1 APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July 13, Report_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers P.O. Box 774, Manotick, ON K4M 1A7 - Tel (613) Fax (613)

2 TABLE OF CONTENTS PAGE 1. INTRODUCTION Scope of Work EXISTING ROADWAY NETWORK PROPOSED DEVELOPMENT Trip Generation Trip Distribution TRANSPORTATION IMPACT Background Traffic Volumes Total Traffic Volumes Traffic Analysis Site Circulation Transportation Demand Management (TDM) FINDINGS AND RECOMMENDATIONS APPENDIX LIST OF FIGURES 1.1 SITE LOCATION PLAN EXISTING PEAK AM AND PM HOUR TRAFFIC COUNTS CONCEPTUAL SITE PLAN WEEKDAY PEAK AM AND PM HOUR SITE GENERATED TRIPS YEAR 2020 PEAK AM AND PM HOUR BACKGROUND TRAFFIC YEAR 2025 PEAK AM AND PM HOUR BACKGROUND TRAFFIC YEAR 2020 PEAK AM AND PM HOUR TOTAL TRAFFIC YEAR 2025 PEAK AM AND PM HOUR TOTAL TRAFFIC RECOMMENDED ROADWAY MODIFICATIONS Site Access (CTC)/Heron LIST OF TABLES 3.1 TRIP GENERATION RATES PEAK HOUR SITE TRIPS GENERATED SITE ACCESS (CTC ACCESS)/HERON ROAD - LoS & Volume to Capacity (v/c) CECIL AVENUE/BANK STREET - LoS & Delay HERON ROAD/BANK STREET - LoS & Volume to Capacity (v/c)... 19

3 1. INTRODUCTION APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY A Site Plan has been prepared for the development of a parcel of land along the north side of Heron Road approximately 155 m west of Bank Street. The land is ha in size with a municipal address of 1161 Heron Road. The owner of the property, Manor Park Management, has proposed to development the land by constructing residential apartments. The development will consist of 343 rental units in two 4 to 16 storey apartment buildings. The plan provides 403 parking spaces in an underground garage with 8 surface parking spaces for visitors. The site will have one access onto Heron Road and one access onto Cecil Avenue adjacent to the north property line of the site. The site will also have two access points for truck loading. The development is expected to be completed and substantially occupied by the year The location of the site is shown in Figure 1.1. The developer of the lands has retained the firm of D. J. Halpenny & Associates Ltd. to prepare a traffic study report in support of the Site Plan Control Application for the land. The study will address the impact of site related trips on the adjacent roads at the completion of the development. The study will determine the operation of the site accesses and adjacent intersections, and recommend modifications if required due to the development of the site. 1.1 Scope of Work The scope of the traffic study is to examine the operation of the site accesses and adjacent intersections which may be impacted by the traffic generated by the development. The number of new site generated trips would trigger the requirement of a as documented in the City of Ottawa Transportation Impact Assessment Guidelines, The report will address the operation of the site access onto Heron Road (existing Canadian Tire store access), and the Heron/Bank and Cecil/Bank intersections. The study will not be examining the site access onto Cecil Avenue since the volume of traffic along Cecil Avenue is very low, but will determine the operation of the Cecil/Bank intersection due to the impact of the site generated trips. The traffic analysis will be completed for the Site Access (Canadian Tire)/Heron, Heron/Bank, and Cecil/Bank intersections for the existing traffic counts, for the expected traffic at the year 2020 when the site is completed, and at the year 2025 which represents five years beyond completion of the site. The time period for the study was taken as the weekday peak AM and PM hours of the adjacent streets which is when both the residential apartment development and the background traffic volumes on the adjacent streets would be the highest.

4 2 FIGURE 1.1 SITE LOCATION PLAN

5 3 2. EXISTING ROADWAY NETWORK The site is located along the north side of Heron Road. Heron Road is an east-west roadway designated as an arterial road in the City of Ottawa Transportation Master Plan. The road has a four lane divided cross section with a posted speed limit of 50 km./h. The speed limit increases to 60 km./h. at approximately the west property limit of the site. There is a westbound abandoned bus bay in front of the site, but the location of the westbound bus stop is not within the bus bay and is not used by OC Transpo buses. There are no cycling lanes on Heron Road in the vicinity of the site. Parking is prohibited along both sides of Heron Road. Pedestrian sidewalks exist along both sides of Heron Road. The north limit of the site fronts onto Cecil Avenue, a two lane local street with a rural cross section. Cecil Avenue is approximately 160 metres in length, and dead ends at approximately the west limit of the proposed site. There are two small commercial buildings along the north side of Cecil Avenue, a Shoppers Drug Mart at the southwest corner of Cecil Avenue and Bank Street, and a Bank of Montreal at the northwest corner. The Shoppers Drug Mart has access points onto both Cecil Avenue and Bank Street, and the Bank of Montreal onto Cecil Avenue. The roadway has an unposted speed limit of 50 km./h., with no pedestrian sidewalks. Bank Street in the vicinity of Cecil Avenue is a four lane undivided roadway with a shared northbound and southbound centreline left turn lane. Bank Street has a posted speed limit of 50 km./h., with no cycling lanes. Pedestrian sidewalks exist along both sides of the roadway. The intersection of Heron Road and the access to the Canadian Tire (CTC) store is a two phase signalized intersection. The north approach to the intersection will form the Heron Road access to the proposed residential development. The intersection currently has a westbound Heron Road left turn lane into the CTC site which contains approximately 25 metres of vehicular storage. There is a median cut approximately 35 metres west of the intersection which served as a railway crossing, but has since been abandoned. Traffic signs at the median cut prohibit U Turns in both the eastbound and westbound directions along Heron Road. The intersection of Cecil Avenue and Bank Street is an unsignalized T intersection controlled by a stop sign at the eastbound Cecil Avenue approach. The northbound Bank Street approach comprises of two northbound through lanes, and a shared northbound/southbound centreline left turn lane. The southbound Bank Street approach comprises of one southbound through lane, and a shared southbound through/right turn lane. The eastbound Cecil Avenue approach comprises of one shared left/right turn lane. The Heron/Bank intersection is controlled by traffic signals with Bank Street forming the northbound and southbound approaches, and Heron Road the eastbound and westbound approaches. The intersection has signs prohibiting U Turns at the northbound and southbound Bank Street approaches, and eastbound Heron Road approach. The intersection has the following lane configuration:

6 4 Northbound Bank Street - 2 left turn lanes 1 through lane 1 shared through/right lane (channelized right) Southbound Bank Street - 1 left turn lane 1 through lane 1 shared through/right lane (channelized right) Eastbound Heron Road - 1 left turn lane 2 through lanes 1 right turn lane (channelized) Westbound Heron Road - 1 left turn lane 2 through lanes 1 right turn lane Figure 2.1 shows the existing traffic volumes for the weekday peak AM and PM hours taken by City of Ottawa staff on August 3, 2012 at the intersection of Heron Road and the access to the CTC store, and at the intersection of Bank Street and Heron Road on May 15, The peak hour counts at the CTC/Heron intersection is provided in the Appendix as Exhibit 1, and at the Heron/Bank intersection as Exhibit 2. Counts at the Cecil Avenue and Bank Street intersection were taken by the consultant (D. J. Halpenny & Associates Ltd.) on November 9, 2015 with the Bank Street traffic balanced with the Heron/Bank intersection. 3. PROPOSED DEVELOPMENT The residential apartment development at 1161 Heron Road is located along the north side of Heron Road approximately 155 m west of Bank Street. The development property is currently vacant and ha in size. The property is zoned Arterial Mainstreet Subzone 8 (Bank Street Subzone) AM8 which will support the proposed development. Development in the area consists mainly of commercial uses with the Canadian Tire (CTC) store on Heron Road across from the site and commercial along Bank Street. West of the site on Heron Road the land use is mainly residential. The development is expected to be completed and substantially occupied by the year The Site Plan proposes a rental apartment development which will consist of two buildings. The apartment buildings will contain a total of 343 rental apartment units. Access to the site will be from an interior road which will connect to both Heron Road and Cecil Avenue. The interior road will provide one main access to a parking garage which will be utilized by both apartment buildings. The parking garage will provide 403 vehicular parking spaces and storage for 314 bicycles. The development would also provide 5 surface visitor parking spaces and 3 layby spaces, and two outside bike racks for the storage of 8 bicycles. Each of the two apartment buildings will have a secondary access to a loading area for trucks, with one access onto Heron Road and a second access onto Cecil Avenue. Figure 3.1 provides a conceptual site plan of the development.

7 5 FIGURE 2.1 EXISTING PEAK AM AND PM HOUR TRAFFIC COUNTS

8 6 FIGURE 3.1 CONCEPTUAL SITE PLAN

9 7 3.1 Trip Generation The will examine the trips from the proposed high-rise apartment building. The trips were determined utilizing the statistical data published in the Institute of Transportation Engineers (ITE) document, Trip Generation, 9 th Edition. The trip generation analysis used the trip rates for a High-Rise Apartment land use, ITE Land Use Code 222. Table 3.1 presents the average trip rates during the weekday peak AM and PM hour time period for a high-rise apartment building. TABLE 3.1 TRIP GENERATION RATES LAND USE TRIP GENERATION RATE Peak AM Hr. Peak PM Hr. High-Rise Apartment (ITE Land Use 222) 0.30 T/Unit 0.35 T/Unit The determination of the number of site generated trips utilized the trip rates of Table 3.1 and the proportion of trips entering and exiting the site as documented in the ITE manual. The City of Ottawa Transportation Master Plan 2013 has identified the 2011 peak morning period as having a transit share of 22.4%, with a share expected at 26.0% by the year The surrounding area of the proposed apartment buildings is well serviced by transit with Route #112 travelling along Heron Road past the site, Route #1 along Bank Street, and the Heron Transitway station and Confederation O - Train station located a couple of blocks west of the site. The City of Ottawa Official Plan Schedule D (Rapid Transit Network) indicates that Heron Road is planned as a future bus intensive Transit route past the site with a bus transit station planned at the intersection of Heron Road and Bank Street. With the current level of transit service and the planned service in the future, the analysis has applied a 30 percent transit share reduction to the site generated trips to account for shared trips with public transit. Table 3.2 shows the expected number of weekday peak AM and PM hour site generated trips for the apartment building development. 3.2 Trip Distribution The distribution of site generated trips was determined by examining the distribution of existing traffic during the weekday peak AM and PM hours at the intersection of Heron Road and Bank Street. The background traffic volumes would best represent the origin/destination of peak hour commuter traffic.

10 8 TABLE 3.2 PEAK HOUR SITE TRIPS GENERATED UNIT TYPE WEEKDAY PEAK AM HR. WEEKDAY PEAK PM HR. TOTAL ENTER EXIT TOTAL ENTER EXIT 343 Apartment Units (25%) 77 (75%) (61%) 47 (39%) 30% Transit Share Reduction TOTAL SITE TRIPS Below is the distribution of site trips from the apartment building development which was applied in the study analysis. 25 % to/from the north 15 % to/from the south 20 % to/from the east 40 % to/from the west The above distribution of site generated trips was used to distribute the trips of Table 3.2 onto Heron Road, Bank Street, and Cecil Avenue during both the peak AM and PM hours. Since the internal road through the site connects to both Heron Road and Cecil Avenue, the site trips were distributed to the shortest and most convenient route for each direction. The distribution does recognize the difficulty in making the eastbound Cecil Avenue left turn movement to travel north along Bank Street during peak hours, and has assigned 50 percent of the trips to eastbound Heron Road turning left to northbound Bank Street. Figure 3.2 shows the expected distribution of site generated trips for the weekday peak AM and PM hours. 4. TRANSPORTATION IMPACT The study will examine the operation of the site access and adjacent intersections which would be impacted by the expected peak hour traffic from the development. The intersections examined in the study will comprise of the following intersections: 1) Site Access (CTC access)/heron Road 2) Cecil Avenue/Bank Street 3) Bank Street/Heron Road

11 9 FIGURE 3.2 WEEKDAY PEAK AM AND PM HOUR SITE GENERATED TRIPS

12 10 The analysis will use the Highway Capacity Software, which utilizes the intersection capacity analysis procedure as documented in the Highway Capacity Manual The analysis examined the intersections for the existing traffic counts, at build out in 2020, and in 2025 which represents five years beyond the completion of the development. For unsignalized intersections, the level of service of each lane movement is determined as a function of the delay of vehicles at the approach. The following relates the level of service of each lane movement with the expected delay at the approach. LEVEL OF SERVICE DELAY Level of Service A 0-10 sec./vehicle Little or No Delay Level of Service B >10-15 sec./vehicle Short Traffic Delays Level of Service C >15-25 sec./vehicle Average Traffic Delays Level of Service D >25-35 sec./vehicle Long Traffic Delays Level of Service E >35-50 sec./vehicle Very Long Traffic Delays Level of Service F >50 sec./vehicle Extreme Delays Demand Exceeds Capacity The expected length of queue at the critical lane movements for an unsignalized intersection was determined by the calculation of the 95 th percentile queue at the lane approach. The 95 th percentile queue length is the calculated 95 th greatest queue length out of 100 occurrences at a movement during a 15-minute peak period. The 95 th percentile queue length is a function of the capacity of a movement and the total expected traffic, with the calculated value determining the magnitude of the queue by representing the queue length as fractions of vehicles. For a signalized intersection, the operation or level of service of an intersection is determined from the volume to capacity ratio (v/c) for each lane movement as documented by the City of Ottawa in the Assessment Guidelines, October The following relates the level of service with the volume to capacity ratio at each lane movement. LEVEL OF SERVICE VOLUME TO CAPACITY RATIO Level of Service A 0 to 0.60 Level of Service B 0.61 to 0.70 Level of Service C 0.71 to 0.80 Level of Service D 0.81 to 0.90 Level of Service E 0.91 to 1.00 Level of Service F > Background Traffic Volumes The volume of background traffic for the years 2020 and 2025 was determined from examination of historical traffic counts at the Heron Road and Bank Street intersection which were taken on June 7, 1996, July 4, 2001 and May 15, The total Annual Average Daily Traffic (AADT) counts at all approaches to the intersection were examined and it was determined that traffic growth from 1996 to 2014 increased at an annual compounded rate of 0.35 percent, and between 2001 and 2014 the traffic increased at 0.36 percent. To determine the 2020 and 2025 background traffic volumes, the analysis has utilized a 1.0 percent annual compounded increase which was applied to all approaches at the Heron/Bank intersection for the year 2014 traffic.

