1 2017 LGA 191/192 & 195 Pipeline Safety Conference Presented by: Wallace Jones Director, Gas Pipeline Safety Division Alabama Public Service Commission

2 Issues that GPS/PSC Staff are having with Pipeline Operators

3 We ALL have Issues

4 But what are we going to do to address our Issues?

5 What s wrong with this picture? How do we fix this?

6 We get the spare tire out right? Solution: Inspect your spare every time you service your vehicle

7 What about this one?

8 Call 811? What do we do now? Do we call our buddy and tell him we might be late for the golf game? Tell your boss you don t work overtime? Do I call the fire department first or the gas company first? Should I notify PHMSA or the state regulatory authority?

9 PROBLEMS FOUND

10 Each operator shall Prepare and Follow for each pipeline, a manual of written procedures for conducting operations and maintenance activities and for emergency response

11 Refer to your O&M and Emergency Plan (a) Manuals must be REVIEWED and UPDATED by the operator at intervals not exceeding 15 months, but at least once each calendar year. Also Submit to APSC Appropriate parts of the manual Must be kept at locations where operations and maintenance activities are conducted.

12 How do we know these Manuals aren t being Reviewed, Revised or Followed? Operators are not taking into consideration recommendations from their inspector Inspector handwriting and notes are still in plans Operator can t provide Procedures on Construction Sites Operators are performing covered tasks different than the procedure allows

13 Items that are late or not submitted at all Gas DOT Reports March 15 Liquid DOT Reports June 15 Incidents (Reportable or Not) Especially if Media is Involved Mechanical Fitting Failure

14 Atmospheric Corrosion (a) Each operator must inspect each pipeline or portion of pipeline that is exposed to the atmosphere for evidence of atmospheric corrosion, as follows:

15 Atmospheric Corrosion continued If the pipeline is located: Onshore Then the frequency of inspection is: At least once every 3 calendar years, but with intervals not exceeding 39 months If the pipeline is located: Offshore Then the frequency of inspection is: At least once each calendar year, but with intervals not exceeding 15 months

16 Atmospheric Corrosion continued (b) During inspections the operator must give particular attention to pipe at soil to air interfaces, under thermal insulation, under disbonded coatings, at pipe supports, in splash zones, at deck penetrations, and in spans over water. (c) If atmospheric corrosion is found during an inspection, the operator must provide protection against the corrosion as required by Sec

17 Cathodic Protection Isolated Services and Mains Location of Test Points Deficiencies

18 Cathodic Protection (a) Each pipeline all parts of those physical facilities through which gas moves in transportation, including pipe, valves, and other appurtenance attached to pipe, compressor units, metering stations, regulator stations, delivery stations, holders, and fabricated assemblies. that is under cathodic protection must be tested at least once each calendar year, but with intervals not exceeding 15 months, to determine whether the cathodic protection meets the requirements of However, if tests at those intervals are impractical for separately protected short sections of mains or transmission line a pipeline, other than a gathering line, that: (1) Transports gas from a gathering line or storage facility to a gas distribution center, storage facility, or large volume customer that is not down stream from a gas distribution center; (2) operates at a hoop stress of 20 percent or more of SMYS; or (3) transports gas within a storage field., not in excess of 100 feet (30 meters See Customer meter, Meter set assembly. (Guide definition)), or separately protected service line a distribution line that transports gas from a common source of supply to an individual customer, to two adjacent or adjoining residential or small commercial customers, or to multiple residential or small commercial customers served through a meter header or manifold., these pipelines may be surveyed on a sampling basis. At least 10 percent of these protected structures, distributed over the entire system must be surveyed each calendar year, with a different 10 percent checked each subsequent year, so that the entire system is tested in each 10 year period.

19 Cathodic Protection Mapping (a) (a) Each operator shall maintain records or maps to show the location of cathodically protected piping, cathodic protection facilities, galvanic anodes, and neighboring structures bonded to the cathodic protection system. Records or maps showing a stated number of anodes, installed in a stated manner or spacing, need not show specific distances to each buried anode.

20 Cathodic Protection Deficiencies (d) (d) Each operator shall take prompt remedial action to correct any deficiencies indicated by the monitoring.

21 REVIEW What are some Issues we are having with Operators Operators are just creating new cover sheets for programs without actually reviewing or updating the programs Operators not taking any of the inspector recommendations into consideration prior to their next inspection Operators not providing every employee a copy of the manuals Operators are not notifying their inspector of incidents whether or not it s reportable (especially when the media is present)

22 Issues continued Operators not following their own procedures Atmospheric Corrosion Cathodic Protection on Isolated Section of Pipe

23 Operators are not following what their Emergency Plan and Public Awareness Plans have written into their program in regards to emergency responders and school systems.

24 Emergency Plan Issues

25 2. Does the Emergency Plan meet the following requirements of ? a. Has the plan been reviewed and updated at intervals not exceeding 15 months but at least once each calendar year? Ref (a) Does the Plan provide for receiving, identifying, and classifying notices of events which require immediate response? Ref (a)(1). Has the Operator established and maintained adequate means of communication with appropriate fire, police, and other public officials? Ref (a)(2).

26 b. Have responsible supervisors been trained and furnished the 13 parts of this part? When was the most current training? Ref (b). c. Has Operator established and maintained liaison with appropriate public officials? Ref (c).

27 Public Awareness Plan Issues

28 Some Programs Operators are using to address the Appropriate Stakeholders APACT (Alabama Pipeline Awareness Cooperative Training Conducted by Alabama 811 and sponsored by local operators) Paradigm CGA (Common Ground Alliance) Other

29 35. Does the Operator's Public Awareness Program meet the requirements of ? a. Has the Operator evaluated the PAP for effectiveness as described in RP1162? b. Did the operator deliver messages to the following stakeholders: 1. Affected Public? 2. Emergency Officials? 3. Local Public Officials? 4. Excavators? 5. Municipalities, Schools Districts, Businesses, and Residents?

30 How important is this to you and your community?

31 Roanoke, Alabama May 2016 Coordinated with first responders and city school board Held emergency drill based on report of natural gas leak Had all students evacuated and accounted for in 8 minutes Prior Planning: Mapping of all gas in area of schools Staging areas for students and staff designated away from gas lines Staging areas for first responders designated to limit traffic and allow access for emergency vehicles

32 For additional information, contact Brent Wilson Roanoke Utilities Board (334) (6)

33 Construction Inspection Issues Gash in pipe about to be covered up

34 Tracer wire wrapped around pipe

35 Dragging pipe on asphalt/rocks

36 Additional Construction Issues Lack of certification for plastic fusion Lack of procedures on job site Lack of qualified inspector on job site Dirty/non functioning tools being used for fusion Not checking temperature with a pyrometer relying on temperature gauge on fusion iron

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations MINIMUM Pipeline Safety Regulations Application for Jurisdictional LPG Operators 1 Pipeline Safety Regulations 49 CFR Part 192 (NOTE:

More information

O&M MANUAL HIGHLIGHTS

O&M MANUAL HIGHLIGHTS O&M MANUAL HIGHLIGHTS GENERAL PROVISIONS Each pipeline must be operated according to this SUBPART 192.603(a) RECORDS 192.603(b) Keep records necessary to administer the procedures of 192.605 RECORDS Life

More information

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

NATURAL GAS MAINTENANCE. Part 192 Subpart M NATURAL GAS MAINTENANCE Part 192 Subpart "M" CONTACT INFORMATION Pamela West Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Main: (405) 686-2310

More information

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014 PIPELINE SAFETY Darin Burk, Manager Pipeline Safety January 28, 2014 Congressional Delegation of Authority Pipeline Safety Act of 1968 Congress Delegated Inspection and Enforcement Authority to the Secretary

More information

BSR GPTC Z TR GM References and Reporting Page 1 of 8

BSR GPTC Z TR GM References and Reporting Page 1 of 8 Page 1 of 8 PRIMARY: 192.605 SECONDARY: 191.23 PURPOSE: Review guide material added by TR 2009-17 to 5.1(e) and consider restructuring the guide material under 192.605 as discussed further below. ORIGIN/RATIONALE

More information

Subpart E. Pressure Testing

Subpart E. Pressure Testing Subpart E Pressure Testing 195.300 Scope This subpart prescribes minimum requirements for pressure testing of steel pipelines. However, this subpart does not apply to movement of pipe covered by 195.424.

More information

Operation & Maintenance Manual

Operation & Maintenance Manual Operation & Maintenance Manual OPERATING AND MAINTENANCE PROCEDURES FOR THE NATURAL GAS SYSTEM OF SEVIER COUNTY UTILITY DISTRICT APPROVED BY: Executive Administrator Executive Administrator Executive Administrator

More information

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if 1 Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) 477-5050, even if there is no apparent damage. Call 911 if gas is blowing

More information

Be our partner in safe, reliable natural gas delivery

Be our partner in safe, reliable natural gas delivery Wide Web at. pipeline operators. The industry has a proven record of safety. Por favor visite para Main, House Main Wide Web at. pipeline operators. The industry has a proven record of safety. Por favor

More information

Part 192 Subparts J & K. Testing & Uprating

Part 192 Subparts J & K. Testing & Uprating Part 192 Subparts J & K Testing & Uprating MAOP, Testing, & Uprating Are All Linked MAOP = Maximum Pressure Allowed By Regulations (192.619 et seq.) MAOP Determined By Operator for Each Pipeline or Segment

More information

Investigation of failures

Investigation of failures 49 CFR 192.617 192.617 Investigation of failures Each operator shall establish procedures for analyzing accidents and failures, including the selection of samples of the failed facility or equipment for

More information

49 CFR 195 Regulatory Overview

49 CFR 195 Regulatory Overview 49 CFR 195 Regulatory Overview Overview DOT PHMSA OPS Relates to public safety, governs materials, design, construction, operations and maintenance Applies to either transmission, distribution or jurisdictional

More information

APPENDIX A GLOSSARY AND ACRONYMS

APPENDIX A GLOSSARY AND ACRONYMS APPENDIX A GLOSSARY AND ACRONYMS GLOSSARY To understand this manual, operators of small natural gas systems need to know the meaning of some commonly used terms. The terms are defined below for the purpose

More information

Covered Task 409OP Training Guide Inspecting Interference Bonds

Covered Task 409OP Training Guide Inspecting Interference Bonds Directions This training guide is to be used by a Subject matter expert (SME) authorized Evaluator/Trainer and Trainee during on-thejob training (OJT) or prior to an evaluation as a resource. (S) Indicates

More information

SAFETY HANDBOOK. Working around. natural gas pipelines. works for your safety. Reprinted with permission from ATCO Gas.

SAFETY HANDBOOK. Working around. natural gas pipelines. works for your safety. Reprinted with permission from ATCO Gas. SAFETY HANDBOOK Working around natural gas pipelines works for your safety Reprinted with permission from ATCO Gas. ENSTAR Natural Gas Company provides natural gas service through 3,580 miles of gas mains

More information

Updates on CA Pipeline Safety Program

Updates on CA Pipeline Safety Program Updates on CA Pipeline Safety Program Kenneth Bruno Program Manager Gas Safety Branch Safety and Enforcement Division California Public Utilities Commission 1 Mission To ensure that intrastate natural

More information

NATURAL GAS DISTRIBUTION SYSTEM MAYOR: ROBERT BOB HARDY OPERATOR: MICHAEL WARREN

NATURAL GAS DISTRIBUTION SYSTEM MAYOR: ROBERT BOB HARDY OPERATOR: MICHAEL WARREN CITY OF WESTLAKE FOR NATURAL GAS DISTRIBUTION SYSTEM MAYOR: ROBERT BOB HARDY OPERATOR: MICHAEL WARREN Prepared by: Pipeline Integrity Partners, LLC January 2019 TABLE OF CONTENTS Emergency Plans (192.615)...

More information

Becker* Products Below Ground Ball Valve Regulators

Becker* Products Below Ground Ball Valve Regulators GE Oil & Gas Becker* Products Below Ground Ball Valve Regulators Reduce Noise Levels at Large Volume Regulator Stations GE s Becker* Below Ground ball valve regulator has the long-term proven reliability,

More information

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS CHAPTER 35 FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS SECTION 3501 GENERAL 3501.1 Scope. The storage and use of flammable gases shall be in accordance with this chapter. Compressed gases shall also

More information

User Information Sheet 015

User Information Sheet 015 User Information Sheet 015 Formerly LPGA Guidance NO.84 March 2007 Inspection and Maintenance of LPG Pipework at Commercial and Industrial Premises 1. Introduction LPG pipework may, under certain conditions,

More information

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel.

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel. SOP FB-009 (Revised MAR 2014) STANDARD OPERATING PROCEDURES-FLOWBACK Control of Trapped Pressure Section 1.0 Introduction and Background Rockwater Energy Solutions, Inc. (and all its affiliated and subsidiary

More information

Practice Test FOR GAS POSITIONS APTITUDE BATTERY

Practice Test FOR GAS POSITIONS APTITUDE BATTERY Practice Test FOR GAS POSITIONS APTITUDE BATTERY INTRODUCTION The purpose of this Practice Test is to help you prepare for the Gas Positions Aptitude Battery placement exercise. A sample of questions based

More information

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS ISSN 1172-3416 NZ GCP 2 : 1993 NEW ZEALAND GAS CODE OF PRACTICE for MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS Issued by the Secretary of Commerce in accordance with the Gas Act 1992 THE GAS ACT

More information

Leticia Santos Hernández Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications

Leticia Santos Hernández Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Leticia Santos Hernández Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Email: leticia.santos@dot.gov Office: 405-686-2310 192.605(b) Gas Reports

More information

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914 Installation, Operating and Maintenance Instructions V914 Cast Iron Flanged Swing Check Valve V914 THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC and CE MARKING The Pressure Equipment Regulations 1999 (SI 1999/2001)

More information

Veriforce TG CCT 609OP. Training Guide

Veriforce TG CCT 609OP. Training Guide Training Guide Directions: This training guide is to be used by a Veriforce Authorized Evaluator/Trainer and Trainee during on-thejob training (OJT) or prior to an evaluation as a resource. (S) Indicates

More information

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC United States Environmental Protection Agency RCRA Programs Branch Region IV Atlanta, GA CAA/RCRA Air Rules 27 November 2000 General Inspection Guidance for Waste Management Units Requiring Air Emission

More information

INTEGRITY MANAGEMENT OF STRESS CORROSION CRACKING IN GAS PIPELINE HIGH CONSEQUENCE AREAS

INTEGRITY MANAGEMENT OF STRESS CORROSION CRACKING IN GAS PIPELINE HIGH CONSEQUENCE AREAS Designator: Meta Bold 24/26 Revision Note: Meta Black 14/16 INTEGRITY MANAGEMENT OF STRESS CORROSION CRACKING IN GAS PIPELINE HIGH CONSEQUENCE AREAS Date of Issuance: October 31, 2008 This report was prepared

More information

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions PREVIOUS REFERENCE NO. IMP02355 0231150/13 IMF0501ENISS2 CMGT S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions 1. Safety information 2. General product information

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. Appendix H Specific Excavation Requirements This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. Surface encumbrances All surface encumbrances

More information

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which January 27, 2012 307a 1. (Refer to Figures 1-3.) A Viking Non-Interlocked Preaction system utilizes a Viking Deluge Valve to control water flow into system piping equipped with closed sprinklers. Under

More information

Fire Apparatus Operator: ARFF

Fire Apparatus Operator: ARFF Fire Apparatus Operator: ARFF Skill Sheet Package Based on NFPA 1002: Standard on Fire Apparatus Driver/ Operator Professional Qualifications, 2017 Edition. Alabama Fire College November 26, 2018 Alabama

More information

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE 1 of 10 1. DESCRIPTION (Refer to Figures 1-3.) Viking supervised Single Interlocked Preaction Systems utilize a Viking Deluge Valve and a pneumatically pressurized automatic sprinkler system. The system

More information

TABLE OF CONTENTS PART 11 - FIREFIGHTING

TABLE OF CONTENTS PART 11 - FIREFIGHTING TABLE OF CONTENTS PART 11 - FIREFIGHTING Page DEFINITIONS...11-1 APPLICATION...11-1 GENERAL REQUIREMENTS...11-2 PERSONAL PROTECTIVE CLOTHING AND EQUIPMENT FOR FIREFIGHTERS...11-2 SELF-CONTAINED BREATHING

More information

EQUIPMENT AND MATERIALS

EQUIPMENT AND MATERIALS SCUD Procedure # EMER004 Page 1 of 5 SCOPE AND PURPOSE This procedure is to provide performing outside leak investigations with the necessary procedures for prompt and effective response and to protect

More information

MANUAL GAS MANIFOLDS

MANUAL GAS MANIFOLDS MANUAL GAS MANIFOLDS Phoenix Pipeline Products Limited. Unit 8, McKenzie Industrial Park, Tel No.: 44 (0) 161 428 7200 Bird Hall Lane, Fax No.: 44 (0) 161 428 7010 Stockport, Email: info@p3-phoenix.com

More information

Fire Apparatus Operator Aircraft Rescue and Fire Fighting

Fire Apparatus Operator Aircraft Rescue and Fire Fighting Fire Apparatus Operator Aircraft Rescue and Fire Fighting Skill Sheet Package Based on NFPA 1002: Standard on Fire Apparatus Driver/ Operator Professional Qualifications, 2014 Edition. Alabama Fire College

More information

Gulf Coast Mineral, LLC. Gas Pipeline Safety Emergency Procedures

Gulf Coast Mineral, LLC. Gas Pipeline Safety Emergency Procedures Updated 2/25/2014 Gulf Coast Mineral, LLC Gas Pipeline Safety Emergency Procedures 2014 Gulf Coast Mineral, LLC 109 E. 14th Ave Gulf Shores, AL 36542 Office. 251-948-9681 Fax. 251-948-9687 Purpose: The

More information

Introduction to Emergency Response & Contingency Planning

Introduction to Emergency Response & Contingency Planning & Contingency Planning Rationale Why is it important for you to learn this material? Designed for those who may witness a release, this is an introductory course designed to help ensure those who are likely

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

Gulfstream Natural Gas System

Gulfstream Natural Gas System Website: www.gulfstreamgas.com Gulfstream has prepared this fact sheet as a guide for emergency response officials who may be asked to respond to an incident involving a Gulfstream natural gas pipeline

More information

Failure Investigation Report. January 10, 2010 Third Party Damage to Terasen Gas Line at Bay Street and Pleasant Street, Victoria, B.C.

