1 Specification for the Vacuum Chamber of the Liquid Hydrogen Target for the NPDGamma Experiment, 10 July 2002 Address Questions Regarding the Specification to the following people: Bill Lozowski and/or W. Mike Snow 2401 Milo B. Sampson Lane 2401 Milo B. Sampson Lane Bloomington, Indiana Bloomington, Indiana Telephone: (812) Telephone: (812) FAX (812) Fax: (812) Address Quotations to: Tim Rice Indiana University Purchasing Department Poplars Building, Rm 404 Bloomington, Indiana Telephone: (812) FAX: (812) Note: Desired delivery of these items is 5 weeks ARO. Bids will be opened and a Vendor selected on July 25, General This is a formal solicitation to bid on a job to make part of a 17-liter liquid para-hydrogen target. The entire target system includes: (1) two mechanical refrigerators, (2) a hydrogen gas-handling system, (3) an ortho-para converter for liquid hydrogen, (4) a 17 liter titanium target vessel, (5) an aluminum main vacuum chamber with channeling and/or double walls. (6) a copper radiation shield, and (7) entry and exit windows of titanium or magnesium for the main vacuum chamber. Presently, we are asking for quotes on item 5. We have produced two designs that are consistent with the goals of the experiment. At the moment these two alternatives are under consideration by the hydrogen safety committee at Los Alamos. We therefore ask the Vendor to produce a quotation on both variants of the design. They are similar enough that the labor involved in the cost estimate should not be excessive. We are sending you a CD-ROM with CAD drawings in Mechanical Desktop and pdf formats of our design for the items. Furthermore, appropriate files for CNC machine operation are available for pieces of sufficient complexity. This Specification covers the detailed design, fabrication, testing, quality control and documentation, and delivery of a cryogenic vacuum vessel for liquid hydrogen for the NPDGamma experiment. This vessel will be part of an overall liquid hydrogen target and gas handling system under construction at 1
2 the (IUCF) and will be operated at the Los Alamos Neutron Scattering Science Center (LANSCE). The vacuum vessel will be made mostly of aluminum with all welds and seals isolated by helium gas from contact with air. The vacuum vessel consists of a horizontal cylindrical chamber welded to a vertical chamber, which will accommodate the insertion of two mechanical refrigerators. The horizontal portion of the vacuum chamber will be surrounded on the outside by either a helium jacket or an equivalent chamber that insures that all welds and removable seals are surrounded on the outside by helium gas. At the moment there are two possible general designs for the vertical portion of the chamber: both are presented as possibilities for this quotation. Details of the vacuum vessel are shown in the mechanical drawings included with this request for quotation. A chamber inside the vacuum vessel will be filled with liquid hydrogen and operated at temperatures of approximately 20K (-423 F) with occasional thermal cycles back to room temperature over a period of approximately 3 years. The vessel must satisfy safety and quality control documentation requirements specified below. The remainder of the quotation outlines the performance and quality control requirements for the vessel. 1.1 Definitions of Terms A. Buyer: Indiana University will be referred to as the "Buyer." B. Vendor: The company receiving the contract for the work described in the Specification will be referred to as the "Vendor." C. Destination: "F.O.B. Indiana" will mean the, 2401 Milo B. Sampson Lane, Bloomington, IN Vendor Selection Procedures, Schedules, Technical capabilities and Expertise A. Rights Reserved. The Buyer absolutely reserves the right to select a Vendor on the combined bases of cost, technical features and time schedule. B. Implied Agreement. The submission of a quotation implies that the prospective Vendor agrees with Vendor selection procedures stated above. C. Sales Contract. After a Vendor is selected, a purchase order will be sent to that Vendor. D. Response Time. Only the subset of Vendors who submit their quotes on or before the deadline will be considered for the award of the contract. In particular, the buyer will not wait beyond the deadline to receive a response from every potential Vendor before the quotations are forwarded for a decision. 2
3 1.3 Information Required with Quotation The following information must be included with the quotation in order for the Buyer to select a Vendor: A. The total cost of the equipment as proposed with the following items quoted separately: (a) vacuum vessel with all flanges and attachments; (b) testing and associated documentation, (c) delivery costs including packaging, transportation, insurance, rigging and loading to F.O.B. Indiana. Note that the Vendor is free to provide a quotation that does not include some of the testing and associated documentation if these services are expensive, inconvenient, or beyond the expertise of the Vendor. B. A complete time schedule including fabrication, testing, factory inspection and delivery. C. A complete description of the repair and replacement warranty offered by the Vendor. Obligations of the Vendor under this warranty will include replacement of defective parts. D. The Vendor will include with the quotation any exceptions that he takes to the dimensional tolerances, test procedures or techniques of manufacture that are described in this Specification. The Buyer will consider proposals from the Vendor for alternative fabrication techniques, alternative testing methods, and small design modifications that do not compromise the safety and functional constraints. IU Purchasing must approve in writing (posted or ) any change that will alter an item in this Specification. E. The vendor will include with quotation a statement as to whether he has the in-house capability for performing the helium leak tests required in Sec or will rely on an outside agency or IUCF for performing these tests. 1.4 Vendor's Responsibility The intent and scope of this Specification is to cover procurement of materials, fabrication, testing, final inspection, packing, shipping and delivery of the described articles. This includes responsibility for accuracy, quality of workmanship and warranty. No change in this Specification or any drawing will be made without the written consent (posted or ) of the Buyer. 1.5 Vendor's work will include the following: A. The Vendor will furnish all labor, equipment, tools and facilities and perform all work necessary to manufacture the aluminum chamber and inlet and outlet ports per this Specification. 3
4 B. Employ such facilities, equipment and methods as may be necessary to achieve the degree of quality necessary to fulfill the requirements herein specified and to maintain a production rate and schedule consistent with the terms of the contract. C. Provide access for representatives of the Buyer to the production and test areas of the Vendor's facility at any reasonable time during the progress of the work called for by this Specification. D. Perform and document all inspections and tests to demonstrate that the finished product meets all requirements of this Specification. E. Prepare, load for shipment and deliver undamaged to F.O.B Destination, Indiana University Cyclotron Facility, 2401 Milo B. Sampson Lane, Bloomington, IN (See Sec. 2.5 for additional packing and shipping information.) F. In the event that the Vendor encounters a problem involving engineering, design, machining, fabrication or materials he will notify the Buyer promptly to obtain a mutually agreeable solution to the problem before proceeding with fabrication. 2. Detailed Specifications and Requirements 2.1 Design Parameters and Approvals A. This vacuum chamber will be used to contain a liquid hydrogen target for the NPDGamma experiment. Its vertical section will accommodate two mechanical refrigerators (not included in this specification). It will be capable of helium leak-tight operation. In addition, it must be able to withstand with minimal deformation internal pressures of 7 atm absolute (90 psig) in the vacuum vessel. and 7 atm absolute in the helium jacket. B. The body of the vacuum chamber and helium jacket, which must be nonmagnetic to meet the requirements of the NPDGamma experiment, will be made entirely of 5083-O or 6061-T6 aluminum alloy (see 2.2.A below). The source of all materials must be documented for quality control purposes with an appropriate certificate of origin. C. As the OD of the main body of the chamber must fit within the ID of a closely positioned detector array, it is of the utmost importance that the exterior does not have bumps or other irregularities that result in a diameter larger than inches. Within the stated dimensional tolerance, the main body must also be round. D. In addition, the shape of the vacuum vessel and helium jacket and the thicknesses of various portions of the vessel have been verified for acceptable strength under various accident scenarios by finite element calculations approved by the LANSCE safety committee. Therefore, any change in the proposed target design outside of normal fabrication tolerances must be approved in advance. 4
