1 Draft Prioritization for STP, SNK, TA Applications in Ohio and Kentucky ICC Prioritization Subcommittee September 11, 2018

2 Type Funding Available March Estimate Funding Available September Estimate Funding Requested Ohio STP $20 m $26 m $57.9 m Ohio TA $2.6 m $4.2 m $8.0 m Kentucky SNK $7.5 m $7.8 m $12.1 m Kentucky TA $1.6m $1.8 m $1.8 m

3 Ohio STP Applications (15)

4 Butler County SR 129/Liberty Way Modification Phase 2 Construction of new ramps from the eastern terminus of SR 129 to local road network at Cox Road. New roundabout at Cox Road. Removal of nearby SR 129 connections to Liberty Way, eliminating weaving issues. Federal Funds $5,961,500 Local $5,961,500 Total Estimate$11,923,000

5 BCRTA-Chestnut Street Multimodal Shared Services Facility Facility will provide infrastructure for BCRTA, Talawanda School Disrict and Miami University. Bus maintenance facility, passenger waiting area and amenities for local and regional bus passengers. Federal Funds $4,531,250 Local $1,880,000 Total Estimate $6,411,250

6 City of Cincinnati-Hopple St. Viaduct Deck Rehabilitation Rehabilitate and preserve the deck and substructure of the existing Viaduct. Includes repairs to the concrete sidewalk and the addition of vandal protective fencing. Federal Funds $5,600,000 Local $1,400,000 Total Estimate $7,000,000

7 City of Fairfield South Gilmore Road Improvements Between Mack Road and Resor Road. New asphalt surface, curb and drainage improvements, pavement markings, retaining walls, guardrail and LED roadway lighting. Includes new 6 wide sidewalk. Federal Funds $2,451,717 Local $612,930 Total Estimate $3,064,647

8 Hamilton County Western Hills Viaduct Replacement Partial funding for project. Total construction costs = $283.5m Federal Funds $6,000,000 Local $1,500,000 Total Estimate $7,500,000

9 City of Lebanon-Glosser Road Improvements Between US 42 and SR 63. Widening to three-lane improved roadway with curbing and storm sewer. Realign Glosser and US 42 (Cincinnati Ave) to 90 degree intersection. Federal Funds $1,177,175 Local $1,154,504 Total Estimate $2,331,679

10 City of Mason-SR 741 Widen (Cox-Smith to Spy Glass Hill) Widen to two travel lanes each direction with left turn lanes. Includes new mulituse path and sidewalk. Federal Funds $3,967,917 Local $991,979 Total Estimate $4,959,896

11 City of Middletown-Central Avenue Reconstruction Between Verity Parkway and University Blvd. Reconstruction with upgraded pavement, curb, storm sewer and pedestrian lighting. Includes left turn lanes, street calming and bike racks. Federal Funds $4,405,621 Local $2,372,257 Total Estimate $6,777,878

12 City of Sharonville US 42 Shared Use Path Multi-use path along east side of US 42 (Lebanon Rd) between Reading Rd and Kemper Rd. Provides connection to Sharon Woods Park. Federal Funds $1,006,448 Local $670,965 Total Estimate $1,677,413

13 Village of Silverton-Montgomery Rd (US 22) Corridor Improvements Between Coleridge Ave and Stewart Rd. Rehabilitate existing areas of pavement failure. Includes resurfacing and restoration of curbs. Add concrete pavers 2 wide along curb line. Add sheltered benches, bike racks and extend concrete bus pads at bus stops. Federal Funds $3,379,952 Local $844,988 Total Estimate $4,224,940

14 SORTA Smart Technologies Advancing Regional Transportation (START) Replacement of transit vehicles with clean diesel technology buses. Federal Funds $5,697,765 Local $2,441,889 Total Estimate $8,139,694

15 City of Springdale East Crescentville Road Improvements Between Transportation Way and Centerdale Road. Install new traffic signal and ped signal at the East Crescentville/ Chesterdale intersection with left turn lane, interconnect/coordination with existing International Blvd signal, TWLTL throughout, replace pavement with properly sized storm sewer. Federal Funds $3,992,874 Local $998,218 Total Estimate $4,991,092

16 Sycamore Township-East Kemper Rd Resurfacing/Sidewalk New sidewalk along East Kemper between Snider and Baen, then along Deerfield to Schuler Sports Complex. Additional segment along Salzman to McDaniel Park. Includes Kemper Road resurfacing. Federal Funds $2,447,128 Local $611,782 Total Estimate $3,058,910

17 Symmes Twp-Montgomery Rd (US 22) Signal Preemption Installation of emergency preemption at the nine existing traffic signals, from Cornell Road to Fields-Ertel Road. Federal Funds $276,430 Local $118,470 Total Estimate $394,900

18 Warren County-King Avenue Bridge over Little Miami River New 48-foot wide (two-lane), structure with shoulders and 11 wide dedicated pedestrian/bike way with barrier separation. Improved horizontal alignment and new vertical profile that will moderate the existing steep vertical grades on the King Avenue approach. New tunnel crossing of LMT under Grandin Road and relocated parking area for the trail. Federal Funds $6,000,000 Local $3,821,429 Total Estimate $9,821,429

19 OHIO STP TRANSPORTATION FACTORS FOR HIGHWAY PROJECTS LPA Sponsor Project Name SAFETY IMPACT ON SAFETY AVERAGE DAILY TRAFFIC (ADT) TRAVEL TIME INDEX (TTI) IMPACT ON TTI FREIGHT (% TRUCK) EXISTING CONDITIONS PAVEMENT OR BRIDGE COMPLETE STREETS STATUS OF PROJECT Butler County Engineer's Office S.R. 129 / Liberty Way Modification, Phase Cincinnati Hopple Street Viaduct - Deck Rehabilitation Fairfield South Gilmore Road Improvements - Resor Road to Mack Road Hamilton County Engineer's Office Western Hills Viaduct Replacement Project Lebanon Glosser Road Improvements Mason SR 741 Widening (Cox-Smith Rd to Spy Glass Hill) Middletown Central Avenue Reconstruction and Improvements Silverton Montgomery Road Corridor Improvements Springdale East Crescentville Road Improvements Sycamore Township East Kemper Road Sidewalk Project Symmes Township Montgomery Road (US-22) Signal Preemption Symmes Township, Ohio Warren County King Avenue Bridge over the Little Miami River

20 LPA Sponsor OHIO STP Project Name TYPE OF PROJECT TRANSPORTATION FACTORS FOR TRANSIT PROJECTS IMPACT ON RIDERSHIP IMPACT ON SAFETY & SECURITY TIME TO IMPLEMENTATION SYSTEM IMPACT EXISTING ASSET PHYSICAL CONDITION Butler County Regional Transit Authority Southwest Ohio Regional Transit Authority Butler County Connect - Chestnut Street Multimodal Shared Services Facility Smart Technologies Advancing Regional Transportation (START)

21 LPA Sponsor OHIO STP Project Name SAFETY TRANSPORTATION FACTORS FOR BIKE/PED PROJECTS IMPACT ON SAFETY NETWORK CONNECTIONS FEASIBILITY EXISTING SURFACE CONDITION COMPLETE STREETS STATUS OF PROJECT Sharonville US 42 - Shared Use Path

22 OHIO STP PLANNING FACTORS FOR ALL PROJECTS LPA Sponsor Project Name ENVIRONMENTAL JUSTICE ECONOMIC VITALITY INVESTMENT/ EMPLOYMENT BONUS AIR QUALITY INTERMODAL ELEMENTS REPLACEMENT/ EXPANSION SRPP LOCAL PLANNING LOCAL SHARE HISTORY OF PROJECT DELIVERY TECHNOLOGY Butler County Engineer's Office S.R. 129 / Liberty Way Modification, Phase Butler County Regional Transit Butler County Connect - Chestnut Street Authority Multimodal Shared Services Facility Cincinnati Hopple Street Viaduct - Deck Rehabilitation Fairfield South Gilmore Road Improvements - Resor Road to Mack Road Hamilton County Engineer's Office Western Hills Viaduct Replacement Project Lebanon Glosser Road Improvements Mason SR 741 Widening (Cox-Smith Rd to Spy Glass Hill) Middletown Central Avenue Reconstruction and Improvements Sharonville US 42 - Shared Use Path Silverton Montgomery Road Corridor Improvements Southwest Ohio Regional Transit Smart Technologies Advancing Regional Authority Transportation (START) Springdale East Crescentville Road Improvements Sycamore Township East Kemper Road Sidewalk Project Symmes Township Montgomery Road (US-22) Signal Preemption Symmes Township, Ohio Warren County King Avenue Bridge over the Little Miami River

23 OHIO STP LPA Sponsor Project Name TOTAL POINTS FED $ REQUESTED FED $ Recommended RUNNING TOTAL OKI I-71 MLK SIB Loan Debt Service x $1,000,000 $1,000,000 $1,000,000 Southwest Ohio Regional Transit Smart Technologies Advancing Regional 62 $5,697,765 $5,347,765 $6,347,765 Authority Transportation (START) Springdale East Crescentville Road Improvements 62 $3,992,874 $3,793,230 $10,140,995 Middletown Central Avenue Reconstruction and 59 $4,405,621 $4,185,340 $14,326,335 Improvements Warren County King Avenue Bridge over the Little Miami River 55 $6,000,000 $5,700,000 $20,026,335 Butler County Engineer's Office S.R. 129 / Liberty Way Modification, Phase 2 53 $5,961,500 $5,663,425 $25,689,760 Hamilton County Engineer's Office Western Hills Viaduct Replacement Project 49 $6,000,000 $4,000,000 $29,689,760 $26 M Available Sharonville US 42 - Shared Use Path 47 $1,006,448 $0 $29,689,760 Butler County Regional Transit Butler County Connect - Chestnut Street 44 $4,531,250 $0 $29,689,760 Authority Multimodal Shared Services Facility Silverton Montgomery Road Corridor Improvements 43 $3,379,952 $0 $29,689,760 Fairfield South Gilmore Road Improvements - Resor 41 $2,451,717 $0 $29,689,760 Road to Mack Road Symmes Township Montgomery Road (US-22) Signal Preemption - 40 $276,430 $0 $29,689,760 Symmes Township, Ohio Mason SR 741 Widening (Cox-Smith Rd to Spy Glass 35 $3,967,917 $0 $29,689,760 Hill) Sycamore Township East Kemper Road Sidewalk Project 30 $2,447,128 $0 $29,689,760 Cincinnati Hopple Street Viaduct - Deck Rehabilitation 29 $5,600,000 $0 $29,689,760 Lebanon Glosser Road Improvements 29 $1,177,175 $0 $29,689,760

24 Kentucky SNK Applications (9)

25 Boone County Conner Road Multi-Use Path Construct a 10 wide multi-use path from KY237 (North Bend Road) to KY 20 (Petersburg Road), a distance of 1.35 miles. Includes a sidewalk connection on KY 20 from Merrie Drive to Conner Road, a distance of 730 feet. This path section is a segment of the overall regional CVG Trail Loop. Federal Funds $1,012,500 Local $1,012,500 Total Estimate $2,025,000

26 Boone County KY20 & Loomis Road Multi-Use Path Construct a 10' wide multi-use path along KY 20 (Petersburg Road) and Loomis Road from Conner Road to KY 236 (Donaldson Road). Total length is 2.4 miles. This path is a segment of the regional CVG Trail. Federal Funds $2,316,000 Local $579,000 Total Estimate $2,895,000

27 Campbell County Improved Access to NKU Mixed-Use Development The project is located near NKU's campus on KY SR 2238 (Louie B. Nunn Drive) and on US- 27. Includes transit super stop, turn lanes on Nunn, upgrade and reconstruction of old sidewalks and new pedestrian/bicycle path linking the NKU campus to the new development. Federal Funds $861,704 Local $369,302 Total Estimate $1,231,006

28 City of Covington Pike Street (Madison to Main) This project will include pavement and sidewalk restoration on and along Pike Street in Covington between Madison Avenue and Pike Street. Federal Funds $3,093,957 Local $773,489 Total Estimate $3,867,446

29 City of Covington West Covington Riverfront Commons Multi-Use Path Construct an 8 wide concrete multi-use path along the Ohio River using existing public right of way/city-owned property between River Road (city street) and the existing shared use path located on the north side of the floodwall, just west of the Brent Spence Bridge. Federal Funds $600,970 Local $150,242 Total Estimate $751,212

30 City of Dayton Riverfront Commons This phase of the overall 11.5-mile multi-use trail is 1 mile between Berry Street and Fourth Avenue (KY 8). Federal Funds $685,035 Local $171,259 Total Estimate $856,294

31 KYTC KY 1303 (Bristow Rd) Roadway Drainage Improvements The primary goal of this project is to improve safety along KY 1303 (Bristow Road) between Timber Lane Drive and KY 536 in Kenton County. This section of KY 1303 floods regularly and the flooding has caused the edges of the roadway to deteriorate. Federal Funds $468,000 Local $117,000 Total Estimate $585,000

32 City of Taylor Mill Taylor Mill Sidewalk Project Phase III Construction of a new sidewalk along the north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street. Federal Funds $621,168 Local $155,292 Total Estimate $776,460

33 TANK Bus Replacements Replacement of Four (4) Diesel Buses with Hybrid-Electric Buses Federal Funds $1,990,176 Local $497,544 Total Estimate $2,487,720

34 KY SNK Sponsor Covington KYTC Project Name Pike Street from Madison Avenue to Main Street KY 1303 (Bristow Road) Roadway/Drainage SAFETY IMPACT ON SAFETY TRANSPORTATION FACTORS FOR HIGHWAY PROJECTS AVERAGE DAILY TRAFFIC (ADT) TRAVEL TIME INDEX (TTI) IMPACT ON TTI FREIGHT (% TRUCK) EXISTING CONDITIONS PAVEMENT OR BRIDGE COMPLETE STREETS STATUS OF PROJECT

35 KY SNK Sponsor Project Name TYPE OF PROJECT TRANSPORTATION FACTORS FOR TRANSIT PROJECTS IMPACT ON RIDERSHIP IMPACT ON SAFETY & SECURITY TIME TO IMPLEMENTATION SYSTEM IMPACT EXISTING ASSET PHYSICAL CONDITION Campbell County Transit Authority of Northern Kentucky Improved Access to NKU Mixed- Use Development Replace 4 Diesel Buses with Hybrid-Electric Buses

36 KY SNK Sponsor Project Name SAFETY TRANSPORTATION FACTORS FOR BIKE/PED PROJECTS IMPACT ON SAFETY NETWORK CONNECTIONS FEASIBILITY EXISTING SURFACE CONDITION COMPLETE STREETS STATUS OF PROJECT Boone County Fiscal Court Boone County Fiscal Court Covington Dayton Taylor Mill Conner Road Multi-Use Path KY 20 & Loomis Road Multi-Use Path West Covington Riverfront Commons - Shared Use Path Riverfront Commons: Dayton, KY Eastern Trail Taylor Mill Sidewalk Project Phase III

37 KY SNK Sponsor Project Name ENVIRONMENTAL JUSTICE PLANNING FACTORS FOR ALL PROJECTS ECONOMIC VITALITY INVESTMENT/ EMPLOYMENT BONUS AIR QUALITY INTERMODAL ELEMENTS REPLACEMENT/ EXPANSION SRPP LOCAL PLANNING LOCAL SHARE HISTORY OF PROJECT DELIVERY TECHNOLOGY Boone County Fiscal Court Boone County Fiscal Court Campbell County Covington Covington Dayton KYTC Taylor Mill Transit Authority of Northern Kentucky Conner Road Multi-Use Path KY 20 & Loomis Road Multi-Use Path Improved Access to NKU Mixed- Use Development Pike Street from Madison Avenue to Main Street West Covington Riverfront Commons - Shared Use Path Riverfront Commons: Dayton, KY Eastern Trail KY 1303 (Bristow Road) Roadway/Drainage Taylor Mill Sidewalk Project Phase III Replace 4 Diesel Buses with Hybrid-Electric Buses

38 KY SNK Sponsor Project Name TOTAL POINTS FED $ REQUESTED RUNNING TOTAL Transit Authority of Replace 4 Diesel Buses with Northern Kentucky Hybrid-Electric Buses 58 $1,990,176 $1,990,176 Dayton Riverfront Commons: Dayton, 51 $810,665 $2,800,841 KY Eastern Trail Campbell County Improved Access to NKU Mixed- 49 $861,704 $3,662,545 Use Development Covington West Covington Riverfront 47 $714,530 $4,377,075 Commons - Shared Use Path Boone County Conner Road Multi-Use Path 39 $1,012,500 $5,389,575 Fiscal Court Taylor Mill Taylor Mill Sidewalk Project 34 $846,424 $6,235,999 Phase III Boone County Fiscal Court KY 20 & Loomis Road Multi-Use Path 33 $2,316,000 $8,551,999 Covington Pike Street from Madison 32 $3,093,957 $11,645,956 Avenue to Main Street KYTC KY 1303 (Bristow Road) Roadway/Drainage 27 $468,000 $12,113,956 $7.8 m available

39 Ohio TA Applications (14)

40 Anderson Township Paddison Road Sidewalk New sidewalks on Paddison Road from Bluecrest to Beechmont Federal Funds $723,000 Local $408,500 Total Estimate $1,131,500

41 Cincinnati Central Parkway Bikeway Phase 2 Extension of Central Parkway bikeway from Marshall Avenue in CUF to Ludlow Avenue in Clifton Federal Funds $500,000 Local $125,000 Total Estimate $625,000

42 Cincinnati Wasson Way Phase 2B Extend Wasson Way from Floral/Elsmere Avenue in Evanston to Montgomery Road in Evanston. Federal Funds $740,000 Local $185,000 Total Estimate $925,000

43 Cincy Bike Share Red Bike Expansion 20 new bike share stations and 200 additional bicycles, predominantly electric assist (e-bikes) Federal Funds $750,000 Local $187,500 Total Estimate $937,500

44 Fairfield Great Miami River Trail Extension Extend the Great Miami River Trail approximately 8,300 feet from Waterworks Park to the parking facilities at Marsh Lake Park Federal Funds $750,000 Local $325,000 Total Estimate $1,075,000

45 Green Township Colerain Avenue Sidewalks Install sidewalks on both sides of Colerain Avenue from Blue Rock Road to 200 north of Loretta Avenue Federal Funds $409,969 Local $175,701 Total Estimate $585,397

46 Green Township Bridgetown Rd Sidewalks Phase 4 Phase 4 of the sidewalk system along Bridgetown Road from Kuliga Park to Hammersmith Drive (.66 miles) Federal Funds $397,978 Local $170,562 Total Estimate $568,540

47 City of Hamilton Miami 2 Miami Multi-Use Path Canal cultural trail from Bilstein Boulevard to Gilmore Road (east-west connection) Federal Funds $510,064 Local $127,516 Total Estimate $637,580

48 Hamilton Township Rivercrest Trail 1600 path connecting local neighborhoods to the Little Miami Scenic Bike Trail Federal Funds $300,000 Local $60,000 Total Estimate $360,000

49 City of Harrison Campbell Rd Multi-Use Path 10 wide multi-use path along the north side of Campbell Road from Featherstone Drive to West Road Federal Funds $289,200 Local $72,300 Total Estimate $361,500

50 Butler County MetroParks M2M Connection-Bypass 4 to Bilstein Blvd Multi-use trail that will connect the western end of the existing Miami and Erie Canal to an existing trailhead at Bilstein Park. Federal Funds $750,000 Local $500,903 Total Estimate $1,250,903

51 City of Monroe Great Miami River Trail 10 multi-use path along the Great Miami River. From the Monroe Bicentennial Commons Park to the city limits north. Federal Funds $650,000 Local $650,000 Total Estimate $1,300,000

52 City of Oxford Oxford Area Trail Network West side connector multiuse trail from Talawanda Middle School to Oxford Community Park. Federal Funds $750,000 Local $1,785,750 Total Estimate $2,535,750

53 West Chester Township Smith Road Connector Multi-use path connecting the roundabout at Smith and Beckett Road to the existing trail on Smith Road, just west of Princeton-Glendale Road. Federal Funds $740,000 Local $185,000 Total Estimate $925,000

54 LPA Sponsor OHIO TA - $4.2 million available Project Name PROJECT TYPE TA INFRASTRUCTURE FACTORS SAFETY CONSISTENCY WITH PLAN RECOMMENDATIONS CONNECTIONS STATUS OF PROJECT Anderson Township Paddison Road Sidewalk Butler County MetroParks M2M MUP - Bypass 4 to Bilstein Blvd Cincinnati Central Parkway Bikeway Phase Cincinnati Wasson Way Phase 2B Cincy Bike Share Red Bike Expansion Project Fairfield Fairfield Great Miami River Trail Extension Green Township Bridgetown Road Sidewalks Phase Green Township Colerain Avenue Sidewalks Hamilton M2M MUP: Canal Cultural Trail (Bilstein) to Gilmore Road Hamilton Township Rivercrest Trail Harrison Campbell Road Shared Use Path Monroe Great Miami River Trail - Monroe Section Oxford West Chester Township Oxford Area Trail Network-West Side Connector Smith Road Connector Trail - West Chester

55 LPA Sponsor OHIO TA - $4.2 million available Project Name PLANNING FACTORS FOR ALL PROJECTS ENVIRONMENTAL JUSTICE EXISTING EMPLOYMENT BONUS AIR QUALITY/ENERGY INTERMODAL ELEMENTS REPLACEMENT EXPANSION SRPP LOCAL PLANNING LOCAL SHARE HISTORY OF PROJECT DELIVERY Anderson Paddison Road Sidewalk Township Butler County M2M MUP - Bypass 4 to Bilstein Blvd MetroParks Cincinnati Central Parkway Bikeway Phase Cincinnati Wasson Way Phase 2B Cincy Bike Share Red Bike Expansion Project Fairfield Fairfield Great Miami River Trail Extension Green Township Bridgetown Road Sidewalks Phase Green Township Colerain Avenue Sidewalks Hamilton M2M MUP: Canal Cultural Trail (Bilstein) to Gilmore Road Hamilton Rivercrest Trail Township Harrison Campbell Road Shared Use Path Monroe Oxford West Chester Township Great Miami River Trail - Monroe Section Oxford Area Trail Network-West Side Connector Smith Road Connector Trail - West Chester

56 OHIO TA - $4.2 million available LPA Sponsor Project Name TOTAL POINTS FED $ REQUESTED FED $ RECOMMENDED RUNNING TOTAL Cincy Bike Share Red Bike Expansion Project 64 $750,000 $500,000 $500,000 Monroe Great Miami River Trail - Monroe Section 56 $650,000 $650,000 $1,150,000 Anderson Township Paddison Road Sidewalk 55 $723,000 $723,000 $1,873,000 Oxford West Chester Township Butler County MetroParks Hamilton Oxford Area Trail Network-West Side Connector Smith Road Connector Trail - West Chester 54 $750,000 $500,000 $2,373, $435,055 $435,055 $2,808,055 M2M MUP - Bypass 4 to Bilstein Blvd. 47 $750,000 $750,000 $3,558,055 M2M MUP: Canal Cultural Trail (Bilstein) to Gilmore Road 46 $510,064 $510,064 $4,068,119 Cincinnati Wasson Way Phase 2B 45 $740,000 $0 $4,068,119 Green Township Colerain Avenue Sidewalks 45 $409,969 $0 $4,068,119 Cincinnati Central Parkway Bikeway Phase 2 44 $500,000 $0 $4,068,119 Harrison Campbell Road Shared Use Path 44 $289,200 $0 $4,068,119 Hamilton Township Rivercrest Trail 43 $300,000 $0 $4,068,119 Green Township Bridgetown Road Sidewalks Phase 4 40 $397,978 $0 $4,068,119

57 Kentucky TA Applications (5)

58 Boone County Fiscal Court Burlington Sidewalks New sidewalks on the south side of KY18 from Ethan Drive to existing sidewalk east of Southpointe Drive and north side from Main Street to existing sidewalk west of Nicholas Street. Federal Funds $500,000 Local $128,000 Total Estimate $628,000

59 Boone County Fiscal Court Frogtown Connector Rd New sidewalk on the west side of Frogtown Connector Road from the end of the existing sidewalk north of Calle Luna Lane. Federal Funds $500,000 Local $140,000 Total Estimate $640,000

60 City of Erlanger Brightleaf & Narrows Rd Sidewalks New sidewalks on Brightleaf and Narrows Road from Turkeyfoot Road to Thorntree Road. Federal Funds $188,475 Local $47,119 Total Estimate $235,594

61 City of Florence Center and Russell Street Sidewalk New sidewalk along the south side of Center Street from Shelby Street to Liberty Court and the north-east side of Russell Street. Federal Funds $390,664 Local $97,666 Total Estimate $488,330

62 City of Silver Grove KY 8 Multi-Use Path, Phase 3 Multi-use path on the south side of KY 8 from the corner of KY 8 and Kay Wright Lane and the western entrance in Morschel Park. Federal Funds $186,163 Local $46,541 Total Estimate $232,704

63 LPA Sponsor KENTUCKY TA Project Name $1.8 million available TA INFRASTRUCTURE FACTORS PROJECT TYPE SAFETY CONSISTENCY WITH PLAN RECOMMENDATIONS CONNECTIONS STATUS OF PROJECT Boone County Fiscal Court Boone County Fiscal Court Burlington KY 18 Sidewalks Frogtown Connector Road Sidewalk Erlanger Brightleaf & Narrows Road Sidewalk Completion Grant Florence Center and Russell Street Sidewalk Silver Grove Silver Grove KY 8 Sidewalks Phase

64 KENTUCKY TA $1.8 million available PLANNING FACTORS FOR ALL PROJECTS LPA Sponsor Project Name ENVIRONMENTAL EXISTING BONUS AIR QUALITY/ENERGY INTERMODAL REPLACEMENT SRPP LOCAL PLANNING LOCAL SHARE HISTORY OF PROJECT DELIVERY Boone County Burlington KY 18 Sidewalks Fiscal Court Boone County Frogtown Connector Road Sidewalk Fiscal Court Erlanger Brightleaf & Narrows Road Sidewalk Completion Grant Florence Center and Russell Street Sidewalk Silver Grove Silver Grove KY 8 Sidewalks Phase

65 KENTUCKY TA $1.8 million available LPA Sponsor Project Name TOTAL POINTS FED $ REQUESTED RUNNING TOTAL Boone County Fiscal Court Burlington KY 18 Sidewalks 46 $512,000 $512,000 Florence Center and Russell Street Sidewalk 42 $390,664 $902,664 Silver Grove Silver Grove KY 8 Sidewalks Phase 3 41 $186,163 $1,088,828 Erlanger Brightleaf & Narrows Road Sidewalk Completion Grant 36 $188,475 $1,277,303 Boone County Fiscal Court Frogtown Connector Road Sidewalk 28 $560,000 $1,837,303

66 Next Steps September 18, 2018 October 9, 2018 October 11, 2018 By October 26, 2018 April 11, 2019 Prioritization Subcommittee (if needed) ICC Approval OKI Board Approval Award letters distributed Included in Final FY20-23 TIP

OKI Awards More Than $41 Million to Transportation Projects Across the Region

OKI Awards More Than $41 Million to Transportation Projects Across the Region FOR IMMEDIATE RELEASE October 11, 2018 Contact: Ashley Patrick apatrick@oki.org (330) 573-4932 m. OKI Awards More Than $41 Million to Transportation Projects Across the Region Cincinnati, Ohio Ohio-Kentucky-Indiana

More information

2017 (FY 21,22,23) Ohio CMAQ Project Selection

2017 (FY 21,22,23) Ohio CMAQ Project Selection 2017 (FY 21,22,23) Ohio CMAQ Project Selection Executive Committee September 14, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit Authorities

More information

2017 (FY 21,22,23) Ohio CMAQ Prioritization

2017 (FY 21,22,23) Ohio CMAQ Prioritization 2017 (FY 21,22,23) Ohio CMAQ Prioritization Intermodal Coordinating Committee September 12, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Appendix C. Data on Transportation Improvements

Appendix C. Data on Transportation Improvements Appendix C Data on Transportation Improvements Table 5. Transportation Improvements for Expanding Highway Capacity in Ohio Counties in the OKI Region BUTLER COUNTY Scheduled Transportation Improvements

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Appendix A. Summary of Progress Made Since 2004 Plan. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

Appendix A. Summary of Progress Made Since 2004 Plan. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan Appendix A Summary of Progress Made Since 2004 Plan Appendix A Summary of Progress Made Since 2004 Plan INTRODUCTION This appendix provides a list of transportation related projects that have been completed

More information

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018 ATTRIBUTABLE FUNDS COMMITTEE Summary of Project Updates and New Funding Requests September 5, 2018 Funding Management Process Review & Update Policies Adopt Funding Commitments Public Comment Public Comment

More information

Deerfield Township Hamilton Township

Deerfield Township Hamilton Township EXECUTIVE SUMMARY I. Introduction The Southwest Warren County Transportation Study is focused on a 100 square mile area with numerous transportation problems that call for a multitude of solutions (see

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Planned Improvements from Sector & Area Plans that have been added to the MTP

Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

R O A D W A Y S. Chapter

R O A D W A Y S. Chapter INTRODUCTION The region s roadway system carries the vast majority of person trips and is an important part of the freight movement system. Roads also provide the right of way for buses, making the roadway

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

Engineering - Bicycle and Pedestrian

Engineering - Bicycle and Pedestrian Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

COMMITTED TOTAL 9,518,714 5,167, ,800 15,185,405 BALANCE (2,486,243) 6,751, ,256 5,082,514

COMMITTED TOTAL 9,518,714 5,167, ,800 15,185,405 BALANCE (2,486,243) 6,751, ,256 5,082,514 TMACOG TIP PROGRAM FY2010 AND FY2011 PLUS PIPELINE PROJECTION FY2012 THROUGH 2017 revised 02/03/2010 FISCAL PROJECT R/W PS&E FEDERAL PROJECT CONSTRUCT CONSTRUCT YEAR PID SPONSOR PROJECT NAME PROJECT LIMITS

More information

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer Colerain Avenue Roadway Improvements Sponsored by Hamilton County Engineer Participants Lead Agency: Hamilton County Engineer Review and Approval: Ohio Department of Transportation Design Engineer: Edwards

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Balancing Operation & Safety for Motorized and Non-Motorized Traffic Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

Implementation Plan. 5.1 Improvement Program

Implementation Plan. 5.1 Improvement Program 5 Implementation Plan Section 4 presented detailed recommendations for transportation improvements and land use strategies in the Route 6 Hop River corridor. This section outlines how the transportation

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Quebec Alternatives Analysis Public Meeting Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,

More information

Proposed White Flint Separated Bike Lane Network September 2015

Proposed White Flint Separated Bike Lane Network September 2015 Proposed White Flint Separated Bike Lane Network September 2015 Abstract This report includes a proposed separated bike lane network for the White Flint Sector Plan area. Separated bike lanes create a

More information

Long Island Rail Road Expansion Project Floral Park to Hicksville

Long Island Rail Road Expansion Project Floral Park to Hicksville Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral

More information

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017 MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood

More information

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose

More information

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017 1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

Lynchburg District Update

Lynchburg District Update Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011 Transportation in Washoe County Lee Gibson, Executive Director February 15, 2011 RTC OF WASHOE COUNTY Metropolitan Planning Organization Meet long term needs Deliver federal funding Program projects in

More information

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY SECTION 7 INVEY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY The study corridor includes a total of 19 signalized intersections. Through consultation with Campbell County and the KYTC,

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

Complete Streets Funding Program Project Prioritization Plan

Complete Streets Funding Program Project Prioritization Plan Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1) Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

Project Status Update

Project Status Update Project Status Update : Novato Boulevard, 4th & 3rd Streets, Sir Francis Drake Boulevard (3), and Miller Avenue Major roads projects target the most heavily traveled roads in Marin County for repairs,

More information

List of Display Boards

List of Display Boards List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments

More information

5 Transit & Traffic. Overview

5 Transit & Traffic. Overview 5 Transit & Traffic Overview Montgomery Place s roadways and overall traffic circulation are unique in the city due to the narrow streets and avenues with boulevards; however, no sidewalks or curbs in

More information

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator Bicycle Lanes Planning, Design, Funding 2018 South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator Policy Changes: BOP Bicycle Policy Changes The OLD Way

More information

Spring Athletic Directions 2014

Spring Athletic Directions 2014 Spring Athletic Directions 2014 ALTER Volleyball/Lacrosse I 75 north to I 675 north take the St Rt 48 Kettering exit (2 nd Rt 48 exit) bear right off the ramp and follow St Rt 48 (Far Hill) to David Rd

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

2017 General Obligation Bond

2017 General Obligation Bond 2017 General Obligation Bond Agency Presentation to Transportation & Mobility Stakeholder Committee April 6, 2017 Presentation Highlights Overview Vision and Need Projects Critical System Mobility Networks

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Who is Toole Design Group?

Who is Toole Design Group? 2018 AASHTO Bike Guide Status Update NCHRP 15 60 Amalia Leighton Cody, PE, AICP & Kenneth Loen, PE Washington APWA October 4, 2018 Who is Toole Design Group? TDG is a full service engineering, planning

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

NEED FOR ADDITIONAL FUNDING

NEED FOR ADDITIONAL FUNDING Measure B BACKGROUND 2013: Vision for a supplement to Measure A that prioritizes local roads & regional capital projects Plan developed by Professional Advisory Group Consensus recently built on RT O&M

More information

SNCC Demographic Trends

SNCC Demographic Trends Employment Population SNCC Demographic Trends In 1970 the SNCC population was 10,040, accounting for roughly 3% of the County population In 2015, SNCC grew to 60,567 people, roughly 11% of the County population

More information

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project

More information

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017 Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we

More information

KY 536 Scoping Study Final Report

KY 536 Scoping Study Final Report KY 536 Scoping Study December 16, 2015 Prepared for and with the Ohio-Kentucky-Indiana Regional Council of Governments 720 E. Pete Rose Way, Suite 420 Cincinnati, OH 45202 Prepared by WSP Parsons Brinckerhoff

More information

ExpressFall/Winter 2017

ExpressFall/Winter 2017 Evansville MPO Fall/Winter 017 Transportation Planning for Henderson, Vanderburgh, and Warrick counties Metropolitan Transportation Plan 0 The Evansville MPO is gearing up to begin updating Metropolitan

More information

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council Bicycle and Pedestrian Connectivity Study Old Colony Planning Council Outline Why consider bike/peds in road designs? Why are measures needed? Connecting Land Use with Transportation Evaluation Tools:

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Bicycle Transportation Budget Plan: Lawrence, KS

Bicycle Transportation Budget Plan: Lawrence, KS Bicycle Transportation Budget Plan: Lawrence, KS Bicycle Objectives Lawrence Planning Documents Establish a dedicated funding plan to complete the implementation of a bikeway system plan, and for maintenance

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie