1 Extensive Damage Mitigation Guidelines (EDMG) Roy Harter RLH Global Services Regional Workshop on Sharing Best Practices in Development and Implementation of Severe Accident Management Guidelines October 3-7, 2016

2 Terrorist Attacks Impact of attack on a Nuclear Plant?? 2

3 NRC Measures Following 9-11 NRC Order EA , Section B.5.b February 25, 2002: Develop specific guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities Using existing or readily available resources (equipment and personnel) Implemented under the circumstances associated with loss of large areas of the plant due to explosions or fire. 3

4 NRC Order EA Phase 1 - Operational enhancements: Response to large area fires Long-term availability of makeup sources, electrical power, pneumatics Fission product scrubbing Maintaining Ultimate Heat Sink Phase 2 - Spent Fuel Pool Evaluation Phase 3 - Reactor & Containment Evaluation 4

5 B5b Phase 2 SFP Evaluations NEI 05-09, Industry Spent Fuel Pool Mitigation Strategy Study Guideline Framework to identify strategies that will mitigate the postulated effects of large fires and explosions caused by external threats to the spent fuel pool Goal is to maximize the capability provided by existing systems and identify mitigation strategies or measures using existing or readily available resources to maintain spent fuel pool cooling 5

6 6 B5b Phase 2 SFP Evaluations SFP Scenario 1: Any accessible SFP walls, penetrations, or piping that could lead to drainage below the top of the spent fuel assumed to be structurally damaged with liner failure resulting in a breach. Leakage rate from the pool is to be assumed to be 500 gpm. Mitigation should address makeup capabilities in excess of 500 gpm, accessibility for deployment of mitigation measures, and means to reduce leakage rate (e.g., plug hole). SFP Scenario 2 Accessible SFP wall is assumed to have been breached such that water level cannot be restored and the pool will be drained. Mitigation measures to be considered focus on delaying fuel damage, providing external sprays and other actions that could be taken to delay and / or reduce release of fission products.

7 7 B5b Phase 2 SFP Evaluation Process

8 8 B5b Phase 2 SFP Evaluation Process

9 9 B5b Phase 2 SFP Evaluation Process

10 10 B5b Phase 2 SFP Evaluation Process

11 11 B5b Phase 3 Evaluations Consider spectrum of enhancements to: Prevent core damage; Delay core damage; Prevent containment failure; Delay containment failure; and, Mitigate releases from Containment Identify high confidence mitigation capabilities for each safety function, either using existing plant capability or via enhancements to plant capabilities Brainstorming (Operations, Engineering, EP, SMEs, NRC) Is there is an alternate means to accomplish this function/attribute? Would this strategy be effective in a lesser damage state that may be more likely? Is there a more reliable means? Is there a more cost effective means? Is there a more effective means to envelope the necessary capabilities, even if it cost more?

12 B5b Phase 3 Key Safety Functions PWRs RCS Inventory Control RCS Heat Removal Containment Integrity Control Containment Isolation Control Release Mitigation BWRs RPV Level Control Containment Integrity Control Containment Bypass Prevention Release Mitigation 12

13 B5b Phase 3 Evaluation of Safety Function Mitigation Capability Select Safety Function Identify Primary Means & Locations Identify Alternate Means & Locations Determine Spatial Orientation vs. Primary Means In Non-Adjacent Building? Yes Next Safety Function Stage 1 Map Key Safety Functions Next Alternative No In Adjacent Building? Yes No Identify Candidate EDMG Strategies Stage 3 Identify Plantspecific Enhancements Stage 2 Evaluate Spatial Dependencies Opposite Side & Different Elevation? No Yes Yes Identify Additional Candidate Strategies No At Least One High Confidence Alternative? Assess Confidence Yes Additional Alternatives? No Yes Same Bldg., Same Side or Elev. Additional Possible RAM? No Not Spatially Separated Spatially Separated 13

14 B5b Phase 3 Approach to Evaluating Safety Function Mitigation Capability Reactor Building Mapping Scheme STAIRS TO N.W. CORNER ROOM RB757-NW S.D. Panel (above) Access Control AIR LOCK 9168 RB757-NE STAIR TO N.E. CORNER ROOM 9170 CRD REPAIR ROOM Rx Bldg Exh Vent Turbine Building Airlock N NW SW NW SW NE SE NE SE 5 = RB Fifth Floor (855') Reactor Building 5 = Fifth Floor (855') 4 = Fourth Floor (833') 3 = Third Floor (812') 2 = Second Floor (786') 1 = First Floor (757') -1 = Torus Room, Corner Rooms, HPCI, RCIC (716') RHR VALVE ROOM NW SW NE SE 4 = RB Fourth Floor (833') STEAM TUNNEL DRYWELL 9176 TIP ROOM NW SW NE SE 3 = RB Third Floor (812') 9167 R.R. Airlock AIRLOCK ELEV. STAIRS TO S.W. CORNER ROOM RB757-SW 9169 HATCH RB757-SE STAIRS TO HPCI, RCIC AND S.E. CORNER ROOM Turbine Building Airlock NW SW NW SW NW SW NE SE NE SE NE SE 2 = RB Second Floor (786') 1 = RB First Floor (757') -1 = RB Torus Room (716') RCIC Room = SW HPCI Room = SE 14

15 Extensive Damage B5b Phase 3 introduced the term Extensive Damage Used to denote the potential for spatial impacts that are quite broad Not tied to any specific threat May not only affect equipment, but may affect the ability of plant operators to monitor plant conditions and gain access to equipment in portions of the plant In addition, due to the nature of some beyond design basis threats, it possible to envision combinations of failures which might be considered of negligible probability in traditional severe accident analysis 15

16 Extensive Damage Mitigation Guidelines Purpose is to pre-think the kinds of responses that may be appropriate Two types of EDMGs Initial response (prior to establishing TSC) Longer-term response (ERO procedures after TSC staffed) Focus of initial response is stabilization of the plant until additional resources are available Longer-term actions part of a toolkit for TSC Different than SAMGs in baseline assumptions about extent of physical damage and potential availability of power and instrumentation However, in some cases, SAMG strategies may be applicable with minor adaptation 16

