RESTON ON FOOT AND BICYCLE

Size: px
Start display at page:

Download "RESTON ON FOOT AND BICYCLE"

Transcription

1 RESTON ON FOOT AND BICYCLE Improving the Pedestrian and Cyclist Experience in Reston BICYCLE FRIENDLY COMMUNITY BRONZE

2 TABLE OF CONTENTS INTRODUCTION 3 Purpose 3 Benefits 3 What s New 4 THE PEDESTRIAN AND BICYCLING ADVISORY COMMITTEE 6 RESPONSIBILITIES 6 CHARACTERISTICS OF PEDESTRIAN AND BICYCLE FRIENDLY COMMUNITIES 6 RESPONSIBLE ORGANIZATIONS 7 VDOT TIPS FOR SAFE BICYCLING 8 PEDESTRIAN FACILITIES 9 BICYCLE FACILITIES 11 RECOMMENDATIONS 13 Intersection Improvements 15 Walkway Improvements 21 Bicycle Facility Improvements 26 The Need For An Implementation Mechanism 26 RESOURCES 29 HISTORY OF RESTON ON FOOT AND BICYCLE 30 THE NEED FOR PERIODIC UPDATING 30 Origins Update Update Update 32

3

4 INTRODUCTION PURPOSE We feel fortunate to live in Reston, a place that was designed to be healthy, family-centered and enjoyable. To a large extent, this vision was to be realized by the creation of an extensive pathway network for recreation and transportation. Vision is one thing, reality another. Pedestrians increasingly prefer to walk on more traditional sidewalks that take them where they want to go faster and safer, particularly at night. More and more people use bicycles as transportation and need convenient on-street bicycle infrastructure. However, neighborhood shopping areas, the Town Center and places of work are not always easily accessible by foot or bicycle. Even people who live within a reasonable walking or cycling distance from their regular destinations consider driving to be a better transportation option due to missing infrastructure. This adds up to significant barriers to getting around Reston on Foot and Bicycle. The Pedestrian and Bicycling Advisory Committee (PBAC) is committed to making Reston more accessible for walking and bicycling. The Committee studies Reston s pedestrian and bicycling facilities and needs, develops recommendations and presents them in this report. By identifying responsible parties whenever possible, the Committee hopes this carefully researched plan will be used to make Reston safer, more comfortable and more convenient for walking and cycling. This report is designed to inform decision-makers in Reston, Fairfax County, and the State of Virginia and may be helpful to people who are interested in improving the bicycling and walking conditions in Reston. Residents and Reston-based employers and employees are encouraged to contact the PBAC to voice their opinions on recommendations stated in this report so that the Committee can better determine and communicate the community s priorities. The Reston Association (RA) Board of Directors should coordinate implementation of the recommendations with the County and the State. The completion of each project is a step to making the network complete. BENEFITS Roads and trails that are safe for walking and bicycling are critical for creating healthy, active communities. Consider the benefits of having more people walking and bicycling more often: Cleaner environment: Reduced air, soil and water pollution. Homeland security: Independence from fossil fuels and other finite energy sources. Health: 30 minutes of daily physical activity increases one s chance of living a longer life, and reduces the likelihood of developing chronic diseases such as depression and diabetes. Independence: Increased mobility options for older adults, people with lower incomes, people with disabilities, people that choose not to drive, teens and children. Social: Walking and cycling encourages people to make meaningful social connections and build relationships within their community. Economics: A comprehensive network of on- and off-street facilities for walking and cycling increases land values, contributes to a stronger local economy, and reduces maintenance needs of the road network. Learning & Productivity: Physically active students and employees perform better. Safety: Car crashes are the leading cause of death for people ages Making streets safer for pedestrians and cyclists makes roads safer for all road users. Quality of Life: Walking and bicycling reduce traffic congestion and noise pollution. 3

5 The economic benefits of bicycling Advocacy Advance WHAT S NEW This 2013 update is shifting the focus of Reston on Foot to Reston on Foot and Bicycle. In recent years, the Committee was able to enlist several new members with strong interest and expertise in cycling and has been substantially increasing its focus on improving bicycling facilities and programs. A major part of this new focus has been Reston s first application to be recognized as a Bicycle Friendly Community (BFC) through the League of American Bicyclists (B). Reston received an Honorable Mention in In addition to this recognition, the PBAC received a set of recommendations on how to better promote cycling in Reston. The Committee integrated the recommendations in its work plan and applied in 2013 and was awarded Bronze level BFC. Other steps the PBAC has taken recently to improve Reston s bicycle system and programs include: The Committee drafted a Bicycle Friendly Community Action Plan, which was adopted by the RA Board of Directors on May 24, A committee member participated in an all-day program on bicycle advocacy organized by the Washington Area Bicyclist Association in November A Committee member participated in a Safe Routes to School workshop. Two Committee members attended the National Bike Summit in March A Committee member organized a Sustainability Workshop for the RA Board of Directors, Reston committee members and other community leaders. The workshop partly focused on sustainable transportation, in particular walking and cycling. A Committee member attended the first national full-day workshop on bike sharing. The Committee prepared input to Fairfax County s effort to create a County-wide bicycle improvement program. The following map includes the Committee s recommendations, including on-road bike lanes, shared on-road lanes (aka sharrows), and other facilities. 4

6 BIKE NE IMPROVEMENTS Bike Lane Paved Shoulders Shared Lane Markings Signed Bike Route Roads Lakes 5

7 THE PEDESTRIAN AND BICYCLING ADVISORY COMMITTEE The Pedestrian and Bicycling Advisory Committee advises the Board of Directors on the sound development, management, and safe use of Reston s pedestrian and bicycle systems as they relate to infrastructure improvements, accessibility, and promoting the benefits of these systems. RESPONSIBILITIES In coordination with private and public entities, governmental agencies, and citizens, evaluate and provide recommendations regarding necessary improvements to, changes to, or funding for Reston s pedestrian and bicycle systems/facilities. Assist in developing priorities for funding improvements of such systems. Encourage utilization of pedestrian and bicycle systems for transportation and recreation. Evaluate safety concerns and develop recommendations for implementation and public education. The Committee meets on every second Wednesday of the month at 7 p.m. at the Reston Association offices Sunrise Valley Drive. The meetings are open to the public. PBAC MEMBERS AS OF SEPTEMBER 2013: Burton Griffith, Chair BJ Silvey, Member Brian Murphy, Reston Association Staff Liaison Doug Pew, Member Nicole Wynands, Member Joe Stowers, Member Craig Clark, Member Dan Kole, Member Kelley Westenhoff, Member Timothy Cohn, RA Board OTHER REGUR PARTICIPANTS: Bruce Wright, Chairman of Fairfax Advocates for Better Bicycling (FABB) Steve Gurney, Resident CHARACTERISTICS OF PEDESTRIAN AND BICYCLE FRIENDLY COMMUNITIES Focus on moving people, not cars. Well-maintained and contiguous network of complete and inclusive streets - sidewalks along all streets, traditional and buffered bike lanes, cycle tracks, sharrows and shared-use paths. Security and visibility - particularly at crossings, intersections and transit stops - through striped crosswalks, curb extensions, landscaped refuge islands and bike boxes. Links to a variety of destinations, amenities and services with highly visible way finding signage. Ample and high quality bicycle parking at all destinations. Attractive streetscaping pedestrian scale lighting, benches, public art, shade, landscaping. Proximity - Mixed and dense land use patterns throughout the community, including residential areas. Multimodal - Integration of different modes of transport and of transportation and land use. Universal design - Accessibility by users of all ages and abilities. Community-wide traffic calming and traffic reduction - low speeds throughout the community, vehicle-restricted zones, play streets/shared space, speed tables and bike boulevards. Disincentives to driving - priced public parking, no minimum parking standards, maximum car parking standards and shared-parking allowances. Education - Opportunities for all residents to receive bicycle safety education starting with children in school. 6

8 RESPONSIBLE ORGANIZATIONS This report is intended to facilitate coordination among organizations that will oversee the implementation of PBAC s recommendations. The Virginia Department of Transportation (VDOT) is responsible for all intersection and road improvements, including the addition of bike lanes and shared use lanes (or shared lane markings/sharrows), and all appropriate signing and pavement markings for them in Reston and other parts of Fairfax County (except in incorporated towns). These include: New traffic signals in some locations in planned development areas of the Town Center, the Metrorail station areas, and other high density areas of Reston. New pedestrian signals at many signalized intersections. Prominently marked crosswalks at many high traffic intersections and path crossings. New standard crosswalks at many intersections and path crossings on low traffic streets. Road diets of many arterials and collector streets to slow traffic and create space for bicycle infrastructure. Lower speed limits that currently exceed 35 miles per hour on some arterials. Lower speed limits that currently exceed 30 miles per hour on some collector streets. Fairfax County is responsible for approximately 40,000 feet of sidewalks and trails at 41 locations in the Reston area. These are necessary for safe access to schools, jobs, shops, the future Metrorail stations, parks, and county facilities. Missing gaps in the system should be built to design standards and layouts recommended in this plan to maintain consistency with sidewalks and trails, or conform to general community standards. The Reston Association (RA) is responsible for improvements of facilities such as sidewalks and shared use paths on RA property and improvements that provide important links to RA facilities. Developers are generally responsible for all pedestrian and bicycle facility improvements on their property; for crosswalks at intersections adjoining their property; for curb cuts at each end of a crosswalk; and wherever an increase in traffic (pedestrian and vehicular) due to the development is generating the need for a signal or facility. The exact responsibilities of a developer are determined on a case by case basis by the county, the Reston Planning and Zoning Committee, and the Reston Association. Reston residents can help make this community better for people on foot and bicycle by Not using a cell phone or texting while driving. Studies have shown that driver distraction caused by cell phones and other hand held devices is as dangerous as driving while intoxicated. Slowing down. Speeding is a contributing factor in 31 percent of all fatal crashes. Expecting the unexpected. Pedestrians may be encountered in unexpected places especially in areas where the pathway network is incomplete. Sharing the road. Cyclists should be expected on all roads in Reston. Motorists should use caution when passing a cyclist and when turning. Avoiding backing out of a parking space. AAA studies have shown that reversing out of a parking spot is very dangerous for small children and cyclists. Backing into a parking space is preferable. 7

9 VDOT TIPS FOR SAFE BICYCLING Be a responsible bicyclist - obey all traffic control devices and use proper hand signals. Always ride with the flow of traffic. Dress safely - wear a helmet, wear bright colored clothing, and secure loose pant legs. Ride defensively - anticipate the actions of other road users and watch for road hazards. Pass vehicles with extreme care - turning vehicles may not see you. Be aware of motor vehicle blind spots whether while riding or when stopped at an intersection. Maximize your visibility at night - wear reflective clothing and apply reflective tape to your bicycle. Walk your bicycle when you get into traffic situations beyond your cycling abilities. Exercise great caution when riding in bus traffic - watch out for buses pulling to and from curbs and passengers getting on and off buses. Park your bicycle so you do not block sidewalks, handicap and building accesses, or emergency drives. Lock your bicycle - secure both wheels and the frame to a stationary object using a sturdy lock. PEDESTRIAN AND BICYCLE FACILITIES The last decade has seen significant advances in traffic engineering for walkable and bikeable communities. These include real time traffic responsive signal control systems and traffic calming techniques to improve pedestrian and bicycle safety and comfort, such as the use of landscaping, bulb-outs, raised crosswalks, pavers, and refuge islands. Advances have also been made for transporting pedestrians safely through parking lots. While this report focuses narrowly on a few types of pedestrian and bicycle facilities, the PBAC encourages VDOT, Fairfax County, Reston Association and private developers to use such innovative practices. Very practical and useful information can be found at and bicycle facility design guidelines can be found at Click here for link to a Safety & Courtesy Tips graphic chart: 8

10 PEDESTRIAN FACILITIES SIDEWALKS AND TRAILS Wherever possible, there should be sidewalks on both sides of major thoroughfares. Sidewalks and major paths should be at least 6 feet wide wherever possible and at least 8 feet on major pedestrian pathways including sidewalks adjacent to commercial frontage zones (5 foot minimum clear width). Wider paths are necessary where bicyclists are expected to share the trail. These recommendations are minimums, and wider facilities should be considered wherever warranted by volumes. Sidewalks should be separated from the roadway by a landscaped buffer of at least four feet wherever possible. All pedestrian pathways should have adequate, continuous lighting. Wherever high levels of pedestrians are expected, pedestrian-scale lighting elements should be included that provide good visibility for pedestrians. Sidewalks and trails should connect to adjacent communities wherever possible to provide additional connectivity throughout the region, not just within Reston. In order to promote the use of sidewalks and trails in the Reston of 2030, the study team has developed a set of recommendations that are urban in their character. Pedestrians and bicyclists do not need to be separated from the activities of daily life; trails and sidewalks should be built on street level with access to the businesses, residences and other elements of the Reston community. These more urban roadway cross sections provide a safe and vibrant atmosphere for pedestrians and bicyclists, and encourage these users to use the facilities on a regular basis. CROSSWALKS There are two types of crosswalks: standard and high visibility. Standard crosswalks, as defined by the Virginia Department of Transportation, are two parallel white stripes. These are used in areas where there is not a high volume of pedestrians, such as in low density areas on collector streets. High visibility crosswalks are white plastic markings or paint stripes in the direction of traffic flow, at least one foot wide (measured across the roadway), spaced about 18 inches apart (also measured across the roadway), covering the full normal width of a crosswalk (about eight feet wide) or wider in special locations such as crossings of arterials by the W&OD Trail. PEDESTRIAN COUNTDOWN SIGNALS VDOT has been replacing older non-countdown signals with clearer and safer count-down signals, which are intended to inform pedestrians and cyclists about the time remaining to complete crossings before the signal cycle changes. Pedestrian signals should be placed where they are most needed by pedestrians and bicyclists. Often this will require a separate signal phase to interrupt turning movements, thereby reducing vehicular capacity. Pedestrian signals and crossings should be relocated only when necessary. Standard crosswalks High visibility crosswalks 9

11 BUS STOPS A healthy transit system factors in the needs of pedestrians. One rule of thumb is that all bus stops should have sidewalks or some form of hard surface. Some of these locations have been identified and are presented in this 2013 report; however, many additional needed locations are known to exist. The committee will continue to identify improvements to the transit system and use this information to rally and coordinate responsible agencies. REFUGE ISNDS A Pedestrian Refuge Island, also known as a crossing island, center island, median refuge area, pedestrian island, or median slow point, is a raised island placed in the street at an intersection or midblock to separate crossing pedestrians from motor vehicles. According to the (Federal Highway Administration), providing raised medians or pedestrian refuge areas at pedestrian crossings at marked crosswalks has demonstrated a 46% reduction in pedestrian crashes. Installing such raised channelization on approaches to multi-lane intersections has been shown to be particularly effective. At unmarked crosswalk locations, medians have demonstrated a 39% reduction in pedestrian crashes. Medians are especially important in areas where pedestrians access a transit stop or other clear origin/destinations across from each other. Midblock locations account for over 70% of pedestrian fatalities. Also it is where vehicle travel speeds are higher which contributes to the injury and fatality rate at this location. Over 80% of pedestrians die when hit by vehicles traveling at 40 mph or faster while less than 20% die when hit at 20 mph. The FA recommends raised medians (or pedestrian refuge areas) be considered in curbed sections of multi-lane urban roadways, particularly where pedestrians, high traffic volumes (exceeding 12,000 average daily trips per day), and intermediate or high travel speeds occur together. Medians/refuge islands should be at least 4 feet wide, but preferably 8 feet for pedestrian and bicycle comfort and safety. They should also be of adequate length to allow the anticipated number of pedestrians and bicyclists to stand and wait for gaps in traffic before crossing the second half of the street. Safety Effects of Marked vs. Unmarked Crosswalks at Uncontrolled Locations, p. 55. Federal Highway Administration

12 BICYCLE FACILITIES BIKE NES Bike lanes are markings for the preferential or exclusive use of bicyclists. Bike lanes enable bicyclists to ride at their preferred speed without interference from prevailing traffic conditions and facilitate predictable behavior and movements between bicyclists and motorists. Conventional bike lanes run curbside when no parking is present, adjacent to parked cars on the right-hand side of the street or on the left-hand side of the street in specific situations. Bike lanes typically run in the same direction of traffic, though they may be configured in the contra-flow direction on low-traffic corridors necessary for the connectivity of a particular bicycle route. The configuration of a bike lane requires a thorough consideration of existing traffic levels and behaviors, adequate safety buffers to protect bicyclists from parked and moving vehicles, and enforcement to prohibit motorized vehicle encroachment and double-parking. They also require good intersection design to reduce conflicts with motorists. Bike Lanes may be distinguished using color, lane markings, signage, and intersection treatments. (National Association City Transport Officials) SHARED NE MARKINGS/SHARROWS Shared Lane Markings, or sharrows, are road markings used to indicate a shared lane environment for bicycles and automobiles. Among other benefits shared lane markings reinforce the legitimacy of bicycle traffic on the street and recommend proper bicyclist positioning. The shared lane marking is not a facility type, it is a pavement marking with a variety of uses to support a complete bikeway network. The Manual of Uniform Traffic Control Devices outlines guidance for shared lane markings in section 9C.07. (National Association City Transport Officials) BUFFERED BIKE NES Buffered bike lanes are conventional bicycle lanes paired with a designated buffer space separating the bicycle lane from the adjacent motor vehicle travel lane and/or parking lane. A buffered bike lane is allowed as per Manual of Uniform Traffic Control Devices guidelines for buffered preferential lanes (section 3D-01). (National Association City Transport Officials) CYCLE TRACKS A cycle track is an exclusive bike facility that combines the user experience of a separated path with the on-street infrastructure of a conventional bike lane. A cycle track is physically separated from motor traffic and distinct from the sidewalk. Cycle tracks have different forms but all share common elements they provide space that is intended to be exclusively or primarily used for bicycles, and are separated from motor vehicle travel lanes, parking lanes, and sidewalks. In situations where on-street parking is allowed cycle tracks are located to the curb-side of the parking (in contrast to bike lanes).cycle tracks may be one-way or two-way, and may be at street level, at sidewalk level, or at an intermediate level. If at sidewalk level, a curb or median separates them from motor traffic, while different pavement color/texture separates the cycle track from the sidewalk. If at street level, they can be separated from motor traffic by raised medians, on-street parking, or bollards. By separating cyclists from motor traffic, cycle tracks can offer a higher level of security than bike lanes and are attractive to a wider spectrum of the public.(national Association City Transport Officials) 11

13 INTERSECTION TREATMENTS Intersections are junctions at which different modes of transportation meet and facilities overlap. An intersection facilitates the interchange between bicyclists, motorists, pedestrians, and other competing modes in order to advance traffic flow in a safe and efficient manner. Designs for intersections with bicycle facilities should reduce conflict between bicyclists (and other vulnerable road users) and motor vehicles by heightening the level of visibility, denoting a clear right-of-way, and facilitating eye contact and awareness with competing modes. Intersection treatments can resolve both queuing and merging maneuvers for bicyclists, and are often coordinated with timed or specialized signals. The configuration of a safe intersection for bicyclists may include elements such as color, signage, medians, signal detection, and pavement markings. Intersection design should take into consideration existing and anticipated bicyclist, pedestrian and motorist movements. In all cases, the degree of mixing or separation between bicyclists and other modes is intended to reduce the risk of crashes and increase bicyclist comfort. The level of treatment required for bicyclists at an intersection will depend on the bicycle facility type used, whether bicycle facilities are intersecting, the adjacent street function and land use. (National Association City Transport Officials) BICYCLE WAYFINDING SYSTEM A bicycle wayfinding system consists of comprehensive signing and/or pavement markings to guide bicyclists to their destinations along preferred bicycle routes. Signs are typically placed at decision points along bicycle routes typically at the intersection of two or more bikeways and at other key locations leading to and along bicycle routes. (National Association City Transport Officials) SHARE THE ROAD SIGNS In situations where there is a need to warn drivers to watch for other slower forms of transportation traveling along the highway, such as bicycles ( ) a SHARE THE ROAD plaque may be used. (Manual of Uniform Traffic Control Devices) BICYCLE PARKING The lack of a secure parking space keeps many people from using their bikes for basic transportation. Leaving a bicycle unattended, even for short periods, can easily result in damage or theft. Finding a bike rack that doesn t work or isn t conveniently located makes for a frustrating experience. All bike parking facilities in Reston should follow the bicycle parking guidelines of the Association of Pedestrian and Bicycle Professionals: 12

14 RECOMMENDATIONS The PBAC has drawn upon its collective professional engineering and planning experience to develop recommendations on how to improve conditions for pedestrians and cyclists in Reston. The PBAC has separated its recommendations into the five districts of Reston to allow residents to find recommendations for their particular neighborhood more easily and therefore to encourage public input into this plan. Much of the material has been assembled from plans prepared by others, ranging from officially adopted Development Plans, Site Plans, and the County Trails Plan to casual proposals by members of the Reston Association s Transportation Advisory Committee, and the Planning and Zoning Committee. Using a common set of criteria and general knowledge of how the community functions, the Committee evaluated these proposals, made recommended additions and priorities. CRITERIA CONSIDERED INCLUDE: DAILY TRAFFIC VOLUME The higher the traffic volume, the greater the need for pedestrian and cycling protections, all other things being equal. Consideration was given to volumes on the major and minor streets at each intersection, as well as the volume of turning movements, which make pedestrian and cycling crossings more hazardous. All traffic volumes are approximate estimates no counts were made. NUMBER OF NES AND PRESENCE OF A MEDIAN The more lanes a pedestrian or cyclist has to cross, the greater the need for protection, all other things being equal. A median provides a refuge, and can mitigate the need for additional measures, for example, by allowing a shorter pedestrian phase of the signal cycle. PEDESTRIAN AND CYCLIST VOLUME This is one of the most important criteria. In many cases significant increases in pedestrian and cyclist volumes will occur when planned development is completed. ND USE CONSIDERATIONS Access to neighborhood shopping areas and the Town Center: Because Reston s Master Plan has always emphasized the pedestrian orientation of village centers and the Town Center, special attention was given to the need for pedestrian and cyclist protections on routes that feed the village centers and the Town Center. CONTINUITY OF THE SIDEWALK, PATAY AND ON-STREET BIKE FACILITY NETWORK Special attention was also devoted to achieving continuity of the sidewalk, pathway and on-street bike facility network, giving high priority to improvements that will eliminate important gaps for both internal circulation and connections to surrounding communities. SCHOOLS Improving safe routes to schools is an important way to allow children to walk and bike to school, therefore decreasing congestion in residential areas, providing health benefits to school-aged children and their parents, and reducing air and noise pollution. METRORAIL Many of the highest priorities are in the vicinity of the proposed Metrorail stations. Walking, bicycling, and bus trips will be critical for access to the Metrorail and will help limit negative impacts on quality of life around the Metro stations. 13

15 INTERRUPTION OF CONTINUOUS TRAFFIC A signal may be warranted at locations where traffic is continuous for long periods of time. At intersections with heavy turning movements, a pedestrian phase of a signal cycle may be needed because the combination of through traffic on one phase and turning movements on other phases results in insufficient gaps in traffic flow for safe pedestrian crossing. PROGRESSIVE MOVEMENT A signal may be warranted at a location where speeds are high and the addition of a signal would encourage traffic to move in platoons through nearby coordinated signals (i.e., progressive movement). Safe pedestrian and cyclist crossing at such locations may be difficult without a signal because of lack of gaps between vehicles. In such situations, a signal may be warranted to provide a safe pedestrian and cyclist crossing, even if pedestrian/cyclist volumes and cross traffic are quite low. Such signal additions also assist motorists desiring to make turning movements from connecting local streets. 85TH PERCENTILE SPEED The speed which is exceeded by 15% of the traffic is called the 85th percentile speed. It is the measure of current speeds most commonly used by traffic engineers when considering speed limits and the need for traffic controls. The greater the 85th percentile speed, the greater the need for pedestrian and bicycle protection, all other things being equal. The committee made educated guesses based on field observations and regular use of routes. PNNED DEVELOPMENT Attention was given to the type of planned development as an indicator of the amount and type of pedestrian, cyclist, and vehicular traffic anticipated. The committee gave attention to the expected timing of development based on known status of development plans. SPECIAL CONDITIONS The proximity of community facilities, housing, or major attractions were given special attention. These include routes that are: used by children on their way to school; used by residents of senior housing; have heavy volumes of transit passengers during peak periods; used to travel to medical facilities (often by handicapped persons); and used to travel to recreational facilities, especially by children. 14

16 PROPOSED INTERSECTION IMPROVEMENTS SORTED BY RESTON DISTRICT PRIORITY DISTRICT LOCATION EXISTING PEDESTRIAN PROTECTION RECOMMENDATION COMMENTS/ND USE CONSIDERATIONS Fairfax County Pkwy & Sunrise Valley Dr Sunrise Valley Dr & Wiehle Ave Sunrise Valley Dr & Reston Pkwy Sunrise Valley & Edmund Halley Dr Sunrise Valley Dr & Glade Dr Colts Neck & Sunrise Valley Dr Reston Parkway & Glade Dr Colts Neck & Glade Dr and nearby E & S underpasses Fox Mill Rd & Reston Pkwy Standard N, E & S crosswalks with no pedestrian signal Signal and standard N & W crosswalks with pedestrian signal Signal and standard W, S & E crosswalks with pedestrian signal Signal and standard S & E crosswalks without pedestrian signal Traffic signal; all approaches pedestrian signals & standard crosswalks Standard S & E crosswalks with pedestrian signal Signal North, East, and South: high visibility crosswalks with pedestrian signal North and West: high visibility crosswalks North: Channelized right turns; West: Re-align crosswalk; South: Re-align crosswalk; East: re-align crosswalk, channelize right turns, decrease right turn radius; All approaches: high visibility crosswalks, pedestrian countdown signals, upgrade curb ramps North: upgrade curb ramps; East: construct/ upgrade curb ramps; West: construct/upgrade curb ramps; All approaches: high visibility crosswalks, pedestrian countdown signals, pedestrian median refuges. East: Pedestrian median refuge, upgrade or construct curb ramps; South: Re-align crosswalk, construct/upgrade curb ramps; West: Re-align crosswalk West: Re-align stop bar, upgrade curb ramps; North: Upgrade 1 curb ramp; East: extend median to include pedestrian refuge; All approaches: pedestrian countdown signals, high visibility crosswalks. All approaches: high visibility crosswalks South and East: pedestrian signal; All approaches: high visibility crosswalks high visibility crosswalk to connect proposed sidewalk with existing sidewalk Dangerous crossings; high volumes, turning movements & high speeds; substantial bike traffic Increasing pedestrian movement will occur when the rail station opens and planned new development begins Metrorail access. Dangerous crossing; high speeds and few pedestrian crossings in the area. RMAG study, Table 3-4 No. I13. Metrorail access. From RMAG, Table 3-7, No. I15. Metrorail access. From RMAG, Table 3-7, No. I17. Metrorail access. RMAG study, Table 3-7, No. I14. Proposed new workforce housing at Park & Ride site will substantially increase pedestrian volume. 15 Reston Parkway & Oslo Dr Glade Drive at Dogwood Elementary School Colts Neck Rd at 2 Hunters Woods Elementary School entrances Colts Neck Rd at Hunters Woods Village Center Lawyers Rd between Fox Mill Rd & Farrier Lane Standard crosswalk SE South: Standard crosswalk at school entrance East: Bus stop pad; South: high visibility crosswalk High visibility crosswalks at school entrances and change existing standard crosswalk to high visibility high visibility crosswalks at 2 entrances across Colts Necks; South: change existing standard crosswalk to high visibility crosswalk North and South: high visibility crosswalks across Colts Neck at entrances to village center high visibility crosswalk with advance signs at entrance to new trail Primary school crossing Primary school crossing Connects residential and village center. New elderly housing planned for existing UCP church site Consider moving crosswalk to Tack Lane or Farrier Lane

17 Glade Dr & Triple Crown Dr Lawyers Rd & Blue Spruce Rd Colts Neck Rd & South Lakes Dr Sunrise Valley Dr & Mercator Dr Colts Neck Rd & Steeplechase Dr Reston Pkwy & South Lakes Dr Glade Dr & Pinecrest Rd All approaches: standard crosswalks with pedestrian signal Signal All approaches: standard crosswalks with pedestrian signal North and East: standard crosswalks; NE stop sign Standard crosswalk between proposed curb cuts high visibility crosswalk All approaches: high visibility crosswalks North: High visibility crosswalk, upgrade curb ramps, pedestrian countdown signal; West: high visibility crosswalk, pedestrian countdown signal, pedestrian median refuge, upgrade/construct curb ramps, decrease right turn curb radius; South: high visibilit East: Move crosswalk to align with curb cut All approaches: upgrade curb-ramps, high visibility crosswalks, pedestrian countdown signals. East: High visibililty crosswalk Metrorail access and office development under construction. Recommended by RMAG, Table 3-7, No. I12. Metrorail access. RMAG Table 3-7, No. I16.: Increasing pedestrian volume with new Southgate Community center. Wiehle Ave & W&OD Trail Wiehle Ave & Dulles Toll Rd ramps W Reston Pkwy & Dulles Toll Rd ramps W Reston Parkway & Temporary Rd Sunset Hills Rd & Wiehle Ave Isaac Newton Sq (W) & Sunset Hills Rd Isaac Newton Sq (N) & Wiehle Ave high visibility E-W crosswalk without pedestrian signal Standard W crosswalks (without pedestrian signal) 2 signals (N & S ramps) and standard W crosswalks without pedestrian signal Signal and standard N, E & W crosswalks with pedestrian signal Traffic signal; All approaches: standard crosswalks with pedestrian signal East: standard crosswalk with signal New traffic signal & pedestrian signal; should be coordinated with signal at Sunset Hills Rd West: high visibility crosswalk, pedestrian countdown signal, upgrade curb ramps. North: realign pedestrian refuge island, decrease right turn radius; West: Realign crosswalks, high visibility crosswalks, pedestrian countdown signal, upgrade curb ramps. North, West, and East: high visibility crosswalks North: Decrease right turn radius; extend median to include pedestrian refuge; East: raised median; South: Decrease right turn radius; West: channelize right turns, decrease right turn radius; All approaches: high visibility crosswalks, updgraded curb ramp East: upgrade curb ramps, decrease right turn radius; North: decrease right turn radius, upgrade/construct curb ramps; West: construct curb ramps; South: construct/upgrade curb ramps; All approaches: high visibility crosswalks, pedestrian countdown signal South: potential infill of striped lane area; East: upgrade curb ramps, high visibility crosswalk; North: Channelize right turns, median pedestrian refuge, high visibility crosswalk, pedestrian warning signs, pedestrian knockdown signs, West: high visibility crosswalk This is an extremely dangerous crossing because of high volume of traffic and vehicles turning; Consider grade separation with interim adjustments to improve safety. Metrorail access. RMAG, Table 3-10, No. I32. Metrorail access. RMAG, Table 3-3, No. I29. Connects residential areas to Reston Town Center residential, offices, services, and retail. Metrorail access. RMAG, Table 3-10, No. I. 21. Metrorail access. RMAG, Table 3-10, No. I. 22. Metrorail access. RMAG, Table 3-10, No. I19. 16

18 Isaac Newton Sq (S) & Wiehle Ave North Shore Dr & Village Rd Wiehle Ave & North Shore Dr at pedestrian overpass Fairway Dr & Wiehle Ave Sunset Hills Rd & Plaza America entrance (W) North Shore Dr & Temporary Rd Sunset Hills Rd & N entrances between Reston Pkwy and Old Reston Ave Reston Pkwy & Sunset Hills Rd Sunset Hills Rd & Bechtel entrance (E) Sunset Hills Rd & Bechtel entrance (W) Sunset Hills Rd & W entrance to and undeveloped parcel North Shore Dr & Hickory Cluster North Shore Dr & Wiehle (Southern intersection) Wiehle Ave & Station entrance South: pedestrian median refuge; All Metrorail access. RMAG, Table 3-10, No. I20. approaches: upgrade curb ramps, high visibility crosswalks, pedestrian countdown signals. East: high visibility crosswalk Connects residential areas with Lake Anne Village Center. Increasing pedestrian volume as revitalization of Lake Anne occurs. Signal; standard W crosswalk and S pedestrian Standard W crosswalk West: high visibility crosswalk with pedestrian countdown signal Traffic signal, West: high visibility crosswalk; South: high visibility crosswalk w/ pedestrian activated signal This modification is an important addition to the project that is adding sidewalks to the western side of Wiehle Ave between North Shore Dr and Baron Cameron Ave; One possibility is to open up the concrete wall for direct access to the pedestrian overpass Connects residential areas to heavily utilized church, school, and garden plots. Need complement to recently completed motor vehicle safety improvements; consider refuge islands. South: Standard crosswalk Metrorail access. This is part of the route that will be used to access the rail station. West: high visibility crosswalk Increasingly heavy traffic with large turning volumes North: high visibility crosswalk and pedestrian signal; South and West: high visibility crosswalks West: signal and standard crosswalk (without pedestrian signal) Standard crosswalks across all entrances and high visibility crosswalk across Old Reston Ave East: Realign right turn channelization; South: Realign right turn channelization, extend median to include pedestrian refuge; All approaches: High visibility crosswalk, pedestrian countdown signal, decrease right turn radius, upgrade curb ramps East: Median pedestrian refuge; West: median pedestrian refuge; All approaches: high visibility crosswalk, pedestrian countdown signal, upgrade curb ramps. North and South: Standard crosswalks Traffic signal; North: standard crosswalk and pedestrian signal Recommended by RMAG, Table 3-3, No. I8. North: High visibility crosswalk, pedestrian countdown signal, ugrade/construct curb ramps; South: pedestrian countdown signal, upgraded curb ramps, high visibility crosswalk, extend median to include pedestrian ref Reccomended by RMAG. Table 3-3, No. I7 From RMAG, Table 3-3, No. I29. This will become a major signalized intersection when development is completed. North: standard crosswalk Heavy pool parking on both sides of North Shore Dr North and East: standard crosswalks with pedestrian signals South and West: standard crosswalk with pedestrian signals North: extend median to include pedestrian refuge; South: extend median as much as possible, wide curb lanes to accommodate bikes; All approaches: upgrade curb ramps, pedestrian countdown signals, high visibility crosswalk. Metrorail access. This intersection connects residential areas to Tall Oaks Plaza, daycare, and pool. Metrorail access. RMAG, Table 3-10, No. I18. 17

19 NP NP NP Baron Cameron Ave & Village Rd Route 7 & Baron Cameron Ave Lake Fairfax Dr & Baron Cameron Ave NP Wiehle Ave & N. & S. Longwood Grove Dr & Baron Cameron Park entrance NP Bennington Woods Rd & North Village Rd Traffic East: signal & standard E crosswalk with pedestrian signal; underpass 1/4 mi E East: high visibility crosswalk; East at Trail crossing 100' North of intersection: standard crosswalk North: high visibility crosswalk and pedestrian signal East: high visibility crosswalk; connect crosswalk with ramp to trail on N side of Baron Cameron Both East intersections: standard crosswalks; West park entrance: standard crosswalk West and East: Standard crosswalks Increasing pedestrian volume as revitalization occurs Countywide Trails Plan: This improvement would fix a gap in the County trail system. Countywide Trail Plan: This would fix a gap in County trail system. Sunrise Valley Dr & South Lakes South Lakes & Twin Branches Glade Dr at Nature Center Soapstone Dr & Ridge Heights South Lakes Dr & Soapstone Dr Glade Dr & Twin Branches Rd South Lakes Dr & Ridge Heights Rd Soapstone Dr & Golf Course Square Sunrise Valley Dr, Upper Lake Dr & Campus Commons Dr Sunrise Valley Dr & Preston White Dr (E intersection) Sunrise Valley Dr & Alexander Bell Dr Sunrise Valley Dr & Parkridge Blvd (W intersection) Sunrise Valley Dr & Parkridge Blvd (E intersection) Standard N, S, & W crosswalks with S & W pedestrian signal Traffic signal; North standard crosswalk with pedestrian signal North: high visibility crosswalk All approaches: standard crosswalks with pedestrian signal West: Standard crosswalk; North: high visibility crosswalk North, South, and West: high visibility crosswalks High visibility crosswalk crossing on Twin Branches at South Lakes North and South: high visibility crosswalks connecting Nature Centers at Crooked Oak Trail East: high visibility crosswalk All approaches: high visibility crosswalks; move SB right lane stop line back even with through/ left lane West: high visibility crosswalk 2 underpasses North and West: high visibility crosswalks West: standard crosswalk East: high visibility crosswalk with pedestrian signal; North: standard crosswalk high visibility crosswalk North: standard crosswalk North: standard crosswalk North: standard crosswalk Connects offices to South Lakes Village Center Connects residential areas with South Lakes Village Center. Vehicle/pedestrian conflicts occur because vehicles turn left out of shopping center at same time pedestrian signal is green. New trail on the western side of Twin Branches scheduled will require a crosswalk at South Lakes. Connects Nature House to trail. Improvements at Nature House will bring added pedestrian volume. Need consistency in marking crosswalks on Cross County Trail; heaviest pedestrian volume is on West side. 18

20 Weathersfield Ct & Sunrise Valley Dr Traffic signal; East: crosswalk and pedestrian signal The traffic signal needs to be interrupted for people leaving this cluster and for pedestrians getting to the bus. This signal would be primarily beneficial for drivers making a left turn at this intersection, but it would also aid those turning right. Reston Pkwy & Market St Library St & Bluemont Way Explorer St & Bluemont Way Reston Pkwy & Dulles Toll Rd ramps E Fairfax County Pkwy ramps at Sunset Hills Rd & Sunrise Valley Dr E high visibility W crosswalk without pedestrian signal Standard crosswalks with no pedestrian signal Signal with pedestrian phase and high visibility crosswalk North: Upgraded curb ramps, East: Median pedestrian refuge, pedestrian warning and knockdown signs; West: Median pedestrian refuge, pedestrian warning and knockdown signs; All approaches: high visibility crosswalk North: Signal and high visibility crosswalk; West: high visibility crosswalk West: high visibility crosswalk, pedestrian countdown signal, upgrade curb ramps, warning signage at unsignalized crossing, decrease right turn radius; South: pedestrian median refuges, high visibility crosswalk, pedestrian countdown signal, construct cur All aproaches: high visibility crosswalks Completed From RMAG, Table 3-3, No. I6. From RMAG, Table 3-3, No I5. North: High visibility crosswalk and upgraded curb ramps. Metrorail access. RMAG, Table 3-7, No. I31. Dangerous crossing; high volumes and poor angles between vehicles and bikers create poor visibility Market St & Town Center Pkwy New Dominion Pkwy & Town Center Pkwy Explorer St & New Dominion Pkwy Town Center Pkwy & Bluemont Way Bluemont Way & Discovery Pedestrian Bridge Fairfax County Pkwy & Sunset Hills Rd at Spring St ramps St. Francis St & New Dominion Pkwy Standard N, S & W crosswalks with no pedestrian signal 4 standard crosswalks with pedestrian signal East: signal and high visibility crosswalk North and South: pedestrian signal New traffic signal; All approaches: pedestrian signal and high visibility crosswalks All approaches: High visibility crosswalks, upgraded curb ramps, decrease curb radii, potential signal with pedestrian phase; East: extend median island to include pedestrian refuge; West: pedestrian media refuge. North: Extend median to include pedestrian refuge; South: extend median to include pedestrian refuge, decrease right turn radius; All approaches: upgrade curb ramps, high visibility crosswalk, re-align crosswalk. West: High visibility crosswalk, pedestrian countdown signal, raised median refuge island; North: high visibility crosswalk, construct curb ramp (east). North: high visibility crosswalk with pedestrian signal; break in guard rail; complete sidewalk to bridge Increasing pedestrian movement and high speed Completed with standard crosswalks Metrorail access. RMAG study, Table 3-3, No. I10. Metrorail access. From RMAG. Table 3-3, No. I4. Metrorail access. From RMAG, Table 3-3, No. I2. Important pedestrian connection between Reston & Herndon North and South: Standard crosswalks Increasing pedestrian movement due to very high density housing being completed. 19

21 Fountain Dr & Baron Cameron Ave St. Francis St & Bluemont Way Town Center Pkwy & Sunset Hills Rd New Dominion Pkwy & Crescent Park Dr East: standard crosswalk and pedestrian signal; North and South: standard crosswalks North: pedestrian signal Increasing pedestrian movement due to new development. North: high visibility crosswalk Increasing pedestrian movement between bus transit station, coming rail station, and Town Center core Signal All approaches: High visibility crosswalk, extend median to include pedestrian refuge, pedestrian countdown signal, construct curb ramps Metrorail access. Recommended by RMAG, Table 3-3, No. I3 North and South: standard crosswalks Increasing pedestrian movement Town Center Pkwy & Cameron Glen Dr Bowman Towne Dr & Cameron Glen Dr Bowman Towne Dr & Fountain Dr Bowman Towne Dr & Explorer St. Sunset Hills Rd & YMCA entrance (W) Sunset Target Driveway West: standard crosswalk All approaches: stop signs; South, East and West: standard crosswalks 50 Bowman Towne Dr & Explorer St. 64 Sunset Hills Rd & YMCA entrance (W) 98 Sunset Target Driveway West, South, and East: standard crosswalks North and South: standard crosswalks with pedestrian signal North: standard crosswalk Increasing pedestrian volume North and South: standard crosswalks Number of people walking in this location is increasing Standard NE crosswalk Connects retail area, YMCA, hotel, access to W&OD trail, gas station, and restaurants. All approaches: high visibility crosswalks, countdown signals, upgraded curb ramps; East: Extend medians to include pedestrian refuge, re-align crosswalk. Metrorail access. Connects retail in Herndon to Target, gas station, and retail areas to North. From RMAG, Table 3-3, No. I9. North and South: standard crosswalks Number of people walking in this location is increasing Standard NE crosswalk Connects retail area, YMCA, hotel, access to W&OD trail, gas station, and restaurants. All approaches: high visibility crosswalks, countdown signals, upgraded curb ramps; East: Extend medians to include pedestrian refuge, re-align crosswalk. Metrorail access. Connects retail in Herndon to Target, gas station, and retail areas to North. From RMAG, Table 3-3, No. I9. KEY: CTP - Countywide Trails Plan, As adopted by the Fairfax County Board of Supervisors, June 17, 2002 RMAG - Reston Metrorail Access Group: Refer to the report, Wiehle Avenue/Reston Parkway Station Access Management Plans, Final Report, April 15, 2008, Submitted to Fairfax County, VA by Vanasse Hangen Brustlin, Inc. On-line at: - Hunters Woods - South Lakes - Lake Anne NP - North Point 20

22 WALKWAY IMPROVEMENTS PROPOSED WALKWAY IMPROVEMENTS The process of developing priorities for pedestrian improvements at non-intersection locations was less systematic than that used for intersection improvements. There is no equivalent to the Manual on Uniform Traffic Control Devices, nor any known set of accepted criteria for planning walkway systems. The process involved mapping proposals from all of the above sources, field inspection, and suggesting links based on need arising from expected use. Portions of the Reston walkway system currently have adequate lighting installed. Consideration should be given to increasing the walkways that have lighting with priority given to walkways within a ¼ mile radius of village and shopping centers. CRITERIA CONSIDERED WERE: Pedestrian traffic volume Special conditions, similar to those used for defining intersection improvements: schools, elderly pedestrians, transit passenger movements, town or village center access, medical and recreational facilities, and the need for continuity of the pedestrian system Fairfax County s Trail Plan Fairfax County Park Authority plans Herndon s draft plan for a systematic town wide pedestrian system Suggestions from PBAC members Public feedback through the RA website Developer plans Input from the Planning and Zoning Committee Resident suggestions 21

23 PROPOSED WALKWAY IMPROVEMENTS SORTED BY RESTON DISTRICT DISTRICT ROUTE FROM TO SURFACE WIDTH LENGTH SOURCE RESPONSIBILITY Glade Dr (E) Coquina Dr (S) Near Sunrise Valley Dr C 5' 500 PBAC FC Glade Dr (N) Colts Neck Rd Shire Ct C 5' 850 FC FC Glade Dr (N) Glade Bank Way Middle Creek Ln A 8' 500 FC FC Glade Dr (S) Reston Pkwy Freetown Dr C 5' 300 PBAC FC Glade Dr (W) Green Range Dr (N&S) Bus stops C 5' 50' each PBAC FC Glade Dr (S&W) Green Range Dr (S) Rosedown Dr C 5' 2050 FC FC INTERIOR Steeplechase Dr Fox Mill District Park NS 5' 1400 PBAC RA OVER TOLL ROAD International Center Plaza America/Oracle C 10' 1200 PBAC FC Lawyers Rd(N) Farrier Lane Park and Ride Path A 8' 294 PBAC FC Reston Parkway (OVER) International Center Nextel Building C 8' 500 PBAC FC Monroe Street (E) Sunrise Valley Dr Bridge over Toll Rd & A/C 8' 2100 Herndon & PFG FCDOT Herndon Town Center Station Sunrise Valley Dr Sunset Hills Road A RMAG FC Town Center Station Reston Parkway Town Center Station A RMAG FC Reston Parkway (W) Fox Mill Road Sunrise Valley Drive A 8' 9000 PBAC FC South Lake Dr(N) Sanibel Ct Sunrise Valley Dr A 8' 3,400 CTP FC South Lakes Dr (N) Cascade Exec Ctr Entrance Sanibel Dr C 5' 900 PBAC FC South Lakes Dr (S) Pinecrest Rd 50' W of Sanibel Dr C 5' 300 PBAC FC Sunrise Valley Dr(N) Fairfax County Pkwy W&OD Trail C 10' 22,977 RMAG FC Sunrise Valley Dr (N) Hitchcock Rd Colts Brook Drive A 8' 771 RA FC Toll Road (S) Monroe Street Wiehle Avenue A RMAG FC Baron Cameron Ave (S) Lake Fairfax Dr Route 7 A 8' 1400 RCA P Dressage Dr End of Dressage Dr Into new development A 8' 200 FAC P Interior Sycamore Valley Old Reston Ave C 8' 22 RA RA Inter-parcel connection Roger Bacon Dr Business Center Dr C 6' 2,662 RMAG D Isaac Newton Sq S Wiehle Ave Isaac Newton Sq W C 6' 1,211 RMAG D North Shore Dr Tall Oaks Shopping Center Tall Oaks Shopping C 5' 589 RA FC/D Center North Shore Dr (N) Wiehle Ave Ring Road C 5' 500 PBAC FC North Shore Dr (S) Wiehle Ave Wedge Dr C 5' 150 PBAC FC North Shore Dr (N) Golf Course sidewalk/ GCI Recreation area C 5' 1445 PBAC FC RA Path North Shore Dr (N) Charter Oak Ct Charter Oak sidewalk C 5' 971 PBAC FC North Shore Dr (S) Sycamore Valley New Fannie Mae Path C 5' 776 RA FC Plaza America entrance Trail along Sunset Hills Crosswalk across Sunset A 8' 25 FAC P Rd (S) Hills Rd Sunset Hills Rd (N) Wiehle Avenue Business Center Dr C 6' 9,568 RMAG FC Sunset Hills Rd W&OD Trail Michael Faraday Ct C 5' 480 FC FC Sunset Hills Rd (N & S) W & OD Trail Hunter Mill Road A 8' 4500 RCA & PFG VDOT Sunset Hills Rd (N) W&OD Trail Post Office entrance C 5' 400 PBAC FC Sunset Hills Rd (N) Old Reston Ave New Condo C 5' 482 PBAC FC Sunset Hills Rd (N) Business Center Drive Clay Lane C 5' 176 RA FC 22

24 W & OD Trail to Lake Fairfax Park Michael Faraday Ct Lake Fairfax Park (natural trail) A 8' 600 RCA & PFG P Wiehle Ave Chestnut Grove North Shore Drive C 5' 1210 RA FC Wiehle Ave Underpass Wiehle Ave A 8' 68 RA RA Wiehle Avenue rail access from NE & SE Sunset Hills Rd along E side of Wiehle bridge Through rail station access on bridge to Sunrise Valley Dr A 8' or wider 2000 PBAC DR Wiehle Avenue rail station access from north Wiehle Avenue rail station access from south Bridge over Toll Rd. to rail station at Wiehle park & ride Bridge over Toll Rd to rail station from Centennial Park Isaac Newton Sq. with new signal on Sunset Hills Rd Sunrise Valley Dr near Centennial Park Dr A A 8' or wider 8' or wider 1300 PBAC DR 900 RMAG & PBAC DR NP Reston Pkwy (E) Wiehle Ave Existing trail S of Bright Pond Ln NP Baron Cameron Ave (N) Longwood Grove (near Old Quincy Ln) NP Baron Cameron Park (N & W) A 8' 600 PBAC FC Gatesmeadow Way A 8' 2000 RCA & Crippen-Rucker Baron Cameron Ave trail Wiehle Ave trail A 8' 2800 PBAC FCPA NP Bennington Woods Rd Path Bennington Woods Road NP Bennington Woods Rd (N) Reston Pkwy Existing trail east of Reston Parkwy A 8' 20 RA RA C 5' 350 PBAC FC NP INTERIOR Waterfront Rd Baron Cameron Park NS 5' 150 PBAC FCPA NP INTERIOR Tommye Lane Bright Pond Path NS 5' 867 PBAC RA NP Lake Newport Rd (S) Arbor Glen Way Existing trail A 8' 200 PBAC FC NP Reston Ave (W) Southington La Shaker Dr C 5' 225 FC FC NP Stuart Rd Lake Newport Rd Cheviot Dr C 5' 1624' FC PBAC NP Stuart Rd Lake Newport Rd Walnut Branch C 5' 1270 RA FC NP Wiehle Ave (S) Center Harbor Rd Reston Pkwy A 8' 2612 CTP FC P Ridge Heights Road South Lakes End of Old Westbury Rec Area Fox Mill Park east entrance 23 End of Soapstone Dr at cul de sac Into Fox Mill District Park C 5' 528 RA RA NS 5' 30 PBAC FCPA Glade Dr (N) Timberhead Ln E of Quartermaster Ln A 8' 1850 FC FC Hunter Mill Rd (W) Dulles Toll Road Trail N of Sunrise A 8' 800 RCA & PFG P Valley Dr Interior Reston Pkwy International Center C RA D Lawyers Dr (N) Twin Branches Rd Guildmore Rd A 8' 400 FC FC Lawyers Rd (S) Fox Mill Rd Twin Branches Rd A 8' CTP FC New Trail End of Foxclove Rd New subdivision to east NS 5' 200 PBAC LO Soapstone (E) South Lakes Dr Glade C 5' 3100 CTP FC Soapstone (W) Hunters Green Crt Sunrise Valley Dr C PBAC FC Soapstone Dr(W) Sweetbay Ln Fire Ring Path C 5' 1501 CTP FC Soapstone Dr (W) Fire Ring Path Lawyers Rd C 5' 612 CTP FC South Lakes Dr (N) E of Olde Crafts Dr (W) Soapstone Dr C 5' 2750 FC FC South Lakes Dr (NW) Ridge Heights Rd Path on dam C 5' 150 PBAC RA South Lakes Dr (SE) Twin Branches Rd Ridge Heights Rd C 5' 1750 RA FC South Lakes Dr (N) HS (W) Ridge Heights Rd C 5' 1341 CTP & RA FC South Lakes Dr (S) West of Chestnut Burr Ct Tanbark Dr A 8' 980 FC FC

25 Sunrise Valley Dr(S) Glade Dr Barton Hill Road C 6' 17,000 RMAG FC Sunrise Valley Dr (S) W&OD Trail Hunter Mill Rd A 8' 2675 FC FC Twin Branches (E)/ Bradford Rd Hunter Station A 8' 1246 PBAC RA Lawyers(N) Twin Branches Rd (E) Glade Dr 50' S of Sentinel Point C 5' 1500 PBAC FC Ct Twin Branches Rd (W) South Lakes Dr 75' N of Beacon Ridge C 5' 950 RA FC Wiehle Avenue Station Sunrise Valley Drive Wiehle Avenue Station A RMAG FC Town Center rail station access from NE & SE Town Center rail station access from Town Center Town Center rail station access from south W&OD Trail to Town Center to & from west W&OD Trail to Town Center to & from east Oracle site along E side of Reston Pkwy Bridge Bridge over Toll Rd. to rail station at TRW site Bridge over Toll Rd. to rail station at Carr site Town Center Pkwy Trail under Reston Pkwy Through rail station access on bridge to Sheraton & Intl. Ctr. Bridge over W&OD Trail to Bluemont Way at Discovery St Sunrise Valley Drive through Unisys site West of Town Center Pkwy Discovery St & Bluemont by ramp A A 8' or wider 8' or wider 1000 PBAC FC 1800 PBAC FC A 8' or 2000 PBAC FC wider A 8' 500 PBAC FC A 8' 400 PBAC FC Sunset Hills Rd (S) End of ramp from Fairfax Herndon C 5' 700 PBAC FC Co. Pkwy Bluemont Way Reston Pkwy Discovery St C 6' 1,894 RMAG FC Town Center Pkwy W&OD Trail Sunset Hills Rd C 6' 810 RMAG FC Reston Parkway (E) Dulles Toll Rd (bridge to 1801 Reston Pkwy A 8' 2100 RLC P rail station) Explorer St (E) Bowman Towne Dr New Dominion Pkway C 6' 425 RLC P Fountain Dr (W) Access Sunrise House C 5' 500 RLC P New Dominion Pkwy Town Center Pkwy Fairfax County Pkwy C 6' 1300 RLC FC (N&S) Bluemont Way (N&S) Town Center Pkwy Library St C 6' 1100 RLC FC Hunters Woods FAC Facilities Advisory Committee South Lakes RMAG Reston Metrorail Access Group Lake Anne RCA Reston Citizens Association NP North Point PFG Pedestrian Facilities Group PBAC Pedestrian and Bicycle Committee FC Fairfax County CTP RA RLC P County Trails Plan Reston Association Reston Land Corporation Private 24

26 PROPOSED TRAIL IMPROVEMENTS Proposed Trail Improvements Roads Lakes 25

27 BICYCLE FACILITY IMPROVEMENTS PROPOSED BIKE FACILITY IMPROVEMENTS Recommendations for the bicycle facilities have been developed to be consistent with the Fairfax County Master Bicycle Plan. Additionally, curb cuts improvements listed are based on actual observation of locations where bicycles, wheelchairs, strollers, and pedestrians would benefit from curb cuts being created. DISTRICT ROUTE FROM TO TYPE STATUS / Steeplechase Drive Hunters Woods Pool Fox Mill Road Shared Lane Markings / South Lakes Drive Sunrise Valley Drive USGS Shared Lane Markings / Glade Drive Twin Branches Road Sunrise Valley Drive Signed Bike Route / Twin Branches Road Lawyers Road South Lakes Drive Shared Lane Markings / Colts Neck Road Sunrise Valley Drive Glade Drive Bike Lane / Reston Parkway Sunrise Valley Drive Fox Mill Road Shared Use Path / Colts Neck Road Steeplechase Road Reston Parkway Bike Lane / Sunrise Valley Drive Monroe Street Hunter Mill Road Bike Lane North Shore Drive Ring Road Park Glen Court Shared Lane Markings Baron Cameron Avenue Fairfax County Parkway Route 7 Paved Shoulders Wiehle Avenue Baron Cameron Avenue Sunrise Valley Drive Bike Lane Sunset Hills Road Town Center Parkway W&OD Trail Bike Lane NP Wiehle Avenue Baron Cameron Ave Fairfax County Parkway Shared Lane Markings NP North Village Road Baron Cameron Ave Wiehle Avenue Shared Lane Markings NP Bennington Woods Road Baron Cameron Ave North Village Road Shared Lane Markings Town Center Parkway Sunset Hills Road Baron Cameron Avenue Bike Lane Fountain Drive Freedom Drive Baron Cameron Avenue Bike Lane New Dominion Parkway North Shore Drive Fairfax County Parkway Bike Lane New Dominion Parkway North Shore Drive Fairfax County Parkway Bike Lane NP Hunters Woods South Lakes Lake Anne North Point THE NEED FOR AN IMPLEMENTATION MECHANISM The main items missing from this report are a budget and a recognized mechanism for coordinating implementation of the prioritized improvements contained in this report. While the responsibilities of the respective entities mentioned above were laid out, no attempt was made to develop a funding strategy for implementing the improvements. This important part of the pedestrian and bicycle system is not something that the Reston Association has a great deal of ability to influence. The need is for the responsible entities to (1) recognize the importance of the these systems, (2) recognize that improvements are needed, (3) agree that Reston On Foot and Bicycle represents the best effort to date to set priorities on the needs of the community, and (4) cooperate with each other on a continuing basis to implement the plan. A bikeshare feasibility study for Reston is currently underway. Fairfax County also recieved a TAP grant which will provide $400,000 for bikeshare infrastructure, assuming the feasibility study supports bikeshare in Reston. PBAC accepts a significant part of the community s need to continually monitor challenges and opportunities to implement the recommendations in this report and to work with all responsible organizations to do so. 26

28 PROPOSED CURB CUT IMPROVEMENTS SORTED BY RESTON DISTRICT DISTRICT ROUTE INTERSECTION TYPE COMMENTS NP Woodbrook Lane Wiehle Avenue Trail end NP Stonesthrow Dr. Fieldview Dr Trail end NP Bright Pond La (W end) Trail end NP Bright Pond La (E end) Trail end NP Bright Pond La (E end) Dog Run Path NP Bradbury Lane Trail end NP Concord Point Lane Trail end NP Waterfront Rd. Lake Newport trail East side of Lake Newport near Baron Cameron Park NP North Village Rd. Trail end Trail to Lake Newport NP Lake Newport Rd. (N) Trail end Access to Soccer Field NP Reston Parkway (W) Deer Forest Rd. (S) Trail end Access to playground NP Bennington Woods Rd. Autumn Wood Trail end NP Winstead Lane Trail end New Dominion Dr. (median) Town Center Pkwy.(W) Curb cut needed in existing median Bluemont Way W & OD ramps Crosswalk needed Discovery Street W & OD ramps Crosswalk needed Green Run Lane Trail end Hunt Club Rd. (N end) Trail end Hunt Club Rd. (S end) Trail end Becontree Lane (W) Becontree Lake Dr. Crosswalk needed Inlet Court Wiehle Ave. Inlet Court Trail At cul de sac Northgate Sq. Trail end Near Lake Anne Park Lakeview Condo Trail to Lake Anne Crosswalk needed Lakeview Condo Crosswalk needed Orchard Lane Trail end Hook Rd. Hook Rd. Rec. Area Trail end Apricot Court (N end) Trail North shore Drive Golf Course Path Saffold Way sidewalk (NE) all intersections Crosswalk needed Saffold Way sidewalk (SE) all intersections Crosswalk needed Hunters Green Ct. Trail end Indian Ridge Rd. Trail end Shadbush Ct. Trail end Old Trail Dr. Crosswalk needed Old Trail Dr. Crosswalk needed Red Leaf Ct. Trail end Millenium Lane (W side) Crosswalk needed Millenium Lane (E side) Crosswalk needed Paddock Lane Trail end 27

29 Shire Ct. Trail end Breton Ct. Trail end Colts Neck Rd. South Lakes Dr. Trail end South Lakes Ct. Trail end Nutmeg Lane Trail end Sanibel Dr. Trail from USGS south to tot lot Sanibel Dr. White Cornus Lane (N end) Trail end White Cornus Lane (S end) Trail end Turkey Wing Ct. Trail end Marginella Dr. Trail end Coquina Dr. Trail end Stirrup Iron Lane Trail end Bayard Dr. Trail end Darius Lane (E end) Trail end Darius Lane (W end) Trail end Players Pond Lane Trail end Soapstone Sunrise Valley Dr. (SW) Trail end Tournament Dr.(S) Pathway into RA open space (next to 12809) Twin Branches By pool Crosswalk needed Ridge Heights (NE & SE) South Lakes (NW) Coordinate with crosswalks & gaps Purple Beech Pathway between Eakins Trail end Ct. and Durand Dr. Upper Lake Dr. Great Meadow (SW) Trail end Upper Lake Dr. Great Meadow (SE) Trail end Weybridge Lane South Lakes Dr. (W) Harbor Court (N) To sidewalk along Harbor Court (N) leading into South Lakes V.C. NP Hunters Woods South Lakes Lake Anne North Point 28

30 RESOURCES The Federal Highway Administration Office of Safety released A Resident s Guide for Creating Safe and Walkable Communities. The Guide includes information, ideas, and resources to help residents learn about issues that affect walking conditions; find ways to address or prevent these problems; and promote pedestrian safety: America Walks is a national advocacy organization that supports local pedestrian advocacy: The League of American Bicyclists is a member-based national bicycle advocacy organization: The Bicycle Friendly America program provides a roadmap on building a bicycle-friendly community, business or university: The Walk Friendly Community program provides resources on how to improve a community s walkability: The National Highway Traffic Safety Administration published a pamphlet called Creating Communities for Active Aging: Fairfax Advocates for Better Bicycling is the local bicycle advocacy group: Washington Area Bicyclist Association is serving the DC metro area. The organization organizes events, works with local governments on becoming more bike-friendly and provides bicycle education and services: Federal Highway Administration Design Guidance: Accommodating Bicycle and Pedestrian Travel: A Recommended Approach: National Complete Streets Coalition: Pedestrian and Bicycling Information Center: NACTO (National Association of City Transportation Officials) Urban Bikeway Design Guide: American Association of State Highway and Transportation Officials Guide for the Development of Bicycle Facilities: Association of Pedestrian and Bicycle Professionals (APBP) provides free webinars: Association of Pedestrian and Bicycle Professionals Bicycle Parking Guidelines: 29

31 HISTORY OF RESTON ON FOOT THE NEED FOR PERIODIC UPDATING Because plans for development of Reston and surrounding areas are still evolving and likely to change substantially, this plan needs to be revised periodically -- perhaps once every five years, more often if the opportunity is created to have the plan directly affect the capital improvement programs of Fairfax County and Virginia Department of Transportation (VDOT) and other responsible organizations. ORIGINS Robert Simon s original team made an excellent start at planning Reston s pathway system. Over the years, however, it has become apparent that no one agency was assuming the responsibility for planning and implementing an overall pedestrian plan. This was dramatically illustrated when, during the first phase of Town Center was being built as an exceptionally well designed pedestrian environment, while at the same time it remained difficult and unsafe to get there by foot or bicycle. Similarly, problems had often been identified for accessing village centers, job sites, health care facilities, and recreation areas. People often walk in the streets and along goat trails, and scamper across major intersections designed by traffic engineers who paid too little attention to how people want to get around and how the community was being planned and built. To address these shortcomings, a group, including several members of RCA s Planning and Zoning Committee (P & Z) and the Reston Transportation Committee (R), Larry Butler of RA staff, Bruce Taylor of Fairfax County s Office of Transportation, and Sean Hosty of VDOT s local Resident Engineer s office met on July 23, They agreed on the desirability of a comprehensive plan based on (1) accepted professional standards used by traffic engineers and (2) community objectives. With advice and assistance from the VDOT and County representatives, an ad hoc Pedestrian Facilities Group was formed to prepare the first version. This group included experienced professional engineers, planners, and persons with detailed familiarity with all aspects of community development. The following volunteers prepared the initial report or contributed to it, over a dozen meetings and many site visits (the affiliations noted are as of period of original report preparation). Joe Stowers, Chair, P & Z, and principal author George Toop, P & Z and principal author Cal Brunner Larry Butler, RA Staff Bob Feeley Tony Hylton, Former RA Board member and R Bob Kleinfeld, R Lee Libman, P & Z Dan McGuire, Former RA Board member and R Katherine Mull, Greater Herndon Citizens Association Patricia Nicoson, Chair, R Marcia Stowers Michael Taddei Ron Weber, P & Z 30

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Federal Highway Administration Pedestrian Safety Guidance for Transit

Federal Highway Administration Pedestrian Safety Guidance for Transit Federal Highway Administration Pedestrian Safety Guidance for Transit Dan Nabors Vanasse Hangen Brustlin, Inc. September 23, 2009 Pedestrian Safety Tools & Techniques Pedestrian Safety Guidebooks Transit

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

ACTIVE TRANSPORTATION

ACTIVE TRANSPORTATION ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE G AT E WAY PLAN GATEWAY BIKE Community BRIEFING KIT PLAN August 2016 TABLE OF CONTENTS INTRODUCTION... 1 THE BENEFITS OF A BIKEABLE COMMUNITY... 2 ECONOMY...2 SAFETY...3 HEALTH...3 HOUSEHOLD SPENDING...3

More information

Bicycle Facilities Planning

Bicycle Facilities Planning Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

INDOT Complete Streets Guideline & Policy

INDOT Complete Streets Guideline & Policy INDOT Complete Streets Guideline & Policy INTRODUCTION The Complete Streets guidelines build upon multiple efforts and promote a multimodal transportation system that is integrated and sustains land use

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

EXECUTIVE SUMMARY. Vision

EXECUTIVE SUMMARY. Vision Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,

More information

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Perryville TOD and Greenway Plan

Perryville TOD and Greenway Plan Perryville TOD and Greenway Plan Greenway Glossary Pathway: A bicycle and pedestrian path separated from motorized vehicular traffic by an open space, barrier or curb. Multi-use paths may be within the

More information

Multimodal Through Corridors and Placemaking Corridors

Multimodal Through Corridors and Placemaking Corridors 68 Multimodal Through Corridors and Placemaking Corridors Corridors have different functions in a region. Some corridors are used to get smoothly and rapidly through a region or to get quickly to major

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Appendix A: Crosswalk Policy

Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements Harbor Mixed Use CHAPTER Transit Corridor 4: Mobility Plan 4 MOBILITY PLAN Mobility Plan Objectives The Harbor Corridor Plan seeks to expand and improve the ways that people move along and through the

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

5/31/2016 VIA  . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 5/31/2016 VIA EMAIL Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: El Pollo Loco (P16-028) Dear Ms. Wacht: WALKSacramento has reviewed

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

AMATS Complete Streets Policy

AMATS Complete Streets Policy AMATS Complete Streets Policy Table of Contents: Section 1. Definition of Complete Streets Section 2. Principles of Complete Streets Section 3. Complete Streets Policy Section 4. Consistency Section 5.

More information

NEWMARKET UPHAM S CORNER

NEWMARKET UPHAM S CORNER SOUTH STATION Planning Initiative NEWMARKET UPHAM S CORNER COLUMBIA ROAD (P) FOUR CORNERS/GENEVA Working Advisory Group (WAG) Meeting #5 TALBOT AVENUE MORTON STREET BLUE HILL AVE/CUMMINS HWY (P) RIVER

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process Bicycle Transportation Plan Summary Madison Urban Area and Dane County Introduction September 2000 Bicycling is an important mode of transportation in the Madison urban area and countywide that is available

More information

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan... BICYCLE AND This plan was created through a grant from the Healthy Communities Program with the cooperation of the City of Cynthiana, Cynthiana Main Street, Cynthiana-Harrison County-Berry Joint Planning

More information

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES December 2018 TABLE OF CONTENTS I. Executive Summary 3 II. When Is A Bicycle Pedestrian Transit Assessment (BPTA) Required? 4 III.

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback. City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for

More information

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline EISEN LETUNIC T R A N S P O R T A T I O N, ENVIRO N M E N TA L A N D URBAN PLANNIN G MEMORANDUM To Oakland Pedestrian Plan Technical Advisory Committee & Pedestrian Advisory Group From Victoria Eisen Date

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5/7/2013 VIA  . RE: University Village Safeway Expansion (P13-019) 5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village

More information

CITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX

CITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX CITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX This toolbox is to be used to guide pedestrian crossing improvements within the City of Saratoga Springs. Details for each crossing type are provided.

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC

More information

East Burke Transportation, Safety and Capacity Improvements

East Burke Transportation, Safety and Capacity Improvements East Burke Transportation, Safety and Capacity Improvements The purpose of this project is to increase mobility and improve safety for pedestrians, cyclists, and motor vehicles along VT Route 114 in the

More information

Creating walkable, bikeable and transit-supportive communities in Halton

Creating walkable, bikeable and transit-supportive communities in Halton Creating walkable, bikeable and transit-supportive communities in Halton By presenting current research and best practices, the information in this paper is meant to support and broaden discussion on how

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors. Lincoln Highway Streetscape Plan Stakeholder Workshop #2 Handout Contents Introduction and Project Vision Planning Principles Specific Recommendations including a Proposed Typical Roadway Section Renderings

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project Memo Memphis STP Pedestrian Sidewalk Project To: Kyle Wagenshutz, City of Memphis From: Matthew Berkow, Collin Chesston, and Anne Eshleman, Alta Planning + Design Date: June 2014 Re: Photo Inventory Introduction

More information

Bicycle Boulevards and Neighborhood Greenways

Bicycle Boulevards and Neighborhood Greenways Bicycle Boulevards and Neighborhood Greenways Traffic Safety is Improving for Everyone 90 80 70 60 50 40 30 20 10 0 PORTLAND: TOTAL TRAFFIC FATALITIES 1986-2008 1986 1987 1988 1989 1990 1991 1992 1993

More information

Access Management in the Vicinity of Intersections

Access Management in the Vicinity of Intersections Access Management in the Vicinity of Intersections FHWA-SA-10-002 Technical Summary Photo: Ralph Bentley (used with permission) 0 Access Management is: The design, implementation and management of entry

More information

Why Zone In on Speed Reduction?

Why Zone In on Speed Reduction? Learn it. Do it. Live it! SPEED REDUCTION IN THE ZONE Why Zone In on Speed Reduction? Speeding is a serious issue that plays a major role in the risk of serious injury and pedestrian fatality in a crash.

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior

More information

Designing Complete Streets: What you need to know

Designing Complete Streets: What you need to know Designing Complete Streets: What you need to know Getting from this to this. Continuous sidewalk Buffer w/trees Bicycle lane Raised median Buildings close to the street Flexibility in design Design and

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

THE OFFICIAL GUIDE TO CYCLING SAFELY IN PHILADELPHIA

THE OFFICIAL GUIDE TO CYCLING SAFELY IN PHILADELPHIA B IKE NICE THE OFFICIAL GUIDE TO CYCLING SAFELY IN PHILADELPHIA A partnership of the City of Philadelphia and the Bicycle Coalition of Greater Philadelphia ABOUT VISION ZERO & BIKE NICE It s a great day

More information

Active Transportation Infrastructure Investment A Business Case

Active Transportation Infrastructure Investment A Business Case Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

NEIGHBORHOOD TRAFFIC CALMING POLICY

NEIGHBORHOOD TRAFFIC CALMING POLICY NEIGHBORHOOD TRAFFIC CALMING POLICY I. PURPOSE The City of Kent continually strives to strengthen and protect its neighborhoods by improving the quality of life in residential areas. Traffic conditions

More information

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

Chapter 5: Crossing the Street

Chapter 5: Crossing the Street Chapter 5: Crossing the Street Whether walking or bicycling, a student s journey to school will more than likely require crossing one or more streets. Per the Safe Routes to School Guide, maintained by

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

City of Vallejo Traffic Calming Toolbox

City of Vallejo Traffic Calming Toolbox City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

12/4/2016 VIA  . RE: Grocery Outlet Del Paso (DR16-328) 12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.

More information

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014 MOBILITY WORKSHOP Joint City Council and Transportation Commission May 5, 2014 Review of General Plan M-1 Develop world-class transit system M-3 Maintain/enhance pedestrian-oriented City M-4 Create comprehensive

More information

On Road Bikeways Part 1: Bicycle Lane Design

On Road Bikeways Part 1: Bicycle Lane Design On Road Bikeways Part 1: Bicycle Lane Design Presentation by: Nick Jackson Bill Schultheiss, P.E. September 04, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

El Centro Mobility Hub

El Centro Mobility Hub The El Centro drive shed comprises a major portion of the El Centro downtown area, which is well served by bus routes. The proposals intend to promote use of public transit through improvements and enhancements

More information

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists Cyclists and Bikeways: What s your match? guide to bikeway options for a variety of cyclists The workshop and this resource were made possible by funding from the Province of Ontario via the Ministry of

More information

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

6/14/2013 VIA  . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814 6/14/2013 VIA EMAIL Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd RE: Sacramento Natural Foods Co-Op (P13-025) Dear Mr. Compton: WALKSacramento appreciates

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

This chapter describes the proposed circulation system and transportation alternatives associated with

This chapter describes the proposed circulation system and transportation alternatives associated with 5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing

More information

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

6/22/2018 VIA  . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 6/22/2018 VIA EMAIL Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 RE: Quick Quack Car Wash (DD9801) Dear Ms. Goulart: WALKSacramento

More information

11/28/2016 VIA

11/28/2016 VIA 11/28/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, Ca 95811 RE: Natomas Corporate Center Commercial Building

More information