1 ` Pedestrians CITY OF FALLS CHURCH Traffic Calming Bicyclists ADA Assessment Pedestrian, Bicycle, and Traffic Calming Strategic Implementation Plan Strategic Plan Policy Safe Routes to School Appendix D Public Comments and Responses March 2012 DRAFT

2 APPENDIX D - PUBLIC COMMENTS AND RESPONSES Appendix D contains the public comments received during the planning process for the Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan as well as the team s responses to the comments. This appendix also contains the summary results from the Interactive Web Tool. The public input on this project was significant. The City received over 800 comments on the project, which indicates that residents value walking and biking and would like to see improved and/or new pedestrian and bicycle facilities throughout the City. Many comments stated concerns about specific locations and recommended improvements. Responses on the web tool indicated that the most popular destinations are the shopping centers, City Hall, parks, and downtown. Sidewalks are the most important amenity to walkers. Survey respondents indicated that sidewalks are missing along important routes where people want to walk and/or that existing sidewalks are often cracked or blocked by overgrown vegetation, which makes walking difficult. In addition, respondents indicated that the top five most difficult intersection crossings are: 1. W&OD Trail at N. West Street 2. W&OD Trail at Fairfax Drive (outside the City) 3. W&OD Trail at Great Falls Street 4. Lee Highway/Cavalier Trail /S. Maple Avenue and 5. Pennsylvania Avenue/Rees Place. Survey responses from persons with disabilities focused on the need for additional accessibility improvements including compliant curb ramps, audible and vibrating signals and sidewalks without obstacles. Those responding to the questions about bicycle accommodations indicated support for more bicycle lanes separated from traffic. The public input received for this project provided invaluable guidance for the project team in identifying projects and setting priorities. The pages that follow contain the full list of comments and the team s responses to those comments. The majority of the comments have been addressed in the Plan. Appendix D - Public Comments and Responses 1

3 APPENDIX D Question 1. What are your pedestrian destinations? 1 Donald Frady Park 2 City Center, 300 Park Ave 3 Cherry Hill Park It is the closest park with playground equipment from our end of town. The walk down route 7 with children/dogs is scary. The sidewalk is narrow and the cars speed recklessly 300 Park Ave (almost daily). Cherry Hill Park, Community Center, Library, and City Hall are all big walking destinations A HAWK signal is proposed at the intersection of E. Broad St and E. Fairfax St (intersection closest to the Donald Frady park). The City sidewalk policy for E. Broad St is to provide a minimum of 10 foot sidewalk (sidewalk and buffer) on E. Broad Street. However, due to relative priority of each project and limited budget the implementation will take place in phases. Appendix C details the rankings for each sidewalk segment. 4 City Center, 300 Park Ave crossing Virginia and Great Falls is dangerous. Cars accelerate into turn, sidewalks are missing, traffic on Virginia never stops at the stop sign (cannot see traffic until they have entered the traffic lane on Great Falls) The plan shows intersection improvements to Great Falls and Virginia including curb radii reduction with splitter islands. The goal is to calm traffic turning onto the street and create better visiblity and safety for pedestrians. 5 Falls Church Churchyard Destination The falls Church. You can only cross 7 by foot at either cherry st. or Washington St. I d like to cross closer to Fairfax or Lawton street (or in the middle). I see tons of people crossing here on Sundays 6 Cherry Hill Park Dog walking 7 East Falls Church Metro East Falls Church Metro 8 Giant, CVS, ABC, Staples (regularly) -- Haandi, Hair Fall Church Shopping Cuttery, Baskin Robbins (irregularly, but in past Center year) 9 Devonshire Park Good place to take dog. Cut-through in woods A HAWK signal is proposed at the intersection of E. Broad St and E. Fairfax St. Appendix D - Public Comments and Responses 2

4 APPENDIX D Question 1. What are your pedestrian destinations? W&OD Trail at N Van Buren St Buxton Rd and Tyson Corner N Spring St between Fulton and Park Ave 13 Falls Church Park 14 City Center, 300 Park Ave Hard to get to from our street with children. Many missing sidewalks and not clear crossings making it stressful. Hidden corner - where cars come flying around both directions. Home (where I start or end) I enjoy walking on the Crossman Park walking path. It is provides a pleasant, safe walk next to Four Mile Run. I run/walk around the city for exercise. I mainly use the streets/bike path north of Broad street and from my home in Broadmont over to the city center. The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. While the City understands that every location without a sidewalk should receive a sidewalk at some point, there needs to be a ranked list in order to identify the relative priority of each project and also due to the limited budget for implementation. Chapter 6 shows the locations of all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. The City will review this issue and consider measures as appropriate. 15 Governors Ct and Little Falls St South Maple Ave 17 Cherry Hill Park Lincoln Great Falls St and Lincoln Ave City Center, 300 Park Ave I walk from Gresham Place to the Farmers Market on Saturdays. N Washington St is heavily travelled by fast moving, noisy cars and trucks. The sidewalks are narrow and close to the street. I try to avoid walking along N Washington St. I walk from my home on N. Virginia to my office on S. Maple Ave several times per month I walk from my home on N. Virginia with my kids to Cherry Hill Park several times per month I walk from my home on N. Virginia with my kids to Lincoln Park several times per month I walk from my home on N. Virginia with my kids to the Farmer s Market most Saturdays The City sidewalk policy for N. Washington St is to provide a 20 foot streetscape (10 ft sidewalk and 10 ft buffer) on N. Washington Street. Appendix D - Public Comments and Responses 3

5 APPENDIX D Question 1. What are your pedestrian destinations? Graham Rd Magruder s Grocery store. Sidewalk along city side of Lee Highway/S Washington St overgrown on way to light at Graham. The City has adopted a goal to 'Develop and implement a walkway maintenance program that includes annual sidewalk inspections' which will take care of these issues. Further all existing sidewalk deficiencies such as heaving, settling, buckling, etc have been identified in the existing conditions report (Chapter 4) and are scheduled to be remedied through the ADA Transition Plan. 21 Shopping Center, 352 West Broad St Many cars speed down our cul de sac looking for access to 29. They turn around and speed out again. The population of children continues to increase and the street becomes more dangerous 22 West Falls Church metro Metro Stop. Like marked crossing on Haycock Need more information to address the comment. It is not clear which cul-de-sac is referred to Fall Church Shopping Center Broad St between S Lee St and Penn Ave Broad St between Little Falls and N. Maple Ave My family and I walk from our home on N. Virginia to the Falls Plaza Shopping Center about once per month. My family and I walk from our home on N. Virginia to the shops on Broad St. several times per month My family and I walk from our home on N. Virginia to the shops on Broad St. several times per month N Washington between Fairfax Drive and N. Westmoreland St Library, 120 N Virginia Ave East Fairfax St 29 Shopping Center on Broad St between Spring and Oak St My family and I walk from our home on N. Virginia up to Bear Rock Cafe about once a month My family walks from our home on N. Virginia to the library several times per month My wife and I walk our kids to school (the Day School) from our home on N. Virginia several times per month. New Post Office is not easily accessible from Broad Falls Apartments by foot. Additionally, car turning in and out of the P.O. frequently inhibit cars from making a left turn out of Broadfalls Plaza The City will review this issue and consider measures as appropriate. Appendix D - Public Comments and Responses 4

6 APPENDIX D Question 1. What are your pedestrian destinations? 30 Falls Park No sidewalk on one side of Seaton Lane, so many people cross at end of W Rosemary to get to sidewalk, including children going to TJ. No street crossing warning for cars. Why?? Lots of kids cross here 31 Roberts Park Our new Mt. Daniel bus stop due to construction on Randolph West Broad St pancake house 33 Cherry Hill Park Panera, Spectrum, Library, Post Office, Rt. 7 businesses, State theatre, Clare & Don s and Argia s, Browns, Ireland s Four Provinces, RedWhite&Bleu, etc. Pedestrian sidewalk needed for the length of Park Ave from N. West St to N. Washington St. Shopping Center, on Broad St b/w Penn Ave PNC Bank/Vantage Fitness & N Virginia Ave Forest Drive and Tyson Dr Post Box Shopping Center on Broad St between Spring Post Office and Oak St Shopping Center on Post Office Walking not bad except at building PO is Broad St between Spring located where there is a driveway with poor and Oak St visibility of sidewalk. Summerfield Rd & Cavalier Trail Quality Auto Parts Shopping Center, 352 Restaurants and Stores - La Caraquena, Anthony s, West Broad St and nearby - Starbucks, Kinkos, etc. Broad St between Little Restaurants and stores - Maneki Neko, Natalia s, Falls and N. Maple Ave CVS, etc. Hunan Café, 7175 Lee Highway S Washington St sidewalks often sandy/messy. Shopping Center, 352 West Broad St Starbucks Seaton Lane is a walking route to TJ Elementary School, and as such it is included in the City Safe Routes to School Plan for new sidewalks. However, due to relative priority of each project and limited budget the implementation will take place in different stages in the priority as described in Chapter 6 of the Plan. The Plan recommends the construction of the missing sidewalk links of Park Ave from N. West Street to N. Washington Street. The City will review this issue and consider measures as appropriate. Appendix D - Public Comments and Responses 5

7 APPENDIX D Question 1. What are your pedestrian destinations? 43 Shopping Center, 352 West Broad St Starbucks, Anthony's, chipotle Shopping Center on 44 Hillwood Ave between Stores - Lebanese Butcher, Halal Market, Red, Hot & Douglas Ave and Blue, etc. Annandale Rd This is a walking path where all can enjoy nature. 45 Falls Church Park Bicyclists who use this gravel path go too fast...causing problems and putting adults and children in danger of being hit or run over 46 TJ Elementary School TJ Elementary school (daily) 47 Broad St and Shreve Rd (c/w on Shreve Rd) Traffic lights do not prioritize walkers crossing Route 7. Pedestrians should have priority to cross and enough time. 48 Fowler St and Railroad Ave Walk to bike trail...to walk some more. 49 East Falls Church Metro Walk to EFC metro from Yucatan St. 50 Walk to Poplar Heights swimming pool and woods. Kennedy St and Crane St Like wide marked shoulders on West St 51 TJ Elementary School Walking down Randolph to get to Thomas Jefferson Elementary is dangerous. No sidewalks, cars parked on both sides, blind curve, seasonal blocks that require us to walk in the middle of the road (leaf piles, snow, garbage day, yard waste pick-ups) 52 TJ Elementary School walking to TJ Elementary 53 Grandmart, 6326 we like to go to grandmart for the selection of Arlington Boulevard product w/o having to walk through 7 corners 54 Broad St between S Oak We walk everywhere but often walk to downtown and S Lee St falls church to eat, shop, etc. 55 Shopping Center, on Broad St b/w Penn Ave & N Virginia Ave We walk regularly to restaurants. 56 Fall Church Shopping We walk to Giant from Pennsylvania Ave to do our Center shopping. Appendix D - Public Comments and Responses 6

8 APPENDIX D Question 1. What are your pedestrian destinations? 57 Community Center, 223 Little Falls St 58 West Falls Church Metro West Falls Church Metro 59 West Falls Church metro West Falls Church metro 60 West Falls Church metro Fall Church Shopping 61 Center on Broad St between Haycock Rd and Birch St 62 Broad St and Birch St 63 Fall Church Shopping Center 64 Kennedy St and Sewell Ave 65 Broad St and Falls Ave Broad St, Shopping Center Broad St, Shopping Center Broad St, Shopping Center 69 Wachovia Bank, 1000 Broad St 70 Sunoco, 934 West Broad St 71 Roberts Park Shopping Center on 72 Broad St between Spring and Oak St 73 N Spring St between Fulton and Park Ave 74 W&OD Trail near Lee St We walk to the community center and the park with our children on a daily basis Appendix D - Public Comments and Responses 7

9 APPENDIX D Question 1. What are your pedestrian destinations? 75 W&OD Trail near Cedar St 76 Lincoln Great Falls St and Lincoln Ave 77 W&OD Trail near Riley St Cherry Hill Park (On 78 Great Falls between N. Virginia Ave and Little Falls St) 79 East Falls Church Metro 80 East Falls Church Metro 81 East Falls Church Metro 82 East Falls Church Metro 83 W&OD Trail and 19th St 84 Falls Church Park 85 Crossman Park 86 Falls Church Park 87 Benjamin Banneker Park 88 Benjamin Banneker Park 89 Eden Center, 6763 Wilson Boulevard 90 Grandmart, 6326 Arlington Boulevard 91 Grandmart, 6326 Arlington Boulevard 92 Donald Frady Park 93 E Columbia and N Washington St N Washington St N Washington St # Madison Park 97 Madison Park Appendix D - Public Comments and Responses 8

10 APPENDIX D Question 1. What are your pedestrian destinations? 98 State Theatre, 220 N. Washington St 99 State Theatre, 220 N. Washington St 100 State Theatre, 220 N. Washington St 101 State Theatre, 220 N. Washington St East Broad St 103 Falls Church Churchyard Shopping Center on 104 Hillwood Ave between Douglas Ave and Annandale Rd Lee Highway 106 Wallace St & S. Washington St 107 Wallace St & S. Washington St 108 Tinners Hill & S. Maple Ave South Maple Ave 110 Cavalier Trail Park 111 TJ Elementary School 112 Seaton Lane and Sherrow Ave 113 Broad St between S Lee St and Penn Ave 114 Broad St between S Lee St and Penn Ave 115 Broad St between S Lee St and Penn Ave 116 Rees Pl & Rees Place Rees Place Appendix D - Public Comments and Responses 9

11 APPENDIX D Question 1. What are your pedestrian destinations? 118 Penn Ave between Broad St and Park Ave Shopping Center, on 119 Broad St b/w Penn Ave & N Virginia Ave Shopping Center, on 120 Broad St b/w Penn Ave & N Virginia Ave Shopping Center, on 121 Broad St b/w Penn Ave & N Virginia Ave Shopping Center, on 122 Broad St b/w Penn Ave & N Virginia Ave 123 Library, 120 N Virginia Ave 124 Library, 120 N Virginia Ave 125 Library, 120 N Virginia Ave 126 Shopping Center, 352 West Broad St 127 Shopping Center, 352 West Broad St 128 Shopping Center, 352 West Broad St 129 Shopping Center, 352 West Broad St 130 Shopping Center, 352 West Broad St 131 Cherry Hill Park 132 Cherry Hill Park 133 Cherry Hill Park 134 Cherry Hill Park 135 Cherry Hill Park 136 Cherry Hill Park Appendix D - Public Comments and Responses 10

12 APPENDIX D Question 1. What are your pedestrian destinations? 137 Cherry Hill Park 138 City Center, 300 Park Ave 139 Community Center, 223 Little Falls St 140 Community Center, 223 Little Falls St 141 US Post Office, 301 West Broad St 142 US Post Office, 301 West Broad St 143 Broad St between Little Falls and N. Maple Ave 144 Broad St and N. Maple Ave Broad St between N. 145 Maple Ave and N. Washington Ave Broad St between N. 146 Maple Ave and N. Washington Ave Broad St between N. 147 Maple Ave and N. Washington Ave Broad St between N. 148 Maple Ave and N. Washington Ave Broad St between N. 149 Maple Ave and N. Washington Ave Broad St between N. 150 Maple Ave and N. Washington Ave S. Maple between 151 Annandale Rd & Broad St Appendix D - Public Comments and Responses 11

13 APPENDIX D Question 2. What are your bicycle destinations? 152 Great Falls Street and Little Falls Street To promote bike travel and commuting, propose we deter. what roads could support bike lanes. We could review the standards for rd. width, markings and signage applied by Arlington and DC. Some possibilities Little Falls, Great Falls, Park, West, Lincoln,Hillwood, Timber, Annandale Rd The City developed a proposed network of bicycle facilities. The new bicycle route includes almost ten miles of new dedicated on-street bicycle lanes, ten miles of shared bike lane markings (sharrows) and four miles of signed bike routes. Chapter 6 provides information on the streets planned for bicycle facilities. The City also identified 5 potential locations for a pilot Capital Bikeshare program (Phase 1). Bike lanes are proposed on Little Falls, West, Lincoln, Hillwood. Sharrows are proposed on Great Falls and Park Hillwood Rd and Annandale Rd W. Columbia Street cul-desac 7-11 off of 29/Fairfax. Not easy to bike down Hillwood. Need bike lane. Access to Bike Trail important 155 W&OD Trail Anywhere on the WO&D trail 156 East Falls Church Metro Station Bike lanes up lee highway and along broad to get to metro 157 S. Oak Street and S Lee Street Bike to school with your child Bike lanes are proposed on both sides of Hillwood Avenue from the City limits to S. Washington Street. Chapter 6 provides information on the streets planned for bicycle facilities. The City developed a proposed network of bicycle facilities. The new bicycle route includes almost ten miles of new dedicated on-street bicycle lanes, ten miles of shared bike lane markings (sharrows) and four miles of signed bike routes. Chapter 6 provides information on the streets planned for bicycle facilities. The City developed a proposed network of bicycle facilities. The new bicycle route includes almost ten miles of new dedicated on-street bicycle lanes, ten miles of shared bike lane markings (sharrows) and four miles of signed bike routes. Chapter 6 provides information on the streets planned for bicycle facilities. The City developed a proposed network of bicycle facilities. The new bicycle route includes almost ten miles of new dedicated on-street bicycle lanes, ten miles of shared bike lane markings (sharrows) and four miles of signed bike routes. Chapter 6 provides information on the streets planned for bicycle facilities. 158 N. Spring and Fulton Avenue Bike trail going East 159 W&OD Trail Bike trail going West 160 City Center, 300 Park Avenue Cherry Hill Park, Famer s Market,etc. 161 City Center, 300 Park Avenue Farmer s market, Gov. t/community events 162 City Center, 300 Park Avenue Farmers Market 163 Sewell Avenue and Fowler Street W. Broad Street Giant W. Broad Street Giant Getting from Randolph to bike path is difficult at West. Need a crosswalk to safely access the bike path. Randolph Street is along the proposed bicycle route. The street is also proposed to receive a sidewalk (along with Kennedy on the north side of S. West Street) to provide connectivity to the W&OD trail. Appendix D - Public Comments and Responses 12

14 APPENDIX D Question 2. What are your bicycle destinations? W. Broad Street Giant, CVS Hidden corner - where cars come flying 167 Tyson Drive and Buxton Road around in both directions... The City will review this issue and consider measures as appropriate. Wood Mist Ln and Hollywood 168 Home Road 169 N. Spring and Park Avenue Home (where I start or end my rides) 170 West Falls Church Metro I bike to the metro 171 West Falls Church Metro I bike to WFC Metro (and will more often now that George bus will be gone), and it s very treacherous. The City developed a proposed network of bicycle facilities. The new bicycle route includes almost ten miles of new dedicated on-street bicycle lanes, ten miles of shared bike lane markings (sharrows) and four miles of signed bike routes. Chapter 6 provides information on the streets planned for bicycle facilities. The plan proposes sharrows for Grove Avenue, which leads to the WFC Metrorail station Virginia Sq. GMU Metro Station Broad Street and Washington Street I bike to work N Virginia Avenue Library th Rd and N Van Buren Road I suggest PR campaign by City Gov. to City businesses to promote biking by their customers. Businesses could be encouraged/receive incentives to add bike racks, offer discounts to bikers Need better bike trail to get to the WO&D from Ridge Place. This is one of the goals stated in Chapter 3 of the plan. There are 11 parks within the City, as well as the W&OD trail, which runs through the City. In 2005, the Task Force on Open Space Acquisition developed a map of existing and proposed trails to connect the City s parks. Building on that effort, the City created the Parks Connectivity Map, which designates on-road and off-road paths to connect all of the parks and trails. Chapter 5 shows the Park Connectivity Plan which has connections to W&OD Trail (from the intersection of Ridge Place and N. Roosevelt Street). 176 E. Jefferson and Little Falls Street Need bike lane up Little Falls from bike trail to get to restaurants and shops. The City developed a proposed network of bicycle facilities. Little Falls Street is part of the proposed bicycle route (for bike lanes) as shown in the Bicycle Route Map in Chapter 6. Appendix D - Public Comments and Responses 13