5 E. The LANL safety committee must approve the final mechanical drawings for the vessel before fabrication can start. 2.2 Chamber Fabrication A. The main body (cylindrical portion) of the vacuum chamber must be fabricated from aluminum seamless pipe. If seamless 5083-O pipe is not available in a suitable diameter for fabrication, 6061-T6 may be substituted to allow seamless fabrication. Note that the entire vacuum chamber will be constructed in such a way as to minimize the number and length of weld joints. The chamber will have associated entrance and exit pipes and appropriate flanges per the drawings. B. The welds of all vacuum-tight portions of the vessel will be continuous. Where possible, they will be made on the inside surface of the chamber. Double-sided welds will not be used. Abnormal weld buildup must be prevented to avoid interference with the elements to be fit inside and outside the chamber. C. Welds that join sections of the main chamber wall must achieve full penetration. These will be continuous welds to provide helium-leak-tight joints with minimum warping and distortion. D. Both sealing surfaces and flange faces will be machined to standard o-ring dimensional specifications and specified finishes where appropriate. E. Final machining on flange faces will be done after all welding is completed. F. All inside surfaces and sealing surfaces will have 16 RMS finish or better. G. The vacuum chamber will be cleaned and either electro-polished or chemi-polished. All forms of sand or bead blasting are forbidden. Trichlorethylene or perchlorethylene may be used for degreasing. H. The chamber will be annealed to relieve residual stress after all welds and other heat treatments associated with fabrication have been applied. I. With the exception of the chamber exterior, all internal surfaces must be electro-polished to reduce the emissivity of the vacuum walls and the radiation shield. 2.3 Welding A. It is essential that welders used on this project have complete mastery of helium-leak-tight welding of aluminum. Welders are required to have passed the qualification tests given in section IX of the ASME Boiler and Pressure Vessel Code. B. Welding will be done with tungsten or metallic inert gas-shielded arc, using reactor grade helium, argon or mixtures thereof, containing less than 15 ppm impurities and less than 15 microns particle size. Filler material will be free of oil, oxides and other contaminants and will be compatible with the parent material. 5
6 C. All brushes used for cleaning will have new clean stainless steel bristles. Hand scrapers will be clean and of high quality. D. All weld areas will have 250 RMS finish or better. The material in the weld areas will be free of cracks, cavities, porosity and inclusions of foreign material. There will be no burrs or sharp edges on the metal parts that can tear gloves or cleaning tissues. E. Surfaces to be welded will be wire brushed. Trichlorethylene or perchlorethylene may be used for degreasing. F. After each vacuum-tight weld is completed, it will be carefully inspected for cracks. Any crack will be ground out, wire brushed to remove foreign particles and then re-welded without excessive buildup of material. G. The vacuum tight continuous welds will be on interior joints and will be performed after all exterior structural welds are complete. H. Peening and all other forms of hand working of weld surfaces are forbidden. All forms of sand or bead blasting are forbidden. I. Post-weld annealing will be performed before final testing. 2.4 Inspection and Testing A written record of all tests will be maintained. These reports will be available to the buyer at any reasonable time. Copies will be supplied to the buyer upon successful completion of each test. Each report will include date, location of test, name of vendor s representative in charge and name of buyer's representative, if any The vendor must send a written copy of a document that certifies the reliability of all instruments and equipment used in testing Before shipment of this chamber, all mechanical dimensions will be checked for agreement with the drawings and this specification Upon acceptance of the order but prior to performing the work, the vendor will check the Specification and drawings furnished by the buyer and report in writing any errors, omissions or discrepancies found therein Helium Leak Testing A. For vacuum testing, the chamber will be thoroughly cleaned per sec. 2.2.G, and assembled using appropriate blank-off plates and temporary support blocks as needed. 6
7 B. Testing will be done with a helium spectrometer-type leak detector with a sensitivity of at least 2 x 10-9 std. cc/sec. The spectrometer will be recalibrated with a standard leak at intervals during the test as required. C. A leak will be defined by a 2% or more deflection on the most sensitive scale of the leak rate meter when the weld is probed with helium or when a vessel containing 100% helium for at least one minute surrounds the vacuum chamber. D. The initial test procedure will be as follows; a) Evacuate the vessel and attach the helium spectrometer leak detector. b) Valve off the vacuum pumps, leaving the spectrometer pumping on the chamber. c) Confirm spectrometer sensitivity by checking with a standard leak. d) Test for chamber leaks by spraying each section of the chamber surface with a microscopic jet of helium. E. If a leak is found, the weld will be ground out, wire brushed to remove foreign particles, and then re-welded without excessive buildup of material. This will be repeated until the chamber is free of leaks. All other methods for leak sealing, such as peening or chemical sealing, are expressly forbidden. F. Should a leak result from faulty chamber material rather than faulty welding, the vendor will report this to the buyer before attempting a repair. G. After all apparent leaks have been found and repaired, the evacuated chamber will be enclosed in a plastic bag and a helium atmosphere introduced around it. The chamber will be free of leaks as defined by C Pressure Testing For pressure testing, the chamber will be assembled using appropriate blank-off plates and temporary support blocks as needed. The chamber will be filled with gas at a pressure of 7 atm absolute (103 psia), as measured by a calibrated pressure gauge with certification provided to the Buyer. The chamber must neither fail nor permanently deform as a result of this test. A final helium leak test (2.4.5.G) and a weld test (2.4.7) must be performed after the completion of this test Weld Testing All welds must be inspected for faults by x-ray radiography, ultrasonic techniques, or other nondestructive techniques. All results of such tests will be made available to the Buyer. Any faults exposed by such testing must be corrected and the welds retested until no faults are present. 7
8 2.5 Packing and Shipping Following satisfactory completion and tests at the vendor's plant, the chamber will be wrapped and then crated for shipping. All boxes and wrappings will be of sufficient quality and strength to protect the parts against weather and handling damage during shipment. A representative of the buyer will supervise unloading of the shipment at the Shipping will be by truck. Rail shipment is forbidden. Transfer between vehicles is forbidden (i.e., no off-loading before destination) Each item will be insured at a value at least equal to its replacement cost as estimated by the Vendor The Vendor will notify the Buyer ten (10) days prior to shipment. The notice will include the purchase order number, origin, date, routing of shipment, date of arrival and the shipping weight. Please let us know what questions/comments you have on this job. Hermann Nann nann@iucf.indiana.edu (812) FAX (812) Mike Snow snow@iucf.indiana.edu (812) FAX (812) Walt Fox waltf@iucf.indiana.edu (812) FAX (812) Bill Lozowski lozowski@iucf.indiana.edu (812) FAX (812)
v. Size shall be specified on drawings.
SPECIFICATION FOR VACUUM INSULATED PIPING Part 1 General 1. Submittals a. After award of contract and before executing any manufacturing, shop drawings and specifications shall be submitted to the customer
More informationSTANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)
STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) TEE (HOT TAPPING MATERIAL) S-04-02-040 Page 1 of 7 1.0 SCOPE This specification covers the basic requirements for the design, manufacture and supply
More informationDesign and Safety Document for the Vacuum Windows of the NPDGamma Liquid Hydrogen Target at SNS
Design and Safety Document for the Vacuum Windows of the NPDGamma Liquid Hydrogen Target at SNS Prepared: Checked: Approved: H. Nann W. Fox M. Snow The NPDGamma experiment is going to run at BL13 at SNS
More informationCLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.
Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is
More informationHYDROSTATIC LEAK TEST PROCEDURE
This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics
More informationSafety Aspects and Design of the Vent Isolation Chamber. Prepared: W.M. Snow Checked: H. Nann Approved: W. M. Snow
Safety Aspects and Design of the Vent Isolation Chamber Prepared: W.M. Snow Checked: H. Nann Approved: W. M. Snow 1. Scope This document addresses the safety aspects and design of the vent isolation chamber
More informationANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS
Procedure-assembly-functional test and performance requirements 1 SCOPE 1.1 This document establishes the general procedure for assembly, functional testing and normal performance requirements of low Series
More informationPIP PNE00012 Piping Examination and Leak Test Guide
October 2017 Piping PIP PNE00012 Piping Examination and Leak Test Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has
More informationCanadian Light Source Inc. Vacuum Component Leak Test Technical Procedure
Canadian Light Source Inc. Vacuum Component Leak Test Technical Procedure CLSI Document 8.7.33.2 Rev. 2 Date: 2006-03-08 Copyright 2006, Canadian Light Source Inc. This document is the property of Canadian
More informationSeries 8500 Expansion Compensators. Catalog 674H
Series 8500 Expansion Compensators Catalog 674H 500 Laminated Bellows Expansion J Series 8500 on Joints Expansion Compensators Sizes 3/4" through 4" Threaded, welded, flanged and grooved steel pipe joints
More informationA Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)
UN-GTR PART A INSERTION Stand 09.02.2011, 17:20 Uhr A.3.3 HYDROGEN STORAGE SYSTEM The hydrogen storage system consists of all components that form the primary pressure boundary of the stored hydrogen in
More informationLiquefied gas cargo tanks and process pressure vessels
.1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant
More informationRELIEF VALVES. General Description
RELIEF VALVES FOR CONDENSER SERVICE General Description Graham Viking Valves are produced in three basic designs: Horizontal, Vertical and Angle. The Horizontal and Angle valves are available with various
More informationThe latest automotive systems require innovative leak test methods and fixturing.
Leak Testing Auto Parts The latest automotive systems require innovative leak test methods and fixturing. In the past, automobile manufacturers only required basic forms of leak testing to check standard
More informationINSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures
INSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures MINT-0289-XX TABLE OF CONTENTS Limited Warranty... 3 User Responsibility... 3-4 General Service... 4 Safety Precautions.... 5 Physical Dimensions..
More informationCSA Sample Draw Aspirator Adapter Operator s Manual
30-0951-CSA Sample Draw Aspirator Adapter Operator s Manual Part Number: 71-0367 Revision: 0 Released: 4/30/15 www.rkiinstruments.com WARNING Read and understand this instruction manual before operating
More informationInstallation restrictions for length of sections should also be noted.
Since 1966 CHART (formerly MVE) has specialized in the design and fabrication of custom cryogenic piping for liquid nitrogen, oxygen, argon, helium, and hydrogen in pipe sizes ranging from 1/4" through
More informationNPDGamma LH2 Target OJT Lesson Plan: Senior Operator for the NPDGamma LH2 Target Operators
0. Introduction Object of this on-the-job Training (OJT) Lesson Plan is to train Senior Operators for the NPDGamma LH2 target system. After successful of this OJT and authorization by line management Senior
More informationUse of Underwater Dry Welding for In Situ Repair to Offshore Structures. Sabine Powell 02/12/2016
Use of Underwater Dry Welding for In Situ Repair to Offshore Structures Sabine Powell engineering@neptunems.com 02/12/2016 In Situ Welding Steel Structures Suitability of Repair Methods Mobile Offshore
More informationPiped Air SCBA Refilling System Standard
WALT WHITE Fire Chief 5770 Freeport Blvd., Suite 200 Sacramento, CA 95822-3516 Ph: (916) 808-1300 Fax: (916) 808-1629 www.sacfire.org Piped Air SCBA Refilling System Standard SCOPE: This specification
More informationOutline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products
Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products Appendix 1 Supervisory Inspection Rule for Safety Performance of Boiler and Pressure Vessel Products Published
More informationSterile Visual Flow Indicator
Sterile Visual Flow Indicator Sanitary Process Connection Installation / Operation / Maintenance Manual P.O. Box 1116 Twinsburg, OH 44087 Phone: 330/405-3040 Fax: 330/405-3070 E-mail: view@ljstar.com Web
More informationAtmospheric relief valve type 1100 Installation and maintenance instructions
SAPAG 1. Description Sapag atmospheric relief valves type 1100 have been selected for installation because of their performance features, reliability and ease of maintenance. They are designed to protect
More informationFlange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing
Flange Bolt Torquing for Resistoflex Plastic-Lined Piping Products Torquing When assembling flange connections, always use a full complement of clean, new high strength A193-B7 bolting. If using stainless
More informationRK-IR Sample Draw Aspirator Adapter Operator s Manual
30-0951RK-IR Sample Draw Aspirator Adapter Operator s Manual Part Number: 71-0018RK Revision: A Released: 6/2/10 www.rkiinstruments.com Product Warranty RKI Instruments, Inc. warrants gas alarm equipment
More informationThe Committee is asked to report to the LANSCE-12 group leader, Alan Hurd. The Committee is asked to;
AGENDA AND DESCRIPTION OF SYSTEM The committee met at the Indiana University Cyclotron Facility (IUCF), Bloomington, Indiana, on December 4-5, 2001. The charge to the committee was given by the LANSCE-12
More informationMedical Gas Solutions
WHN YOU ND from OKRING okring Technology, C offers a patented, permanent, axially swaged tube fitting. This technology for medical gas applications has been approved by NFP 99-005 (Paragraph 5..0.7 (4)).
More informationHot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS
262-2040 Hot Tapping Machine For performing 1/4 6 Hot taps 285 psi or less. Municipal Water, Sewage, & Building Services Use OPERATIONS MANUAL and OPERATING INSTRUCTIONS WARNING: These instructions are
More informationMSC Guidelines for Independent Fuel Tanks
References: Contact Information a. 46 CFR 58.50 (Independent Fuel Tanks) b. 46 CFR 119.440 (Independent Fuel Tanks) c. 46 CFR 182.440 (Independent Fuel Tanks) C. J. Robuck, LCDR, Chief, Engineering Division
More informationOptimizing Gas Supply for Industrial Lasers
Optimizing Gas Supply for Industrial Lasers Laser cutting of metals and other materials has grown rapidly due to developments in laser power, advancements in CNC automation, and decreasing costs. The industrial
More informationRK LEL Sample Draw Aspirator Adapter Operator s Manual
30-0951RK LEL Sample Draw Aspirator Adapter Operator s Manual Part Number: 71-0017RK Revision: A Released: 6/2/10 www.rkiinstruments.com Product Warranty RKI Instruments, Inc. warrants gas alarm equipment
More informationCS Controlled Dissolved Gas assembly with optional CS Air Aspirator assembly. Installation and Operation information
CS-425-01 Controlled Dissolved Gas assembly with optional CS-603-01 Air Aspirator assembly Installation and Operation information Serial # CS-XXX Date of shipment:, 2005 Shipped to: Purchase order #: xxxxxxx
More informationAmerican Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM
American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1048 - REVISED: 2009 Double Check Detector Fire Protection Backflow Prevention Assemblies Separate, complete laboratory
More informationBODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION
BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION May and September, 2017 and January 2018 (Replaces May 2016) API Authorized Pressure Vessel Inspectors must have a broad knowledge
More informationCVI Valve Line. Exceeds the industry s highest standards for reliability and performance
CVI Valve Line Exceeds the industry s highest standards for reliability and performance Available in the most standard models with the shortest lead times in the industry Exceptional quality every CVI
More informationGas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A.
Gas Lines Technical Manual Sumitomo (SHI) Cryogenics of America, Inc. 1833 Vultee Street Allentown, PA 18103-4783 U.S.A. Revision F: April 2008 261320A TABLE OF CONTENTS Page DESCRIPTION...1 SPECIFICATIONS...2
More informationCircular Sight Windows
ARCHON Industries, Inc. Circular Sight Windows Model: SS-TC Installation / Operation / Maintenance Instruction Instruction No.: 1031 Issued: 09/20/2011 Approved: F. Bongiorni, Engineering Mgr TABLE OF
More informationINSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES
INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES THIS BOOKLET CONTAINS PROPRIETARY INFORMATION OF ADVANCED SPECIALTY GAS EQUIPMENT CORP. AND IS PROVIDED TO THE PURCHASER SOLELY FOR USE
More informationU S E R M A N U A L CAUTION. SAVE THESE INSTRUCTIONS Federal (USA) law restricts this device to sale by or on the order of a physician.
U S E R M A N U A L 1600 SERIES OXYGEN REGULATOR 168715G (Shown) SAVE THESE INSTRUCTIONS Federal (USA) law restricts this device to sale by or on the order of a physician. 300 Held Drive Tel: (+001) 610-262-6090
More informationWHEATLEY Series 500 Swing Check Valve
Document Number: TC003001-13 Revision: 02 WHEATLEY Series 500 Swing Check Valve Installation, Operation, and Maintenance Manual TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...5 INSTALLATION AND OPERATION
More informationSECTION DOMESTIC WATER PIPING
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections
More informationWATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL
Capital Controls Series 71V3000 The Series 71V3000 electrically-heated vaporizer automatically vaporizes and superheats liquid chlorine, sulfur dioxide or ammonia at a rate controlled by the gas feed system.
More informationTHE PROCESS OF JOINT INTEGRITY
BOLTED JOINTS A.333 THE PROCESS OF JOINT INTEGRITY To assist in managing a process, ask yourself the following questions: why, what, who, and how? Why do we need a Flange Joint Integrity program? This
More informationModel Series 62 Constant Differential Relay
Siemens Industry, Inc. INSTALLATION AND SERVICE INSTRUCTION INTRODUCTION Model Series 62 Constant Differential Relay Rev 11 March 2011 Supersedes Rev 10 The Constant Differential Relay maintains a constant
More information1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)
1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1. According to NFPA 99, SCFM is an acronym for. a) Surface Conditions at Fahrenheit Mercury b) Standard Conditions
More informationVIC offers a variety of Calibrated Gas Leaks
CALIBRATED GAS LEAKS VIC offers a high quality line of calibrated gas leaks traceable to National Institute of Standards Technology (NIST). Calibrated gas leaks are used to provide a controlled delivery
More informationFAILURE AND HAZARD ANALYSIS OF THE NPDGAMMA LH2 TARGET SYSTEM
FAILURE AND HAZARD ANALYSIS OF THE NPDGAMMA LH2 TARGET SYSTEM Revision: 0.00 Edited by: Seppo Penttila, November 10, 2010 1. General The RSS 8305.0 Installation, Commissioning, and Operation of the NPDGamma
More informationLimited quantities of compressed gases.
173.306 Limited quantities of compressed gases. (a) Limited quantities of compressed gases for which exceptions are permitted as noted by reference to this section in 172.101 of this subchapter are excepted
More informationRegulatory Concerns for Leakage Testing of Packagings with Three 0-Ring Closure Seals
Regulatory Concerns for Leakage Testing of Packagings with Three 0-Ring Closure Seals John J. Oras Argonne National Laboratory Argonne, II 60439-4825 Robert H. Towell Eagle Research Group, Inc. Germantown,
More informationAPI-510 PRESSURE VESSEL INSPECTOR
BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION July 2013 (Replaces July 2012) API Authorized Pressure Vessel Inspectors must have a broad knowledge base relating to maintenance,
More informationACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS
ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th Floor,
More informationAPCO ASU-SCAV & ASU-CAV SINGLE BODY COMBINATION AIR VALVES
APCO ASU-SCAV & ASU-CAV SINGLE BODY COMBINATION AIR VALVES Instruction D12039 December 2015 Instructions These instructions provide installation, operation and maintenance information for the. They are
More informationPRO-50 Instrument Supply Regulator
Features CRN Approved The PRO-50 Regulator has been granted a Canadian Registration Number. