ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

Size: px
Start display at page:

Download "ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR"

Transcription

1 ODOT DISTRICT CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

2 Ohio Department of Transportation - District DRAFT CONSTRUCTION PROGRAM O hio s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible for maintaining one of the largest transportation networks in the nation. Guided by ethical principles and accountability, ODOT works to improve safety, enhance travel and advance economic development. The following draft summary outlines those projects which are programmed for the 2019 construction season in ODOT District 9. With an estimated cost of more than $100 million, the construction program will consist of 71 new and ongoing preservation, maintenance and safety improvement projects to be sold and/or constructed through FY2019 and the first quarter of FY2020, and included in these are 20 projects in which the department is partnering with the respective county engineer s office. Due to production and planning variables, however, not all projects may be sold as proposed, and projects are subject to funding availability. Any cost estimates, sale dates or schedules cited in this document are subject to change, and estimated costs are the construction cost estimates established by District 9 s Planning & Design staff prior to bid letting; these do not include any preliminary engineering or right of way acquisition costs as applicable to the project. Projects listed as Local Government are those which are being administered by the Department of Transportation; additional information about these and other local projects can be obtained from the respective local agency. Additional information about these projects will be released as they are scheduled or awarded. For more information, please contact the District 9 Public Information Office at or d09.pio@dot.state.oh.us. The environmental review, consultation, and other actions required by applicable Federal environmental laws for these projects are being, or have been, carried-out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT. PID = Project Identification Number CRS = County, Route, Section

3 2019 CONSTRUCTION PROGRAM COST SUMMARY $26,000,000 $23,500,000 $21,000,000 $18,500,000 $16,000,000 $13,500,000 24,468,046 $11,000,000 20,008,450 $8,500,000 13,314,856 $6,000,000 10,936,421 10,282,818 11,227,815 $3,500,000 6,193,677 7,523,146 $1,000,000 Adams Brown Highland Jackson Lawrence Pike Ross Scioto

4 ADAMS COUNTY CONSTRUCTION PROGRAM STATE GOVERNMENT PROJECTS ADA Bridge Between CR 6 (Fawcett Road) and TR 91 (Murphin Ridge Road), three miles south of 04/15/19 $792,248 Replacement SR 781. Traffic will be maintained in one lane with temporary signals ADA-247/781- Resurfacing On SR 247, from the intersection with SR 32 to the north corporation limit of $1,400, /2.02 Seaman near CR 64 (Curt Road), and on SR 781, from CR 27 (Steam Furnace Road) to SR 348. Traffic will be maintained by flaggers. (10/04/18) ADA Resurfacing From US 52 at Manchester to SR 41. Traffic will be maintained by flaggers. (See also $873,162 BRO ) (11/01/18) ADA Bridge Just west of CR 18 (Blue Creek Road) and the village of Rome. Traffic will be 05/13/19 $2,657,085 Replacement detoured via SR 247 and SR ADA Bridge Replacement Between CR 20 (Ripley Pike) and TR 185 (Gray Road). Traffic will be detoured via US 52 and SR 136 (02/11/19) $284, ADA Minor Widening Widen west side of SR 73 from SR 32 to CR 18 (Jaybird Road). Eastbound traffic will be detoured via SR 32 and CR 198 (Portsmouth Road) during the first phase of construction; at all other times, traffic will be maintained with temporary signals. 03/18/19 $2,491, ADA Slide Repair Immediately east of SR 125. Traffic will be maintained with temporary signals. 06/17/19 $326, ADA Slide Repair Between Sparks and Jane streets at the north corporation limit of West Union. $393,233 Traffic will be maintained with temporary signals. (11/01/18) ADA Slide Repair Between TR 91 (Murphin Ridge Road) and TR 90 (Hull Road), south of SR /17/19 $1,150,444 Traffic will be maintained with temporary signals ADA Slide Repair Between CR 55 (Owens Road) and CR 1 (Vaughn Ridge Road), one mile east of West $411,718 Union. Traffic will be maintained with temporary signals. (02/04/19) ADA Tree Removal Between SR 32 and CR 18 (Jaybird Road). Traffic will be maintained by flaggers. (12/20/18) $155,000 TOTAL: $10,936,421

5

6 BROWN COUNTY CONSTRUCTION PROGRAM LOCAL GOVERNMENT PROJECTS BRO-CR13 Bridge Replacement On North Pole Road, a new bridge construction to replace the existing covered bridge located between the overlap of TR 28 (Eagle Creek/Upper Eagle Creek roads. (The covered bridge will remain in place.) Traffic will be detoured locally by way of TR 28 and CR 49B. 10/18/18 $1,830,245 STATE GOVERNMENT PROJECTS BRO Bridge Located immediately west of the village of Georgetown. 03/18/19 $7,898,259 Replacement Traffic will be maintained in one, 10-foot lane in each direction BRO Resurfacing Between the intersection with US 62 in Aberdeen to the Adams County line. Traffic $873,162 will be maintained by flaggers. (See also ADA ) (11/01/18) BRO Tree Removal West of the village of Georgetown. Traffic will be maintained with the use of flaggers as needed. 07/26/18 $302,842 CARRYOVER PROJECTS BRO Safety Improvement Installation of RICWS at the intersection of S.R. 123, just south of the Clinton County line. Traffic will be maintained with the use of flaggers as needed. (05/14/18) $251,472 TOTAL: $10,282,818

7

8 HIGHLAND COUNTY CONSTRUCTION PROGRAM LOCAL GOVERNMENT PROJECTS HIG-TR225B- Section On TR 225B (Tolle Road), between US 50 and SR 138. Traffic will be detoured via SR 04/01/19 $1,515, Improvement 138, CR 7 (Mad River Road) and US HIG-CR3- Various Pavement Marking At various locations on multiple county roads. Traffic will be maintained in one lane with the use of flaggers, arrow boards and/or temporary signals. 08/19/19 $144,200 STATE GOVERNMENT PROJECTS HIG HIG Resurfacing On SR 138, from US 62 in Hillsboro to TR 288 (Rittenhouse Road), and on SR 753, from US 50 at Rainsboro to CR 25 (Paint Creek Road). Traffic will be maintained in one lane with the use of flaggers. (12/20/18) $1,494, HIG HIG Resurfacing HIG Bridge Replacement On SR 41, through the village of Sinking Spring, and on SR 124, from SR 506 at Marshall to SR 41 at Sinking Spring. Traffic will be maintained in one lane with the use of flaggers. Between CR 83 (N. Beach/Overman Road) and CR 46 (Worley Mill Road), midway between the communities of Boston and Rainsboro. Traffic will be detoured via SR 124, SR 506 and SR HIG Resurfacing Between the western and the eastern corporation limits in the city of Hillsboro. Traffic will be maintained in one lane with the use of flaggers. CARRYOVER PROJECTS (11/15/18) (10/12/18) $1,544,665 $988,668 10/12/18 $1,305, HIG-CR (HIG ) Widening; Minor Realignment On Prospect Road, between SR 73 and TR 378 (Pigeon Roost Road), and on SR 73 at the intersection with CR 5 (Prospect Road). Phased construction with closures on SR 73, CR 5, CR 75, TR 263, TR 264 & TR 378 during various stages. (10/26/17) $6,322,144 TOTAL: $13,314,856

9

10 JACKSON COUNTY CONSTRUCTION PROGRAM LOCAL GOVERNMENT PROJECTS JAC-TR Bridge On TR 221 (Roberts Road), immediately south of US 35. Traffic will be detoured 08/19/19 $626,400 Replacement locally via CR 21 (Oakland Road). STATE GOVERNMENT PROJECTS JAC-124- Bridge Deck At two structures located between CR 39 (Mulga Road) and the Vinton County line. 06/03/19 $1,200, /23.37 Replacement Traffic will be maintained in a minimum of one lane in each direction JAC Preventive From the SR 327 interchange at Wellston to the Vinton County line. Traffic will be 07/01/19 $2,939,316 Maintenance maintained in a minimum of one lane in each direction JAC Slide Repair Between TR 724 (McGiffens Road) and SR 124, immediately west of CR 78 04/01/19 $553,926 (Fairgreens Road). Traffic will be maintained in a minimum of one lane in each direction JAC Slide Repair At the interchange with SR 327. Traffic will be maintained in a minimum of one lane in each direction. 06/17/19 $445,500 CARRYOVER PROJECTS JAC Resurfacing From just west of the SR 93 interchange to the SR 327 intersection. $2,839,900 Traffic will be maintained in a minimum of one lane in each direction. 05/14/ JAC Resurfacing Between TR 601 (Sternberger Road) and CR 11 (Four Mile Road), just south of $568,498 Jackson. Traffic will be maintained with the use of flaggers as needed. 08/06/ JAC Slide Repair Between Exline and Davis streets, near the corporation limit of Coalton. $335,275 Traffic will be maintained with flaggers and/or temporary signals. 08/23/ JAC Culvert Repair (flood damage) Between TR 124 (Plum Road) and CR 5 (Moriah Road), near Gallia County. Traffic will be maintained in a minimum of one lane in each direction. 08/06/18 $1,719,000 TOTAL: $11,227,815

11

12 LAWRENCE COUNTY CONSTRUCTION PROGRAM LOCAL GOVERNMENT PROJECTS LAW-Ironton Bike/Walkway In the city of Ironton, from the Transit Center to West Ironton at locations along $985,883 2 nd Street and the floodwall. Traffic will be maintained by flaggers as needed. 09/27/ LAW-CR10A-0.91 Bridge On CR 10A (Old SR 522), approximately one mile south of SR 522. Traffic will be $1,451,400 Replacement detoured via SR /02/ LAW-CR15/CR18 Resurfacing On CR 15 (Lick Creek Road), from its junctions with US 52, and on CR 18 (Solida $1,329,090 Road), from US 52 to Lick Creek Road. Traffic will be maintained with the use of flaggers as needed. 07/02/ LAW-CR Slide Repair On CR 2 (Greasy Ridge Road), approximately one mile north of SR 243. Traffic will be detoured locally. 06/03/19 $223,330 STATE GOVERNMENT PROJECTS LAW-52/7/527- Resurfacing Between CR 18 (Solida Road) and the junction with 3 rd Avenue at Chesapeake. $4,529, /0.00/0.00 Traffic will be maintained in a minimum of one, 12-foot lane in either direction. 12/06/ LAW-52-Various Sign Upgrade At various locations on US 52, between the Scioto County line and SR 243 at Coal $354,810 Grove. Traffic will be maintained in a minimum of one lane in each direction. 02/04/ LAW Slide Repair Near the junction with CR 3 (Old SR 7), between the village of Chesapeake and SR $1,000, Traffic will be maintained with the use of temporary signals. 02/11/ LAW Rock Slope Phase II of a rock remediation project between SR 652 at the Ashland twin $13,680,164 Maintenance bridges and TR 268 (Crabtree Hollow Road). Traffic will be maintained in a minimum of one lane in each direction. 06/03/ LAW Bridge Replacement Between CR 64 (Venisonham-Camp Branch Road) and TR 79 (Ridge Baptist Church Road), just east of SR 378. Traffic will be maintained with temporary signals. 04/15/19 $912,919 TOTAL: $24,468,046

13

14 PIKE COUNTY CONSTRUCTION PROGRAM LOCAL GOVERNMENT PROJECTS PIK-TR655- Bridge Replacement Replace the structure located on TR 655 (Good Manor Road). Traffic will be $738, maintained in one lane with the use of temporary signals. (08/30/18) PIK-CR59- Various Locations Pavement Marking Pavement markings at multiple locations on CR 59. Traffic will be maintained in one lane with the use of flaggers. (10/18/18) $63,545 STATE GOVERNMENT PROJECTS PIK PIK Resurfacing On SR 104, from Forest Hills Drive to US 23 at Waverly, and on SR 335, from the Scioto County line to the north corporation limit of Beaver. Traffic will be maintained in one lane with the use of flaggers. (12/20/18) $2,275,397 CARRYOVER PROJECTS PIK Bridge Replacement Intersection Improvement Just west of CR 6 (Lapperell Road); project includes repairs to Lapperell Road. Traffic will be maintained in one lane with the use of temporary signals. (11/09/17) $3,116,322 TOTAL: $6,193,677

15

16 ROSS COUNTY CONSTRUCTION PROGRAM LOCAL GOVERNMENT PROJECTS ROS-CR Bridge Repair On CR 60 (Westfall Road), two miles north of SR 28. Traffic will be detoured locally. 06/17/19 $238, ROS-CR1-Various Guardrail At various locations on multiple county roads. Traffic will be maintained in one lane $263,855 Locations Replacement with the use of flaggers, arrow boards and/or temporary signals. 10/18/ ROS-FR10 Slide Repair Slip repair on FR 10 in Tar Hollow State Forest. Traffic will be maintained on one lane with the use of flaggers; short-term closure of roadways may be imparted. (01/17/19) $181,853 STATE GOVERNMENT PROJECTS ROS Bridge Demolition At the CR 13 (Overbridge Road) structure (US 23 overpass) just north of the SR 159 $263,413 interchange. US 23 traffic will be maintained during demolition. (12/06/18) ROS New Construction Extension of SR 207 from the US 23 interchange to SR 159, north of TR 236 (Delano 08/19/19 $8,384,545 Road), with roundabouts at SR 207-SR 159 and at SR 159-SR 180 intersections ROS Intersection Turn lane construction and signalization at Plyleys Lane in Chillicothe. Traffic will be 05/27/19 $1,762,775 Improvement maintained in one lane in each direction ROS Resurfacing From the junction with CR 205 (Three Locks Road) to the intersection with E. 8th 07/01/19 $1,619,121 Street/Eastern Avenue in the city of Chillicothe. Traffic will be maintained in a minimum of one lane in each direction ROS Intersection Turn lane construction, traffic signal replacement and culvert extension at the $1,195,699 Improvement intersection with TR 236 (Delano Road). Traffic will be maintained by flaggers. (12/20/18) ROS Culvert Replacement Between TR 89 (Halley Road) and CR 93 (Porter Hollow Road). Traffic will be detoured via US 50 and SR 41. (03/04/19) $677,123 CARRYOVER PROJECTS ROS-CR Bridge On West Junction Road, immediately west of the Ross-Vinton County line. $1,633,892 Replacement The route will be closed, and traffic will be detoured via local routes. 11/15/ ROS-CR Resurfacing On Blain Highway, from its junction with US 23 to its junction with US 50. $1,330,696 Traffic will be maintained in one lane with the use of flaggers. 08/02/ ROS /22.65 Resurfacing From the CR 550 interchange to just east of the SR 159 interchange, and from the US 23 split (end of overlap) to the US 50 interchange. Traffic will be maintained in a minimum of one lane in each direction. 09/20/18 $3,068,461 TOTAL: $19,935,725

17

18 SCIOTO COUNTY CONSTRUCTION PROGRAM LOCAL GOVERNMENT PROJECTS SCI-CR Various Guardrail At various locations on multiple county roads. Traffic will be maintained in one 07/02/19 $288,500 Locations Replacement lane with the use of flaggers, arrow boards and/or temporary signals SCI-Shawnee Culvert Culvert and pavement repairs at various locations on FR 1, 6 & 14. Traffic will be $387,198 State Forest Replacement maintained on one lane with the use of flaggers; short-term, temporary closure of roadways may be imparted during hours of operation. (03/01/19) SCI-CR540 New Construction Roadway extension of CR 540 (Barklow Road) at the Scioto County Airport. There should be little to no impact to traffic. 06/14/19 $811,150 STATE GOVERNMENT PROJECTS SCI Bridge Between TR 75 (Dry Run Road) and TR 79 (Laurel Fork Road), approximately two 06/17/19 $1,220,000 Replacement miles east of Rarden. SR 73 traffic will be maintained with temporary signals. TR 75 and TR 79 will be subject to closure, and traffic will be detoured locally SCI Resurfacing Between CR 12 (Bennett Schoolhouse Road) and CR 23 (Piketon Road). Traffic will be maintained in one lane with the use of flaggers. (12/20/18) $2,275, SCI-52 Various Locations Bridge Maintenance Bridge sealing at various structures located at SR 239, SR 73 and SR 852 over/underpasses. Traffic will be maintained in a minimum of one lane in each direction SCI Resurfacing From the Adams County line to just east of TR 323 (Tipton Lane). Traffic will be maintained in one lane with the use of flaggers. CARRYOVER PROJECTS (02/11/19) 08/30/18 $272,823 $869, SCI Bridge Immediately south of the Pike County line. Traffic will be maintained by flaggers $1,169,188 Replacement through the remainder of construction. (02/01/18) SCI Bridge Maintenance At the US 52 overpass, between CR 1 (Gallia Pike Road) and TR 515 (Kenyon Road). Traffic will be maintained in one lane with the use of flaggers. (01/25/18) $1,716,165 TOTAL: $7,523,146

19

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2018 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT

More information

information, please contact the District 9 Offices at or

information, please contact the District 9 Offices at or O hio s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

DISTRICT CONSTRUCTION PROGRAM

DISTRICT CONSTRUCTION PROGRAM ODOT DISTRICT 3 2016 CONSTRUCTION PROGRAM photo by Tom Puskar SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE

2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE 2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE 2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS HOLD HARD ROAD & SAWMILL ROAD INTERSECTION HARD ROAD WIDENING RIVERSIDE DRIVE REALIGNMENT I-270/US

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

News Release Eastern Oregon Region 5

News Release Eastern Oregon Region 5 News Release Eastern Oregon Region 5 Morrow, Umatilla, Wallowa, Union, Baker, Grant, Harney, and Malheur Counties Oregon Department of Transportation Date: May 22, 2015 NR number: 150522015 For more information:

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report Study Schedule C Municipal Class Environmental Assessment Prepared By: BT Engineering 100 Craig Henry Drive, Suite 201 Ottawa, ON K2G 5W3 (613) 228-4813 (855) 228-4813 Toll free Executive Summary Executive

More information

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018 ATTRIBUTABLE FUNDS COMMITTEE Summary of Project Updates and New Funding Requests September 5, 2018 Funding Management Process Review & Update Policies Adopt Funding Commitments Public Comment Public Comment

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

SC 41/Joe Rouse Intersection Improvements

SC 41/Joe Rouse Intersection Improvements SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost

More information

District Construction Projects

District Construction Projects District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage

More information

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017 TRANSPORTATION & MOBILITY VISIONING MEETING August 23 24, 2017 Project Team 1999 South Lakefront Framework Plan In 1999, the Chicago Park District authorized framework plans for three historic parks: Jackson,

More information

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011 Transportation in Washoe County Lee Gibson, Executive Director February 15, 2011 RTC OF WASHOE COUNTY Metropolitan Planning Organization Meet long term needs Deliver federal funding Program projects in

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey Serving North Carolina s High Country with Continuing, Cooperative,

More information

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid New Jersey Department of Transportation Complete Streets Summit 10-24-2017 Shukri Abuhuzeima NJDOT-Local Aid Grant Resources State Funded Programs Funding Levels Funding appropriated for FY 2017 State

More information

HIGHWAY CAPITAL IMPROVEMENT PLAN

HIGHWAY CAPITAL IMPROVEMENT PLAN 2018 2023 HIGHWAY CAPITAL IMPROVEMENT PLAN 0.5% Sales Tax CIP July 25, 2017 6-Year CIP Summary 2018-2023 CALENDAR YEAR 2018 Highway & Bridge Improvement Projects COUNTY PROJECT LANE IMPROVEMENT TOTAL FEDERAL

More information

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66

More information

HIGHWAY 11 CORRIDOR STUDY

HIGHWAY 11 CORRIDOR STUDY HIGHWAY 11 CORRIDOR STUDY Executive Summary August 2016 Roseau County?æA@?çA@ Warroad Lake of the Woods Roseau Roosevelt Badger?ÄA@ Greenbush Legend N Hwy 11 Study Area Figure 1: Corridor Study Limits

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Cincinnati Dayton Rd Widening

Cincinnati Dayton Rd Widening Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge

More information

D I S T R I C T CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR LLOYD MACADAM, DISTRICT DEPUTY DIRECTOR

D I S T R I C T CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR LLOYD MACADAM, DISTRICT DEPUTY DIRECTOR D I S T R I C T 1 1 2017 CONSTRUCTION PROGRAM SERVING BELMONT, CARROLL, COLUMBIANA, HARRISON, HOLMES, JEFFERSON & TUSCARAWAS COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR LLOYD MACADAM,

More information

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Florida Department of TRANSPORTATION 2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has currently

More information

Transportation and Air Quality Committee GEL Project Briefing and Update

Transportation and Air Quality Committee GEL Project Briefing and Update Transportation and Air Quality Committee GEL Project Briefing and Update Mr. Darryl D. Van Meter, P.E. State Innovative Delivery Engineer June 11, 2015 Georgia Express Lane Projects 2 Program Benefits

More information

CITY OF SOUTH DAYTONA

CITY OF SOUTH DAYTONA CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage

More information

VIII. Project Prioritization & Implementation

VIII. Project Prioritization & Implementation Transportation Plan 2030 July 2006 VIII. Project Prioritization & Implementation Public Transit Service Investigation into the development of a demand responsive service route system through a process

More information

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator Bicycle Lanes Planning, Design, Funding 2018 South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator Policy Changes: BOP Bicycle Policy Changes The OLD Way

More information

Clinton Street Bridge over the Maumee River. ODOT Project DEF April 1, 2015 Stakeholder s Meeting

Clinton Street Bridge over the Maumee River. ODOT Project DEF April 1, 2015 Stakeholder s Meeting Clinton Street Bridge over the Maumee River ODOT Project DEF-15-14.77 April 1, 2015 Stakeholder s Meeting Purpose of Stakeholder Meeting Review the project and why it s happening Share the results of the

More information

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Request for Authorization to Open Public Comment Period

Request for Authorization to Open Public Comment Period Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information

SFY Transportation Improvement Program Highway and Bikeway Element Amendments

SFY Transportation Improvement Program Highway and Bikeway Element Amendments PID Project Description SFY 2014-2017 Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data CUY FARNSLEIGH RD IMPROVEMENT Bike/Pedestrian/Streetscape C Shaker

More information

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M. WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Implementation Plan. 5.1 Improvement Program

Implementation Plan. 5.1 Improvement Program 5 Implementation Plan Section 4 presented detailed recommendations for transportation improvements and land use strategies in the Route 6 Hop River corridor. This section outlines how the transportation

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE February 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-039 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

ROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road. Closed due to bridge down. Road is open to local traffic only.

ROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road. Closed due to bridge down. Road is open to local traffic only. ROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road Closed due to bridge down. Road is open to local traffic only. ALTON CARLTON ROAD, from W. Main Street to the bridge Closed

More information

EXHIBIT U THE SCOPE DOCUMENT

EXHIBIT U THE SCOPE DOCUMENT EXHIBIT U THE SCOPE DOCUMENT 1. Introduction 1.1 Purpose of the Scope Document The Scope Document provides an overview of the Route 495 HOT Lanes in Virginia Project as description of the Concessionaire

More information

Appendix D: Planning Level Cost Calculator

Appendix D: Planning Level Cost Calculator Appendix D: Planning Level Cost Calculator Network Costs by Facility Type Facility Type Total Miles of Facility Total Number of Intersections Cost per feature or per mile Total Cost Bicycle Boulevard 52.14

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

STIP Scoping and Design Projects November Administrative Amendment

STIP Scoping and Design Projects November Administrative Amendment NW Dekalb US 36 1P3237 Scoping for pavement and shoulder improvements in the westbound lanes from east of Rte. 31 (north) to Rte. C. Project includes eastbound lanes shoulder improvements from Rte. 33

More information

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer Colerain Avenue Roadway Improvements Sponsored by Hamilton County Engineer Participants Lead Agency: Hamilton County Engineer Review and Approval: Ohio Department of Transportation Design Engineer: Edwards

More information

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements

More information

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017 Proposed FUL-SR 66 Relocation on to CR 24 Presentation to Archbold Village Council April 17, 2017 Robert J. Seaman, P.E., P.S. Village Engineer Andrew J. Langenderfer, P.E. Sr. Project Manager Agenda Stakeholders

More information

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000 Corridor Context The corridor runs from Norwood Young America to the connection with US 212 in Eden Prairie. The corridor serves the communities of Chanhassen, Eden Prairie, Norwood Young America, Victoria,

More information

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036 HAM-32F-0.00 PID 86461 PREFERRED ALTERNATIVE IMPLEMENTATION PLAN Prepared for Ohio Department of Transportation, District 8 505 South SR 741 Lebanon, Ohio 45036 Prepared by URS Corporation 564 White Pond

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT

MONTGOMERY COUNTY PLANNING DEPARTMENT MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No Date: 6-07-2018 MD355 Over Little Bennett Creek Bridge Replacement (SHA Project No. MO4275180),

More information

Detailed Descriptions and Maps of Woodside s Nature Trails

Detailed Descriptions and Maps of Woodside s Nature Trails Detailed Descriptions and Maps of Woodside s Nature Trails Access Mill Road Trail Park along Anderson Mill road. Signs on West Pleasant Colony and Anderson Mill road clearly point to the beginning of the

More information

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information