FDOT Broward County Traffic Report April 27 through May 4, 2018

Size: px
Start display at page:

Download "FDOT Broward County Traffic Report April 27 through May 4, 2018"

Transcription

1 FDOT Broward County Traffic Report April 27 through May 4, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of April 27 through May 4, Weather permitting, work will be done at the following locations throughout the county. For around-the-clock, real-time, traffic information on major south Florida highways call 511, download the FL 511 app on your mobile device or view real-time video from the Florida Department of Transportation s traffic monitoring cameras on the web at For updated lane closure information, visit our website at and follow us on INTERSTATE CONSTRUCTION PROJECTS Interstate South of Broward Boulevard to north of Commercial Boulevard in Fort Lauderdale Three northbound and southbound lanes of I-95 will be closed Sunday through Thursday night between 10:30 p.m. and 5:00 a.m. The first lane will close at 10:30 p.m., the second lane at 11:30 p.m. and the third lane at 12:30 a.m. until 5:00 a.m. All lanes will be open by 5:30 a.m. I-95 in both directions, from south of Davie Boulevard to north of Commercial Boulevard, will have intermittent shoulder and ramp shoulder closures, as needed, daily and nightly. The I-95 northbound exit ramp to Commercial Boulevard will have one left lane closed, daily, 9:00 a.m. until 3:00 p.m., Monday through Friday, through May. The I-95 northbound entrance ramp from Oakland Park Boulevard will undergo a full nightly closure, 11:30 p.m. until 5:00 a.m., Sunday through Thursday. Traffic will detour via Commercial Boulevard and Powerline Road. FHP will be on scene to assist motorists. The I-95 northbound exit ramps to Oakland Park Boulevard will be closed, 11:30 p.m. until 5:00 a.m., Sunday through Thursday. Traffic will detour via Commercial Boulevard. FHP will be on scene to assist motorists. The I-95 southbound exit ramp to Oakland Park Boulevard will be closed, as needed, 11:30 p.m. until 5:00 a.m., Sunday through Thursday. Traffic will be detour via I-95 and Sunrise Boulevard. FHP will be on scene to assist motorists.

2 The I-95 southbound entrance ramps from Oakland Park Boulevard will be closed, as needed, 11:30 p.m. until 5:00 a.m., Sunday through Thursday. Traffic will detour via Powerline Road and Sunrise Boulevard. FHP will be on scene to assist motorists. The I-95 southbound exit ramp to Sunrise Boulevard will be closed, as needed, 11:30 p.m. until 5:00 a.m., Sunday through Thursday. Traffic will detour via Broward Boulevard and I-95. FHP will be on scene to assist motorists. The I-95 southbound entrance ramps from Sunrise Boulevard will be closed, as needed, 11:30 p.m. until 5:00 a.m., Sunday through Thursday. Traffic will detour via Powerline Road, Oakland Park Boulevard and I-95. FHP will be on scene to assist motorists. The I-95 southbound exit ramp to Broward Boulevard will be closed, 11:30 p.m. until 5:00 a.m., Sunday through Thursday night, through May. Traffic will detour via I-95 and SR 84/Marina Mile. FHP will be on scene to assist motorists. Description: This project will extend the High Occupancy Toll lanes from north of Commercial Boulevard to south of SW 10 th Street in Broward County. The scope of work includes adding a lane and converting the High Occupancy Vehicle (HOV) lanes to create two express lanes in each direction. Other work includes: installing Intelligent Transportation System (ITS) and tolling equipment; widening bridges; and installing noise barrier walls at locations along I-95 northbound between Atlantic Boulevard and Sample Road, and along I-95 southbound north of Sample Road. Contract time for this $154 million project began Friday, January 8, 2016, with design activities currently underway. Construction began Sunday, August 14, For more information, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction cost is $154 million. Completion is expected in spring I-95 from north of Commercial Boulevard in Fort Lauderdale to south of SW 10 th Street in Deerfield Beach Three northbound and southbound lanes of I-95 between Commercial Boulevard and SW 10 th Street will be closed Sunday through Thursday night between 10:30 p.m. and 5:30 a.m. The first lane will close at 10:30 p.m., the second lane at 11:30 p.m. and the third lane at 12:30 a.m. until 5:30 a.m. One lane in each direction of Atlantic Boulevard from Andrews Avenue to N. Dixie Highway will be closed daily, 9:00 a.m. until 3:00 p.m., Monday through Friday. One lane in each direction of Copans Road between North Andrews Avenue and North Dixie Highway will be closed daily, 9:00 a.m. until 3:00 p.m., Monday through Friday. McNab Road at I-95 will have two lanes closed in each direction, Sunday through Thursday night between 10:30 p.m. and 5:00 a.m. The I-95 southbound entrance ramp from Andrews Avenue will be closed nightly, 10:00 p.m. until 5:00 a.m., Sunday night through Thursday. Traffic will detour via Commercial Boulevard. FHP will be on scene to assist motorists. McNab Road at I-95 will be closed for bridge construction, 11:00 p.m. until 5:00 a.m., Sunday through Thursday. Eastbound traffic will detour via N. Andrews Avenue, Cypress Creek Road and S. Dixie Highway. Westbound traffic will detour via S. Dixie Highway, Cypress Creek Road, and N. Andrews Avenue. FHP will be on scene to assist motorists. Sample Road at I-95 will be closed for bridge construction, 11:00 p.m. until 5:00 a.m., Sunday through Thursday. Eastbound Sample Road traffic will detour via I-95 and Copans