15 APPENDIX D Question 2. What are your bicycle destinations? 177 Broad Street and N. Washington Street No reasonable way to bike down Broad or Washington St. except sidewalk where Bikes should not be allowed. The City developed a proposed network of bicycle facilities. The new bicycle route includes almost ten miles of new dedicated on-street bicycle lanes, ten miles of shared bike lane markings (sharrows) and four miles of signed bike routes. Bicycle facilities are shown on routes parallel to Broad and Washington rather than on the main corridors. Chapter 6 provides information on the streets planned for bicycle facilities. 178 Broad Street and Rees Place On a bike it is difficult to cross from Park to the other side of route 7. Sewell Avenue and Kennedy 179 Street Poplar heights pool via the W&OD N. Lee Street and Broad 180 Street Post Office West Broad Street Post Office West Broad Street shopping destination 183 Cherry Hill Park 184 E. Columbia Street and N Van Buren Street Suggest we promote and provide facilities for biking for public events, such as concerts in the park, and holiday festivals. W&OD The new signal at Penn/Broad will facilitate better crossing of Route 7 in this location. The City will review this issue and consider measures as appropriate. 185 W&OD Trail between Great Falls Street and N. Oak Street we like to ride down great falls st to get to the trail... very hard w/o a bike lane The City plans to install sharrows and a new sidewalk on Great Falls Street. Also, some of the intersecting side streets will be retrofitted with smaller curb radii to slow turning vehicles, reduce pedestrian crossing distances and increase the visibility of pedestrians. Additionally, the City plans to redesign the W&OD trail crossing (raise the crosswalk and provide additional signage) to warn approaching motorists to slow down and to alert them to the presence of trail users. It is anticipated that all these improvements will narrow the roadway width and help to calm traffic and provide a safe pedestrian environment. Chapter 6 shows the concept plans for Great Falls Street N Virginia Avenue We need more bicycle racks at the library. The City will review this issue and consider measures as appropriate. 187 N. Lee and Broad Street We need more bicycle racks near Panera Bread and Mad Fox Brewery. The City will review this issue and consider measures as appropriate. Appendix D - Public Comments and Responses 14

16 APPENDIX D Question 2. What are your bicycle destinations? 188 Upton Hill Regional Park (Not part of Study Area) Arlington Blvd (not part of Study Area) Roosevelt Boulevard 191 Falls Church park Roosevelt Street and W & OD 192 Trail East Falls Church Metro 193 Station East Falls Church Metro 194 Station East Falls Church Metro 195 Station East Falls Church Metro 196 Station E. Jefferson Street and N 197 Washington Street 198 Madison Park Broad Street and Maple 199 Avenue Douglas Avenue and E Fairfax 200 Street 201 Cherry Hill Park 202 City Center, 300 Park Avenue N Virginia Avenue N Virginia Avenue N Virginia Avenue N Virginia Avenue N Virginia Avenue N Virginia Avenue 209 N Lee and Park Avenue 210 Falls Park Appendix D - Public Comments and Responses 15

17 APPENDIX D Question 2. What are your bicycle destinations? 211 W&OD Trail 212 W&OD Trail 213 W&OD Trail Hughes Court and Buckelew 214 Drive 215 Lynn Pl and Randolph Street 216 West Falls Church Metro Appendix D - Public Comments and Responses 16

18 APPENDIX D Question 3. Where is bicycle parking missing or insufficient? 217 Broadale Village Shopping Center Is there bike parking here? The City will consider installation of additional bicycle parking as appropriate. 218 Broadale Village Shopping Center The City will consider installation of additional bicycle parking as appropriate. 219 Falls Plaza Shopping Center All along shopping plaza The City will consider installation of additional bicycle parking as appropriate. 220 Falls Plaza Shopping Center Current defacto bike parking in front of the Giant is in conflict with other pedestrian uses of the space The City will consider installation of additional bicycle parking as appropriate. 221 Falls Plaza Shopping Center The City will consider installation of additional bicycle parking as appropriate. 222 Gresham Road South of Lee Highway (Outside City Limits) The City will consider installation of additional bicycle parking as appropriate. 223 Madison park Would be nice to have a place to lock up my bike here The City will consider installation of additional bicycle parking as appropriate. 224 S. Spring St and W. Broad St Post Office The City will consider installation of additional bicycle parking as appropriate Shopping Plaza to the SE corner of W. Broad Street and S. Maple Avenue W & OD trail north of Broad Street The City will consider installation of additional bicycle parking as appropriate. The City will consider installation of additional bicycle parking as appropriate. Appendix D - Public Comments and Responses 17

19 APPENDIX D Question 4. Where are there damaged sidewalks? 227 W. Annandale Ave between W. Broad St and S. Maple Ave It seems, perhaps, that recent heavy rains and associated runoff may have contributed to shifting a huge block of sidewalk pavement UP at this location on the NORTH side of W. Annandale Road adjacent to the down-ramp exit to the old Post Office. The ADA Transition Plan includes a prioritized list of approximately 36 miles of sidewalks that need to be repaired or replaced. The ADA Plan anticipates phased implementation to achieve compliance with the ADA s program accessibility requirements. The implementation will take place in different stages in the priority as described in Chapter 6 of the Plan. Please refer to the stand alone Self Evaluation Update and Americans with Disabilities Act (ADA) Transition Plan for Public Rights of Way for more details. 228 West St and Grove Ave Major cracks and breaks between the entries to Shreve and the side entry to the 7-Eleven lot. See response to comment above Lincoln Ave between N. West St and N. Spring St Lincoln Ave between Meridian St and Yucatan St cracked, broken and missing sidewalk sections in front of 913 Lincoln Avenue. Lincoln Avenue See response to comment above. See response to comment above. 231 Little Falls St between Great Falls St and Park Ave Trees in sidewalk breaking up sidewalk; also not ADA compliant in several places due to tree See response to comment above. and poles 232 Little Falls St between Great Falls St and Park Ave Almost everywhere the sidewalks have some problems - but nothing that would prohibit access even by wheelchair. See response to comment above. Appendix D - Public Comments and Responses 18

20 APPENDIX D Question 4. Where are there damaged sidewalks? 233 Great Falls St between Riley St and Little Falls St Tree cuts into narrow sidewalk that is frequented by wide strollers, bikes, etc., and traffic is pushed close to sidewalk 234 Park Ave between Bricks sinking around an underground access to Pennsylvania Ave and utilities. N. Virginia Ave 235 Park Ave between N. Oak St and N. Spring St Damage especially noticeable on the ingress/egress ramp to St. James parking lot. 236 Cracks and misalignments on south side of Park Ave between street in this block. Cracks and a noticeable Pennsylvania Ave and slant towards the street on the north (and N. Lee St truncated) sidewalk. The ADA Transition Plan includes a prioritized list of approximately 36 miles of sidewalks that need to be repaired or replaced. The ADA Plan anticipates phased implementation to achieve compliance with the ADA s program accessibility requirements. The implementation will take place in different stages in the priority as described in Chapter 6 of the Plan. Please refer to the stand alone Self Evaluation Update and Americans with Disabilities Act (ADA) Transition Plan for Public Rights of Way for more details. 237 Park Ave between Little Falls St and N. Maple Ave Heaving on S.W. side of Park between Maple and Little Falls, but closer to corner w/ Maple 238 Broad St between S. West St and S. Lee St Old concrete sidewalk segments on Route 7 (W Broad) between S West Street and S Lee Street need to be replaced with updated paver sidewalks to join "uptown" and "downtown" Falls Church "main street" and improve ADA access and pedestrian safety. Appendix D - Public Comments and Responses 19

