58' EL :1 5' BC-1 STA CONSTRUCT TRIPLE 5' X 3' CONCRETE BOX CULVERT FL LT 59.0 FL RT 59.3 DESIGN STANDARD 289

Size: px
Start display at page:

Download "58' EL :1 5' BC-1 STA CONSTRUCT TRIPLE 5' X 3' CONCRETE BOX CULVERT FL LT 59.0 FL RT 59.3 DESIGN STANDARD 289"

Transcription

1

2

3 : 5' ' EL BC- STA 27+0 CONSTRUCT TRIPLE 5' X ' CONCRETE BOX CULVERT FL LT 59.0 FL RT 59. DESIGN STANDARD ' 0: " = 0' Horizontal " = 5' Vertical THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 6G , F.A.C. JAMES H. PITMAN P.E. LICENSE 4205 NFPS P.O. BOX 82 LAKE CITY, FLORIDA 2056 CERTIFICATE OF AUTHORIZATION 290 ROAD. KING ROAD RESURFACING Robert (JR) Davis 0//207 0:55:02 AM DRAINAGE. X:\207\L7009CCB\H.CADD\Roadway\DSNRD0.dwg

4 LOCATION BC- BOX CULVERT DATA TABLES BOX, HEADWALL AND CUTOFF WALL DATA TABLE (inches unless shown otherwise) Table Date BOX HEADWALL AND CUTOFF WALL Wc(ft) Hc(ft) Tt Tw Tb Ti #cells Lc(ft) Cover Blhw Hlhw Brhw Hrhw Blcw Hlcw Brcw Hrcw SL(deg)SR(deg) Designed By : MBH 04-7 Checked By : YT 04-7 BC- LE SIDE S DATA TABLE (inches unless shown otherwise) Table Date 0-0- LE END LE BEGIN Rt Rw Rh Rd SW(deg)β (deg) He(ft) Hs(ft) Lw(ft) Rt Rw Rh Rd SW(deg)β (deg) He(ft) Hs(ft) Lw(ft) Drawn By : MM 04-7 Checked By : YT 04-7 RIGHT SIDE S DATA TABLE (inches unless shown otherwise) Table Date 0-0- BC- RIGHT END RIGHT BEGIN Rt Rw Rh Rd SW(deg) β (deg) He(ft) Hs(ft) Lw(ft) Rt Rw Rh Rd SW(deg) β (deg) He(ft) Hs(ft) Lw(ft) TES:. Environmental Class: Slightly Aggressive ESTIMATED CONCRETE QUANTITIES (CY) Table Date Reinforcing Steel, Grade 60 BC- Left Right Bottom Cutoff Cutoff Slab s BOX Top Slab Left Head Right Head Footing LE END Footing LE BEGIN Footing RIGHT END Footing RIGHT BEGIN Concrete Class IV, f'c = 5.5 ksi 4. Soil Properties: Friction Angle: 4 Modulus of grade Reaction: 220 pci Nominal Bearing Resistance: 5400 psf 5. Work this Drawing with Design Standards Index No. 289 and Sheet Nos. 2-. MAIN STEEL REINFORCEMENT SPACING (inches) Table Date Precast box culverts shall not be permitted BOX , 6... HEADWALLS CUTOFF WALLS BC STEEL REINFORCEMENT SPACING (inches) Table Date LE END LE BEGIN RIGHT END RIGHT BEGIN (8) 402 (40) 404 (405) (8) 502 (50) 504 (505) (8) 602 (60) 604 (605) (8) 702 (70) 704 (705) BC TE: Bar designations in "( )" are only required for variable height wingwalls. Terry T. Hall, Jr., P.E. P.E..: STV Incorporated 5200 Belfort Road, Suite 400 Jacksonville, Florida 2256 Certificate of Authorization No. 90 ROAD. BOX CULVERT DATA TABLE N/A. thaoy 5/5/207 :47:27 PM \\stvgroup.stvinc.com\v\dgpa\vol\projects\40869\40869_000\50_deliverables & S

5 MARK SIZE DES LENGTH IN BARS TYP BAR STY B A G IN C FR IN FR D E F LOCATION MAIN BOX. REQUIRED = LOCATION LE END. REQUIRED = H J K N Ø ANG Designed By : MBH 04-7 Drawn By : MM 04-7 Checked By : YT 04-7 Checked By : YT LOCATION LE BEGIN. REQUIRED = LOCATION RIGHT END. REQUIRED = LOCATION RIGHT BEGIN. REQUIRED = TES:. Work this sheet with Design Standard Index No Terry T. Hall, Jr., P.E. P.E..: STV Incorporated 5200 Belfort Road, Suite 400 Jacksonville, Florida 2256 Certificate of Authorization No. 90 ROAD. REINFORCING BAR LIST ( OF 2) N/A 2. thaoy 5/5/207 :47:28 PM \\stvgroup.stvinc.com\v\dgpa\vol\projects\40869\40869_000\50_deliverables & S

6 MARK SIZE DES LENGTH IN BARS TYP BAR STY A G IN B C FR IN FR D E F LOCATION LE HEADWALL. REQUIRED = H J K N Ø ANG Designed By : MBH 04-7 Checked By : YT LOCATION RIGHT HEADWALL. REQUIRED = LOCATION LE CUTOFF WALL. REQUIRED = Drawn By : MM 04-7 Checked By : YT LOCATION RIGHT CUTOFF WALL. REQUIRED = END OF LIST TES:. Work this sheet with Design Standard Index No Terry T. Hall, Jr., P.E. P.E..: STV Incorporated 5200 Belfort Road, Suite 400 Jacksonville, Florida 2256 Certificate of Authorization No. 90 ROAD. REINFORCING BAR LIST (2 OF 2) N/A. thaoy 5/5/207 :47:29 PM \\stvgroup.stvinc.com\v\dgpa\vol\projects\40869\40869_000\50_deliverables & S

7

Formation level = m. Foundation level = m. Height of the wall above the Ground Level = 7.42 m

Formation level = m. Foundation level = m. Height of the wall above the Ground Level = 7.42 m DESIGN OF RETAINING WALL INTRODUCTION: This wall is designed for active earth pressure and live load surcharge pressure The loads for the purpose of design are calculated per meter length of wall. BASIC

More information

VVH No. Rod Elev. Measure own Top of Pipe Elevation Utility Northing Easting VVH1 13.448 3.80 9.65 8" wm 1314748.87 504816.345 VVH2 13.538 3.50 10.04 12" wm 1314744.671 504930.209 VVH3 8.964 3.87 5.09

More information

CONE PENETRATION TESTS

CONE PENETRATION TESTS February 25, 2015 John Doe, P.E. Acme Engineering and Testing 1234 Test Avenue, Suite 204 Lake Wales, FL 33853 Re: Sample CPT Soundings Dear Mr. Doe, Direct Push Services, LLC (DPS) was retained by Acme

More information

DESIGN OF AXIALLY LOADED STEPPED FOOTING DATA :- SBC of soil =200 KN /m 2 Concrete Mix =M20 Steel Grade = Fe 415 Clear cover of bottom slab =50 mm

DESIGN OF AXIALLY LOADED STEPPED FOOTING DATA :- SBC of soil =200 KN /m 2 Concrete Mix =M20 Steel Grade = Fe 415 Clear cover of bottom slab =50 mm STEPPED FOOTING The construction of sloped footing is sometimes difficult and when the slope of the top face of footing is more, say more than 1 vertically to 3 horizontally, it may be difficult to finish

More information

APPENDIX K CULVERT INSPECTION MEMO

APPENDIX K CULVERT INSPECTION MEMO APPENDIX K CULVERT INSPECTION MEMO McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO

More information

Pole Foundation Design with Spreadsheet

Pole Foundation Design with Spreadsheet PDHonline Course S235 (1 PDH) Pole Foundation Design with Spreadsheet Instructor: John W. Andrew, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

6.0 ENGINEERING. Build Anything Better. REPRINTED 2017

6.0 ENGINEERING. Build Anything Better.  REPRINTED 2017 6.0 ENGINEERING TABLE OF CONTENTS 6.1 U.S. ENGINEERING ANALYSIS REPORT... P. 6-3 BELOW-GRADE WALL REINFORCEMENT TABLES... P. 6-5 ABOVE-GRADE WALL REINFORCEMENT TABLES.. P. 6-21 LINTEL REINFORCEMENT TABLES...P.

More information

Code Compliance Research Report CCRR-0145

Code Compliance Research Report CCRR-0145 Code Compliance Research Report CCRR-0145 Issue Date: 11-16-2009 Revision Date: 11-29-2018 Renewal Date: 11-18-2019 DIVISION: 05 - Metals Section: 05 50 00 Metal Fabrications Marshall Stamping Company

More information

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. PN #MBPPT Push Pier Systems About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair and new construction

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7780 CSAH 133 OVER A DITCH ST. LOUIS COUNTY SEPTEMBER 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO. CDBG HANDICAP RAMPS PROJECT NO. 1 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION 1 TITLE SHEET 2 SUMMARY OF QUANTITIES 3-4 DETAS 5-23

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 ED FIELDING Commissioner, District 2 HAROLD E. JENKINS II Commissioner, District

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

CERTIFICATION TEST REPORT

CERTIFICATION TEST REPORT CERTIFICATION TEST REPORT 515 Gus Hipp Blvd. Rockledge, Florida 32955 Telephone (321) 632-2008 http://www.imanna.com Post Office Box 560933 Rockledge, Florida 32956-0933 FAX (321) 690-3360 CERTIFICATION

More information

FAIRWAY PALMS II CONDOMINIUM PROPERTY

FAIRWAY PALMS II CONDOMINIUM PROPERTY FAIRWAY PALMS II CONDOMINIUM PROPERTY 6533, through 6553 SE Federal HWY, Stuart Florida, 34997. Structural Inspection Report Prepared by CA 26583 Ph: 561-204-5000 Fax: 561-204-1050 E-mail: aali@universalengineering.net

More information

Slide and Turn System SF35

Slide and Turn System SF35 Profile system Framed slide and turn system Non-thermally insulated aluminum profiles with insulated glass Option of flush or weathered bottom track The flush bottom track is particularly suitable for

More information

REPORT HOLDER: FRAMECAD LICENSING LTD. POST OFFICE BOX 1292 AUCKLAND 1140 NEW ZEALAND EVALUATION SUBJECT: COLD FORMED STEEL C SHAPES AND TRACKS

REPORT HOLDER: FRAMECAD LICENSING LTD. POST OFFICE BOX 1292 AUCKLAND 1140 NEW ZEALAND EVALUATION SUBJECT: COLD FORMED STEEL C SHAPES AND TRACKS 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2361 Reissued 05/2017 This report is subject to renewal 05/2019. DIVISION: 05 00

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

upvc MANHOLES APPLICATIONS Sewerage applications: Vacuum sewerage applications: Landfill applications: Valve boxes:

upvc MANHOLES APPLICATIONS Sewerage applications: Vacuum sewerage applications: Landfill applications: Valve boxes: upvc MANHOLES upvc MANHOLES upvc manholes can be used in conjunction with various outflow processes covering a variety of applications including drainage, foul water overflow, soil and waste and sewerage

More information

Code Compliance Research Report CCRR-0145

Code Compliance Research Report CCRR-0145 Code Compliance Research Report CCRR-0145 Issued: 11-16-2009 Renewal Due: 11-18-2018 Revised: 11-28-2017 DIVISION: 05 - Metals Section: 05 50 00 Metal Fabrications MARSHALL STAMPING COMPANY 355 Glade Mills

More information

Pressure Independent Control Series

Pressure Independent Control Series Document No. 155-522 Pressure Independent Control Series Two-Way Cast Iron Flanged Bodies, ANSI 125 and 250 Description Siemens Pressure Independent Control Valves integrate three functions into a single

More information

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut

More information

Wind and Fastener Calculation Report for property located at

Wind and Fastener Calculation Report for property located at Martinez Antonio Wind and Fastener Calculation Report for property located at Martinez Antonio Universal Engineering, Inc 12828 Buckland St., Wellington FL 33414 Tel: 561-204-5000, Fax:561-204-1050 e-mail:

More information

Slide and Turn System SF25

Slide and Turn System SF25 Profile system Frameless all-glass slide and turn system Option of flush or weathered bottom track Optionally with lateral aluminium panel profiles to close the ventilation gap The flush bottom track is

More information

THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER

More information

for Cold-Formed Steel Framing Products

for Cold-Formed Steel Framing Products Technical Guide for Cold-Formed Steel Framing Products Technical Data in this publication is applicable to the following SFIA Member Company: For a complete directory of SFIA Members who are certified

More information

Geocells. Sundeep Inti Vivek Tandon

Geocells. Sundeep Inti Vivek Tandon Geocells Sundeep Inti Vivek Tandon Need for Reinforcement Shortage of Good Quality Material Pavement Thickness Limitations Reduced Financial Resources Presto Geocells Used Tenex Laboratory Evaluation Plan

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1 WHITE EPOXY REFLECTORIZED PAVEMENT STRIPES, 20 MILS ITEM 685.11 (FT) CL STATION ALIGN FROM TO SIDE DESCRIPTION FACTOR LENGTH (FT) E 18+62 62 18+79.19 RT STOP BAR 6 16.6 99.4 E 18+55 00 20+08.00 LT B KE

More information

SITRANS P measuring instruments for pressure

SITRANS P measuring instruments for pressure SITRANS P measuring instruments for pressure Z series for gage pressure Siemens AG 008 Overview Design The main components of the pressure transmitter are: Brass housing with silicon measuring cell and

More information

Pressure Measurement. Transmitters for basic requirements SITRANS P Z for gauge pressure. 2/4 Siemens FI Overview

Pressure Measurement. Transmitters for basic requirements SITRANS P Z for gauge pressure. 2/4 Siemens FI Overview f gauge pressure Siemens AG 010 Overview Design The main components of the pressure transmitter are: Brass housing with silicon measuring cell and electronics plate Process connection Electrical connection

More information

CAISSON SHAFT SYSTEM

CAISSON SHAFT SYSTEM CAISSON SHAFT SYSTEM Installation Guide INSTALLATION GUIDE FOR DN2000 TO DN3660 UNITS PLATE JOINTING SYSTEM This guide is to be used for the Installation of CPM Group Ltd caisson shaft units which use

More information

Homework 2 PROBLEM No. 1

Homework 2 PROBLEM No. 1 PROBLEM No. 1 In accordance with the project requirements, the contractor has obtained a 4 diameter core from below the shaft bottom. The core run was 5.0 and the total rock recovered was 4.2. A total

More information

EUROFLO CULVERT PIPE. Fittings / Pipes

EUROFLO CULVERT PIPE. Fittings / Pipes EUROFLO CULVERT PIPE Fittings / Pipes F EUROFLO FITTINGS RUBBERS SIZE CODE COMMENT 160 OD 200 OD 250 OD 315 OD 400 OD 500 OD 630 OD 800 OD 1000 OD 1200 OD 1550 OD 1750 OD 1950 OD 520-160-RBR 520-200-RBR

More information

STAINLESS STEEL GRAND SERIES

STAINLESS STEEL GRAND SERIES STAINLE STEEL GRAND SERIES STAINLE STEEL GRAND SERIES DEEPWELL SUBMERSIBLE PUMPS STAINLE STEEL - GRAND SERIES C.R.I. Always equips itself in advance to face the exponentially growing technological challenges

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

LAMINATED POLES. engineered to solve problems. Coastal Douglas-fir. Field Raked and Tangent Poles

LAMINATED POLES. engineered to solve problems. Coastal Douglas-fir. Field Raked and Tangent Poles Coastal Douglas-fir Field Raked and Tangent Poles LAMINATED POLES engineered to solve problems 1 Design Criteria Submission Form You can either fax this information to 253-627-4188 or submit your drawings

More information

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,

More information

Stability of Pipeline and details of Anchor blocks

Stability of Pipeline and details of Anchor blocks Stability of Pipeline and details of Anchor blocks For Offshore pipeline laying at Gulf of Kutch, Gujarat. Client WELSPUN (I) LTD, Gujarat EPC Contactor PATEL CONSTRUCTION CO. Consultants Prof. R. Sundaravadivelu

More information

Sept 23, 2014 LAB MANUAL

Sept 23, 2014 LAB MANUAL Sept 23, 2014 LAB MANUAL 1000.0 1000 STANDARD PRACTICES 1000.1 CALCULATIONS and FORMS Throughout this manual there are test calculation procedures. These calculations are provided so that a technician

More information

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures Sep/16 R-2 No Drawing Jan/17 R-2A Typical Cross Sections for Granular

More information

PolySwitch Radial-leaded Resettable Devices

PolySwitch Radial-leaded Resettable Devices PolySwitch Radial-leaded Resettable Devices Radial-leaded Raychem Circuit Protection has pioneered PPTC technology for over twenty years. Our radialleaded products represent the widest range of product

More information

TECHNICAL MANUAL. COPRA Anchoring Coupler. For Smart Bolted Connections

TECHNICAL MANUAL. COPRA Anchoring Coupler. For Smart Bolted Connections TECHNICAL MANUAL Anchoring Coupler For Smart Bolted Connections Version: PEIKKO GROUP 03/2017 Anchoring Coupler For bolted connections Multi-purpose anchoring system for all bolted connections Simplifi

More information

INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN

INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN Important: Read all instructions and refer to local codes prior to installation. l Local soil conditions may require more gravel for drainage. l

More information

Highway geometric design QUESTION PAPER

Highway geometric design QUESTION PAPER QUESTION PAPER UNIT 1 1. Explain the design control and criteria which governs the design and highway. ( Dec 2011, june july 2011, June 2010, Dec 2010, Dec 2012) 2.Explain PCU value and factors affecting

More information

ASTM E1886 and ASTM E1996 TEST REPORT. Report No.: E Rendered to: 3M COMPANY St. Paul, Minnesota 55144

ASTM E1886 and ASTM E1996 TEST REPORT. Report No.: E Rendered to: 3M COMPANY St. Paul, Minnesota 55144 ASTM E1886 and ASTM E1996 TEST REPORT Report No.: E6587.01 201 44 Rendered to: 3M COMPANY St. Paul, Minnesota 55144 PRODUCT TYPE: Safety and Security Window Film SERIES/MODEL: 3M Safety and Security Film

More information

Mass Flow Controller (MFC) for Gases

Mass Flow Controller (MFC) for Gases Mass Flow Controller (MFC) for Gases Bypass MFC with capillary technology for nominal flow rates from 5 ml N /min to 15 l N /min Applicable for aggressive gases Compact design and digital communication

More information

DIVISION: 06--WOOD AND PLASTICS SECTION: Wood, Plastic and Composite Fastenings

DIVISION: 06--WOOD AND PLASTICS SECTION: Wood, Plastic and Composite Fastenings DIVISION: 06--WOOD AND PLASTICS SECTION: 060523 -- Wood, Plastic and Composite Fastenings REPORT HOLDER: ITW BUILDING COMPONENTS GROUP, INC. 2400 LAKE ORANGE DRIVE, SUITE 150 ORLANDO, FLORIDA 32837 (800)

More information

A formwork system developed for one-way ribbed slabs for residential or industrial buildings.

A formwork system developed for one-way ribbed slabs for residential or industrial buildings. A formwork system developed for one-way ribbed slabs for residential or industrial buildings www.geoplast.it SKYRAIL ADVANTAGES SAVINGS Thanks to the radical reduction of consumables, the system is amortised

More information

Design Data 22M. Flotation of Circular Concrete Pipe. w w I = w - x 1000 (3) (SG x 1000)

Design Data 22M. Flotation of Circular Concrete Pipe. w w I = w - x 1000 (3) (SG x 1000) Design Data M Flotation of Circular Concrete Pipe There are several installation conditions where there is the possibility that concrete pipe may float even though the density of concrete is approximately.4

More information

THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS

THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS Prepared for City of Santa Ana Draft Report January 1999 Prepared by M. Y. Shahin, Ph.D., P.E. Consulting Engineer RJN

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

Valves. Diaphragm shut-off valves, kidney-type

Valves. Diaphragm shut-off valves, kidney-type Valves Diaphragm shut-off valves, kidney-type Application When leakage of even the smallest quantities must be avoided with certainty For maximum requirements to operating safety For maximum requirements

More information

DEEP WELL SUBMERSIBLE PUMPS. An ISO 9001 & Company

DEEP WELL SUBMERSIBLE PUMPS. An ISO 9001 & Company C.R.I. PUMPS DEEP WELL SUBMERSIBLE PUMPS EVERGREEN SERIES - 5Hz An ISO 91 & 141 Company Submersible Pumps C.R.I. Submersible Pumps are the products of the expertise gained from over four decades of experience,

More information

(i) Write down equations for x and y in terms of t. (iii) Find the range of the golf ball.

(i) Write down equations for x and y in terms of t. (iii) Find the range of the golf ball. 1 A golf ball is hit at an angle of 60 to the horizontal from a point, O, on level horizontal ground. Its initial speed is 20 m s 1. The standard projectile model, in which air resistance is neglected,

More information

CIVIL INDEX LANDSCAPE INDEX ELECTRICAL INDEX STRUCTURAL INDEX COVER SHEET G.101, 1 OF 55 LEGEND,ABBREVIATIONS, AND GENERAL NOTES G.

CIVIL INDEX LANDSCAPE INDEX ELECTRICAL INDEX STRUCTURAL INDEX COVER SHEET G.101, 1 OF 55 LEGEND,ABBREVIATIONS, AND GENERAL NOTES G. CIVIL INDEX LANDSCAPE INDEX COVER SHEET LEGEND,ABBREVIATIONS, AND GENERAL NOTES TRAFFIC CONTROL AND PHASING REQUIREMENTS TYPICAL SECTIONS CORROSION PROTECTION DETAILS TEMPORARY PEDESTRIAN WALKWAY DETAIL

More information

Outlet Structures T-12

Outlet Structures T-12 Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed

More information

BEC Custom properties

BEC Custom properties Custom properties Version 1.0 Betoniteollisuus ry May 2016 2 (12) Version history: Version Author Date Desciption 1.0 Teemu Anttila 20.5.2016 The first version of the document 3 (12) Contents Preface 7

More information

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016*** General Info Number: PROJECT NO. 43-16-03 Description: Deadline: BRIDGE DECK REPLACEMENT AND REHABILITATION, CLIFTON-GUNN ROAD OVER OHIO TURNPIKE M.P. 21.4, RUEGER-SHETLER ROAD OVER OHIO TURNPIKE M.P.

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS

More information

Gas Pressure Regulator HON 270 MK2

Gas Pressure Regulator HON 270 MK2 Gas Pressure Regulator HON 270 MK2 PRODUCT INFORMATION Serving the Gas Industry Worldwide Introduction, Application, Features & Technical Data Introduction The HON 270 MK2 regulator is a direct acting,

More information

Belt strength. Available the belt. (kg/m) PP - Polypropylene 2, to [B] PE - Polyethylene 1, to [B]

Belt strength. Available the belt. (kg/m) PP - Polypropylene 2, to [B] PE - Polyethylene 1, to [B] SERIES E20 FLAT TOP Eurobelt Series E20 Flat Top, due to a closed surface configuration, is the suitable conveyor belt for those applications in which it is not necessary any drainage through the belt

More information

LEGAL DESCRIPTION PARCEL 5, L.T.C. RANCH, P.U.D No. 1, ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 40, PAGE 1, OF THE PUBLIC RECORDS, OF ST. LUCIE COUNTY, FLORIDA. THIS DOCUMENT, TOGETHER WITH

More information

TZ WEDGE ANCHOR FOR CRACKED AND UNCRACKED CONCRETE

TZ WEDGE ANCHOR FOR CRACKED AND UNCRACKED CONCRETE www.ucanfast.com TECHNICAL MANUAL SECTION 2.2 PAGE 1 / 10 ä DESCRIPTION UCAN TZ torque controlled mechanical expansion wedge anchors have a Category 1 classification. They are used to resist static, wind

More information

Skill-Based Practice Pages to Enhance Student Performance

Skill-Based Practice Pages to Enhance Student Performance From Your Friends at The MAILBOX GRADES 4 6 Target Math Success TEC60831 Skill-Based Practice Pages to Enhance Student Performance Multiplication oflarger Numbers Multiple practice opportunities for each

More information

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector

More information

Gillfab 4422 Panel June 2002

Gillfab 4422 Panel June 2002 Gillfab 4422 Panel June 22 Description Gillfab 4422 is a high impact resistant sandwich panel with facings of woven fiberglass reinforced phenolic laminate with 1 mil Tedlar overlay bonded to Nomex honeycomb

More information

F L E T C H E R A V E N U E

F L E T C H E R A V E N U E Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are

More information

KM/ Stainless steel air bellows Single acting Ø 220 to 400 mm

KM/ Stainless steel air bellows Single acting Ø 220 to 400 mm KM/ Stainless steel air bellows Single acting Ø to mm Stainless steel end plates Frictionless operation No maintenance or lubrication Ideal for short stroke, high-force applications High isolation level

More information

VENTILATOR OPTIONS. Please visit our web page to view all the available options and for a specification.

VENTILATOR OPTIONS. Please visit our web page to view all the available options and for a specification. Seefire Natural Louvred Ventilator Seefire is a natural louvred ventilator that is available in a wide range of sizes, louvre options and control options. Seefire has been exhaustively tested and certified

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 91725 CR 52 over CALDWELL BROOK DISTRICT: District 1 COUNTY: Koochiching CITY/TOWNSHIP: T - 151 R - 27 STATE: Minnesota Date of Inspection: Equipment Used:

More information

WESTERN BRANCH METALS

WESTERN BRANCH METALS WESTERN BRANCH METALS High strength with superior corrosion resistance, AQ- 22 rudders are hydrodynamically designed to provide excellent performance throughout the entire speed range. AQ-22 Rudders AQ-22

More information

CONDITION ASSESSMENT REPORT

CONDITION ASSESSMENT REPORT CONDITION ASSESSMENT REPORT ALAMEDA ISLES PROPERTY ASSOCIATION - SMALL CRAFT HARBOR PREPARED BY: 564 AVALON PARK BLVD. E., SUITE 1 # 111 ORLANDO, FLORIDA 88 C.O.A. # 876 SCES Job No.: 106.05-15 MAY 015

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

Gas Pressure Regulator HON 280H - 309

Gas Pressure Regulator HON 280H - 309 Gas Pressure Regulator HON 280H - 309 PRODUCT INFORMATION Serving the Gas Industry Worldwide 2 GAS PRESSURE REGULATOR HON 280H - 309 Technical Data Introduction The HON 280H-309 are spring loaded, externally

More information

EVALUATION SUBJECT: DIVISION: HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION: HVAC DUCTS AND CASINGS.

EVALUATION SUBJECT: DIVISION: HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION: HVAC DUCTS AND CASINGS. ICC-ES Report PMG-1171 Reissued 11/2018 This report is subject to renewal 11/2019 EVALUATION SUBJECT: UNDERGROUND SINGLE WALL & DOUBLE WALL INSULATED DUCT FOR HVAC DIRECT BURIAL APPLICATIONS AND UNDERGROUND

More information

Pressure regulator for water

Pressure regulator for water Pressure regulator for water rass version with VGW and international drinking water approvals Stainless steel version with VGW approval Compact plastic version Manometer port at pressure output The water

More information

Application for Approval of Additional Equipment

Application for Approval of Additional Equipment Application for Approval of Additional Equipment (Revised November 2013) ( Select One) 1. Crew Equipment Application 2. Equipment Repair Application 3. New Equipment Application (NEW) Applicant to complete

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

T T 0809-364-0413-8 JOHNSTON, DANIEL & SHARON 2202 BRENTW OOD PKW Y T T drive OD DR HKE HERRITZ N 8 walk walk walk walk 128.2 BRENTWOOD, MONTEREY, TRAILSWAY SHEET NO. & WYLDEWOOD 2013 - PROJECT NO. 53W1542

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY OCTOBER 22, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY

More information

Readington Road (C.R. 637) Construction

Readington Road (C.R. 637) Construction Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon

More information

Northside School Class I Bike Path, Cool, CA Application Attachments

Northside School Class I Bike Path, Cool, CA Application Attachments PLHD Grant Application, 12/9/2011 County of El Dorado Department of Transportation Northside School Class I Bike Path, Cool, CA Application Attachments 1. Project Site Map 2. Auburn State Recreation Area

More information

ISO INTERNATIONAL STANDARD. Hydraulic fluid power Hose assemblies Part 1: Dimensions and requirements

ISO INTERNATIONAL STANDARD. Hydraulic fluid power Hose assemblies Part 1: Dimensions and requirements INTERNATIONAL STANDARD ISO 17165-1 First edition 2007-10-15 Hydraulic fluid power Hose assemblies Part 1: Dimensions and requirements Transmissions hydrauliques Flexibles de raccordement Partie 1: Dimensions

More information

Mass Flow Controller (MFC) for Gases

Mass Flow Controller (MFC) for Gases Mass Flow Controller (MFC) for Gases Type 8713 can be combined with... Direct flow measurement by MEMS- Technology for nominal flow rates from 1 ml N /min to 8 l N /min (N 2 ) High accuracy and repeatability

More information

Reg No: 1999/027771/07 ACCREDITED AND APPROVED TEST LABORATORY IN TERMS OF ARP 0108: REGULATORY REQUIREMENTS FOR EXPLOSION PROTECTED APPARATUS

Reg No: 1999/027771/07 ACCREDITED AND APPROVED TEST LABORATORY IN TERMS OF ARP 0108: REGULATORY REQUIREMENTS FOR EXPLOSION PROTECTED APPARATUS Government Approved Test Laboratory (Previously AIA) Reg No: 1999/027771/07 ACCREDITED AND APPROVED TEST LABORATORY IN TERMS OF ARP 0108: REGULATORY REQUIREMENTS FOR EXPLOSION PROTECTED APPARATUS ZEST

More information

VERTICAL TURBINE PUMPS Right Angle Gears. Shaft Guarding for Horizontal Mounted Spicer Universal Joint Drive Shafts

VERTICAL TURBINE PUMPS Right Angle Gears. Shaft Guarding for Horizontal Mounted Spicer Universal Joint Drive Shafts Peerless Pump Company Indianapolis, IN 46207-7026 VERTICAL TURBINE PUMPS Right Angle Gears SECTION 110 Page 1 January 2, 2007 Shaft Guarding for Horizontal Mounted Spicer Universal Joint Drive Shafts A

More information

Item 585 Ride Quality for Pavement Surfaces

Item 585 Ride Quality for Pavement Surfaces Item 585 Ride Quality for Pavement Surfaces 1. DESCRIPTION 2. EQUIPMENT Measure and evaluate the ride quality of pavement surfaces. 2.1. Surface Test Type A. Provide a 10-ft. straightedge or where allowed,

More information

Application for Approval of Additional Equipment

Application for Approval of Additional Equipment Application for Approval of Additional Equipment (Revised November 2013) ( Select One) 1. Crew Equipment Application 2. Equipment Repair Application 3. New Equipment Application (NEW) Applicant to complete

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

Suspension Ropes. Suspension Rope

Suspension Ropes. Suspension Rope Suspension Ropes IMechE CPD Certificate Course 23 Nov. 2016 Suspension Rope Standard Configuration Replacement Criteria Tension Measurement Traction Measurement Standard Nominal diameter at least 8mm BS302

More information

Road Side Design: When is a Barrier Required?

Road Side Design: When is a Barrier Required? Road Side Design: When is a Barrier Required? Jennifer Schmidt, Ph.D., P.E. University of Nebraska-Lincoln Department of Civil Engineering Guide Rail Safety Symposium Brampton, ON October 24, 2017 Research

More information

VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES 10

VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES 10 / ED VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES OPERATING PRINCIPLE The VPPL are variable displacement axial-piston pumps with variable swash plate, suitable for applications

More information

ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel

ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel 1.0 Introduction ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel Katherine Wilson 28 May 2007 To minimize the hazards associated with vacuum and pressure

More information

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The

More information

City of Margate, Florida. Neighborhood Traffic Management Manual

City of Margate, Florida. Neighborhood Traffic Management Manual City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT

More information