3 Road. Westbound Sample Road traffic will detour via I-95 and SW 10 th Street. FHP will be on scene to assist motorists. Atlantic Boulevard at I-95 will be closed for bridge construction, 11:00 p.m. until 5:00 a.m., Sunday through Thursday. Eastbound Atlantic Boulevard traffic will detour via I-95 southbound and Cypress Creek Road. Westbound Atlantic Boulevard traffic will detour via I-95 northbound and Copans Road. FHP will be on scene to assist motorists. Long-term Full Closure Notice: The Park & Ride entrance from the eastbound exit ramp to Cypress Creek Road is closed completely, reopening 5:00 a.m., Friday morning, May 11. Traffic will detour east along Cypress Creek Road to a U-Turn at NE 7 th Ave/Corporate Drive, and then west along Cypress Creek Road to the Park and Ride. Long-term Full Closure Notice: The I-95 southbound entrance ramp from the Cypress Creek Park & Ride Lot is closed completely, reopening 5:00 a.m., Thursday morning, May 31. Traffic will detour via West Cypress Creek Road or North Andrews Avenue and I-95. FHP will on scene to assist motorists. Description: This project will extend the High Occupancy Toll lanes from north of Commercial Boulevard to south of SW 10 th Street in Broward County. The scope of work includes adding a lane and converting the High Occupancy Vehicle (HOV) lanes to create two express lanes in each direction. Other work includes: installing Intelligent Transportation System (ITS) and tolling equipment; widening bridges; and installing noise barrier walls at locations along I-95 northbound between Atlantic Boulevard and Sample Road, and along I-95 southbound north of Sample Road. Contract time for this $154 million project began Friday, January 8, 2016, with design activities currently underway. Construction began Sunday, August 14, For more information, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction cost is $154 million. Completion is expected in spring I-95 Interchange from Hillsboro Boulevard to SW 10 th Street The I-95 southbound exit ramp to SW 10 th Street will be fully closed, as needed, Sunday night through Thursday night between 9:00 p.m. and 5:00 a.m. Motorists can detour via Hillsboro Boulevard. The outside lanes of I-95 southbound from Hillsboro Boulevard to SW 10 th Street will be closed Sunday night through Thursday night with the first lane closing at 9:00 p.m., the second lane closing at 10:00 p.m. and the third lane, if necessary, closing at 12:30 a.m. until 5:00 a.m. Two westbound lanes of SW 10 th Street at I-95 will be closed Sunday night through Thursday night between 9:00 p.m. and 5:00 a.m. The sidewalk on the north side of SW 10 th Street between SW 12 th Avenue and SW Natura Boulevard is closed through May Signs are in place to direct pedestrians to the south sidewalk. Description: Construction on this 1.5-mile project began Monday, January 26, Work consists of widening southbound I-95 to add an auxiliary lane from the Hillsboro Boulevard entrance ramp to the SW 10 th Street exit ramp, widening the existing southbound I-95 exit ramp to SW 10 th Street, addition of a free flow right turn lane to westbound SW 10 th Street, widening of westbound SW 10 th Street to add an acceleration lane, utility relocation, milling and resurfacing, bridge widening, installation of barrier walls, curbs, sidewalks, guardrail, drainage, overhead signs, signing and pavement markings, signals, lighting, and retaining walls. This is the

4 first of five interchange improvement projects throughout Broward and Palm Beach Counties. For more information, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction cost for all five projects is $32.5 million. Completion in spring I-95 from south of SW 10 th Street to south of Glades Road I-95 will have two inside lanes closed in each direction nightly, as needed, between Hillsboro Boulevard and Camino Real, with the first lane closing at 9:30 p.m. and the second lane closing at 10:30 p.m., until 5:30 a.m., Sunday through Thursday, through May. For more information, please contact Andrea Pacini, Community Outreach Specialist, Description: This 4.8-mile project will extend the High Occupancy Toll lanes from south of SW 10 th Street to south of Glades Road in Broward and Palm Beach counties. The scope of work includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other activities include reconstruction of I-95 on the northbound and southbound approaches to the Hillsboro Canal bridges, milling and resurfacing of I-95, construction of northbound and southbound auxiliary lanes between Hillsboro Boulevard and Palmetto Park Road, and construction of a northbound auxiliary lane between the SW 10 th Street entrance ramp and the Hillsboro Boulevard exit ramp. Other project improvements include: guardrail, barrier wall, attenuators, shoulder gutters, drainage, dredging of Hillsboro Canal, bridge widenings at Palmetto Park Road and Camino Real, bridge replacement at Hillsboro Canal, temporary and permanent retaining walls, noise wall construction, sign structures, portable traffic monitoring sites, toll gantry installation, Intelligent Transportation System (ITS) installation, signing and pavement markings; Express Lane markers, lighting, ramp metering signals, utility relocation, and landscape relocation. Contract time for this $102 million project began Monday, July 10, 2017, with design and construction activities currently underway. For more information on this project, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction began Monday, January 8, Work is being performed by Prince Contracting, LLC and is expected to be completed spring Detour graphics and more information about these closures can be found on our website by clicking here. Interstate Segments A & B - I-75 from NW 170 to South of Miramar Parkway Two lanes in each direction of I-75 from Miami Gardens Drive to NW 170 Street will be closed nightly Sunday, April 29 through Thursday, May 3. The northbound lane will be closed from 9:00 p.m. to 6:00 a.m., and the southbound lane will be closed from 10:00 p.m. to 6:00 a.m. Two southbound lanes of I-75 from Florida s Turnpike to Miami Gardens Drive will be closed nightly Sunday, April 29 through Thursday, May 3 from 9:00 p.m. to 6:00 a.m. Two lanes in each direction of I-75 from Miramar Parkway to Florida s Turnpike will be closed nightly Sunday, April 29 through Thursday, May 3. The northbound lanes will be

5 closed from 10:00 p.m. to 6:00 a.m., and the southbound lanes will from 9:00 p.m. to 6:00 a.m. Two northbound lanes of I-75 from NW 170 Street to Miami Gardens Drive will be closed nightly Sunday, April 29 through Thursday, May 3 from 10:00 p.m. to 7:00 a.m. One lane in each direction of Florida s Turnpike from Red Road to the I-75 Interchange will be closed nightly Sunday, April 29 through Thursday, May 3 from 10:00 p.m. to 6:00 a.m. One lane in each direction of Florida s Turnpike from I-75 Interchange to Okeechobee Road will be closed nightly Sunday, April 29 through Thursday, May 3 from 10:00 p.m. to 6:00 a.m. One northbound ramp lane of Florida s Turnpike from Okeechobee Road to I-75 Interchange will be closed nightly Sunday, April 29 through Thursday, May 3 from 10:00 p.m. to 6:00 a.m. One southbound ramp lane of I-75 from Snake Creek Canal to Florida s Turnpike will be closed nightly Sunday, April 29 through Thursday, May 3 from 9:00 p.m. to 6:00 a.m. One lane in each direction of I-75 from NW 170 Street to Florida s Turnpike will be closed daily Sunday, April 29 through Thursday, May 3 from 10:00 a.m. to 4:00 p.m. One northbound ramp lane of I-75 from Florida s Turnpike will be closed Saturday, April 21, from 9:00 a.m. to 3:00 p.m. The northbound ramp to I-75 from Florida s Turnpike will be closed 11:00 p.m. Wednesday, May 2 to 5:00 a.m. Thursday, May 3. During this time, motorists wishing to use the northbound ramp to I-75 from Florida s Turnpike will be detoured to exit at US 27/Okeechobee Road (Exit 35), continue south on US 27/Okeechobee Road to NW 138th Street, and east on NW 138th Street to Hialeah Garden Boulevard to take the northbound entrance ramp to I-75. All northbound lanes on I-75 between Florida s Turnpike and Bass Creek Bridge will be closed 11:00 p.m. Wednesday, May 2 to 5:00 a.m. Thursday, May 3. During this time, motorists wishing to travel northbound on I-75 between Florida s Turnpike and Bass Creek Bridge will be detoured to exit at Miami Gardens Drive (Exit 4), continue east on Miami Gardens Drive to Flamingo Road, north on Flamingo Road to Miramar Parkway, and west on Miramar Parkway to take the northbound entrance ramp to I Segment C - I-75 from South of Miramar Parkway to South of Sheridan Street in Broward County One westbound lane of Miramar Parkway will be closed from 11:00 p.m. Monday, April 30 to 3:00 a.m. Tuesday, May 1. A 15-minute full closure will also occur during that time frame in order to allow crews to perform the work safely. If necessary to complete the work, this lane closure will also take place from 11:00 p.m. Tuesday, May 1 to 3:00 a.m. Wednesday, May Segment D - I-75 from South of Sheridan Street tonorth of Griffin Road One eastbound and one westbound lane of Sheridan Street may be closed Sunday, April 29 through Thursday, May 3 from 9:00 a.m. to 6:00 p.m. as the contractor continues to work in this area.

6 Two eastbound or two westbound lanes of Sheridan Street may be closed Sunday, April 29 through Thursday, May 3 from 10:00 p.m. to 5:00 a.m. as the contractor continues to work in this area. 8. Segment E - I-75 from North of Griffin Road to I-595 in Broward County All lanes are open. 9. The northbound ramp to I-75 from Florida s Turnpike will be closed 11:00 p.m. Wednesday, May 2 to 5:00 a.m. Thursday, May 3. During this time, motorists wishing to use the northbound ramp to I-75 from Florida s Turnpike will be detoured to exit at US 27/Okeechobee Road (Exit 35), continue south on US 27/Okeechobee Road to NW 138th Street, and east on NW 138th Street to Hialeah Garden Boulevard to take the northbound entrance ramp to I-75. For more information about the I-75 Express Lanes Project, please call FDOT s Public Information Office at (954) , or the project Community Outreach Specialist, Gerdy St. Louis, at (954) or visit the project website at All northbound lanes on I-75 between Florida s Turnpike and Bass Creek Bridge will be closed 11:00 p.m. Wednesday, May 2 to 5:00 a.m. Thursday, May 3. During this time, motorists wishing to travel northbound on I-75 between Florida s Turnpike and Bass Creek Bridge will be detoured to exit at Miami Gardens Drive (Exit 4), continue east on Miami Gardens Drive to Flamingo Road, north on Flamingo Road to Miramar Parkway, and west on Miramar Parkway to take the northbound entrance ramp to I-75. For more information about the I-75 Express Lanes Project, please call FDOT s Public Information Office at (954) , or the project Community Outreach Specialist, Gerdy St. Louis, at (954) or visit the project website at Westbound Lane Closure on Miramar Parkway: One westbound lane of Miramar Parkway will be closed from 11:00 p.m. Monday, April 30 to 3:00 a.m. Tuesday, May 1. A 15-minute full closure will also occur during that time frame in order to allow crews to perform the work safely. If necessary to complete the work, this lane closure will also take place from 11:00 p.m. Tuesday, May 1 to 3:00 a.m. Wednesday, May Full Closure on the I-75 Northbound Ramp from Florida's Turnpike: The northbound ramp to I-75 from Florida's Turnpike will be closed 11 p.m. Wednesday, May 2 to 5 a.m. Thursday, May 3. During this time, motorists wishing to use the northbound ramp to I- 75 from Florida's Turnpike will be detoured to exit at US 27/Okeechobee Road (Exit 35), continue south on US 27/Okeechobee Road to NW 138th Street, and east on NW 138th Street to Hialeah Garden Boulevard to take the northbound entrance ramp to I All Northbound Lanes on I-75 between Florida's Turnpike and Bass Creek Bridge Scheduled to Close Wednesday, May 2: All northbound lanes on I-75 between Florida's Turnpike and Bass Creek Bridge will be closed 11 p.m. Wednesday, May 2 to 5 a.m. Thursday, May 3. During this time, motorists wishing to travel northbound on I-75 between Florida's Turnpike and Bass Creek Bridge will be detoured to exit at Miami Gardens Drive (Exit 4), continue east on Miami Gardens Drive to Flamingo Road,

7 north on Flamingo Road to Miramar Parkway, and west on Miramar Parkway to take the northbound entrance ramp to I-75. Interstate One lane on I 595 Westbound on west side of Flamingo Bridge: One lane on I 595 Westbound on west side of Flamingo Bridge will be closed from 9:00pm to 5:00am/Two lanes on I 595 Westbound on west side of Flamingo Bridge will be closed from 11:00pm to 5:00am on Sunday April 29, 2018 and Monday, April 30, 2018 for Milling and resurfacing. 15. One Lane on I 595 Eastbound on east and west side of University Bridge: One Lane on I 595 Eastbound on east and west side of University Bridge will be closed from 9:00pm to 5:00am/ Three lanes on I 595 Eastbound on east and west side of University Bridge will be closed from 11:00pm to 5:00am on Monday, April 30, 2018 and Tuesday, May 1, 2018 for Milling and resurfacing. 16. One right lane on I-75 Southbound to Eastbound I-595: One right lane on I-75 Southbound to Eastbound I-595 will be closed from 9:00pm to 5:00am on Tuesday May 1, 2018 until Friday, May 4, 2018 for CMS work. 17. One left lane on I-75 Northbound to Eastbound I-595: One left lane on I-75 Northbound to Eastbound I-595 will be closed from 9:00pm to 5:00am on Wednesday May 2, 2018 until Friday, May 4, 2018 for CMS work. 18. One right lane on I-75 Northbound to Eastbound I-595: One right lane on I-75 Northbound to Eastbound I-595 will be closed from 9:00pm to 5:00am on Thursday, May 3, 2018 until Friday, May 4, 2018 for CMS work. Northeast Broward 19. A1A Improvements Project from Oakland Park Boulevard to Flamingo Avenue in Fort Lauderdale This project was completed Tuesday, April 17. Description: Project improvements include removing old asphalt and resurfacing the roadway within the project limits, upgrading sidewalks and ramps to meet ADA requirements, repairing, adjusting, and replacing drainage structures throughout the project limits, upgrading the following existing intersections to mast arm signals: 34th Street, mid-block between 36th and 40th Street, and at 40th Street, upgrading all existing pedestrian signals to countdown timers, upgrading signs and pavement markings throughout the project limits, including adding a 1.5 foot striped buffer to separate the four-foot wide bike lanes from the outside vehicle travel lane, upgrading existing lighting along the corridor to lighting with a variable intensity function that can be accessed remotely in order to cause minimal disruption to sea turtles during their nesting season, adding elevated roadway lighting and lower level lighting to illuminate the sidewalk, and adding a business access drive aisle along the east side of road between NE 34th and NE 36th

8 Street. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or Cost/Completion: $9.3 million / Early Broward Boulevard Improvements and Bridge Replacement Project in Fort Lauderdale Up to two lanes in each direction of Broward Boulevard from US 1 to NW 18 Avenue (500 feet maximum at a time) will be closed between 10 p.m. and 6 a.m. and Saturdays between 9 a.m. and 4 p.m. for drainage improvements, widening, curb and gutter installation, and sidewalk construction. Portions of the sidewalk on either side of the road from NW 18 Avenue to US 1 are closed for construction. Signs are in place to direct pedestrians to the open sidewalk on the opposite side of the road. One westbound lane of Broward Boulevard from NW 15 Avenue to NW 18 Avenue at the approaches to and from the bridge over the North Fork New River may be closed at any time through May for emergency AT&T fiber relocation. Description: Project improvements include replacing the bridge over the North Fork of the New River, removing old asphalt and resurfacing the roadway, upgrading crosswalk ramps to meet ADA requirements, upgrading signs and pavement markings, relocating bus shelters, adding roadway lighting, installing drainage structures, upgrading signalized intersections to mast arms, reconstructing sidewalks, and widening roadway to add bike lanes in each direction. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $16 million / Summer Hillsboro Boulevard Improvements Project from Military Trail to US 1 in Deerfield Beach One lane in each direction of Hillsboro Boulevard from Military Trail to US 1 may be closed for signalization improvements, paving, striping, and miscellaneous construction activities through May. Up to two lanes in each direction of Hillsboro Boulevard from Military Trail to US 1 will be closed nightly between 7:30 p.m. and 5:30 a.m. through May for milling and resurfacing. Description: Project improvements include improving the off-ramp from northbound I-95 to eastbound Hillsboro Boulevard including adding a new signalized intersection and adding second lane to increase capacity, relocating and upgrading drainage structures, upgrading crosswalk ramps to meet ADA requirements, constructing new stamped asphalt crosswalks from east of Natura Boulevard to US 1, upgrading existing pedestrian signals to countdown timers, upgrading signalized intersections to mast arms, installing new decorative lighting, constructing new medians east of SE 2 Avenue, removing old asphalt and resurfacing the roadway, upgrading signs and pavement markings to reflect the new roadway configuration as follows: (1) Military Trail to Dixie Highway - Three 11-foot lanes in each direction (2) NE / SE 2 Avenue to US 1 - Two 11-foot lanes in each direction, and adding a bike lane or sharrows in each direction as follows: (1) Military Trail to NW/SW 2 Terrace - 4-foot bike lane (2) NW / SW 2 Terrace to NE

9 / SE 2 Avenue - Sharrow symbols to designate that the outside travel lane will be shared with vehicles (3) NE / SE 2 Avenue to US 1-7-foot bike lane. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $9.4 million / Early Broward Mobility Project One lane on each direction of NW 31 Avenue from Sunrise Boulevard to Oakland Park Boulevard will be closed Monday through Thursday evenings between 8 p.m. and 5 a.m. for milling and resurfacing. One lane in each direction of SW 4 Avenue from SW 28 Street to SR 84 will be closed Monday through Friday between 9 a.m. and 4:30 p.m. for roadway widening and median reconstruction. Description: The improvements under this contract include constructing sidewalks, multi-use pedestrian paths, and bicycle lanes along 45 roadways in Broward County within Hollywood, Pembroke Pines, Davie, Plantation, Deerfield Beach, Pompano Beach, Lauderhill, Oakland Park, Lauderdale Lakes, and Fort Lauderdale. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $15 million / Late Old Dixie Highway Improvements Project from NE 13 th Street to the south end of the Middle River Bridge in Fort Lauderdale This project was completed Friday, April 20. Description: The improvements under this contract include reducing the width of the travel lanes and modifying shoulders to add 4-foot bike lanes in both directions, constructing sidewalk, drainage improvements, adding roundabout at NE 16th Court, permanently reducing speed limit to 25 MPH, installation of pedestrian lighting, adding landscaping and swales to improve drainage, removing old asphalt and resurfacing the roadway, constructing 8 raised intersections and 6 raised pedestrian crosswalks and adding new signing and pavement markings. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $2.6 million / Early A1A Landscaping Improvements Project from Oakland Park Boulevard to Flamingo Avenue in Fort Lauderdale One southbound lane of A1A from Flamingo Avenue to NE 41 Street will be closed Monday through Friday between 9 a.m. and 3 p.m. for landscaping and irrigation work. Description: Project improvements include installing a new irrigation system in the median and along both sides of the road and installing plants in the median and along both sides of the road, including various species of palms, shade trees and shrubs. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $1,225,731 / Fall 2018 Northwest Broward

10 25. Sunset Strip Complete Streets Project in Sunrise Boulevard from Sunrise Boulevard to Nob Hill Boulevard One lane in each direction of Sunset Strip at University Drive may be closed for lighting improvements Monday through Friday between 7 a.m. and 5 p.m. The outside lane in each direction of Sunset Strip from Nob Hill Road to University Drive may be closed Monday through Friday between 7 a.m. and 5 p.m. for driveway reconstruction. The outside lane in each direction of Sunset Strip from NW 64 Avenue to NW 15 Street may be closed Monday through Friday between 7 a.m. and 5 p.m. for driveway reconstruction. Description: The improvements under this contract include removing old asphalt and resurfacing the roadway, upgrading crosswalk ramps to meet ADA requirements, adding roadway lighting, upgrading existing drainage structures and adding one new drainage structure east of NW 68 Avenue, replacing the signalized intersection at NW 64 Avenue with a roundabout, replacing the four-way stop sign at NW 19 Street with a roundabout, reconstructing sidewalks in various locations, upgrading signs and pavement markings, and adding bike lanes throughout the corridor as follows Nob Hill Road to NW 15 Street: Eliminating a travel lane by milling, resurfacing, and restriping to provide one 12-foot travel lane and a 6-foot bike lane separated by a 3-foot striped buffer; NW 15 Street to Sunrise Boulevard: Widening the road to accommodate 5-foot bike lanes; At the intersections of Nob Hill Road, Pine Island Road, University Drive and Sunrise Boulevard, two through lanes will be maintained in each direction and the road will be widened to provide a 5-foot bike lane. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $3.4 million / Summer SR 7 Improvements Project from Commercial Boulevard to south of Glades Road in Tamarac, North Lauderdale, Fort Lauderdale, Margate, Coral Springs, Coconut Creek, Parkland and Palm Beach County Commercial Boulevard to Broward / Palm Beach County Line: One lane in each direction of SR 7 from north of NW 31 Street to south of Hillsboro Boulevard will be closed Monday through Friday between 9 a.m. and 3 p.m. for the installation of drainage structures. One southbound lane of SR 7 from Atlantic Boulevard to NW 31 Street will be closed Monday through Friday between 9 a.m. and 3 p.m. for conduit installation. Description: The improvements under this contract include removing old asphalt and resurfacing the roadway, upgrading pedestrian features including10-foot sidewalks on both sides and detectable warning surfaces at crosswalks, installing overhead sign structures, upgrading signs and pavement markings to include a 7-foot bike lane in each direction, installing new bus shelters with bicycle racks, trash receptacles, and benches, upgrading drainage structures, upgrading signalization, including pedestrian signals and detectors and vehicle video detection, and upgrading lighting. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $13,403, / Late 2019

11 Broward / Palm Beach County Line to south of Glades Road: One lane in each direction of SR 7 from the Broward / Palm Beach County Line to south of Glades Road will be closed Monday through Friday between 9 a.m. and 3 p.m. for concrete, drainage, and sod placement. The signalized intersection at SR 7 and Judge Winikoff Road will be inoperable while crews replace the traffic control cabinet overnight Thursday, May 3 between 10 p.m. and 6 a.m. Officers will be on scene to direct traffic through the intersection. Description: The improvements under this contract include removing old asphalt and resurfacing the roadway, minor shoulder widening, upgrading drainage structures, upgrading pedestrian features including a 10-foot sidewalk on the west side and a 5-foot sidewalk on the east side, and detectable warning surfaces at crosswalks, upgrading signalization, including pedestrian signals and detectors and vehicle video detection, upgrading signs and pavement markings to include a 7-foot bike lane in each direction, and upgrading lighting. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $6,772, / Spring Districtwide Truck Parking Availability System Project in Martin, St. Lucie, and Broward Counties There are no anticipated traffic impacts on this project and no more than three (3) parking stops will be closed at a time at each location. All lanes are open through May 4. Description: On Monday, March 19, Traffic Control Devices, Inc. will begin installing a Truck Parking Availability System (TPAS) at rest areas and weigh stations in Martin, St. Lucie, and Broward Counties, which detects available spaces at rest areas and weigh stations and alerts commercial drivers via message boards. The Truck Parking Availability System installation will occur at the following locations: I-95 Northbound & Southbound Rest Areas in St. Lucie County at MM 133, two miles north of Orange Avenue / SR 68 (Exit 131), near Ft. Pierce; I-95 Northbound Rest Area in Martin County at MM 106, four miles south of Martin Highway / SR 714 (Exit 110), near Palm City; I-95 Southbound Rest Area in Martin County at MM 107, three miles south of Martin Highway / SR 714 (Exit 110), near Palm City; I-95 Southbound Weigh-in- Motion Station in Martin County at MM 113, one mile south of Becker Road (Exit 114), near Palm City; I-95 Northbound Weigh-in-Motion Station in Martin County at MM 92, four miles south of Bridge Road (Exit 96), near Hobe Sound; and I-75 Rest Area in Broward County at MM 34, 11 miles north of SR 25 / US 27 South (Exit 23), near Weston. For more information, contact Community Outreach Specialist Kathleen Dempsey at (772) or kdempsey@corradino.com. Cost/Completion: $2,285, Completion is expected in fall Southeast Broward 28. Hollywood Boulevard Complete Streets Project in Hollywood from east of City Hall Circle to Dixie Highway

12 Eastbound traffic has been shifted slightly north into the dual left turn lane to accommodate the work on the south side of the road. One lane will be maintained in each direction. Description: The improvements under this contract include removing old asphalt, resurfacing the roadway, adding decorative lighting, widening sidewalks and adding decorative pattern, upgrading existing pedestrian signals to countdown timers, constructing new median with parallel parking, replacing the existing water main and connections at various cross streets, and upgrading signs and pavement markings to reflect the new roadway configuration as follows: two lanes in each direction throughout the entire corridor, a four-foot bike lane in each direction separated by a two-foot buffer throughout the entire corridor. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $7,667, / Summer A1A Improvements Project from Sheridan Street to Monroe Street in Hollywood Traffic has been shifted into a new pattern consisting of one lane in each direction of A1A and a dual left turn lane in the center of the road. Taylor Street at A1A will be closed beginning Wednesday, April 25 at 7 a.m. through Friday, May 4 at 7 a.m. for side street paver installation. Motorists traveling north or south on A1A to Taylor Street will detour via Tyler Street through Polk Street and North Surf Road. Taylor Street will be accessible for westbound and eastbound local traffic only. To access A1A, motorists will detour via North Surf Road and New York Street. Description: Improvements under this project include removing old asphalt and resurfacing the roadway, widening sidewalks and upgrading ramps to meet ADA requirements, replacing drainage structures and installing flap gates, removing, narrowing, and /or upgrading medians and curb and gutter, adding 4-foot bike lanes from Monroe Street to Arizona Street, adding sharrows (share the road pavement markings) from Arizona Street to Sheridan Street, upgrading and installing new pedestrian signals, and minor signalization and street light improvements. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $9,366, / Spring 2019 Southwest Broward 30. SR 7 / US 441 Improvements from SW 25 th Street to Fillmore Street in West Park, Miramar, and Hollywood One of the two left turn lanes from southbound SR 7 to eastbound Hollywood Boulevard is closed through May. One lane in each direction of SR 7 at Pembroke Road may be closed Monday through Saturday between 7 a.m. and 4 p.m. and Sunday through Thursday evenings between 9 p.m. and 6 a.m. One lane in each direction of SR 7 at Washington Street may be closed Monday through Saturday between 7 a.m. and 4 p.m. and Sunday through Thursday evenings between 9 p.m. and 6 a.m.

13 Intermittent lane closures in each direction of SR 7 from SW 25 th Street to Fillmore Street between 9 a.m. and 4 p.m. Two lanes in each direction of SR 7/ US 441 from south of Washington Street to Pembroke Road will be closed overnight Sunday through Thursday between 9 p.m. and 6 a.m. One lane in each direction will be maintained. Description: The improvements under this contract include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians; constructing new storm sewer system and retention ponds; installing new water and sewer lines; constructing bus bays at current bus stop locations; constructing curbs and gutters; adding or replacing sidewalks with ADA compliant ramps on both sides of the road; upgrading existing signalized intersections with mast arms and adding pedestrian countdown timers at Pembroke Road, Washington Street, and Hollywood Boulevard; improving street lighting along the corridor by installing new lighting system along the west side of SR 7 / US 441; adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $30.7 million. Completion in Summer SR 7 / US 441 Improvements Project from Fillmore Street to south of Stirling Road in Hollywood and the Seminole Indian Reservation One lane in each direction of SR 7 from Stirling Road to Fillmore Street will be closed overnight, intermittently Monday through Thursday between 10 p.m. and 5 a.m. One lane in each direction of Taft Street at SR 7 and the southbound right turn lane of Taft Street onto SR 7 will be closed continuously beginning Monday, April 23 at 7 a.m. through Monday, May 7 at 7 a.m. for roadway reconstruction. One lane in each direction of Taft Street will be maintained. Description: Project improvements include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians, constructing new storm sewer system and retention ponds, installing new water and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing sidewalks with ADA compliant ramps on both sides of the road, upgrading existing signalized intersections with mast arms and add pedestrian countdown timers at Johnson Street, Taft Street, and Sheridan Street, installing new signalized intersection and pedestrian countdown timers at Fillmore Street, improving street lighting along the corridor by installing new lighting system along the west side of SR 7/US 441, adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $29.6 million / Spring Hallandale Beach Boulevard Improvements from SR 7 to Lake Shore Drive in Pembroke Park and West Park All lanes open.

14 Description: The improvements under this contract include adding new drainage along project corridor, removing old asphalt and resurfacing the roadway within project limits, installing new traffic signal mast arms and pedestrian countdown timers at SW 56th Avenue and SW 40th Avenue, and installing 4-foot bike lanes throughout the project limits. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or Cost/Completion: $6.6 million. Completion in Fall I-95 Lighting Improvements Project from Hallandale Beach Boulevard to Hollywood Boulevard in Hallandale Beach, Hollywood, and Pembroke Park The shoulder in each direction of I-95 from north of Hollywood Boulevard to south of Hallandale Beach Boulevard will be closed Monday through Friday between 8 a.m. and 4 p.m. The outside lane in each direction of I-95 from north of Hollywood Boulevard to south of Hallandale Beach Boulevard will be closed overnight Monday through Friday between 10 p.m. and 6 a.m. for the installation of light pole bases. Description: The improvements under this contract include the installation of new light poles, conduits, conductors, barrier wall, guardrail and new load centers for electrical components within project limits. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $1.9 million. Completion in Spring US 27 Improvements Project in Pembroke Pines, Miramar, and Southwest Ranches One lane in each direction of US 27 from the Miami-Dade/Broward County Line to Griffin Road may be closed Monday through Friday between 9 a.m. to 7 p.m. for milling and resurfacing operations. Description: The improvements under this contract include removing old asphalt and resurfacing, constructing a buffered 7-foot bike lane in both directions, widening at existing intersections, and installing new lights and pavement markings along the corridor. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $8.5 million / Summer Advanced Traffic Management System Installation on Pines Boulevard from Dykes Road to Flamingo Road in Pembroke Pines All lanes open. Description: The improvements under this contract include the installation of Intelligent Transportation System (ITS), Adaptive Traffic Control System (ATCS), and Advanced Transportation Management System (ATMS) components. These include enhancements to vehicle detection, fiber optic communications infrastructure, traffic monitoring cameras, and new poles and data collection devices at the eight signalized intersections and the I-75 interchange within the project limits. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com.

15 Cost/Completion: $2,949,000 / Late Stirling Road At I-95 Lighting Improvements Project In Hollywood and Dania Beach One eastbound lane of Stirling Road at I-95 will be closed Monday through Friday between 9 a.m. and 4 p.m. for lighting foundation and underground conduit installation. Description: The improvements under this contract include installing 11 additional light poles and luminaires on both sides of Stirling Road from west of SW 19 Court to SW 18 Court, upgrading pedestrian crosswalk signal near the on-ramp from Stirling Road to northbound I-95, and upgrading signs within the project limits, including pedestrian crossing signs and signal ahead signs. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $199,400/ fall 2018 Maintenance & Permit Projects: 37. Right Turn Lane Construction on Northbound I-95 Off-Ramp at Stirling Road One lane at the off-ramp from northbound I-95 to Stirling Road will be closed Sunday through Thursday evenings through Thursday, May 24, 2018 between 9 p.m. and 5 a.m. For more information about this work, please contact AED Corp project manager Taylor Glazer at (954) or tglazer@aedcorp.com. 38. Bridge and Roadway Improvements in Pompano Beach One lane in each direction of Atlantic Boulevard from NE 27 Avenue to N Riverside Drive will be closed Monday, February 19 through Wednesday, July 31, 2019 between 9 a.m. and 3:30 p.m. For more information about this work, please contact Burkhardt Construction, Inc. representative Brandon Rhodes at brandon@burkhardtconstruction.com or (561) AT&T Mobility Project in Pembroke Pines One eastbound lane and one westbound lane of Pines Boulevard from Dykes Road to NW 106 Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. Monday, April 16 through Thursday, May 3. Two eastbound lanes and two westbound lanes of Pines Boulevard from Dykes Road to NW 106 Avenue will be closed Sunday through Thursday between 9 p.m. and 5 a.m. Monday, April 16 through Thursday, May 3. For more information about this work, please contact AWP Traffic representative Dan Jeziorkowski at Djeziorkowski@awptraffic.com or (561) Asphalt Improvements in Hallandale Beach One southbound lane of NE 14 Avenue at Hallandale Beach Boulevard will be closed Monday, April 9 through Tuesday, May 1 between 9 a.m. and 3:30 p.m. For more information about this work, please contact Florida Engineering representative Juan at juan@floridaengineering.net or (305)

16 41. AT&T Mobility Project in Coral Springs One southbound lane of N University Drive from NW 25th Court to NW 20th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. Monday, April 16 through Friday, May 4. Two southbound lanes of N University Drive from NW 25th Court to NW 20th Street will be closed Sunday through Thursday between 9 p.m. and 5 a.m. Monday, April 16 through Thursday, May 3. For more information about this work, please contact AWP Traffic representative Dan Jeziorkowski at Djeziorkowski@awptraffic.com or (561) AT&T Mobility Project in Cooper City One southbound lane and one northbound lane of S Flamingo Rd from Country Glen Drive to Sheridan Street will be closed Monday through Friday between 9 a.m. and 4 p.m. Monday, April 16 through Friday, May 4. Two southbound lanes and two northbound lanes of S Flamingo Rd from Country Glen Drive to Sheridan Street will be closed Sunday through Thursday between 9 p.m. and 5 a.m. Monday, April 16 through Thursday, May 3. For more information about this work, please contact AWP Traffic representative Dan Jeziorkowski at Djeziorkowski@awptraffic.com or (561) Drainage and Sewer Improvements in Fort Lauderdale One lane in each direction of A1A from NE 23 Street to N Atlantic Boulevard will be closed Monday, April 16 through Friday, June 15 between 9 a.m. and 4 p.m. For more information about this work, please contact City Engineering Contractors representative Shawn Alava at shawn@cityengineering.net or (786) Broward County Transit Bus Stop Improvements in North Lauderdale One northbound lane of SR 7 at SW 12 Street will be closed Monday, April 30 through Monday, May 28 between 8 a.m. and 4:30 p.m. One southbound lane of SR 7 at Commercial Boulevard will be closed Monday, April 30 through Monday, May 28 between 8 a.m. and 4:30 p.m. One southbound lane of SR 7 at Prospect Road will be closed Monday, April 30 through Monday, May 28 between 8 a.m. and 4:30 p.m. For more information about this work, please contact Broward County Transit representative Ralph Viola at rviola@broward.org or (954) Utility Improvements in Deerfield Beach and Pompano Beach One southbound lane of Powerline Road from SW 10 Street to Copans Road will be closed Monday, April 23 through Friday, May 18 between 9 a.m. and 4 p.m. One southbound lane of Powerline Road from SW 10 Street to Copans Road will be closed overnight Monday, April 30 through Friday, May 4 between 9 p.m. and 5 a.m. For more information about this work, please contact Blood Hound Underground Utility Locators representative Joe Murphy at jmurphy@bhug.com or (513) Gas Line Installation in Davie

17 One westbound lane of Griffin Road from SR 7 to Florida s Turnpike will be closed daily between 9 a.m. and 4 p.m. through Friday, May 11. For more information about this work, please contact Teco Energy representative Andre Finch at AlFinch@Tecoenergy.com or (305) Sewer Installation in Miramar The turn lane from both directions of Pembroke Road to SW 68 Avenue will be closed Monday, April 30 through Wednesday, May 2 between 9 a.m. and 4 p.m. motorists will detour to SW 67 Avenue. For more information about this work, please contact Reynolds Construction, LLC representative Juan Ramirez, P.E. at juan.ramirez@reynoldscon.com or (561) Pedestrian Improvements in Fort Lauderdale One eastbound lane of Sunrise Boulevard at NE 10 Street will be closed Monday through Friday between 9 a.m. and 4 p.m. For more information about this work, please contact Community Outreach Specialist Dayana Diaz at ddiaz@corradino.com or (954) Gas Line Improvements in Margate One southbound lane of SR 7 from Coconut Creek Parkway to Southgate Boulevard will be closed Monday, April 30 through Friday, May 4 between 9 a.m. and 4 p.m. For more information about this work, please contact Teco Energy representative Andre Finch at alfinch@tecoenergy.com or (305) Traffic Pole Replacement in Lauderdale Lakes One eastbound lane of Commercial Boulevard west of NW 37 Avenue will be closed overnight Wednesday, May 2 through Thursday, June 28 between 9 p.m. and 5 a.m. For more information about this work, please contact AP Communities representative Pedro Quijada at pquijada@apcommunities.com or (305) FPL NOTIFICATIONS Florida Power and Light Improvements in Fort Lauderdale/Lauderdale By the Sea One eastbound lane and one westbound lane of Commercial Boulevard from NE 20th Avenue to Sea Grape Drive will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lane and two westbound lane of Commercial Boulevard from NE 20th Avenue to Sea Grape Drive will be closed Sunday through Thursday between 9 p.m. and 5 a.m. Florida Power and Light Improvements in Deerfield Beach One northbound lane of S Dixie Highway from SW 2nd Court to SW 10th Street will be closed Monday through Friday between 9 a.m. and 4 p.m.

18 Two northbound lanes of S Dixie Highway from SW 2nd Court to SW 10th Street will be closed Sunday through Thursday between 9 p.m. and 5 a.m. Florida Power and Light Improvements in Cooper City One northbound lane of S Flamingo Road from Sheridan Street to SW 49th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. One northbound lane of S Flamingo Road from Sheridan Street to SW 49th Street will be closed Sunday through Thursday between 9 p.m. and 5 a.m. Florida Power and Light Improvements in Cooper City One northbound lane and one southbound lane of S Flamingo Road from West Lake Boulevard to SW 55th Street will be closed Monday through Friday between 9 a.m. and 4 p.m. One northbound lane and one southbound lane of S Flamingo Road from West Lake Boulevard to SW 55th Street will be closed Sunday through Thursday between 9 p.m. and 5 a.m. Florida Power and Light Improvements in Fort Lauderdale One northbound lane and one southbound lane of S State Rd 7 from SW 20th Street to Davie Boulevard will be closed Monday through Friday between 9 a.m. and 4 p.m. Two northbound lanes and two southbound lanes of S State Rd 7 from SW 20th Street to Davie Boulevard will be closed Sunday through Thursday between 9 p.m. and 5 a.m. Florida Power and Light Improvements in Fort Lauderdale/Pompano Beach One southbound lane and one northbound lane of Powerline Road from NW 61st Street to Gateway Drive will be closed Monday through Friday between 9 a.m. and 4 p.m. Two southbound lanes and two northbound lanes of Powerline Road from NW 61st Street to Gateway Drive will be closed Sunday through Thursday between 9 p.m. and 5 a.m. Florida Power and Light Improvements in Fort Lauderdale One eastbound lane of W Commercial Boulevard from W Prospect Road to NW 15th Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. Two eastbound lanes of W Commercial Boulevard from W Prospect Road to NW 15th Avenue will be closed Sunday through Thursday between 9 p.m. and 5 a.m.

FDOT Broward County Traffic Report April 20 through April 27, 2018

FDOT Broward County Traffic Report April 20 through April 27, 2018 FDOT Broward County Traffic Report April 20 through April 27, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week

More information

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Broward County Traffic Report May 11 through May 18, Interstate 95

FDOT Broward County Traffic Report May 11 through May 18, Interstate 95 FDOT Broward County Traffic Report May 11 through May 18, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

FDOT Broward County Traffic Report March 2 through March 9, 2018

FDOT Broward County Traffic Report March 2 through March 9, 2018 FDOT Broward County Traffic Report March 2 through March 9, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018

FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018 FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week

More information

FDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95

FDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95 FDOT Broward County Traffic Report August 31, 2018 through September 7, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018

FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018 FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Broward County Traffic Report September 14, 2018 through September 21, Interstate 95

FDOT Broward County Traffic Report September 14, 2018 through September 21, Interstate 95 FDOT Broward County Traffic Report September 14, 2018 through September 21, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

Palm Beach County Traffic Report November 16 through November 23, 2018

Palm Beach County Traffic Report November 16 through November 23, 2018 November 16, 2018 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report November 16 through November 23, 2018 Palm Beach County Palm Beach County traffic will

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

PRESENTATION OUTLINE

PRESENTATION OUTLINE November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 13 December 19, 2018 Alico Road Widening from Ben Hill Griffin

More information

Palm Beach County Traffic Report January 11 through January 18, 2019

Palm Beach County Traffic Report January 11 through January 18, 2019 January 11, 2019 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report January 11 through January 18, 2019 Palm Beach County Palm Beach County traffic will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 20, 2018 January 2, 2019 Alva Bridge & Big Carlos Pass Bridge:

More information

Palm Beach County Traffic Report October 26 through November 2, 2018

Palm Beach County Traffic Report October 26 through November 2, 2018 October 26, 2018 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report October 26 through November 2, 2018 Palm Beach County Palm Beach County traffic will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 10-16, 2019 Summerlin Road & Colonial Blvd: Lee County DOT will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 24-30, 2019 Corbett Road: Motorists who use Corbett Road in North

More information

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018 Florida Department of Transportation District Six Project FM #432687-1-52-01 Public Information Meeting Tuesday, July 24, 2018 South Florida Express Lanes Network The I-75/SR 826 Palmetto Express Lanes

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE October 12 October 18, 2017 Gunnery Road and 8th Street SW Intersection

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update April 1, 2016 Corkscrew Road West of I-75: Lee County DOT will

More information

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 3-9, 2019 RICK SCOTT GOVERNOR Florida Department of Transportation

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 6 December 12, 2018 South Pointe Boulevard & College Parkway:

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 10 th, through November 16 th, 2016 Alico & Gator Road Intersection

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May5 th through May 11 th, 2016 Road Maintenance This Week Striping Maintenance:

More information

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018 ^Lee County Jt Southwest T:[o ln Onaa Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE July 19 - July 25, 2018 Sanibel Bridge

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 9 November 15, 2017 Update: 11/9/17 3:45 p.m. New Pass, Bridge

More information

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks

More information

^Lee County Jt Sotft^West T:foH^a Lee County

^Lee County Jt Sotft^West T:foH^a Lee County ^Lee County Jt Sotft^West T:foH^a Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 11th through August 17th, 2016

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 24 August 30, 2017 Hancock Bridge Parkway: Lee County DOT will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 30 September 5, 2018 Buckingham Road: Florida Power and Light

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May 25 May 31, 2017 College Parkway: Lee County DOT will be trimming

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016 CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016 CALL TO ORDER: 9:30 a.m. ROLL CALL: PLEDGE OF ALLEGIANCE: Vice Mayor Diane Glasser

More information

^ Lee County ^OU fewest T:foH^ Lee County

^ Lee County ^OU fewest T:foH^ Lee County ^ Lee County ^OU fewest T:foH^ Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 18th through August 24th, 2016 Ben

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

Update January 4, 2016

Update January 4, 2016 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update January 4, 2016 Cape Coral - Del Prado Boulevard Lee County DOT

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: November 9, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction & Traffic Highlights

More information

February 11, 2016 TPO Board Presentation

February 11, 2016 TPO Board Presentation February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 17 August 23, 2017 Traffic Maintenance: Signal Maintenance Bonita

More information

Florida Department of Transportation MIKE DEW SECRETARY

Florida Department of Transportation MIKE DEW SECRETARY RICK SCOTT GOVERNOR Florida Department of Transportation MIKE DEW SECRETARY June 7, 2018 JoAnn May, 239-225-1900 JoAnn.May@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH REPORT #23 FOR WEEK OF

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE June 15, 2018 New Update: Landscape: Lee County Department of Transportation

More information

Completing the Vision

Completing the Vision Villas of Positano Completing the Vision North A1A Lane Reconfiguration N. Surf Rd. Redirection of Traffic Margaritaville Resort March 4, 2014 1 Completing The Vision Project Limits Hollywood Blvd. to

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter

More information

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT: AGENDA REQUEST AGENDA HEADING: Unfinished Business BY Neighborhood and Development Services Originating Department COMMISSION MEETING DATE: November 1, 2010 Timothy Litchet Department Head AGENDA ITEM

More information

Lee County Department of Transportation

Lee County Department of Transportation Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE New Updates & Revisions September 3 rd, through September 9 th, 2015

More information

Pinellas County Traffic Advisory

Pinellas County Traffic Advisory 12/22/17 2:00PM For up-to-date information regarding traffic (crashes) on Pinellas County roadways that are monitored by our Intelligent Transportation System (ITS) Smart Tracs cameras - follow us on Twitter

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

I 595 Express Corridor Improvements Project. February 2014 Update

I 595 Express Corridor Improvements Project. February 2014 Update I 595 Express Corridor Improvements Project February 2014 Update PROJECT COMPONENTS Reversible Express Lanes Direct Connect to Florida s Turnpike Open Road Tolling SR 84 Continuous Connection Florida s

More information

Broward Complete Streets Advisory Committee (CSAC) Meeting. Monday, September 24, 2018

Broward Complete Streets Advisory Committee (CSAC) Meeting. Monday, September 24, 2018 Broward Complete Streets Advisory Committee (CSAC) Meeting Monday, September 24, 2018 HOUSEKEEPING Please make sure you have signed in and have an agenda. This meeting is being recorded. Please introduce

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Why invest in the 1 Street S.W. Corridor?

Why invest in the 1 Street S.W. Corridor? Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Complete Streets Advisory Committee Meeting Summary

Complete Streets Advisory Committee Meeting Summary Complete Streets Advisory Committee Meeting Summary September 24, 2018 BrowardMPO.org Broward MPO Complete Streets Advisory Committee (CSAC) September 24, 2018 ADVISORY COMMITTEE MEETING 2 MEETING PARTICIPANTS

More information

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new

More information

Transportation and General Civil Engineering Projects

Transportation and General Civil Engineering Projects Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active

More information

Rio Intersection Traffic Restrictions Begin Monday

Rio Intersection Traffic Restrictions Begin Monday May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

DISTRICT BICYCLE PROGRAM

DISTRICT BICYCLE PROGRAM DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

Pre-Construction Meeting

Pre-Construction Meeting Pre-Construction Meeting Wednesday, March 21 Drop-in from 5 9pm Please visit displays for project information, talk to staff, and ask questions! Edmonton.ca/SouthsideBikeRoutes Objectives & Project Scope

More information

LANE ELIMINATION PROJECTS

LANE ELIMINATION PROJECTS PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:

More information

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate

More information

IMPLEMENTATION WORKBOOK

IMPLEMENTATION WORKBOOK Lawrence Township Bicycle and Pedestrian Planning Assistance Study IMPLEMENTATION WORKBOOK Final Action Plan - Part 2 April 2009 Prepared For: The Township of Lawrence and the New Jersey Department of

More information

Hollywood/Pines Boulevard Multimodal Corridor Study

Hollywood/Pines Boulevard Multimodal Corridor Study Hollywood/Pines Boulevard Multimodal Corridor Study FINAL REPORT Prepared for: Broward County Metropolitan Planning Organization Prepared by: Kimley-Horn and Associates, Inc. Fort Lauderdale, Florida Kimley-Horn

More information

Option W: N. Washington Street Project

Option W: N. Washington Street Project Option W: N. Washington Street Project Location: one block of North Washington Street, between West Broad Street and Park Avenue Description: upgrades to existing lighting new brick sidewalk to replace

More information

Hidden Oaks Elementary School

Hidden Oaks Elementary School Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for: SCHOOL ROUTE PLAN For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering Division 42 South John

More information

Joshua Jester, E.I., Florida Department of Transportation, District One

Joshua Jester, E.I., Florida Department of Transportation, District One MEMORANDUM To: From: Joshua Jester, E.I., Florida Department of Transportation, District One Michael Garau, P.E., Kimley-Horn and Associates, Inc. Date: October 5, 2018 Subject: at Gulfstream Avenue Intersection

More information