ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

Size: px
Start display at page:

Download "ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES."

Transcription

1 ODOT DISTRICT CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Tammy K. Campbell, P.E., District Deputy Director

2 2 $2.35 BILLION 28 90% 10% 2018 TOTAL MAJOR PROJECTS (each more than $10m) PRESERVING THE SYSTEM ENHANCING CAPACITY FROM 2011 TO 2018 ODOT 2018 Construction ODOT prepares for another near-record construction season 2018 CONSTRUCTION SEASON HIGHLIGHTS 959 PROJECTS 200 SAFETY PROJECTS 5,645 MILES OF PAVEMENT 1,040 BRIDGES $16.4 BILLION 7,918 PROJECTS KEEPING OHIO S ECONOMY MOVING Since 2011, $16.4 billion invested into nearly 8,000 projects COLUMBUS This year, the Ohio Department of Transportation is investing $2.35 billion into nearly 1,000 projects that will preserve existing roads and bridges, enhance capacity, and improve safety. Roads and bridges don t get better over time. That s why 90 cents of every dollar we re investing this year is to take care of what we have, said ODOT Director Jerry Wray. We re using better data and more frequent maintenance to address the small issues with our infrastructure before they become big issues. ODOT and contractors will repair or replace 5,645 miles of pavement, enough to pave a four-lane highway from Columbus to Albuquerque, New Mexico, and perform work on 1,040 bridges. While orange barrels can be an inconvenience, they are a sign of progress and improvement. Since 2011, ODOT has invested an unprecedented $16.4 billion into 7,918 projects across the state. ODOT is responsible for maintaining 43,211 lane miles of roadway and 14,095 bridges. Ohio has the 4th largest interstate system by lane miles. Ohio s transportation infrastructure supports the state s 6.5 million jobs. Our transportation network is Ohio s most valuable man-made asset, said Wray. It gives us the ability to move goods to market, get to work, take our children to school, visit an amusement park or explore the beautiful natural wonders of Ohio. District 8 Deputy Director Tammy Campbell said, These projects will greatly enhance mobility in southwest Ohio. We are rebuilding our existing system while making strategic investments to add capacity where it s essential. Despite a near-record level of road work, last year saw the second lowest number of work zone crashes in a decade in Ohio. There were 4,891 work zone crashes, resulting in 119 serious injuries and 19 deaths. The vast majority of these crashes were caused by drivers following too close. We need drivers to pay attention every moment they are behind the wheel, but it s even more vital in work zones. These zones often contain narrow lanes and changing traffic patterns. When driving through work zones, drivers need to leave more room between their vehicle and the vehicle in front of them, slow down, pay attention, and avoid all distractions, Wray said. ODOT crews were struck 152 times last year. Ohio law requires that drivers move over or slow down when they see our crews working along the roadway. Unfortunately, through the years 164 ODOT employees have lost their lives while on the job.

3 2018 Construction Season Highlights in District 8 Cover: Photo shows concrete pour for pedestrian tunnel that is being constructed as part of the I-75 reconstruction and widening work between Shepherd Lane and Glendale-Milford Road. Inside: Red: Bridge/culvert work; Green: Road resurfacing; Blue: Section improvement, safety and enhancement; Purple: Major construction. Project I-71/Western Row Interchange Description Construction of full interchange Cost: $47 million County Warren PID Start May 2017 Est. End June 2019 Project I-75 Mill Creek Expressway Description Two-phase Rreconstruction and widening of I-75 from Monmouth Street overpass to Clifton Avenue Cost: $79 million County Hamilton PID Start August 2018 Est. End May 2022 Project I-275 Description Pavement and bridge repair from Four Mile Road to Ohio River; project includes Combs-Heil Bridge County Hamilton PID Start June 2018 Est. End August 2020 Project I-75 Thru the Valley Description Reconstruction of I-75 between Shepherd Lane and Glendale-Milford Road Cost: $105 million County Hamilton PID Start May 2017 Est. End September 2020 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT. 3

4 Butler County Map No. Project No. PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date SR 73/177 Resurfacing July 2017 to Sept $5.3 million Sold SR 73 Urban Paving, Trenton May to Aug $258,900 Sold SR 747 Resurfacing Aug. to Nov $2.8 million June SR 129 Resurfacing Oct to Oct $8.7 million Aug SR 748 Erosion Protection March to Sept $566,538 Sold SR 744 Intersection Improvement July to Aug $75,000 April 2 4

5 Clermont County Map No. Project No PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date SR 32 Bridge Repair July to Sept $135,000 April SR 28/125/132 Resurfacing May 2018 to June 2019 $3.8 million Sold I-275/SR 32 Ramp Widening Aug to Aug $2.1 million Sold Loveland Ave. Signage, Striping April to Sept $58,292 Sold SR 32 Section Improvement Aug to Aug $3.4 million July 2 5

6 Map No. Clinton County Project No. PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date Clinton Routes Crack Seal Aug. to Nov $548,430 July SR 380/730 Resurfacing May 2018 to June 2019 $3.8 million Sold SR 350 Pavement Overlay Oct to March 2019 $2.2 million Sept SR 133 Culvert Jan. to Oct $647,846 Sold 6

7 Map No. Greene County Project No. PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date Central State Resurfacing Campus Roads May to July 2018 $864,434 Sold SR 72 Resurfacing March to June 2018 $2.5 million Sold US 35 Preventive Maintenance July to Oct $1.5 million June Creekside Trail Resurfacing Aug. to Oct $472,000 May I-71 Pavement repair Sept. to Nov $315,000 July Countywide Bridge Maintenance Aug to June 2018 $480,000 Sold US 42/343 Culvert Repair Jan. to Oct $647,846 Sold US 42 Culvert Repair Jan. to Oct $1.3 million Sold SR 4 Culvert Repair Jan. to Sept $1.6 million Sold US 68 Xenia Bikeway Improvement Aug to May 2018 $1.5 million Sold Yellow Springs Safe Routes to School Aug to June 2018 $385,000 Sold US 35 Turn Lane Addition March to Aug $130,050 Sold I-675 exit ramp Intersection Improvement May to Nov $1.3 million Sold Countywide Sign Upgrade July 2018 to July 2019 $1.4 million Sold Yellow Springs Curb Ramp Upgrade Sept. to Nov $122,000 June 18 7

8 8 Greene County

9 Hamilton County Map No Proj. No. PID No. Location Work Type Construction Dates Contract Est./Cost Award Date I-75 Major Reconstruction May 2017 to Sept $105 million Sold I-75 Major Widening Aug to May 2022 $79 million June Mt. Adams Wall Preventive Maintenance Jan to Aug $1.7 million Sold US 50 Bridge Repair May 2017 to July 2018 $5.4 million Sold SR 126 Bridge Maintenance July 2017 to July 2018 $1.4 million Sold SR 4/SR 561 Bridge Replacement July 2017 to Oct $7.5 million Sold US 50 Culvert construction May to Nov $738,713 Sold I-275 Bridge Repair June 2018 to Aug $31 million Sold SR 126 Bridge Painting Sept to Aug $2.6 million July SR 128/Harrison Road Culvert Aug. to Dec $181,000 July I-71 Pavement Rehab, Bridge Repair March 2017 to Aug $24 million Sold I-71 Pavement Rehab Aug to Aug $4.2 million Sold US 42 Major Rehabilitation Oct to Oct $1 million Sold I-275/SR 126 Crack Seal May to Aug $539,496 Sold US 50 Resurfacing April to Aug $3 million Sold I-71 Resurfacing July 2018 to Aug $36 million Sold Winton Woods Resurfacing April to June 2018 $368,042 Sold US 127 Pavement Aug. to Nov $3.2 million May I-74/I-275 Crack Seal Sept. to Dec $990,000 Aug SR 264 Intersection Improvement April 2017 to July 2018 $3.8 million Sold SR 125 Sidewalks May 2017 to May 2018 $2.3 million Sold US 22/US 27/SR 125 Signal Upgrade Sept to Sept $1 million Sold I-71/75 Banks Variable Message Signs March to Dec $475,664 Sold Reading Signal Updates April to Aug $330,315 Sold SR 264 Sidewalks May to Dec $295,867 Sold Harrison Avenue Bikepath May to Nov $646,042 Sold SR 126 Intersection Improvement May to Sept $2.2 million Sold Norwood Safe Routes to School Sept. to Nov $656,000 July I-71 Signage Sept to June 2019 $302,000 Aug. 6

10 10 Hamilton County

11 Preble County Map No. Proj. No. PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date US 127 Culvert Jan. to Oct $647,846 Sold SR 122 Bridge Repair April to July 2018 $501,454 Sold SR 725 Bridge Replacement May to Oct $1.1 million Sold SR 503 Resurfacing Aug to June 2018 $3.1 million Sold Hueston Woods Resurfacing Oct. to Dec $1.2 million May SR 726 Pavement Repair/ Sealing Oct. to Dec $348,000 Sept

12 Warren County Map No. Project No. PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date I-71/Western Row Interchange May 2017 to June 2019 $47 million Sold I-71 Bridge Repair March 2017 to Oct $4.9 million Sold US 42 Culvert Repair March to Oct $655,117 Sold SR 123 Bridge Repair/Erosion Protection Aug. to Nov $119,810 Aug Warren Routes Crack Seal Aug. to Nov $548,000 July I-71 Resurfacing Sept to Aug $12 million July Franklin Safe Routes to School Aug. to Oct $82,000 July 2 12

13 Districtwide Project No. PID No. Work Type Construction Dates Contract Estimate/Cost Award Date Bridge Maintenance March 2017 to May 2019 $910,400 Sold Bridge Maintenance June 2017 to Oct $2.2 million Sold Bridge Maintenance Sept to May 2019 $2.1 million Sept Signals June 2017 to June 2019 $2.2 million Sold Pavement Markings June 2017 to June 2018 $3.3 million Sold Pavement Markings April 2018 to April 2019 $3 million April Signs May 2018 to March 2019 $504,000 April Tree Removal/Pruning Sept to Oct $782,000 Sept Preventive Maintenance Aug to June 2018 $2.6 million Sold Friction Surface Treatments Sept to June 2019 $1.9 million July 23 13

14 Local Projects Agency PID Work Type Construction Dates Contract Estimate/Cost Award Date Butler County Engineer SR 747 widening June 2017 to Nov $6.7 million Sold Butler County Engineer Yankee Road widening June 2017 to Dec $3.3 million Sold Butler County Engineer Cincinnati-Dayton Road widening June 2018 to Nov $7.3 million May 15 Butler County Engineer Princeton Road widening July 2018 to July 2019 $2.2 million May 30 Butler County Engineer Beckett/Smith roundabout June 2018 to Oct $968,090 Sold Butler County Engineer Myers Road Bridge Replacement July 2018 to July 2019 $733,812 Sold Butler County Engineer Lanes Mill Bridge replacement June 2018 to June 2019 $2.4 million May 15 Butler County Engineer I-75/Tylersville exit ramp June 2018 to June 2019 $1.3 million May 1 City of Fairfield SR 4 Urban Paving May to Oct $3.7 million April 2 City of Fairfield Central Traffic System Upgrade June 2018 to June 2019 $2.8 million May 1 City of Hamilton SR 129/177/Eaton Avenue realignment June 2018 to Nov $2.4 million May 1 City of Middletown Yankee Road Phase 3 widening May 2017 to May 2018 $5.7 million Sold Clermont County Engineer SR 32/Bells Lane, SR 32/Old 74 intersection improvements Clinton County Engineer SR 350/CR 7 intersection improvement July 2018 to Nov $4.1 million May 16 July 2017 to July 2018 $555,904 Sold Clinton County Engineer Spring Hill Road Bridge replacement Oct to June 2019 $1 million May 23 Clinton County Engineer Guardrail replacement Oct. to Nov $208,000 Sept. 14 Clinton County Engineer Pavement Markings Oct. to Nov $156,000 Sept. 14 City of Beavercreek Grange Hall/National Road widening Nov to Nov $1.1 million Sept. 3 City of Beavercreek Indian Ripple Road widening April to Oct $602,615 Sold City of Beavercreek Indian Ripple Road resurfacing Sept. to Nov $1 million Sept. 1 City of Fairborn Dayton Drive widening Aug to Oct $1.3 million Sold City of Fairborn Central Avenue Resurfacing June to Aug $658,432 Sold 14

15 Local Projects Agency PID Work Type Construction Dates Contract Estimate/Cost Hamilton County Engineer Pippin Road Phase 1 Bridge and Pavement June 2017 to July 2018 $6 million Sold Hamilton County Engineer Pfeiffer Road Bridge rehab March to Nov $555,669 Sold Hamilton County Engineer Cheviot Road pavement rehab Aug to Aug $2.8 million May 29 Hamilton County Engineer Winton Road rehab July 2018 to Nov $3.5 million May 15 Hamilton County Engineer Banks Dynamic Message Signs Aug to Oct $5 million June 8 City of Montgomery US 22 Sidewalks Oct to June 2018 $597,007 Sold City of Cincinnati Marburg Bridge replacement April 2017 to Nov $2 million Sold City of Cincinnati High Friction Surface Treatments April to July 2018 $290,859 Sold City of Cincinnati Signals Jan to April 2019 $8 million Sold City of Cincinnati Signals Jan to Jan $3.5 million Sold Warren County Engineer Old SR 122/Township Line roundabout April 2018 to April 2019 $1.4 million Sold Warren County Engineer Strout Road bridge replacement March to Nov $807,520 Sold Warren County TID SR 48/Mason-Morrow-Millgrove Intersection Feb to Sept $2.7 million Sold Warren County TID SR 741/73 intersection improvement June 2017 to June 2018 $2.9 million Sold City of Mason Mason Montgomery/Bethany Bikepath June 2017 to June 2018 $512,217 Sold City of Lebanon SR 48 Urban Paving July to Oct $2 million Sold Award Date 15

16

2017 (FY 21,22,23) Ohio CMAQ Project Selection

2017 (FY 21,22,23) Ohio CMAQ Project Selection 2017 (FY 21,22,23) Ohio CMAQ Project Selection Executive Committee September 14, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit Authorities

More information

2017 (FY 21,22,23) Ohio CMAQ Prioritization

2017 (FY 21,22,23) Ohio CMAQ Prioritization 2017 (FY 21,22,23) Ohio CMAQ Prioritization Intermodal Coordinating Committee September 12, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT

More information

DISTRICT CONSTRUCTION PROGRAM

DISTRICT CONSTRUCTION PROGRAM ODOT DISTRICT 3 2016 CONSTRUCTION PROGRAM photo by Tom Puskar SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

I-90 Corridor Performance Corridor Result

I-90 Corridor Performance Corridor Result I-90 Corridor Performance Corridor Result Statewide Result 87.1% 86.9% 0% 3.2% Ride Quality Good--% of miles 65.4% 70.2% Ride Quality Poor--% of miles 0% 3.7% 73 MPH N/A Measure Corridor Context The corridor

More information

Gerald P. Oliveto, P.E. George Franz NJDOT

Gerald P. Oliveto, P.E. George Franz NJDOT Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing

More information

Theodore Roosevelt Expressway (TRE) Annual Meeting. Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov.

Theodore Roosevelt Expressway (TRE) Annual Meeting. Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov. Theodore Roosevelt Expressway (TRE) Annual Meeting Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov. 14, 2012 Williston Minot Dickinson Bismarck Increase in oil production

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2018 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT

More information

OKI Awards More Than $41 Million to Transportation Projects Across the Region

OKI Awards More Than $41 Million to Transportation Projects Across the Region FOR IMMEDIATE RELEASE October 11, 2018 Contact: Ashley Patrick apatrick@oki.org (330) 573-4932 m. OKI Awards More Than $41 Million to Transportation Projects Across the Region Cincinnati, Ohio Ohio-Kentucky-Indiana

More information

News Release Eastern Oregon Region 5

News Release Eastern Oregon Region 5 News Release Eastern Oregon Region 5 Morrow, Umatilla, Wallowa, Union, Baker, Grant, Harney, and Malheur Counties Oregon Department of Transportation Date: May 22, 2015 NR number: 150522015 For more information:

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

information, please contact the District 9 Offices at or

information, please contact the District 9 Offices at or O hio s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible

More information

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development State Transportation Commission 2015 Twelve Year Program Development Regional results of the survey and public feedback from August thru November 2013 Shenango Valley MPO Version 01-2014 Mobility Concerns

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330

More information

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000 Corridor Context The corridor runs from Norwood Young America to the connection with US 212 in Eden Prairie. The corridor serves the communities of Chanhassen, Eden Prairie, Norwood Young America, Victoria,

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND

ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND TMACOG TRANSPORTATION SUMMIT MARCH 16, 2018 Mike Gramza, District Two, Capital Programs Administrator John R. Kasich, Governor Jerry Wray, ODOT

More information

District Construction Projects

District Construction Projects District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

Use of Funding for Local Improvements City Example. Andrew Stone, P.E. City Engineer & Director of Public Works

Use of Funding for Local Improvements City Example. Andrew Stone, P.E. City Engineer & Director of Public Works Use of Funding for Local Improvements City Example Andrew Stone, P.E. City Engineer & Director of Public Works City of Athens Overview Athens Infrastructure Roads over 194 lane miles (not counting alleys)

More information

Freeway ramp intersection study

Freeway ramp intersection study Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate

More information

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid New Jersey Department of Transportation Complete Streets Summit 10-24-2017 Shukri Abuhuzeima NJDOT-Local Aid Grant Resources State Funded Programs Funding Levels Funding appropriated for FY 2017 State

More information

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000

More information

New Mexico Transportation Funding Challenges

New Mexico Transportation Funding Challenges New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze

When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze Future Needs: Roadways 26 Anticipated Development Trends When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Manual Of Standard Traffic Signs And Pavement Markings Alberta

Manual Of Standard Traffic Signs And Pavement Markings Alberta Manual Of Standard Traffic Signs And Pavement Markings Alberta Traffic Accommodation and Control Alberta Highway Pavement Marking Guide and made available by Alberta Transportation, please see the following

