQUIPMENT... 5

More information

Lockout/Tagout - Control of Hazardous Energy Program

Lockout/Tagout - Control of Hazardous Energy Program Lockout/Tagout - Control of Hazardous Energy Program The University Of Iowa Environmental Health & Safety 122 Grand Avenue Court Iowa City, IA 52242-1000 Phone: 319-335-8501 Date Revised/Reviewed: 6/8/2018

More information

Work Health and Safety Risk Management Procedures

Work Health and Safety Risk Management Procedures Work Health and Safety Risk Management Procedures Table of Contents 1. Governing Policy 2. Purpose 3. Scope 4. Definitions 5. Responsibilities 6. Risk Management Process 6.1. Process summary 6.2. Hazard

More information

Design & Technology Department Health & Safety Policy. Outwood Academy Ripon

Design & Technology Department Health & Safety Policy. Outwood Academy Ripon Design & Technology Department Health & Safety Policy Outwood Academy Ripon Document control table Document title: Author (name & job title): Version number: DT Health and Safety Policy Katy Bradford,

More information

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different incidents, injuries, loss of lives, and property damages. Dimension

More information

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine. Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the

More information

PRESSURE SYSTEMS POLICY

PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY 1. Introduction 2. Policy Statement 3. Scope 4. Background 5. Roles & Responsibilities 6. Training 7. Contractors 8. Policy Review 1. Introduction The Kilmarnock

More information

Health, Safety, Security and Environment

Health, Safety, Security and Environment Document owner and change code Document Owner Aaron Perronne Title HSSE Manager Mark X Change Code Description X N/A First Issue A Typographical/Grammatical correction; formatting change; text clarification-no

More information

BHC-P-07.2 Health Hazards in Construction

BHC-P-07.2 Health Hazards in Construction BHC-P-07.2 Health Hazards in Construction Contents 1.0 Purpose 2.0 Scope 3.0 Definitions 4.0 Main requirements 5.0 Guidance documents and references 6.0 Appendices Revision Register Date Version Description

More information

THICKNESSER RISK ASSESSMENT (U003ra)

THICKNESSER RISK ASSESSMENT (U003ra) Task Being Carried Out: Area: Persons at Risk: Operation of T500 Thicknesser Brindle Mill Operatives, Maintenance engineers Description of Equipment: Wadkin T500 Thicknesser Serial No.: T500 82240 (Machine

More information

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018 University Policy Volume E2: Environment, Health, Safety and Security E2.14 Control of Hazardous Energy Responsible Office: Facilities Management Responsible Officer: Safety Officer POLICY STATEMENT All

More information

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE Office of Environmental Health & Safety CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE LOCK OUT/TAG OUT OSHA 29 CFR 1910.147 rev. 3 2014 Director of Environmental Health & Safety Control of Hazardous Energy

More information

POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH)

POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH) POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH) INTRODUCTION & LEGISLATION Using chemicals or other hazardous substances at work can put people s health at risk. The law requires employers

More information

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010)

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010) COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010) Introduction This document contains corporate standards and guidance on the management of risks arising from the

More information

Control of Energy - Isolation Process

Control of Energy - Isolation Process Issue Date: 24/03/17 Last Reviewed: 24/03/17 Next Review Date: 24/03/18 Authorised By: Mike Muir Safe Operating Procedure Control of Energy - Isolation Process Purpose: This SOP is based on a Generic 12-step

More information

HS26 Working at Height Policy and Procedure

HS26 Working at Height Policy and Procedure HS26 Working at Height Policy and Procedure HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 1 of 8 1. Scope This policy applies to all staff, students and visitors to The Shared Learning

More information

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY 1. CONTROL OF HAZARDOUS ENERGY POLICY AND PROCEDURES A. OSHA References: 29 CFR 1910.147, 29 CFR 1910.332, 29 CFR 1910.333, 29 CFR 1926.417 B.

More information

Reducing Exposures From Confined Space Entry

Reducing Exposures From Confined Space Entry Reducing Exposures From Confined Space Entry Over 1.6 million Americans work in Confined Spaces each year, and each year many accidents occur. Many of these accidents lead to serious injury or death from

More information

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998 FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998 CONTENTS 1. Introduction 2. Definitions and Statements 3. LOLER Considerations

More information

Lock Out/Tag Out Control of Hazardous Energy

Lock Out/Tag Out Control of Hazardous Energy Lock Out/Tag Out Control of Hazardous Energy University Facilities Internal Procedure: July 1, 2013 Effective date: July 1, 2013 Last Modified: April 2013 Approved by: Bob Wells 1.0 Program Objective UF

More information

Waste Industry Safety & Health

Waste Industry Safety & Health Waste Industry Safety & Health A practical pocket guide for the Waste industry Supported by: Delivering the Solution Together Introduction The Waste Industry Safety and Health (WISH) forum is supporting

More information

The Best Use of Lockout/Tagout and Control Reliable Circuits

The Best Use of Lockout/Tagout and Control Reliable Circuits Session No. 565 The Best Use of Lockout/Tagout and Control Reliable Circuits Introduction L. Tyson Ross, P.E., C.S.P. Principal LJB Inc. Dayton, Ohio Anyone involved in the design, installation, operation,

More information