Shell Castor & Pollux Rig Equipment Primary Items

Size: px
Start display at page:

Download "Shell Castor & Pollux Rig Equipment Primary Items"

Transcription

1 Shell Castor & Pollux Rig Equipment Primary Items

2 DRAW WORKS WITH SKID Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: 39,000 lbs Estimated construction Weight 21,800kg Crane #1: Sub End 10,500 lbs Crane #2: Load End 8,000 lbs JSA Ref: 1.13 Placing Draworks on Substructure, 1.15 Working with cranes. DRILLER CABIN Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: 31,600 lbs. Crane #1: Landing End Crane #2: Wind Board End JSA Ref: 1.12 Installing Doghouse with cranes, 1.15 Working with cranes.

3 MANIFOLD BUILDING Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: 26,500 lbs. Crane #1: A-Leg End DS Crane #2 A-Leg End ODS JSA Ref: 1.15 Working with Cranes ACCUMLATOR SUPPORT Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: 5720 lbs. Crane #1: Shiv End DS 3080 lbs. Crane #2: Shiv End ODS 2640 lbs. JSA Ref: 1.15 Working with Cranes.

4 MAST Lift Type Non-Routine Complex Lift Tandem Lift 2 Cranes Total Weight: Complete derrick with Top drive 84,000lbs. JSA Ref: 2-5 Raise derrick, 2-15 Raising derrick, 2-16 Prepare derrick for removal. TOP DRIVE UNIT Lift Type: Total Weight: JSA Ref: (Lift Unknown Approx. Weight 20,000 lbs.)

5 BOP STACK Lift Type: Critical complex lift Single crane Total Weight: 18,500lbs JSA Ref: 8-1 Nipple down Bop s from skid, 8-2 Laying down Bop s. PUMPHOUSE (x4) Lift Type: Assisted lift Crane and Bed Truck Total Weight: 120,000 lbs. Crane: Sub End Bed Truck: Load End JSA Ref: 1.7 Back Load into position, 1.15 Working with Cranes

6 LER BUILDING Lift Type: Critical/ Complex Lift 2 Cranes JSA Ref: 1.15 Working with Cranes Total Weight: 59,000 lbs. CATCH TANK Lift Type: Critical/Complex Lift 2 Cranes JSA Ref: 1.15 Working with Cranes Total Weight: 91,950 lbs.

7 PIPE BIN Lift Type: Bed truck Bed truck JSA Ref: 2-23 Rig in/out catwalk Total Weight:: 35,000lbs, Palfinger tubs 41,000lbs. MUD TANK Lift Type: Bed truck Bed truck JSA Ref: 1.7 Back Load into Position Installing Suction lines, Total Weight: 90,500lbs.

8 WATER TANK Lift Type: Bed truck Bed truck JSA Ref: 1-17 Working with bed truck Total Weight: 29,000lbs SUITCASE Lift Type: Loader JSA Ref: 16-1 Loader operations. Total Weight: lbs (23 suitcases)

9 DEGASSER TANK Lift Type: JSA Ref: Total Weight: (Est. construction Weight 2850Kg) DRILL LINE SPOOLER Lift Type: JSA Ref: Total Weight: (Est. construction Weight 1050Kg)

10 SHALE SHAKER Lift Type: Single Crane or Picker JSA Ref: 1.14 Picker Work Total Weight: 6,600 lbs. DRIVE HOUSE Lift Type: Critical/ Complex Lift 2 Cranes JSA Ref: 1.15 Working with Cranes Total Weight: 123,000 lbs.

11 HYDRAULIC POWER UNIT Lift Type: Single Crane JSA Ref: 1.15 Working with Crane Total Weight: lbs. LOADER 950K

12 LOADER 938K

13 Shell Castor & Pollux Rig Equipment Secondary Items

14 ACCUMLATOR SUPPORT Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: 5720 lbs. Crane #1: Shiv End DS 3080 lbs. Crane #2: Shiv End ODS 2640 lbs. JSA Ref: 1.15 Working with Cranes. MAST Lift Type Non-Routine Complex Lift Tandem Lift 2 Cranes Total Weight: Complete derrick with Top drive 84,000lbs. JSA Ref: 2-5 Raise derrick, 2-15 Raising derrick, 2-16 Prepare derrick for removal.

15 BOTTOM SUB-STRUCTURE BOX #1 Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: Crane #1: Pump End Crane #2: Crown End JSA Ref: 1.11 Installing Substructure with crane, 2.8 Working around open cellars

16 BOTTOM SUB-STRUCTURE BOX #2 Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: Crane #1: Pump End Crane #2: Crown End JSA Ref: 1.11 Installing Substructure with cranes, 2.8 Working around open cellars. LOWER SUB-STRUCTURE BOX #3 Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: Crane #1: Pump End Crane #2: Crown End JSA Ref: 1.11 Installing substructure with crane, 2.8 Working around open cellars.

17 TOP SUB-STRUCTURE DS BOX #4 Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: Crane #1: Pump End Crane #2: Crown End JSA Ref: 1.11 Installing Substructure with crane TOP SUB-STRUCTURE ODS BOX #5 Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: Crane #1: Pump End Crane #2: Crown End JSA Ref: Installing Substructure with crane

18 ROTARY CENTER SECTION Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: Crane #1: DS Crane #2: ODS JSA Ref: 1.15 Working with cranes PIPE ARM TRAILER Lift Type: Assisted Lift Bed/Crane JSA Ref: 1-16 Working with 3 rd party rig move, 2.23 Rig In/Out Catwalk Total Weight: 48,000 lbs. Insert Picture

19 ACCUMULATOR BUILDING Lift Type: Critical/Complex Lift 2 Cranes JSA Ref: 1.15 Working with Cranes Total Weight: 26,400 lbs. Insert Picture TOOLHOUSE/CHANGEROOM Lift Type: Bed truck Bed truck JSA Ref: 1-17 working with bed truck Total Weight: 57,000lbs Insert Picture

20 UTILITY CORRIDOR (C-16 CAT BACK UP GEN) Lift Type: Assist Lift Crane & bed truck JSA Ref: 1.7 Back Load into Position. Total Weight: Gen 44,000lbs. Insert Picture CABLE SKID Lift Type: JSA Ref: Total Weight: (Est. construction Weight 3800Kg) Insert Picture

21 BOILER BUILDING Lift Type: Bed truck Bed truck JSA Ref: 1-17 Working with bed truck. Total Weight: 47,500lbs. Insert Picture UTILITY HOUSE Lift Type: Bed truck Bed truck JSA Ref: 1.17 Working with bed truck Total Weight: 37,400 lbs.

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

CKE2500 HYDRAULIC CRAWLER CRANE GENERAL DIMENSIONS. Max. Lifting Capacity

CKE2500 HYDRAULIC CRAWLER CRANE GENERAL DIMENSIONS. Max. Lifting Capacity HYDRAULIC CRAWLER CRANE CKE Max. Lifting Capacity: 2 t Max. Boom Length: 91.4 m Max. Jib Combination: 76.2 +. m Max. Luffing Jib Combination: 1.8 + S P E C I F I C A T I O N S Main Boom Max. Lifting Capacity

More information

22.30 hrs. DrillSafe Forum Presentations - Perth Western Australia 5 th Mar 09

22.30 hrs. DrillSafe Forum Presentations - Perth Western Australia 5 th Mar 09 Near Miss Dropped 13 3/8 inch Casing 6 th November 2008 22.30 hrs What Happened A joint of 13 3/8 inch casing came out of the single joint elevator at floor level and travelled down the vdoor, along the

More information

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad. Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well

More information

Table of Contents. Chapter 1: Health, Safety and Environment Programs. Chapter 2: General Guidelines and Health Control

Table of Contents. Chapter 1: Health, Safety and Environment Programs. Chapter 2: General Guidelines and Health Control IADC Health, Safety and Environmental Reference Guide Table of Contents Chapter 1: Health, Safety and Environment Programs Safety Policy Statement... 1 HSE Meetings... 1 Safety Inspections and Logbooks...

More information

API RECOMMENDED PRACTICE 500 THIRD EDITION, DECEMBER 2012 ERRATA, JANUARY 2014

API RECOMMENDED PRACTICE 500 THIRD EDITION, DECEMBER 2012 ERRATA, JANUARY 2014 Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2 API RECOMMENDED PRACTICE 500 THIRD EDITION, DECEMBER

More information

Protecting People and the Environment during Stimulation Treatments in Offshore Settings

Protecting People and the Environment during Stimulation Treatments in Offshore Settings Protecting People and the Environment during Stimulation Treatments in Offshore Settings NASEM Workshop: Offshore Well Completion and Stimulation using Hydraulic Fracturing and Other Technologies Paul

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

RIG CAPABILITIES For Multi Well/Pad Development

RIG CAPABILITIES For Multi Well/Pad Development RIG CAPABILITIES For Multi Well/Pad Development Advantages to Multi-Well Pad - Continuous Operations Minimize EHS Risk Less iron to move Less trucking Less risks for spills Fewer or no Well Heads to avoid

More information

CKE4000 HYDRAULIC CRAWLER CRANE GENERAL DIMENSIONS PRELIMINARY. Max. Lifting Capacity

CKE4000 HYDRAULIC CRAWLER CRANE GENERAL DIMENSIONS PRELIMINARY. Max. Lifting Capacity HYDRAULIC CRAWLER CRANE CKE4000 Max. Lifting Capacity: 350 t Max. Boom Length : 78.0 m Max. Luffing Jib Combination : 72.0 + 54.0 m PRELIMINARY S P E C I F I C A T I O N S Main Boom Max. Lifting Capacity

More information

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

S0300-BV-CAT-020 AIR COMPRESSOR SYSTEM, SUB SALV, 1150-CFM, 500-PSI. System - DS0130. System DS0130 7/8/2018 2:56:57 AM

S0300-BV-CAT-020 AIR COMPRESSOR SYSTEM, SUB SALV, 1150-CFM, 500-PSI. System - DS0130. System DS0130 7/8/2018 2:56:57 AM System DS0130 Page 1 The Submarine Salvage Air Compressor System DS0130 is a portable unit used to provide high-pressure compressed air to dewater sunken vessels in up to 1000 feet of seawater. The system

More information

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): 42383383570000 MIRU MIRU INTEGRITY 3. 70 Longitude Orig

More information

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Slot Recovery Procedures: Slot Recovery Running Procedures 1. Cut And Retrieve Operation: Borais s cut and retrieve equipment: 1.

More information

Dropped Sheave Saddle Bracket

Dropped Sheave Saddle Bracket Dropped Sheave Saddle Bracket Dropped Sheave Bracket - Chronology Date and Time of incident Location of Incident Severity 28 th August 2007 @ 00:15 hrs RIG 100 Work floor High Potential Chronology 28th

More information

Engineered solutions for complex pressure situations

Engineered solutions for complex pressure situations SPECIAL SERVICES Engineered solutions for complex pressure situations Cudd Energy Services (CES) delivers custom engineered solutions to resolve complex pressure situations resulting from equipment failure

More information

Fall Protection Plan. Chinook Drilling 8/10/2012

Fall Protection Plan. Chinook Drilling 8/10/2012 2012 Fall Protection Plan Chinook Drilling 8/10/2012 Written by: ST, AO Checked by: Approved by: A.O 2 3 Table of Contents 179.0 Fall Protection Plan... 9 180.0 Slips, Trips and Falls from The Same Level...

More information

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 2 RIG TYPES Land rigs in 2012... total (approx) 3200 Jack Up,... in 2012... total (approx) 485 units 300 * in drilling mode 130 for WD > 350 ft Floaters,...

More information

INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES

INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES ContiTech Rubber Industrial Kft. Hose Technical Department HANDLING Page: 1/9 Date: 31.07.2008 Invalidate the document TKO AS3 rev.4 INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES

More information

IADC ISP PROGRAM. Summary of Occupational Incidents (Industry Totals)

IADC ISP PROGRAM. Summary of Occupational Incidents (Industry Totals) IADC ISP PROGRAM Summary of Occupational Incidents (Industry Totals) Issued 3 May 213 Table of Contents (Table of Contents is Hyperlinked, Just click on Topic & go) SUMMARY OF OCCUPATIONAL INCIDENTS INTRODUCTORY

More information

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper Offshore Managed Pressure Drilling Experiences in Asia Pacific SPE paper 119875 Authors: Steve Nas, Shaun Toralde, Chad Wuest, SPE, Weatherford Solutions Sdn Bhd, SPE, Weatherford Indonesia SPE, Weatherford

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

MISCELLANEOUS OILFIELD TYPE "H" OIL SAVER RUBBERS SPIRAL LINE STRIPPERS JU STRIPPER RUBBERS RECORDER DIAPHRAGMS FOR MARTIN DECKER RECORDERS

MISCELLANEOUS OILFIELD TYPE H OIL SAVER RUBBERS SPIRAL LINE STRIPPERS JU STRIPPER RUBBERS RECORDER DIAPHRAGMS FOR MARTIN DECKER RECORDERS TYPE "H" OIL SAVER RUBBERS SPIRAL LINE STRIPPERS JU STRIPPER RUBBERS RECORDER DIAPHRAGMS FOR MARTIN DECKER RECORDERS SIDEWINDER MUD MIXERS (REWORK) SIDEWINDER MUD MIXERS (COMPLETE) BRIDGE GATE GASKETS

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC Dilution-Based Dual Gradient Well Control Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC In this very short presentation, we will Review Dilution-based

More information

FALL FROM LADDER INCIDENT

FALL FROM LADDER INCIDENT FALL FROM LADDER INCIDENT DRILLSAFE MELBOURNE 02 DECEMBER, 2010 Presenter: Russell Telford Rig175 HR /HSE Supervisor WORKING AT HEIGHT EXPECTATIONS WHEN WORKING AT HEIGHTS THE EXPECTATION IS NOBODY FALLS

More information

BLACK HILLS PLATEAU PRODUCTION COMPANY

BLACK HILLS PLATEAU PRODUCTION COMPANY BLACK HILLS PLATEAU PRODUCTION COMPANY DRILLING PROGRAM Homer Deep Unit 9 11CH SHL: 300 FNL, 200 FWL, NWNW Sect. 9 T8S R98W BHL: 1350 FSL, 2100 FEL NWSE Sect. 15 T8S R98W Garfield & Mesa Counties, Colorado

More information

Drilling Blowout Prevention Requirements and Procedures

Drilling Blowout Prevention Requirements and Procedures Directive 036 Release date: January 31, 2018 Effective date: January 31, 2018 Replaces previous edition issued February 2006. Drilling Blowout Prevention Requirements and Procedures The Alberta Energy

More information

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER INNOVATIVE ANALYSIS IMPROVED BLOWOUT PREVENTER 1. BRIEF DESCRIPTION OF THE SITUATION The blowout preventer (BOP) is a valve assembly usually mounted on the sea floor at the mouth of an oil well to control

More information

Specifications Testing & Adjusting Disassembly & Assembly

Specifications Testing & Adjusting Disassembly & Assembly SB4191E00 Jul. 2005 Specifications Testing & Adjusting Supplement for Quad Lift Mast D20/25/30/32/33S-3 G/GC20/25/30/32P-3 G/GC20/25/30/32E-3 Important Safety Information Most accidents involving product

More information

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump

More information

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

W I L D W E L L C O N T R O L SNUBBING OPERATIONS SNUBBING OPERATIONS Snubbing Operations Learning Objectives You will learn - Various activities suitable for snubbing operations. Best practices and techniques for conducting snubbing operations. The types

More information

Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations

Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations High resolution pressure control at your fingertips, during your UBD and

More information

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Safety and Risk Engineering. HSE Case Implementation Clive Rawson Safety and Risk Engineering HSE Case Implementation Clive Rawson Purpose ALARP Risk Assessment Major Accident Events Bowties Safety Critical Systems Performance Standards Implementation Getting HSE Case

More information

Total s Golden rules

Total s Golden rules Total s Golden rules Golden rule No. 12: Simultaneous operations or co-activities This presentation resumes in part the document that won an award at the 2011 World Day for Safety at work, written by:

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

LINK-BELT MODEL HC-278H TON CAPACITY

LINK-BELT MODEL HC-278H TON CAPACITY TRANSPORTATION SPECS - Conventional Truck Cranes LINK-BELT MODEL HC-278H - 300 TON CAPACITY COMPONENT WEIGHTS LBS. KGS. BOOM TYPE: TUBULAR 80 X 68 LBS. KGS. Complete Crane C/W 70 Boom, 320,123 145 207

More information

Lattice Boom Crawler Crane 300-ton (272 mt)

Lattice Boom Crawler Crane 300-ton (272 mt) Lattice Boom Crawler Crane 300-ton (272 mt) Wide or narrow gauge patented All hydraulic controls & power Dual cross-section main boom High performance matching main hoists with 28mm rope Tilt cab High

More information

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary PRES WELL NO. Report End Date: 5/19/2016 Report Number: 3 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : : 0 Planned VS (ft): Current VS (ft): WOC WOC, CONTACTED TRRC, SPOKE TO ABRAHAM, ADVISED

More information

Lattice Boom Crawler Crane 300-ton (272 mt)

Lattice Boom Crawler Crane 300-ton (272 mt) Lattice Boom Crawler Crane 300-ton (272 mt) Wide or narrow gauge patented All hydraulic controls & power Dual cross-section main boom High performance matching main hoists with 28mm rope Tilt cab High

More information

Demag TC3000

Demag TC3000 www.barnhartcrane.com Demag TC3000 550T 550T 550T Component Weights Weight of counterweighted Machine with 39' (12m) boom Superstructure only (with 4 drums, boom foot section and mast) Truck Carrier Outrigger

More information

Model A Sleeve Valve Cement Retainer

Model A Sleeve Valve Cement Retainer Ret. O.D. Model A Sleeve Valve Cement Retainer DIMENSIONAL DATA A B C D E F G H J K L M N P Q R 3.593 3.593 3.500 2.500 3.531 3.531 1.345 3.375.750.437 2.437 2.187 7.062 2.437 5.312 11.685 20.093 3.937

More information

HANDS-FREE RC ROD HANDLER. Technical Datasheet. Copyright 2012 Boart Longyear. All rights reserved.

HANDS-FREE RC ROD HANDLER. Technical Datasheet. Copyright 2012 Boart Longyear. All rights reserved. HANDS-FREE RC ROD HANDLER Technical Datasheet Copyright 2012. All rights reserved. hands-free rc rod handler 76 Rods per shift, 300 shifts per year, 22,800 rods per year, up to 4,240,800 Kg per year: Reduce

More information

KEEP IN MIND THAT YOU ARE THE KEY TO SAFETY

KEEP IN MIND THAT YOU ARE THE KEY TO SAFETY Sto-away Power Cranes, Inc. How to Properly Set up the Bumper Crane for use. KEEP IN MIND THAT YOU ARE THE KEY TO SAFETY Parking your Truck on a Level area. Park the truck in a position that gives you

More information

Training for the Drilling Industry Order sets online at

Training for the Drilling Industry Order sets online at Training for the Drilling Industry Order sets online at www.graphicsafety.com Drilling Rig Hazard Recognition This workbook teaches hazard recognition by illustrating scenes and requiring student/employees

More information

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA Well Control Manual Bharat PetroResources Limited BLOCK: CB-ONN-2010/8 GUJRAT-INDIA Prepared By: EnQuest PetroSloutions Pvt. Ltd. Contents 1.0.0 Definitions 2.0.0. Causes of Kicks 3.0.0. Kick indications

More information

Drilling Blowout Prevention Requirements and Procedures

Drilling Blowout Prevention Requirements and Procedures Directive 036 Drilling Blowout Prevention Requirements and Procedures February 16, 2006 Effective January 1, 2008, the Alberta Energy and Utilities Board (EUB) has been realigned into two separate regulatory

More information

PETITION OF SHELL OIL COMPANY TO MAKE PERMANENT THE PRESENT SPECIAL FIELD RULES FOR THE SOUTHWEST PINEY

PETITION OF SHELL OIL COMPANY TO MAKE PERMANENT THE PRESENT SPECIAL FIELD RULES FOR THE SOUTHWEST PINEY -V FILED FOR RECORD APR 1 3 1981 BEFORE THE STATE OIL AND GAS BOARD OF MISSISSIPPI S i A i E Oil AMD GAS BOARD DOCKET NO. 75-81-386 Ci>Js&C*.^ s^oj4cassujmisor ORDER NO. //o? - // PETITION OF SHELL OIL

More information

W I L D W E L L C O N T R O L AIR DRILLING

W I L D W E L L C O N T R O L AIR DRILLING AIR DRILLING Air Drilling Learning Objectives You will learn the basics of: Air drilling equipment Types of air drilling Differences between mud and air drilling You will learn how to apply well control

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated:

More information

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

Performance and Value of the invision System : Offshore in Coiled Tubing Operations Performance and Value of the invision System : Offshore in Coiled Tubing Operations Case Study #0004 Date November 01 21, 2017 Location Gulf of Mexico, Deep Water Introduction Intelligent Wellhead Systems

More information

Ocean Bounty Dropped Riser Stand Incident. Incident Number OB Result - LTA Well Location: AP-4 16 th January 02:40

Ocean Bounty Dropped Riser Stand Incident. Incident Number OB Result - LTA Well Location: AP-4 16 th January 02:40 Ocean Bounty Dropped Riser Stand Incident Incident Number OB 144-03-07 Result - LTA Well Location: AP-4 16 th January 2007 @ 02:40 Incident Details Completion Phase on 1 st Angel well Completion run, Tree

More information

Specifications For Threaded and Butt Weld Hammer Unions

Specifications For Threaded and Butt Weld Hammer Unions .02 Introduction Pacific Hoseflex offers a comprehensive range of standard and sour gas. Each union is thoroughly inspected to ensure long, dependable service in the most extreme conditions. - Three lug

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 12 Choose the best answer to the following Multiple Choice Questions. 1. What class of bulkhead is required around

More information

Phuel Portable Control Units

Phuel Portable Control Units Phuel Portable PCE Control Unit Pressure Test Unit c/w Chart Recorder Triple Wireline BOP The Phuel range of Air Driven Portable provide all the control functions required for well intervention operations

More information

Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico

Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico Lew Dennis Decommissioning Manager Chevron Gulf of Mexico Business Unit 1 Key Messages Focusing on Risk Reduction in Decommissioning

More information

NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40)

NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40) NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40) Rev.1, Dec. 1994 CONTENTS 1 FOREWORD 2 2 SCOPE 2 3 NORMATIVE REFERENCES 2 4 DEFINITIONS AND ABBREVIATIONS

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

Version 1.0 March 2016

Version 1.0 March 2016 POL Permit to Work Information for Shipping Agents Version 1.0 March 2016 Page 1 of 9 Introduction The objective of the Permit to Work process is to ensure Port Otago Limited and its operational Staff,

More information

TurboDraft Fire Eductor

TurboDraft Fire Eductor TurboDraft Fire Eductor Operating Manual Introduction The TurboDraft is designed to be used for rural water supply operations. Many of us take for granted that there is a fire hydrant on every corner.

More information

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover: Zone: War-Wink Cherry Canyon TD: 7250' Rig: Union Drlg Rig 229 Status: WOC Spud Date: 1/26/2013 RR Date: 2/12/2013 First Sales: AFE: $1,393,293.00 DHC: $761,963.00 WI: Notes: Date Activity 11/14/2012 11/14/12

More information

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Standard Edition Section Inquiry # Question Reply 4.3.6-10-17 API Std - Blowout Prevention Equipment Systems for Drilling Wells The cost of NDE/NDT inspection of some fasteners outweigh the cost to replace

More information

Des Plaines Fire Dept. Engineer Program

Des Plaines Fire Dept. Engineer Program Des Plaines Fire Dept. Engineer Program Lieutenants Palenik, Gross, Owen, Butenschoen, Engineer Felde New Developments 1. Laminated fluid specs on the rigs 2. Maintenance repair request updates 3. Locations

More information

The Developing Design of the Blowout Preventer in Deep Water

The Developing Design of the Blowout Preventer in Deep Water The Developing Design of the Blowout Preventer in Deep Water IADC World Drilling 2011 Conference & Exhibition 15-16 June 2011, Bella Centre, Copenhagen Eric Brown Project Manager National Oilwell Varco

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

NORSOK STANDARD D-002 Edition 2 (2013)

NORSOK STANDARD D-002 Edition 2 (2013) Date: 2015-06-01 NORSOK STANDARD D-002 Edition 2 (2013) Well intervention equipment Frequently asked questions - FAQ NORSOK 2015 2 INTRODUCTION NORSOK standard D-002 Revision 2 was released in June 2013.

More information

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS 11/17/2011 11/18/2011 11/19/2011 AFE dated 11/18/2011 - pull tbg out of hole and make a mill run. Run packer on tbg and attempt to reestablish production from Devonian Formation. MIRU Great Basin Pulling

More information

Bishamon Parts Manual READ ONLINE

Bishamon Parts Manual READ ONLINE Bishamon Parts Manual READ ONLINE Bishamon Parts - MRK SALES - MRK SALES, INC., is a supplier of Bishamon Pallet Truck Parts providing you with all Bishamon Pallet Truck parts as well as new equipment.

More information

Size 10 (D05) p max 320 bar (4600 PSI) Technical Features. Technical Data. Port dimensions ZB10A(B) SMT_0019 ZB K -

Size 10 (D05) p max 320 bar (4600 PSI) Technical Features. Technical Data. Port dimensions ZB10A(B) SMT_0019 ZB K - ase late with with ressure Relief Valve for Serial lates ssemblies Z0 Size 0 (D05) p max 320 bar (4600 SI) echnical Features ank cover mounted base manifold for hydraulic power packs which require one

More information

Top Drive System. 1. AC VFD Top Drive System. Technical characters

Top Drive System. 1. AC VFD Top Drive System. Technical characters Top Drive System The top drive system is a high-tech content products, which integrates mechanical, electrical hydraulic, and communications integration, and was used to replace traditional rotary table-kelly

More information

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Dynamic Positioning: Method for Disaster Prevention and Risk Management Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96) BOP CLASSIFICATION SYSTEM FOR ONSHORE NEWFOUNDLAND AND LABRADOR INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96) PREPARED BY THE PETROLEUM RESOURCE DEVELOPMENT DIVISION

More information

Reverse Circulation Drilling Rig

Reverse Circulation Drilling Rig BUILT ON BUILT TRUST ON BUMA Reverse Circulation Drilling Rig 02. www.bumace.com COMPANY BUMA CE is a leading manufacturer and supplier of foundation equipment in Korea. Since the company was built in

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

API RP 2D sect C.4.1.2: 4-yearly load test of BOP crane to SWL +5 Ton and NDT inspection post load test.

API RP 2D sect C.4.1.2: 4-yearly load test of BOP crane to SWL +5 Ton and NDT inspection post load test. API Commonly Used & Relevant Spec's & RP notes: API RP 2D sect C.4.1.2: 4-yearly load test of BOP crane to SWL +5 Ton and NDT inspection post load test. API Spec 4F: Crown Block Data Plate section 4.4.4.

More information

Rigless Cutting the Cost of Well Abandonments

Rigless Cutting the Cost of Well Abandonments SPE 4th European Well Abandonment Seminar Rigless Cutting the Cost of Well Abandonments Date: Thursday 18th April 2013 Richard Innes, Decommissioning Engineer Objective What Does Rigless Mean Basic Requirements

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT 1.1 INTRODUCTION Development drilling and testing operations of hydrocarbon wells are considered hazardous in nature, which can pose risk to life and property in an unlikely event

More information

August 21, Deepwater MPD / PMCD

August 21, Deepwater MPD / PMCD August 21, 2011 Deepwater MPD / PMCD Managed Pressure Drilling (MPD) Pressure held on top of riser while drilling. Drill in overbalance condition Pressurized Mud Cap Drilling (PMCD) Pressure of mud column

More information

Oil & gas. Safe Reliable. Pumps. Pumps. CSA Accessories. Toll Free: Int'l:

Oil & gas. Safe Reliable. Pumps. Pumps. CSA Accessories.   Toll Free: Int'l: Oil & gas I n d u s t r y / A p p l i c at i o n s Pumps Safe Reliable The Widest Range of Certified Safe & Reliable Natural Gas Operated Pumps DRILLER S MUD SERIES Pumps CSA Accessories Toll Free: 8--

More information

Float Equipment TYPE 925/926

Float Equipment TYPE 925/926 Type 925 Float Collar Plunger Valve Float Equipment For less demanding well conditions, such as shallower depths or lower pressures, Top- Co offers economical float equipment certified to API RP 10F category

More information

Attachment 1 T&T Salvage, LLC Standard Tariff (Revision Date: 4 October 2013)

Attachment 1 T&T Salvage, LLC Standard Tariff (Revision Date: 4 October 2013) PERSONNEL & ADMINISTRATION Rate SALVAGE TEAM: Salvage Master 2,100.00 1,785.00 Salvage Engineer / Naval Architect 2,100.00 1,785.00 Assistant Salvage Master 1,800.00 1,530.00 Salvage Dive Supervisor 1,800.00

More information

ENERGY BLADE 3K4. Energy Blade Installation Instructions

ENERGY BLADE 3K4. Energy Blade Installation Instructions ENERGY BLADE 3K4 Energy Blade Installation Instructions 1 Contents General information 2 Scope of these instructions 2 Product information 2 Designated use 3 Warranty 3 Safety instructions 4 Assembly and

More information

DREDGING. with particular emphasis on Oil and Gas activities in Canada

DREDGING. with particular emphasis on Oil and Gas activities in Canada DREDGING with particular emphasis on Oil and Gas activities in Canada Dredging is an excavation activity or operation usually carried out at least partly underwater, in shallow seas or fresh water areas

More information

A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk Assessment

A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk Assessment A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk Assessment Dr. Sethupathi Arumugam PhD Principal Consultant Biswa Ranjan Patra Principal Consultant Shebi

More information

Oil connector 3/8NPT. usable oil Air inlet pressure max. operating Air consumtion. oil capacity capacity min. max.

Oil connector 3/8NPT. usable oil Air inlet pressure max. operating Air consumtion. oil capacity capacity min. max. 44 97 ir hydraulic pump 9 Operating pressure max. 2 bar/7 bar Conversion ratio :3, : Compact irhydraulicpump for single acting hydraulic tools. This air hydraulic pump can activate a higher number of clamping

More information

Abandonment Program for Paramount Fort Liard F 36

Abandonment Program for Paramount Fort Liard F 36 Abandonment Program for Paramount Fort Liard F 36 Well Name: Paramount et al Liard F 36 Area: 60 0 10 N, 123 0 15 W Location: Latitude: 60 0 05 27 Longitude: 123 0 22 00 UWI: 300F366010123150 WID: 1841

More information

DROPPED OBJECT PREVENTION ON OFFSHORE UNITS AND INSTALLATIONS

DROPPED OBJECT PREVENTION ON OFFSHORE UNITS AND INSTALLATIONS Guide for Dropped Object Prevention on Offshore Units and Installations GUIDE FOR DROPPED OBJECT PREVENTION ON OFFSHORE UNITS AND INSTALLATIONS MAY 2017 (Updated September 2017 see next page) American

More information

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001 OCS Report MMS 2002-040 Investigation of Loss of Well Control Eugene Island Block 277 OCS-G 10744 Well A-2 Off the Louisiana Coast July 6, 2001 U.S. Department of the Interior Minerals Management Service

More information

Last Updated: April 19, 2018

Last Updated: April 19, 2018 API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last Updated: April 19, 2018 Standard Edition Section Inquiry # Question Reply 4.3.6 53-10-17 The cost of NDE/NDT inspection of some

More information

Appendix Q Possible Ignition Sources. Appendix Q Possible Ignition Sources

Appendix Q Possible Ignition Sources. Appendix Q Possible Ignition Sources Appendix Q Possible Ignition Sources The size of the flammable gas cloud that enveloped the Deepwater Horizon made an explosion almost inevitable. While the investigation team cannot specify what source

More information

The African Union Code of Practice for Geothermal Drilling

The African Union Code of Practice for Geothermal Drilling Welcome The African Union Code of Practice for Geothermal Drilling African Union June 13-14, 2018 Addis Ababa, Ethiopia Sam Abraham Geothermal Engineer and Consultant Contents 1. Introduction 2. Well Design

More information

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment Contents 1. GENERAL INFORMATION & RECOMMENDATIONS 1 2. INSTALLATION FLOAT EQUIPMENT 2 2.1 PRE-USE FIELD INSPECTION 2 2.2 POSITION FLOAT ON CASING STRING 3 3. RUNNING OF FLOAT EQUIPMENT 3 3.1 CIRCULATION

More information

Drilling Morning Report

Drilling Morning Report REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:

More information

OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM

OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM 1 You have purchased a very high quality piece of equipment that should provide years of useful life. Following the instructions

More information

SEMI-SUB AND JACK UP DRILL RIGS SPECIALIST CLEANING SERVICES & EQUIPMENT RENTAL SOLUTIONS

SEMI-SUB AND JACK UP DRILL RIGS SPECIALIST CLEANING SERVICES & EQUIPMENT RENTAL SOLUTIONS SEMI-SUB AND JACK UP DRILL RIGS SPECIALIST CLEANING SERVICES & EQUIPMENT RENTAL SOLUTIONS PONTOON BALLAST / FUEL TANKS DRILL WATER TANKS POTABLE WATER TANKS SPECIALIST CLEANING FUEL OIL DAY TANK & SETTLING

More information

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top DAYS FROM SPUD: 35 DAYS ON 0 Mar 1 2016 RIG SUPERVISOR: Tyler Clean and prep location, MIRU pulling unit to mill liner top Blade location, set anchors. Bring surface and int CSG valves to surface and fill

More information

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0 International Well Control Forum IWCF Drilling Well Control Syllabus and 4 March 2017 Version 7.0 IWCF Drilling Well Control Syllabus and 4 Contents Guidance Notes... 5 1.1. Introduction... 5 1.2. Who

More information