1 Appendix A Summary of Progress Made Since 2004 Plan

2 Appendix A Summary of Progress Made Since 2004 Plan INTRODUCTION This appendix provides a list of transportation related projects that have been completed by OKI since the last plan update in Some of these projects may have been referenced previously in this plan. It is important to identify these projects to illustrate the variety and number of transportation plans and projects that affect residents, businesses and workers in the region. This list is separated into eight categories by type of project and include Land Use Commission recommendations, transit, bicycle, pedestrian, Transportation Enhancements (TE) funded projects, corridor studies, special studies, county transportation plans, and Transportation Improvement Program (TIP) projects, Land Use Commission In January 2005, the OKI Land Use Commission produced an interim report containing trends and conditions for strategic regional issues, goals, objectives and policies. With that action, the Land Use Commission completed a specific nine task scope of work. In April 2005, the Board of Trustees adopted the groundbreaking Strategic Regional Policy Plan (SRPP) for growth and development. Implementation of the policy plan commenced immediately pursuant to an action plan and timeline. The first implementation action was to establish criteria in the TIP, worth up to five points, for scoring proposed transportation projects on how they furthered a local comprehensive plan, thoroughfare plan, or small area plan. In early 2006, guidance on writing an effective local government comprehensive plan was produced, along with several model ordinances for use by local governments at their discretion. Over time, OKI staff met with a number of local officials to promote better comprehensive plans. OKI entered into three contracts to assist communities in writing their comprehensive plans, all of which are underway. OKI s greenspace program was refocused to help implement the SRPP and the new Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) environmental regulations. OKI staff also started a landmark project to produce a Web site based fiscal impact analysis model for use by local governments across the region. Implementation of the SRPP is being accomplished by OKI and by various jurisdictions and organizations on a voluntary basis. Transit Clermont Transportation Connection (CTC) In 2007, CTC began operating two fixed route services including one from New Richmond to downtown Cincinnati and one from Felicity to Eastgate via Amelia. Also in 2007, CTC created a strategic development plan with goals to improve transportation options to county residents, maximize existing resources through more efficient operations, reduce peak hour demand for roads and highways, and increase transportation options for zero car households and persons with disabilities. Southwest Ohio Regional Transit Authority (SORTA) In 2007, SORTA s Metro buses began using the I-71 left shoulder lane for an express bus route between Kenwood and Kings Island. This new operational improvement helps A-

3 buses bypass congestion as it occurs on the interstate. The Government Square transit hub in downtown Cincinnati began renovation construction in 2005 and was completed in Transit Authority of Northern Kentucky (TANK) Beginning in late 2006, TANK added 10 new Bus Rapid Transit style buses to the fleet. These buses offer many comforts usually found in over-the-road buses such as high backed, wide cushioned reclining seats and individual air vents and lamps. In January 2008, TANK placed its first hybrid electric buses into service. The vehicles are powered by a battery-powered electric motor that provides most of the vehicles power at slower speeds. A smaller clean diesel engine takes over only when the bus reaches higher speeds. BICYCLE AND PEDESTRIAN PROJECTS During 2004 to 2005, OKI carried out a pilot bicycle parking program under the Congestion Mitigation and Air Quality CMAQ program placing 35 bike racks and two bike lockers at 15 locations. Bike racks have been installed on all 110 TANK buses. Significant progress on the regional trails since the last plan includes the following; Extension of the Little Miami Scenic Trail south from Milford, through Terrace Park, to the Little Miami Golf Center on Newtown Road. Construction of the Lebanon Connector Trail from downtown Lebanon to the Little Miami Scenic Trail near Kings Mill. A multi-jurisdictional feasibility study for the Miami 2 Miami Connection was managed by OKI and identified specific routes and facilities. Construction and planning for segments of the connection are underway in Butler and Warren counties. A multi-jurisdictional feasibility study was managed for the Williamsburg Batavia Hike/Bike Trail in Clermont County. Funding has also been secured for a portion of the trail. There are active projects in Cincinnati, Anderson Township and New Richmond for the Ohio River Trail connecting Cincinnati to New Richmond along the Ohio River. Plans for Cincinnati s Central Riverfront Park include the trail. A portion of the West Fork Mill Creek Trail was built in Woodlawn and this was subsequently extended north to Glenwood Gardens County Park. Extension of the Great Miami Trail from Montgomery County south through Franklin in Warren County and additional segments built in Middletown and Fairfield in Butler County. Construction of the Dearborn Trail through Greendale, Lawrenceburg and Aurora in Dearborn County. In 2005, OKI updated the bike route guide maps for the four Ohio counties. Seventy-seven issues of the OKI Bicycle E-Info Newsletter were electronically distributed. The distribution list has grown to include nearly 250 individuals. A-2

4 Over 15,000 copies of Wanna Bike? - a 2004 promotional brochure for bicycling in the region - have been distributed through bike shops, events and requests. The brochure contains information about shared use paths, mountain bike trails and road riding in the region. OKI organized and conducted eight Walkable Communities workshops (April 2004), a Safe Routes to Schools program workshop (2006), a presentation on the Portland, Oregon bicycle program (2007), and annual presentations at the TE workshops. Reimbursement to OKI staff for the use of personal bicycles to conduct OKI business was implemented in the 2005 revision of the OKI Employee Handbook. The rate for bicycle miles is 10 /mile. Definition of priority cycling resources in the region including more detailed inventories of on street facilities and regional trail facilities. As part of the updated 2008 Regional Bicycle Plan, a primary shared road network was developed. OKI participates in annual bike-to-work promotions during National Bike Month programs in May. The OKI Bike Route Guides are used by cyclists to assist in finding commuting routes. Additionally, approximately 180 requests for bicycle information are filled annually. Transportation Enhancements Program Summary The Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), the Transportation Equity Act for the 21 st Century (TEA-21), and SAFETEA-LU all included a requirement that 10 percent of federal Surface Transportation Program funding be dedicated to a TE program. These types of projects add community or environmental value to planned or completed transportation projects. The three general categories of enhancement projects include bicycle/pedestrian, historic/archaeological and scenic/environmental. Between 2004 and early 2008, an additional nine projects were approved to receive federal funding totaling $4.755 million. Two of these, the Purple People Bridge on the Ohio River in Cincinnati and a streetscape project on Five-Mile Road in Anderson Township, have already been completed. Three more, Williamsburg streetscape, Mount Adams Steps, and Sutton Five Mile Trail, are scheduled for construction in Two other projects are due to go to construction in The remaining two TE projects are programmed further in the future. Taken collectively, between the years 2000 and early 2008, 31 separate projects in the four Ohio counties of the OKI region received a total of $13.5 million in OKI allocated federal TE funding. The local sponsors contributed a total of $7 million in matching local funds for a total investment of nearly $20.5 million. As the TE program has grown through the last decade, its popularity has increased substantially and the demand for funding continues to grow. As of early 2008, OKI staff was monitoring and assisting local sponsors on approximately 12 projects which are in the active stage of development. These projects are expected to apply for an estimated $6 million to $8 million in OKI allocated TE funding in the near future, whereas OKI s A-3

5 annual allocation from ODOT is about $2 million. Beyond these active projects, staff has also coordinated with a similar number of applicants, who are in the earlier stages of project development, and may be applying for funding in future years. A summary of the current status of all OKI funded projects from 2000 through early 2008 is presented in Figure A-1. Fiscal Year (FY) FY01 FY02 Project Lebanon Railroad Reconstruction Building Rehab. - Waynesville s Old Lockup Figure A-1 Transportation Enhancements Project Status (Through March 2008) Federal Share $236,000 $56,708 Local Share Total Status $59,000 $295,000 $87,829 $144,537 FY03 Springdale Streetscaping $294,026 $636,591 $930,617 FY04 Little Miami River Bike/Hike Bridges $745,000 $1,453,836 $2,198,836 Cincinnati Bicycle Grates $266,650 $66,662 $333,312 West Sharon Road Bike Path $103,000 $46,315 $149,315 Murray Road Hike-Bike Trail $339,986 $0 $339,986 Oxford Bikeway & Raised Crosswalks Market Street Hub Improvement SR 129 High Street Bridge Replacement Delhi Springhouse Renovation $39,576 $205,600 $1,200,000 $180,225 $8,604 $48,180 $51,400 $257,000 $1,200,000 $81,460 $261,685 SR 747 $126,788 $31,697 $158,485 L&N (Purple People) Bridge $238,749 $0 $238,749 Fairfield Bike Path $141,600 $123,000 $264,600 FY05 SR 4 Streetscape (Fairfield) $760,000 $190,000 $950,000 SR 73 Streetscape (Springboro) $472,000 $118,000 $590,000 FY06 Lebanon Streetscape $600,000 $150,000 $750,000 Five-Mile Road Shared-Use Trail $480,000 $480,000 $960,000 Oxford Road Bridge $126,000 $31,500 $157,500 Springfield Pike Streetscape - Phase II $661,862 $165,465 $827,327 A-4

6 Fiscal Year (FY) FY07 FY08 FY09 FY11 FY13 Central Parkway Streetscape $661,050 $165,262 $826,312 Gilbert Avenue Streetscape $674,960 $168,740 $843,700 Muddy Creek Bikeway (Mason) Five Mile Streetscape (Anderson Township) Main Street Streetscape (Williamsburg) Mt. Adams Steps (Cincinnati) Sutton - Five Mile Trail (Anderson Township) Buckwheat Sidewalks (Miami Township) Lebanon Streetscape - Final Phase Asbury Sidewalks (Anderson Township) Muddy Creek Trail - Phase II (Mason) $347,780 $592,000 $704,000 $647,000 $553,000 $217,596 $600,000 $536,000 $86,945 $434,725 $148,000 $740,000 $276,000 $980,000 Construction in 2008 $713,000 $1,360,000 Construction in 2008 $188,300 $741,300 Construction in 2008 $54,000 $271,596 Construction in 2009 $1,100,000 $1,700,000 Construction in 2009 $134,000 $670,000 Construction in 2011 $665,600 $187,500 $853,100 Construction in to 2008 Totals $13,472,756 $7,003,106 $20,475,862 SOURCE: OKI. Project Federal Share Local Share Total Status Corridor Studies Figure A-2 Corridor, Special and County Transportation Plans and Studies of Completion Dixie Highway Corridor Study June 2005 Southwest Warren County Transportation Study August 2005 The Dixie Fix: Envisioning the Future of Dixie Highway June 2006 Southeastern Indiana Gateway: US 50 Transportation and Land Use Plan September 2006 Uptown Transportation Study January 2007 Western Hamilton County Transportation Study February 2007 I-471 Corridor Concluding in summer 2008 Special Studies Its Architecture And Strategic Plan March 2008 Traffic Analysis For Alexandria Pike August 2004 Countrywide Transportation Plans Boone County Transportation Plan 2005 Dearborn County Transportation Plan June 2004 A-5

7 TIP Projects OKI solicited applications for Surface Transportation Program (STP) and Congestion Mitigation and Air Quality (CMAQ) applications from Ohio entities in 2004, 2006 and There was also a special 2007 solicitation for STP projects in Ohio. In 2006, OKI solicited projects from Northern Kentucky for SNK (STP funds allocated to Northern Kentucky). This is the first time that SNK funds had been sub-allocated to OKI. Due to the lower funding levels of STP and CMAQ federal funds available to Dearborn County, OKI has been working with the County Engineer to develop projects using funds specified for Dearborn County. Presently, no projects are being funded with STP or CMAQ funds sub-allocated to OKI for Dearborn County. ODOT has sub-allocated approximately $22 million in federal STP funds and $12 million in CMAQ funds annually to OKI for projects located in the Ohio portion of the region. KYTC sub-allocates approximately $ 3.7 million in federal SNK funds annually to OKI for projects located in the Kentucky portion of the region. In addition, OKI receives approximately $77,000 in federal STP funds and $97,000 in federal CMAQ funds for projects in the Indiana portion of the region. A summary of projects that were either implemented (contract/let) or cancelled since the 2004 plan are presented in Figure A-3. This figure includes all federally funded projects, not just those using OKI sub-allocated federal funds. PID Ohio Figure A-3 Federally Funded Projects Implemented or d Since July 1, /19/2004 District 8 District-wide /30/2004 District 8 District-wide /6/2004 District /6/2004 District /6/2004 District 8 District-wide state routes District wide state routes Various state and interstate routes district-wide /6/2004 District 8 District-wide /14/2005 District 8 District-wide Contract to replace roadside delineators in FY 05 Ground mounted sign replacement contract for FY 04 Apply polyester painted pavement markings in FY 07 Apply polyester painted pavement markings in FY 08 Apply fast dry alkyd paint for auxiliary markings in FY 06 Apply fast dry alkyd paint for auxiliary markings in FY 07 Pavement marking contract for FY 05 Contact Let district district district district A-6

8 /28/2005 District 8 District-wide /30/2005 District 8 District-wide /30/2005 OKI /30/2005 OKI /30/2005 OKI /7/2005 District 8 District-wide /31/2005 District 8 District-wide /22/2006 District 8 Various state and interstate routes district-wide /12/2006 District 8 District-wide /30/2006 District 8 District-wide /30/2006 OKI /23/2006 District 8 District-wide /31/2006 District /31/2006 Study OKI District-wide state routes /10/2007 District 8 District-wide /28/2007 OKI Bridge deck sealing for FY 05 General project inspection for FY 05 Regional Transportation Planning FY 06 Regional Ozone Program FY 06 Rideshare Program FY 06 Bridge deck sealing for FY 06 Guardrail repair and upgrading contract for FY 06 and FY 07 Apply fast dry water base pavement markings in FY 06 Replacement of prismatic retro reflectors General project inspection for FY 06 Regional Transportation Planning FY 07 Maintenance contract for highway lighting for FY 06 and FY 07 Apply polyester painted pavement markings in FY 06 Comprehensive Transportation Impact Study District-wide microsurfacing on general system. Routes to be selected Western Hamilton County Corridor Study Cancelled A-7

9 /26/2007 District 8 District-wide /7/2007 District 8 District-wide /13/2008 District 8 District-wide Butler /15/2004 CR 18 Rural areas /15/2004 Various /20/2004 SR 748 Various routes in Butler County 1.87 Miles North of SR /6/2004 SR 4 District-wide /3/2005 US /30/2005 SR /15/2005 Breiel Blvd /25/2005 SR 73 Intersection of US 42 and Butler/ Warren Roads Indiana State Line to SR 128 Breiel Boulevard from SR 122 to Central Avenue.36 Miles east of SR /1/2005 District 8 District-wide /21/2005 SR Miles North of SR 129 (Over Little Indian Creek) /21/2005 District 8 District-wide /4/2005 SR 4 In the vicinity of Mulhauser Road Bridge deck sealing project for FY 08 Guardrail repair and upgrading contract for FY 08 General system crack sealing in FY 08 Guardrail Rebuilding Pavement Markings Bridge Replacement Install replacement prismatic retro reflectors Install left turn lanes and realign intersection Resurfacing Construct three bus shelters, upgrade existing handicap ramps, resurfacing Breiel Boulevard Bridge Replacement Install by contract a maximum of 18 traffic signals-fy 05 and FY 06 Bridge Replacement (92 foot 3 span bridge) Bridge maintenance contract for FY 06 Construct a streetscape along SR 4 in the City of Fairfield district A-8

10 /4/2005 Forest Park Preserve /24/2005 SR 122 Intersection of New London Road and Timberman Road Preble County Line to 1.47 Miles East of SR /19/2005 SR 177 At Nichols Road /14/2005 SR /31/2005 Study OKI /23/ /1/2006 CR 19 (Cincinnati- Dayton Road) SR 4 Bypass /1/2006 SR /17/2006 CR 18 (Princeton Road) /21/2006 US /18/2006 Butler County /26/2006 US miles north of Oxford south corporation line and 0.97 miles north of SR 73 Curb, gutter and storm sewer from SR 129 to Princeton Road, paved shoulder from Princeton to Millikin Hamilton SCL to NCL Hamilton southeast corporate line to northeast corporate line Intersection of CR 18 (Princeton Road) and TR 131 (Lesourdsville West Chester Road) Hamilton NCL to 0.34 miles north of New Miami NCL Various routes in Butler County Various priority system routes-i-71, I-75, SR 126 and US 27 Repair base and pave existing gravel road to Forest Run Wildlife Preserve Resurfacing, milling, striping and pavement markings Culvert Replacement Replace bridge BUT and replace floor and paint bridge BUT (toll revenue credits) Butler County Intermodal Freight Study Widen existing road from two lanes to three lanes (PIDs18961 and combined into PID18961) Pavement planing, asphalt resurfacing, replace raised pavement markers, painting & striping Pavement planing, asphalt resurfacing, replace raised pavement markers, painting & striping Install a traffic signal Planing & resurfacing mainline and shoulders Pavement Markings Crack sealing A-9

11 /20/2006 SR /1/2006 SR /13/ /31/2006 SR 4/SR 4B/SR 63/ SR 747 IR 75/SR /31/2006 SR /9/2007 SR /13/2007 CR 19 (Cincinnati- Dayton Road) /1/2007 SR /7/2007 US 27 Bridge carries SR 73 over Mutton Run from 0.88 to 0.89 miles east of SR 503 From 0.14 miles west to 0.26 miles east of SR 503 Middletown NCL to Montgomery county line; Hamilton NCL to SR 4; 0.49 miles west of Monroe to WCL to Warren Intersection of SR 63 & IR 75 (Environmental cleared under PID 10752) Between Hamilton and Middletown Between Tylersville Road and SR 129 in West Chester and Liberty Townships Hamilton/Butler county line to 1.93 miles south Portions of SR 122 and US 27 in Butler County and SR 732 in Preble County 1.98 miles south of Oxford NWCL to.88 miles south of Oxford NWCL /7/2007 SR 63 City of Monroe /15/2007 District 8 District-wide Replace concrete slab of bridge , SFN: Reconstruct vertical curves and widen the roadway to meet current design standards Resurfacing Modify intersection and completion of access control on SR 63 in Monroe and two bridge replacements Crack sealing Widen SR 747 from two lanes to four lanes Cincinnati-Dayton Road Safety Upgrade Plane and pave Widen to three lanes; adding center turn lane; curb and gutter; sidewalks; lighting; signal improvement Plan and pave SR 63 Maintenance and preventative maintenance contract for FY 08 Cancelled Butler Portion d A-10

12 /26/2007 SR /5/2008 US 127 Clermont /28/2004 SR 28 From 5.11 miles west of SR 748 to 5.04 miles west of SR 748 From 1.48 to 1.38 miles south of county line 1.56 miles east of IR 275 to 1.98 miles west of SR /30/2004 US 52 Chilo Lock Park /11/2004 SR /6/2004 SR /24/2004 US miles east of IR 275 to 1.98 miles west of SR miles east of Milford corporation line, upgrade signal at Wolfpen-Pleasant Hill Road US 50 to Wolfpen- Pleasant Hill Road /2/2004 SR 32 At Herold Road /2/2004 SR /2/2004 SR /9/2004 SR 131 Bridge No. CLE , SFN: (spans Poplar Creek) White Oak Road/ Lewis Road/Bristold Lakes Drive Intersection.38 Miles East of SR 727 Replace deteriorated 102 by 66 slabtop culvert. Minor roadway alignment modifications Rehabilitate bridges BUT and PRE by replacing concrete slab superstructures Demolition of two commercial and one residential structure for utilities relocation for PID 7948 Renovate existing operations building to visitors center Tree removal and utility relocation prior to widening project PID 7948 Two-way left turn lanes Relocate Wolfpen- Pleasant Hill Road to permit installation of left turn lane on US 50 New Interchange Study Replace bridge Intersection Improvement/ Realignment Bridge Repair Study Complete District Applicant A-11

13 /31/2004 SR 32 At Bauer Road /19/2005 SR /3/2005 US /3/2005 IR /3/2005 US /17/2005 SR /28/ /22/2005 SR 743/SR 756 Various Bridges /1/2005 SR /7/2005 SR Km South of US 50 SR 28 to.26 miles west of SR miles south of SR 125 to Clermont/Hamilton County line from Clermont /Hamilton County line to 0.16 miles south of 5- Mile Road Bridge carries US 52 over Bear Creek.50 miles south of SR 125 to SR 125 US 52 to SR 756 and SR 232 to SR 743 Bridges are on/over priority system routes in Clermont and Hamilton counties.25 Miles West of SR 133 to Brown County Line From US 50 to SR /21/2005 SR 133 US 52 to SR /5/2005 US /5/2005 SR /19/2005 SR Miles East of New Richmond East Corporate Line Eastern termini of the east bound onramp to SR 32 from SR miles east of IR 275 to 1.98 miles west of SR 48 New Interchange Study Culvert Replacement Resurfacing Add lane to I-275 and rehabilitate existing pavement; plans completed under PID Replace Bridge No. CLE , SFN: Widen pavement to two 12-foot lanes with four-foot shoulders Resurfacing Bridge cleaning Resurfacing Plane and pave SR 132 Pavement planning, asphalt resurfacing on SR 133 and SR 125 Three bridge replacement (toll revenue credits) Repair vertical failure of embankment Widen to five lanes Sponsor A-12

14 /2/2005 SR miles west of SR /16/2005 SR 125 SR 132 to SR /7/2005 CR /1/2006 CR 33 (Clough Pike) /11/2006 SR /26/2006 SR /1/2006 SR /22/2006 SR /24/2007 SR /7/2007 Various Bridges /18/2007 SR /27/2007 Various Branch Hill-Guinea Pike at Wards Corner Road At CR 107 (Shayler Road) From 2.62 miles north of SR 28 to 2.72 miles north of SR 28 From 0.11 miles east of US 50 to 0.58 miles east of SR to 6.70 miles north of SR Miles South of Concord Hennings Mill Road 1.16 Miles South of SR 125 to 0.56 Miles South of SR 125 Bridges are on/over priority system routes in Clermont and Hamilton Counties 0.1 Miles South of Deerfield Road County-wide (Clermont County) Bridge Replacement Widen SR 125: install two-way left turn lanes between SR 132 and SR 222 Intersection Improvement Intersection Improvement Landslide repair project, project identified by Clermont County manager Crack seal a portion of I-275 in Clermont County Relocate curve and correct drainage problems Bridge Rehabilitation Reconstruct horizontal curves and widen roadway to provide two 12-foot lanes (no additional lanes) Bridge Cleaning Minor Rehabilitation of Four Culverts Ground mounted sign replacement for FY 08 Contract let District A-13

15 /20/2007 SR /12/2007 SR /30/2007 SR /5/2008 SR 125 Hamilton /7/2004 SR 125 Routes in Loveland: Clermont County- SR 48 (LM 6.45 to 6.80), Warren County-SR 48 (LM 0.00 to 0.30) Twin mainline SR 32 bridges over SR 276. Bridge Nos. CLE L/R, SFNs: / Bridge No. CLE , SFN: Bridge carries SR 727 over Stonelick Creek Res. Spillway At Glen-Este Withamsville Vicinity of Beechmont Mall /14/2004 US 52 At Broadway /10/2004 SR 561 Over IR /23/2004 US /3/2004 IR 74 From 1.09 miles south of Montgomery corporate line to Montgomery northern corporate line Indiana State Line to IR 275 West Interchange /14/2004 IR 74 At IR /14/2004 IR 75 Glendale-Milford road to Kemper Road including bridge work Arlington Heights to north of Kemper Road Urban paving project in the City of Loveland New reinforced concrete decks, structural steel painted, minor bridge work (toll revenue credits) Bridge Rehabilitation Intersection Improvement Construct park-andride lot Bridge Painting (Three) Replace the concrete deck of SR 561 over IR 75 Planing and resurfacing Minor Rehabilitation Interchange study, resurfacing, slide repair, guardrail repair, sign upgrade Resurfacing Cancelled applicant district A-14

16 /14/2004 US /14/2004 Caldwell/ Seymour Trail /31/2004 SR /31/2004 IR /31/2004 US /19/2005 Elm Avenue /3/2005 US /17/2005 IR 275/ ARTIMIS Amber Plan /31/2005 US 22 City of Cincinnati: from 2.48 miles east of Cincinnati Corporate line to 0.56 miles west of SR 264 Trail connects Seymour Preserve off Estes Avenue to Caldwell Park/ Preserve on North Bend Road From US 22 to the City of Montgomery/Village of Indian Hill Corporate line Bridge No. HAM , SFN: Bridge carries 8-Mile Road over IR 275 Along US 22/SR 3 (Montgomery Road) between Courtland Avenue and Smith Road Bridge carries ODNR bike path over Elm Avenue in Terrace Park 1.05 miles east of Indiana State Line to Cleves Corporate Line From the US 127 interchange to the SR 4 interchange 0.59 miles north of US 22 DA to 0.26 miles south of Cincinnati Corporate Line Plane and resurface Construct a multiuse (bike/hike) trail and greenway on new alignment Plane and resurface a portion of SR 126 Replace existing concrete deck, raise bridge for 16.5 clearance over IR 275, paint structural steel Construct a streetscape Repair stone masonary arch bridge HAM-ELMAV Upgrading Design and installation of equipment between Hamilton County Emergency Management and ARTIMIS Resurfacing district Cancelled applicant district applicant A-15

17 /31/2005 US /28/2005 IR /28/2005 US /13/2005 SR /1/2005 SR /1/2005 Lake Isabella /21/2005 SR miles north of IR 75 to 1.03 miles south of Cincinnati Corporate Line IR 74 to 0.06 Miles West of SR 4 Intersection of US 50 and SR 264 From IR 75 to 0.5 miles east of IR 75 SR 4 in the City of Springdale Various locations within Lake Isabella and Miami Whitewater Forest From IR 75 to IR /5/2005 IR 74 Over IR /29/2005 US /29/2005 IR /29/2005 SR /29/2005 US 22/US 22D /2/2005 US 50 Norwood SCL to Norwood NCL 0.07 miles south of US 50 to the Silverton/Madeira Corporate Line From 0.12 miles west of Reading/ Amberly Corporate Line to US 22 At US 22 and US 22DA over Eggleston Avenue 0.24 Miles South of North Bend NCL Resurfacing Crack Seal Install signal at intersection and construct left turn lane for westbound US 50 Install activated flashing signs to alert motorists to stopped traffic-work included in PID Construct Phase II of a streetscape along Springfield Pike (SR 4) Rehabilitate and resurface existing park drives and parking areas Rehabilitate SR 562 New Haven Road bridge replacement and expansion Resurfacing Microsurface a portion of IR 71 Crack Seal Install rigid overlays and minor bridge work: Bridge Nos. HAM R and HAM L Deck replacement and painting See PID District District District District A-16

18 /2/2005 US /2/2005 IR /27/2006 US /1/2006 IR /8/2006 US /8/2006 US /8/2006 SR /8/ /8/2006 CR 504 (Five Mile Road) Oxford Road /16/2006 SR 126 Fairbanks Avenue to Mt. Echo Road Southbound lanes just north of Kilby Road Km E of Mariemont East Corporate Line to 0.29 Km E of Newtown Road Bridge No. HAM , SFN: ; at Cooper Road over IR mi. S. of Montgomery Corporate line to 1.41 miles north of IR miles south to 2.72 miles north of Hamilton/ Warren line From 0.2 miles south of Kemper Road to 0.2 miles north of Kemper Road 0.28 Miles West of Indian Hill East Corporate Line Along 5-Mile Road from State Road to Clough Road then extending north in 5-Mile Road to Newtown Road Relocate bridge from Oxford Road to a walking trail at the Willey Road Senior Center/ Crosby Township 0.10 Miles West of Loveland-Madeira Road Widening to Standard Width Slide Repairs Safety Upgrade Install rigid concrete overlay on bridge; Work includes raising structure over interstate Phase 4-Phases 1,2 and 4 combined for construction. Widen to five lanes. RWsee PID Add left turn lanes for northbound and southbound US 127 at Kemper Road Culvert Replacement Construct shareduse trail Relocate and reconstruct a bowstring arch bridge to the Willey Road Senior Center/Crosby Township Civic Culvert Replacement (combined with PID for construction) A-17

19 /22/2006 SR /5/2006 US /2/2006 M.L. King (CR612) /17/2006 US /7/2006 SR /21/2006 US /21/2006 SR /27/2006 IR /9/2006 IR /9/2006 IR 275 Cincinnati ECL to Clermont County Line Silverton North Corporate Line to Kenwood Road R/R: Woodside Place to Vine Street; I/I: at Vine Street/Jefferson Avenue Various portions of US 42, US 52 and US 127, all in the City of Cincinnati From 0.13 miles south of IR 74/IR 275 to 0.09 miles north of IR 74/IR 275 From 0.46 miles east of SR 264 to 0.02 miles west of IR 71 From Ebenezer Road to Race Road From 0.1 miles east of US 42 to 0.07 miles east of US 22 Various priority system routes IR 71 from IR 275 to SR 48 and IR 275 from US 42 to US 22 Winton Road to 0.11 miles east of US 42 Resurfacing Add Turning Lane and Curbed Median Reconstruction/ Rehabilitation and Intersection Improvement Plane and resurface Construct left turn lane on SB SR 128 for turn to EB IR 74/IR 275 entrance ramp Resurface 6 th Street Expressway and perform minor bridge work Minor pavement repair and pavement inlet repair Crack sealing Crack Seal Overlay of 1.5 for maintenance of traffic prior to phase 1 of PID Contact Let District A-18

20 /28/2006 CR /6/2006 SR /1/2006 IR /3/2006 IR 275/ Mosteller /9/2006 IR miles north of US 42 in Sharonville 0.14 miles west of Galbraith Road to 0.12 miles west of the Reading/ Amberly Village Corporation line Dry Fork Road to Harrison Road (omitting the overlap with IR 275) IR 275 at Mosteller Road 0.06 miles west of SR 4 to 0.11 miles east of US /30/2006 US 22 At US 22 DA /31/2006 US /31/2006 IR 71 From 0.30 miles north of IR 275 to 1.41 miles north of IR 275 (Cornell to Kemper) Hamilton County from Silverton/Madeira Corporation Line to 0.26 miles south of Blue Ash/ Montgomery Corp. Two-part study for rail grade separation, includes right-of-way and construction. Right-of-way and construction eliminated. Concrete pavement restoration Plane and resurface Westbound and eastbound IR 275 off ramps widen and reconstructed. Includes rightof-way and PE. Construction in PID Rehabilitation and widening. Project includes 28 structures. Bridge Paining (Eight) Phase I (PE and right-of-way only). Widen to five lanes. Combined with PID for construction Crack seal a portion of I-71 Study completed Cancelled Cancelled A-19

21 /31/2006 US /18/2007 IR /24/2007 US /24/2007 US /24/2007 IR /31/2007 SR /29/ /29/2007 Gilbert Avenue Central Parkway /4/2007 US /18/2007 IR 75 From.18 miles south to 2.72 miles north of Hamilton/ Warren County Line Fields Ertel to Foster Viaduct From 300 north of Galbraith Road on IR 75 southbound exit ramp to Galbraith Road Cincinnati Corporate line to Village of Mariemont From 0.06 miles south of Banning Road to 0.08 miles north of Banning Road Between IR 71 and Loveland-Madeira Road City of Springdale- Glensprings Drive to northern corporate line Gilbert Avenue between Eden Park Drive and East McMillan Street Central Parkway between Broadway and 12 th Street At Carthage/ Norwood Lateral Entrance On IR 75 from IR 74 to Sharon Road and On SR 562 from IR 75 to IR 71 Phase 2 (PE and right-of-way only) Widen to five lane. See PID for construction Remove slip ramp right turn on Galbraith, construct standard right turn lane Plane and pave Construct right turn lane and center median Construct noise barriers at various locations, both north and south sides Urban paving Streetscape Project Streetscape Project Intersection Realignment Overhead Sign Replacements A-20

22 /1/2007 US 127 On US 127 at Two Intersections: Windermere Way and Belmont Avenue /2/2007 US 22 Various Routes /16/2007 SR 264 Various Routes /23/2007 IR /1/2007 SR /18/2007 Various /18/2007 SR /18/ /1/2007 CR 504 (Five Mile Road) Vine Street Pedestrian Bridge /8/2007 IR 471 From Harrison/ Rybolt Interchange to the Spring Grove Interchange City of Indian Hill western corporate line to eastern corporate line County-wide (Hamilton County) Improvements are on Church Street, Main Street, and Round Bottom Road Along Five Mile Road between SR 125 (Beechmont Avenue) and State Route in Anderson Township Bridge over Vine Street from Erkenbrecher to the Zoo s parking lot Mt. Adams wall along IR 471 Minor widening, construct new curb and sidewalks, resurface pavement, construct left turn lanes Urban paving in Cincinnati including US 22, US 42 and US 52 Urban paving in Cincinnati including SR 264, US 22, US 27 and US 27 DA Install ramp meters for eastbound entrance ramps Urban paving Ground mounted sign replacements in FY 2008 Traffic signal interconnection system total of six signals through the Village of Newtown Streetscape Project Construct new pedestrian bridge Minor rehabilitation and repair to the Mt. Adams Slope Stability System A-21

23 /15/2007 IR /16/2007 US /8/2008 Mt. Adams Steps /9/2008 SR /9/2008 US /10/2008 US /25/2008 US 50 (Columbia Parkway) /29/2008 SR /5/2008 SR /5/2008 US 127 From the Western Hills Viaduct to IR Miles south of SR 126 Between the Mt. Adams neighborhood and the Cincinnati riverfront Bridge No. HAM , SFN: Bridge carries SR 126 over a tributary of Little Miami River 2.06 miles south of IR 275 to Hamilton/ Butler line and on US 42 south from US 42 to US 42 From east of Elwynne to eastern corporate line (deleted and combined with PID 81662) Kemper Lane to Delta Avenue From 2 miles south to 1.98 miles north of IR 74. Bridge spans a tributary of the Great Miami River From 0.05 miles west of Race Road to 0.05 miles south of Race Road From south corporate line to north corporate line Various signing, striping, vegetation removal, skid surface treatments, etc. to improve safety Bridge Overlay (Three) Construct a sidewalk and steps to re-establish the connection between Mt. Adams and the riverfront Bridge Replacement Urban paving project Urban paving project in the City of Silverton (TIP Amendment ) Acquire limited access right-ofway and safety improvements Replacement of Bridge No. HAM , SFN: Project deleted and added to PID Intersection improvement add right turn lane on Race Road, eliminate three curb islands Urban paving project in North College Hill Project d Project d A-22

24 Warren /12/2004 SR 132/SR /12/2004 SR /9/2004 SR /9/2004 SR /31/2004 SR /2/2005 SR /17/2005 SR /3/2005 SR 73 On SR 132 and SR 730 in Warren and Clinton counties At Lower Springboro Road 0.19 Miles West of US 42 Mason NCL to Springboro SCL SR 73, SR 741 and various city streets From 2.16 miles west to 2.24 miles west of US miles to 1.65 miles north of SR 63 Along SR 73 between Clearcreek-Franklin Road and SR /16/2005 IR 75 At Union Road /1/2005 SR /1/ /9/2005 Lebanon Streetscape Great Miami Bikeway /22/2005 SR /2/2005 SR 73 Monroe ECL to Lebanon WCL Along Broadway (SR 48) and Mulberry Streets in Lebanon Baxter Street to Montgomery County Line 3.45 miles east of Butler County line to SR 48 From 0.87 miles west of SR 741 to 0.85 miles west of SR 741; from 0.22 miles west of SR 741 to 0.20 miles west of SR 741 Rehabilitate two structures Intersection Improvement Culvert Replacement Resurfacing Construct Bike Path City not pursuing (12/10/02) Replace culvert no. WAR Reconstruct Curve Construct a streetscape Bridge Deck Replacement Planing and resurfacing existing pavement Construct a streetscape in the City of Lebanon Construct bikeway along Great Miami River Resurfacing Overlay and rehabilitate two bridges in Springboro Applicant A-23

25 /9/2006 IR 75/SR /8/2006 SR /5/2006 Mathers Mill /16/2006 IR /17/2006 SR /25/2006 SR /2/2006 SR /17/2006 Various /21/2006 SR /26/2006 SR /31/2006 IR 75 On SR 63 from 0.15 miles west of IR 75 to 0.16 miles east of IR 75; on IR 75 at SR 63 From the southern Springboro corporate line to SR 73 Ohio Department of Natural Resources park entrance road 1.45 miles north of SR 123 At Bunnell Hill Road/Pekin Road 1.01 miles north of IR 71 to Mason NCL Franklin north corporate line to the Warren/ Montgomery County line Various routes in Warren County From the Butler/ Warren County Line to Commerce Drive Various routes in the City of Lebanon including SR 48, SR 63, SR 123 and US 42 IR 75/State Route 122 Interchange Replace SR 63 bridge over IR 75 for proposed single point interchange. Accelerated from PID Replace SR 63 bridge over IR 75 for proposed single point interchange. Accelerated from PID Culvert construction/repair Waste water treatment plant replacement Relocate Bunnell Hill Road to eliminate five leg intersection, straighten curve on SR 48 at Pekin Road Resurfacing Paving and asphalt resurfacing on SR 123 Correct unsafe roadway conditions by adding and replacing guardrail Urban paving project in the City of Middletown Urban paving project in the City of Lebanon Study the existing interchange for geometric and capacity improvements District Contract let A-24

26 NP 12/31/2006 SR /1/2007 SR /28/2007 SR /16/2007 US /1/2007 US /15/2007 SR /12/2007 IR /12/2007 SR 28 Kentucky /30/ /30/ /30/2006 From SR 63 north to SR to 0.84 miles east of Butler county Line 1.36 miles south of Clinton County Line From 0.12 miles south of SR 73 to 0.12 miles north of SR 73 From 1.15 miles west of SR 741 to Mason east corporate line Clermont/Warren County line to Warren/Clinton County Line IR 71 ramps, Western Row Road and Kings Island Drive 0.22 miles south of SR 123 to 0.06 miles south of SR 123 Boone, Campbell and Kenton Boone, Campbell and Kenton Boone, Campbell and Kenton Two-lane roadway Installing raised median, turn lanes and realignment of intersections for access management Bridge Replacement SFN: over a branch of Todd Fork Offset and lengthen left turn lanes on US 42 at SR 73 Urban paving project Plane and pave Intersection improvement Replacement of the railroad bridge and box culvert on existing alignment Northern Kentucky Rideshare Program FY 06 OKI Regional Transportation Planning FY 06 (See Ohio Line Items) Northern Kentucky Rideshare Program FY 07 Contact Let A-25

27 /30/2006 Boone /31/2004 KY /17/ /1/2006 KY 1017 (Turfway Road) New Connector /12/2006 KY /12/2006 KY /17/2006 IR /21/2006 Airport Boone, Campbell and Kenton Over Utterback Creek US 25 to KY 717 (Thoroughbred Avenue) Between Walton and Nicholson At the intersection of US 42 in Florence At the intersection with Rogers Lane in Burlington Weigh Facility along IR 71 Cincinnati/ Northern Kentucky International Airport /31/2006 IdleAire Near Richwood /31/2007 IR /20/2007 KY 338 TE 15 5/1/2007 Walton Gaines TE 21 5/1/2007 KY 18 At KY 212 including connections to KY 20 Intersection with IR 75 Walton Gaines Tavern History Center Along KY 18 and extending east to Tanners Lane OKI Regional Transportation planning FY 07 (See Ohio Line Items) Replace bridge and approaches Widen to five lanes Scoping study for new roadway Construct a southbound left turn lane on KY 237 (toll credits) Construct a left turn lane on northbound 237 at Roger Lane (toll credits) Add Restroom Construct infrastructure for biodiesel fuel and one-year buy down (toll credits) Construct an idleaire facility Airport Access Interchange Improvements (toll credits) Construct a right turn lane on KY 338 to southbound IR 75 (toll credits) Restoration of property and minor repairs Construction of sidewalks and pedestrian connection across IR 71/75 District Cancelled Cancelled Cancelled Cancelled See & A-26

28 /25/2007 KY 1829 (Industrial Road) /25/2007 IR /28/2007 KY /28/2007 KY /28/2007 KY 237 Campbell /12/2004 KY /31/2004 KY /4/2005 KY /29/2006 KY /23/2007 From US 42 to US 25 (first phase) From milepost to the Ohio River Bridge From IR 275 north three miles toward KY 8 From IR 275 north three miles toward KY 8 From IR 275 north three miles toward KY miles north of county route 5306 Between mileposts 8.90 and Milepost 18 to Milepost 20 At the intersection with Riviera Drive in Bellevue 12/31/2006 Study Campbell County Park Avenue /20/2007 IR 471 Kenton /31/2004 Various On Park Avenue at KY 8 All steel bridges and bearings on IR 471, except the Daniel Carter Beard Bridge City of Covington on Madison Avenue, Pike Street and Seventh Street Widen roadway to five lanes Structural overlay (toll credits) Reconstruct and widen (toll credits) Reconstruct and widen (toll credits) Reconstruct and widen (toll credits) Replace the bridge over Owl Creek Shoulder stabilization on KY 9 Slide Repairs Increase turning radius at intersection for better traffic flow (toll credits) I-471 Corridor Study (toll credits) Construct a left turn lane (toll credits) Powerwash and paint Installation of historic boulevard lighting, planters, sidewalk improvements and urban landscaping Study Initiated A-27

29 /28/2005 IR /17/2005 KY /26/2005 KY /31/2005 IR /28/2006 KY 1072 (new) /29/2006 KY 17 Brent Spence Bridge From Apple Drive to Pelly Drive Autumn Road to Richardson Road Brent Spence Bridge from Kyles Lane in Kentucky to Ezzard Charles Drive in Ohio From KY 17 at Highland Pike directly to Fidelity Investments Roebling Suspension Bridge over the Ohio River /17/2006 IR 75 Kenton County Brent Spence Bridge congestion relief project Widen to five lanes Widen to five lanes Replacement of bridge, preliminary engineering, environmental, design, right-ofway, utilities New two-lane connector Structural analysis Add restroom to weight facility (toll credits) Study Complete /31/2006 KY 1501 Hands Pike Scoping Study /31/2006 KY /31/2006 KY 16 TE 10 12/31/2006 Royal Drive TE 9 12/31/2006 Lyndale Road /18/2007 KY /31/ th Street On KY 17 at Independence Station Road On KY 16 at KY 2045 (Cox Road) Royal Drive in Ft. Mitchell Old Edgewood section of the city Along KY 8 in Ludlow Office development in Covington Construct a northbound left turn lane on KY 17 Construction of left turn lanes Construct a sidewalk Construct a sidewalk on Lyndale Road Streetscape revitalization and beautification project Construct ingress/ egress roadways via 13 th Street to office development d d d A-28

30 /22/2007 KY 17 Indiana Dearborn /30/2006 SR /31/2006 US 50 Various /31/2006 IR /31/2006 US /31/2006 SR /31/2006 Bike/Ped On KY 17 at the intersection of KY 14 Bridge over Central Railroad Company of Indiana, 0.35 miles north of US 50 Along IR 465 and IR 74 from Marion County to Dearborn county On US 50 from SR 56/SR 350 to SR 1 At Georgetown Road Surrounding Greendale /28/2007 SR 46 From SR 1 to US 52 Reconstruct the intersection and improve site distance through horizontal realignment Bridge rehabilitation Pump Station replacements Riprap repair District pavement project Intersection Improvement Bike/pedestrian trail roadway HMA overlay, preventive maintenance Eliminated /28/2007 SR 62 At RP Slide Correction Suspended SOURCE: OKI. A-29

OKI Awards More Than $41 Million to Transportation Projects Across the Region

OKI Awards More Than $41 Million to Transportation Projects Across the Region FOR IMMEDIATE RELEASE October 11, 2018 Contact: Ashley Patrick apatrick@oki.org (330) 573-4932 m. OKI Awards More Than $41 Million to Transportation Projects Across the Region Cincinnati, Ohio Ohio-Kentucky-Indiana

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

2017 (FY 21,22,23) Ohio CMAQ Project Selection

2017 (FY 21,22,23) Ohio CMAQ Project Selection 2017 (FY 21,22,23) Ohio CMAQ Project Selection Executive Committee September 14, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit Authorities

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

2017 (FY 21,22,23) Ohio CMAQ Prioritization

2017 (FY 21,22,23) Ohio CMAQ Prioritization 2017 (FY 21,22,23) Ohio CMAQ Prioritization Intermodal Coordinating Committee September 12, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit

More information

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

Draft Prioritization for STP, SNK, TA Applications in Ohio and Kentucky

Draft Prioritization for STP, SNK, TA Applications in Ohio and Kentucky Draft Prioritization for STP, SNK, TA Applications in Ohio and Kentucky ICC Prioritization Subcommittee September 11, 2018 Type Funding Available March Estimate Funding Available September Estimate Funding

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Appendix C. Data on Transportation Improvements

Appendix C. Data on Transportation Improvements Appendix C Data on Transportation Improvements Table 5. Transportation Improvements for Expanding Highway Capacity in Ohio Counties in the OKI Region BUTLER COUNTY Scheduled Transportation Improvements

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities

More information

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek, INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north

More information

Welcome to the Open House

Welcome to the Open House Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

Deerfield Township Hamilton Township

Deerfield Township Hamilton Township EXECUTIVE SUMMARY I. Introduction The Southwest Warren County Transportation Study is focused on a 100 square mile area with numerous transportation problems that call for a multitude of solutions (see

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Request for Authorization to Open Public Comment Period

Request for Authorization to Open Public Comment Period Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New

More information

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Federal and state agencies provide funding for local bikeway and trail projects. Descriptions follow for programs that

More information

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Phone: Fax: Project Reference No. (to be filled out by MassHighway): Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is

More information

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1) Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Project Description Form 6V

Project Description Form 6V Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd. DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan #70421 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan Public Information Meetings and Hearings May June 2002 1 Reason for Freeway System Study 270-mile

More information

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036 HAM-32F-0.00 PID 86461 PREFERRED ALTERNATIVE IMPLEMENTATION PLAN Prepared for Ohio Department of Transportation, District 8 505 South SR 741 Lebanon, Ohio 45036 Prepared by URS Corporation 564 White Pond

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

Proposed White Flint Separated Bike Lane Network September 2015

Proposed White Flint Separated Bike Lane Network September 2015 Proposed White Flint Separated Bike Lane Network September 2015 Abstract This report includes a proposed separated bike lane network for the White Flint Sector Plan area. Separated bike lanes create a

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Giles Run Connector Road

Giles Run Connector Road Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment

More information

R O A D W A Y S. Chapter

R O A D W A Y S. Chapter INTRODUCTION The region s roadway system carries the vast majority of person trips and is an important part of the freight movement system. Roads also provide the right of way for buses, making the roadway

More information

When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze

When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze Future Needs: Roadways 26 Anticipated Development Trends When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze

More information

Oldham County Major Thoroughfare Plan

Oldham County Major Thoroughfare Plan Prepared for: Oldham County Planning & Zoning Commission Prepared by: December 2003 Table of Contents I. INTRODUCTION...1 A. Contents of Report...1 B. Purpose of Study...2 C. Related Project Documents...2

More information

CHAPTER 5 TRANSPORTATION GOAL

CHAPTER 5 TRANSPORTATION GOAL CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks

More information

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017 MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood

More information

Lynchburg District Update

Lynchburg District Update Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

Implementation Plan. 5.1 Improvement Program

Implementation Plan. 5.1 Improvement Program 5 Implementation Plan Section 4 presented detailed recommendations for transportation improvements and land use strategies in the Route 6 Hop River corridor. This section outlines how the transportation

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information