L&U DOK. SENTER WELL SUMMARY ANCHOR DRILLING FLUIDS O STATOIL L. NR. Denne rapport tilhorer. KODE \X/(,(l 31/3-JJ \b FOR NORSKE SHELL WELL NO.

Size: px
Start display at page:

Download "L&U DOK. SENTER WELL SUMMARY ANCHOR DRILLING FLUIDS O STATOIL L. NR. Denne rapport tilhorer. KODE \X/(,(l 31/3-JJ \b FOR NORSKE SHELL WELL NO."

Transcription

1 Denne rapport tlhorer O STATOL L&U DOK. SENTER L. NR. KODE \X/(,(l 3/3-JJ \b Returneres etter bruk WELL SUMMARY FOR A/S NORSKE SHELL WELL NO. 3/2- ANCHOR DRLLNG FLUDS

2 WELL SUMMARY FOR A/S NORSKE SHELL WELL NO. 3/2-

3 GENERAL SUMMARY OPERATOR A/S NORSKE SHELL WELL NO. 3/2- OPERATOR'S REPRESENTATVES CONTRACTOR FRANS VAN KAMPEN, CHRS WESTON, HANS FECKEN DOLPHN SERVCES RG BORGNY DOLPHN _ CONTRACTOR'S REPRESENTATVES JOHN BUTCHART, HARALD FRGSTAD _ ANCHOR ENGNEERS CHRS ATKNSON, CHRS MEYJES, JOHN SETCHEL, CHARLES BLANCHARD WATER DEPTH 336 m SEABED to RKB 36 m 36" HOLE DRLLED TO 47 m 3" CASNG SET AT 46 m 26" HOLE DRLLED TO 3 O m 2" CASNG SET AT 799 m 7V 2 " HOLE DRLLED TO 535 m 3%" CASNG SET AT 525m 2 / 4 " HOLE DRLLED TO 744m 9%" CASNG SET AT 72m 8 / 2 " HOLE DRLLED TO 7" LNER SET AT 6" HOLE DRLLED TO

4 ANCHOR DRLLNG FLUDS AS OSLO STAVANGER DALY SUMMARY REPORT WELL NAME 3/2- OPERATOR A/S NORSKE SHELL ENGNEERS C. MEYJES 6 & Ran Anchors , bbls pre-hydrated gel mxed by WSPE John Allen : Ran T.G.B. Pcked up drllng assembly and spud well at 7. hrs. Drlled 36" hole to 38 m. POOH to nck up core bbl. Cut back vscosty of pre-hydrated gel by addton of 65 bbls drll water Cored from 38 m to m. POOH and servce core barrel. RH and cored from m to 399 m. POOH. RH wth 26" bt and 36" hole opener. Drlled to 43 m usng seawater and vscous plls wth returns to seabed. Mud engneer arrved on rg 2. hrs. Mxed 3 bbls prehydrated gel. Mud consumpton hgher than antcpated snce 3 bbls mud spotted on each survey (5 bbls sweep and 25 bbls left n hole) Drlled to 47 m. Surveyed and made wper trp to seabed to retreve survey. RH - m fll. Swept hole wth 5 bbls pll and pumped 7 bbls mud nto hole (hole capacty 43 bbls for gauge hole). POOH and rgged up to run 3" casng. Ran 3" casng to 46 m - no problems. Cement casng. Dsplaced wth seawater. Wated on cement /2 hr. Backed out runnng tool and jetted well head.

5 . ANCHOR DRLLNG FLUDS AS '^ OSLO STAVANGER DALY SUMMARY REPORT WELL NAME 3/2- OPERATOR A/S NORSKE SHELL ENGNEERS C. MEYJES POOH wth runnng tool. Lad down 36" BHA. RH and attempted to stab n wth 4 3/4" bt and 26" hole opener. Gude frame damaged whle tryng to stab n bad weather. Wated on weather 9 hrs and repared gude frame. RH. Stabbed n. Tagged cement at 449 m. Drlled out cement and shoe. Clean out rathole and drlled to 475 m. Sweot hole wth 5 bbls mud and spotted 5 bbls mud on bottom. POOH to run rser. Mxed 35 bbls pre-hydrated gel. Ftted shaker screens: 2/4, 2/4, 2/3, used screens whch had been used on prevous Fnshed POOH. Wated on weather 2 /2 hrs. Ran rser. Requested to mx pt (3 bbls) of kll mud at.35 SG Fnshed runnng rser. Made up core barrel and RH. Cored from 475 m to m. Made no progress. POOH wth core barrel. Stablzer hung up n dverter whle POOH. Elevators opened and STD DC's and core barrel dropped n hole. M/u overshot and bent jont and RH to fsh. Tagged fsh at 458 m but could not latch on. Weghted up 3 bbls pre-hydrated gel to use as kll mud. Mxed 3 bbls pre-hydrated gel.

6 tanchor DRLLNG FLUDS AS OSLO STAVANGER DALY SUMMARY REPORT WELL NAME 3/2- OPERATOR A/S NORSKE SHELL ENGNEERS C. MEYJES POOH wth fshng assembly. Unlatched and pulled rser. Made up overshot wth 2 /2" gude. RH and tagged top of fsh at 432 m. Engaged fsh and POOH wth same. Restrng new drllng lne Restrng new drllng lne. Vetco nspecton of blocks, crown etc. to check for damage caused when fsh was dropped (see )'. Ran and latched rser. Flled wth seawater. Made up BHA for 4 3/4" plot hole. Requested to run the gelled seawater mud for ths secton at a mnmum vs of 55-6 sees and to have all surface pts full wth 2 vs mud before startng drllng. ncreased pt volume and mxed gel as necessary. m ft RH to 46 m. Tested dverter and overboard lnes. Dsplaced hole to mud. Reamed to 475 m. Drlled to 58 m. Pump broke down. POOH to shoe to repar same. RH and drlled to 75 m. For hole dsplacement watered back pre-hydrated Bentonte wth seawater. ntal vscosty very hgh. Lost mud over shakers. Dluted back heavly wth seawater. Ran mud cleaner contnuously wth 2 mesh screens, plus desander and deslter as necessary. Excess volume caused by dluton was dsposed of by regularly dumpng of the gumbo box and sand traps.

7 ,_ ANCHOR DRLLNG FLUDS AS " OSLO - STAVANGER DALY SUMMARY REPORT WELL NAME 3/2- OPERATOR A / S NORSKE SHELL ENGNEERS C. MEYJES Drlled from 75 m to 85 m. Dropped survey and POOH to retreve same at shoe. RH - hole OK. Crculated bottoms up and spotted 338 bbls.35 SG vscous mud n the open hole. POOH to log. Rgged up Schlumberger. Ran SF, LDT/CNL. Both runs to bottom no problems. RH OEDP to dsplace hole to seawater. Ran seawater, deslter and mud cleaner whle drllng to control mud weght. Dumped 8 bbls surplus volume and gumbo box. Mxed 76 bbls extra mud at.35 SG whle drllng. Flled all avalable pts wth mud returns when spottng.35 SG mud. Dumped remanng returns (+5 bbls) RH to 45 m. Dsplaced 3" casng and rser to seawater. Saved 3 bbls of returns. Dumped balance (+_38 bbls) and crculated untl returns clean. Open dump valve on seabed. RH to 65 m and dsplaced out.35 SG mud wth seawater. RH to 8 m and dsplaced to seawater agan. Observed well - statc for 3 mns. Dsplaced open hole wth 365 bbls hvs mud (.8 SG). POOH. Unlatched and pull rser. Made up 26" BHA and RH. Mxed 3 bbls pre-hydrated gel RH wth 26" bt. Stabbed nto hole and RH to 46 m. Open 4 3/4" plot hole to 26" from 47 m to 8 m. Pumped 25 bbls hgh vs pll on each connecton. 2 hrs washed and reamed out ledge at 55 m. Otherwse no hole problems. Requested by Shell tool pusher to have all surface pts full of.35 SG hgh vs mud for pumpng nto hole before POOH to run casng. Pumped bbls mud from sandtraps to actve. Dumped remanng 4 bbls and cleaned pts. Mxed 25 bbls unweghted vscous mud. Weghted up 675 bbls mud to.35 SG and mxed a further 375 bbls of.35 SG mud.

8 . ANCHOR DRLLNG FLUDS AS '^ OSLO STAVANGER DALY SUMMARY REPORT WELL NAME 3/2- OPERATOR A / s NORSKE SHELL ENGNEERS Pumped 5 bbls vscous pll and chased out of hole wth 8, strokes seawater. Dropped survey and POOH to shoe - hole OK. Wated hr and RH. Stood up at 784 m. Reamed to bottom. Swept hole wth 5 bbls hvs mud and pumped 85 bbls.35 SG vscous mud nto hole. POOH to run casng. Rgged up and ran 2" casng. Stabbed nto well head. Wnd became too severe to run last 5 JTS of casng. Shut down watng on weather. Dumped and cleaned all pts and lnes. (Dumped 85 bbls mud left n bottom of pts). Mxed 5 bbls CaClp water for cement lob Wated on weather to 7. hrs. Pulled 3 JTS 2" casng. Ballasted down rg to 7' and pulled rest of casng. RH wth 26" bt to 459 m. Dsplaced hole to seawater. RH to 628 m and dsplaced agan. RH to 794 m - hole tght. Washed and reamed to 8 m. Pumped 5 bbls mud to sweep hole. Dsplaced hole to.35 SG mud. Pumped 3 bbls (hole capacty 4 bbls), POOH to run 2" casng. Dumped 5 bbls CaCl 2 water and mxed 345 bbls mud at.35 SG hvs whle pullng casng. After dsplacng hole to mud dumped balance of mud n pts (65 bbls). Started cleanng out pts and lnes Ran and cement 2" casng wth shoe at 799 m. Jetted well head clean.-ran stack and marne rser. Mxed 5 bbls CaCl 2 water for cement job. Dumped and cleaned all pts pror to takng on 64 bbls brne from boat. Started mxng new KCl/Polymer system. KCl ffasv

9 ANCHOR DRLLNG FLUDS AS OSLO - STAVANGER DALY SUMMARY REPORT WELL NAME 3/2- OPERATOR A / s NORSKE SHELL ENGNEERS ATKNSON.4.83 Ran and landed stack and marne rser. Tested BOP's. POOH wth test plug. Run wear bushng. Fnshed mxng KCl/Polymer system (total of 55 bbls bult) weghted up to.3 SG for drllng out. Flled sand traps wth mud also Unable to set wear bushng. POOH. Carred out repars. Set wear bushng. Lad down excess HWDP at 26" BHA. Made up new 7 /2" BHA. RH to 77 m. Pcked up kelly. Tagged cement at 78 m. Drlled cement from 78 m to 799 m wth seawater. Dsplaced to mud and drlled 7 /2" hole from 8 m to 82 m. Crculated bottoms up and hole clean. Carred out leak of f test. Gave leak of f at equvalent mud weght of.49 SG. Drlled ahead from 82 m to 825 m. Took on 39 bbls brne total n pt no. 2, 3 and 4. Started mxng new volume n pt no. 2 and pt no. 3. Total of 55 bbls, Drlled 7 /2" hole from 825 m to 987 m. Dropped survey. POOH to 2" shoe (max., bs overpull frst stand). Retreved survey. RH. Drlled ahead from 987 m to 82 m. (Used Hallburton to pump also after 8. hrs due to lack of power for two rg pumps. Slower ROP - down to m/hr. Losses over shakers when sold cuttngs too great to handle due to hgh ROP. Mxed new volume pt no. 4 and no. 3. (Total of 6 bbls at.3 SG). ncreased Ancopol polymer content whle drllng (generally add can per hr). Dumped and cleaned sand trap durng survey wp^r trp A'ssw

10 tanchor DRLLNG FLUDS AS OSLO STAVANGER DALY SUMMARY REPORT WELL NAME 3/2- OPERATOR A/S NORSKE SHELL ENGNEERS C. ATKNSON Drlled 7 /2" hole from 82 m to 2 m. Started usng 2 rg pumps at 7. hrs. Drlled ahead from 2 m to 68 m. Crculated /2 hr. Dropped survey. POOH for wper trp to shoe. Tght hole from 95 m to 895 m (max. 25, bs overpull). Pcked up kelly at 98 m. Crculated /2 hr. POOH to shoe. Retreved survey (/2 ). RHto52 m. Broke crculaton Reamed and washed to bottom (2 m fll). Drlled 7 /2" hole from 68 m to 285 m. Treated system wth 4 ppb KCl after some hydraton of cuttng startng to be notceable. Drlled 7 /2" hole from 285 m to 349 m. Crculated 3/4 hr. Dropped survey (/'2 ),pooh for wper trp to shoe. Tght hole at 9 m. Pcked up kelly. Crculated /4 hr. Contnued POOH to shoe. RH. Reamed and washed from 62 m to 8 m and 34 m to 349m. Contnued drllng ahead from 349 m to 372 m. POOH to change bt. Tght at 35 m to 3 m. Changed bt. RH to 228 m. Tght hole. Washed down. Contnued RH to 36 m. Washed to T.D. - no fll. Drlled ahead from 372 m to 455 m. Mantaned K at approx.4 ppb n actve system. Mxed 23 bbls over mud volume n pt no Drlled 7 /2" hole from 455 m to 535 m (casng depth). Crculated /2 hr. Dropped survey (/2 ). Wper trp"to shoe. Tght at 495 m to 49 m. Pumped 3 JTS out of hole. Contnued POOH. RH. Tagged bottom at 535 m - no fll. Crculated bottoms up and cleaned hole. POOH - no drag. Ran Schlumberger logs. Made up casng hanger and hang off tool and cement head. RH wth bt for clean out trp pror to runnng casng.

11 ANCHOR DRLLNG FLUDS AS OSLO STAVANGER DALY SUMMARY REPORT WELL NAME 3/2- OPERATOR A / S NORSKE SHELL ENGNEERS C. ATKNSON/ J. S ETCH EL Contnued RH for clean out trp. Ht brdge at 523 m. Broke crculaton. Washed to T.D. from 523 m to 535 m. Crculated hole clean. RH. Washed well head area. Fnshed POOH. Pulled wear bushng. Rgged up and ran 3 3/8" casng. Landed casng wth shoe at 525 m. Crculated 9 bbls mud - no losses. Cement casng. Full returns (55 bbls). Dsplaced cement wth seawater. Lost returns after 242 bbls (lost total of 38 bbls mud before Dumpng olug). Started dumpng and cleanng pts after cementng Fnshed pumpng plug wth 2 ps. P-tested casng to 25 ps. No back flow. POOH wth runnng tool. Pulled wear bushng. RH wth test plug. Tested BOP's. Lad down 7 /2" BHA. RH wth wear bushng and set same. Made up new 2 /4" BHA. RH to 54 m. Slpped and cut lne. Tagged cement at 5 m. Drlled cement from 5 m to 53 m. Fnshed dumpng and cleanng all pts, sand traps, lnes and dtches. Took on CaCl2 brne _+.2 SG (57ppb) from boat. Total 83 bbls. Dluted to.7 SG wth drll water (38 pob CaCl 2 ). Mxed total 395 bbls of.4 SG non-damagng chalk mud wth bacteracde and.3 ppg Enorflo-S (actve) and /2 ppb HEC and 2 ppb CaCO3 N-4 and 2 ppb CaC 3 N-5 and 2 ppb CaC3 N Contnued drllng cement wth seawater from 53 m to 524 m. Crculated hole clean. Dsplaced to mud. Drlled out cement and7 /2" rat hole from 524 m to 535 m. Drlled 2 /4" hole from 535 m to 536 m. Leak off test (leak off equvalent.5sc Drlled ahead from 536 m to 555 m. Crculated bottoms up for sample after drll break. POOH to make up 3" core barrel. Recovered core (82 %). Made up new BHA wth 6' core barrel. RH to contnue corng. Mxed pts no. 3 and 4 new mud (total 64 bbls) after dsplacng hole. Bypassed sand traps untl new mud volume avalable. afaear-

12 ANCHOR DRLLNG FLUDS AS OSLO - STAVANGER DALY SUMMARY REPORT WELL NAME 3/2- OPERATOR A/S NORSKE SHELL ENGNEERS C. ATKNSON/ J. SETCHEL.4.83 Contnued RH. Tght hole from top of rat hole (555 m). Worked ppe to bottom (564 m). Cut core from 564 m to 578 m. Barrel jammed. POOH. Recovered core (35 %). Made UD new core head. RH. Crculated and washed hole clean at 555 m to 578 m. Cut core from 578 m to 592 m. POOH. Recovered core (68 %). RH wth core barrel. Slpped and cut drll lne. Contnued RH ncreased system mud weght to. 5 SG wth CaC3. Mxed /4 ppb HEC to mantan vs >7 and mprove flud loss oropertes. Notceable mprovement n flud loss also wth addtons of CaC Fnshed RH. Tagged bottom at 592 m - no fll. Crculated /2 hour. Cut core from 592 m to 6.5 m. POOH. Recovered core (99.8 Servced core barrel. RH. Cut core from 6.5 m to 629 m. POOH. Recovered core ( %). Lad out core barrel. Made UD new 2 /4" BHA. RH wth bt to 547 m. Broke crculaton. Reamed 2 /4" hole from 555 m to 68 m from 8 /2" core hole. Mantaned HEC Caustc. concentraton n system and ph level wth Reamed from 68 m to 629 m (8 /2" - 2 /4" hole). Survey (/2 ). Wper trp to shoe. RH. Drlled 2 /4" hole from 629 m to 735 m (T.D.). Crculated bottoms UD. Survey ( /4Q) POOH to shoe (some overpull from 6 m to 635 m). RH. No fll. Crculated hole clean. POOH - no draq. Rgged UD and ran Schlumberger logs. (SF/sonc/GR/SP - LDT/CNL/CAL/NGT). NOTE; Losses to the hole seen when startng pumas after each connecton. Also losses whle loggng. Kept hole full wth trp tank pump. ffresrf

13 ANCHOR DRLLNG FLUDS AS OSLO STAVANGER DALY SUMMARY REPORT WELL NAME 3 /?_ OPERATOR A/S NORSKE SHELL ENGNEERS C. ATKNSON/ J. SETCHEL 3. 4.R Logged. Dumped and cleaned out sand traps, gumbo box and shaker box and all dtches. Dumped 25 bbls pt no. 4 and 25 bbls pt no. 2 and cleaned out both pts. Servce no. 2 mxng pump. Cleaned out all rg pump sucton lnes Contnued loggng Fnshed loggng. Made up casng hanger and runnng tool and stand n Derrck. RH wth 9 meters of fll. Crculated hole clean. Ran CST. RH wth meters fll and reamed to T.D. 735 m.

14 ANCHOR DRLLNG FLUDS AS OSLO - STAVANGER DALY SUMMARY REPORT WELL NAME 3/2- OPERATOR A / S NORSKE SHELL ENGNEERS RT.ANCHARn Drlled 2 /4" hole from 735 m to 744 m. Cleaned hole and POOH. Pulled wear bushng and ran 9 5/8" casng. Crculated 29 strokes. Cemented 9 5/8" casng. Check for back flow - returns. Pressure up to ps and bled off n 3 mnutes ntervals 7 ps. Back flow at 3 ps. Pressure un to 5 ps and wated for cement Wated on cement. Tested BOP's. Unable to pump through kll lne. Pulled rser and top package after dsplacng rser to seawater. Worked on BOP's. /.«TST»

15 SUMMARY OF EVENTS OPERATOR: A/S NORSKE SHELL WELL NO. 3/2-36" HOLE/ 3" CASNG NTERVAL The 36" hole was drlled to 47 m. Seawater and vscous plls were used wth returns gong to the seabed. Cores were taken at 38 m to m and ra to 399 m. Mud consumpton was hgher than expected snce 3 bbls of mud was spotted on each survey. Before settng casng the hole was flled wth 7 bbls. 3" casng was run wthout any problems.

16 RECOMMENDATONS 36" HOLE Ths secton was drlled accordng to program wth no major problems.

17 SUMMARY OF EVENTS OPERATOR: A/S NORSKE SHELL WELL NO. 3/2-26" HOLE/ 2" CASNG NTERVAL (4 3/4" PLOT HOLE) The 4 3/4" hole was drlled to 85 m wth seawater and gell/seawater mud. Whle runnng nto hole the gude frame was damaged and had to be repared. Cement was tagged at 449 m and drlled wth seawater and vscous mud, the rser was then run. 35 bbls of prehydrated gel was mxed and 3 bbls of kll mud was also mxed (.35 SG). After the rser was run a core barrel was run n hole and drlled from 475 m to 476 m makng no progress. Whle pullng the core barrel out of the hole the assembly was dropped n the hole, the fsh was tagged at 458 m but could not be latched on to. The rser was then pulled and the fsh engaged and POOH. After makng rg repars, ran n hole as requested to run gelled seawater at 55-6 vscosty and all surface pts full wth 2 vscosty mud. Drlled to 58 m and then made rg repars, resumed drllng to 75 m. Solds equpments was run at all tmes and mud was dluted heavly wth seawater. The hole was then drlled to 85 m and 338 bbls of.35 SG was spotted and loggng was carred out wth no problems. The hole was then dsplaced to seawater wth returns saved. When the complete hole was flled wth seawater the well was observed for 3 mnutes. The hole was then dsplaced wth 365 bbls of mud (.8 SG) and then rser was pulled. The 4 3/4" plot hole was opened to 26" from 47 m to 8 m wth 25 bbls plls of hvs mud spotted on each connecton. A ledge was washed and reamed at 55 m, otherwse no hole problems. Surface pts were kept full wth.35 SG mud for dsplacement before casng. The hole was then swept clean and a wper trp made. Whle runnng n the hole had to ream from 784 m to bottom. The hole was then flled wth 85 bbls.35 SG, vscous mud. 2" casng was run but had to shut down due to weather. 5 bbls of CaCl2 water was mxed for the cement job. The hole was agan flled wth seawater and tght hole was found at 794 m. The hole was then cleaned at 8 m and dsplaced agan to.35 SG vscous mud. The 5 bbls of CaCl2 water was dumped and mxed agan n order to have space for vscous mud. 2" casng was then run and cemented.

18 26" RECOMMENDATONS HOLE Ths secton was drlled wth no major problems except for mechancal and weather mshaps causng an excess of mud to be mxed n order to keep the hole n shape.

19 l l l l SUMMARY OF EVENTS OPERATOR: A/S NORSKE SHELL WELL NO. 3/2-7 /2" HOLE/ 3 3/8" CASNG NTERVAL A total of 55 bbls of KCl/Polymer mud were mxed at a weght of.3 SG pror to drllng out the 2" casng shoe. Cement n the casng was drlled out to wthn l m of the shoe wth seawater, and the hole then dsplaced to mud wth no cement contamnaton. After drllng the shoe and cleanng out the 26" rat hole from 799 m to 8 m, a 7 /2" hole was drlled from 8 m to 82 m and a leak off test was taken. Ths gave an equvalent break down at.49 SG. Drllng then contnued ahead to the casng pont of 535 m, over a perod of 3 /2 days and a bt change at 372 m. The secton from m to m approx. was drlled at a slower ROP ( m/hr) due to reduced avalable pump pressure wth one rg pump down and the use of the Hallburton pump requred. Trps were made for surveys approx. each 5 m and tght hole was experenced wth some swabbng when POOH on each new secton but RH was no problem and a second trp through the secton produced no overpull each tme. The KCl/Polymer system was run wth a K + of approx. 4 to 42 ppb whch was found necessary together wth polymer (Ancopol) addtons (3/4 ppb) for adequate nhbton of clays, otherwse some hydraton of cuttngs was notceable. Mud weght n the secton was ntally.3 SG and rose to.35 SG by T.D. and gave good stablty. Schlumberger logs were then run after a clean out trp and the 3 3/8" casng was run and cemented wth shoe at 525 m. Returns were lost (total approx. 3 bbls) durng the cement dsplacement. All surface mud system was then dumped and pts cleaned out pror to mxng new mud system for the 2 /4" secton.

20 RECOMMENDATONS 7 /2" SECTON t was felt that use of.3 SG ntally, ncreasng to.35 SG at TD resulted n much better hole stablty than prevous wells where.26 SG was started wth and ncreased to.35 SG after some unstable hole had been encountered. Therefore X C J. C.L.W.. *^ t J_ *- s JLO recommended J- ^*~ WllUU^llVl^lU to -W contnue V~*w'll»--LlUC use UO< of.3 SG as ntal weght to drll out 2" casng.

21 SUMMARY OF EVENTS OPERATOR: A/S NORSKE SHELL WELL NO. 3/2-2 /4" HOLE/ 9 5/8" CASNG NTERVAL After all pts were cleaned out a total of 83 bbls of CaClo brne at.2 + SG was taken onboard to mx, after dluton wth drll water, an ntal batch total of 395 bbls of "non-damagng" chalk mud (CaCl2/CaC3/Polymer). The composton of ths mud was ppb Enorflo-S (a substtute for XC-Polymer n ths type of system) and /2 ppb HEC and 2 ppb N-4 CaCC>3 and 2 ppb N-5 CaCO3 and 2 ppb N-5 CaCC>3. These values were used after a seres of plot tests had been run both wth seawater and drll water dlutons of orgnal CaCl2 brne receved. After drllng out cement to 3 3/8" shoe, and crculatng the hole clean, the hole was dsplaced wth the new mud and drllng contnued to 536 m where a leak off test was taken, gvng an equvalent break down at.5 SG. Drllng ahead contnued to 555 m where an ROP drll break was crculated out gvng sands and t was decded to start corng the Jurassc reservor. An ntal run of 3 ft core barrel was made for corng 555 m to 564 m, then a 6 ft barrel was run for a furhter 4 cores to depth of 629 m where shows were then neglgable. Reamng out of the cored secton was then carred out (555 m to 629 m) and then 2 /4" hole drlled to 735 m. A further total of 64 bbls of new mud was mxed after dsplacng the hole and treatments whle corng and drllng were only made for mantenance of HEC concentraton and flud loss control and CaCO3 levels and mnmal Caustc for ph mantenance.

22 SUMMARY OF EVENTS OPERATOR: A/S NORSKE SHELL WELL NO. 3/2-?. /4" HOLE/ 9 5/ft" CASNG NTERVALcont' d As drlled clays were pcked up the flud loss dropped greatly from 38 cc down to approx. 5 cc wth ppb MET. Mud weght rose from.5 to.6+ SG by the end of the secton. The only solds control used was shaker wth screens 2, due to non possble use of 6 hydrocyclone equpment whch would have throuwn out too great an amount of CaCO3. The man factor for runnng the system was to have clean fltrate to decrease any skn damage to reservor pror to testng. The mxng of the system was relatvely easy wth Enorflo-S comng nto soluton wth mnmal shear requred as wth the HEC - but order of addton was found to be vtal from plot tests, requrng Enorflo-S mxng frst otherwse HEC would not shear n and form "fsh eyes". Consderable tme was requred though for mxng of CaCO3 sacks due to the hgh contamnaton necessary to gve a.5 SG mud weght. The only real problem durng drllng usage seemed to be "seepage" losses when turnng on pumps after each connecton. Total losses durng drllng were approx. bbls. An extensve loggng program was then carred out for a perod of 3 days when runnng n the hole 9 m of fll was found. The hole was crculated clean and a CST was run. After runnng n the hole m of fll was found and reamed to 735 m and then drllng 2 /4" hole to 744 m T.D. The hole was crulated clean and 9 5/8" casng was then run and cemented.

23 RECOMMENDATONS 2 /4" HOLE The only recommendaton to be made would be to keep a small amount of Mca n the mud to stop seepage losses to the formaton, although ths may not be compatable wth the use of a non-damagng chalk mud. Also as ponted out before the order of mxng should be carefully watched.e. Enerflo-S should be mxed frst n order to prevent fsh eyes from the HEC.

24 OPERATOR A/S NORSKE SHELL WELL NO. 3/2- MATERAL CONSUMPTON & COST ANALYSS Meters 36" HOLE DRLLED TO 47 CASNG SET AT Meters FKSCX ACTUAL AMOUNT OF HOLE DRLLED ; 9 Meters DAYS ON NTERVAL DRLLNG FLUD SYSTEM SEAWATER AND VSCOUS BENTONTE PLLS MATERAL UNT SZE PROG. USED VARANCE ± US$ COST BENTONTE M/T?n ,96 CAUSTC SODA 25 KC/SX 5 R +?"* 76 O^ SODA ASH 5 KG/SX LME /SX 6 - f [.. COST/DAY us$ 3,84. TOTAL COST FOR NTERVAL us$ 2,336. COST/Mt.:»KRtx$ 3. 7 PROG. COST FOR NTERVALUS$ + 8,56. ENGR. COST COST VARANCE FOR NTERVAl$ 4,28.

25 OPERATOR A / s WELL NO. 3/2- NORSKE SHELL MATERAL CONSUMPTON & COST ANALYSS 26" HOLE DRLLED TO g5 Meters rø&x 2,, CASNG SET AT Meters 799 FK«ACTUAL AMOUNT OF HOLE DRLLED 345 ^e' ers DAYS ON NTERVAL n K& DRLLNG FLUD SYSTEM PLOT HOLE (4 3/4"): GELLED SEAWATER/26" HOLE: SEAWATER AND VSCOUS PLLS MATERAL UNT SZE PROG. USED VARANCE ± COST BARTE M/T BENTONTE M/T s,;>4n nn CAUSTC SODA ,8. SODA ASH 5 KG SPERCELL C nn LF COST/DAY US5 4,348- COST/Mt. fucr. $ ENGR. COST /fss-n- _ ' TOTAL COST FOR NTERVAL US $ 47,835. PROG. COST FOR NTERVAL US$ 3,74. COST VARANCE FOR,NTERVAL $ + 34, Q95. Q

26 OPERATOR A/S NORSKE SHELL WELL NO. 3/2- MATERAL CONSUMPTON & COST ANALYSS 7 /2" HOLE DRLLED ' ro 535 Meters 6CTJX OUNT OF HOLE DFBLLED 72 LUD SYSTEM KC/POLYMER 3 3/8" BASNG SET AT Meters XBCK DAYS ON NTERVAL Meters 525 *** MATERAL UNT SZE PROG. USED VARANCE ± US$ COST BARTE M/T ,564. o KC BRNE BBLS ,44. KC SACKS 5 KG ,86. rahsttf. 25 K n 95 «7 8,74. SODA ASH T.F-5 CMC (LOVS) DRSPAC REG. ANCOPOL (CANS) DRTT.T.TNf; HETKR^KNT DEFOAMER (CAN).- 5 KG 5 LBS?nn T. 2 L n ,95f_nn 5,5. 2, COST/DAY COST/Mt. ENGR. COST atusnr US?, TOTAL COST FOR NTERVAL US$ 86,36. PROG. COST FOR NTERVAL US$, COST VARANCE FOR NTERVAL? 4,26.9

27 f OPERATOR A/S NORSKE SHELL WELL NO. 3/2- MATERAL CONSUMPTON & COST ANALYSS 2 /4,, HOLEDRLLEDTO ^^ Meters R*tx 9 5/8" CASNGbblAl CASNG SET AT 72Q ^ ACTUAL AMOUNT OF HOLE DRLLED ;, DAYS ON NTERVAL ^ u u CT H u DRLLNG FLUD SYSTEM CaCl 2 /CaCO3/POLYMER (NON-DAMAGNG CHALK) Meters Meters n MATERAL UNT SZE PROG. USED VARANCE ± US$ COST BARTE M/T 8-8 BENTONTE 5 KG 5-5 LGNO CAUSTC CMC /LOVS) LF-5 XC-POLYMER DRSPAC REG. DRLLNG DETERGENT H EC ENORFLO-S GLUTARALDEHYDE (CAN SODA ASH 5 LBS 5 LBS 2 L 2 L 2 L 5 KG o 2. n o 4, , PEFOftHPR (<"AN)?n T. n? no CALCUM CHLORDE BBLS ,4. CALCUM CHLORDE (SX ) 5 KG ,28. CALC UM CARBONATE ( S C)5 KG ,864. COST/DAY us< 4,6.49 TOTAL COST FOR NTERVAL us<j 46,4.88 COST/Mt. <%&. j PROG. COST FOR NTERVAL USJ 32,97. ENGR. COST COST VARANCE FOR NTERVAL^ 3,44.88 /. *srr

28 OPERATOR WELL NO. TOTAL C( DNSUMPTON & COST ANALYSS TOTAL DEPTH A/S 3/2- NORSKE SHELL Meters 744 X&K Meters TOTAL HOLE DRLLED...,.,. 374 jorøt TOTAL DAYS 33 MATERAL UNT SZE PROG. USED VARANCE ± us$ COST SODA ASH LME SPERCELL C LF-5 CMC (LOVS) DRSPAC REG. XC-POLYMER Kfl BRTNF. KC SACKS ANCOPOL DRLLNG DEFOAMER H EC ENERFLO-S GLUTARALEDHYD DETERGENT CALCUM CHLORDE CALCUM CHLORDE SX CALCUM CARBONATE DOST/DAY us$ :OST/Mt. orcflt.$ ENGR. COST V.-M-ur>- ";., 5 KG 5 LBS 5 LBS BRLS 5 KG 2 L 2 L 2 L 2 L BBLS 5 KG 5 KG OQO ,836.2 TOTAL COST FOR NTERVAL^ 92, PROG. COST FOR NTERVAL <j 55,2. COST VARANCE FOR NTERVAL} + 37,39 5, ,5 5, , nn 4, R , BARTE M/T , 375 BENTONTE M/T ,336. CAUSTC

29 '>. 4. P^ ) J 5 S C & cc UJ cr y < tr Aj 5 ^5^ )Lf~ tr UJ >^ *^J "^ t<_/ * ve K ro * vo * CN r VC y «P ' r UJ. O tr?f> ^^J&~\ T S \ CO - ^. ro < (j s s < u. O tr O O t- ADDED ^ - ^ ^"'^'^X.,** ^ "" --^ > JS ro ro fr a t* <* c ro ul ve ff m <3 vo c «ff Z < 2 -j ct - - uj c: > O u.? M E UJ 5 UJ C S^ > -4, \ \. \ ' ^ < "^Q& CN VD E S M S- </> e >r T EJ " ^H^«2 "C y v/) o C O tt D E a> m C ^ "-= -B 8 gjs ^^ K? = + _J co O S E ' ^ -s -^ O OJ C/j ^ yl < UJ 2 D CO - 2 ATED DA VOLUMES ^ UJ DC X ^ ^ C <, \ 3/ 'A,.. ^^\ '~-\ ^ r^\ \ \ ^ ' \ ^ V^ ^^v> f/~) ^s** s «b_ O/*^ *%?* c O < CT t O O co m ro o ro? o n m VD t n ro CN CN t. ^ c^~ t- ro oo O VC T- f T C ^; C C f C a O OO - n CN o o n m c CT CN VC VC r a CN CN c CT CT to en S H É B! ^ ^ ^ CT co ^ UJ ^^ - co So ^ V '= r,, o z ~\. ro oo ro <- ro CN m ro VD ro o od ro oo * r- n ro ro o ^f m c VC f C CN r- ff c oc r* c ^ o ro n ff C <- t * o le c> f c r> o ro O ro o oo ro m oo CN ro o O^ ^ o a: 5 tr O o o OC ff CN u- ^r-l K to tr UJ a

30 g E < n: * z - er - _ UJ O tu D O m g l l CN ro æ u co (S) g f u; ^ a N cc c O c o O o -s to O.3 k. & Æ "ro 6 U U_ w O) to ~ D n

31

32

33

34

35

Contractor's Material and Test Certificate for Underground Piping

Contractor's Material and Test Certificate for Underground Piping UNDERGROUND PPNG 13-97 Contractors Materal and Test Certfcate for Underground Ppng PROCEDURE Upon completon of work, nspecton and tests shall be made by the contractors representatve and wtnessed by an

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporaton Commsson Ol & Gas Conservaton Dvson Post Offce Box 52000 Oklahoma Cty, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A AP No.: 35149215290000 OTC Prod. Unt No.: 149-205146 Completon

More information

Gripping force, O.D. gripping. MPZ 20 / 4 bar MPZ 20 / 6 bar. MPZ 20-AS / 4 bar MPZ 20-AS / 6 bar. Gripping force, I.D. gripping

Gripping force, O.D. gripping. MPZ 20 / 4 bar MPZ 20 / 6 bar. MPZ 20-AS / 4 bar MPZ 20-AS / 6 bar. Gripping force, I.D. gripping SCHUNK Grppers pneumatc 3-Fnger Centrc Grppers Small Components Grpper Grppng force, O.D. grppng Fnger load Grppng force 50 MPZ 20 / 4 bar MPZ 20 / 6 bar MPZ 20-AS / 4 bar MPZ 20-AS / 6 bar 40 30 20 10

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

For models: 660 EF/EFO

For models: 660 EF/EFO Installaton Instructons Gas converson kts For models: 660 EF/EFO Part no. 660NGKIT/660LPKIT Warnng: Ths kt must be nstalled by a qualfed nstaller n accordance wth these nstructons and all applcable codes

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporaton Commsson Ol & Gas Conservaton Dvson Post Offce Box 52000 Oklahoma Cty, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A AP No.: 35043231380001 OTC Prod. Unt No.: 043-205416 Completon

More information

Terminating Head

Terminating Head Termnatng Head 58246-1 Instructon Sheet for MTA- 100 Receptacle Connectors 408-6929 Usng Dscrete Wre 07 APR 11 Locatng Pawl Feed Slde Tool Base Wre Inserter Adjuster (Inserton Rod) Mass Termnaton Assembly

More information

Reduced drift, high accuracy stable carbon isotope ratio measurements using a reference gas with the Picarro 13 CO 2 G2101-i gas analyzer

Reduced drift, high accuracy stable carbon isotope ratio measurements using a reference gas with the Picarro 13 CO 2 G2101-i gas analyzer Reduced drft, hgh accuracy stable carbon sotope rato measurements usng a reference gas wth the Pcarro 13 CO 2 G2101- gas analyzer Chrs Rella, Ph.D. Drector of Research & Development Pcarro, Inc., Sunnyvale,

More information

SILDRIL System Engineering Guidelines

SILDRIL System Engineering Guidelines SILDRIL System Engineering Guidelines SILDRIL is an inhibitive system formulated with soluble silicate to achieve maximum shale inhibition. The primary shale inhibitor in the system is the Silicate, which

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): 42383383570000 MIRU MIRU INTEGRITY 3. 70 Longitude Orig

More information

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover: Zone: War-Wink Cherry Canyon TD: 7250' Rig: Union Drlg Rig 229 Status: WOC Spud Date: 1/26/2013 RR Date: 2/12/2013 First Sales: AFE: $1,393,293.00 DHC: $761,963.00 WI: Notes: Date Activity 11/14/2012 11/14/12

More information

FORGE Energy UL 21 Freedom 1 API Number:

FORGE Energy UL 21 Freedom 1 API Number: FORGE Energy UL 21 Freedom 1 API Number: 42-371-39061 07/13/2013 RU E&P WL Open well RIH correlate GR log to get on depth. Run BL found cement to surface. Tag 7566' PBTD. RU Rising Star test lines to 5000

More information

Drilling Morning Report

Drilling Morning Report REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:

More information

Product Information. Universal gripper PZN-plus

Product Information. Universal gripper PZN-plus Product Informaton Unversal grpper PZN-plus PZN-plus Unversal grpper Relable. Robust. Flexble. PZN-plus unversal grpper Unversal 3-Fnger Centrc Grpper wth hgh grppng force and maxmum moments due to mult-tooth

More information

ENDEAVOR ENERGY RESOURCES

ENDEAVOR ENERGY RESOURCES ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA

More information

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS 11/17/2011 11/18/2011 11/19/2011 AFE dated 11/18/2011 - pull tbg out of hole and make a mill run. Run packer on tbg and attempt to reestablish production from Devonian Formation. MIRU Great Basin Pulling

More information

Product Information. Long-stroke gripper PFH-mini

Product Information. Long-stroke gripper PFH-mini Product Informaton PFH-mn PFH-mn Loadable. Flexble. Relable. PFH-klen long-stroke grpper 2-fnger parallel grpper wth large jaw stroke for large parts and / or a broad range of parts Feld of applcaton clean

More information

BP SIT Testing Franks Facility Lafayette

BP SIT Testing Franks Facility Lafayette BP SIT Testing Franks Facility Lafayette General Information Status: Franks test well Lafayette La. Rig: Franks Test Rig Casing: 13 3/8, 0 to 4,600 Workstring: 4 ½ IF Brine: Fresh Water Directional: Straight

More information

ITRS 2013 Silicon Platforms + Virtual Platforms = An explosion in SoC design by Gary Smith

ITRS 2013 Silicon Platforms + Virtual Platforms = An explosion in SoC design by Gary Smith ITRS 2013 Slcon Platforms + Vrtual Platforms = An exploson n SoC desgn by Gary Smth 2013 2013 Gary Gary Smth Smth EDA, EDA, Inc. Inc. All All Rghts Rghts Reserved. Reserved. 1 The Fve Desgn Constrants

More information

ADDITIONAL INSTRUCTIONS FOR ISU SYNCHRONIZED SKATING TECHNICAL CONTROLLERS AND TECHNICAL SPECIALISTS

ADDITIONAL INSTRUCTIONS FOR ISU SYNCHRONIZED SKATING TECHNICAL CONTROLLERS AND TECHNICAL SPECIALISTS A ADDITIONAL INSTRUCTIONS FOR ISU SYNCHRONIZED SKATING TECHNICAL CONTROLLERS AND TECHNICAL SPECIALISTS DIFFICULTY GROUPS OF FEATURES 1 DEFINITIONS: Change of Rotaton: Refers to TURNS or LINKING STEPS rotatng

More information

MODEL : LDF7810WW/ LDF7810BB/ LDF7810ST LDF7811WW/LDF7811BB / LDF7811ST LDS5811WW/ LDS5811BB/ LDS5811ST LDF6810WW/LDF6810BB / LDF6810ST

MODEL : LDF7810WW/ LDF7810BB/ LDF7810ST LDF7811WW/LDF7811BB / LDF7811ST LDS5811WW/ LDS5811BB/ LDS5811ST LDF6810WW/LDF6810BB / LDF6810ST _/ / _ III IRL III" Dshwasher MODEL : LDF7810WW/ LDF7810BB/ LDF7810ST LDF7811WW/LDF7811BB / LDF7811ST LDS5811WW/ LDS5811BB/ LDS5811ST LDF6810WW/LDF6810BB / LDF6810ST Please read ths manual carefully Retan

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

Evaluation of a Center Pivot Variable Rate Irrigation System

Evaluation of a Center Pivot Variable Rate Irrigation System Evaluaton of a Center Pvot Varable Rate Irrgaton System Ruxu Su Danel K. Fsher USDA-ARS Crop Producton Systems Research Unt, Stonevlle, Msssspp Abstrat: Unformty of water dstrbuton of a varable rate center

More information

The fish community of Rat Cove, Otsego Lake, sumn,er 1997

The fish community of Rat Cove, Otsego Lake, sumn,er 1997 74 The fsh communty of Rat Cove, Otsego Lake, sumn,er 1997 Mcah ngalls ABSTRACT n Rat cove thrteen speces of fsh were documented durng the summer of 1997: alewfe (Alosa pseudoharengus), yellow perch (Percaflavenscens),

More information

Fully encapsulated. Reliable. Precise. DPZ-plus Sealed Gripper

Fully encapsulated. Reliable. Precise. DPZ-plus Sealed Gripper DPZ-plus Fully encapsulated. Relable. Precse. DPZ-plus Sealed Grpper Despte the hgh moment load of the base jaws, ths sealed 3-fnger centrc grpper satsfes the requrements of IP67 and does not permt any

More information

'!' CORDOVA BRANDON GREEN

'!' CORDOVA BRANDON GREEN STERLNG HWY FOREST SERVCE- REGON TEN CHUGACH NATONAL FOREST CORDOVA RANGER DSTRCT PLANS FOR PROPOSED CONSTRUCTON SAND ROAD TRAL PARKNG AREA LEGAL DESCRPTON T. 16 S., R. 2 W., COPPER RVER MERDAN SHEET NDEX

More information

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures BAROID DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton January 2014 1 Copyright

More information

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top DAYS FROM SPUD: 35 DAYS ON 0 Mar 1 2016 RIG SUPERVISOR: Tyler Clean and prep location, MIRU pulling unit to mill liner top Blade location, set anchors. Bring surface and int CSG valves to surface and fill

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 09A #1003H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern - ERPBU Project AFE: DV02251

More information

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Sharing To Be Better. Influx through failed cement in shoetrack during completion operations "Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG

More information

A Prediction of Reliability of Suction Valve in Reciprocating Compressor

A Prediction of Reliability of Suction Valve in Reciprocating Compressor Purdue Unversty Purdue e-pubs nternatonal Compressor Engneerng Conference School of Mechancal Engneerng 1996 A Predcton of Relablty of Sucton Valve n Recprocatng Compressor W. H. You Samsung Electroncs

More information

Product Information. Long-stroke gripper PHL

Product Information. Long-stroke gripper PHL Product Informaton PHL PHL Flexble. Precse. Powerful. PHL long-stroke grpper 2-fnger parallel grpper wth large jaw stroke for large parts and / or a broad range of parts Feld of applcaton Optmum standard

More information

CONOCO NORWAY INC. 1/6-7

CONOCO NORWAY INC. 1/6-7 INDEX 5 CONOCO NORWAY INC. 1/67 36" HOLE SECTION Contractor. SMEDVIG DRILLING. Start date for hole section: Start Rep No. for hole sect: 15392 1 0 92 17392 36 3 165 Benite Spud Mud Soda ash XCD polymer

More information

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.

More information

Chapter 3 Reserve Estimation. Lecture notes for PET 370 Spring 2012 Prepared by: Thomas W. Engler, Ph.D., P.E.

Chapter 3 Reserve Estimation. Lecture notes for PET 370 Spring 2012 Prepared by: Thomas W. Engler, Ph.D., P.E. Chapter 3 Reserve Estmaton Lecture notes for PET 370 prng 2012 Prepared by: Thomas W. Engler, Ph.D., P.E. Volumetrc N ol n 7758A B o place, n h f (1 1 ) here, N = ol n place, stb A = dranage area, acres

More information

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control

More information

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Final Well Report Revision: Version 0 Operating Company: Vulcan Minerals Inc. (Investcan Energy Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Field: Flat Bay Location: Western Newfoundland,

More information

Extended leak off testing

Extended leak off testing Extended leak off testing Rev: 1.0 03/01/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

An oil gradient of 8.6 kpa/m (0.879 g/cc) is established from the pressure plot. The results of the pressure readings are listed and plotted below.

An oil gradient of 8.6 kpa/m (0.879 g/cc) is established from the pressure plot. The results of the pressure readings are listed and plotted below. 3. FMT summary Two runs with the FMT tool was made in the interval 8-933 m RKB. The first run was performed in the chalk and gave no results due to tight formation. The second FMT run in Oxfordian sandstone

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

it500 Internet Thermostat

it500 Internet Thermostat T500 User Manual 16pp 025_Layout 1 03/09/2013 12:00 Page 1 T500 Internet Thermostat U S E R M A N U A L T500 User Manual 16pp 025_Layout 1 03/09/2013 12:00 Page 2 Product complance & safety nformaton These

More information

Operating manual. ProSpray Airless high-pressure spraying unit. Model: Original operating manual. ProSpray 3.39

Operating manual. ProSpray Airless high-pressure spraying unit. Model: Original operating manual. ProSpray 3.39 Operatng manual ProSpray.9 Arless hgh-pressure sprayng unt Model: 055808 Orgnal operatng manual ProSpray.9 Edton 5 / 04 0558 978L Warnng! Attenton: Danger of njury by njecton! Arless unts develop extremely

More information

Planning of production and utility systems under unit performance degradation and alternative resource-constrained cleaning policies

Planning of production and utility systems under unit performance degradation and alternative resource-constrained cleaning policies 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Plannng of producton and utlty systems under unt performance degradaton

More information

Operating manual. Airless high-pressure spraying unit Exclusive Suppliers of. Maxi Spray 21.XL (PS 3.20)

Operating manual. Airless high-pressure spraying unit Exclusive Suppliers of. Maxi Spray 21.XL (PS 3.20) Operatng manual Arless hgh-pressure sprayng unt Exclusve Supplers of Max Spray.XL (PS.0) Edton 9 / 05 05 88A Orgnal Operatng Manual Warnng! Attenton: Danger of njury by njecton! Arless unts develop extremely

More information

Study Guide IADC WellSharp Driller and Supervisor

Study Guide IADC WellSharp Driller and Supervisor Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated:

More information

FMT PRESSURE RESULTS CRETACEOUS AND BRENT GROUP PF PSIH PHA PSIA

FMT PRESSURE RESULTS CRETACEOUS AND BRENT GROUP PF PSIH PHA PSIA _ FMT PRESSURE RESULTS CRETACEOUS AND BRENT GROUP WELL 3/-3A NO/ TEST NO MRKB, MD PHI PSIA PF PSIH PHA PSIA REMARKS / /2 /3 /4 / /6 / / / / / /2 /3 /4 / /6 2/ 2/2 2/3 2/4 2/ 2/6 2/ 2/ 3/ 3/2 4/ / /2 /3

More information

ST70+ User Reference Manual. Document reference: Date: January 2009

ST70+ User Reference Manual. Document reference: Date: January 2009 ST70+ User Reference Manual Document reference: 85024-1 Date: January 2009 Autohelm, HSB, RayTech Navgator, Sal Plot, SeaTalk and Sportplot are UK regstered trademarks of Raymarne UK Lmted. Pathfnder and

More information

ASSEMBLY INSTRUCTIONS. TECHART roof spoiler

ASSEMBLY INSTRUCTIONS. TECHART roof spoiler Part no. 070.100.650.009 Roof spoler Contents I Important safety nformaton...3 II Preparaton...5 III Installaton...6 1 Preparng the vehcle...6 2 Fttng the...6 3 Fnal nspecton...6 TECHART Verson 01 Page

More information

and and Norton J. Lapeyrouse CONTENTS

and and Norton J. Lapeyrouse CONTENTS and and Norton J. Lapeyrouse CONTENTS Chapter 1 Basic Formulas P. 3 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Pressure Gradient Hydrostatic Pressure Converting Pressure into Mud

More information

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 37.00 Objective Install Completion Original

More information

A comparison study on the deck house shape of high speed planing crafts for air resistance reduction

A comparison study on the deck house shape of high speed planing crafts for air resistance reduction csnak, 2014 Int. J. Nav. Archt. Ocean Eng. (2014) 6:867~875 http://dx.do.org/10.2478/ijnaoe-2013-0218 pissn: 2092-6782, eissn: 2092-6790 A comparson study on the deck house shape of hgh speed planng crafts

More information

Automated External Defibrillators DESIGNED FOR UNEXPECTED HEROES

Automated External Defibrillators DESIGNED FOR UNEXPECTED HEROES Automated External Defbrllators DESIGNED FOR UNEXPECTED HEROES HOPE IS IN YOUR HANDS It happens n a splt second. A person collapses the vctm of sudden cardac arrest (SCA) and the clock starts tckng n the

More information

Pasquale Imbò e Marco Pelucchi ENI S.pA;

Pasquale Imbò e Marco Pelucchi ENI S.pA; 7th European Gas Well Deliquification Conference Innovative Failsafe Capillary Injection System Resolves Liquid Loading in Gas Well with a Cost- Effective Solution that Maintaining Production and Well-Safety

More information

Pneumatic level indicator Unitel

Pneumatic level indicator Unitel Pneumatc level ndcator Untel Reference ponter for easy consumpton montorng Zero correcton possble Page 28 pplcaton For contnuous level measurement n tanks contanng fuel ol, desel fuel and ranwater. For

More information

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017 5/2/27 5:23:5 Report Version: 4..6R9 Generated from data in EDM/Opens/PROFILE Report 29 5/9/27 Company Type WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H 32656 / 4233326.

More information

Product Information. Gripper for small components MPG 32

Product Information. Gripper for small components MPG 32 Product Informaton MPG 32 MPG Precse. Compact. Relable. MPG grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng and movng of small to medum-szed

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

Product Information. Radial gripper PRG 52

Product Information. Radial gripper PRG 52 Product Informaton PRG More flexble More powerful. Slm. PRG unversal grpper 180 radal grpper wth powerful 1-shft slotted lnk gear and oval pston. Feld of applcaton For areas of applcaton whch, n addton

More information

Product Information. Gripper for small components MPG-plus

Product Information. Gripper for small components MPG-plus Product Informaton Grpper for small components MPG-plus MPG-plus Grpper for small components More powerful. Faster. Longer fngers. MPG-plus grpper for small components 2-fnger parallel grpper wth smooth

More information

RIH intermediate section casing in Bazian-1 exploration oil well

RIH intermediate section casing in Bazian-1 exploration oil well Energy and Sustainability V 559 RIH intermediate section casing in Bazian-1 exploration oil well A. K. Darwesh Petroleum Engineering Department, Engineering Faculty, Koya University, Kurdistan Abstract

More information

FORGE Energy UL 21 Pahaska 1H API Number:

FORGE Energy UL 21 Pahaska 1H API Number: FORGE Energy UL 21 Pahaska 1H API Number: 42-495-33740 10/26/2016 07:00 HPJM 07:15 Install 1502 Adapter Flanges to Well Head. RU Pump Truck test lines to 1000 PSI no leaks. Load hole w/ 15 bbls fresh water.

More information

Track Reconditioning Guidelines

Track Reconditioning Guidelines 1. Scope, Ths gude has been prepared to assst n the nvestgaton, desgn and rehabltaton of the exstng track formaton and ballast. It s ntended to be used n all constructon or mantenance actvtes amed at modfyng

More information

BLACK HILLS PLATEAU PRODUCTION COMPANY

BLACK HILLS PLATEAU PRODUCTION COMPANY BLACK HILLS PLATEAU PRODUCTION COMPANY DRILLING PROGRAM Homer Deep Unit 9 11CH SHL: 300 FNL, 200 FWL, NWNW Sect. 9 T8S R98W BHL: 1350 FSL, 2100 FEL NWSE Sect. 15 T8S R98W Garfield & Mesa Counties, Colorado

More information

Zarvona DAILY WORKOVER / COMPLETION REPORT

Zarvona DAILY WORKOVER / COMPLETION REPORT Lease/Well No: CURRENT WELL TEST: PURPOSE OF WORK: MIRU service companies/start frac PULLING UNIT: KOP 10,429' TD: 15,906' KB ABOVE GL: 30 10,713' PBTD: 15,885' INT CSG: 60 10,998' TVD: 10,950' PROD CSG:

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box 52000 Oklahoma City, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A AP No.: 35051235810000 OTC Prod. Unit No.: 051-207824

More information

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment Contents 1. GENERAL INFORMATION & RECOMMENDATIONS 1 2. INSTALLATION FLOAT EQUIPMENT 2 2.1 PRE-USE FIELD INSPECTION 2 2.2 POSITION FLOAT ON CASING STRING 3 3. RUNNING OF FLOAT EQUIPMENT 3 3.1 CIRCULATION

More information

Product Information. Gripper for small components MPG 80

Product Information. Gripper for small components MPG 80 Product Informaton MPG 80 MPG Precse. Compact. Relable. MPG grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng and movng of small to medum-szed

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move

More information

Sample Preparation. Solid Phase Extraction Mechanisms

Sample Preparation. Solid Phase Extraction Mechanisms Sample Preparaton Sold Phase Extracton Mechansms Wherever you see ths symbol, t s mportant to access the on-lne course as there s nteractve materal that cannot be fully shown n ths reference manual. Ams

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 102948 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

Product Information. Gripper for small components MPG 50

Product Information. Gripper for small components MPG 50 Product Informaton MPG 50 MPG Precse. Compact. Relable. MPG grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng and movng of small to medum-szed

More information

Product Information. Long-stroke gripper PSH 42

Product Information. Long-stroke gripper PSH 42 Product Informaton PSH 42 PSH Compact. Flexble. Fully encapsulated. PSH long-stroke grpper 2-fnger parallel grpper wth long jaw stroke and drt-resstant round gudance Feld of applcaton n contamnated work

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

High Speed 128-bit BCD Adder Architecture Using CLA

High Speed 128-bit BCD Adder Architecture Using CLA Hgh Speed 128-bt BCD Archtecture Usng CLA J.S.V.Sa Prasanth 1, Y.Yamn Dev 2 PG Student [VLSI&ES], Dept. of ECE, Swamy Vvekananda Engneerng College, Kalavara, Andhrapradesh, Inda 1 Assstant Professor, Dept.

More information

Underground Natural Gas Storage

Underground Natural Gas Storage CHAPTER 8 Underground Natural Gas Storage 8.1 Introducton In the Unted States and a few other countres, the underground storage of natural gas has become ncreasngly mportant after World War II. The obvous

More information

Product Information. Universal gripper PGN-plus 80

Product Information. Universal gripper PGN-plus 80 Product Informaton PGN-plus 80 PGN-plus Relable. Robust. Flexble. PGN-plus unversal grpper Unversal 2-Fnger Parallel Grpper wth large grppng force and hgh maxmum moments due to mult-tooth gudance. Feld

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

7v7 RULES. 1 Field Dimensions: Field Length will be 100 yards: 80 yard playing field with 10 yard end zone.

7v7 RULES. 1 Field Dimensions: Field Length will be 100 yards: 80 yard playing field with 10 yard end zone. 77 RULES 1 Feld Dmensons: Feld Length wll be 100 yards: 80 yard playng feld wth 10 yard end zone. If not enough space aalable feld wll be altered n the best way possble. 1 Startng Each Game: Home team(1

More information

BaraShield -664 LCM Standard Field Application Procedure

BaraShield -664 LCM Standard Field Application Procedure BaraShield -664 LCM Standard Field Application Procedure Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton March 2016 1 Copyright 2011

More information

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001 OCS Report MMS 2002-040 Investigation of Loss of Well Control Eugene Island Block 277 OCS-G 10744 Well A-2 Off the Louisiana Coast July 6, 2001 U.S. Department of the Interior Minerals Management Service

More information

FK240 FLAT SOLAR COLLECTORS ROOF-TOP INSTALLATION FOR WORCESTER SOLAR SYSTEMS

FK240 FLAT SOLAR COLLECTORS ROOF-TOP INSTALLATION FOR WORCESTER SOLAR SYSTEMS FK240 FLAT SOLAR COLLECTORS ROOF-TOP INSTALLATION FOR WORCESTER SOLAR SYSTEMS G INSTALLATION INSTRUCTIONS About ths manual Ths nstallaton manual contans mportant nformaton for the safe and approprate nstallaton

More information

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Parry Hillis: Technical Manager BakerHughes David Ayre: BP Well Perforation Specialist Jim Gilliat: TCP/DST Business Development

More information

Hydraulic DTH Fluid Hammer Drilling as a Seismic While Drilling (SWD) Source for Geothermal Exploration and Drilling Prediction

Hydraulic DTH Fluid Hammer Drilling as a Seismic While Drilling (SWD) Source for Geothermal Exploration and Drilling Prediction Proceedngs World Geothermal Congress 2015 Melbourne, Australa, 19-25 Aprl 2015 Hydraulc DTH Flud Hammer Drllng as a Sesmc Whle Drllng (SWD) Source for Geothermal Exploraton and Drllng Predcton Poletto

More information

PHE KE30-A8 WORKOVER PROGRAM

PHE KE30-A8 WORKOVER PROGRAM PHE WMO KE30-A8 WORKOVER PROGRAM PHE KE30-A8 WORKOVER PROGRAM Prepared by: Ross Webber. Hendra Wahyudi. Chandra Maulana. George Lattimore Adi Benanjaya Achmad Soendaroe. Tri Wiyono DRILLING ENGINEER SR.

More information

2018 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE

2018 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE 2018 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE GENERAL OVERVIEW USA Hockey Grls Player Development Dstrct-Specfc Gude The USA Hockey Grls Player Development Dstrct-Specfc Gude outlnes the 2018 grls

More information

CAUTION When using any equipment, always follow the manufacturer s instructions for safe operation.

CAUTION When using any equipment, always follow the manufacturer s instructions for safe operation. Cleanng 3M Controltac Decorated Graphc Vnyl Awnng Flmand Sgn Facngs Instructon Bulletn 6.1 Release I, Effectve March 2017 (replaces H, Oct 03) These cleanng nstructons are furnshed as a gude. The end-user

More information

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

Performance and Value of the invision System : Offshore in Coiled Tubing Operations Performance and Value of the invision System : Offshore in Coiled Tubing Operations Case Study #0004 Date November 01 21, 2017 Location Gulf of Mexico, Deep Water Introduction Intelligent Wellhead Systems

More information

Engineering Analysis of Implementing Pedestrian Scramble Crossing at Traffic Junctions in Singapore

Engineering Analysis of Implementing Pedestrian Scramble Crossing at Traffic Junctions in Singapore Engneerng Analyss of Implementng Pedestran Scramble Crossng at Traffc Junctons n Sngapore Dr. Lm Wee Chuan Eldn Department of Chemcal & Bomolecular Engneerng, Natonal Unversty of Sngapore, 4 Engneerng

More information

Float Equipment TYPE 925/926

Float Equipment TYPE 925/926 Type 925 Float Collar Plunger Valve Float Equipment For less demanding well conditions, such as shallower depths or lower pressures, Top- Co offers economical float equipment certified to API RP 10F category

More information

Product Information. Gripper for small components MPG-plus 32

Product Information. Gripper for small components MPG-plus 32 Product Informaton MPG-plus 32 MPG-plus More powerful. Faster. Longer fngers. MPG-plus grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng

More information

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas H. H. HOWELL, INC. Bevans & Wildcat Field Menard County, Texas API #42-327- 31235 RRC Permit # 803460 GAU letter, RRC Letter #GAU-1436 = 245 Ground Elevation GL: 2186 (Rig KB to GL =8 ) Rig KB =2194 Location:

More information

THIS DOCUMENT IS BEST QUALITY AVAILABLE. THE COPY FURNISHED TO DTIC CONTAINED A SIGNIFICANT NUMBER PAGES WHICH DO NOT

THIS DOCUMENT IS BEST QUALITY AVAILABLE. THE COPY FURNISHED TO DTIC CONTAINED A SIGNIFICANT NUMBER PAGES WHICH DO NOT THS DOCUMENT S BEST QUALTY AVALABLE. THE COPY FURNSHED TO DTC CONTANED A SGNFCANT NUMBER OF PAGES WHCH DO NOT REPRODUCE LEGBLYo 1 ' ^^^^^^m^^^rynt^^ ' '^Scfw JÜMM»^>tw»W«vwwn'*f>-»ww -w"., «'^.^.n*feff*gy»*f«t;

More information

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe Type 965 float collar Type 966 float shoe 1. GENERAL INFORMATION & RECOMMENDATIONS Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe Type 969 Sidewinder reamer shoe Float Equipment Top-Co Float

More information

2017 GIRLS CENTRAL DISTRICT PLAYER DEVELOPMENT GUIDE

2017 GIRLS CENTRAL DISTRICT PLAYER DEVELOPMENT GUIDE 2017 GIRLS CENTRAL DISTRICT PLAYER DEVELOPMENT GUIDE GENERAL OVERVIEW USA Hockey Grls Player Development Dstrct-Specfc Gude The USA Hockey Grls Player Development Dstrct-Specfc Gude outlnes the 2017 grls

More information