TRAFFIC IMPACT STUDY
|
|
- Colin Hutchinson
- 5 years ago
- Views:
Transcription
1 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: F: TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED FOR: MUSLIM ASSOCIATION OF MILTON August Transportation Planning Traffic Engineering Specialized Traffic Assessments Site and Location Investigation Strategic Advisory A Member of The Sernas Group Inc.
2 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: F: August 2, 212 Muslim Association of Milton 511 Ontario Street Milton, Ontario L9T 2N2 Attention: Mr. Shoukat Choudry, President Dear Sir: Re: Traffic Impact Study Proposed Mosque Development 4269 Regional Road 25 Town of Oakville Our Project No Transtech is pleased to submit the following Traffic Impact Study assessing the traffic impacts of the proposed mosque development located at 4269 Regional Road 25, in the Town of Oakville. The 12.7 acre site is currently a residential property with a house and separate storage building. The proposal is to use 21 m 2 (226.4 sq-ft) of the house as the mosque prayer area, maintain the storage building and relocatee the site driveway to the south on Regional Road 25, opposite Henderson Road. The driveway will connect to a new 4 space parking lot. Our study concludes that traffic generated by the proposed mosque development can be accommodated at the existing Regional Road 25 and Henderson Road intersection. This includes provision of a warranted southbound left turn lane at the proposed site driveway, which can be included as part of the planned 212/213 widening of Regional Road 25. We trust the enclosed is sufficient for your needs, but please do not hesitate to contact the undersigned should you require any additional assistance. Yours truly, TRANSTECH William Maria, P.Eng. Associate, Transportation Engineer Michael Dowdall, Dipl.T. Transportation Analyst MD/db Encl Transportation Planning Traffic Engineering Specialized Traffic Assessments Site and Location Investigation Strategic Advisory A Member of The Sernas Group Inc.
3 TABLE OF CONTENTS PAGE EXECUTIVE SUMMARY 1. INTRODUCTION RETAINER AND OBJECTIVE STUDY BACKGROUND STUDY TEAM SITE CHARACTERISTICS SITE ENVIRONS STUDY AREA SITE PLAN SITE ACCESS EXISTING (212) CONDITIONS ROAD NETWORK EXISTING TRAFFIC DATA BACKGROUND (217) TRAFFIC CONDITIONS STUDY HORIZON YEAR PLANNED STUDY AREA ROAD NETWORK FUTURE DEVELOPMENTS FUTURE TRAFFIC GROWTH ESTIMATED SITE TRAFFIC SITE TRIP GENERATION SITE TRIP DISTRIBUTION AND ASSIGNMENT TOTAL (217) TRAFFIC CONDITIONS PROJECTED TOTAL TRAFFIC WARRANT ANALYSES CAPACITY ANALYSES CONCLUSIONS... Error! Bookmark not defined.
4 TABLE OF CONTENTS PAGE FIGURES Figure 1: SITE LOCATION... 2 Figure 2: SITE PLAN... 4 Figure 3: EXISTING (212) TRAFFIC VOLUMES... 7 Figure 4: SITE ACCESS FUNCTIONAL DESIGN OVERLAY... 9 Figure 5: BACKGROUND (217) TRAFFIC VOLUMES... 1 Figure 6: ESTIMATED SITE TRIPS Figure 7: TOTAL (217) TRAFFIC VOLUMES TABLES Table 1: SUMMARY OF MOSQUE PRAYER PERIODS... 1 Table 2: TRAFFIC ANALYSIS PERIODS... 6 Table 3: SITE TRIP GENERATION Table 4: SITE TRIP DISTRIBUTION Table 5: EXISTING (212) TRAFFIC CONDITIONS Table 6: BACKGROUND (217) TRAFFIC CONDITIONS Table 7: TOTAL (217) TRAFFIC CONDITIONS APPENDICES APPENDIX A: APPENDIX B: TRAFFIC DATA AND WARRANT REPORTS SYNCHRO AND SIMTRAFFIC ANALYSIS
5 EXECUTIVE SUMMARY 1. The proposed mosque prayer area within the existing house is 21 m 2 (226 sq-ft). 2. There are four significant prayer periods of site arrival and departure traffic impact analysis: Early Morning Prayer: Daily at sunrise, conservatively uses the a.m. peak hour for background traffic volumes Evening Prayer: Daily at sunset, conservatively uses the p.m. peak hour for background traffic volumes Nightly Prayer: Daily from 8: 11: p.m., conservatively uses the busiest hour during Nightly Prayer from 8: 9: p.m. Friday Prayer: Weekly from 1: 2: p.m., uses an arrival background traffic peak from 12: 1: p.m. and a departure background traffic peak from 2: 3: p.m. 3. The site plan proposes a new full movement access driveway (with two exit lanes) on Regional Road 25 to be aligned with the Henderson Road centreline. 4. A new parking lot with 4 parking spaces is planned along with two handicapped parking spaces in front of the existing house. 5. Traffic counts at the Regional Road 25 intersection with Henderson Road were obtained using the Miovision traffic data collection system on Friday April 27, In accordance with Halton Region requirements, a horizon year of 217 (5 year post buildout) was selected for the analysis to represent the future traffic conditions. 7. A 3.% annual growth rate was applied to existing 212 through volumes on Regional Road 25 to project background traffic for the 217 horizon year. 8. Existing and future traffic conditions were analyzed assuming completion of the Halton Region scheduled Regional Road 25 road widening to four travel lanes. 9. Mosque prayer period arrival and departure trips typically occur separately, before and after the scheduled prayer times (each assumed to have a duration of approximately 15 minutes). Site trips were assumed to peak at the capacity of the parking lot, which are 4 inbound and 4 outbound trips for each prayer period. Based on the attendance expected, this overstates the estimated trips for all daily prayer periods while matching the expected attendance for the weekly Friday Prayer period. 1. Site generated trips were assigned 75% north and 25% south. This reflects that the Muslim Association of Milton mosque is currently located north in the Town of Milton, while the Town of Oakville and Highway 47 are in close proximity to the south. 11. Under total 217 traffic conditions with the addition of the site arrival trips, the unsignalized Regional Road 25 study intersection is expected to operate with very good to excellent operational characteristics and no significant queuing.
6 12. Under total 217 traffic conditions with the addition of the site departure trips, the unsignalized Regional Road 25 study intersection is again expected to operate with very good to excellent operational characteristics with exception of the westbound left turn movement after Early Morning Prayer. The minor queuing because of delay is however a very short duration and is based on a conservative estimate of trip volume in comparison to the expected attendance. 13. Application of the MTO Left Turn Storage Lane, Four-Lane Divided Highways, Unsignalized Procedure indicates the warrant for a southbound left turn lane at the site driveway is satisfied and should have a minimum of 15 metre storage length and 15 metre taper, for a 1 km/h design speed. This was confirmed by SimTraffic queuing analysis. The turning lane can be provided within the planned shadow lane and 2 metre flush median island at the Henderson Road intersection. 14. The MTO Traffic Signal Warrant Analysis (Projected Volumes for Justification 7) confirms that the Regional Road 25 study intersection does not warrant traffic signals in the 217 horizon year.
7 1. INTRODUCTION 1.1. RETAINER AND OBJECTIVE Transtech was retained by The Muslim Association of Milton for the preparation of a Traffic Impact Study to determine the impact of the proposed mosque located at 4269 Regional Road 25 on the adjacent road network. The subject site location is within the Town of Oakville at the northern limit of the municipality as shown in Figure STUDY BACKGROUND The proposed site has an existing house with 21 m 2 (2,26 sq-ft) used for the prayer area. The current site access driveway will be relocated and a 4 parking space parking lot will be constructed to accommodate the maximum 12 mosque attendees. Four significant prayer periods were identified by Muslim Association of Milton officials: Table 1 summarizes the information provided about the significant prayer periods. Table 1: SUMMARY OF MOSQUE PRAYER PERIODS Prayer Period: Frequency Prayer Time Attendees Average Time on Premises Early Morning Daily Sunrise minutes Evening Daily Sunset minutes Nightly Daily 8: 11: p.m minutes Friday Weekly 1: 2: p.m. Max 12 6 minutes The objective of this study is to determine the impact of anticipated traffic volumes generated by the proposed mosque on the surrounding road network and if necessary recommend improvements. Traffic data was collected for the intersection of Regional Road 25 and Henderson Road to provide background traffic conditions. A planning horizon of 5 years (217) was selected for analysis of future traffic conditions. Transtech consulted with Halton Region staff to discuss and confirm the scope of assumptions for this study STUDY TEAM The following Transtech team was involved in the preparation of this study: Mr. William Maria, P. Eng., Associate, Transportation Engineer Mr. Michael Dowdall, Dipl.T., Transportation Analyst Mr. Ben Gammie, Transportation Assistant Transtech August Regional Road Town of Oakville - 1 -
8 LOWER BASE LINE NOT TO SCALE SITE BURNHAMTHORPE ROAD WEST HIGHWAY 47 SITE LOCATION FIGURE 1
9 2. SITE CHARACTERISTICS 2.1 SITE ENVIRONS The proposed property is 12.7 acres located at 4269 Regional Road 25, in the Town of Oakville. It is northeast of the Regional Road 25 intersection with Henderson Road. The site is just south of the Town of Milton borderline and approximately 1.5 km north of Highway 47. There is an electrical transmission corridor south of the site. The subject property is currently a private residence. The proposal to convert it into a mosque assumes that 21 m 2 (226 sq-ft) will be used as prayer area. Another existing structure on the site will be only used for storage. The surrounding land is comprised primarily of agricultural uses, but also includes residential and worship land uses. 2.2 STUDY AREA The study area includes the intersection of: 2.3 SITE PLAN Regional Road 25 at Henderson Road / Proposed Site Driveway Figure 2 shows the proposed mosque development site plan including the new access driveway. The proposed site driveway location appears to be aligned with the centreline of Henderson Road, but should be confirmed. The proposed parking lot contains 4 spaces with an additional two handicap spaces in front of the existing attached garage. The site driveway has an internal two-way connection to the proposed parking lot and a one-way loop to the front of the proposed mosque. 2.4 SITE ACCESS The proposed site driveway is recommended to centreline align with Henderson Road as the east leg at the intersection on Regional Road 25. It is further recommended that the site driveway be stop controlled at Regional Road 25. The driveway has three lanes on the approach to Regional Road 25, a single entry lane and dual exits lanes, for left and through-right turning movements. Future plans to widen Regional Road 25 create an opportunity to provide an exclusive southbound left turn lane for the driveway in the shadow of the proposed northbound left turn lane for Henderson Road. Transtech August Regional Road Town of Oakville - 3 -
10 HENDERSON ROAD PROPOSED MOSQUE SITE PLAN FIGURE 2
11 3. EXISTING (212) CONDITIONS 3.1 ROAD NETWORK The following summarizes the roads within the study area. Regional Road 25 is a north-south major arterial rural cross-section roadway under the jurisdiction of Halton Region extending from the Town of Acton in the north to Lake Ontario in the south. In the study area it currently has a two-lane cross-section, however Halton Region plans improvement to a four/five-lane cross section in 212/13. Regional Road 25 has a posted speed limit of 8 km/h. Henderson Road is a north-south collector roadway under the jurisdiction of the Town of Milton extending from Lower Base Line in the north to Regional Road 25 in the south. Henderson Road has a two lane rural cross-section and currently Teeintersects with stop control at Regional Road 25. The posted speed limit is 5 km/h. 3.2 EXISTING TRAFFIC DATA Weekday turning movement counts were undertaken by Transtech using the Miovision data collection system at the intersection of Regional Road 25 and Henderson Road on Friday April 27, 212 from 7:3 a.m. to 11: p.m. The data is provided in Appendix A. (Regional Road 25 is still a two-lane roadway, however because of the imminent timing of the planned improvements, the following capacity analyses under the existing traffic conditions adopted the widened Regional Road 25 lane configuration.) The weekday a.m. peak hour from 7:3 to 8:3 a.m. was used to analyze the Early Morning Prayer period and the weekday p.m. peak hour from 4:3 to 5:3 p.m. was used to analyze the Evening Prayer period. This produces conservative estimates due to sunrise and sunset variations in the actual prayer times throughout the year, which only occasionally completely overlap the peak traffic hours on Regional Road 25. Turning movement count volumes included 8: to 9: p.m. for the Nightly Prayer period and 12: to 1: p.m. and 2: to 3: p.m. for the Friday Prayer period arrival and departure peak hours, respectively. Table 2 summarizes prayer times/periods, estimated average prayer durations, and the identified study peak hours. The arrival and departure peak hours are different for the weekly Friday prayer period. Transtech August Regional Road Town of Oakville - 5 -
12 Table 2: TRAFFIC ANALYSIS PERIODS Prayer Period: Prayer Time Average Time on Premises Arrival Peak Hour Departure Peak Hour Early Morning Prayer Evening Prayer Sunrise 2 3 minutes 7:3 8:3 a.m. 7:3 8:3 a.m. Sunset 2 3 minutes 4:3 5:3 p.m. 4:3 5:3 p.m. Nightly Prayer 8: 11: p.m. 2 3 minutes 8: 9: p.m. 8: 9: p.m. Friday Prayer 1: 2: p.m. 6 minutes 12: 1: p.m. 2: 3: p.m. Figure 3 shows the existing 212 traffic volumes for Early Morning Prayer, Evening Prayer, Nightly Prayer and Friday Prayer arrival and departure periods, at the study area intersection. Transtech August Regional Road Town of Oakville - 6 -
13 NOT TO SCALE EARLY MORNING PRAYER FRIDAY PRAYER R.R. 25 R.R. 25 Henderson Road SITE Henderson Road () (541) () () {} {1} (1) {} {44} () (36) () {} () {} (45) (593) () SITE {51} {615} {} {3} {64} {} R.R. 25 R.R. 25 EVENING PRAYER NIGHTLY PRAYER R.R. 25 R.R. 25 Henderson Road SITE Henderson Road SITE R.R. 25 R.R. 25 XX (XX) {XX} LEGEND Peak Hour Volumes Arrival Peak Hour Volumes Departure Peak Hour Volumes Stop Control EXISTING (212) TRAFFIC VOLUMES FIGURE 3
14 4. BACKGROUND (217) TRAFFIC CONDITIONS 4.1 STUDY HORIZON YEAR Future traffic conditions are predicted for a five-year planning horizon (217) based on discussions with Halton Region to represent the future traffic demands. 4.2 PLANNED STUDY AREA ROAD NETWORK Halton Region s Roads Capital Projects ( ) schedule confirms that Regional Road 25 will be widened to a four travel lane cross-section in 212/13. Existing, future background, and future total traffic conditions were subsequently analyzed assuming completion of the improvement project. Functional drawings for planned Regional Road 25 improvements show the exclusive northbound left turn lane for Henderson Road with an opposing shadow lane and 7 metre taper. Figure 4 shows the Full Moves Access Draft Functional Design overlaid on the Halton Region planned improvements for Regional Road FUTURE DEVELOPMENTS A review of the Town of Oakville s Active Development Applications shows there are no significant planned future developments contributing traffic in the study area. 4.4 FUTURE TRAFFIC GROWTH Based on consultation with Halton Region, a growth rate of 3.% per annum was applied to northbound and southbound through movements on Regional Road 25 to project the background traffic conditions at the 217 horizon year. Figure 5 shows the estimated background 217 traffic volumes for Early Morning Prayer, Evening Prayer, Nightly Prayer and Friday Prayer arrival and departure periods, at the study intersection. Transtech August Regional Road Town of Oakville - 8 -
15 NOT TO SCALE SOURCE: HALTON REGION CLASS E.A. REGIONAL ROAD 25 IMPROVEMENTS SITE ACCESS FUNCTIONAL DESIGN OVERLAY FIGURE 4
16 NOT TO SCALE EARLY MORNING PRAYER FRIDAY PRAYER R.R. 25 R.R. 25 Henderson Road () () {} Henderson () {} SITE Road {1} (1) {} () 134 {44} (36) {3} {7} {} () (627) () (45) (687) () {} SITE {51} {713} {} R.R. 25 R.R. 25 EVENING PRAYER NIGHTLY PRAYER R.R. 25 R.R. 25 Henderson Road Henderson SITE Road SITE R.R. 25 R.R. 25 LEGEND XX (XX) {XX} Peak Hour Volumes Arrival Peak Hour Volumes Departure Peak Hour Volumes Stop Control BACKGROUND (217) TRAFFIC VOLUMES FIGURE 5
17 5. ESTIMATED SITE TRAFFIC 5.1 SITE TRIP GENERATION Site trip generation was based on full occupancy of the parking lot for each of the prayer periods. With the exception of the Friday Prayer arrivals and departures, the adopted trip volumes were therefore conservatively overstated. Within the context that the Muslim Association of Milton advised that vehicle occupancy averages three persons per vehicle, the expected number of attendees and related vehicle trips are summarized as follows: Early Morning Prayer is expected to have 2 3 attendees which is 7 1 vehicles; Evening Prayer is expected to have 6 8 attendees which is 2-27 vehicles; Nightly Prayer is expected to have 8 1 attendees which is vehicles; and Friday Prayer is expected to have a maximum of 12 attendees which is a maximum of 4 vehicles. Each prayer period was analyzed based on 4 vehicles arriving and departing at different times before and after the typically scheduled times of the prayer periods. This is 8 two-way trips, or 4 inbound and 4 outbound trips. However, not only would the arrival and departure trips occur at different times (negligible interaction), but they are expected to occur over a much shorter time interval than the typical one hour analysis period. Capturing the short term intensity of arrival and departure trips was subsequently modelled by assuming that all 4 trips occur within a 15 minute period (16 trips per hour). Table 3 summarizes the adopted arrival and departure site generated vehicle trips to for each prayer period. Table 3: SITE TRIP GENERATION Prayer Period: Attendees Vehicles Trips in 15 Minute Intervals Inbound Outbound Early Morning Prayer Evening Prayer Nightly Prayer Friday Prayer Max 12 Max Transtech August Regional Road Town of Oakville
18 5.2 SITE TRIP DISTRIBUTION AND ASSIGNMENT The distribution of site generated arrival and departure trips was assumed 75% to/from the north and 25% to/from the south. This reflects that the Muslim Association of Milton mosque is currently located north of the proposed site in the Town of Milton and therefore many attendees will be derived from this established group of people. It also considers that the Town of Oakville and Highway 47 are in close proximity to the south which can impact the future orientation of a significant volume of trips. Table 4 summarizes the trip distribution adopted to assign the site trips to Regional Road 25 for all four prayer periods. Table 4: SITE TRIP DISTRIBUTION Prayer Period: Regional Road 25 Directional Split To / From: North South ALL Prayer Periods 75% 25% Figure 6 shows the estimated site trip assignment for Early Morning Prayer, Evening Prayer, Nightly Prayer and Friday Prayer arrival and departure periods, at the study intersection. Transtech August Regional Road Town of Oakville
19 NOT TO SCALE EARLY MORNING PRAYER FRIDAY PRAYER R.R. 25 R.R. 25 Henderson Road 3 3 () () {3} 1 Henderson () {1} SITE Road {} () {} () {} () 1 {} {} {} () () (3) () () (1) {} SITE {} {} {} R.R. 25 R.R. 25 EVENING PRAYER NIGHTLY PRAYER R.R. 25 R.R. 25 Henderson Road Henderson 1 SITE Road SITE R.R. 25 R.R. 25 LEGEND XX (XX) {XX} Peak Hour Volumes Arrival Peak Hour Volumes Departure Peak Hour Volumes Stop Control ESTIMATED SITE TRIPS FIGURE 6
20 6. TOTAL (217) TRAFFIC CONDITIONS 6.1 PROJECTED TOTAL TRAFFIC The future background 217 traffic volumes were combined with the estimated site generated vehicle trips to derive the future total 217 traffic volumes. All traffic conditions assumed completion of the Regional Road 25 planned widening to four lanes with an exclusive northbound left turn lane at the study intersection. Figure 7 shows the estimated total 217 traffic volumes for Early Morning Prayer, Evening Prayer, Nightly Prayer and Friday Prayer arrival and departure phases, at the study intersection. 6.2 WARRANT ANALYSES The warrant for the proposed southbound left turn lane (for the site driveway) is satisfied under the total 217 traffic conditions during the weekday a.m. and p.m. peak hours. Using the MTO Left Turn Storage Lane, Four-Lane Divided Highways, Unsignalized Procedure, the critical period occurs during the weekday p.m. peak hour and requires a minimum storage length of 15 metres and 15 metre taper, for a 1 km/h design speed. This storage and taper length can be accommodated within the planned shadow lane and 2 metre wide flush median island at the Henderson Road intersection shown on the Regional Road 25 Class Environmental Assessment drawing obtained from the Region. This storage length was supported by a subsequent queuing analysis using SimTraffic software during the critical weekday p.m. peak hour traffic conditions. The warrant and SimTraffic reports are provided in Appendix A and B, respectively. The MTO Traffic Signal Warrant Analysis (Projected Volumes for Justification 7) based on the weekday a.m. and p.m. peak hours, is not satisfied. The warrant report is provided in Appendix A. Transtech August Regional Road Town of Oakville
21 NOT TO SCALE EARLY MORNING PRAYER FRIDAY PRAYER R.R. 25 R.R. 25 Henderson Road () () {3} 1 Henderson () {1} SITE Road {1} (1) {} () 134 {44} (36) {3} {7} {} () (627) (3) (45) (687) (1) {} SITE {51} {713} {} R.R. 25 R.R. 25 EVENING PRAYER NIGHTLY PRAYER R.R. 25 R.R. 25 Henderson Road Henderson 1 SITE Road SITE R.R. 25 R.R. 25 LEGEND XX (XX) {XX} Peak Hour Volumes Arrival Peak Hour Volumes Departure Peak Hour Volumes Stop Control TOTAL (217) TRAFFIC VOLUMES FIGURE 7
22 7. CAPACITY ANALYSES Capacity analysis reports on the expected operational characteristics of the study intersection. The analysis contained within this report utilized the Highway Capacity Manual (HCM) 2 techniques within the Synchro Version 8 Software package. The reported intersection volume-to-capacity ratios (v/c) are a measure of the saturation volume for each turning movement, while the levels-of-service (LOS) are a measure of the average delay for each turning movement. Queuing characteristics are reported as the predicted 95 th percentile queue for each turning movement. The following tables summarize the HCM unsignalized capacity results for the study intersection during the peak hour periods for Early Morning Prayer (weekday a.m. peak hour), Evening Prayer (weekday p.m. peak hour), Nightly Prayer period hour, and Friday Prayer arrival and departure hours. The detailed capacity analysis summaries are provided in Appendix B. Table 5: EXISTING (212) TRAFFIC CONDITIONS Regional Road 25 and Henderson Road Prayer Period: Movement v/c (LOS) Average Delay in Seconds 95 th %ile Queues (vehicles) Early Morning Prayer NB Left.8 (B) 1s 1 veh Evening Prayer NB Left.16 (A) 1s 1 veh Nightly Prayer NB Left.3 (A) 9s 1 veh Friday Prayer ARRIVAL Friday Prayer DEPARTURE NB Left.4 (A) 9s 1 veh NB Left.5 (A) 9s 1 veh Under existing 212 traffic conditions, the overall intersection operation is characterized by the northbound left turn movement. All approaches at the unsignalized intersection are operating with very good to excellent operational characteristics. Transtech August Regional Road Town of Oakville
23 Table 6: BACKGROUND (217) TRAFFIC CONDITIONS Regional Road 25 and Henderson Road Prayer Period: Movement v/c (LOS) Average Delay in Seconds 95 th %ile Queues (vehicles) Early Morning Prayer NB Left.9 (B) 11s 1 veh Evening Prayer NB Left.17 (B) 11s 1 veh Nightly Prayer NB Left.3 (A) 9s 1 veh Friday Prayer ARRIVAL Friday Prayer DEPARTURE NB Left.5 (A) 9s 1 veh NB Left.6 (A) 1s 1 veh Under future background 217 traffic conditions, the overall intersection operation is characterized by the northbound left turn movement. All approaches at the unsignalized intersection continue to operate with very good to excellent operational characteristics. Transtech August Regional Road Town of Oakville
24 Table 7: TOTAL (217) TRAFFIC CONDITIONS Regional Road 25 and Henderson Road / Proposed Site Driveway Prayer Period: Movement Arrival Peak Hour v/c (LOS) Average Delay in Seconds 95 th %ile Queues (vehicles) Departure Peak Hour v/c (LOS) Average Delay in Seconds 95 th %ile Queues (vehicles) Early Morning Prayer EBLTR WB Left WBTR NB Left SB Left.26 (B) 15s N/A N/A.9 (B) 11s.16 (B) 11s 2 veh N/A N/A 1 veh 1 veh.26 (B) 15s.92 (F) >18s.22 (B) 14s.9 (B) 11s N/A 2 veh 4 veh 1 veh 1 veh N/A Evening Prayer EBLTR WB Left WBTR NB Left SB Left.11 (B) 12s N/A N/A.17 (B) 11s.18 (B) 12s 1 veh N/A N/A 1 veh 1 veh.11 (B) 12s.47 (F) 81s.24 (B) 15s.17 (B) 11s N/A 1 veh 2 veh 1 veh 1 veh N/A Nightly Prayer Friday Prayer EBLTR WB Left WBTR NB Left SB Left EBLTR WB Left WBTR NB Left SB Left.4 (A) 1s N/A N/A.3 (A) 9s.11 (A) 9s.6 (B) 12s N/A N/A.5 (A) 9s.14 (A) 1s 1 veh N/A N/A 1 veh 1 veh 1 veh N/A N/A 1 veh 1 veh.4 (A) 1s.1 (C) 16s.15 (B) 11s.3 (A) 9s N/A.8 (B) 12s.19 (D) 27s.19 (B) 12s.6 (A) 1s N/A N/A typically negligible turning volume during this peak period 1 veh 1 veh 1 veh 1 veh N/A 1 veh 1 veh 1 veh 1 veh N/A Under total 217 traffic conditions, with the addition of site generated arrival trips for each of the prayer periods, all approaches/movements at the unsignalized intersection are expected to continue to operate with very good to excellent operational characteristics and no significant queuing. Under total 217 traffic conditions, with the addition of site generated departure trips for each of the prayer periods, the westbound left turn (site egress) movement can be expected to have the longest delays, while all other approaches/movements at the unsignalized intersection are expected to continue to operate with very good to excellent operational characteristics and no significant queuing. The westbound left turn delays are longest during the weekday a.m. and p.m. peak hours because of the conflicting higher volumes on Regional Road 25 including the northbound left turn movement to Henderson Road. The exit delay after the Early Morning Prayer results in the longest predicted queues of 4 vehicles. This is however very short duration with the least attendance. The adopted site trips at this prayer time are however overstated and therefore the operational characteristics are expected to be much better than reported. Transtech August Regional Road Town of Oakville
25 APPENDIX A
26 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road MORNING Site Code: Start Date: 4/27/212 Page No: 1 Turning Movement Data Regional Road 25 Regional Road 25 Henderson Road Start Time Southbound Northbound Eastbound Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Right Left U-Turn Peds App. Total Int. Total 7:3 AM :45 AM Hourly Total : AM :15 AM :3 AM :45 AM Hourly Total : AM :15 AM Grand Total Approach % Total % Car % Car Truck % Truck Ped % Ped
27 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road MORNING Site Code: Start Date: 4/27/212 Page No: 2 Regional Road 25 [N] Out In Total R T U P Henderson Road [W] Total In Out U R 1 1 L P 4/27/212 7:3 AM Ending At 4/27/212 9:3 AM Car Truck Ped U L T P Out In Total Regional Road 25 [S] Turning Movement Data Plot
28 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road MORNING Site Code: Start Date: 4/27/212 Page No: 3 Turning Movement Peak Hour Data (7:3 AM) Regional Road 25 Regional Road 25 Henderson Road Start Time Southbound Northbound Eastbound Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Right Left U-Turn Peds App. Total Int. Total 7:3 AM :45 AM : AM :15 AM Total Approach % Total % PHF Car % Car Truck % Truck Ped % Ped
29 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road MORNING Site Code: Start Date: 4/27/212 Page No: 4 Regional Road 25 [N] Out In Total R T U P Henderson Road [W] Total In Out R U L P Peak Hour Data 4/27/212 7:3 AM Ending At 4/27/212 8:3 AM Car Truck Ped U L T P Out In Total Regional Road 25 [S] Turning Movement Peak Hour Data Plot (7:3 AM)
30 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road EVENING Site Code: Start Date: 4/27/212 Page No: 1 Turning Movement Data Regional Road 25 Regional Road 25 Henderson Road Start Time Southbound Northbound Eastbound Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Right Left U-Turn Peds App. Total Int. Total 4:3 PM :45 PM Hourly Total : PM :15 PM :3 PM :45 PM Hourly Total : PM :15 PM Grand Total Approach % Total % Car % Car Truck % Truck Ped % Ped
31 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road EVENING Site Code: Start Date: 4/27/212 Page No: 2 Regional Road 25 [N] Out In Total R T U P Henderson Road [W] Total In Out U R 1 1 L P 4/27/212 4:3 PM Ending At 4/27/212 6:3 PM Car Truck Ped U L T P Out In Total Regional Road 25 [S] Turning Movement Data Plot
32 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road EVENING Site Code: Start Date: 4/27/212 Page No: 3 Turning Movement Peak Hour Data (4:3 PM) Regional Road 25 Regional Road 25 Henderson Road Start Time Southbound Northbound Eastbound Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Right Left U-Turn Peds App. Total Int. Total 4:3 PM :45 PM : PM :15 PM Total Approach % Total % PHF Car % Car Truck % Truck Ped % Ped
33 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road EVENING Site Code: Start Date: 4/27/212 Page No: 4 Regional Road 25 [N] Out In Total R T U P Henderson Road [W] Total In Out R U L P Peak Hour Data 4/27/212 4:3 PM Ending At 4/27/212 5:3 PM Car Truck Ped U L T P Out In Total Regional Road 25 [S] Turning Movement Peak Hour Data Plot (4:3 PM)
34 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road NIGHTLY Site Code: Start Date: 4/27/212 Page No: 1 Turning Movement Data Regional Road 25 Regional Road 25 Henderson Road Start Time Southbound Northbound Eastbound Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Right Left U-Turn Peds App. Total Int. Total 8: PM :15 PM :3 PM :45 PM Hourly Total : PM :15 PM :3 PM :45 PM Hourly Total : PM :15 PM :3 PM :45 PM Hourly Total Grand Total Approach % Total % Car % Car Truck % Truck Ped % Ped
35 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road NIGHTLY Site Code: Start Date: 4/27/212 Page No: 2 Regional Road 25 [N] Out In Total R T U P Henderson Road [W] Total In Out U R L P 4/27/212 8: PM Ending At 4/27/212 11: PM Car Truck Ped U L T P Out In Total Regional Road 25 [S] Turning Movement Data Plot
36 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road NIGHTLY Site Code: Start Date: 4/27/212 Page No: 3 Turning Movement Peak Hour Data (8: PM) Regional Road 25 Regional Road 25 Henderson Road Start Time Southbound Northbound Eastbound Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Right Left U-Turn Peds App. Total Int. Total 8: PM :15 PM :3 PM :45 PM Total Approach % Total % PHF Car % Car Truck % Truck Ped % Ped
37 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road NIGHTLY Site Code: Start Date: 4/27/212 Page No: 4 Regional Road 25 [N] Out In Total R T U P Henderson Road [W] Total In Out R U L P Peak Hour Data 4/27/212 8: PM Ending At 4/27/212 9: PM Car Truck Ped U L T P Out In Total Regional Road 25 [S] Turning Movement Peak Hour Data Plot (8: PM)
38 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road FRIDAY Site Code: Start Date: 4/27/212 Page No: 1 Turning Movement Data Regional Road 25 Regional Road 25 Henderson Road Start Time Southbound Northbound Eastbound Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Right Left U-Turn Peds App. Total Int. Total 12: PM :15 PM :3 PM :45 PM Hourly Total *** BREAK *** : PM :15 PM :3 PM :45 PM Hourly Total Grand Total Approach % Total % Car % Car Truck % Truck Ped % Ped
39 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road FRIDAY Site Code: Start Date: 4/27/212 Page No: 2 Regional Road 25 [N] Out In Total R T U P Henderson Road [W] Total In Out U 8 8 R 2 2 L P 4/27/212 12: PM Ending At 4/27/212 3: PM Car Truck Ped U L T P Out In Total Regional Road 25 [S] Turning Movement Data Plot
40 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road FRIDAY Site Code: Start Date: 4/27/212 Page No: 3 Turning Movement Peak Hour Data (12: PM) Regional Road 25 Regional Road 25 Henderson Road Start Time Southbound Northbound Eastbound Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Right Left U-Turn Peds App. Total Int. Total 12: PM :15 PM :3 PM :45 PM Total Approach % Total % PHF Car % Car Truck % Truck Ped % Ped
41 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road FRIDAY Site Code: Start Date: 4/27/212 Page No: 4 Regional Road 25 [N] Out In Total R T U P Henderson Road [W] Total In Out R U 1 1 L P Peak Hour Data 4/27/212 12: PM Ending At 4/27/212 1: PM Car Truck Ped U L T P Out In Total Regional Road 25 [S] Turning Movement Peak Hour Data Plot (12: PM)
42 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road FRIDAY Site Code: Start Date: 4/27/212 Page No: 5 Turning Movement Peak Hour Data (2: PM) Regional Road 25 Regional Road 25 Henderson Road Start Time Southbound Northbound Eastbound Right Thru U-Turn Peds App. Total Thru Left U-Turn Peds App. Total Right Left U-Turn Peds App. Total Int. Total 2: PM :15 PM :3 PM :45 PM Total Approach % Total % PHF Car % Car Truck % Truck Ped % Ped
43 The Sernas Group Inc. 45 Vogell Road Suite 36 Richmond Hill, Ontario, Canada L4B 3P Count Name: Regional Road Henderson Road FRIDAY Site Code: Start Date: 4/27/212 Page No: 6 Regional Road 25 [N] Out In Total R T U P Henderson Road [W] Total In Out R U 1 1 L P Peak Hour Data 4/27/212 2: PM Ending At 4/27/212 3: PM Car Truck Ped U L T P Out In Total Regional Road 25 [S] Turning Movement Peak Hour Data Plot (2: PM)
44 MTO Left Turn Storage Lane, Four-Lane Divided Highways, Unsignalized Analysis For: Unsignalized 4-Lane Divided Highway AM ARRIVAL Peak Hour: Design Speed 1 km/h % Left Turn Traffic 3 % Results: 15 metre storage lane Advancing Traff Vol 1132 VA Opposing Traff Vol 988 VO Left Turn Traff Vol 3 VL (See Graph on next page for: MTO Left Turn Storage Lane, Four-Lane Divided Highways, Unsignalized) PM ARRIVAL Peak Hour: Design Speed 1 km/h % Left Turn Traffic 3 % Results: 15 metre storage lane Advancing Traff Vol 957 VA Opposing Traff Vol 129 VO Left Turn Traff Vol 3 VL (See Graph on next page for: MTO Left Turn Storage Lane, Four-Lane Divided Highways, Unsignalized)
45
46
47 SERNAS TRANSTECH TRAFFIC SIGNAL WARRANT DATA INPUT PROJECTED VOLUMES FOR JUSTIFICATION 7 Study Period: Total 217 East/West Street Name : Henderson Road/Proposed Site Driveway Major Street Minor Street x North/South Street Name : Regional Road 25 Major Street x Minor Street 1 2 Average Hourly Volume (PHV/4) Henderson Road/Proposed Site Driveway Major Street Minor Street Major Street Minor Street Pedestrians Regional Road 25 son Road/Proposed Site D Regional Road 25 son Road/Proposed Site D Crossing PEAK Northbound Eastbound Southbound Westbound Major Street HOUR RIGHT THRU LEFT RIGHT THRU LEFT RIGHT THRU LEFT RIGHT THRU LEFT AM PM PHV (AM+PM) The crossing volume is defined as the sum of: (1) Left turns from both minor street apporaches (2) The heaviest through volume from the minor street (3) 5% of the heavier left turn movement from major street when both of the following criteria are met: (a) The left turn volume > 12 vph (b) The left turn volume plus the opposing volume > 72 vph heavier left turn= 51 oppposing though= (4) Pedestrians crossing the major street 462 T=TRUE F=FALSE F F sum: 5 5 MTO Signal Warrant - AM-PM - RR25-Henderson Rd Page 1
48 SERNAS TRANSTECH TRAFFIC SIGNAL WARRANT ANLYSIS FORM FOR INTERSECTION CONTROL. Traffic Signal Justification for Future Development - Traffic Impact Studies (page 88 OTM Book 12) Total 217 Major street : Regional Road 25 No. of lanes : 2 Minor street : Henderson Road/Proposed Site Driveway FREE FLOW CONDITIONS (RURAL) x IS THIS A T - INTERSECTION YES NO IS THIS AN EXISTING INTERSECTION YES NO RESTRICTED FLOW CONDITIONS (URBAN) IS THIS A NEW INTERSECTION YES x NO X X WARRANT 7 - PROJECTED VOLUMES 1 % SATISFIED - YES NO X 8 % SATISFIED - YES NO X MINIMUM REQUIREMENTS Justification Increased by 5% APPROACH LANES 1 2 or MORE FREE RESTR. FREE RESTR. FLOW CONDITION FLOW FLOW FLOW FLOW X 9 PERCENTAGE WARRANT AVERAGE HOURLY VOLUME 188 TOTAL ACROSS A. ALL APPROACHES 1% FULFILLED 8% FULFILLED ACTUAL % IF BELOW 8% VALUE Justification Increased by 5% TOTAL DOWN 1 1 / 1 = 1 TOTAL ACROSS SECTIONAL PERCENT B. MINOR STREET BOTH APPROACHES* 1% FULFILLED 8% FULFILLED ACTUAL % IF BELOW 8% VALUE * FOR 'T' INTERSECTIONS MINOR ROAD THRESHOLDS ARE INCREASED BY AN ADDITIONAL 5% 38 TOTAL DOWN / SECTIONAL PERCENT 1 = 38 WARRANT 2 - DELAY TO CROSS TRAFFIC 1 % SATISFIED - YES NO X 8 % SATISFIED - YES NO X MINIMUM REQUIREMENTS Justification Increased by 5% APPROACH LANES 1 2 or MORE FREE RESTR. FREE RESTR. FLOW CONDITION FLOW FLOW FLOW FLOW X 9 PERCENTAGE WARRANT AVERAGE HOURLY VOLUME 119 TOTAL ACROSS A. MAJOR STREET BOTH APPROACHES 1% FULFILLED 8% FULFILLED ACTUAL % IF BELOW 8% VALUE Justification Increased by 5% TOTAL DOWN 1 1 / 1 = TOTAL ACROSS SECTIONAL PERCENT 1 B. TRAFFIC CROSSING MAJOR STREET 1% FULFILLED 8% FULFILLED ACTUAL % IF BELOW 8% VALUE 3 TOTAL DOWN 3 SECTIONAL PERCENT 3 / 1 = 3 NOTES: 1. The warrant values are based on annumal average daily traffic (AADT) which apporximates May and October traffic 2. For warrants 1, 2, 3 and 4, each hourly volume must exceed the minimum requirements for the warrant to be 1% satisfied 3. For warrant 5 the 8 hour average must exceed the minimum requirements for the warrant to be 1% satisfied 4. The crossing volume is defined as the sum of: (1) Left turns from both minor street apporaches (2) The heaviest through volume from the minor street (3) 5% of the heavier left turn movement from major street when both of the following criteria are met: (a) The left turn volume > 12 vph (b) The left turn volume plus the opposing volume > 72 vph (4) Pedestrians crossing the major street MTO Signal Warrant - AM-PM - RR25-Henderson Rd Page 2
49 APPENDIX B
50 Queuing and Blocking Report Evening Prayer Peak Hour - 15 minute Intervals (ARRIVAL) 3/7/212 Intersection: 1: Regional Road 25 & Henderson Road/New Site Driveway, Interval #1 Movement EB NB SB Directions Served LR L L Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) 2 Queuing Penalty (veh) 1 Intersection: 1: Regional Road 25 & Henderson Road/New Site Driveway, Interval #2 Movement EB NB Directions Served LR L Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) 2. Storage Blk Time (%) 1 Queuing Penalty (veh) 3 Intersection: 1: Regional Road 25 & Henderson Road/New Site Driveway, Interval #3 Movement EB NB Directions Served LR L Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) 2. Storage Blk Time (%) Queuing Penalty (veh) Total Traffic SimTraffic Report Page 1
51 Queuing and Blocking Report Evening Prayer Peak Hour - 15 minute Intervals (ARRIVAL) 3/7/212 Intersection: 1: Regional Road 25 & Henderson Road/New Site Driveway, Interval #4 Movement EB NB NB SB Directions Served LR L TR L Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) 2 Queuing Penalty (veh) 11 1 Intersection: 1: Regional Road 25 & Henderson Road/New Site Driveway, All Intervals Movement EB NB NB SB Directions Served LR L TR L Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) 1 Queuing Penalty (veh) 7 Network Summary Network wide Queuing Penalty, Interval #1: 1 Network wide Queuing Penalty, Interval #2: 3 Network wide Queuing Penalty, Interval #3: 2 Network wide Queuing Penalty, Interval #4: 13 Network wide Queuing Penalty, All Intervals: Total Traffic SimTraffic Report Page 2
52 Lanes and Geometrics 212 Existing Traffic 1: Regional Road 25 & Henderson Road Early Morning Prayer Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (m) Grade (%) % % % Storage Length (m) Storage Lanes 1 Taper Length (m) Link Speed (k/h) Link Distance (m) Travel Time (s) Lane Group Flow (vph) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Synchro 8 Report Page 1
INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.
INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting
More informationMEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9
MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates
More informationTraffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC
Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.
More informationThe proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.
Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4
More informationOFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.
OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation
More informationTraffic Impact Analysis Chatham County Grocery Chatham County, NC
Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...
More informationHILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:
HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October
More informationURBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2
URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny
More informationINDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:
INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.
More informationFAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:
FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,
More informationBistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748
City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License
More informationFieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton
Fieldgate Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton September 214 September 23 214 Ms Debbie Pacchiarotti Our
More informationMEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:
MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.
More informationAPARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:
APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July
More informationTraffic Impact Study WestBranch Residential Development Davidson, NC March 2016
Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC
More informationHOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:
HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc
More informationREDEVELOPMENT TRAFFIC IMPACT STUDY
REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport
More informationPlace Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012
Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800
More informationQUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:
QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny
More informationOTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:
OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012
More information2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited
2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta
More informationNEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:
NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony
More informationWalmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota
Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn
More information9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.
9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major
More informationGeorge Street Transportation Impact Study. Paradigm Transportation Solutions Limited
George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9
More informationTraffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning
F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,
More informationVIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY
VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates
More informationTraffic Impact Study, Premier Gold Mines Limited, Hardrock Property
Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014
More informationTraffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.
Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain
More informationJames M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study
Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior
More informationTraffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017
Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI
More informationEXECUTIVE SUMMARY. Page 1 of 6
EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the
More informationStudent Housing Development
Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,
More informationTRAFFIC IMPACT STUDY
TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT
More informationTRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio
TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client
More informationGlenn Avenue Corridor Traffic Operational Evaluation
Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More informationCorporation of the Town of Oakville. December 16, 2013
Corporation of the Town of Oakville Transportation Impact Analysis and Parking Study for Proposed Secondary School, Oakville Draft Final Report Submitted by: HDR Corporation 100 York Boulevard, Suite 300
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More informationList of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...
List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing
More informationHenderson Avenue Mixed-Use Development
Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic
More informationjoint access drive. will be
Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION
More informationORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:
ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7
More informationAMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning
AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic
More informationTRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT
November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront
More informationTRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT
TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE
More informationCOMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:
COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc
More informationTraffic Impact Analysis (TIA) Process and Procedures Manual. September 2017
Traffic Impact Analysis (TIA) Process and Procedures Manual Post Office Box 664 101 Huntersville-Concord Road Huntersville, NC 28070 Phone 704-766-2220 Fax 704-992-5528 www.huntersville.org (c) 2017, Town
More informationHarrah s Station Square Casino
Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December
More informationWalton Acres at Riverwood Athletic Club Clayton, North Carolina
9. CONCLUSIONS This Traffic Impact Analysis Update was conducted to determine the potential traffic impacts of the proposed Walton Acres at Riverwood Athletic Club residential development, located east
More informationDraft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for
oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared
More informationHUMC/Mountainside Hospital Redevelopment Plan
Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED
More informationTransportation Impact Study for Abington Terrace
Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,
More informationTable of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents
Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6
More informationOperational Ranking of Intersections: A Novel Prioritization Methodology
Operational Ranking of Intersections: A Novel Prioritization Methodology Reza Omrani, Ph.D. Transportation Engineer CIMA+ 3027 Harvester Road, Suite 400 Burlington, ON L7N 3G7 Reza.Omrani@cima.ca Pedram
More informationDonahue Drive Corridor Traffic Operational Evaluation
Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More information3.2.2 Proposed Road Network within Phase 1B Lands
3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing
More informationAPPENDIX D Traffic Impact Study (Draft Report)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REGISTRATION, TRAFFIC IMPACT STUDY (DRAFT REPORT), AND WATER SUPPLY SOURCE ASSESSMENT (WSSA): CAMPING PLAGE ABOITEAU BEACH, CAP-PELÉ, NB APPENDIX D (Draft Report)
More informationMEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.
MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled
More informationPRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT
PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership
More informationTRAFFIC ASSESSMENT River Edge Colorado
TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF
More informationPINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina
PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...
More informationTHIS PAGE LEFT BLANK INTENTIONALLY
GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,
More informationLIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY
LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty
More informationTraffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017
TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC
More informationTRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:
TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:
More informationTRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO
TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO APRIL 12, 218 REV. JULY 16, 218 Prepared for: Davis Development 43 Corporate Center Dr Suite 21 Stockbridge, GA 3281 Prepared by: 112
More informationTroutbeck Farm Development
Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com
More informationMEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff
MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:
More informationFINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM
FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item
More informationSTRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018
STRATEGY 4 INC. TRAFFIC IMPACT AND PARKING STUDY 3257 Mainway, City of Burlington Project No.: 27-675 APRIL 28 [ Month Year ] April 7, 28 Reference No. 27-675 Mr. Jeff Kenny Strategy 4 Inc. 262 Bristol
More informationRoad Conversion Study Plumas Street
Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education
More informationFebruary 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085
WWW.TRAFFICPD.COM February 8, 2016 Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 Re: Kohelet Yeshiva School Lower Merion Township, Montgomery County,
More informationTRANSPORTATION IMPACT STUDY
Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners
More informationSubject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis
MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade
More informationTHE LANDMARK AT TALBOT PARK
TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the
More informationNO BUILD TRAFFIC OPERATIONS
3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected
More informationTraffic Study North Shore School District 112
Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained
More informationProposed Addition to Pickering Islamic Centre
TRAFFIC IMPACT STUDY, PARKING STUDY, SITE CIRCULATION REVIEW & TDM PLAN Proposed Addition to Pickering Islamic Centre 265 Brock Road City of Pickering, Ontario Prepared for: Pickering Islamic Centre Masjid
More information5858 N COLLEGE, LLC N College Avenue Traffic Impact Study
5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...
More informationHENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.
HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc
More informationMichigan Avenue Traffic Study
City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC. 4 327 Harvester Road Burlington, ON L7N 3G7 T 289 288-287 F 289 288-285 cima.ca CONTACT Stephen
More informationSyracuse University University Place Road Closure
Transportation Impact Study for the proposed Syracuse University University Place Road Closure City of Syracuse, Onondaga County, NY March 216 Project No. 3613 Prepared For: Syracuse University Office
More informationShockoe Bottom Preliminary Traffic and Parking Analysis
Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA
More informationBenga Mining Limited Grassy Mountain Coal Project Appendix 8: Traffic Impact Assessment. Appendix 8 Traffic Impact Assessment
Benga Mining Limited Grassy Mountain Coal Project Appendix 8: Traffic Impact Assessment Appendix 8 Traffic Impact Assessment August 216 Riverdale Resources Proposed Coal Mine near Blairmore AB Traffic
More informationSignal Warrant Studies
Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data
More informationEvaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation
Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad
More informationFigure 1: Vicinity Map of the Study Area
ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove
More informationBLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.
BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates
More informationFRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY
FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE
More informationFORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION
FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise
More informationGateway Transportation Study
Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of
More informationFebruary 24, 2017 Project #: 20076
February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change
More informationGrant Avenue Streetscape
REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,
More informationProject Niagara. within the Town of Niagara-on-the-Lake
Traffic Traffic Impact Impact Study Study Project Niagara within the Town of Niagara-on-the-Lake Prepared for: Project Niagara July 2009 Traffic Impact Study PROJECT NIAGARA Niagara-On-The-Lake, Ontario
More informationTraffic Academy: IJS & IMS FAQ/RULES OF THUMB
FAQ/RULES OF THUMB HCS intersection analysis criteria See LDM Figure 401-14aE Cycle lengths between 60 to 120 seconds No impractical phases, i.e., 1 second green time Yellow + All Red must be no less than
More informationExisting Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer
Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /
More informationPrepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC
Prepared for Lutheran Services Carolinas Project Number: 16273 4/7/217 Trinity Landing New Hanover County, NC Trinity Landing Transportation Impact nalysis Prepared for Lutheran Services Carolinas New
More informationSTILLWATER AVENUE CORRIDOR STUDY Old Town, Maine
Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table
More informationCapital Region Council of Governments
March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry
More informationDate: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study
To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth
More information