Table 6: Schedule of Operational Commitments

Size: px
Start display at page:

Download "Table 6: Schedule of Operational Commitments"

Transcription

1 Page 26 of 46 Table 6: Schedule of s OC OC OC OC OC OC OC OC Close out Requir This restriction was complied with prior to the core offload. Completed see AR No more than TWO pressuriser heater repairs will be undertaken at the same time in Mode 5 RCS Intact (with normal RCS venting with the exclusion of the CETNA being CLOSED) unless otherwise justified via a Safety Submission (EC). Ensure the NSORC is updated within 3 months of return to service from FO43 with a justification to continue with this EC (338561) as a Master, or simply to report back the closure of the EC. Applicable to HWIs Nos. 42 and 70, to provide a justification for ASME fatigue analysis if plugs remain in service beyond. To inspect the fillet sealing welds on HWI Nos. 42 and 70 by visual inspection (VT-2 standard) and RT during and at future outages while they remain in service. To inspect HWI Nos. 42 and 70 for evidence of stress corrosion cracking using UT during and at future outages while they remain in service. Extent of the UT to be confined to HWI outside the Pressuriser. To amend SP10 to specifically cover the visual inspection of the HWI/Pressuriser Shell interface To develop a repair technique for HWIs Nos. 42 and 70 that is suitable for the remainder of station life without an excessive inspection burden, for deployment by including all necessary safety justification. Confirm the operable status of the strain gauges and associated instrumentation no later than two weeks after entry to Mode 2. to RT is no longer applicable as the design of plug has changed from that originally proposed. This only applied to those section of HWI external to the Pressuriser. These sections were removed under EC Rev 007. This OC no longer applies 31 Oct days after Mode 2 entry OC To undertake a fatigue analysis to confirm the design life for the sealing Applies to all plugs other than those in use for / Waiting closure

2 Page 27 of 46 OC OC OC OC OC OC OC Close out Requir weld if plugs are to remain beyond. 42 and 70 Insulation Resistance testing of Pressuriser Backup Heaters to be TS, new SR and relevant STEs will be issued Mode 2 undertaken on a monthly basis under TS once EC is approved Station to develop a strategy for the long term management of heaters, This is partly resolved through QP/435, such strategy to include regular reviews of OEF to ensure the risk of a dealing with failures that might occur whilst repeat event is avoided, before. This must include the the current design of heaters are kept in replacement of heaters once they have failed electrically, at the next service. Longer term there is an ongoing refuelling outage. project to establish revised heaters less susceptible to failures as seen on 42 and 70. To procure and replace all the Pressuriser Heaters by no later than. Such heaters to take account of the root cause of FO43 Safety Relief Valves removed to provide additional access for Section of this EC and Mode 2 ventilation and services may not be set-point tested during RTS under STM-BB-001 (Ref 35), as justified in section of this EC. If a under EC PZR SLSRV is dropped or involved in a significant impact during removal then the valve will be the subject of further assessment and testing prior to start-up. This proposal will not apply loadings on adjacent heaters resulting Section of this EC EC and from the deployment of cutting equipment for cutting operations and therefore if this proposal is used in isolation there is no need to justify under EC loadings applied to adjacent heaters as identified in OC (from Ref 1). Visual inspection of the Spray Nozzle for signs of damage will be undertaken following removal of the shielding from the spray nozzle as part of the back-out activities that will be a requirement under the Implementation QP (Ref 5). Visual inspection of the general state of the Support Plates will be undertaken as part of the back-out activities will be a requirement under the Implementation QP (Ref 5). by Quality Plan SZB/PQP/PD/NA0375/005 (Item4.5) by Quality Plan SZB/PQP/PD/NA0375/005 (Item 4.1) /

3 Page 28 of 46 OC OC OC OC OC OC OC OC Close out Requir / Maintain a log and report any significant collisions to the PSRG for See Section and Attachment 3 to this EC their assessment and consideration of corrective measures by an appropriate SQEP body (i.e. SIP). This safety case considers the thermal hydraulic and structural effects See Section (b) of this EC and EC of additional larger holes to support heater removal, however the RTS case will also considers the totality of the holes remaining in the Can be closed once ref [16] is issued, on support plates from both the removal of mechanically failed heaters approval of this EC and removal of any other heaters during FO43. This proposal will not require significant holes to be cut in the Lower Support Plate to gain access, and therefore on successful completion of this proposal this OC can be closed without any further action. A hold point will be included in the Implementation QP (Ref 5) to ensure that all parties including Industrial Safety are satisfied that any Confined Spaces Safe System of Work (SSOW) is suitable and sufficient for use, specifically the rescue plan and the associated WOCs have undergone review and approval. Fuel Assembly 0D24 will be inspected during for any sign of debris on or inside the Fuelguard bottom nozzle. EC remains valid for a fuel reload up until 22nd November Subsequent to this date, further consideration is required in the reactor physics area; detailed analysis must be performed to confirm that sufficient signal will be receiv the source range detectors. Prior to Mode 6 up in, an inspection/audit of the AREVA manufacturing process for RCCAs is required in order to confirm satisfactory compliance with BEOM 210 (British Energy Operating Memorandum) going forward. Review the cabling and insulation arrangements for the Pressuriser heaters before Cycle 13 to justify that the cables are suitable for No holes other than those justified in Section (b) have been cut in either Support Plate under EC This issue was fully considered and the Hold Point cleared prior to man entry into the Pressuriser. Cover Quality Plan SZB/PQP/PD/NA0375/005 (Item 1.21) OSRC 141 advised and the Plant Manager agreed that Fuel Assembly 0D24 should be reloaded Nov 2010 Not part of this EC

4 Page 29 of 46 OC OC OC OC OC Close out Requir continued use and the insulation does not require modification. This should be done in conjunction with the replacement of the pressuriser heaters as per OC Produce a Revision to EC after return to service to report the following: Completion of the NOP/NOT VT-2 inspections of the HWI welds prior to Mode 2 entry Remaining metallurgical investigations into failed heaters Results of magnesium oxide swelling test programme. Strain Gauge monitoring arrangements post-t&cp and revise SZB/QP/435 as appropriate. The SCC assessment of HWIs 42 and 70 is only sanction the SIP until. Operation beyond this point will require further justification, and consideration of EAG advice. The issue of susceptibility to SCC will be dealt with in the Closeout Section (b) Report, EC , including reference to the deliberations of the Expert Advisory Group on material corrosion. Can be clos this EC The thermal fatigue cycles resulting from the welding of plugs inside the Pressuriser Heater Well Inserts shall be taken into consideration as part of the normal transient assessment Surveillance Programme (TSP-SP-003). This temporary EC is to be upgraded to a (full) permanent EC once the full life analysis is completed and approved, otherwise a suitable alternative position will be required to replace this proposed (temporary) plug option. / Waiting Closure Notes: 1558 series raised in EC series raised in EC series raised in EC

5 Page 30 of series raised in EC series raised in EC raised in this EC 1567 series raised in EC

Installation, Operation and Maintenance Instructions for Direct Hot Water Storage Vessels

Installation, Operation and Maintenance Instructions for Direct Hot Water Storage Vessels OM003 Installation, Operation and Maintenance Instructions for Direct Hot Water Storage Vessels The operating and maintenance instructions contained within this package are for standard storage vessels

More information

TP 11249E SHIP SAFETY STANDARD FOR IN-WATER SURVEYS

TP 11249E SHIP SAFETY STANDARD FOR IN-WATER SURVEYS TP 11249E SHIP SAFETY STANDARD FOR IN-WATER SURVEYS Canadian Coast Guard Ship Safety Branch 1992 TP 11249E RECORD OF CHANGES STANDARD FOR IN WATER SURVEYS DATE OF AMENDMENT AMENDMENT NUMBER SECTION AMENDED

More information

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger OM008 Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger The operating and maintenance instructions contained within this package are for Pacific water/water

More information

Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel

Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel OM006 Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel The operating and maintenance instructions contained within this package are for standard mild steel buffer vessels

More information

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2) UN-GTR PART A INSERTION Stand 09.02.2011, 17:20 Uhr A.3.3 HYDROGEN STORAGE SYSTEM The hydrogen storage system consists of all components that form the primary pressure boundary of the stored hydrogen in

More information

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS ISSN 1172-3416 NZ GCP 2 : 1993 NEW ZEALAND GAS CODE OF PRACTICE for MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS Issued by the Secretary of Commerce in accordance with the Gas Act 1992 THE GAS ACT

More information

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk (June 1999) (Rev.1 Mar 2006) (Rev.2 May 2007) (Rev.3 Mar 2010) (Corr.1 Feb 2011) (Rev.4 Oct 2013) Periodical surveys of cargo installations on ships carrying liquefied gases in bulk 1 General 1.1 Scope

More information

HEALTH AND SAFETY EXECUTIVE HM NUCLEAR INSTALLATIONS INSPECTORATE

HEALTH AND SAFETY EXECUTIVE HM NUCLEAR INSTALLATIONS INSPECTORATE HEALTH AND SAFETY EXECUTIVE HM NUCLEAR INSTALLATIONS INSPECTORATE New Reactor Generic Design Assessment (GDA) - Step 2 Preliminary Review Assessment of: Structural Integrity Aspects of AREVA/EdF EPR HM

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

Liquefied gas cargo tanks and process pressure vessels

Liquefied gas cargo tanks and process pressure vessels .1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant

More information

UKOPA Dent Management Strategy

UKOPA Dent Management Strategy UKOPA Dent Management Strategy 1 Background Pipelines are thin shell structures which are susceptible to geometric distortions and dents during handling, construction, and operation. These dents and distortions,

More information

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION I, the undersigned, being experienced and competent in the applicable field of design related to pressure vessel requirements relative to

More information

Installation, Operation and Maintenance Instructions Buffer Vessel OM006

Installation, Operation and Maintenance Instructions Buffer Vessel OM006 Installation, Operation and Maintenance Instructions Buffer Vessel OM006 Calorifiers Heat Exchangers Pressurisation Units Sales Tel: 01457 835700 Sales Fax: 01457 832700 E-mail: sales@gmsthermal.co.uk

More information

PULSAR 5000 SERIES OPERATING & INSTALLATION INSTRUCTIONS SERIES 5000 PLEASE READ CAREFULLY BEFORE INSTALLING

PULSAR 5000 SERIES OPERATING & INSTALLATION INSTRUCTIONS SERIES 5000 PLEASE READ CAREFULLY BEFORE INSTALLING PULSAR 5000 SERIES OPERATING & INSTALLATION INSTRUCTIONS SERIES 5000 PLEASE READ CAREFULLY BEFORE INSTALLING Please Note: Ranges above 500mbar are designed and manufactured in accordance with sound engineering

More information

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP: PRESSURE RETEST 49 CFR, 180.407(g) Co#: Vin#: Spec: MAWP: Retest Date: Location: *External Inspection Performed: *Internal Inspection Performed: Test Pressure: psig Held for: min. (Must be at least 10

More information

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR 1910.119 PSM - Definition Not all refining hazards are caused by the same factors or involve ve the same degree of potential damage.

More information

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors 0862050/1 IM-P086-18 MI Issue 1 Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors Installation and Maintenance Instructions 1. Safety Information 2. General product information 3. Installation 4.

More information

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations Workplace Address: Page 1 of PART 1: TASK DETAILS Client: JOB/TASK: Using Water blaster PART 2: RESOURCES Relevant Legislation/Codes Practice: Training Required: Equipment Used: Materials Used: Substances

More information

ST/SG/AC.10/C.3/2016/8. Secretariat. United Nations. Transport of gas tanks for motor vehicles. Introduction

ST/SG/AC.10/C.3/2016/8. Secretariat. United Nations. Transport of gas tanks for motor vehicles. Introduction United Nations Secretariat Distr.: General 29 March 2016 ST/SG/AC.10/C.3/2016/8 Original: English Committee of Experts on the Transport of Dangerous Goods and on the Globally Harmonized System of Classification

More information

TP1 and TP2 Temporary Cone Shaped Strainers

TP1 and TP2 Temporary Cone Shaped Strainers 1698051/2 IM-P169-07 ST Issue 2 TP1 and TP2 Temporary Cone Shaped Strainers Installation and Maintenance Instructions TP1 1. Safety information 2. General product information 3. Installation and commissioning

More information

UKEPR Issue 05

UKEPR Issue 05 Title: PCSR Sub-chapter 10.5 Integrity of the main steam lines inside and outside the containment Total number of pages: 13 Page No.: I / III Chapter Pilot: M. LACHAISE Name/Initials Date 31-10-2012 Approved

More information

2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec.

2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec. MS No: :. A 1.0 Scope of Work Preparation notes: delete column before issuing. 1.1 General Description of Works, Location & Boundaries Strength and tightness testing of Glycol System between plant room

More information

MDEP Common Position No AP

MDEP Common Position No AP MDEP Validity: until net update or archiving MDEP Common Position No AP1000-01 Related to : AP1000 Working Group activities THE DESIGN AND USE OF EXPLOSIVE - ACTUATED (SQUIB) VALVES IN NUCLEAR POWER PLANTS

More information

IACS History File + TB

IACS History File + TB IACS History File + TB Part A UI SC140 Secondary Means of Venting Cargo Tanks Part A. Revision History Version no. Approval date Implementation date when applicable Rev.3 (Jan 2011) 28 January 2011 1 July

More information

ASTATT10 Carry out air tightness testing on large and complex, high rise and phased hand over zonal buildings

ASTATT10 Carry out air tightness testing on large and complex, high rise and phased hand over zonal buildings Carry out air tightness testing on large and complex, high rise and phased Overview This standard is for those who carry out air tightness testing and inspection of large and complex buildings, high rise

More information

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart Technical Standards and Legislation: Risk Based Inspection Presenter: Pierre Swart Agenda Change in Legislation. Where RBI fits in. Application to implement RBI. RBI concepts. Elements of an RBI analysis.

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

CP10 Sensor Installation and Maintenance Instructions

CP10 Sensor Installation and Maintenance Instructions 4030150/9 IM-P403-26 EMM Issue 9 CP10 Sensor Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Maintenance 5. Spare parts Copyright 2017

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-09100-060 : Gantry hoist system Sale Type For what use is this asset being sold? Re-Use Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other use is at the

More information

Translation of the original Operating Instructions for HKS rubber compensators

Translation of the original Operating Instructions for HKS rubber compensators Because of their flexible elements and mechanisms, HKS rubber compensators are susceptible to damage of all types and adverse loads in operation. For reliable operation of a compensator and, thus, the

More information

NEW IGC CODE AND IGF CODE

NEW IGC CODE AND IGF CODE NEW IGC CODE AND IGF CODE SAFETY ASPECTS Raffaele Piciocchi Gas Center - Greece SAFETY4SEAS - Athens 1 October 2014 Content NEW IGC CODE DRAFT IGF CODE 2 The New IGC Code A new IGC Code has been approved

More information

FV Flash Vessel Installation and Maintenance Instructions

FV Flash Vessel Installation and Maintenance Instructions 4041050/5 IM-P404-10 EMM Issue 5 FV Flash Vessel Installation and Maintenance Instructions 1. Safety information 2. Specific product safety information 3. Product information 4. Installation 5. Commissioning

More information

Health & Safety Policy & Plan. Rightway Roofing.

Health & Safety Policy & Plan. Rightway Roofing. Health & Safety Policy & Plan. Rightway Roofing. Valid: 02/2012-02/2013 Contents ( 1 ) Policy Statement. ( 2 ) Hazard Identification. ( 3 ) Hazard Management. ( 4 ) Induction & Training. ( 5 ) Monitoring

More information

NBIC Committee Action Block

NBIC Committee Action Block NBIC Committee Action Block Subject File Number Change of Service NB 08 0321 (Inspec) NB 08 0320 (Install) NB 08 0322 (R & A) Prop. on Pg. Proposal Explanation Part 2: Add a new Supplement 9, Requirements

More information

Pressure Systems Safety Regulation

Pressure Systems Safety Regulation Pressure Systems Safety Regulation Introduction This document informs Faculty of the key requirements of the UK and Chinese Pressure Systems Safety regulations. The aim of these regulations is to prevent

More information

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES PBV-USA,Inc. 12735 Dairy Ashford. Stafford, Texas USA 77477 281-340-5400; 800-256-6193 FAX: 281-340-5499 INDUSTRIAL BALL VALVES IM0 69 April 2001 Rev 9 INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk SOFT LINE CUTTER SL55 PRODUCT CODE No. 980504 INSTRUCTIONS FOR INSTALLATION,

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

MSC Guidelines for Independent Fuel Tanks

MSC Guidelines for Independent Fuel Tanks References: Contact Information a. 46 CFR 58.50 (Independent Fuel Tanks) b. 46 CFR 119.440 (Independent Fuel Tanks) c. 46 CFR 182.440 (Independent Fuel Tanks) C. J. Robuck, LCDR, Chief, Engineering Division

More information

An Urgent Bulletin from CSA Group

An Urgent Bulletin from CSA Group An Urgent Bulletin from CSA Group Gas Products No. 335 (Supersedes Notice Gas Products No. 270, Ref No: N12-055) Effective Date: October 1, 2015 Date: July 21, 2014 Apply Before February 2, 2015 Announcing:

More information

ACTIVITY RISK ASSESSMENT

ACTIVITY RISK ASSESSMENT ACTIVITY RISK ASSESSMENT Activity Name and Description: Child Activity Risk Assessment Template normally you would describe the activity here Activity Location: Where is the activity to be held? Activity

More information

Transport of gas tanks for motor vehicles

Transport of gas tanks for motor vehicles United Nations Secretariat ST/SG/AC.10/C.3/2016/51 Distr.: General 30 August 2016 Original: English Committee of Experts on the Transport of Dangerous Goods and on the Globally Harmonized System of Classification

More information

Manual Actuated Boiler Blowdown Valves

Manual Actuated Boiler Blowdown Valves Manual Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Operation 5. Maintenance 6. Spare parts p.1 1. Safety

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO GUIDE CRITERIA FOR WATER HEATER SUPPLY SHUTOFF VALVE WITH A / THERMAL EXPANSION CONTROL VALVE IGC 128-2006a8 1. PURPOSE 1.1 The purpose

More information

Gas Network Craftsperson

Gas Network Craftsperson Gas Network Craftsperson Unit EIAU06 Maintaining Instrumentation and Control Equipment Circuits This assessment specification has been developed as part of the network maintenance craftsperson standard

More information

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS) GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS) Local Exhaust Ventilation Inspection & Maintenance 1 LOCAL EXHAUST AND OTHER VENTILATION Contents 1. Introduction 2. Design specifications

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk SOFTLINE CUTTER SL80 PRODUCT CODE No. 980248 INSTRUCTIONS FOR INSTALLATION,

More information

Portable Appliance Testing

Portable Appliance Testing The University of Edinburgh E Brief description of the paper University Health and Safety Committee Tuesday 18 th November 2014 Portable Appliance Testing This Paper presents the review of the University

More information

SAMPLE EXAMINATION QUESTIONS AND ANSWERS

SAMPLE EXAMINATION QUESTIONS AND ANSWERS AUSTRALIAN INSTITUTE FOR THE CERTIFICATION OF INSPECTION PERSONNEL AICIP Doc-021 Rev 4 SAMPLE EXAMINATION QUESTIONS AND ANSWERS General Notes: 1. It is suggested that applicants attempt these questions

More information

TSS21 Sealed Thermostatic Steam Tracer Trap

TSS21 Sealed Thermostatic Steam Tracer Trap 1255050/4 IM-P125-10 ST Issue 4 TSS21 Sealed Thermostatic Steam Tracer Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection 1170850/1 IM-P117-36 ST Issue 1 MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection Installation and Maintenance Instructions 1. Safety information 2. General product information

More information

SEMEMI SQA Unit Code H2AX 04 Carrying out scheduled maintenance tasks on fluid power equipment

SEMEMI SQA Unit Code H2AX 04 Carrying out scheduled maintenance tasks on fluid power equipment Carrying out scheduled maintenance tasks on fluid power equipment Overview This unit identifies the competences you need to carry out scheduled maintenance tasks on fluid power equipment on mobile or static

More information

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10 LK product no: PCS 1-10 Article no: 74503 Revision:8 Article no: 74503 Revision: 8 2 (23) Contents 1. General information... 5 2. Safety precautions... 5 2.1 Significance of symbols... 5 2.2 Explanatory

More information

Product Bulletin No.: D99-RRV2015-PIB-001

Product Bulletin No.: D99-RRV2015-PIB-001 Product Bulletin No.: D99-RRV2015-PIB-001 Titan BX Automatic Pressure Relief Valves Issue Date: April 22, 2016 Subject: Product: Affected Assemblies Objectives: Structural failure of a Titan Type BX pneumatically-operated

More information

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual 10-12 Steel Pipe Squeezer Sch. 40 & Sch. 80 Operations Manual 1.0 Introduction This manual is issued as a basic operation manual covering the Regent Model 7989T, Pipe Squeezer and Pump as manufactured

More information

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine Release: 1 UEPOPL002A Licence to operate a reciprocating steam engine UEPOPL002A Licence to operate a reciprocating steam engine Modification History Not applicable. Unit Descriptor Unit Descriptor 1)

More information

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS INTRODUCTION The Janis Research Company's Superconducting Magnet/Cryostat System is one of the most versatile tools available to the scientist

More information

BCGA GUIDANCE NOTE 17

BCGA GUIDANCE NOTE 17 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF

More information

Overview EUSDSG3.12. Install gas meters and regulators (2.5 to 16.0m3/hr)

Overview EUSDSG3.12. Install gas meters and regulators (2.5 to 16.0m3/hr) Overview This national occupational standard is for gas engineerswho are required to install and exchange meters and regulators (2.5 to 16.0m3/hr) on low pressure and medium pressure gas systems. This

More information

Testing Procedures of Watertight Compartments

Testing Procedures of Watertight Compartments (1996) (Rev.1 Feb 2001) (Rev.2 May 2001) (Rev.3 May 2010) (Rev.4 Aug 2012) Testing Procedures of Watertight Compartments.1 Application Revision 4 of this UR is to be complied with in respect of the testing

More information

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap 1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

System Pressure Manager Standard & System Pressure Manager Plus

System Pressure Manager Standard & System Pressure Manager Plus System Pressure Manager Standard & System Pressure Manager Plus Installation, Commissioning & Servicing Instructions Note: THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING, COMMISSIONING,

More information

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1064-2006 (R2011) - REVISED: 2011 Backflow Prevention Assembly Field Test Kits MANUFACTURER: CONTACT PERSON: E-MAIL:

More information

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT ASSET INTEGRITY INTELLIGENCE CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT JAMES R. WIDRIG, Manager Advanced Engineering at Quest Integrity Group VOLUME 23, ISSUE 6 NOVEMBER DECEMBER

More information

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE 11841 Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 www.cosasco.com Page: 2 of 26 Revision

More information

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL Company Registered Office: Crown House, Stockport, Cheshire, SK13RB No. 850 0700 67 Registered in England and Wales No. 05058855

More information

Regulations Respecting Compressed Gas Pressure Vessels

Regulations Respecting Compressed Gas Pressure Vessels COMPRESSED GAS PRESSURE VESSELS SR 99/70 1 Regulations Respecting Compressed Gas Pressure Vessels Repealed by Chapter B-5.1 Reg 1 (effective January 1, 2007) Formerly Saskatchewan Regulations 99/70 (effective

More information

Emergency Situation Assessment

Emergency Situation Assessment Appendix 1 Emergency Situation Assessment Emergency Situation Assessment In-coming mains electricity failure sites with generator backup Useful Information: Severity 2 Risk Rating Low / 10 Likelihood 5

More information

Subject: Structural Certification Criteria Date: 10/11/18 Policy No: PS-AIR for Antennas, Radomes, and Other External Modifications

Subject: Structural Certification Criteria Date: 10/11/18 Policy No: PS-AIR for Antennas, Radomes, and Other External Modifications Policy Statement Subject: Structural Certification Criteria Date: 10/11/18 Policy No: PS-AIR-25-17 for Antennas, Radomes, and Other External Modifications Initiated By: AIR-675 Summary This policy statement

More information

GUIDELINES. Systems. Pressure. Guidelines for Competent Person In-service examination of pressure systems pipework

GUIDELINES. Systems. Pressure. Guidelines for Competent Person In-service examination of pressure systems pipework GUIDELINES Pressure Systems Guidelines for Competent Person In-service examination of pressure systems pipework Document Reference: PSG 05 Issue 01.3 Dated 10/04/19 The Safety Assessment Federation Ltd

More information

Transport of gas tanks for motor vehicles

Transport of gas tanks for motor vehicles Committee of Experts on the Transport of Dangerous Goods and on the Globally Harmonized System of Classification and Labelling of Chemicals Transport of gas tanks for motor vehicles Submitted by the expert

More information

Notice for Pressure Special Equipment Manufacture Licensing

Notice for Pressure Special Equipment Manufacture Licensing AQSIQ Notice No.151 (2012) Notice for Pressure Special Equipment Manufacture Licensing To further enhance the implementation of the manufacture licensing system to imported pressure special equipment,

More information

Innovative Pressure Testing Equipment

Innovative Pressure Testing Equipment Innovative Pressure Testing Equipment Oil & Gas Subsea Universities Nuclear Materials Science Supporting Industry and Research Worldwide www.kwdesign.co.uk Who are KW Designed Solutions? We are industry

More information

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE Rohrback Cosasco Systems, Inc. 11841 E. Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 www.cosasco.com

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK Document Title: Work Instruction Isolation of a Water Network Document Reference: DOM-WN-WIN-00000302 Approved By: Asset Management Title: General Manager Record of Changes and Amendments Amendment No.

More information

STD Spray Type Desuperheater

STD Spray Type Desuperheater 4759902/1 IM-P475-04 CH Issue 1 STD Spray Type Desuperheater Installation and Maintenance Instructions 1. Safety information 2. Introduction 3. General product information 4. Inspection and performance

More information

COMPETENCIES FOR IN-SERVICE INSPECTORS OF PRESSURE EQUIPMENT (NOTE 1)

COMPETENCIES FOR IN-SERVICE INSPECTORS OF PRESSURE EQUIPMENT (NOTE 1) COMPETENCIES FOR IN-SERVICE INSPECTORS OF PRESSURE EQUIPMENT (NOTE 1) AICIP-003REV7 31 JULY 2017 No COMPETENCY LIST Time (Mins) Note 7 1. PLANNING AND PREPARING FOR INSPECTION ISI SISI AS/NZ 3788 Reference

More information

USER INSTRUCTIONS FOR VALVES WITH MEMBRANES

USER INSTRUCTIONS FOR VALVES WITH MEMBRANES Page: 1/8 USER INSTRUCTIONS FOR Page: 2/8 CONTENTS 1 SCOPE... 3 2 REFERENCE TYPES... 3 3 PRESENTATION... 3 3.1 SINGLE-PHASE VALVES... 3 3.2 DOUBLE-PHASE VALVES... 3 4 ADDITIONAL EQUIPMENT (ACCESSORIES)...

More information

PV4 and PV6 Piston Valves

PV4 and PV6 Piston Valves 1181250/1 IM-P118-05 ST Issue 1 PV4 and PV6 Piston Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6.

More information

OFFICIAL. Agreement to the implementation of pressurised inerting to manage excursion hydrogen within the Magnox Swarf Storage Silo OFFICIAL

OFFICIAL. Agreement to the implementation of pressurised inerting to manage excursion hydrogen within the Magnox Swarf Storage Silo OFFICIAL Magnox Swarf Storage Silo Risk and Hazard Reduction Programme Agreement to the implementation of pressurised inerting to manage excursion hydrogen within the Magnox Swarf Storage Silo Project Assessment

More information

Record of Assessment OFFICER IN CHARGE OF AN ENGINEERING WATCH

Record of Assessment OFFICER IN CHARGE OF AN ENGINEERING WATCH Record of Assessment for OFFICER IN CHARGE OF AN ENGINEERING WATCH Candidate s Name Candidate s Signature Candidate s Mariner Reference NOTE TO QUALIFIED ASSESSOR(S): In performing your function as a Qualified,

More information

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th Floor,

More information

Doors in watertight bulkheads of cargo ships and passenger ships

Doors in watertight bulkheads of cargo ships and passenger ships (June 2002) (Rev.1 Oct 2018) Doors in watertight bulkheads of cargo ships and passenger ships Application This unified interpretation pertains to doors 1 located in way of the internal watertight subdivision

More information

Coke drum Monitoring & Inspection for Fatigue Life and Safety Improvement

Coke drum Monitoring & Inspection for Fatigue Life and Safety Improvement Coke drum Monitoring & Inspection for Fatigue Life and Safety Improvement Amish B. Jani Asstt Vice President (Corrosion & Inspection), 2012 Coking.com, Ft. McMurray, Canada Presentation Tej Chadda Chief

More information

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317) IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN 46206-6015 OLQ PH: (317) 232-8941 Information SUBPART CC AIR EMISSION STANDARDS (40 CFR 264.1080

More information

CURI Pierside Stainless Diesel Tank

CURI Pierside Stainless Diesel Tank Mechanical Integrity Report for the CURI Pierside Stainless Diesel Tank at 208 North Palmetto Boulevard Clemson, South Carolina 29631 Inspection: 26 September 2012 Prepared by: George E. Matthews, E.I.T.

More information

GENERAL SAFETY INSTRUCTION GSI-M-2 STANDARD PRESSURE EQUIPMENT

GENERAL SAFETY INSTRUCTION GSI-M-2 STANDARD PRESSURE EQUIPMENT GENERAL SAFETY INSTRUCTION GSI-M-2 STANDARD PRESSURE EQUIPMENT Publication date: 09-06-2015 All CERN Safety Rules are available on the web site: https://www.cern.ch/safety-rules Page 1 of 8 1 INTRODUCTION

More information

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility,

More information

GUIDE YVL 3.7 / 26 Se p t e m b e r 2008

GUIDE YVL 3.7 / 26 Se p t e m b e r 2008 GUIDE YVL 3.7 / 26 Se p t e m b e r 2008 Pressure equipment of nuclear facilities Commissioning inspection 1 Ge n e r a l 3 2 Contents of the commissioning inspection 3 3 First phase of the commissioning

More information

F All types of inert gas systems are to comply with the following:

F All types of inert gas systems are to comply with the following: (1974) (Rev.1 1983) (Rev.2 1987) (Rev.3 May 1998) (Corr. Sept 2001) (Rev.4 May 2004) (Rev.5 Nov 2005) (Rev.6 May 2012) (Rev.7 May 2015) Inert Gas Systems.1 General Requirements.1.1 All types of inert gas

More information

LEGIONELLA MANAGEMENT PROCEDURE

LEGIONELLA MANAGEMENT PROCEDURE LEGIONELLA MANAGEMENT PROCEDURE This procedure sets out the aims and objectives of the school and outlines responsibilities for managing the risk of exposure to legionella. General Statement of Intent

More information

General maintenance engineering applications

General maintenance engineering applications Unit 868 General maintenance engineering applications UAN: J/600/6007 Level: Level 2 Credit value: 12 GLH: 55 Relationship to NOS: Endorsement by a sector or regulatory body: Aim: This unit has been derived

More information

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions 6250250/1 IM-P625-03 ST Issue 1 USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions 1. General safety information 2. General product information

More information

Implementing IEC Standards for Safety Instrumented Systems

Implementing IEC Standards for Safety Instrumented Systems Implementing IEC Standards for Safety Instrumented Systems ABHAY THODGE TUV Certificate: PFSE-06-607 INVENSYS OPERATIONS MANAGEMENT What is a Safety Instrumented System (SIS)? An SIS is designed to: respond

More information

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures Number K-3.0 Issued: 1/2009 Revised: 3/2016 Page 1 of 3 1.0 PURPOSE: To standardize procedures associated with production and maintenance welding and to minimize the potential risk of accident or injury

More information

Bubble Chamber Detector System

Bubble Chamber Detector System Bubble Chamber Detector System 1 ANL Bubble Chamber Lead designer and fabricator Brad DiGiovine (ANL) April 2009 Chamber Received Full Operation Authorization for (C 4 F 10 ) February 2010 First Bubble

More information

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING

More information

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions 4059051/3 IM-P405-48 EMM Issue 3 KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines Communication 1779 Assessing the risks from high pressure Natural Gas pipelines Founded 1863 Royal Charter 1929 Patron: Her Majesty the Queen Communication 1779 Assessing the risks from high pressure Natural

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-08001-011 : Harrison 550 CNC Lathe Large Sale Type For what use is this asset being sold? Re-Use þ Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other

More information