More information

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036 HAM-32F-0.00 PID 86461 PREFERRED ALTERNATIVE IMPLEMENTATION PLAN Prepared for Ohio Department of Transportation, District 8 505 South SR 741 Lebanon, Ohio 45036 Prepared by URS Corporation 564 White Pond

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare

More information

Appendix C. Data on Transportation Improvements

Appendix C. Data on Transportation Improvements Appendix C Data on Transportation Improvements Table 5. Transportation Improvements for Expanding Highway Capacity in Ohio Counties in the OKI Region BUTLER COUNTY Scheduled Transportation Improvements

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

National Network Safety Analysis (6/4/2015 Revision) FRA and FRA PID 86661

National Network Safety Analysis (6/4/2015 Revision) FRA and FRA PID 86661 Existing Roadway National Network Safety Analysis (6/4/2015 Revision) FRA-23-10.83 and FRA-23-12.24 PID 86661 This 8.82 miles project is on United States Route 23 (US-23) and United States Route 23 Directional

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

Smoothing Out the Bumpy Road Ahead

Smoothing Out the Bumpy Road Ahead Julie Hannah, P.E. Technical Services and Asset Management May 11, 2017 Smoothing Out the Bumpy Road Ahead Nationwide D = Poor, At Risk Conditions & Capacity Pavement Condition & Congestion Nationwide

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Florida Department of TRANSPORTATION 2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has currently

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

2018 ROAD MAINTENANCE PROGRAM

2018 ROAD MAINTENANCE PROGRAM 2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

Engineering - Bicycle and Pedestrian

Engineering - Bicycle and Pedestrian Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman

More information

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program Why worry about the roadside? 18,586 deaths per year in the USA Annual U.S. Fatalities

More information

R O A D W A Y S. Chapter

R O A D W A Y S. Chapter INTRODUCTION The region s roadway system carries the vast majority of person trips and is an important part of the freight movement system. Roads also provide the right of way for buses, making the roadway

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

IMPLEMENTATION WORKBOOK

IMPLEMENTATION WORKBOOK Lawrence Township Bicycle and Pedestrian Planning Assistance Study IMPLEMENTATION WORKBOOK Final Action Plan - Part 2 April 2009 Prepared For: The Township of Lawrence and the New Jersey Department of

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015 Riverside Drive Complete Streets Project 3 rd Community Meeting March 26, 2015 Providing Feedback Sign-In with contact information for future updates Complete questionnaire provided tonight Complete comment

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North

More information

Appendix A. Summary of Progress Made Since 2004 Plan. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

Appendix A. Summary of Progress Made Since 2004 Plan. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan Appendix A Summary of Progress Made Since 2004 Plan Appendix A Summary of Progress Made Since 2004 Plan INTRODUCTION This appendix provides a list of transportation related projects that have been completed

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

The Year Ahead: Virginia Department of Transportation Northern Virginia District

The Year Ahead: Virginia Department of Transportation Northern Virginia District The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents Keep Placer Moving Placer is Growing Keep Placer Moving POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents 30% of the total housing market growth in the Sacramento region.

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information

Parewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18

Parewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18 RDC ROADING REPORT: FEBRUARY 2018 1. MAINTENANCE, OPERATIONS AND RENEWALS This year s resealing programme of 61 km has been completed. Pre-reseal repairs for the 2018/19 year have been programmed. Installing

More information

Pavement Management Program

Pavement Management Program Pavement Management Program Public Works Department January 5, 2016 Chad Butzow, P.E. Deputy Director Field Operation Services Public Works Department Brian Martineau Pavement Manager Public Works Department

More information

Kentucky Highway District 7

Kentucky Highway District 7 Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

I-25 South Gap Project Monument to Castle Rock

I-25 South Gap Project Monument to Castle Rock I-25 South Gap Project Monument to Castle Rock Project Overview Castle Rock Town Council April 3, 2018 by Chuck Attardo I-25 South: Monument to C-470 An Important Corridor to Colorado Links the state s

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

Project Name Project Description Authorized Amount

Project Name Project Description Authorized Amount 1, 13 Branchville-Lewisburg Road (CR 628) Lewisburg-Creamery Road (CR 565) 2,3 Asbury-Bloomsbury Road/Asbury- Anderson Road (CR 632) Skid-resistant surface treatment, enhanced signage, pavement markings

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Annual Listing of Obligated MPO Projects

Annual Listing of Obligated MPO Projects Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,

More information

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

El Dorado County / Tahoe Roadwork Schedule

El Dorado County / Tahoe Roadwork Schedule Today s Date: Friday, August 3, 2012, #12-220 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566

More information