21 APPENDIX D Question 4. Where are there damaged sidewalks? 239 E. Broad Street and W&OD Trail The boards on the pedestrian/bicycle bridge over Broad Street have become badly warped making the ride over extremely bumpy. 240 W. Broad St and N. Virginia Ave Bricks popping up on sidewalk in front of bus stop at corner of W. Broad and N. Virginia. 241 N. Washington between E. Columbia St and Great Falls St Problems along both streets around corner, incl. misalignments, e.g., at manhole cover, and cracked pavement N. Washington St between E. Broad St and Great Falls St Lawton St between E. Columbia St and E. Broad St E. Columbia between N. Cherry St and Noland St N. Cherry St. between E. Columbia Stand E. Broad St Roosevelt Blvd between N. Roosevelt St and Wilson Blvd Lots of cracks/damage/sinking of broken pieces of sidewalk along east side of N. Washington from intersection w/ Broad to Sun Rise Retirement Home. Damaged driveway apron and sidewalk surrounding same. Very rough. Lots of cracks and crumbling and sinking of cracked/crumbled pieces of sidewalk up and down E. Columbia. Plenty of cracked uneven sidewalk along Cherry St. between E. Columbia and E. Broad Streets. The ADA Transition Plan includes a prioritized list of approximately 36 miles of sidewalks that need to be repaired or replaced. The ADA Plan anticipates phased implementation to achieve compliance with the ADA s program accessibility requirements. The implementation will take place in different stages in the priority as described in Chapter 6 of the Plan. Please refer to the stand alone Self Evaluation Update and Americans with Disabilities Act (ADA) Transition Plan for Public Rights of Way for more details. Appendix D - Public Comments and Responses 20

22 APPENDIX D Question 4. Where are there damaged sidewalks? 247 N. Cherry St. between E. Columbia St and E. Broad St N. Cherry St. between E. Columbia St and E. Jefferson St N. Washington St between E. Columbia St and Great Falls St The ADA Transition Plan includes a prioritized list of approximately 36 miles of sidewalks that need to be repaired or replaced. The ADA Plan anticipates phased implementation to achieve compliance with the ADA s program accessibility requirements. The implementation will take place in different stages in the priority as described in Chapter 6 of the Plan. Please refer to the stand alone Self Evaluation Update and Americans with Disabilities Act (ADA) Transition Plan for Public Rights of Way for more details. 250 S. Lee St between W. broad St and S. Lee St 251 Tripps Run behind TJ (near Seaton Ln between Sherrow Ave and W. Cameron Rd) The asphalt path along Tripps Run behind TJ is heavily damaged in this location. The nearby bike/ pedestrian bridge also needs repair. The City will review this issue and consider measures as appropriate. Appendix D - Public Comments and Responses 21

23 252 11th St between N. Underwood St and N. Tuckahoe St APPENDIX D Question 5. Where are the missing sidewalk links? th Street between N. Van Buren St and N. Underwood St E. Columbia St between N. Roosevelt Blvd and Forest Drive No where that I have really cared about in the city. Sidewalks are not needed except on main streets as long as the streets are reasonably wide. (I can't type my comments because of char limit.) Sidewalk ends on right side (towards Arlington), but picks up across the street (towards Arlington) forcing walkers to cross the street or walk in the street. The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. 255 E. Jefferson St between N. Cherry St and Cul-de-sac See response to comment above. 256 Great Falls St between Lincoln Ave and W&OD trail Great Falls needs a sidewalk from the corner of Lincoln & Great Falls to the W&OD Bike trail so that kids don't have to cross the street twice to get to the W&OD bike trail heading east Great Falls Street between N. Maple Ave and Little Falls St Great Falls Street between N. Maple Ave and N. Washington St Great Falls Street between N. Maple Ave and N. Washington St The City plans to install a new sidewalk on Great Falls Street. Chapter 6 shows the concept plans for Great Falls Street. Appendix D - Public Comments and Responses 22

24 APPENDIX D Question 5. Where are the missing sidewalk links? 260 Great Falls Street between N. Virginia Ave and Little Falls St 261 Great Falls Street between Pennsylvania Ave and Little Falls St Sidewalks are missing on the northeast side of great falls street to get to the bus stop. there are lots of kids on this side of the street that have no way to get to the bus stop. The City plans to install a new sidewalk on Great Falls Street. Chapter 6 shows the concept plans for Great Falls Street Hollywood Rd between Wood Mist and Broadway Dr. Lawton St between E. Broad St and E. Columbia St Missing sidewalk between Wood Mist and Broadway. Sidewalk to nowhere on side of office building along Lawton. This location is outside the City Limits. The City will forward this issue to the appropriate department in Fairfax County Lawton St between E. Broad St and E. Columbia St Lincoln Avenue between Meridian St and N. Yucatan Ave Neither adults nor children should have to cross Lawton (or a number of other F.C. streets) in the middle of the block to stay on a sidewalk. Sidewalk ends on north side of Lincoln Avenue one house east of Walden Court. The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. 266 Little Falls St between W&OD Trail and W. Jefferson St There is a nice path along the stream next to the fire station but it is accessible from Little Falls/W&OD only via the fire station driveway. A sidewalk here would be great. There are 11 parks within the City, as well as the W&OD trail, which runs through the City. In 2005, the Task Force on Open Space Acquisition developed a map of existing and proposed trails to connect the City s parks. Building on that effort, the City created the Parks Connectivity Map, which designates onroad and off-road paths to connect all of the parks and trails. Chapter 5 shows the Park Connectivity Plan which has connections to W&OD Trail (near Falls Church Fire Dept.) Appendix D - Public Comments and Responses 23

25 APPENDIX D Question 5. Where are the missing sidewalk links? 267 N. Roosevelt St between Broad St and N. Roosevelt Blvd No sidewalk along cemetery fence. 268 N. Roosevelt St between Broad St and N. Roosevelt Blvd Sidewalks just end after the Oakwood Apts. and don't pick up again until after Ridge Pl. N. Roosevelt St is one of the streets proposed for traffic calming. The concept plans are detailed in Chapter N. Roosevelt St between Broad St and N. Roosevelt Blvd Many walk from Oakwood to East Broad -- needs sidewalk on cemetery side of N. Roosevelt St. 270 N. Virginia Ave between Great Falls St and Park Ave Virginia AVE - connecting great falls & park should definitely have a sidewalk - there is a bus stop on this road and it is unsafe for children to be crossing a street with no sidewalks between parked cars 271 N. Virginia Ave between Great Falls St and Park Ave Sight distance is limited by parked cars, so ped/bike travel is unsafe along N. VA Ave, especially around the corners of Riley St and Park Ave. Paint a lane along one side of N. VA Ave as a cost-effective measure to provide a safe ped/bike path. The Plan recommends installation of a sidewalk on N. Virginia Avenue as well as intersection improvements to Great Falls/Virginia and Great Falls/Riley. Appendix D - Public Comments and Responses 24