17 B5b Phase 2 and 3 Closure NEI 06-12, B.5.b Phase 2 & 3 Submittal Guideline describes approach to addressing the mitigating strategies committed in the industry proposal for closing Phase 2 and Phase 3 of Section B.5.b of the 2002 ICM Four components were identified for implementation at all US plants to address B.5.b Phases 2 and 3: 1. Internal SFP Makeup Strategy 2. External SFP Makeup & Spray Strategy 3. Enhanced Response Strategies for Reactor Challenges (Reactor & Containment Challenges) 4. Enhanced Initial Command and Control for Reactor Challenges All US plants implemented B5b closure actions in

18 18 Internal SFP Makeup Strategy Objective: Establish a diverse means of SFP makeup with at least a concurrent makeup capability of 500 gpm beyond the normal SFP makeup capability. Performance Attributes: Concurrent SFP makeup capability of 500 gpm is the total flow rate of water that can be simultaneously supplied to the pool beyond the normal SFP makeup capability. Can be accomplished with multiple systems beyond the normal makeup system, but all must be diverse from the normal makeup system. Engineering basis that provides reasonable assurance that the intended makeup rate and capacities can be provided. Diverse means that the makeup source does not rely upon any of the same components or piping as the normal makeup source. This includes power supplies that are located in the same building as the SFP. Example of diverse makeup source is the fire water system headers in the vicinity of the spent fuel pool with a sufficient number of fire hoses as a means to provide SFP makeup.

19 Internal SFP Makeup Strategy Require 500 gpm internal makeup from diverse (independent) sources ESW Hose Well Water via ESW Hose Fire Hoses on RB 855, 833, 812, 786, and 757 Levels Condensate SW Hoses Demin Water Hoses Spool Piece RHR RHRSW ESW Fire Water Cond SW Well Water GSW Fuel Pool Gate Shield Blocks Condensate & Feedwater RHR Core Spray CRD RHRSW ESW Fire Water Condensate SW Well Water GSW SBLC Reactor Well Spent Fuel Pool Normal SFP Makeup Source Fuel Pool Cask Storage Alternate SFP Makeup Source Skimmer Surge Tanks Condensate Service Water To RHR Fuel Pool Cooling System Additional SFP Makeup Sources During Outages with Reactor Cavity Flooded 19

20 External SFP Makeup Strategy Objective: Establish a flexible means of SFP makeup of at least 500 gpm using a portable, power-independent pumping capability Performance Attributes: Portable pumping capability sufficient to supply pool makeup directly at a rate of at least 500 gpm for each SFP Can use on-site fire truck or external portable diesel driven pump External fire protection system ring header is an acceptable water source to supply the pump, provided damage to the header and distribution piping in the vicinity of the SFP structure can be isolated Sufficient fuel for the pumping source to operate for 12 hours Sufficient water sources are available to operate the system for at least 12 hours at the flow rate anticipated to be provided Deployed within 2 hours from the time plant personnel diagnose that external SFP makeup is required 20

21 Internal SFP Makeup Strategy Fire Hose Restraint Mounted on SFP Curb 21

22 External SFP Spray Strategy Objective: Establish a flexible means of providing at least 200 gpm per unit of spray to the spent fuel pool using a portable, powerindependent pumping capability Performance Attributes: Portable pumping capability sufficient to supply one or more monitor nozzles located to spray the SFP at a flow rate of at least 200 gpm per unit Can use on-site fire truck or external portable diesel driven pump Sufficient fuel for the pumping source to operate for 12 hours Sufficient water sources are available to operate the system for at least 12 hours Deployed within 2 hours from the time plant personnel diagnose that external SFP makeup is required or 5 hours if fuel is dispersed Sufficient portable spray monitor nozzles and associated hoses to provide a spray over the entire spent fuel pool (assuming freshly discharged fuel has been distributed), best accomplished with oscillating monitor nozzle(s) 22

23 External SFP Spray Strategy Performance Attributes: Spray flows to the SFP should be maximized in the event the damage occurs prior to the recently discharged fuel being distributed External strategy must include steps to assist the plant staff in determining whether use of the external strategy in makeup mode or spray mode Can use monitor nozzles on the spent fuel pool floor to spray into the pool for situations where the pool leakage rates and plant conditions permit Capability to lift/locate the monitor nozzle such that the spray can be externally directed into the spent fuel pool (e.g., from an adjacent building roof, fire truck extension ladder). The lifting capability (e.g., crane or fire truck with extension ladder) may be located off-site as long as the site has confidence (e.g., through an MOU) that it will be available for use on-site within the required timeframe (2 hours or 5 hours). 23

24 24 External SFP Makeup Strategy

25 SFP Makeup / Spray Strategy Indication of SFP damage resulting in a large leak 1 SFP area accessible 2? Yes SFP leakage Yes Local spray Yes excessive 3? possible? No No No Makeup using available injection systems that do not require SFP access (Refer to Emergency Management Guideline) If building damage permits external spray via Aerial Ladder Truck then perform PDFP External Spray Strategy (Attachment 3) If a refuel outage is in progress then maximize spray flow Makeup using available injection systems (Refer to Emergency Management Guideline) Makeup using PDFP External Makeup Strategy (Attachment 1) SFP level still dropping? Yes If building damage permits external spray via Aerial Ladder Truck then perform PDFP External Spray Strategy (Attachment 3) If a refuel outage is in progress then maximize spray flow Deploy PDFP Local Spray Strategy (Attachment 2) If a refuel outage is in progress then maximize spray flow Notes: No Refer to Leakage Control Strategies (Attachment 4) 1. A large leak is one that exceeds available normal makeup or in which the effectiveness of normal makeup cannot be determined. 2. Accessibility can be affected by damage conditions and local dose rates. Implement strategies to contain sprays/runoff (Attachment 5) 3. Excessive leakage is a SFP leak rate estimated to be greater than 500 gpm or high dose rates indicate excessive loss of inventory. 25

26 Reactor and Containment Strategies BWR Mitigation Strategies Manual Operation of RCIC or Isolation Condenser DC Power Supplies to Allow Depressurization of RPV & Injection with Portable Pump Utilize Feedwater and Condensate Makeup to Hotwell Makeup to CST Maximize CRD Procedure to Isolate RWCU Manually Open Containment Vent Lines Inject Water into the Drywell Portable Sprays PWR Mitigation Strategies Makeup to RWST Manually Depressurize Steam Generators to Reduce Inventory Loss Manual Operation of Turbine (or Diesel)-Driven AFW Pump Manually Depressurize Steam Generators and Use Portable Pump Makeup to CST Containment Flooding with Portable Pump Portable Sprays 26

27 27 Sample EDMG Procedure

28 Command & Control Enhancements Initial Response EDMG 28 Not a new type of EOP/SAMG Intended to be used when the normal command and control structure is disabled and use of EOPs/SAMGs is not feasible Provide a bridge between normal operational command and control and the command and control that is provided by the emergency response organization Development of Initial Response EDMG: Assessment of on-site and off-site communication in light of potential damage to normal methods available to the ERO Identify methods for notifications of the utility ERO/ERO activation to mobilize additional resources to the site in a timely manner Actions needed to stabilize the situation or delay event degradation, including key mitigation strategies to help manage critical safety functions in the near term Initial damage assessment to provide the ERO with information on plant damage conditions and status

29 Command & Control Enhancements What if Control Room Command Structure is lost? 29

30 Command & Control Enhancements Initial Response EDMG Flowchart On Shift Staff Muster & Establish C&C Initial Response EDMG (3.2) & Initial Security Response 1. Notify Utility ERO 3. Notify LLEA 2. Initial Operational Actions 4. Notify Fire Dept Long-term Emergency Response 3.3/3.4 ERO Arrives at Site Specific Location and Assumes Command & Control Event Mitigation Strategies* ED Classifies and Notifies ORO and NRC Secure Site 5. Initial Damage Assessment LLEA and FD Arrive at Incident Command Post Event Mitigation * Location of strategies TBD 30

31 Closing Thoughts 31 Operations engagement and ownership is critical Technical evaluations and formal calculations must be performed to validate capabilities Verification and Validation must be performed of procedures to ensure that guidance can be followed and time limits can be met Formal training classroom, field demonstrations, and testing Equipment must be staged, strictly controlled, and periodically inspected and tested The resources of the entire Emergency Response Organization are utilized to support implementation (on-site and/or offsite) Addresses the possible short-term loss of command & control Enhanced the understanding of the challenges facing a plant under beyond design bases scenarios While there is no assurance of success under all conditions, the accident mitigation strategies provide significant enhancement beyond a plant s current capabilities more options for response

ACCIDENT MANAGEMENT AND EPR AT DUKOVANY NPP

ACCIDENT MANAGEMENT AND EPR AT DUKOVANY NPP ACCIDENT MANAGEMENT AND EPR AT DUKOVANY NPP 27-29 September 2017 Vienna IAEA Miroslav Trnka OVERVIEW General EOPs and SAMGs (changes) DAM (FLEX) EDMG Equipment (new + ongoing projects) Staff (drills and

More information

TEPCO s Safety Assurance Philosophy on Nuclear Power Generation Plants

TEPCO s Safety Assurance Philosophy on Nuclear Power Generation Plants TEPCO s Safety Assurance Philosophy on Nuclear Power Generation Plants January 25, 2013 Tokyo Electric Power Company, Inc. This English translation has been prepared with the intention of creating an accurate

More information

Integrated Coping Strategies for Beyond-Design-Basis External Events

Integrated Coping Strategies for Beyond-Design-Basis External Events IAEA IEM on SAM in the Light of the Fukushima Daiichi NPP, 17-20 March 2014, Vienna, Austria Integrated Coping Strategies for Beyond-Design-Basis External Events Jaewhan Kim and Kwang-Il Ahn KAERI Contents

More information

-. 30ýv. Entergy ARKANSAS NUCLEAR ONE - UNIT I IMPROVED TECHNICAL SPECIFICATIONS SUBMITTAL. 05/01101 Supplement Volume 2 of 2. (Sections 3.7 and 3.

-. 30ýv. Entergy ARKANSAS NUCLEAR ONE - UNIT I IMPROVED TECHNICAL SPECIFICATIONS SUBMITTAL. 05/01101 Supplement Volume 2 of 2. (Sections 3.7 and 3. ARKANSAS NUCLEAR ONE - UNIT I IMPROVED TECHNICAL SPECIFICATIONS SUBMITTAL -. 30ýv May 1, 2001 05/01101 Supplement Volume 2 of 2 (Sections 3.7 and 3.8) Entergy MSSVs 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Main Steam

More information

Accident Management Strategies for Mark I and Mark III BWRs

Accident Management Strategies for Mark I and Mark III BWRs Accident Management Strategies for Mark I and Mark III BWRs E. L. Fuller Office of Nuclear Regulatory Research United States Nuclear Regulatory Commission IAEA Workshop Vienna, Austria July 17-21, 2017

More information

The Nitrogen Threat. The simple answer to a serious problem. 1. Why nitrogen is a risky threat to our reactors? 2. Current strategies to deal with it.

The Nitrogen Threat. The simple answer to a serious problem. 1. Why nitrogen is a risky threat to our reactors? 2. Current strategies to deal with it. International Conference on Topical Issues in Nuclear Installation Safety: Safety Demonstration of Advanced Water Cooled Nuclear Power Plants. The simple answer to a serious problem Vienna. 6 9 June 2017

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC)

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC) PAGE : 1 / 11 1. PASSIVE SINGLE FAILURE ANALYSIS The aim of the accident analysis in Chapter P is to demonstrate that the safety objectives have been fully achieved, despite the most adverse single failure.

More information

IEM on Severe Accident Management in the light of the accident at the Fukushima Daïchi NPP

IEM on Severe Accident Management in the light of the accident at the Fukushima Daïchi NPP IEM on Severe Accident Management in the light of the accident at the Fukushima Daïchi NPP Progress, challenges and perspectives in the field of design features, as regards SAMG IAEA, March 2014 Introduction

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER F: CONTAINMENT AND SAFEGUARD SYSTEMS 7. CONTAINMENT HEAT REMOVAL SYSTEM (EVU [CHRS])

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER F: CONTAINMENT AND SAFEGUARD SYSTEMS 7. CONTAINMENT HEAT REMOVAL SYSTEM (EVU [CHRS]) PAGE : 1 / 16 7. CONTAINMENT HEAT REMOVAL SYSTEM (EVU [CHRS]) 7.0. SAFETY REQUIREMENTS 7.0.1. Safety functions The main functions of the EVU system [CHRS] are to limit the pressure inside the containment

More information

REGULATORY OBSERVATION

REGULATORY OBSERVATION RO unique no.: REGULATORY OBSERVATION REGULATOR TO COMPLETE RO-ABWR-0046 Date sent: 20 th April 2015 Acknowledgement required by: 08 th May 2015 Agreement of Resolution Plan required by: 14 th May 2015

More information

IAEA SAFETY STANDARDS for protecting people and the environment

IAEA SAFETY STANDARDS for protecting people and the environment IAEA SAFETY STANDARDS for protecting people and the environment DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS DRAFT SAFETY GUIDE DS 482 STATUS: STEP 11 Submission to Review

More information

IAEA SAFETY STANDARDS for protecting people and the environment

IAEA SAFETY STANDARDS for protecting people and the environment Date: 2016-08-31 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: STEP 8a For Submission to Member States DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS

More information

AP1000 European 19. Probabilistic Risk Assessment Design Control Document

AP1000 European 19. Probabilistic Risk Assessment Design Control Document APPENDIX 19E SHUTDOWN EVALUATION 19E.1 Introduction Westinghouse has considered shutdown operations in the design of the A1000 nuclear power plant. The AP1000 defense-in-depth design philosophy to provide

More information

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES NB16 0603 NR Task Group 1 9 16 1. One update by NR task group page 3: 7/17/19 2. Two updates to S6.1 and S6.3 on page 1: 7/19/17 SUPPLEMENT 6 PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES

More information

Custom-Engineered Solutions for the Nuclear Power Industry from SOR

Custom-Engineered Solutions for the Nuclear Power Industry from SOR Custom-Engineered Solutions for the Nuclear Power Industry from SOR As the world s aging nuclear power plants continue to be challenged with maintenance and Instrumentation Solutions for the Nuclear Power

More information

ASVAD THE SIMPLE ANSWER TO A SERIOUS PROBLEM. Automatic Safety Valve for Accumulator Depressurization. (p.p.)

ASVAD THE SIMPLE ANSWER TO A SERIOUS PROBLEM. Automatic Safety Valve for Accumulator Depressurization. (p.p.) ASVAD Automatic Safety Valve for Accumulator Depressurization (p.p.) THE SIMPLE ANSWER TO A SERIOUS PROBLEM International Experts Meeting on Strengthening Research and Development Effectiveness in the

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge]

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge] PAGE : 1 / 9 5. CONTAINMENT PURGE (EBA [CSVS]) The Reactor Building purge system comprises the following: A high-capacity EBA system [CSVS] [main purge] A low-capacity EBA system [CSVS] [mini-purge] 5.1.

More information

Regulatory requirements with respect to Spent Fuel Pool Cooling

Regulatory requirements with respect to Spent Fuel Pool Cooling Regulatory requirements with respect to Spent Fuel Pool Cooling Dr. Christoph Pistner Annual Meeting on Nuclear Technology Hamburg, 12.05.2016 Important Documents Safety Requirements for Nuclear Power

More information

BSR GPTC Z TR GM References and Reporting Page 1 of 8

BSR GPTC Z TR GM References and Reporting Page 1 of 8 Page 1 of 8 PRIMARY: 192.605 SECONDARY: 191.23 PURPOSE: Review guide material added by TR 2009-17 to 5.1(e) and consider restructuring the guide material under 192.605 as discussed further below. ORIGIN/RATIONALE

More information

NPSAG RAPPORT

NPSAG RAPPORT NPSAG RAPPORT 11-004-03 Evaluation of Existing Applications and Guidance on Methods for HRA EXAM-HRA HRA Application guide NPSAG Report 11-004-03 Gunnar Johanson, Sandra Jonsson 1 Kent Bladh, Tobias Iseland

More information

DDnmm,-- SEP U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Mail Stop OP1-17 Washington, D. C

DDnmm,-- SEP U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Mail Stop OP1-17 Washington, D. C SEP 0 5 2001 George T. Jones Vice President Nuclear Engineering & Support PPL Susquehanna, LLC Two North Ninth Street Allentown, PA 18101-1179 Tel. 610.774.7602 Fax 610.774.7797 gtjones@pplweb.com DDnmm,--

More information

Assessment of Internal Hazards

Assessment of Internal Hazards Joint ICTP- Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety Trieste, 12-23 October 2015 Assessment of Internal Hazards Javier Yllera Department

More information

An Improved Modeling Method for ISLOCA for RI-ISI and Other Risk Informed Applications

An Improved Modeling Method for ISLOCA for RI-ISI and Other Risk Informed Applications An Improved odeling ethod for ISLOCA for RI-ISI and Other Risk Informed Applications Young G. Jo 1) 1) Southern Nuclear Operating Company, Birmingham, AL, USA ABSTRACT In this study, an improved modeling

More information

IAEA Training in Level 2 PSA MODULE 8: Coupling Source Terms to Probabilistic Event Analysis (CET end-state binning)

IAEA Training in Level 2 PSA MODULE 8: Coupling Source Terms to Probabilistic Event Analysis (CET end-state binning) IAEA Training in Level 2 PSA MODULE 8: Coupling Source Terms to Probabilistic Event Analysis (CET end-state binning) The Problem A probabilistic treatment of severe accident progression leads to numerous

More information

FIRE FIGHTER II - SKILLS PERFORMANCE SHEET

FIRE FIGHTER II - SKILLS PERFORMANCE SHEET Fire Fighter II Skill Stations: NFPA 1001 2013 Edition Station A Fire Ground Communications & Operations / Interior Attack Coordination MANDATORY STATION Station B Sprinkler Drain/Pressures RANDOM STATION

More information

DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS

DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS SAFETY STANDARDS SERIES No. NS-G-1.10 DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS SAFETY GUIDE DS 482 2016-04-20 INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, C-41 (May 13)

More information

DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS

DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS SAFETY STANDARDS SERIES No. NS-G-1.10 DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS SAFETY GUIDE DS 482 2016-04-20 INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, C-41 (May 13)

More information

A comparative study of FLEX strategies to cope with Extended Station Blackout (SBO)

A comparative study of FLEX strategies to cope with Extended Station Blackout (SBO) A comparative study of FLEX strategies to cope with Extended Station Blackout (SBO) Presented by M. G Shahinoor Islam Master s Student of KINGS October 26 th 2017 KNS Meeting FLEX Objectives 2 page of

More information

Lockout/Tagout Training Overview. Safety Fest 2013

Lockout/Tagout Training Overview. Safety Fest 2013 Lockout/Tagout Training Overview Safety Fest 2013 Purpose of Lockout/Tagout The standard covers the servicing and maintenance of machine and equipment in which the unexpected energization or start up of

More information

Classical Event Tree Analysis and Dynamic Event Tree Analysis for High Pressure Core Melt Accidents in a German PWR

Classical Event Tree Analysis and Dynamic Event Tree Analysis for High Pressure Core Melt Accidents in a German PWR OECD International Workshop on Level 2 PSA and Severe Accident Management Koeln, Germany, March 29-31, 2004 Classical Event Tree Analysis and Dynamic Event Tree Analysis for High Pressure Core Melt Accidents

More information

Suppression Pool Diving Dose Reductions at Limerick Generating Station. January 2015 Tom Mscisz Exelon Nuclear Limerick Generating Station

Suppression Pool Diving Dose Reductions at Limerick Generating Station. January 2015 Tom Mscisz Exelon Nuclear Limerick Generating Station Suppression Pool Diving Dose Reductions at Limerick Generating Station January 2015 Tom Mscisz Exelon Nuclear Limerick Generating Station Typical Suppression Pool Diving Scope 1 Vacuuming (desludging)

More information

DETAILS OF THE ACCIDENT PROGRESSION IN 1F1

DETAILS OF THE ACCIDENT PROGRESSION IN 1F1 DETAILS OF THE ACCIDENT PROGRESSION IN 1F1 EMUG 2019 BRAUN, Matthias Switzerland, 3 rd -5 th April 2019 Not part of the BSAF OECD Benchmark Project Relying exclusively on publically available input data

More information

THE NITROGEN INJECTION THREAT IN PWR REACTORS

THE NITROGEN INJECTION THREAT IN PWR REACTORS THE NITROGEN INJECTION THREAT IN PWR REACTORS Weakness of current strategies & ASVAD, the new passive solution. Arnaldo Laborda Rami ASVAD INTL. SL (SPAIN) Tarragona (SPAIN) Email: alaborda@asvad-nuclear.com

More information

DRAFT REGULATORY GUIDE DG-1074

DRAFT REGULATORY GUIDE DG-1074 Draft Guide DG-1074 - December 1998 Page 1 of 55 U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REGULATORY RESEARCH DRAFT REGULATORY GUIDE December 1998 Division 1 Draft DG-1074 Contact: E.L. Murphy

More information

Containment Isolation system analysis and its contribution to level 2 PSA results in Doel 3 unit

Containment Isolation system analysis and its contribution to level 2 PSA results in Doel 3 unit Containment Isolation system analysis and its contribution to level 2 PSA results in Doel 3 unit Marius LONTOS a*, Stanislas MITAILLÉ a, and Shizhen YU a, Jérémy BULLE a TRACTEBEL ENGIE, Brussels, Belgium

More information

Table 6: Schedule of Operational Commitments

Table 6: Schedule of Operational Commitments Page 26 of 46 Table 6: Schedule of s OC 1558.1 OC 1558.2 OC 1560.1 OC 1560.2 OC 1560.3 OC 1560.4 OC 1560.5 OC 1560.6 Close out Requir This restriction was complied with prior to the core offload. Completed

More information

2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES

2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES 2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES This section of the GOSRP provides the general procedures to be followed at the time of an incident. The section is distinctively marked by a RED

More information

Severe Accident Management Programmes for Nuclear Power Plants

Severe Accident Management Programmes for Nuclear Power Plants DS 483: Mode 2 27 March 2017 IAEA SAFETY STANDARDS for protecting people and the environment STEP 11: Approval by the relevant review Committees Reviewed in NSOC (Asfaw) Severe Accident Management Programmes

More information

Loss of Normal Feedwater Analysis by RELAP5/MOD3.3 in Support to Human Reliability Analysis

Loss of Normal Feedwater Analysis by RELAP5/MOD3.3 in Support to Human Reliability Analysis Loss of Normal Feedwater Analysis by RELAP5/MOD3.3 in Support to Human Reliability Analysis ABSTRACT Andrej Prošek, Borut Mavko Jožef Stefan Institute Jamova cesta 39, SI-1 Ljubljana, Slovenia Andrej.Prosek@ijs.si,

More information

Lockout Tagout Policy

Lockout Tagout Policy Office of Environmental Health & Safety www.moreheadstate.edu/ehs 606-783-2584 Lockout Tagout Policy PURPOSE To establish procedures for the de-energization and isolation of energy sources or the lockout

More information

FIRE FIGHTER II SKILL PERFORMANCE CHECK SHEETS NFPA FIRE FIGHTER II SKILL STATION MENU

FIRE FIGHTER II SKILL PERFORMANCE CHECK SHEETS NFPA FIRE FIGHTER II SKILL STATION MENU FIRE FIGHTER II SKILL STATION MENU STATION TASK(S) A FIREGROUND OPERATIONS/FIRE COMMUNICATIONS MANDATORY B SPRINKLER DRAIN/PRESSURES RANDOM C PITOT GAUGE USE RANDOM D INSPECTION/MAINTENANCE: GENERATOR,

More information

LaSalle Unit 2 Source Term Reduction L2R16. John Moser Radiation Protection Manager LaSalle Station

LaSalle Unit 2 Source Term Reduction L2R16. John Moser Radiation Protection Manager LaSalle Station LaSalle Unit 2 Source Term Reduction L2R16 John Moser Radiation Protection Manager LaSalle Station Strategy for Elimination of Source Term Remove source term from piping/components Immediate reduction

More information

The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America.

The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America. Construction & Utilities Division Planning Tools The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America. Guidelines for Creation of

More information

CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION

CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION PAGE : 1 / 8 CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION SUB-CHAPTER 1.1 INTRODUCTION SUB-CHAPTER 1.2 GENERAL DESCRIPTION OF THE UNIT SUB-CHAPTER 1.3 COMPARISON WITH REACTORS

More information

Safety and efficiency go hand in hand at MVM Paks NPP

Safety and efficiency go hand in hand at MVM Paks NPP International Forum Atomexpo 2018 Safety and efficiency go hand in hand at MVM Paks NPP József Elter MVM Paks Nuclear Power Plant Ltd. Hungary Start up Four of the VVER-440/V213 unit Power units up-rate

More information

in84061.txt at Page 1 of 6 2/25/00

in84061.txt at  Page 1 of 6  2/25/00 in84061.txt at www.nrc.gov Page 1 of 6 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 SSINS No.: 6835 IE INFORMATION NOTICE NO. 84-61: OVEREXPOSURE

More information

Instrumentation systems of BWR

Instrumentation systems of BWR Instrumentation systems of BWR 1 Reactor core and pressure vessel of BWR Fuel rod Fuel assembly Reactor vessel :15~22cm thickness of steel, height of 21m, diameter of 7m Steam dryer Pressure vessel Main

More information

Health and Safety Executive. Key aspects of HS(G) 253. Andrew Hall HID CI 1G. HM Specialist Inspector (Mechanical)

Health and Safety Executive. Key aspects of HS(G) 253. Andrew Hall HID CI 1G. HM Specialist Inspector (Mechanical) Health and Safety Executive Key aspects of HS(G) 253 Andrew Hall HID CI 1G HM Specialist Inspector (Mechanical) Human Factors Human Failures can be grouped into: Errors And Violations Errors are not intended

More information

How to reinforce the defence-indepth in NPP by taking into account natural hazards?

How to reinforce the defence-indepth in NPP by taking into account natural hazards? How to reinforce the defence-indepth in NPP by taking into account natural hazards? Caroline LAVARENNE Karine HERVIOU Patricia DUPUY Céline PICOT IAEA 21-24 October 2013, Vienna Introduction The DiD has

More information

NE 405/505 Exam 2 Spring 2015

NE 405/505 Exam 2 Spring 2015 NE 405/505 Exam 2 Spring 2015 (80%) 1) A PWR with UTSGs is operating at 100% power, BOC, with control rods all out in automatic control when a failure in the speed pump controller results in all feed pumps

More information

FSRS Relative Point Value Guide

FSRS Relative Point Value Guide FSRS Relative Point Value Guide Note: This document has been produced by PIAL as a "guide" to show each 's impact to your total score. Certain ideal scenarios were assumed to determine the score in the

More information

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell: Energy Control Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: 905.577.0303 cell: 905.977.0210 consultant@staffaid.ca www.staffaid.com Safety, Energy Control, Power Lockout & Function Test Procedures

More information

Leaks from Unit-3 PCV and steam release in a large amount

Leaks from Unit-3 PCV and steam release in a large amount Attachment 3-8 Leaks from Unit-3 PCV and steam release in a large amount 1. Background At Unit-3 the suppression chamber (S/C) vent line configuration was completed at 08:41 on March 13 th and the dry

More information

CONSIDERATIONS FOR THE USE OF SEA WATER IN FIREFIGHTING. Prepared and Presented by Lenny Naidoo (Chief Fire Officer), Engen Petroleum Company

CONSIDERATIONS FOR THE USE OF SEA WATER IN FIREFIGHTING. Prepared and Presented by Lenny Naidoo (Chief Fire Officer), Engen Petroleum Company CONSIDERATIONS FOR THE USE OF SEA WATER IN FIREFIGHTING Prepared and Presented by Lenny Naidoo (Chief Fire Officer), Engen Petroleum Company Content Introduction Risk Assessment Legal Obligations Planning

More information

OPERATING PROCEDURES

OPERATING PROCEDURES OPERATING PROCEDURES 1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is

More information

TOWN OF LINCOLN ARENA FACILITIES OPERATIONAL SAFETY POLICY

TOWN OF LINCOLN ARENA FACILITIES OPERATIONAL SAFETY POLICY Policy Number: PW 2008-04 Page 1 of 5 Authored by Department: Department PURPOSE The Purpose of this policy is to establish formal safety procedures for municipal workers who perform routine maintenance

More information

Considerations for the Practical Application of the Safety Requirements for Nuclear Power Plant Design

Considerations for the Practical Application of the Safety Requirements for Nuclear Power Plant Design Considerations for the Practical Application of the Safety Requirements for Nuclear Power Plant Design Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects

More information

DeZURIK. KSV Knife Gate Valve. Safety Manual

DeZURIK. KSV Knife Gate Valve. Safety Manual KSV Knife Gate Valve Safety Manual Manual D11035 August 29, 2014 Table of Contents 1 Introduction... 3 1.1 Terms... 3 1.2 Abbreviations... 4 1.3 Product Support... 4 1.4 Related Literature... 4 1.5 Reference

More information

Portable Oil Lube Air Compressors

Portable Oil Lube Air Compressors Portable Oil Lube Air Compressors 8003631 8003632 0410149 8018968 8018940 Owner s Manual Read and understand operating instructions before use Safety definitions The information listed below should be

More information

TECHNICAL DATA. than the water inlet pressure to the concentrate

TECHNICAL DATA. than the water inlet pressure to the concentrate Foam102a 1. DESCRIPTION The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with 3M foam concentrates. This system consists of a standard wet pipe sprinkler

More information

BS Series Basket Strainer

BS Series Basket Strainer BS Series Basket Strainer Operating, Installation, & Maintenance Manual Corrosion Resistant Fluid and Air Handling Systems. Dated 04-26-12 PRESSURE DROP SIMTECH strainers are engineered to offer the lowest

More information

PRA Methodology Overview

PRA Methodology Overview PRA Methodology Overview 22.39 Elements of Reactor Design, Operations, and Safety Lecture 9 Fall 2006 George E. Apostolakis Massachusetts Institute of Technology Department of Nuclear Science and Engineering

More information

Ammonia Purge Near Miss. Jason Clarke, Gulf Power Co.

Ammonia Purge Near Miss. Jason Clarke, Gulf Power Co. Ammonia Purge Near Miss Jason Clarke, Gulf Power Co. Four generating units 2-82 MW 1-320 MW 1-500 MW Plant Crist Overview All four units run through a common scrubber The two large units utilize SCR technology

More information

If -~l N ---- "Soli T Khericha/SLK2/LMITCO/INEEL/US" 7VEFL To: Glenn Kelly t. Date: From:

If -~l N ---- Soli T Khericha/SLK2/LMITCO/INEEL/US 7VEFL To: Glenn Kelly t. Date: From: If h~i--- ly-dogument -~l N ----... Pa-e-1- Page I I From: "Soli T Khericha/SLK2/LMITCO/INEEL/US" 7VEFL To: Glenn Kelly t. Date: Thu, Dec 9,1999 2:10 PM Subject: DOCUMENT

More information

HEALTH AND SAFETY EXECUTIVE HM NUCLEAR INSTALLATIONS INSPECTORATE

HEALTH AND SAFETY EXECUTIVE HM NUCLEAR INSTALLATIONS INSPECTORATE HEALTH AND SAFETY EXECUTIVE HM NUCLEAR INSTALLATIONS INSPECTORATE New Reactor Generic Design Assessment (GDA) - Step 2 Preliminary Review Assessment of: Structural Integrity Aspects of AREVA/EdF EPR HM

More information

Delayed Coker Automation & Interlocks

Delayed Coker Automation & Interlocks Delayed Coker Automation & Interlocks a Presented by Mitch Moloney of ExxonMobil @ coking.com April-2005 MJ Moloney - ExxonMobil April-2005 coking.com 0 Automation & Interlocks @ ExxonMobil - Background

More information

Inspection Credit for PWSCC Mitigation via Peening Surface Stress Improvement

Inspection Credit for PWSCC Mitigation via Peening Surface Stress Improvement Inspection Credit for PWSCC Mitigation via Peening Surface Stress Improvement Glenn A. White, Kyle P. Schmitt, Kevin J. Fuhr, Markus Burkardt, and Jeffrey A. Gorman Dominion Engineering, Inc. Paul Crooker

More information

SENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 440/270 REACTOR

SENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 440/270 REACTOR PROCEEDINGS OF THE YEREVAN STATE UNIVERSITY Physical and Mathematical Sciences 216, 2, p. 57 62 P h y s i c s SENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 44/27

More information

EMERGENCY CORE COOLING SYSTEM SIMPLIFICATION

EMERGENCY CORE COOLING SYSTEM SIMPLIFICATION EMERGENCY CORE COOLING SYSTEM SIMPLIFICATION XA9846601 R.S. HART Sheridan Park Research Community, Atomic Energy of Canada Ltd, Mississauga, Ontario D.B. RHODES Chalk River Laboratories, Atomic Energy

More information

Verification and validation of computer codes Exercise

Verification and validation of computer codes Exercise IAEA Safety Assessment Education and Training (SAET) Programme Joint ICTP- IAEA Essential Knowledge Workshop on Deterministic Safety Assessment and Engineering Aspects Important to Safety Verification

More information

Spirax Compact FREME Flash Recovery Energy Management Equipment

Spirax Compact FREME Flash Recovery Energy Management Equipment IM-UK-cFREME UK Issue 1 Spirax Compact FREME Flash Recovery Energy Management Equipment Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations MINIMUM Pipeline Safety Regulations Application for Jurisdictional LPG Operators 1 Pipeline Safety Regulations 49 CFR Part 192 (NOTE:

More information

Nuclear safety Lecture 4. The accident of the TMI-2 (1979)

Nuclear safety Lecture 4. The accident of the TMI-2 (1979) Nuclear safety Lecture 4. The accident of the TMI-2 (1979) Ildikó Boros BME NTI 27 February 2017 The China Syndrome Opening: 16 March 1979 Story: the operator of the Ventana NPP tries to hide the safety

More information

Solenoid Valves used in Safety Instrumented Systems

Solenoid Valves used in Safety Instrumented Systems I&M V9629R1 Solenoid Valves used in Safety Instrumented Systems Operating Manual in accordance with IEC 61508 ASCO Valves Page 1 of 7 Table of Contents 1 Introduction...3 1.1 Terms and Abbreviations...3

More information

Irrigation System Winterization and Pressurization Procedures

Irrigation System Winterization and Pressurization Procedures Irrigation System Winterization and Pressurization Procedures Introduction Any time that an irrigation system is filled and pressurized, or when the system is drained and water flushed from the system,

More information

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve. Foam 302 a 1. DESCRIPTION (Refer to Figure 1 on page 302 e.) The Viking Low-Flow Foam/Water Proportioning System is a UL Listed and FM Approved system, for use with 3M and Viking brand foam concentrate.

More information

DeZURIK. KGC Cast Knife Gate Valve. Safety Manual

DeZURIK. KGC Cast Knife Gate Valve. Safety Manual KGC Cast Knife Gate Valve Safety Manual Manual D11036 August 29, 2014 Table of Contents 1 Introduction... 3 1.1 Terms... 3 1.2 Abbreviations... 4 1.3 Product Support... 4 1.4 Related Literature... 4 1.5

More information

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION INSTALLATION INSTRUCTIONS CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION The CVS Controls 67CFR Filter regulator is a pressure reducing supply regulator typically used for pneumatic

More information

Guidance on the maintenance and inspection of fixed CO 2 fire-extinguishing systems

Guidance on the maintenance and inspection of fixed CO 2 fire-extinguishing systems Translation. Only the Danish document has legal validity. Guidance no. 9514 of 9 July 2014 issued by the Danish Maritime Authority Guidance on the maintenance and inspection of fixed CO 2 fire-extinguishing

More information

Ing. JOZEF BALÁŽ Ph.D. and Ing MILAN CVAN CSc

Ing. JOZEF BALÁŽ Ph.D. and Ing MILAN CVAN CSc PROPOSAL, DESIGN, IMPLEMENTATION AND SAFETY DEMONSTRATION OF SEVERE ACCIDENT MANAGEMENT MEASURES AT VVER440 IN SLOVAKIA Ing. Jozef Baláž, Ph.D. VUJE a.s. Trnava, Slovakia Email: Jozef.Balaz@vuje.sk Ing.

More information

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Success Paths: A Risk Informed Approach to Oil & Gas Well Control API Winter E&P Standards Conference, Austin January 18, 2017 Success Paths: A Risk Informed Approach to Oil & Gas Well Control Dr. Dan Fraser Director, Strategic Alliances for Global Energy Solutions,

More information

HOT TOPIC REPORT OF BOTTOM HEADER DEFECTED,YGN PLANT 5 IN 2003 KOREA HYDRO AND NUCLEAR POWER COMPANY

HOT TOPIC REPORT OF BOTTOM HEADER DEFECTED,YGN PLANT 5 IN 2003 KOREA HYDRO AND NUCLEAR POWER COMPANY HOT TOPIC REPORT OF BOTTOM HEADER DEFECTED,YGN PLANT 5 IN 2003 KOREA HYDRO AND NUCLEAR POWER COMPANY ꌙꌙꌙ Table of Contents ꌙꌙꌙ Ⅰ. General Description Ⅱ. The Concept of Rx Vessel and Position of

More information

Human Reliability Analysis of Ultimate Response Guideline in a Compound Disaster. Hyatt Regency Tokyo, Japan April 16, 2013

Human Reliability Analysis of Ultimate Response Guideline in a Compound Disaster. Hyatt Regency Tokyo, Japan April 16, 2013 PSAM 203 Topical Conference in Tokyo OS-VIII : Human Factors and (#08) Human Reliability Analysis of Ultimate Response Guideline in a Compound Disaster Kang-Hung Liu, Sheue-Ling Hwang, Tsu-Mu Kao and Hui-Wen

More information

STYLE 3414/3416 & 3421/3423 Apollo Monitor with Foldaway Legs OPERATING & MAINTENANCE INSTRUCTIONS

STYLE 3414/3416 & 3421/3423 Apollo Monitor with Foldaway Legs OPERATING & MAINTENANCE INSTRUCTIONS STYLE 3414/3416 & 3421/3423 Apollo Monitor with Foldaway Legs OPERATING & MAINTENANCE INSTRUCTIONS The Akron Style 3414/3416 & 3421/3423 Apollo Monitor is designed to provide efficient trouble-free operation

More information

High-Pressure Boiler Inspection Procedures: A Complete Checklist

High-Pressure Boiler Inspection Procedures: A Complete Checklist High-Pressure Boiler Inspection Procedures: A Complete Checklist Inspecting high-pressure boilers is a complex process requiring preparation, planning, and a multitude of safety precautions. Regular inspections

More information

Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries

Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries Focus Area: Automation HMI Title: Author: Shared Field Instruments in SIS: Incidents Caused by Poor Design

More information

PI MODERN RELIABILITY TECHNIQUES OBJECTIVES. 5.1 Describe each of the following reliability assessment techniques by:

PI MODERN RELIABILITY TECHNIQUES OBJECTIVES. 5.1 Describe each of the following reliability assessment techniques by: PI 21. 05 PI 21. 05 MODERN RELIABILITY TECHNIQUES OBJECTIVES 5.1 Describe each of the following reliability assessment techniques by: ~) Stating its purpose. i1) Giving an e ample of where it is used.

More information

HYDROSTATIC LEAK TEST PROCEDURE

HYDROSTATIC LEAK TEST PROCEDURE This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics

More information

Transient Analyses In Relief Systems

Transient Analyses In Relief Systems Transient Analyses In Relief Systems Dirk Deboer, Brady Haneman and Quoc-Khanh Tran Kaiser Engineers Pty Ltd ABSTRACT Analyses of pressure relief systems are concerned with transient process disturbances

More information

Yakima County Fire District 12 Standard Operating Guidelines SOG 5-1 Hazardous Materials Operations

Yakima County Fire District 12 Standard Operating Guidelines SOG 5-1 Hazardous Materials Operations 1. General Yakima County Fire District 12 Standard Operating Guidelines 1.1 Purpose. This Standard Operating Guideline is intended to provide general guidelines for District personnel in responding to

More information

Veriforce TG CCT 609OP. Training Guide

Veriforce TG CCT 609OP. Training Guide Training Guide Directions: This training guide is to be used by a Veriforce Authorized Evaluator/Trainer and Trainee during on-thejob training (OJT) or prior to an evaluation as a resource. (S) Indicates

More information

Emergency Situation Assessment

Emergency Situation Assessment Appendix 1 Emergency Situation Assessment Emergency Situation Assessment In-coming mains electricity failure sites with generator backup Useful Information: Severity 2 Risk Rating Low / 10 Likelihood 5

More information

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection February 9, 1998 Foam 201a 1. DESCRIPTION A Deluge Bladder Tank Foam/Water System is a standard deluge system capable of discharging a foam/water solution automatically through open sprinklers, spray nozzles,

More information

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT Purpose Scope Process flow This operating procedure supports SMS-07-SP-3067 Manage Safety Change and establishes the

More information

Addendum 4 Levels of Response

Addendum 4 Levels of Response Addendum 4 Levels of Response Levels of Response to a Hazardous Materials Incident A. Criteria for Categorization Hazardous materials incidents are categorized as Level I, II, or III depending on the severity

More information

IC67 - Pre-Instructional Survey

IC67 - Pre-Instructional Survey IC67 - Pre-Instructional Survey 1. What does the term code refer to in the installation of power plant piping? a. National welders code b. Fire protection code c. ASME Boiler and Pressure Vessel Code Section

More information

RECOMMENDED GOOD PRACTICE

RECOMMENDED GOOD PRACTICE RECOMMENDED GOOD PRACTICE EMERGENCY SHUTDOWN PROCEDURE (ESP) AND PROCEDURE FOR TESTING ESP SYSTEM FOR BLACK LIQUOR RECOVERY BOILERS THE BLACK LIQUOR RECOVERY BOILER ADVISORY COMMITTEE October 2009 Table

More information

The «practical elimination» approach for pressurized water reactors

The «practical elimination» approach for pressurized water reactors The «practical elimination» approach for pressurized water reactors V. TIBERI K.HERVIOU International Conference on Topical Issues in Nuclear Installation Safety: Safety Demonstration of Advanced Water

More information

TurboDraft Fire Eductor

TurboDraft Fire Eductor TurboDraft Fire Eductor Operating Manual Introduction The TurboDraft is designed to be used for rural water supply operations. Many of us take for granted that there is a fire hydrant on every corner.

More information

MDEP Common Position No AP

MDEP Common Position No AP MDEP Validity: until net update or archiving MDEP Common Position No AP1000-01 Related to : AP1000 Working Group activities THE DESIGN AND USE OF EXPLOSIVE - ACTUATED (SQUIB) VALVES IN NUCLEAR POWER PLANTS

More information