13 11 The existing traffic to the Canadian Tire (CTC) store and traffic along Cecil Avenue were not adjusted and were assumed to not increase over time since no new development is anticipated. Traffic at the Cecil/Bank and Site Access (CTC)/Heron intersections were balanced with the traffic at the Heron/Bank intersection. The following presents the growth factors which were applied to the 2014 traffic at the Heron/Bank intersection to determine the 2020 and 2025 background traffic. To 2020 To Traffic Counts at 1% annual growth Figure 4.1 shows the expected 2020 background traffic volumes (excluding proposed site trips) on the adjacent roadways, and Figure 4.2 the 2025 background traffic. 4.2 Total Traffic Volumes The total expected 2020 and 2025 weekday peak AM and PM hour traffic volumes were determined by the addition of the expected site trips from the proposed development which are shown in Figure 3.2, and the 2020 and 2025 background traffic shown in Figures 4.1 and 4.2 respectively. The results are the expected total traffic volumes which will be examined in the study. The 2020 total traffic is shown in Figure 4.3 and the 2025 total traffic in Figure Traffic Analysis The traffic study has examined the operation of the site s main access onto Heron Road at the access to the existing CTC store. The site has a secondary access onto Cecil Avenue and the study has analyzed the operation of the intersection of Cecil Avenue and Bank Street. The Heron/Bank intersection which is located approximately 155 m east of the site will also be examined in the study analysis. The analysis periods would be for the existing traffic counts, the year 2020 when build out of the development is expected, and at the year 2025 which represents five years beyond build out of the apartment building development. The time period for the analysis would be the weekday peak AM and PM hours of the adjacent roads. The results of the analysis are discussed in detail in the following sections: Site Access (Canadian Tire Access) and Heron Road Intersection The main access to the proposed apartment building site would be from Heron Road at the CTC store access. Currently the intersection is a T intersection with Heron Road forming the eastbound and westbound approaches, and the CTC store access forming the northbound approach. The site access will form the southbound approach which will be 6.0 m in width and will provide a shared left/through/right turning movement. Utilizing the 2012 traffic counts and the signal timing plan which was obtained from the City of Ottawa, the intersection was determined to function at an overall Level of Service (LoS) A during both the peak AM and PM hours. The analysis sheets are provided in the Appendix as

14 12 FIGURE 4.1 YEAR 2020 PEAK AM AND PM HOUR BACKGROUND TRAFFIC

15 13 FIGURE 4.2 YEAR 2025 PEAK AM AND PM HOUR BACKGROUND TRAFFIC

16 14 FIGURE 4.3 YEAR 2020 PEAK AM AND PM HOUR TOTAL TRAFFIC

17 15 FIGURE 4.4 YEAR 2025 PEAK AM AND PM HOUR TOTAL TRAFFIC

18 16 Exhibit 3 for the peak AM hour and Exhibit 4 for the peak PM hour. A summary of the operation of the intersection is provided in Table 4.1. TABLE 4.1 SITE ACCESS (CTC ACCESS)/HERON ROAD LoS & Volume to Capacity (v/c) Intersection Approach WEEKDAY PEAK AM HR. YEAR (2025) WEEKDAY PEAK PM HR. YEAR (2025) LoS v/c LoS v/c EB Left Heron Road * - A (A) (0.06) - A (A) (0.10) EB Through/ Heron Road A A (A) (0.57) A C (C) (0.78) WB Left Heron Road A A (A) (0.11) A B (C) (0.73) WB Through/ Heron Road * A D (D) (0.85) A A (B) (0.63) NB Left/Through CTC Access A A (A) (0.21) A A (A) (0.22) SB Left/Through/ Site Access * - A (A) (0.16) - A (A) (0.09) Total Intersection A B (C) (0.71) A B (B) (0.66) * For the 2012 traffic counts the existing intersection geometry is a T intersection with no southbound approach or eastbound left turn and westbound right turn movements. The expected volume of traffic at the years 2020 and 2025 would include the trips from the proposed apartment building site. The site access would form the southbound approach to Heron Road. An eastbound Heron Road left turn lane is recommended and was incorporated into the operational analysis due to the high volume of through traffic along Heron Road. The westbound Heron Road approach would comprise of a shared through/right lane movement into the site and an existing exclusive left turn lane into the CTC site. The existing abandoned bus bay on the north side of Heron Road adjacent to the site would be removed. Figure 4.5 shows the recommended intersection modifications. The operational analysis for the 2020 traffic determined that the intersection would operate at a LoS B during both the peak AM and PM hours. The analysis made slight adjustment to the existing signal timing plan but retained the 110 second peak AM hour and 120 second peak PM hour signal cycle. The through traffic along Heron Road was balanced with the 2020 traffic at the Heron/Bank intersection. Exhibit 5 and Exhibit 6 provide the operational analysis sheets with a summary of the analysis shown in Table 4.1. For the expected 2025 traffic, the intersection would operate at a LoS C during the peak AM hour and LoS B during the peak PM hour with the analysis sheets provided as Exhibit 7 and Exhibit 8 with the summary of the intersection operation shown in Table 4.1.

19 17 FIGURE 4.5 RECOMMENDED ROADWAY MODIFCATIONS Site Access (CTC)/Heron

20 18 The recommended roadway modifications required due to the development of the site are shown in Figure 4.5 and would consist of an eastbound Heron Road left turn lane providing 40 m of vehicular storage with a 50 m taper, the removal of the abandoned bus bay along the north side of Heron Road adjacent to the site, and modifications to the traffic signals. Cecil Avenue and Bank Street Intersection The site proposes a secondary access onto Cecil Avenue approximately 84 m west of the Cecil/Bank intersection. With little traffic along Cecil Avenue, the study has examined the impact of the site traffic from the Cecil Avenue access on the operation of the Cecil/Bank intersection. The Cecil/Bank intersection is a T intersection with Bank Street forming the northbound and southbound approaches and Cecil Avenue the eastbound stop controlled approach. The eastbound Cecil Avenue approach would consist of one lane providing shared left and right turning movements, and the northbound Bank Street approach would have an exclusive left turn lane onto Cecil Avenue. For the traffic analysis the volume of through traffic along Bank Street was balanced with the traffic at the Heron/Bank intersection. The operational analysis using the 2015 traffic determined that during the peak AM hour the northbound Bank Street left turn movement would function at a LoS A and eastbound Cecil Avenue approach at a LoS B. During the peak PM hour the northbound left turn lane would function at a LoS B and eastbound approach at a LoS C. It was observed during the peak PM hour traffic counts (November 9, 2015) that the queuing at the southbound approach to the Heron/Bank intersection located approximately 135 m south of Cecil Avenue would periodically extend past Cecil Avenue which would block any eastbound left turn movements from Cecil Avenue. The counts observed a maximum queue at the eastbound approach to be 1 vehicle during the peak AM hour and 3 vehicles during the peak PM hour due to the queuing along Bank Street. The queuing would clear every cycle of the Heron/Bank traffic signals. The operational analysis sheets are provided as Exhibit 9 and Exhibit 10, with the summary of the analysis shown in Table 4.2. TABLE 4.2 CECIL AVENUE/BANK STREET LoS & Delay Intersection Approach WEEKDAY PEAK AM HR. YEAR (2025) WEEKDAY PEAK PM HR. YEAR (2025) LoS Delay (sec.) LoS Delay (sec.) NB Left Bank Street A A (A) (8.8) B B (B) (13.7) EB Left/ Cecil Avenue B B (B) (13.2) C C (C) (19.5) Examination of the intersection operation during the 2020 and 2025 traffic periods determined that the intersection would continue to operate at the same level of service with the northbound left turn movement functioning at a LoS A and eastbound approach at a LoS B during the peak AM hour, and during the peak PM hour the northbound left turn movement functioning at a

21 19 LoS B and eastbound approach at a LoS C. The 95 th percentile queue for the 2025 volume of traffic was determined to be 0.32 vehicles at the northbound left turn movement and 0.82 vehicles at the eastbound Cecil Avenue approach. As previously mentioned, the eastbound Cecil Avenue approach would experience an increased queue due to the periodic blocking of the intersection by vehicular queuing from the Heron/Bank intersection. The analysis sheets are provided as Exhibits 11 and 12 for the 2020 traffic and Exhibits 13 and 14 for the 2025 traffic. A summary of the operation of the intersection is shown in Table 4.2. The proposed development would not trigger any requirement for intersection modifications. Heron Road and Bank Street Intersection The intersection of Heron Road and Bank Street is currently controlled by traffic signals with Heron Road forming the eastbound and westbound approaches and Bank Street the northbound and southbound approaches. Utilizing the 2014 traffic counts and the existing intersection geometry and traffic signal timing plan, the intersection was determined to operate at a LoS D during the peak AM hour and a LoS E during the peak PM hour. Exhibit 15 provides the analysis sheet for the peak AM hour and Exhibit 16 the peak PM hour. Table 4.3 summarizes the operation of the intersection. TABLE 4.3 HERON ROAD/BANK STREET LoS & Volume to Capacity (v/c) Intersection Approach WEEKDAY PEAK AM HR. YEAR (2025) WEEKDAY PEAK PM HR. YEAR (2025) LoS v/c LoS v/c EB Left Heron Road E E (E) (1.00) D E (E) (0.98) EB Through Heron Road A A (A) (0.54) C C (C) (0.79) WB Left Heron Road A A (A) (0.36) C C (D) (0.84) WB Through Heron Road F F (F) (1.16) F E (F) (1.02) WB Heron Road A A (A) (0.25) A A (A) (0.18) NB Left Bank Street C B (C) (0.74) A B (D) (0.88) NB Through Bank Street B C (D) (0.82) B B (C) (0.73) SB Left Bank Street E C (D) (0.81) D E (F) (1.03) SB Through Bank Street A B (B) (0.65) E F (F) (1.13) Total Intersection D E (E) (0.94) E E (F) (1.04)

22 20 As the background traffic increases to the year 2020, the intersection was determined to operate at a LoS E during both the peak AM and PM hours. The timing of the traffic signals was adjusted to optimize the movement of traffic, but the signal cycle length was maintained at 120 seconds for the peak AM hour and 130 second for the peak PM hour. The operational analysis sheets are provided as Exhibit 17 for the peak AM hour and Exhibit 18 for the peak PM hour with a summary of the 2020 operation of the intersection shown in Table 4.3. At the year 2025 the operational analysis determined that the intersection would function at a LoS E during the peak AM hour and LoS F during the peak PM hour. The intersection would experience long delays at the approaches due to the increasing volume of background traffic. The traffic signal timing plan was adjusted with a peak AM cycle length of 120 seconds and peak PM cycle length of 125 seconds. Exhibit 19 provides the peak AM hour analysis and Exhibit 20 the peak PM hour analysis. The summary is shown in Table 4.3. The proposed development would not trigger any requirement for intersection modifications with the exception of adjustments to the traffic signal timing. 4.4 Site Circulation The Site Plan of the development shows an efficient circulation of traffic with an access point onto Heron Road at a signalized intersection and an access point onto Cecil Avenue. The clear throat length at each access is approximately 40 m which meets the suggested throat length as documented in the Transportation Association of Canada (TAC) guidelines, Geometric Design Guide for Canadian Roads. The two truck loading area accesses would experience a very low number of intermittent trips and was not examined in the study. The Heron Road truck access would be located approximately 39 m east of the site s main Heron Road access. The truck access would be restricted to right-in/right-out turning movements controlled by the median along Heron Road. The Cecil Avenue truck access is located approximately 22 m west of the site s Cecil Avenue access. Trucks would enter and exit from the Cecil/Bank intersection. The two apartment buildings share one large underground parking garage which has one access. The access provides the opportunity for residents to enter or exit at either Heron Road or Cecil Avenue depending on the destination of their trip or the convenience of the access. The site has an internal sidewalk connecting both buildings to the municipal sidewalk along Heron Road and to Cecil Avenue which connects to Bank Street. 4.5 Transportation Demand Management (TDM) The City of Ottawa is implementing Transportation Demand Management (TDM) measures as a plan to reduce peak hour traffic along the City s transportation network. The site comprises of two residential apartment buildings which can take advantage of all modes of transportation. The Site Plan does serve the principals of TDM by locating the site in close proximity to pedestrian, cycling and transit facilities. The following will list the facilities which would reduce the volumes of peak hour vehicular traffic:

23 21 1. The proposed apartment buildings are connected to the municipal sidewalk along Heron Road which provides access to the commercial and retail stores in the area, and also to the Heron Transitway Station. 2. The site is well served by transit with OC Transpo Route #112 traveling along Heron Road and Route #1 along Bank Street which provides access to the Billings Bridge Transitway Station and to the downtown area. The Heron Transitway Station and Confederation O - Train Station are also located a couple of blocks west of the site. The City of Ottawa Official Plan Schedule D (Rapid Transit Network) indicates that Heron Road is planned as a future bus intensive transit route past the site with a bus transit station planned at the intersection of Heron Road and Bank Street. 3. Heron Road and Bank Street are both identified as a Spine Route and Cross-town Bikeway route in the Primary Cycling Network as documented in the City of Ottawa Transportation Master Plan. The Site Plan provides storage on the first level of the parking garage for 314 bicycles, with two additional bike racks near the front entrance to the buildings which provides storage for 8 bicycles. 5. FINDINGS AND RECOMMENDATIONS A Site Plan has been prepared for the development of land at 1161 Heron Road. The development consists of two apartment buildings which would provide 343 rental apartment units. The site would have an access onto Heron Road forming the southbound approach to the existing CTC store access, and a second access onto Cecil Avenue at the north limit of the site. The development will have one underground parking garage. The has examined the operation of the Site Access (CTC)/Heron, Cecil/Bank, and Heron/Bank intersections. The analysis was completed for the existing traffic counts, for the expected 2020 traffic at build out of the development, and at the year 2025 which represents five years beyond build out. The time period of the analysis would be the weekday peak AM and PM hour traffic of the adjacent roads. The findings and recommendations of the study are summarized in the following: 1) The trip generation analysis determined that the apartment development would generate 18 new trips entering and 54 trips exiting the site during the peak AM hour, and 51 new trips entering and 33 trips exiting the site during the peak PM hour. 2) The study analysis examined the future operation of the Site Access (CTC)/Heron, Cecil/Bank, and Heron/Bank intersections. The analysis determined that: a) The Site Access (CTC)/Heron would operate at an acceptable level of service with modifications to intersection consisting of an exclusive eastbound Heron Road left turn lane, the removal of the existing bus bay along the westbound Heron Road lane adjacent to the site, and adjustment to the traffic signal timing. b) The Cecil/Bank intersection would operate at an acceptable level of service. During the peak PM hour the queue at the southbound approach to the Heron/Bank

24 22 intersection may periodically extend past Cecil Avenue blocking access. The queue would clear every traffic signal cycle. There would be no requirement for modifications to the intersection. c) The Heron/Bank intersection would operate at a poor level of service in 2020 and 2025 due to the increasing background traffic. Adjustments to the signal timing would optimize the operation of the intersection. The volume of traffic may reduce in the future and the level of service increase as public transit is improved. There would be no requirement for modifications to the intersection due to the development of the 1161 Heron Road site. 3) The Site Plan provides one underground garage which would be shared by residents of both apartment buildings. The parking garage would provide 403 parking spaces with an additional 8 surface parking spaces. The development would also provide storage in the parking garage for 314 bicycles, with two surface bike racks located close to the building entrances which would provide an additional 8 storage spaces for bikes. 4) A Check List is provided in the Appendix as Exhibit 21. Prepared by: David J. Halpenny, M. Eng., P. Eng.

25 23 APPENDIX TRAFFIC COUNTS OPERATIONAL ANALYSIS WORK SHEETS

26 24 EXHIBIT PEAK AM HOUR TRAFFIC COUNT Site Access (CTC)/Heron Road

27 PEAK PM HOUR TRAFFIC COUNT Site Access (CTC)/Heron Road

28 26 EXHIBIT PEAK AM HOUR TRAFFIC COUNT Heron Road/Bank Street

29 PEAK PM HOUR TRAFFIC COUNT Heron Road/Bank Street

30 28 EXHIBIT PEAK AM HOUR TRAFFIC COUNTS Site Access (CTC)/Heron Road HCS+: Signalized Intersections Release 5.4 Analyst: Period: Peak AM Hour Project ID: 1161 Heron Road Development E/W St: Heron Road Inter.: Site Access/Heron Year: August 3, 2012 Counts N/S St: Site Access/CTC Access SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig TR L T L Volume Lane Width RTOR Vol 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left NB Left A Thru P Thru P Peds X Peds X WB Left P SB Left Thru P Thru Peds Peds X NB EB SB WB Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio Eastbound Left Thru TR Westbound Left L Thru T # Northbound Left L # Thru Southbound Left Thru Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.39 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.43

31 29 EXHIBIT PEAK PM HOUR TRAFFIC COUNTS Site Access (CTC)/Heron Road HCS+: Signalized Intersections Release 5.4 Analyst: Period: Peak PM Hour Project ID: 1161 Heron Road Development E/W St: Heron Road Inter.: Site Access/Heron Year: August 3, 2012 Counts N/S St: Site Access/CTC Access SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig TR L T L Volume Lane Width RTOR Vol 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left NB Left A Thru P Thru P Peds X Peds X WB Left P SB Left Thru P Thru Peds Peds X NB EB SB WB Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio Eastbound Left Thru TR # Westbound Left L Thru T Northbound Left L # Thru Southbound Left Thru Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.42 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.46

32 30 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC Site Access (CTC)/Heron Road HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Site Access/Heron Period: Peak AM Hour Year: Year 2020 Project ID: 1161 Heron Road Development E/W St: Heron Road N/S St: Site Access/CTC Access SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L TR L TR LT LTR Volume Lane Width RTOR Vol Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A Thru P Thru A P Peds X Peds X WB Left P SB Left A Thru P Thru A P A Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio Eastbound Left L Thru TR Westbound Left L Thru TR # Northbound Left Thru LT # Southbound Left Thru LTR Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.63 Total lost time per cycle, L = 8.00 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.68

33 31 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC Site Access (CTC)/Heron Road HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Site Access/Heron Period: Peak PM Hour Year: Year 2020 Project ID: 1161 Heron Road Development E/W St: Heron Road N/S St: Site Access/CTC Access SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L TR L TR LT LTR Volume Lane Width RTOR Vol Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A Thru P Thru A P Peds X Peds X WB Left P SB Left A Thru P Thru A P A Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio Eastbound Left L Thru TR # Westbound Left L Thru TR Northbound Left Thru LT # Southbound Left Thru LTR Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.59 Total lost time per cycle, L = 8.00 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.63

34 32 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC Site Access (CTC)/Heron Road HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Site Access/Heron Period: Peak AM Hour Year: Year 2025 Project ID: 1161 Heron Road Development E/W St: Heron Road N/S St: Site Access/CTC Access SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L TR L TR LT LTR Volume Lane Width RTOR Vol Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A Thru P Thru A P Peds X Peds X WB Left P SB Left A Thru P Thru A P A Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio Eastbound Left L Thru TR Westbound Left L Thru TR # Northbound Left Thru LT # Southbound Left Thru LTR Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.66 Total lost time per cycle, L = 8.00 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.71

35 33 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC Site Access (CTC)/Heron Road HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Site Access/Heron Period: Peak PM Hour Year: Year 2025 Project ID: 1161 Heron Road Development E/W St: Heron Road N/S St: Site Access/CTC Access SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L TR L TR LT LTR Volume Lane Width RTOR Vol Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A Thru P Thru A P Peds X Peds X WB Left P SB Left A Thru P Thru A P A Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio Eastbound Left L Thru TR # Westbound Left L Thru TR Northbound Left Thru LT # Southbound Left Thru LTR Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.61 Total lost time per cycle, L = 8.00 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.66

36 34 EXHIBIT PEAK AM HOUR TRAFFIC COUNTS Cecil Avenue/Bank Street HCS+: Unsignalized Intersections Release 5.4 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Cecil/Bank Analysis Year: 2015 Traffic Counts Project ID: 1161 Heron Road Development East/West Street: Cecil Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage TWLTL / 1 RT Channelized? Lanes Configuration L T T TR Upstream Signal? Yes Yes Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume 9 9 Peak Hour Factor, PHF Hourly Flow Rate, HFR 9 9 Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / No / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L LR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A B Approach Delay 11.7 Approach LOS B

37 35 EXHIBIT PEAK PM HOUR TRAFFIC COUNTS Cecil Avenue/Bank Street HCS+: Unsignalized Intersections Release 5.4 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Cecil/Bank Analysis Year: 2015 Traffic Counts Project ID: 1161 Heron Road Development East/West Street: Cecil Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage TWLTL / 1 RT Channelized? Lanes Configuration L T T TR Upstream Signal? Yes Yes Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / No / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L LR v (vph) C(m) (vph) v/c % queue length Control Delay LOS B C Approach Delay 15.8 Approach LOS C

38 36 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC Cecil Avenue/Bank Street HCS+: Unsignalized Intersections Release 5.4 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Cecil/Bank Analysis Year: Year 2020 Project ID: 1161 Heron Road Development East/West Street: Cecil Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage TWLTL / 1 RT Channelized? Lanes Configuration L T T TR Upstream Signal? Yes Yes Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / No / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L LR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A B Approach Delay 12.8 Approach LOS B

39 37 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC Cecil Avenue/Bank Street HCS+: Unsignalized Intersections Release 5.4 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Cecil/Bank Analysis Year: Year 2020 Project ID: 1161 Heron Road Development East/West Street: Cecil Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage TWLTL / 1 RT Channelized? Lanes Configuration L T T TR Upstream Signal? Yes Yes Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / No / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L LR v (vph) C(m) (vph) v/c % queue length Control Delay LOS B C Approach Delay 18.2 Approach LOS C

40 38 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC Cecil Avenue/Bank Street HCS+: Unsignalized Intersections Release 5.4 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Cecil/Bank Analysis Year: Year 2025 Project ID: 1161 Heron Road Development East/West Street: Cecil Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage TWLTL / 1 RT Channelized? Lanes Configuration L T T TR Upstream Signal? Yes Yes Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / No / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L LR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A B Approach Delay 13.2 Approach LOS B

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited. BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department 28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

CPC Parking Lot Riverside Drive. Transportation Brief

CPC Parking Lot Riverside Drive. Transportation Brief CPC Parking Lot 2785 Riverside Drive Transportation Brief Prepared By: NOVATECH Suite 2, 24 Michael Cowpland Drive Ottawa, Ontario K2M P6 7 / 5 / 25 Novatech File: 49 Ref: R-25-22 July 5 th, 25 City of

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Proposed Addition to Pickering Islamic Centre

Proposed Addition to Pickering Islamic Centre TRAFFIC IMPACT STUDY, PARKING STUDY, SITE CIRCULATION REVIEW & TDM PLAN Proposed Addition to Pickering Islamic Centre 265 Brock Road City of Pickering, Ontario Prepared for: Pickering Islamic Centre Masjid

More information

Michigan Avenue Traffic Study

Michigan Avenue Traffic Study City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC. 4 327 Harvester Road Burlington, ON L7N 3G7 T 289 288-287 F 289 288-285 cima.ca CONTACT Stephen

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 44 Project INTERSECTION: 16TH AVENUE & EAST MALL FOR AM PEAK HOUR Group Work: Syed Shafaat Ali Shah (2347426) Mohammad Moudud Hasan

More information

Paul VI Redevelopment. Traffic Impact Study

Paul VI Redevelopment. Traffic Impact Study ATTACHMENT 5 Paul VI Redevelopment Traffic Impact Study April 18, 2017 PAUL VI REDEVELOPMENT TRAFFIC IMPACT STUDY CITY OF FAIRFAX, VIRGINIA Prepared for: IDI GROUP COMPANIES Prepared by: Wells + Associates,

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

APPENDIX C Additional Traffic Data

APPENDIX C Additional Traffic Data APPENDIX C Additional Traffic Data Raleigh and Heiden Properties FEIS F- ATTACHMENT Response.8- Traffic Count WEEKENDPEAK5MINUTECOUNTSPROJECTRaleighandHeidenPropertiesLOCATIONCR6,andCR9DATEFridayAugust6,TIME:PMto6:PM5MinuteTraficCR6SBCR9EBCR6NBSTARTENDleftthrurightTotalleftthrurightTotalleftthrurightTotalleftthrurightTotalGRANDTIMETIME56TAL-------------------:PM:5PM56:5PM:PM666566:PM:5PM685886:5PM:PM555585:PM:5PM5856889:5PM:PM8656:PM:5PM955656885:5PM:PM65986858:PM:5PM66855:5PM:PM69898:PM:5PM895858959:5PM:PM8589:PM:5PM85569:5PM:PM586985:PM:5PM55859565:5PM5:PM886559655:PM5:5PM56699595:5PM5:PM668955:PM5:5PM666856555:5PM6:PM95885-------------------TAL85896959688668

More information

Parking Lot P6C Transportation Impact Assessment

Parking Lot P6C Transportation Impact Assessment Transportation Carleton University Parking Lot P6C Transportation Impact Assessment Prepared by: AECOM 302 1150 Morrison Drive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom.com

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

More information

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust.

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust. SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT Transportation Study Prepared For: Morguard Real Estate Investment Trust June, BA Consulting Group Ltd. St. Clair Avenue West, Suite Toronto, ON

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

APPENDIX E: Transportation Technical Report

APPENDIX E: Transportation Technical Report New Jersey Pennsylvania Lackawanna Cut-Off Passenger Rail Service Reston Project Environmental Assessment APPENDIX E: Transportation Technical Report E.1 Introduction As part of the overall environmental

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street

More information

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER December 2012 TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER 1-19 Beechwood Avenue Mixed Use Development Transportation Brief prepared for: Minto Communities

More information

Patuxent Green Golf Course

Patuxent Green Golf Course Patuxent Green Golf Course Laurel, Maryland February 23, 2018 Traffic Impact Analysis Prepared for: ADC Builders Alan Cohen 2701 Tower Oaks Boulevard, Suite 200 Rockville, Maryland 20852 TABLE OF CONTENTS

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Linden Corner at 43 rd Street & Upton Avenue South AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mark Dwyer Linden Hills Redevelopment, LLC 4632 Washburn Avenue South Minneapolis,

More information