26 APPENDIX D Question 5. Where are the missing sidewalk links? 272 Oak St between Park Ave and W. Broad St 273 Oak St between W&OD trail and Lincoln Ave From W&OD trail, north on Oak St. The sidewalk on Oak just ends for about 100 feet until the sidewalk picks up again at Oak & Lincoln Park Ave between Lee St and Virginia Ave Park Ave between N. Virginia Ave and Little Falls St No walk on north side of street from mid-block after Lee St. all the way to past either turn onto Virginia Ave. One side of Park, right near Cherry Hill Park, there's no sidewalk - if you park 2 bikes away with kids, it's hard to walk there The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. 276 Park Ave between N. Virginia Ave and Little Falls St dangerous walking spot between Cherry Hill park and Park Avenue town homes 277 Park Ave between N. Virginia Ave and Little Falls St Sidewalk ends at Park and N. VA Ave. from the townhouses until Cherry Hill park. Right at the intersection of Park and N. VA there should be sidewalks Appendix D - Public Comments and Responses 25

27 APPENDIX D Question 5. Where are the missing sidewalk links? 278 Park Ave between N. Virginia Ave and Little Falls St no sidewalks on the cherry hill park side of park ave to N. Virginia Pine St between Lincoln Ave and Highland Ave S. Lee St between S. Oak St and W. Broad St Seaton Ln between George Mason Rd and Greenway Blvd Pine St needs sidewalks and Lincoln from Pine to West needs improvements. Also, West needs sidewalks on both sides of the street. The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. 282 W. Westmoreland Rd between Sherrow Ave and S. Washington St The area from the bridge to the bike path needs to be improved/leveled. There is a big dip that the newer bikers need to climb off their bikes to cross. The City will review this issue and consider measures as appropriate. 283 Yucatan St between Lincoln Ave and N. Wyoming St Yucatan St (Mostly Arlington Co) has a sidewalk that abruptly ends at 312 Lincoln Ave (Falls Church). Please extend the sidewalk to Lincoln Ave. The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. Appendix D - Public Comments and Responses 26

28 284 11th St between Van Buren St and N. Roosevelt St APPENDIX D Question 6. Where are new sidewalks needed? The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. 285 Buxton Rd between Forest Drive and E. Broad St Children and strollers are in the street, even at blind curves 286 Buxton Rd between Forest Drive and E. Broad St Sidewalk along 100 block Buxton would enhance safety Buxton Rd between Forest Drive and E. Broad St Buxton Rd between Forest Drive and E. Broad St Buxton Rd between Forest Drive and E. Broad St Buxton Rd between Forest Drive and E. Broad St Buxton Rd between Forest Drive and E. Broad St Buxton Rd between Forest Drive and E. Broad St There are no sidewalks on Forest Dr., Buxton RD., Villa Ridge, or Tysons. Children and strollers walk in the street, even at blind curves (Forest/Buxton). From Broad street to walk to the Metro is difficult as there are no sidewalks on Buxton (which includes a steep hill and blind curve which makes for limited visibility) or Forest. Sidewalk along 100 block Buxton would enhance safety The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. Appendix D - Public Comments and Responses 27

29 APPENDIX D Question 6. Where are new sidewalks needed? 293 E Broad from S. Washington St to City limits the entire length of E Broad from Washington to the eastern boundary of the city has poor sidewalks that limit pedestrian and bicycle connections from locations east of city center. The ADA Transition Plan includes a prioritized list of approximately 36 miles of sidewalks that need to be repaired or replaced. The ADA Plan anticipates phased implementation to achieve compliance with the ADA s program accessibility requirements. The implementation will take place in different stages in the priority as described in Chapter 6 of the Plan. Please refer to the stand alone Self Evaluation Update and Americans with Disabilities Act (ADA) Transition Plan for Public Rights of Way for more details. The City developed a proposed network of bicycle facilities. The new bicycle route includes almost ten miles of new dedicated on-street bicycle lanes, ten miles of shared bike lane markings (sharrows) and four miles of signed bike routes. Chapter 6 provides information on the streets planned for bicycle facilities. The City also identified 5 potential locations for a pilot Capital Bikeshare program (Phase 1). It is anticipated that the bike network will act as an incentive to attract new bicyclists within the City as well as from Arlington and Fairfax Counties by providing connections to regional bike network E. Columbia St between S. Washington St and N. Roosevelt St E. Columbia St between S. Washington St and N. Roosevelt St Forest Drive between Villa Ridge Rd and E. Columbia St No sidewalk on the north side of E. Columbia St. all the way to the Arlington line. Heavily traveled E. Columbia St has no sidewalks on its north side. Traffic can get busy during rush hour. Sidewalks would allow kids to play outside better & allow a safe place for walkers/dog walkers, etc. The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. 297 Forest Drive between Villa Ridge Rd and E. Columbia St Appendix D - Public Comments and Responses 28

30 APPENDIX D Question 6. Where are new sidewalks needed? Great Falls St between Lincoln Ave and Little Falls St Great Falls St between N. Maple Ave and Little Falls St Great Falls St between N. Maple Ave and N. Washington St We desperately need sidewalks on the non-park side of Great Falls St. It is a very busy/dangerous street. Because of our house we must walk on that side of the street and have young The City plans to install bike sharrows and a new sidewalk on Great Falls Street. Also, some of the intersecting side streets will be retrofitted with smaller curb radii to slow turning vehicles, reduce pedestrian crossing distances and increase the visibility of pedestrians. Additionally, the City plans to redesign the W&OD trail crossing (raise the crosswalk and provide additional signage) to warn approaching motorists to slow down and to alert them to the presence of trail users. It is anticipated that all these improvements will narrow the roadway width and help to calm traffic and provide a safe pedestrian environment. Chapter 6 shows the concept plans for Great Falls Street.See response to comment PB_MP_ Irving St between Ellison St and parker Avenue On Irving Street Lincoln Ave between Great Falls St and City Limits Lincoln Ave between Meridian St and Great Falls St 304 Midvale between Noland Street Need sidewalk from Meridian down to Great Falls Street The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. 305 N. Cherry St between E. Broad St and E. Columbia St no comments, no comments, no comments 306 N. Cherry St between E. Broad St and E. Columbia St this sidewalk is really narrow. very hard to pass people w/o walking on the s The ADA Transition Plan includes a prioritized list of approximately 36 miles of sidewalks (177 obstacles, 765 driveways, and 742 changes in level) that need to be repaired or replaced. The ADA Plan anticipates an approximate 20-year implementation period to achieve compliance with the ADA s program accessibility requirements. The implementation will take place in different stages in the priority as described in Chapter 6 of the Plan. Please refer to the stand alone Self Evaluation Update and Americans with Disabilities Act (ADA) Transition Plan for Public Rights of Way for more details. Appendix D - Public Comments and Responses 29

31 APPENDIX D Question 6. Where are new sidewalks needed? N. Fairfax St between E. Broad St and N. Cherry St N. Fairfax St between E. Broad St and N. Cherry St On N Fairfax St, we do not have a sidewalk. This is a problem as cars speed up and down our street during rush hour as a cut through to and from the metro. If new sidewalks are not possible, speed bumps would be a good way to slow down rush hour cut through traffic. The City evaluates residential streets for traffic calming through the Neighborhood Traffic Calming (NTC) Program, which is administered by the Citizens Advisory Committee on Transportation (CACT). The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment N. Fairfax St between E. Broad St and N. Cherry St N. Fairfax St between E. Broad St and N. Cherry St N. Lee St between park Ave and Fulton Ave The City's policy is to install sidewalks on both sides of collectors and arterial streets and on one side of local and residential streets. The existing conditions inventory revealed that there were 354 locations in the City where there are no sidewalks. Chapter 6 shows the implementation schedule for all new sidewalks based on priority. Appendix C details the rankings for each sidewalk segment. Appendix D - Public Comments and Responses 30

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011 Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan January 18, 2011 Tonight s Agenda Receive update on project Provide feedback on two policy issues Complete Streets Policy Project Prioritization

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

2.0 Existing Conditions

2.0 Existing Conditions 20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

20 th Avenue Neighborway Project August 2, Second Open House

20 th Avenue Neighborway Project August 2, Second Open House 20 th Avenue Neighborway Project August 2, 2018 - Second Open House General Comments We love the plan in general and appreciate the SFMTA looking out for walkers and bikers. Can we get better traffic enforcement

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes Date of Meeting: June 10, 2010 Location: Ballston Metrorail Station and NRECA Building 4301 Wilson Blvd, Arlington, VA Subject: Ballston Station Multimodal Study Stakeholder Meeting #1 Summary: This first

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

N. Frederick Street to N. Manchester Street

N. Frederick Street to N. Manchester Street November 20, 2014 N. Frederick Street to N. Manchester Street Goals and Summary, November 2007 Map, December 2007 Bicycle Element, July 2008 Pedestrian Element, July 2008 Demand and System Management,

More information

Safe Routes to School Action Plan Aberdeen, Idaho

Safe Routes to School Action Plan Aberdeen, Idaho Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community

More information

Safe Routes to School: Munroe Elementary Walk Audit Report. Image: Drexel, Barrell & Co.

Safe Routes to School: Munroe Elementary Walk Audit Report. Image: Drexel, Barrell & Co. Safe Routes to School: Munroe Elementary Walk Audit Report Image: Drexel, Barrell & Co. April 12, 2016 OVERVIEW As part of the 2014/2015 Denver Safe Routes to School (SRTS) Program, WalkDenver coordinated

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project Memo Memphis STP Pedestrian Sidewalk Project To: Kyle Wagenshutz, City of Memphis From: Matthew Berkow, Collin Chesston, and Anne Eshleman, Alta Planning + Design Date: June 2014 Re: Photo Inventory Introduction

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

COWETA HIGH SCHOOL AND EAST HIGHWAY 51 COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to

More information

Steps to Conducting a Complete Streets Assessment

Steps to Conducting a Complete Streets Assessment Steps to Conducting a Complete Streets Assessment Familiarize yourself with Complete Streets Read through the Complete Streets Assessment Guidelines. This will give you an idea of what Complete Streets

More information

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback. City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

CHAPTER 7 OF THE COMPREHENSIVE PLAN TRANSPORTATION Mobility for all Modes

CHAPTER 7 OF THE COMPREHENSIVE PLAN TRANSPORTATION Mobility for all Modes CHAPTER 7 OF THE COMPREHENSIVE PLAN TRANSPORTATION 2030 Adopted xxx, xx, xxxx Mobility for all Modes Chapter 7, Page 0, Draft version 48 Context and Vision Why Automobiles Alone are not the Answer Because

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

City of Davis East Covell Corridor Plan

City of Davis East Covell Corridor Plan Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Coweta Community Overview Coweta Coweta, a residential community located in Wagoner County, is a suburb of Tulsa situated southeast of the metropolitan area

More information

Chapter 3 DESIGN SPECIFICATIONS

Chapter 3 DESIGN SPECIFICATIONS Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically

More information

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1) Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists Cyclists and Bikeways: What s your match? guide to bikeway options for a variety of cyclists The workshop and this resource were made possible by funding from the Province of Ontario via the Ministry of

More information

Complete Streets Funding Program Project Prioritization Plan

Complete Streets Funding Program Project Prioritization Plan Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path

More information

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

11/3/2014 VIA  . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the 11/3/2014 VIA EMAIL Antonio Ablog Planning Department City of Sacramento 300 Richards Boulevard Sacramento, CA 95811 RE: Design Review for Stockton and T Mixed-Use (P14-042) Dear Mr. Ablog: WALKSacramento

More information

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN TOWN OF IRONDEQUOIT March 2017 FINAL DRAFT: EXECUTIVE SUMMARY PREPARED FOR SUBMITTED BY IN ASSOCIATION WITH Town of Barton & Loguidice, DPC Sprinkle Consulting, Inc. 1280 Titus Avenue Rochester, New York

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city

More information

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Study Area April 9 Public Meeting Comments Summary Pedestrian Safety - A Walking Neighborhood Pedestrian traffic is very difficult A need

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Development of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA

Development of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA Development of Arlington County s Marked Crosswalk Guidelines Jon Lawler, P.E. Design Engineer Arlington County, VA April 13, 2015 Transportation System Users Residents Estimated 215,000 in 2014 Lowest

More information

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego

More information

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Improvements Infrastructure Gap Assessment and Improvements Street Striping Infrastructure Project Proposal The federal-aid Safe Routes to School program funds infrastructure/engineering projects that fall into two categories: Design (available only to School Development Authority

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

Planned Improvements from Sector & Area Plans that have been added to the MTP

Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

Final Sidewalk Feasibility Study

Final Sidewalk Feasibility Study Garfield Drive From Anastasia Drive to Elizabeth Place City of South Daytona July 23, 2009 Final Sidewalk Feasibility Study Prepared for: Prepared by: Final Sidewalk Feasibility Study Garfield Drive 2

More information

SAFE ROUTES TO SCHOOL

SAFE ROUTES TO SCHOOL SAFE ROUTES TO SCHOOL Edgewood Elementary School Existing Conditions and ACTION PLAN > Oak Creek - Franklin Joint School District Table of Contents CONTEXT Enrollment Boundaries Enrollment

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

PEDESTRIAN NETWORK PLAN

PEDESTRIAN NETWORK PLAN GRAHAM PEDESTRIAN TRANSPORTATION PLAN Chapter 3 A 3.1 Overview new pedestrian network plan for the City of Graham has been developed based on an examination of the existing conditions (Chapter 2) and an

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

STREETSCAPE CONCEPT PLAN

STREETSCAPE CONCEPT PLAN 03 STREETSCAPE CONCEPT PLAN Zone 1 This zone includes the gateway into both the downtown and the Village at Harlem. The gateway features are shown closer to the Harlem intersection to make them more prominent.

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Glenpool Community Overview Glenpool Glenpool is a city of nearly 12,000 residents located in Tulsa County southwest of Tulsa and Jenks. The city is growing

More information

Chapter 3: Multi-Modal Circulation and Streetscapes

Chapter 3: Multi-Modal Circulation and Streetscapes CHAPTER 3: MULTI-MODAL CIRCULATION AND STREETSCAPES Chapter 3: Multi-Modal Circulation and Streetscapes Overview Streetscape improvements have already been completed for Depot Street between Main Avenue

More information

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5/7/2013 VIA  . RE: University Village Safeway Expansion (P13-019) 5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village

More information

DRAFT. Table of Contents. Background

DRAFT. Table of Contents. Background Douglas County Table of Contents Existing Infrastructure 86 Funding 89 Policy and Program Recommendations 90 Infrastructure Recommendations 92 Conclusion 95 Background Home to 4,500 residents and Baker

More information

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process Bicycle Transportation Plan Summary Madison Urban Area and Dane County Introduction September 2000 Bicycling is an important mode of transportation in the Madison urban area and countywide that is available

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

and older adults and people with disabilities still face barriers when using the pedestrian network and public transportation.

and older adults and people with disabilities still face barriers when using the pedestrian network and public transportation. Background Afterthe1980Olympics,theLakePlacid/NorthElbacommunityadoptedaneconomicstrategy ofdevelopingandmarketingeventstoincreaseareatourism.thisstrategyhasbeenvery successful.overrecentyearsthevolumeofvisitorshasincreased,andthelengthofthe

More information

North Avenue Rail Station Accessibility Assessment

North Avenue Rail Station Accessibility Assessment North Avenue Rail Station Accessibility Assessment Joel Anders, Arnaud Huguet, and Alex Poznanski 30 July 2012 Table of Contents EXECUTIVE SUMMARY... 1 MISSION STATEMENT... 2 INTRODUCTION... 2 CROSSWALKS

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

Clarkson Walkability Audit: Results and Recommendations Summary

Clarkson Walkability Audit: Results and Recommendations Summary Clarkson Walkability Audit: Results and Recommendations Summary The following document was prepared by the Region of Peel and includes a summary of comments made by participants during our breakout discussion

More information

COMPLETE STREETS PLANNER S PORTFOLIO

COMPLETE STREETS PLANNER S PORTFOLIO COMPLETE STREETS PLANNER S PORTFOLIO ISSUE 3 APRIL 2016 PLANNER S PORTFOLIO COMPLETE STREETS 1 2 6 10 14 OVERVIEW MATURE NEIGHBORHOODS GROWING SUBURBS CENTRAL PLACES ACTIVITY CORRIDORS Planner s Portfolio

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

4 Goals, Objectives & Actions

4 Goals, Objectives & Actions Chapter4 4 This chapter presents goals, objectives, and recommended actions to support the vision of making Overland Park a safer and easier place to ride a bicycle. 35 4.1 Recommendations Structure The

More information

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

8/31/2016 VIA  . RE: Freeport Arco Fuel Station (P16-039) 8/31/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: Freeport Arco Fuel Station (P16-039)

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

EXECUTIVE SUMMARY. Vision

EXECUTIVE SUMMARY. Vision Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,

More information

The DC Pedestrian Master Plan

The DC Pedestrian Master Plan The DC Pedestrian Master Plan September 28, 2010 George Branyan Pedestrian Program Coordinator District Department of Transportation Presentation Agenda Scope of the Plan Methodology Recommendations Implementation

More information

CHAPTER 3: Vision Statement and Goals

CHAPTER 3: Vision Statement and Goals Davidson Walks & Rolls: Active Transportation Master Plan CHAPTER 3 Contents: Overview Vision Statement Measurable Goals Public Outreach CHAPTER 3: Vision Statement and Goals Overview The vision statement

More information

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control

More information

Plant City Walk-Bike Plan

Plant City Walk-Bike Plan Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked

More information

ACTIVE TRANSPORTATION

ACTIVE TRANSPORTATION ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion

More information

What are the Qualities that make Newark a Bicycle Friendly Community? What are aspects that make Newark less Bicycle Friendly?

What are the Qualities that make Newark a Bicycle Friendly Community? What are aspects that make Newark less Bicycle Friendly? What are the Qualities that make Newark a Bicycle Friendly Community? Many stores are within biking distance (1) Lots of bike lanes and new trail Existing bike routes (2) Designated bike lanes on Del ave.

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access COMMUNITY MEETING Project Update March 15, 2010 Purcellville, Virginia OVERVIEW Project need / objectives Project recap Design elements Proposed improvements Summary of project benefits / next steps PROJECT

More information

Land Use Bicycle Spaces Required Type Residential

Land Use Bicycle Spaces Required Type Residential SAMPLE ORDINANCES AND RESOLUTIONS APPENDIX B SAMPLE BICYCLE PARKING ORDINANCE Land Use Bicycle Spaces Required Type Residential Single Family/Two Family N/A N/A Apartment/Townhome 1 per unit plus 6 space

More information

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN North Central Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations

More information

complete streets design and construction standards public primer City of Edmonton

complete streets design and construction standards public primer City of Edmonton complete streets design and construction standards public primer City of Edmonton introduction Complete Streets are streets for everyone: people who walk, wheel, bike, take transit, or drive. They are

More information

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011 The Purpose of GIS Based Network Planning GIS Based Data Collection / Network Planning Healthy Communities Active Transportation Conference Tuesday, May 10, 2011 10:00 AM Norman Cox, LLA, ASLA. Ann Arbor,

More information

Lawrence Avenue Streetscape Concepts August 30, 2011

Lawrence Avenue Streetscape Concepts August 30, 2011 Lawrence Avenue Streetscape Concepts August 30, 2011 Neighborhood Context Phase II: River to Western Ave. Phase I: Western Ave. to Clark St. Key Map Lawrence Ave. Existing Streetscape Conditions East of

More information

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Presented by Luciano Rabito Manager of Complete Streets Presented to Bridgewater, MA Wednesday, April 26, 2017 6:30 P.M.

More information

9/21/2016 VIA . RE: The Knot (DR16-270)

9/21/2016 VIA  . RE: The Knot (DR16-270) 9/21/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: The Knot (DR16-270) Dear Mr. Norman:

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

12/4/2016 VIA  . RE: Grocery Outlet Del Paso (DR16-328) 12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.

More information

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Active Transportation Rail to River Corridor. Community Meeting - Segment A Active Transportation Rail to River Corridor Community Meeting - Segment A June 29, 2017 Tonight s Agenda > Open House (30 min) > Welcome / Project Overview > Presentation of 30% Design Refinements > Next

More information

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One

More information

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018 HYATTSVILLE TRANSPORTATION PLAN City Council Update March 19, 2018 AGENDA PROJECT GOALS DATA COLLECTION WHAT WE LEARNED NEXT STEPS PROJECT GOALS Identify bicycle and pedestrian needs of the city Evaluate

More information