1 PLHD Grant Application, 12/9/2011 County of El Dorado Department of Transportation Northside School Class I Bike Path, Cool, CA Application Attachments 1. Project Site Map 2. Auburn State Recreation Area Map 3. Project Site Photos 4. Engineer s Estimate 5. SACOG MTIP Project Listing, EDCTC Project Funding 6. U.S. Bureau of Reclamation Letter of Support 7. Caltrans PLHD Administration 8. Community Support Letters 9. County of El Dorado Authorization to Apply for Grants (Board Resolution No )

2 PLHD Application 12/9/11, Attachment 1

3 PLHD Application 12/9/11, Attachment 2

4 Northside School Class I Bike Path Cool, CA Attachment 3 Photo Simulation of Proposed Class I Bike Path along west side of SR-49 facing south El Dorado County DOT, PLHD Grant Application, Northside School Class I Bike Path- Cool, CA

5 Northside School Class I Bike Path Cool, CA Attachment 3 West Side of SR-49 facing north toward intersection at SR-193 Photo Simulation of Proposed Class I Bike Path along west side of SR-49 facing north El Dorado County DOT, PLHD Grant Application, Northside School Class I Bike Path- Cool, CA

6 Northside School Class I Bike Path Cool, CA Attachment 3 South end of proposed bike path on SR-49 at Cave Valley Rd (Northside School site) along west side of SR-49 facing north El Dorado County DOT, PLHD Grant Application, Northside School Class I Bike Path- Cool, CA

7 Northside School Class I Bike Path Cool, CA Attachment 3 Guardrail approaching Knickerbocker Creek on west side of SR-49 facing north El Dorado County DOT, PLHD Grant Application, Northside School Class I Bike Path- Cool, CA

8 Northside School Class I Bike Path Cool, CA Attachment 3 West side of SR-49 facing north toward intersection at SR-193 El Dorado County DOT, PLHD Grant Application, Northside School Class I Bike Path- Cool, CA

9 Northside School Class I Bike Path Cool, CA Attachment 3 Proposed bike path on SR-193 (facing east from northwest corner at SR-49 intersection) El Dorado County DOT, PLHD Grant Application, Northside School Class I Bike Path- Cool, CA

10 Northside School Class I Bike Path Cool, CA Attachment 3 North side of SR-93 facing east El Dorado County DOT, PLHD Grant Application, Northside School Class I Bike Path- Cool, CA

11 Northside School Class I Bike Path Cool, CA Attachment 3 Approximate half-way point of proposed bike path on north side of SR-193 near Cherry Acres Rd facing east El Dorado County DOT, PLHD Grant Application, Northside School Class I Bike Path- Cool, CA

12 Northside School Class I Bike Path Cool, CA Attachment 3 North side of SR-193 facing east toward American River Trail (road into Auburn Lakes Trail subdivision), east end of proposed bike path on SR-193 El Dorado County DOT, PLHD Grant Application, Northside School Class I Bike Path- Cool, CA

13 Northside School Class I Bike Path Cool, CA Attachment 3 Olmstead Nature Trail in Auburn State Recreation Area El Dorado County DOT, PLHD Grant Application, Northside School Class I Bike Path- Cool, CA

14 PLHD Application 12/9/11, Attachment 4 Item No. Engineers Estimate El Dorado County Department of Transportation Northside School Class 1 Bike Path - Cool, CA Phase 1 (SR-193) North side of SR-193 from SR-49 to American River Trail and Phase 2 (SR-49) West side of SR-49 from Cave Valley Road to SR-193 Date of Estimate:11/22/2011 Prepared by: Chandra Ghimire/Jennifer Maxwell Estimated Estimated Units of Item Description Quantity Quantity Measure Phase 1 Phase 2 Bikepath Removable Bollard (Center and Edge Bollard) Unit Cost Item Total Phase-1 Item Total Phase-2 1 EA $3,000 $3,000 2 Temporary Fence (Type ESA) LF $4,000 $4,000 3 Temporary Fence LF $10,000 $12,000 4 Plain Cement Concrete for ADA Ramp CY $450 $450 5 Construction Site Management LS $7,500 $7,500 6 Prepare Storm Water Pollution Prevention Plan LS $2,000 $2,000 7 Temporary Creek Diversion LS $0 $5,000 8 Rain Event Action Plan EA $750 $750 9 Annual Report EA $1,000 $1, Stormwater Sampling and Analysis LS ,000 $5,000 $5, Construction Area Sign LS $5,000 $5, Traffic Control System LS $12,000 $12, Portable Changeable Message Sign (Per Sign-Day) SDAY $12,000 $12, Temporary Railing (Type K) LF $71,200 $63, Temporary Crash Cushion System EA $5,500 $3, Remove Pavement Marking SQFT $408 $ Remove Culvert Headwall LS $1,000 $0 18 Reset Mailbox LS $1,500 $0 19 Relocate Roadside Sign EA $2,000 $2, Remove Bridge-Wingwall and Part of Bridge (F) LS $0 $5, Clearing and Grubbing LS ,000 $10,000 $10, Remove Tree EA $3,000 $2, Develop Watersupply LS $4,000 $4, Roadway Excavation (F) CY $87,500 $87, Asbestos Compliance Plan LS $2,000 $2, Prepare Asbestos Dust Mitigation Plan LS $2,000 $2, Asbestos Containing Material Removal LS $32,000 $8, Rock Excavation CY $1,000 $0 29 Structural Excavation for Bridge (F) CY $0 $28, Structural Backfill for Bridge (F) CY $0 $26, Erosion Control (Blanket) SY $9,680 $14, Erosion Control (Type D) SY $39,000 $45, Class 2 Aggregate Base (AB) CY $30,800 $35, Asphalt Concrete (HMA, Type A) Ton $79,650 $92, Place Hot Mix Asphalt Dike (Type E) LF $280 $ Place Hot Mix Asphalt Dike (Type A) LF $76 $0 37 Driveway Conform Deep Lift HMA Ton $4,950 $6, Structural Concrete (Bridge) (F) CY $0 $86, Structural Concrete (Headwall) (F) CY $1,485 $0 40 Bar Reinforceing Steel (Bridge) (F) LB $0 $18, Bar Reinforceing Steel (Headwall) (F) LB $218 $0 42 Roadside (Bikepath) Sign (1-post) EA $4,000 $4, " Smooth Wall Plastic Pipe (Corrugated Outside) for Culvert LF $3,200 $0 44 8" Corrugated Steel Pipe LF $0 $2, " Corrugated Steel Pipe LF $6,600 $ " Corrugated Steel Pipe LF $61,100 $16, " Corrugated Steel Pipe LF $700 $34, " Corrugated Steel Pipe Downdrain LF $0 $3, " Cleanout-Corrugated Steel Pipe Inlet EA $2,000 $4, " Cleanout-Corrugated Steel Pipe Inlet EA $5,000 $5, " Cleanout-Corrugated Steel Pipe Inlet EA $0 $3, " Flared End Section EA $0 $ " Flared End Section EA $450 $ " Flared End Section EA $3,300 $1, " Flared End Section EA $650 $0 56 Type G1 inlet EA $2,500 $0 57 Rock Slope Protection CY $1,200 $1, Detectable Warning Surface for ADA Ramp SF $900 $ Fence (Type BW or WM, Metal Post) LF $30,000 $30, Chainlink Fence LF $9,100 $19, " Thermoplastic Traffic Striping LF $6,750 $7, Thermoplastic Pavement Marking SQFT $1,160 $1, " Thermoplastic Stripe for Cross Walk LF $240 $ Mobilization LS $70,400 $89, Precast Concrete Fence LF $85,250 $132, Coordination With Property Owners LS $5,000 $5, Remove Traffic Stripe and Pavement Marking LS $300 $ Flagging Day $9,000 $9,000 Total Cost $760,747 $985,722 Construction Bid $761,000 $986,000 Supplemental Items $45,000 $32,000 Contingency (10%) $80,500 $102,000 Construction Mgmt - Consultant $15,500 $16,000 Construction Mgmt - Staff (15%) $133,000 $168,000 Mitigation Credits $13,000 $85,000 Construction Total $1,048,000 $1,389,000

15 PLHD Application 12/9/11, Attachment 5

16 PLHD Application 12/9/11, Attachment 5 STIP TE PROJECTS NORTHSIDE SCHOOL BIKE PATH PROJECT UPDATE, SEPTEMBER 2011 Project Description EDCTC programmed STIP TE funding to complete the Project Approval/ Environmental Documentation (PA&ED) phase for a Class I bike path between Auburn Lake Trails and Northside School in two phases: Phase 1: Along the north side of State Route (SR) 193 from the community of Auburn Lake Trails to the intersection of SR 49 and 193; Phase 2: Along SR 49 on the west side from Northside School to the intersection of SR 49 and 193. Current Project Status Site investigations, property owner surveys and public meetings with the Cool/Pilot Hills Advisory Committee were conducted to receive input on potential bike path alignments between Northside School and Auburn Lake Trails. A survey of parents and a public meeting at Northside School both demonstrated local support for the project. The selected alignments along SR 193 and SR 49 were ultimately determined most feasible. The CEQA Mitigated Negative Declaration was approved in December The NEPA Categorical Exclusion was approved on August 24, The County applied for Federal Safe Routes to School Funding (SRTS) for both phases in two applications, with the SR 193 section as top priority. In October of 2008, the SR 193 section was awarded SRTS funding in the amount of $999,500 for construction of the bike path along the north side of SR 193 between the Auburn Lake Trails community and the intersection of SR 49 and 193 in Cool. In July 2009, El Dorado County DOT was notified of the award of Safe Routes to School Funding in the amount of $900,000 for construction of the Phase 2 segment along SR 49. On April 7, 2011, EDCTC programmed $645,200 in CMAQ funds to this project. The project is currently fully funded and both phases will be constructed simultaneously. The project is in the Right-of-Way phase and El Dorado County DOT is working through utility coordination issues. The Draft Project Report is being reviewed by Caltrans and Caltrans is developing the Draft Cooperative Agreement. Project design for both phases is ongoing and approaching 90%. El Dorado County DOT is hopeful the Right-of- Way phase can be completed in time to allow for construction to occur during the Summer of Upcoming Activities Receive Caltrans approval of the Project Report and Cooperative Agreement Complete ROW and 90% plans PROJECT FUNDING DETAIL Project Phase Fund Source Total Cost STIP TE Federal SRTS State SR2S Local Bike/Ped TDA RSTP Exchange CMAQ Road Fund PA&ED $241,799 $29,798 $271,597 PS&E $125,000 $167,657 $82,306 $225,613 $59,469 $660,045 ROW $24,500 $10,400 $22,566 $78,745 $136,211 CON $850,000 $721,943 $35,128 $99,955 $645,200 $2,352,226 Total $241,799 $999,500 $900,000 $140,000 $434,111 $645,200 $59,469 $3,420,079 *Originally programmed $275,000 in STIP TE Funds were subject to 10% Caltrans oversight fee 15

17 12/6/11 Edcgov.us Mail - Administration of Public Lands Highway Funds PLHD Application 12/9/11, Attachment 7 Anne Novotny <anne.novotny@edcgov.us> Administration of Public Lands Highway Funds 1 message James P Day <james_p_day@dot.ca.gov> Tue, Dec 6, 2011 at 10:25 AM To: Local Agenc April Nitsos <april_nitsos@dot.ca.gov> Cc: Peter Kraat TO WHOM IT MAY CONCERN The California Department of Transportation (recipient), in the event a local agenc (subrecipient) is awarded a Public Lands Highwa Grant, shall administer those funds on behalf of the subrecipient. It is the responsibilit of the subrecipient to manage and deliver the project unless otherwise stated in a further agreement. John Hoole, DLAE District 3 Office of Local Assistance sent b : James P. Da, MBA Office of Local Assistance Department of Transportation District 3 Division of Planning & Local Assistance 703 B Street Mar sville, California (530) (office) (530) (FAX) 1/1

18 PLHD Application 12/9/11, Attachment 8

19 PLHD Application 12/9/11, Attachment 8

20 PLHD Application 12/9/11, Attachment 8

21 PLHD Application 12/9/11, Attachment 8

22 PLHD Application 12/9/11, Attachment 8

23 PLHD Application 12/9/11, Attachment 8

24 PLHD Application 12/9/11, Attachment 8

25 PLHD Application 12/9/11, Attachment 8

26 Georgetown Divide Ready by 21 TM, Inc. Fitting Together Community Resources March 18, 2009 Re: El Dorado County Department of Transportation s State Safe Routes To School (SR2S) Grant Applications for Northside School Class I Bike Path on SR-49, and Georgetown School Sidewalk on Harkness Street To Whom It May Concern, As the President of the Board of the Georgetown Divide Ready by 21, Inc., I support the project proposals that El Dorado County Department of Transportation is submitting for the State Safe Routes to School (SR2S) grant program. The EDCDOT is partnering with the Black Oak Mine Unified School District on these projects that propose to construct a Class I bike paths along State Route 49 (SR-49) from Northside School in the Township of Cool to SR 193, and to construct a sidewalk on Harkness Street from Georgetown School to Georgetown Park. The Georgetown Divide Ready by 21, Inc. is a 501c3 nonprofit organization consisting of over 100 individuals and organizations dedicated to helping our Georgetown Divide youth succeed in work, school, and life. The Georgetown Divide Ready by 21, Inc. supports these SR2S proposed project by committing to work with the Black Oak Mine Unified School District to educate parents and students about bicycling and walking safety and encouraging parents to allow their children to bike/walk to school with on-going Bike/Walk-to-School events/ activities. We will provide support to the projects through our outreach materials whenever possible. I know that Black Oak Mine Unified School District is looking forward to partnering with the El Dorado County Department of Transportation on this worthwhile SR2S project, and hope that it is selected for a SR2S grant award. Sincerely, Kyleen Cornell Board President Georgetown Divide Ready by 21, Inc. PLHD Application 12/9/11, Attachment 8

27 PLHD Application 12/9/11, Attachment 8

28 PLHD Application 12/9/11, Attachment 9

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60) Company Name Base Bid Schedule A Base Bid Schedule B Total COUNTY'S ESTIMATE 367,150.00 328,300.00 $695,450.00 1 All American Asphalt 481,360.00 108,180.00 $589,540.00 2 PTM General Eng Services, Inc.

More information

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Sponsor St Peters Project No. RB19-000022 Project Type Other TOTAL FUNDING Total County Sponsor Federal $1,177,251.00 $238,179.00 $59,546.00 $879,526.00

More information

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD STAFF REPORT MEETING DATE: June 7, 2016 TO: FROM: City Council Russ Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213

More information

Diamond Springs Parkway Project

Diamond Springs Parkway Project Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

Item No. 14 Town of Atherton

Item No. 14 Town of Atherton Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY

More information

OneBayArea Grant Application

OneBayArea Grant Application OneBayArea Grant Application ER Taylor Elementary School Safe Routes to School Project Submitted by the San Francisco Department of Public Works To the San Francisco County Transportation Authority April

More information

Kansas Department of Transportation. Tabulation of Bids

Kansas Department of Transportation. Tabulation of Bids Page 1 of 17 SECTION: 1 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025600 FIELD OFFICE AND LABORATORY (TYPE A) 5 071554 CONCRETE FOR SEAL

More information

FINAL SCOPING REPORT. Bennington Streetscape Improvement Project BENNINGTON STP SDWK (12) August Bennington County Regional Commission

FINAL SCOPING REPORT. Bennington Streetscape Improvement Project BENNINGTON STP SDWK (12) August Bennington County Regional Commission FINAL SCOPING REPORT Bennington Streetscape Improvement Project BENNINGTON STP SDWK (12) August 214 Bennington County Regional Commission Table of Contents Purpose & Need 3 Project Area Photos 5 Conceptual

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING 4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE R. J. Noble Company Orange, CA 92856 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 190101 ROADWAY EXCAVATION CY 8,500 16.00 136,000.00 9.50 80,750.00

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court 46th Street Reconstruction North of 28th Avenue to 29th Avenue 29th Avenue Reconstruction 46th Street to 47th Avenue Court 47th Street Court Reconstruction 29th Avenue to Cul-de-sac CITY OF ROCK ISLAND

More information

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, :30 PM Conference Room A

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, :30 PM Conference Room A BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, 2016-5:30 PM Conference Room A The meeting location is accessible to persons with disabilities. A request for an interpreter for the hearing

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 13 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL OF EXISTING STRUCTURES 4 020100 CONTRACTOR CONSTRUCTION STAKING 5 025602 FIELD OFFICE AND LABORATORY

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

TABLE OF CONTENTS. Executive Summary

TABLE OF CONTENTS. Executive Summary Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting

More information

SRTS IMPLEMENTATION COSTS

SRTS IMPLEMENTATION COSTS SRTS IMPLEMENTATION COSTS What Is a Estimate? A cost estimate establishes the anticipated budget required to implement the actions (the improvement projects and programs) identified in your School Travel

More information

CITY OF SOUTH DAYTONA

CITY OF SOUTH DAYTONA CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage

More information

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min: Page 1 of 10 SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 070580 FLAGGER (SET PRICE) (1) LS (1) LS 1.000 HOUR 86,800.00000 86,800.00 3,375.50000

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

IMPLEMENTATION WORKBOOK

IMPLEMENTATION WORKBOOK Lawrence Township Bicycle and Pedestrian Planning Assistance Study IMPLEMENTATION WORKBOOK Final Action Plan - Part 2 April 2009 Prepared For: The Township of Lawrence and the New Jersey Department of

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS March 2, 2011 FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS STANLEY STORM DRAINAGE IMPROVEMENTS, 151sT TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS DESCRIPTION: This report relates

More information

Trail Feasibility. 1. Introduction FINAL. October What s inside?

Trail Feasibility. 1. Introduction FINAL. October What s inside? VOLUSIA COUNTY MPO CITY OF PORT ORANGE FINAL Trail Feasibility October 2006 What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way 4 Trail Concept Plan

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. Financial Project ID: 409870-1-52-01 LAKE COUNTY DESIGN ALTERNATIVE STUDY FOR MULTI-USE PATH Prepared for: FLORIDA DEPARTMENT OF TRANSPORTATION District

More information

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior

More information

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,

More information

GENERAL LEGEND 12"CMP

GENERAL LEGEND 12CMP PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514 Page 1 of 17 18 HNTERDON ROTE 202,ALEXAKEN CREEK ROAD TO RT 179/CR514 Quantity and nits nit Price nit Price nit Price SECTION: 0001 ROADWAY 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

Tabulation of Bids. Counties: Project(s):

Tabulation of Bids. Counties: Project(s): Page: 1 14 ROTE 94, ROTE 46 TO OLD COACH RD Quantity and nits nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 154003P MOBILIZATION 0007 157004M CONSTRCTION LAYOT 0012

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1) Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1

More information

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by Toward Zero Deaths Regional SHSP Road Show Meeting presented by Virginia Strategic Highway Safety Plan December 1, 2016 1 Welcome & Introductions Purpose of the Meeting Objectives & Key Outcomes Agenda»

More information

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014 Humboldt County Association of Governments Eureka, CA, 95501 AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014 DATE: May 1, 2014 TO: HCAOG Technical Advisory Committee (TAC) FROM:, SUBJECT: Letters of

More information

COMPLETE STREETS DURING CONSTRUCTION

COMPLETE STREETS DURING CONSTRUCTION COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com

More information

Background Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay

Background Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Approval of Resolution 18-11-G Appropriating Measure J TLC

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 27 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 154003P MOBILIZATION 0009 157004M CONSTRCTION LAYOT 0010 157006M MONMENT

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building. CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED

More information

Town of Bennington, Vermont Request for Proposals for Design Engineer Bennington Streetscape Improvement Project BENNINGTON STP SDWK(12)

Town of Bennington, Vermont Request for Proposals for Design Engineer Bennington Streetscape Improvement Project BENNINGTON STP SDWK(12) Town of Bennington, Vermont Request for Proposals for Design Engineer Bennington Streetscape Improvement Project BENNINGTON STP SDWK(12) Contact: Mark Anders, Planner, Local Project Manager Bennington

More information

CITY OF WARRENVILLE MEMO

CITY OF WARRENVILLE MEMO CITY OF WARRENVILLE MEMO TO: Mayor, City Council, and City Administrator Coakley FROM: Senior Civil Engineer Hocking SUBJECT: PREFERRED ALTERNATIVE FOR MACK ROAD BIKE PATH PROJECT DATE: May 3, 2017 The

More information

TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL

TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL MONROE COUNTY VILLAGE SQUARE FINAL CONCEPT-LEVEL STRATEGY REPORT I. Introduction The purpose of this report is to recommend

More information

Time of Change We Are Growing We Are An Attractive Place To Live We Are Age Diverse + Living Longer 50000 40000 30000 20000 10000 0 2010 Census Job Density Housing Sheds Transit Sheds The Project FUNDING

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346

More information

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology Appendix F Technical Report on Cost Estimation Methodology This page is intentionally left blank. Technical Report on Cost Estimation Methodology The total costs of the projects in the Non-motorized Transportation

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 ED FIELDING Commissioner, District 2 HAROLD E. JENKINS II Commissioner, District

More information

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes Minutes Approved as Submitted Date: 8/10/17 Initials: EC BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes June 8, 2017 The Bicycle and Trails Advisory Commission was called to order at 4:00 p.m.

More information

APPENDIX G: DETAILED COST ESTIMATES

APPENDIX G: DETAILED COST ESTIMATES APPENDIX G: DETAILED COST ESTIMATES August 2012 7 YUBA COUNTY BIKEWAY MASTER PLAN Preliminary Estimate Memorandum Prepared for: Fehr and Peers Transportation Consultants & Yuba County Department of Public

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

Project Status Update

Project Status Update Project Status Update : Novato Boulevard, 4th & 3rd Streets, Sir Francis Drake Boulevard (3), and Miller Avenue Major roads projects target the most heavily traveled roads in Marin County for repairs,

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS 01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED

More information

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate Project ID Project Category Project Name Qty/Len(Mi) Cost Estimate BB 1 Bike boulevard Jefferson Street or

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

SUBJECT: AUTHORIZE BID ADVERTISEMENT FOR OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO

SUBJECT: AUTHORIZE BID ADVERTISEMENT FOR OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO STAFF REPORT MEETING DATE: May 3, 2016 TO: FROM: City Council Russell Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

Introduction.

Introduction. 2307-1.0. Introduction. Delaware s Safe Routes to School (SRTS) Program was established September 10, 2002 when Governor Ruth Ann Minner signed Senate Bill 353 of the 141st General Assembly of Delaware

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use

More information

AUTHORIZE BID ADVERTISEMENT

AUTHORIZE BID ADVERTISEMENT STAFF REPORT MEETING DATE: May 17, 2016 TO: City Council FROM: Petr Skala, Assistant Engineer PRESENTER: Russell Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/

More information

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011 Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan January 18, 2011 Tonight s Agenda Receive update on project Provide feedback on two policy issues Complete Streets Policy Project Prioritization

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

Request for Authorization to Open Public Comment Period

Request for Authorization to Open Public Comment Period Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 16 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 153011M TRAINEES 0007 154003P MOBILIZATION 0010 157004M CONSTRCTION LAYOT

More information

Appendix H RESPONSES TO PUBLIC COMMENTS

Appendix H RESPONSES TO PUBLIC COMMENTS Appendix H TO PUBLIC COMMENTS A-1 This comment letter confirms receipt and distribution of the draft IS/ MND and documents project compliance with State Clearinghouse review requirements for the draft

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes

More information

APPENDIX B: FUNDING MATRIX

APPENDIX B: FUNDING MATRIX APPENDIX B: FUNDING MATRIX 101752 B - 1 FEDERAL SAFETEA-LU -- Congestion Mitigation and Air Quality Improvement Program (CMAQ) SAFETEA-LU -- Surface Transportation Program (STP)/Congestion Mitigation and

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Readington Road (C.R. 637) Construction

Readington Road (C.R. 637) Construction Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon

More information

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY The Active Transportation Plan is a guide to accomplish the Town s vision for developing a network of sidewalks, on-road bicycle facilities, and trails that allow for safe and convenient

More information

Span-Wire Intersections Study SPAN-WIRE INTERSECTIONS STUDY. City of Naples Streets & Stormwater Department 1

Span-Wire Intersections Study SPAN-WIRE INTERSECTIONS STUDY. City of Naples Streets & Stormwater Department 1 SPAN-WIRE INTERSECTIONS STUDY City of Naples Streets & Stormwater Department 1 Intersection Traffic Control and Design Feasibility Analysis a.k.a Span-Wire Intersections Study Streets & Stormwater Department

More information

Funding Application. Project Information. Contact Information. Project Description. 1 of 6. September 20th, :04 PM

Funding Application. Project Information. Contact Information. Project Description. 1 of 6. September 20th, :04 PM 1 of 6 Funding Application Competition Application Type Status Submitted: Regional TAP Bicycle and Pedestrian submitted September 20th, 2017 2:04 PM Project Information 1. Project Title SR 527/Seattle

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

Programmatic Categorical Exclusion Update Question & Answers

Programmatic Categorical Exclusion Update Question & Answers Office of Environmental Stewardship 395 John Ireland Blvd St. Paul, MN 55155 Programmatic Categorical Exclusion Update Question & Answers Date: October 2017 OPTIONAL District/Division Nam This FAQ document

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state