Submarine Pipeline Design in the South China Sea

Size: px
Start display at page:

Download "Submarine Pipeline Design in the South China Sea"

Transcription

1 Submarine Pipeline Design in the South China Sea ZHAO Dang 1, HE Ning 1, LIU Run 2, WANG Bo 1, LIU Meng-meng 2, WANG Meng 1, HUANG Hui-di 1 1. Offshore Oil Engineering Co., Ltd. Engineering Company, Tianjin, , P. R. China 2. Tianjin University, School of Civil Engineering, Tianjin, , P. R. China zhaodang@mail.cooec.com.cn Abstract: Submarine pipelines in South China Sea have been under consideration for more than a few years, but only few have been built. One reason for this is that petroleum prices have not increased as fast as had been expected, but another is that there have turned out to be several technical difficulties, among them high pressure and high temperature petroleum resource, deepwater and harsh environments, uneven seabed feature, and possible fishing activities. The harsh environment and geological conditions resistant to South China Sea petroleum development, and has a substantial influence on regulatory approvals. Forward environmental data and geotechnical data must be predicated on a complete and convincing resolution of technical questions. This paper examines each problem area, and sets out to reach a judgment on the question that have been resolved and how far the industry is easy to construct submarine pipelines in the South China Sea. Keywords: HPHT; Internal wave; Routes selection; CRA Lined Pipeline. 1. Introduction A few years ago, the hydrocarbon resources of the South China Sea seemed on the point of rapid and energetic development. Many schemes were promoted, some of them very ambitious. Nevertheless, much research was carried out, and a very few projects were actually carried through, partly because costs and technical uncertainty made the economics seem questionable, among them the LIWAN Deepwater EPCI, Shallow Water Facilities of the South China Sea Deepwater Gas Development and PANYU 35-1/2 Subsea EPIC Services project are underway. With research continued, and some ideas changed markedly. The oil price has recovered, at least for the moment, and some offshore projects appear economically and technically feasible in the South China Sea. Most of these projects involve marine pipelines. They are receiving renewed interest, though there are still technical questions and environmental unfavorable factors. The objective of this paper is to review the state of knowledge, and to attempt to assess how far the pipeline industry is now ready for the new challenge. It is clear that some projects are very much more demanding than others. Rightly and unsurprisingly, all the indications are that the industry will begin with the less ambitious and less difficult projects, and expects to apply the lessons learned to the larger projects that may be reached later, probably not for five or ten years. This paper should not be interpreted as a comment on any specific project. As in the case of deep water, some pipeline construction problems are the same as they are elsewhere, and some are easier in the South China Sea. Pipeline affected by marine growth, for example, is rarely a major constraint, because in the South China Sea, the deepwater makes the marine growth effected less. 2. HPHT In comparison to the easy and conventional sources of hydrocarbons found in other sea areas of China, the reservoirs found in the South China Sea are mostly under high pressure and/or high temperature (HPHT) condition (e.g. pipeline from PANYU 35-2 A2H well to PANYU 35-2 CM, the parameters are 38.49MPa for hydrotest pressure, 31.0MPa for operation pressure and the max design temperature up to 84.0 C; and pipeline form PANYU 35-1 A2 PLET to PANYU 35-1 A1H ILM, the parameters are 33.09MPa for hydrotest pressure, 27.0MPa for operation pressure and the max design temperature up to C). Transporting the oil and gas by flowlines and pipelines from these HPHT reservoirs is a major challenge. A pipeline laid on or buried in the seabed responds to high pressure and/or high temperature by expanding against the frictional resistance from the soil and other restrictions, resulting in axial forces, axial displacement (also known as end expansion), lateral buckling, upheaval buckling, or a combination of these, depending on whether the pipeline is partly/fully restrained or unrestrained. In some cases, pipeline walking may occur after the pipeline in operation is cooled down, e.g. in a shutdown, heated up for operation, and then the thermal cycles repeated. These pipeline movements/forces can cause 125

2 failures in the midline or at the tie-ins connected to the pipeline end, and are critical to the integrity of a pipeline. When a pipeline is subject to high pressure and high temperature, its ends expand longitudinally and exert forces and bending moments onto adjacent tied-in structures or pipes connected to it. The tied-in structures/pipes must be designed to withstand these expansions and loads. Dumping rocks along the pipeline has conventionally been adopted to reduce the end expansion, but is challenging for deepwater pipeline. Trenching and burying pipelines are costly. A giant spool installed at the pipeline end is another alternative which is commonly used in the design of subsea pipelines for the South China Sea. They are often used in combination to eliminate end expansion when it is very large. However, such post-lay intervention work is costly, requires long offshore time to accomplish and its installation is restricted by the lay barge and environmental data. Thus, a major challenge is to improve on the ways the pipeline end movements can be controlled ways which are simple, safe and cost effective. A global team of experienced engineers has developed a new concept SliPIPE[1], shown in Figure 1, to deal with the end expansion of a rigid pipeline subject to HPHT. Key advantages of SliPIPE are that it avoids the fabrication and complicated installation associated with giant spools; minimizes costly post-installation subsea intervention work; and SliPIPE is space-efficient, ideal in areas congested with many subsea facilities, as are often encountered in brownfield modification work, where safeguarding their integrity during intervention work can be formidable. Although SliPIPE is conceptual and will require refinement and engineering through basic and detailed design before it can be adopted in an actual project, it is an ideal way put forward to cope with HPHT pipeline design. Figure 1 Sketch of SliPIPE(Chia Chor Yew and Asle Venas, 2013) When pipelines operate at higher temperatures, the likelihood of buckling becomes more pertinent. Global buckling analysis will be performed to identify whether the global buckling is likely to occur. If it is, then further analysis is performed to either prevent buckling or accommodate it. Likelihood of above-mentioned dumping rocks may induces higher loads in the line pipe when prevents it from buckling, and which will not provide enough restraint, then localized buckling may occur (i.e., upheaval buckling), which can cause failure of the pipeline. Another method is to accommodate the buckling problem by permitting the pipeline to deflect on the seabed, by using a snake lay or buckle mitigation methods such as sleepers[2-4] or distributed buoyancies[5]. This method is obviously cheaper than rock dumping, and results in the pipeline experiencing lower loads. However, the analysis will probably have to be based on the limit-state design, because the pipe will have plastically deformed. This method is becoming more popular. This method can also be used with intermittent rock dumping; by permitting the pipeline to snake and then to rock dump, the likelihood of upheaval buckling is reduced. The methods employed in calculating upheaval and lateral buckling, as well as the pullover response, are detailed in Ref. DNV-RP-F110[6]. 3 Internal wave Internal wave is a nonlinear wave, and often happens in the South China Sea, which known as the natural laboratory for the internal wave study. It is only in research step that the effects of nonlinear ocean internal wave make on submarine structure. Studies have shown that two main reasons arise internal wave, one is the stable layer structure of sea water, which should be determined by the seasonal temperature, atmospheric circulation, and geographical position of 126

3 the sea water. For a given sea zone, the density of sea water is stable for different seasons, and the deeper the heavier density of the sea water. The other reason is the disturbance activity, which can be divided into external and internal disturbances. The external contents the rise and fall of barometric pressure, wind inducing at ocean surface and seismic effect from the ocean bottom, while the internal contents the interaction of tide and submarine topography, resonance of surface wave and induced wave caused by the effect of current on the roughness seabed terrain and so on. In the South China Sea, the sea water has acquired the requirements for internal wave. Distribution of the internal solitary waves has shown in Figure 2 and Figure 3. Compared the two-dimensional wave at the ocean surface, the internal wave current (soliton) is three-dimensional. The data used for the PANYU 34-1 marine pipeline design refer to Table 1. There is a proposed riser at the PANYU 34-1 jacket platform, the primary design parameters are: water depth 190m, OD 355.6mm and WT 15.9mm of Grade API 5L X-65, PSL2 (API 5L, 2007). Figure 2 - Distribution of the internal solitary waves in the South China Sea [7] (The iso lines denote water depth in meter) Figure 3 - Monthly distribution of the internal solitons in the northeast of South China Sea from SAR [8] 127

4 Table 1 Main Environmental Extreme Value Wave Current Soliton current H s (m) 13.8 Water depth(m) Data (cm/s) Water depth(m) Data (cm/s) H max (m) T s (s) T p (s) For the soliton current is a three-dimensional, assent the effect on the riser analysis by considering eight directions and two conditions (with soliton current and without). Refer to Figure 4 for the riser model (AutoPIPE) and Figure 5 for the soliton current directions. Riser Figure 4 - Schematic of riser model Figure 5 - Schematic of soliton crrent direction for riser analysis According to DNV-OS -F101[9], analyze the installation case of riser model by LRFD, and the results (load control combined a and b ) list in Figure 6(with soliton current effect) and Figure 7(without soliton current effect). From above analysis and other documents, it is known that the internal wave current may be hazardous for marine riser. For a proper assessment, site specific data are required on the internal wave velocity, direction, duration and frequency of occurrence. In the future, should pay more attention to the internal wave characteristic, and proposal relevant methods as a safeguard against the effects of the internal wave on the submarine pipeline. 128

5 Figure 6 - Results of riser analysis with soliton current effect Figure 7 - Results of riser analysis without soliton current effect 4. Pipeline Routes selection The proposed pipeline route should be performed form the results of seabed soil feature evaluation, pipeline upheaval buckling analysis for HPHT pipeline, exact location and burial status of existing pipeline and cables shall be identified prior to installation activity, pipeline on-bottom roughness and scour induced free span assessment, and pipeline and anchor area QRAs. The water depth in the South China Sea is shown as Figure 8. The water depth and route survey corridors within PANYU and LIWAN zones refer to Figure 9, and the routes for proposed pipelines are generally flat with local variations of seabed level for a few meters due to some irregular seabed areas. 129

6 Figure 8 - Schematic of water depth in the South China Sea Figure 9 - Schematic of survey corridor and pipelines general layout within PANYU and LIWAN zones The main discernible prominent seabed features within this zone are areas of hard irregular seabed and sand waves, and undesirable seabed features and obstructions i.e. isolated pock marks, hard undulated seabed features are found within some proposed pipeline route. Hard irregular seabed features are seems to be the exposed locally strong clay due to erodible soils around. However the effect of these seabed features to pipeline integrity during installation and operating shall not be negligible. 130

7 4.1 Soil characteristic Geotechnical investigation has been carried out along the pipeline route to understand the presence of soil type and derive the geotechnical data required for the proposed pipeline. Liquefaction potentials have been evaluated from seismic response analysis results and cyclic triaxial test results. Analysis results indicate that the liquefaction will not occur along the pipeline route. The survey has not identified any marine activity such as access channel, anchors scars and debris within pipeline route survey corridor. However, there are trawl gear scars existing. If the trawling board hits on 6 (PANYU 35-1 zone) or 10 (PANYU 35-2 zone) pipeline within this zone, according to the results, it will cause damage. According to national regulation, trawling is forbidden on pipeline route, and need enhance management to ensure no trawling on pipeline route. Likelihood of trawling on pipeline is very low, so the risk level is acceptable within national regulation. Sand waves are identified along the pipeline route from LIWAN 3-1 CEP to PANYU 34-1 CEP and PANYU 35-1 zone. But the impact of sand waves to integrity of the pipeline is considered to be insignificant due to smaller height and the wave lengths of the sand waves. These sand waves and potentially scour may cause spans along the pipeline. The evaluation of sand waves and ridges and pipeline scour assessments are performed. The recommendations from analyses include trenching and burial for the selected pipeline (e.g. pipeline form LIWAN 3-1 CEP to PANYU 34-1 CEP). 4.2 Sand waves and sand ridges evaluation Sand waves and sand ridges evaluation are to assess the dynamics of the seabed and to evaluate the impact of sand waves and ridges on the design, maintenance and operation of the pipeline. Possible causes of seabed mobility and dynamics are as follows: a) Seabed changes due to general sediment transport if the seabed is erodible; b) Seabed changes due to development and migration of bed forms. The mobility of the seabed depends on its erodibility. If the seabed is erodible, then sediment transport occurs under the combined action of waves and current, causing potential seabed scouring. In addition, bed forms may occur on an erodible seabed. The bed forms may develop, migrate and disappear depending on variations in the environmental conditions Seabed Erodibility Erodibility and potential seabed scour depend on local soil conditions as well as wave and current conditions. In terms of erodibility and potential of seabed scour, the soil condition in the PANYU and LIWAN areas can be roughly classified as follows: 1) Sandy seabed: Non-cohesive or almost non-cohesive seabed (sandy seabed). The seabed consists of sand with or without silt. There is no clay or the fraction of clay is small (order of 5%). The seabed is generally (easily) erodible. For non-cohesive or almost non-cohesive seabed, the erodibility is determined by the Shields number (van Rijn, L.C., 1993) [10]. The critical Shields number for initiation of motion is about 0.05 for a sandy seabed. The seabed will be mobile if the Shields number exceeds the critical Shields number. 2) Clayey seabed: a) Partly cohesive seabed (clayey seabed): consisting of a small fraction of clay (about 10-20%). The seabed is less erodible than sandy seabed; b) Cohesive seabed: consisting of a significant fraction of clay (>20%). The seabed is more resistant to erosion than partly cohesive seabed. The clayey seabed is cohesive or partly cohesive. It is more resistant to erosion due to waves and current. The flocs on the surface of a cohesive sediment bed are bound together by inter-particle attractive forces. To remove a floc by flow requires a bed shear stress sufficient to overcome the attractive forces. Erosion of bottom material occurs if the bed shear stress exceeds a threshold shear stress Bed forms Bed forms are generated by the combined effect of currents and waves. The type of the bed form in the above classification is related to the peak wave and current velocities, water depth, sediment size and the availability of sediment [10]. According to the amplitude and cause of formation, bed form can be defined as: ripples, mega-ripples, sand waves and tidal sand banks. Based on the evaluation of bed forms in the PANYU and LIWAN zones, these bed forms are mega-ripples and sand waves. They are mobile but their impact on the pipeline is not important. However, in view of a design life of 50 years for the pipeline, the long-term variations should not be neglected. Their impact on the pipeline should be taken into account. The small sand waves may develop and migrate depending on the wave and current conditions. On the basis of the sediment transport calculations, it can be considered that they are relatively stable under the normal conditions and they are dynamic under the storm conditions. Based on the observed seabed features and soil conditions as described above, note that in identifying potential areas of concern, emphasis was placed on the seabed mobility and seabed irregularity, and which will 131

8 lead to free spans. There are two types of free spans: free spans due to seabed roughness and free spans due to local scour. 4.3 Pipeline on-bottom roughness study The on-bottom roughness assessment shall be performed for the surveyed bathymetric data along the pipeline route, and will adopt a realistic seabed profile as well as temperature/ pressure profiles along the pipeline, which can be used to determine the locations, along the pipeline, which are prone to upheaval buckling and will give a guidance to indicate the span location and type of seabed rectification may be required. Rectify the spans exceeding the allowable limit or exceeding the stress criteria due to seabed undulations for the whole length of the pipeline route. It was found that there were no spans exceeding the maximum allowable span along the pipeline route at PANYU 35-1 and LIWAN 3-1 zones. While one proposed pipeline with a greater elevation differences refer to Figure 10 shown that three places (the max at about KP7350) of free span have exceeded the allowable span length calculated from the free span analysis reports. The soil along the pipeline route consists of loose to medium sand, very soft clay and hard undulated seabed feature. The hard seabed feature at the above locations are seems to be the locally hard clay surrounded by more erodible and mobile soil. Historic seabed movement have resulted in rapid seabed elevation changes along the design route and laying the pipeline over these features results in excess spans. Also the pipeline bending moments and stresses are exceeding the allowable limit as per DNV - OS - F101 (2012) (90% of SMYS limit). Therefore the pipeline around this location has been re-routed to avoid the seabed feature to mitigate the free spans and reduce the forces and moment within acceptable limit. The trimming of elevated seabed will result in the pipeline stresses and bending moment within allowable (e.g. refer to Figure 11 for the proposed pipeline trimming) or re-routed with a S-curve. Based on the seabed intervention assessment and cost comparison the conclusions can be drawn: the cost of seabed intervention is significantly more than the increase in cost if the pipeline is re-routed at the seabed feature locations. Figure 10 - On-bottom roughness analysis results for one proposed pipeline (Installation case) 132

9 Figure 11 - Trimming at KP7350 for the proposed pipeline (Installation case, green line is for trimming, red line for pipe elevation and black line for seabed elevation) 4.4 Self-lowering and free spans due to scour In the pipeline design located in the South China Sea, an assessment was made of self-lowering and free span development due to local scour for the proposed pipeline. The assessment of free span development due to local scour was made by combining empirical approach and numerical modeling. The initial self-lowering of the pipeline due to its weight after the pipe laying will be 5-10% of the pipe outer diameter. After laying, the free spans due to scour may generate and develop and further self-lowering may occur. 4.5 Upheaval buckling analysis Upheaval buckling is of particular concern to high temperature and/or high pressure buried pipelines when the pipelines are restrained both axially and laterally, with inadequate resistance to pipeline upward movement. Upheaval buckles could occur when a pipeline is resting on an imperfection, and/or an uneven trench bottom. The pipeline will tend to release the axial force by buckling in the direction with the lowest resistance. When imperfections occur in the vertical plane, this is usually upwards. The pipeline will be analyzed for the minimum backfill materials to resist upheaval buckling. The preliminary upheaval buckling analysis has been carried out to identify whether upheaval buckling is likely to be a problem. The analysis will be performed to calculate the required download to resist the pipeline tendency to buckle upwards due to installation on an uneven trench bottom or seabed. The design methodology of the upheaval buckling is based on the semi-empirical approach given by Palmer et al. [11]. The methodology will calculate the required minimum downward load to counteract upheaval buckling. The required downward load is intended to be provided by the use of concrete weight coating. Where this downward load is beyond the practical limits of concrete weight coating alone, then additional downward load shall be provided by soil burial or rock dumping. Where burial is provided, the uplift resistance may be calculated as follows: For sand: H q= sub H OD 1 f OD For clay: H q= c OD min 3, OD The soil will be in disturbed state after trenching and backfilling, which reduces the shear strength of the clay. The cohesionless backfilled soil is assumed to be fluidised soil. Therefore remoulded shear strength of clayey soil shall be considered for calculating the resistance against upheaval buckling of pipeline at the time of commissioning of the pipeline conservatively. In the deep-water area (e.g. pipeline from LIWAN 3-1 CEP to PANYU 34-1 CEP), trenched to a depth of 1.5m to top of pipe, natural backfill due to waves and currents is expected to occur compared to mechanical backfill. In the shallow water area (e.g. pipeline from LIWAN 3-1 CEP to onshore plant) where the seabed consists of mainly sand, backfill during to waves and currents are expected to occur and the backfill rate is expected to be considerable. In the nearshore area (water depth less than 30 m) where the seabed consists of mainly clay, backfill due to waves and currents could be limited because a) the clay fraction of the backfilled local sediment is likely to be 133

10 washed away; b) natural backfill of the backfilled local silt and sand fraction may be limited due to lack of upstream supply and the fine sizes of the silt and sand. 4.6 About Installation Minimum allowable lateral curve radius For the soil feature characteristic, the proposed pipeline route is not only straight, there also S curve routes (e.g. pipeline form PANYU 35-2 CM to PANYU 35-2 ILM), and the minimum allowable lateral curve radius is calculated by SF T R L, The bottom tension used in the minimum radius calculation is based on pipeline W installation feasibility analysis Spool choose code For there are two proposed platforms (PANYU 34-1 CEP and LIWAN 3-1 CEP) will be built for connection the subsea manifold to transport fluids/gas through long distance pipelines to the onshore plant for further processing. It is unavoidable to use spools to connect the subsea pipeline and riser on the platform at recent design phase. The following conclusions can be drawn from the oil and gas development of PANYU and LIWAN filed: 1) 90 degree bends are more effective in absorbing pipeline expansion and convenient for spool fabrication; 2) L-shape spools with minimized spool length easy for lifting and installation compared to Z-shape spools; 3) Installation contractor shall consider minimum safety distance between the laybarge and structure/jacket during laying down pipeline at platform and install (lifting/lowering) spool and PLET into the specified location in project area; 4) Tolerances will be considered during the spool design, which include: structure installation tolerances, metrology tolerances, fabrication tolerances and connector stroking tolerances (if applicable). The installation tolerances for subsea structures are: 1) Horizontal tolerance: ±2. 2) Plan tolerance: ±2.5 m in any direction for single piece subsea structures installed on the seabed, and ±0.5 m in any direction relative to the pre-installed piping for protection structures. 3) Plan orientation: ±3 from defined orientation. The installation tolerances for pipeline initiation/ termination usually are: five (5) metres long by five (5) metres wide. A suitable acoustic system to position the pipe accurately with respect to the platform and other critical areas in accordance with relevant specifications shall be provided. The fabrication tolerances for spool bend usually are: ± 0.75º. The installation tolerances for spools are: maximum setdown velocity 0.5 m/s. Movement toward deeper waters and harsher environmental conditions has required the continuous development of new technologies, and will continue to do so. Compared with the horizontal spools described above, vertical jumpers had used in South China Sea recent years. The comparison considered from both technical and economic standpoints may refer to Ref. Corbetta, G. and D. Cox [12]. Based on the above summary of results and conclusions the following recommendations can be made: 1) If seabed is rough, a local re-routing may be considered. If the re-routing is outside the available pipeline survey corridor, then a local re-survey is required; 2) If seabed is expected to be dynamic at a time scale of months to one year, then a resurvey of the dynamic areas may be considered in order to better quantify the short term seabed dynamics; 3) For local span length calculated by on-bottom roughness analysis exceeds the allowable span length calculated from the free span analysis, the method to cope with this problem usually contents local trimming of the seabed and/or re-routing the pipeline route; 4) Be reasonable to choose the spool shape. 5 CRA Lined Pipeline For the high corrosion of petroleum resources in the China South Sea, lined pipe has chosen for the subsea pipeline design. 28.6km of 6 lined pipeline and 18.3km of 10 lined pipeline, with 3mm CRA, have designed in PANYU 35-1 and 35-2 zones for oil and gas transition. The cost of lined pipeline is significantly less than the increase in cost if the pipeline to be used traditional steel pipeline design in accordance with 20 years design life. 134

11 Compared to carbon steel pipeline design, there are some key points for the lined pipeline design: 1) Manufacture Pressure: There are hydraulic expansion method, thermal-hydraulic shrink-fit method and hydro-exploding method to manufacture lined pipe. The pressure is a control point for manufacture, if the pressure is higher, which will make the liner pipe be devastatingly plastic deformation. However, if lower, which will make the gripping force of liner pipe and carbon steel pipe less than the demanded. 2) Welding Quality: the welding will use two materials for two pipe connection welding at least, one for liner pipe and the other for carbon steel pipe. It is difficult to meet the welding quality duo to the out-ofroughness of CRA pipe end and carbon steel. 3) Welding Efficiency: Because welding quality is demand high, the welding efficiency may be influenced. This determines the cost of laying vessel. 4) In the analysis (e.g. in-place, on-bottom stability, installation, bottom roughness and so on) for proposed CRA lined pipeline, it is not necessary to consider the utilisation of the strength of the liner, but only consider the mass of the liner with the utilisation of the strength of the backing material. Each length of finished lined pipe shall be measured for conformance to wall thickness and CRA layer requirements. The wall thickness shall conform to the tolerances specified in API 5LC [13] and DNV-OS-F101 [9]. Wall thickness measurements shall be made with a properly calibrated non-destructive inspection device of appropriate accuracy. Four points bend testing shall be carried out for each type of pipe in PANYU 35-1/35-2 project to mimic the deformation which will take place during the laying processes. Before four points testing, test joint shall be liner collapse tested. The test pipes will be subjected to displacement controlled loading in order to achieve the specified level of strain. Monitoring of the test pipe during the bend test will be carried out using internal video cameras and external strain gauges. This data will be captured and recorded for posttest analysis and review. Bending test can be treated as a quasi-static process, use the backing material quasi-static allowable stress and strain based on DNV-OS-F101 [9] limit states to check if the lined pipe meet the MPQT after cycles. The test shall continue bending to liner failure and the maximum strain in pipe shall be recorded. Except the testing of pipe in absolute bending stress condition, the tensile bending test could be additional. The axial tensions applied to the pipe specimen should consider laybarge tension capacity or pipeline submerged weight from end of laybarge stinger to touch down point on the seabed multiplied with dynamic safety factor. Normally tensile testing of both the carbon steel base material and the CRA liner material shall be carried out at the maximum design temperature in addition to the ambient temperature testing. Tensile test will be done separately for the steel and CRA liner material. Out of roundness for pipe body and pipe ends shall according to DNV-OS-F101 [9] and MPQT. 6 Conclusions A strictly personal assessment is that pipeline route selection and CRA lined pipeline construction remain the difficult questions, and that the other issues are either unlikely to be significant or can be solved in a routine way. It is plainly possible to eliminate the effect of the uncertainties by adopting a very conservative design strategy and by incorporating large margins of safety. In the case of pipeline route selection, this can readily be done in areas where the hard undulated seabed and sand wave seabed features are not severe, and the cost of doing so is quite acceptable. In severe undulated and sand wave seabed features, the cost of re-finding a generally flat pipeline route is likely to be very high, and then a greater understanding of trimming processes is likely to be beneficial. The same arguments apply to CRA lined pipeline construction, but there the environmental consequences of getting it wrong are less serious and effective quality control procedures and welding inspection will be enormously valuable. 7 Nomenclature API American Petroleum Institute CEP Central Processing Platform CM Central manifold CNOO China National Offshore Oil Corporation C COOEC Offshore Oil Engineering Co., Ltd. CRA Corrosion Resistant Alloy DNV Det Norske Veritas EPCI Engineering design, Procurement, Construction and Installation 135

12 EPIC H max H s ILM LRFD MPQT OD PLET QRA SF SMYS T T p T s WT W q H c sub f Engineering design, Procurement, Installation and commissioning Maximum wave height Significant wave height In-line Manifold Load and Resistance Factor Design Manufacturing Procedure Qualification Test Outside Diameter Pipeline End Termination Quantitative Risk Analysis Safety Factor Specified Minimum Yield Stress Tension at touch down/bottom Spectral peak wave period Significant wave period Wall Thickness Soil lateral friction factor Pipeline submerged weight Uplift resistance Required minimum backfill height to top of pipe Soil undrained shear strength Submerged density of soil uplift coefficient 8 Acknowledgments The authors would like to thank Chia Chor Yew, DNV GL Singapore, and Asle Venas, DNV GL Hovik, for allowing the use of the results [1] and helpful suggestion. They also would like to thank the South China Sea oil resources development Project Group of CNOOC and Subsea Pipeline Engineering Department of COOEC for encouraging this study and allowing this paper to be published. The paper was supported by: a. Ministry of Industry and Information Technology of P.R.C Offshore Engineering Equipment Scientific Research Project( )- Research & Development for Subsea Production System Design & Key Subsea Equipment (Phase I); b. National Key Technologies R&D Program of China (Grant No. 2011ZX05056). 9 References [1] Chia Chor Yew and Asle Venas, SliPIPE: a new concept to deal with pipeline expansion. Journal of Pipeline Engineering, 12(2). [2] Randolph, M.F., et al., Recent advances in offshore geotechnics for deep water oil and gas developments. Ocean Engineering, 38(7): [3] Esaklul, K., et al Active Heating for Flow Assurance Control in Deepwater Flowlines. Offshore Technology Conference held in Houston, Texas, U.S.A. (OTC 15188). [4] Harrison, G., M. Harrison, and D. S. Bruton, King flowlines-thermal expansion design and implementation. Offshore Technology Conference held in Houston, Texas, U.S.A. (OTC 15310). [5] Y Bai and Q Bai, Subsea Engineering Handbooks. Gulf Professional Publishing is an imprint of Elsevier 225 Wyman Street, Waltham, MA 02451, U.S.A., [6] DNV-RP-F110, Global buckling of submarine pipelines Structural design due to high temperature/high pressure. Det Norske Veritas, Norway. [7] Fang Xin-hua, Du Tao, Fundamentals of OceanicInternal Waves and Internal Waves in the China Seas, QingDao, China Ocean University Press, [8] Zheng, Q., et al., Statistical and dynamical analyses of generation mechanisms of solitary internal waves in the northern South China Sea. Journal of Geophysical Research-Oceans, 112(C3). [9] DNV-OS-F101, Submarine Pipeline Systems. Det Norske Veritas, Norway. [10] Van Rijn L C Principles of sediment transport in rivers, estuaries and coastal seas. Amsterdam, Aqua Publications. [11] Palmer, A., et al Design of submarine pipelines against upheaval buckling. Offshore Technology Conference held in Houston, Texas, U.S.A. (OTC 6335). [12] Corbetta, G. and D. Cox, Deepwater tie-ins of rigid lines: Horizontal spools or vertical jumpers? Oil Production & Facilities, 16(3): API 5L, Specification for Line Pipe. Edition March, Det Norske Veritas, Norway. [13] API 5LC, Specification for CRA Line Pipe. Det Norske Veritas, Norway. 136

Learn more at

Learn more at Full scale model tests of a steel catenary riser C. Bridge 1, H. Howells 1, N. Toy 2, G. Parke 2, R. Woods 2 1 2H Offshore Engineering Ltd, Woking, Surrey, UK 2 School of Engineering, University of Surrey,

More information

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer

More information

Global Buckling Design for Flexible Flowlines

Global Buckling Design for Flexible Flowlines Global Buckling Design for Flexible Flowlines Challenges, Approach and Lessons Learned Mostafa Tantawi 1 Agenda Background to flexible lines Mechanical behavior of Flexible vs Steel. Why flexible buckling

More information

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy OTC-24699-MS Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy Copyright 2014, Offshore Technology Conference This paper was prepared for presentation

More information

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING By Marian Copilet, Durham Pipeline Technology Ltd., Gateshead, UK & Prof. Ernie Appleton, University of Durham 1. ABSTRACT This paper discusses

More information

Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France

Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France DOT-2014 Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France Copyright 2014, Deep Offshore Technology International This paper was

More information

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements STRIDE PROJECT Steel Risers in Deepwater Environments Achievements 1999-21 Neil Willis Principal Engineer 2H Offshore Engineering 6 th Annual Deepwater Technologies and Developments Conference 21 The presentation

More information

FINITE ELEMENT ANALYSIS OF PIPELINE GLOBAL WALKING WITH SPANNING AND LATERAL BUCKLING

FINITE ELEMENT ANALYSIS OF PIPELINE GLOBAL WALKING WITH SPANNING AND LATERAL BUCKLING Proceedings of the ASME 2014 33rd International Conference on Ocean, Offshore and Arctic Engineering OMAE2014 June 8-13, 2014, San Francisco, California, USA OMAE2014-24159 FINITE ELEMENT ANALYSIS OF PIPELINE

More information

Intro r duct u io i n o - 3 -

Intro r duct u io i n o - 3 - Finite Element Analysis in Pipeline Design using Ansys at INTECSEA Agenda: Introduction Lateral Buckling Pipeline Walking Free Span Detailed Analysis On-Shore Installation Analysis Structural Design -

More information

Learn more at

Learn more at IBP1833_06 COST EFFICIENT ARTIFICIAL BUOYANT SEABED DRILLING SOLUTION Dan Moutrey 1, Frank Lim 2 Copyright 2006, Instituto Brasileiro de Petróleo e Gás - IBP This Technical Paper was prepared for presentation

More information

ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES

ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES GE Oil & Gas PII Pipeline Solutions Inessa Yablonskikh Principal Consultant Aberdeen, November, 14 th 2007 Assessment And Analysis Of Pipeline Buckles Introduction

More information

17J Third Edition, January 2008 Specification for Unbonded Flexible Pipe

17J Third Edition, January 2008 Specification for Unbonded Flexible Pipe API Specification 17J Third Edition, January 2008 National Adoption of ISO 13628:2006(Identical) Petroleum and natural gas industries Design and operation of subsea production systems Part 2: Unbonded

More information

Morphodynamics of Borssele Wind Farm Zone

Morphodynamics of Borssele Wind Farm Zone Morphodynamics of Borssele Wind Farm Zone Meeting Tender Borssele Hendrik Jan Riezebos Tommer Vermaas Robert Hasselaar Tim Raaijmakers 17 November 2014, SER Den Haag Contents of presentation Introduction

More information

The Impact of Composites on Future Deepwater Riser Configurations

The Impact of Composites on Future Deepwater Riser Configurations The Impact of Composites on Future Deepwater Riser Configurations Thomas Brown 2H Offshore Engineering Ltd NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Deepwater Riser Technology Today s deepwater

More information

Offshore engineering science

Offshore engineering science Offshore engineering science In this research stream theoretical models advanced geotechnical models and new numerical techniques were used in applied offshore engineering topics such as loading, design

More information

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands Proceedings of the ASME 2011 30th International

More information

The Challenge of Wave Scouring Design for the Confederation Bridge

The Challenge of Wave Scouring Design for the Confederation Bridge 13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge

More information

Learn more at

Learn more at STRIDE JIP Phase III SUT Talk 15th November 2 Offshore VIV monitoring (vortex induced vibration) Catenary riser interaction with deepwater seabeds 3 Full Scale Riser Monitoring To get real measurements

More information

Protectingpipelinesfor

Protectingpipelinesfor 24 Protectingpipelinesfor Michael Paulin, Damien Humby and Joseph Cocker, INTECSEA Canada, and Glenn Lanan, INTECSEA Inc., describe the process of trenching for the protection of pipelines in ice environments.

More information

Edit this text for your title

Edit this text for your title Edit this text for your title MEK 4450 Marine Operations 1-3 Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2014 Installation of flexibles and cables Typical

More information

OMAE THERMO-MECHANICAL DESIGN OF CANAPU PIP SYSTEM

OMAE THERMO-MECHANICAL DESIGN OF CANAPU PIP SYSTEM Proceedings of the 8th International Conference on Ocean, Offshore and Arctic Engineering OMAE 009 May 31 - June 5, 009, Honolulu, Hawaii, USA OMAE 79713 THERMO-MECHANICAL DESIGN OF CANAPU PIP SYSTEM Rafael

More information

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland Abstract Flooding, cleaning, gauging, dewatering and venting of offshore oil and gas pipelines

More information

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT ASSET INTEGRITY INTELLIGENCE CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT JAMES R. WIDRIG, Manager Advanced Engineering at Quest Integrity Group VOLUME 23, ISSUE 6 NOVEMBER DECEMBER

More information

Request Number IR1-12: Flow Passage. Information Request

Request Number IR1-12: Flow Passage. Information Request Request Number IR1-12: Flow Passage Information Request Provide additional information about the 100 metre flow passage channel scenario between the Westshore Terminals and the proposed Project terminal

More information

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES Industry Guidelines Part 2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES ISSUE 5.1 Ref: POP10B 15 MAR 2010 Disclaimer In formulating this guideline PIPA has relied

More information

Stress Analysis of The West -East gas pipeline with Defects Under Thermal Load

Stress Analysis of The West -East gas pipeline with Defects Under Thermal Load Stress Analysis of The West -East gas pipeline with Defects Under Thermal Load Abstract Xu Lei School of Petroleum Engineering, Yangtze University, Wuhan 430000, China 13071247220@163.com Natural gas is

More information

Learn more at

Learn more at vs. for Deepwater Applications Technical Appraisal John McGrail and Frank Lim 2H Offshore Engineering Limited Woking, UK ABSTRACT This paper provides a technical appraisal of the use of Single Line Offset

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

Application of pushover analysis in estimating seismic demands for large-span spatial structure

Application of pushover analysis in estimating seismic demands for large-span spatial structure 28 September 2 October 2009, Universidad Politecnica de Valencia, Spain Alberto DOMINGO and Carlos LAZARO (eds.) Application of pushover analysis in estimating seismic demands for large-span spatial structure

More information

MECHANICAL ASPECTS OF SUBMARINE CABLE ARMOUR

MECHANICAL ASPECTS OF SUBMARINE CABLE ARMOUR MECHANICAL ASPECTS OF SUBMARINE CABLE ARMOUR Ernesto Zaccone ARMORING OF SUBMARINE CABLES Submarine cables must be robust Mechanical aspects are at least as important as the electrical o nes Must withstand

More information

Fitness for Service Assessment of Ageing Pressure Vessel Experiencing External Corrosion: A Case Study

Fitness for Service Assessment of Ageing Pressure Vessel Experiencing External Corrosion: A Case Study The International Journal Of Engineering And Science (IJES) Volume 6 Issue 2 Pages PP 12-16 2017 ISSN (e): 2319 1813 ISSN (p): 2319 1805 Fitness for Service Assessment of Ageing Pressure Vessel Experiencing

More information

THE USE OF SPIN FIN PILES IN MASSACHUSETTS

THE USE OF SPIN FIN PILES IN MASSACHUSETTS THE USE OF SPIN FIN PILES IN MASSACHUSETTS Les R. Chernauskas, P.E., Geosciences Testing and Research, Inc., North Chelmsford, MA Leo J. Hart, Geosciences Testing and Research, Inc., North Chelmsford,

More information

Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering

Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering ABSTRACT Drilling operations for subsea wells are typically carried out

More information

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe THE PROJECT: GOLDENEYE GOLDENEYE FACTS ST. FERGUS GOLDENEYE PLATFORM Gas Condensate Field

More information

TLP Minimum tendon tension design and tendon down-stroke investigation

TLP Minimum tendon tension design and tendon down-stroke investigation Published by International Association of Ocean Engineers Journal of Offshore Engineering and Technology Available online at www.iaoejoet.org TLP Minimum tendon tension design and tendon down-stroke investigation

More information

E02 Rigid hinged stinger with piggyback line

E02 Rigid hinged stinger with piggyback line E02 Rigid hinged stinger with piggyback line This model represents a rigid stinger hinged off the back of a lay vessel using the pipelay supports feature. In addition to the lay pipe, another line is included

More information

Catenary Offset Buoyant Riser Assembly for Malaysian Deepwater

Catenary Offset Buoyant Riser Assembly for Malaysian Deepwater Catenary Offset Buoyant Riser Assembly for Malaysian Deepwater F.E. Jamaludin, a and J. Koto, a,b,* a) Faculty of Mechanical Engineering,Universiti Teknologi Malaysia, 81200 Skudai, Johor Bahru, Malaysia

More information

Buoyancy Control Calculated Cost Allowance for 1 Year Study Cost Estimate

Buoyancy Control Calculated Cost Allowance for 1 Year Study Cost Estimate Prepared for Millennium Project Revision A 21 March 2005 by Greg Lamberson Record of Revisions Prepared Rev Date Description By A 21 Mar 05 Buoyancy Control Study Report FGL Checked By Client Accept Approved

More information

CHAPTER 4: BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL

CHAPTER 4: BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL Figure 4.4m. Type III Floating Turbidity Barrier Source: American Boom and Barrier Corporation and Virginia Department of Transportation (DOT) Standard Sheets 71 4.4.6 Floating Turbidity Barrier Definition

More information

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017 Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability

More information

Subpart E. Pressure Testing

Subpart E. Pressure Testing Subpart E Pressure Testing 195.300 Scope This subpart prescribes minimum requirements for pressure testing of steel pipelines. However, this subpart does not apply to movement of pipe covered by 195.424.

More information

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific June 2011 Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific Daniel Brooker, MCS Kenny Presentation Agenda 1. Objectives 2. Top Tensioned Riser (TTR) Selection Drivers

More information

Subsea Wellhead and Conductor Fatigue

Subsea Wellhead and Conductor Fatigue Subsea Wellhead and Conductor Fatigue 29th January 2014 Simeon Powell, PE Importance of Wellhead Fatigue Fatigue failure of high pressure wellhead housing Due to VIV West of Shetland Region 440 meter water

More information

CROSS-SHORE SEDIMENT PROCESSES

CROSS-SHORE SEDIMENT PROCESSES The University of the West Indies Organization of American States PROFESSIONAL DEVELOPMENT PROGRAMME: COASTAL INFRASTRUCTURE DESIGN, CONSTRUCTION AND MAINTENANCE A COURSE IN COASTAL DEFENSE SYSTEMS I CHAPTER

More information

Internal riser inspections on FPSO storage & production facilities

Internal riser inspections on FPSO storage & production facilities Internal riser inspections on FPSO storage & production facilities by Jurgen F P Elbertse A Hak Industrial Services bv, Rhenen, Netherlands Contents of this Paper: Introduction Preparations Testing Mobilization

More information

Computational Analysis of Oil Spill in Shallow Water due to Wave and Tidal Motion Madhu Agrawal Durai Dakshinamoorthy

Computational Analysis of Oil Spill in Shallow Water due to Wave and Tidal Motion Madhu Agrawal Durai Dakshinamoorthy Computational Analysis of Oil Spill in Shallow Water due to Wave and Tidal Motion Madhu Agrawal Durai Dakshinamoorthy 1 OUTLINE Overview of Oil Spill & its Impact Technical Challenges for Modeling Review

More information

Stability of Pipeline and details of Anchor blocks

Stability of Pipeline and details of Anchor blocks Stability of Pipeline and details of Anchor blocks For Offshore pipeline laying at Gulf of Kutch, Gujarat. Client WELSPUN (I) LTD, Gujarat EPC Contactor PATEL CONSTRUCTION CO. Consultants Prof. R. Sundaravadivelu

More information

Risks Associated with Caissons on Ageing Offshore Facilities

Risks Associated with Caissons on Ageing Offshore Facilities Risks Associated with Caissons on Ageing Offshore Facilities D. Michael Johnson, DNV GL, Peter Joyce, BG Group, Sumeet Pabby, BG Group, Innes Lawtie, BG Group. Neil Arthur, BG Group, Paul Murray, DNV GL.

More information

ADDENDUM. Page iii, replace Foreword with: FOREWORD

ADDENDUM. Page iii, replace Foreword with: FOREWORD Date of Issue: May 2007 Affected Publication: API Recommended Practice 2SM, Recommended Practice for Design, Manufacture, Installation, and Maintenance of Synthetic Fiber Ropes for Offshore Mooring, First

More information

Learn more at

Learn more at Bottom Weighted Riser A Novel Design for Re-location and Disconnection Frank Lim and John McGrail 2H Offshore Engineering Ltd. Woking, Surrey, United Kingdom ABSTRACT Flexible pipe risers have limitations

More information

page - Laboratory Exercise #5 Shoreline Processes

page - Laboratory Exercise #5 Shoreline Processes page - Laboratory Exercise #5 Shoreline Processes Section A Shoreline Processes: Overview of Waves The ocean s surface is influenced by three types of motion (waves, tides and surface currents). Shorelines

More information

EFFECT OF VORTEX INDUCED VIBRATION ON FATIGUE DAMAGE OF TOP-TENSIONED RISER SUBJECTED TO CURRENT LOAD

EFFECT OF VORTEX INDUCED VIBRATION ON FATIGUE DAMAGE OF TOP-TENSIONED RISER SUBJECTED TO CURRENT LOAD EFFECT OF VORTEX INDUCED VIBRATION ON FATIGUE DAMAGE OF TOP-TENSIONED RISER SUBJECTED TO CURRENT LOAD Ke Xin Lai 1,2, Do Kyun Kim 1,2,3 and Eileen Wee Chin Wong 1,4 1 Ocean and Ship Technology Research

More information

RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING

RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING 2001 Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or

More information

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1 CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.

More information

EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE

EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE 1 MR. G.VIJAYA KUMAR, 2 DR. R. PANNEER SELVAM 1 M.S. Research Scholar, Department of Ocean Engineering, IIT Madras, Chennai,

More information

Analysis of dilatometer test in calibration chamber

Analysis of dilatometer test in calibration chamber Analysis of dilatometer test in calibration chamber Lech Bałachowski Gdańsk University of Technology, Poland Keywords: calibration chamber, DMT, quartz sand, FEM ABSTRACT: Because DMT in calibration test

More information

Feasibility of Steel Lazy Wave Risers in the North Sea

Feasibility of Steel Lazy Wave Risers in the North Sea NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Feasibility of Steel Lazy Wave Risers in the North Sea Rohit Shankaran 2H Offshore Engineering Ltd. Agenda Risers in deepwater North Sea Are steel catenary

More information

Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida

Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida Final Report Submitted By Ping Wang, Ph.D., Jun Cheng Ph.D., Zachary Westfall, and Mathieu Vallee Coastal Research Laboratory

More information

DRILLING HOSE SOLUTIONS

DRILLING HOSE SOLUTIONS DRILLING HOSE SOLUTIONS HIGH PRESSURE FLEXIBLE LINES FOR A WIDE RANGE OF DRILLING APPLICATIONS HIGH QUALITY - HIGH STANDARD WE DELIVER ACCORDING TO THE HIGHEST LEVELS OF SPECIFICATIONS AND STANDARDS WITH

More information

Friction properties of the face of a hand-held tennis racket

Friction properties of the face of a hand-held tennis racket Available online at www.sciencedirect.com Procedia Engineering 34 (2012 ) 544 549 9 th Conference of the International Sports Engineering Association (ISEA) Friction properties of the face of a hand-held

More information

A New Thermoplastic Composite Riser for Deepwater Application

A New Thermoplastic Composite Riser for Deepwater Application A New Thermoplastic Composite Riser for Deepwater Application Martin van Onna, Managing Director Airborne Composite Tubulars Patrick O Brien, Group Director Strategic Business & Marketing, Wood Group Kenny

More information

Pile Gripper Systems

Pile Gripper Systems Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +

More information

TACKLING JACK-UP RIG NO-GO LOCATIONS. Prakasha Kuppalli ABSTRACT

TACKLING JACK-UP RIG NO-GO LOCATIONS. Prakasha Kuppalli ABSTRACT TACKLING JACK-UP RIG NO-GO LOCATIONS Prakasha Kuppalli ABSTRACT Jack-up rigs are deployed for drilling and work-over (maintenance) of offshore oil and gas wells for producing hydrocarbons. Rigs drill through

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

Chapter 2 Hydrostatics and Control

Chapter 2 Hydrostatics and Control Chapter 2 Hydrostatics and Control Abstract A submarine must conform to Archimedes Principle, which states that a body immersed in a fluid has an upward force on it (buoyancy) equal to the weight of the

More information

Guide for Evaluating Your Hose Assembly Supplier

Guide for Evaluating Your Hose Assembly Supplier Guide for Evaluating Your Hose Assembly Supplier Supplier Evaluation Checklist, and How to Clearly Define Application Requirements Safe, reliable hose assemblies require appropriate specification work

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

Trenching of Pipelines for Protection in Ice Environments

Trenching of Pipelines for Protection in Ice Environments Trenching of Pipelines for Protection in Ice Environments Michael Paulin, Damien Humby, and Joseph Cocker, INTECSEA Canada; and Glenn Lanan, INTECSEA, Inc. Summary Subsea pipelines located in ice environments

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

A hose layline contains important information for specifying the replacement assembly: manufacturer, hose trade name, working pressure and hose ID.

A hose layline contains important information for specifying the replacement assembly: manufacturer, hose trade name, working pressure and hose ID. CONTENTS Introduction Pressure Pressure Drop Temperature Rating Bend Radius Conclusion Additional Information SIDEBAR: Understanding Hydraulic Hose Reinforcement INTRODUCTION Hydraulic hose has a finite

More information

OCTOBER 2017 ISSUE Page 1 of 7

OCTOBER 2017 ISSUE Page 1 of 7 Field testing is performed on fully assembled pipelines for the purpose of determining pipeline acceptability. Following visual acceptance of joints and pipeline components, pressure pipelines in their

More information

Undertow - Zonation of Flow in Broken Wave Bores

Undertow - Zonation of Flow in Broken Wave Bores Nearshore Circulation Undertow and Rip Cells Undertow - Zonation of Flow in Broken Wave Bores In the wave breaking process, the landward transfer of water, associated with bore and surface roller decay

More information

Elastic-Plastic Finite Element Analysis for Zhongwei--guiyang Natural Gas Pipeline Endangered by Collapse

Elastic-Plastic Finite Element Analysis for Zhongwei--guiyang Natural Gas Pipeline Endangered by Collapse Abstract Elastic-Plastic Finite Element Analysis for Zhongwei--guiyang Natural Gas Pipeline Endangered by Collapse Gengxin Wu,Peng Zhang,Zhixiang Li,Zunhai Ke,Guizhi Li,Anmin Jiang 2 School of Civil Engineering

More information

DIFFERENT SOLUTIONS TO INSPECT PLATFORM RISERS. By R van Agthoven and H Quakkelsteijn, ApplusRTD, Rotterdam, The Netherlands

DIFFERENT SOLUTIONS TO INSPECT PLATFORM RISERS. By R van Agthoven and H Quakkelsteijn, ApplusRTD, Rotterdam, The Netherlands DIFFERENT SOLUTIONS TO INSPECT PLATFORM RISERS By R van Agthoven and H Quakkelsteijn, ApplusRTD, Rotterdam, The Netherlands SUMMARY The need for the inspection of pipelines and risers is growing, as the

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES

APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES J.R. Qian 1 W.J. Zhang 2 and X.D. Ji 3 1 Professor, 3 Postgraduate Student, Key Laboratory for

More information

QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS

QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS Steve Sherwen Senior Consultant, ABB Engineering Services, Daresbury Park,

More information

from ocean to cloud HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS

from ocean to cloud HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS Geoff Holland, Sarah Dzinbal (Alcatel-Lucent Submarine Networks) Email: geoff.holland@alcatel-lucent.com Alcatel-Lucent Submarine Networks

More information

from ocean to cloud PARAMETRIC SUB-BOTTOM PROFILER, A NEW APPROACH FOR AN OLD PROBLEM

from ocean to cloud PARAMETRIC SUB-BOTTOM PROFILER, A NEW APPROACH FOR AN OLD PROBLEM PARAMETRIC SUB-BOTTOM PROFILER, A NEW APPROACH FOR AN OLD PROBLEM Geoff Holland, Alcatel-Lucent Submarine Networks Geoff.holland@alcatel-lucent.com Alcatel-Lucent Submarine Networks Ltd, Christchurch Way,

More information

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS 5.1 Introduction Using surcharging as the sole soil consolidation mean can take a long time to reach the desired soil settlement. Soil consolidation using prefabricated

More information

Offshore platforms survivability to underwater explosions: part I

Offshore platforms survivability to underwater explosions: part I Computational Ballistics III 123 Offshore platforms survivability to underwater explosions: part I A. A. Motta 1, E. A. P. Silva 2, N. F. F. Ebecken 2 & T. A. Netto 2 1 Brazilian Navy Research Institute,

More information

I. CHEM. E. SYMPOSIUM SERIES NO. 85

I. CHEM. E. SYMPOSIUM SERIES NO. 85 FIRE SURVIVAL OF PROCESS VESSELS CONTAINING GAS J. Nylund * The present work is a theoretical evaluation of the ability of process vessels to survive hydrocarbon fires when the vessels are designed and

More information

PRAGMATIC ASSESSMENT OF EXPLOSION RISKS TO THE CONTROL ROOM BUILDING OF A VINYL CHLORIDE PLANT

PRAGMATIC ASSESSMENT OF EXPLOSION RISKS TO THE CONTROL ROOM BUILDING OF A VINYL CHLORIDE PLANT PRAGMATIC ASSESSMENT OF EXPLOSION RISKS TO THE CONTROL ROOM BUILDING OF A VINYL CHLORIDE PLANT L.P. Sluijs 1, B.J. Haitsma 1 and P. Beaufort 2 1 Vectra Group Ltd. 2 Shin-Etsu (contact details: Vectra Group

More information

Sustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson

Sustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson Sustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson Managing Director Ecosse Subsea Systems Ltd Personnel ESS

More information

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc Presented at OMAE, New Orleans, February 2000 Introduction Characteristics

More information

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Guideline No.P-04 (201510) P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS

More information

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Charlottetown Marine Terminal Pipeline Decommissioning Project Description Charlottetown Marine Terminal Pipeline Decommissioning Project Description 69 Marr Road Unit B Rothesay NB, E2E 3J9 Tel (506) 848-1920 Fax (506) 848-1929 Charlottetown Marine Terminal Pipeline Decommissioning

More information

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT Kieran J Glynn, Advisor Major Accident Risk, BP, UK The exceedance curve approach was developed following the issue of the 2003

More information

DR.ING. CARLO AVANZINI PROFESSIONAL ENGINEER GRIP TEST REPORT NOVA SIRIA, ROLETTO, Premise

DR.ING. CARLO AVANZINI PROFESSIONAL ENGINEER GRIP TEST REPORT NOVA SIRIA, ROLETTO, Premise GRIP TEST REPORT NOVA SIRIA, ROLETTO, 07.10.2013 1. Premise The present report covers the witnessing of the test conducted in the Nova Siria Factory in Roletto (Torino, Italy) to verify the behavior of

More information

Learn more at

Learn more at OTC 13113 Interaction between Deepwater Catenary Risers and a Soft Seabed: Large Scale Sea Trials N.R.T. Willis and P.T.J. West, 2H Offshore Engineering Copyright 2001, Offshore Technology Conference This

More information

ON-BOTTOM STABILITY CALCULATIONS FOR FIBRE OPTIC SUBMARINE CABLES

ON-BOTTOM STABILITY CALCULATIONS FOR FIBRE OPTIC SUBMARINE CABLES ON-BOTTOM STABILITY CALCULATIONS FOR FIBRE OPTIC SUBMARINE CABLES Inge Vintermyr (Nexans ray AS) Email: Nexans ray AS, PO.Box 6450 Etterstad, N-0605 Oslo, ray. Abstract: This

More information

THE LIGHTS GO OUT The Ultimate Protection Technology for Protecting Submarine Cables

THE LIGHTS GO OUT The Ultimate Protection Technology for Protecting Submarine Cables THE LIGHTS GO OUT The Ultimate Protection Technology for Protecting Submarine Cables Rene van Kessel, Cor-Jan Stam (Van Oord Offshore) Email: Van Oord Offshore, 2 Jan Blankenweg, 4207HN

More information

Reliable subsea gas transport; the history and contribution of DNV-OS-F101

Reliable subsea gas transport; the history and contribution of DNV-OS-F101 OIL & GAS Reliable subsea gas transport; the history and contribution of DNV-OS-F101 GL-ST-F101 Pipeline Safety Philosophy Leif Collberg, Vice President, DNV GL 1 SAFER, SMARTER, GREENER Safety Philosophy,

More information

John Gurden, J P Kenny Ltd Onshore Pipeline and the Landfall Valve Installation (LVI) Design. Knowledge of the Corrib Onshore Pipeline Project

John Gurden, J P Kenny Ltd Onshore Pipeline and the Landfall Valve Installation (LVI) Design. Knowledge of the Corrib Onshore Pipeline Project STATEMENT OF EVIDENCE ABP Ref. No: PL16.GA0004 John Gurden, J P Kenny Ltd Onshore Pipeline and the Landfall Valve Installation (LVI) Design Qualifications and Experience 1. My name is John Gurden and I

More information

Deepwater Challenges Pipeline Installation Case

Deepwater Challenges Pipeline Installation Case Deepwater Challenges Pipeline Installation Case Seminar Nasional Oceano, ITS, 28 March 2011, Surabaya Gunawan Suwarno, 28 March 2011 DeepLay Energy Services email : marketing@deep-lay.com 1 Deepwater Development

More information

SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM

SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM 18 th Southeast Asian Geotechnical & Inaugural AGSSEA Conference 29-31 May 213, Singapore Leung, Goh & Shen (eds) SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM GOUW TJIE-LIONG

More information

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision J.Linortner & R.Faber Pöyry Energy GmbH, Turkey-Austria E.Üzücek & T.Dinçergök General Directorate of State Hydraulic

More information

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment Naser Badri 1, Farshad Nourai 2 and Davod Rashtchian

More information

CHAPTER 21 VARIABLE DISPERSION AND ITS EFFECTS ON THE MOVEMENTS OF TRACERS ON BEACHES

CHAPTER 21 VARIABLE DISPERSION AND ITS EFFECTS ON THE MOVEMENTS OF TRACERS ON BEACHES CHAPTER 21 VARIABLE DISPERSION AND ITS EFFECTS ON THE MOVEMENTS OF TRACERS ON BEACHES W. A. Price, Senior Principal Scientific Officer Hydraulics Research Station, Wallmgford, Great Britain SUMMARY To

More information