Failure Investigation Report. January 10, 2010 Third Party Damage to Terasen Gas Line at Bay Street and Pleasant Street, Victoria, B.C. Failure Investigation Report January 10, 2010 Third Party Damage to Terasen Gas Line at Bay Street and Pleasant Street, Victoria, B.C. September 1, 2011 Table of Contents Incident Summary...4 Investigation

More information

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate December 6, 2010 Foam 21a 1. Description With Multiple Foam/Water Deluge Systems Supplied by a Bladder Tank, multiple deluge foam risers can be supplied from a single foam concentrate source. Where a bladder

More information

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically

More information

NATURAL GAS RESPONSE SOG

NATURAL GAS RESPONSE SOG SCOPE NATURAL GAS RESPONSE SOG This guideline shall apply to all members of the Stoney Point Fire Department and shall be adhered to by all members. PURPOSE The purpose of this guideline is to explain

More information

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) 1. PURPOSE The purpose of this program is to establish policy, rules and procedures for the protection of employees against the unexpected energizing, start-up,

More information

Installation, Operation and Maintenance Instructions for Direct Hot Water Storage Vessels

Installation, Operation and Maintenance Instructions for Direct Hot Water Storage Vessels OM003 Installation, Operation and Maintenance Instructions for Direct Hot Water Storage Vessels The operating and maintenance instructions contained within this package are for standard storage vessels

More information

ONSHORE GAS GATHERING FAQS

ONSHORE GAS GATHERING FAQS ONSHORE GAS GATHERING FAQS These Frequently Asked Questions (FAQs) are intended to clarify, explain, and promote better understanding of the gas gathering line rules. These FAQs are not substantive rules

More information

User Information Sheet 013

User Information Sheet 013 User Information Sheet 013 Formerly LPGA Technical Memorandum NO.81 Issue 2 September 2007 ACME threaded couplings 1 INTRODUCTION ACME threaded couplings/end fittings are widely used for LPG transfer operations

More information

INSTRUCTIONS FOR FORM RSPA F (1-2001) ACCIDENT REPORT - HAZARDOUS LIQUID PIPE SYSTEMS GENERAL INSTRUCTIONS

INSTRUCTIONS FOR FORM RSPA F (1-2001) ACCIDENT REPORT - HAZARDOUS LIQUID PIPE SYSTEMS GENERAL INSTRUCTIONS INSTRUCTIONS FOR FORM RSPA F 7000-1 (1-2001) ACCIDENT REPORT - HAZARDOUS LIQUID PIPE SYSTEMS GENERAL INSTRUCTIONS Each hazardous liquid pipeline operator shall file Form RSPA F 7000-1 for an accident that

More information

OBSOLETE. Wet pipe low flow manifold system

OBSOLETE. Wet pipe low flow manifold system June 1, 2008 Foam 15a 1. Description Multiple risers can be supplied from a single proportioning device. A riser manifold is installed with various riser types and sizes that are to supply foam solution

More information

2017 LGA SMALL OPERATOR SEMINAR MAOP VERIFICATION. Steven Giambrone Director of Pipeline Safety

2017 LGA SMALL OPERATOR SEMINAR MAOP VERIFICATION. Steven Giambrone Director of Pipeline Safety 2017 LGA SMALL OPERATOR SEMINAR MAOP VERIFICATION Steven Giambrone Director of Pipeline Safety 1 1998 WHITE PAPER Written by Lane Miller (PHMSA TQ) and Don Stursma (Iowa Utilities Board) For onshore pipelines,

More information

Responding to Natural Gas Pipeline Emergencies

Responding to Natural Gas Pipeline Emergencies Responding to Natural Gas Pipeline Emergencies Who is Florida Gas Transmission? Florida Gas Transmission operates nearly 5,000-miles of interstate natural gas transmission pipelines, a system that extends

More information

GAS VALVE PRESENTATION AND APPROVAL OF $30,000 FOR MANUAL GAS VALVE UPGRADES

GAS VALVE PRESENTATION AND APPROVAL OF $30,000 FOR MANUAL GAS VALVE UPGRADES STAFF REPORT DATE: October 20, 2015 TO: FROM: SUBJECT: City Council Cathy Capriola, Assistant City Manager Veronica Nebb, Sr. Assistant City Attorney 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX

More information

VS18/26 with PROFINET and EtherNet/IP Interface. ATEX Installation Instructions

VS18/26 with PROFINET and EtherNet/IP Interface. ATEX Installation Instructions VS18/26 with PROFINET and EtherNet/IP Interface ATEX Installation Instructions INDEX 1. INTENDED USAGE 3 2. OPERATING MANUAL ATEX 4 2.1 General conditions 4 2.2 Installation 5 2.3 Operating 5 2.4 Failures

More information

Life Extension of Mobile Offshore Units

Life Extension of Mobile Offshore Units Life Extension of Mobile Offshore Units Operation of classified aging units Sigmund Røine DNV Mobile Offshore Units in Operation Presentation content MOU integrity during operation Survey Principles for

More information

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks 1. Scope This document describes procedures for determining or confirming the fill condition of

More information

Idaho Fire Service Technology Fire Fighter II

Idaho Fire Service Technology Fire Fighter II ICS Skill Requirements Skill Sheet: 1 STANDARD: 6.1.2 TASK: Organize, coordinate, and function within an incident management system. PERFORMANCE OUTCOME: The candidate shall be able to determine the need

More information

Lockout Tagout Policy

Lockout Tagout Policy Office of Environmental Health & Safety www.moreheadstate.edu/ehs 606-783-2584 Lockout Tagout Policy PURPOSE To establish procedures for the de-energization and isolation of energy sources or the lockout

More information

BUTTERFLY VALVES Series 800

BUTTERFLY VALVES Series 800 BUTTERFLY VALVES Series 800 WARNING Before proceeding read ALL instructions and become familiar with the equipment and associated drawings. Follow ALL applicable safety regulations and codes for pressurized

More information

The purpose of this policy is to provide operational guidelines for San Diego County Fire Departments (FD) responses to natural gas incidents.

The purpose of this policy is to provide operational guidelines for San Diego County Fire Departments (FD) responses to natural gas incidents. Purpose: The purpose of this policy is to provide operational guidelines for San Diego County Fire Departments (FD) responses to natural gas incidents. Policy: This policy shall apply to all FD personnel

More information

Understanding health and safety in gas utilisation

Understanding health and safety in gas utilisation Level: 3 Credit value: 11 URN: M/502/8461 Unit aim This unit aims to provide learners with the knowledge and understanding of the general health and safety requirements for working in the gas industry.

More information

Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel

Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel OM006 Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel The operating and maintenance instructions contained within this package are for standard mild steel buffer vessels

More information

Subpart L NOTES: NOTES:

Subpart L NOTES: NOTES: Odorization of Gas Subpart L Wayne St. Germain Pipeline Safety Specialist Phone (405) 954 7219 Live Person (405) 954 8575 Direct Line Fax (405) 954 0206 Email wayne.stgermain@dot.gov Odorization of Gas

More information

Guidance Manual for Operators of Small Natural Gas Systems January 2017

Guidance Manual for Operators of Small Natural Gas Systems January 2017 Guidance Manual for Operators of Small Natural Gas Systems January 2017 US Department of Transportation Pipeline and Hazardous Materials Safety Administration Office of Pipeline Safety TO THE READER The

More information

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL Company Registered Office: Crown House, Stockport, Cheshire, SK13RB No. 850 0700 67 Registered in England and Wales No. 05058855

More information

Regulations Respecting Compressed Gas Pressure Vessels

Regulations Respecting Compressed Gas Pressure Vessels COMPRESSED GAS PRESSURE VESSELS SR 99/70 1 Regulations Respecting Compressed Gas Pressure Vessels Repealed by Chapter B-5.1 Reg 1 (effective January 1, 2007) Formerly Saskatchewan Regulations 99/70 (effective

More information

Ground Fault Circuit Interrupter(GFCI) Policy

Ground Fault Circuit Interrupter(GFCI) Policy NewStar Netronics, LLC American Products for the World Ground Fault Circuit Interrupter(GFCI) Policy 3926 East 3 rd Street Tulsa, OK 74112 Phone (918)894-5006 Fax (918)836-9909 tech@newstarnetronics.com

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Preaction 346a 1. Description The 6 Model G-6000P Electric Release Preaction System Riser Assembly can be used as a Single Interlock Preaction System with Electric Release, or as a Double Interlock Preaction

More information

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY Page 1 of 9 ISSUED: 5/00 REVISED: 08/06 Introduction Purpose: In accordance with applicable regulations and Temple University, this policy was developed to minimize exposure to Ethylene Oxide. Applicability

More information

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate December 6, 2010 Foam 31a 1. Description With Multiple Pilot Pressure Regulating Foam/Water Deluge Systems Supplied by a Bladder Tank, multiple pilot pressure regulating foam risers can be supplied from

More information

TECHNICAL DATA. Dry 132a. October 1, 2008

TECHNICAL DATA. Dry 132a. October 1, 2008 October 1, 2008 Dry 132a 1. Description Viking High Pressure (HP) Dry Systems utilize a Viking Model E or Model F Deluge Valve to control the water supply to system piping equipped with closed sprinklers.

More information

Compressed Gas Cylinders - Guideline

Compressed Gas Cylinders - Guideline Environmental Health and Safety Compressed Gas Cylinders - Guideline Date of Issuance: 1/10/18 Revision Number: Initial Revision Date: Prepared by: EH&S 1. Purpose Carnegie Mellon University has developed

More information

Two phases have been established for the classification of incidents to help in determining the appropriate course of action;

Two phases have been established for the classification of incidents to help in determining the appropriate course of action; 1.0 CLASSIFICATION OF AN EMERGENCY SITUATION Two phases have been established for the classification of incidents to help in determining the appropriate course of action; Alert phase, and Emergency phase.

More information

4-W GAS ODORIZER WITH POSITIVE ACTION INDICATOR GAUGE (300 PSIG) 2014 INFORMATION MANUAL SUBMITTED BY:

4-W GAS ODORIZER WITH POSITIVE ACTION INDICATOR GAUGE (300 PSIG) 2014 INFORMATION MANUAL SUBMITTED BY: 4-W GAS ODORIZER WITH POSITIVE ACTION INDICATOR GAUGE (300 PSIG) 2014 INFORMATION MANUAL SUBMITTED BY: #3, 1470 28 Street NE Calgary, Alberta Canada, T2A 7W6 Phone: (403) 569-8566 Fax: (403) 207-5110 Submitted

More information

Oil & Gas Hazard Alerts: Past, Present and Future. J.D. Danni Safety and Occupational Health Specialist (Oil & Gas) OSHA - Region VIII

Oil & Gas Hazard Alerts: Past, Present and Future. J.D. Danni Safety and Occupational Health Specialist (Oil & Gas) OSHA - Region VIII Oil & Gas Hazard Alerts: Past, Present and Future J.D. Danni Safety and Occupational Health Specialist (Oil & Gas) OSHA - Region VIII Overview Hazard Alerts History Current Alerts Future Alerts Getting

More information

PURPOSE OF THE POLICY

PURPOSE OF THE POLICY Title: Safe Storage, Handling, Use and Disposal Procedures of Compressed Gas Cylinders Effective Date: November 2005 Revision Date: March 1, 2017 Issuing Authority: Responsible Officer: VP, Capital Projects

More information

1.0 Scope and Application. 2.0 Definitions. Cal Poly Risk Management Confined Space Program Page 1

1.0 Scope and Application. 2.0 Definitions. Cal Poly Risk Management Confined Space Program Page 1 Page 1 1.0 Scope and Application The following procedures describe safe operating practices in confined spaces. These may be sewers, pipelines, tanks, boiler compartments, ducts, vaults, pits, vats, bins

More information

WHEATLEY Series 822/820 Swing Check Valve

WHEATLEY Series 822/820 Swing Check Valve Document Number: TC003001-12 Revision: 02 WHEATLEY Series 822/820 Swing Check Valve Installation, Operation, and Maintenance Manual TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...4 INSTALLATION AND OPERATION

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

CONTACT INFORMATION. Wayne St. Germain Transportation Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications

CONTACT INFORMATION. Wayne St. Germain Transportation Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications ODORIZATION ISSUES CONTACT INFORMATION Wayne St. Germain Transportation Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Email: wayne.stgermain@dot.gov GAS REPORTS

More information

BCGA GUIDANCE NOTE 17

BCGA GUIDANCE NOTE 17 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF

More information

We re good at what we do! Anywhere, TX SITE

We re good at what we do! Anywhere, TX SITE 2224 East 39 th Street North Sioux Falls, SD 57104 (800).653.3392 605.332-7833 fax We re good at what we do! SURFACE ANCHOR INSPECTION FOR ABC COMMUNICATION S Anywhere, TX SITE This is an actual inspection

More information

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 5 Utilities Gas Emergencies Revised

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 5 Utilities Gas Emergencies Revised Truck Module Page 1 of 5 GAS EMERGENCIES Introduction Natural gas and Liquid Propane Gas (LPG) are flammable gases. Many households and commercial buildings utilize these gases for everything from heating

More information

TABLE OF CONTENTS Case Studies for Group Discussion... 2 End of Module Quizzes: Answer Key... 6 Pre-Certification Exam: Answer Key...

TABLE OF CONTENTS Case Studies for Group Discussion... 2 End of Module Quizzes: Answer Key... 6 Pre-Certification Exam: Answer Key... Bobtail Delivery Operations Instructor Guide TABLE OF CONTENTS Case Studies for Group Discussion... 2 End of Module Quizzes: Answer Key... 6 Pre-Certification Exam: Answer Key... 7 Case Studies for Group

More information

Excavation safety around natural gas

Excavation safety around natural gas Excavation safety around natural gas Table of contents You could damage much more than a gas line 3 Your responsibilities 4 Guidelines for locating and hand digging 4 Safety laws and regulations 6 Line

More information

Swimming Pools only* b) rescue procedures

Swimming Pools only* b) rescue procedures E7. Aquatic Emergencies for the Site and ANY body of water campers are transported to (Pool, Stream, River, Lake, Ocean). Provide a brief overview of your aquatic emergency response plan for: a) each body

More information

National Transportation Safety Board Washington, DC 20594

National Transportation Safety Board Washington, DC 20594 Accident/Incident Number: Operator: Accident: Location: National Transportation Safety Board Washington, DC 20594 Safety Recommendation Report Installation of PermaLock Mechanical Tapping Tee Assemblies

More information

Standard Pneumatic Test Procedure Requirements for Piping Systems

Standard Pneumatic Test Procedure Requirements for Piping Systems the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 1 Issued 2016-10-24 Table of Contents FOREWORD... 1 1.0 INTRODUCTION...

More information

Total s Golden rules

Total s Golden rules Total s Golden rules Golden rule No. 9: Excavation works Excavation works The many risks we regularly face in our activities include those related to excavation works. It s wrong to think that only people

More information

SABERINDO PACIF SABERINDO PACIFIC CIFIC SABERINDO PA. A Tyco International Company

SABERINDO PACIF SABERINDO PACIFIC CIFIC SABERINDO PA. A Tyco International Company CIF A Tyco International Company 1 Foam Concentrate CIF 3% AFFF -UL Listed -UL Canada Listed 6% AFFF 6 parts AFFF concentrate to 94 parts water -UL Listed- Foam Liquid -UL Canada Listed 3% FLUOROPROTEIN

More information

BP OIL -- TOLEDO REFINERY

BP OIL -- TOLEDO REFINERY BP OIL -- TOLEDO REFINERY Toledo Refinery Procedure No.: SAF 054 Effective Date: June 29, 2017 Ground Disturbance Rev. No.: 11 Revised By: Mario Rizo Auth. By: Chris Conley (Signature of file) Page 1 of

More information

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection February 9, 1998 Foam 201a 1. DESCRIPTION A Deluge Bladder Tank Foam/Water System is a standard deluge system capable of discharging a foam/water solution automatically through open sprinklers, spray nozzles,

More information

Lockout / Tag out Program

Lockout / Tag out Program Lockout / Tag out Program Presented by DOSHTI www.doshti.com You will learn Purpose of Lockout- Tag out Requirements for LOTO Types of Hazardous Energy Procedures for LOTO The OSHA Standard for the Control

More information

Compressed Gases and Cryogens

Compressed Gases and Cryogens Compressed Gases and Cryogens University of Tennessee Safety Guide HM-011 Document Contact: EHS Date effective: January 1, 2009 Revision Date: October 1, 2015 Purpose This guideline adheres to the Occupational

More information

Excavation safety around natural gas

Excavation safety around natural gas Excavation safety around natural gas Table of contents You could damage much more than a gas line 3 Your responsibilities 4 Guidelines for locating and hand digging 4 Safety laws and regulations 6 Line

More information

Covered Task 614OP Training Guide Purging Pipeline Facilities with Air or Inert Gas

Covered Task 614OP Training Guide Purging Pipeline Facilities with Air or Inert Gas Directions This training guide is to be used by a Subject matter expert (SME) authorized Evaluator/Trainer and Trainee during on-thejob training (OJT) or prior to an evaluation as a resource. (S) Indicates

More information

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13 Page 1 of 13 1. Description The Viking 2 Model G-2000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler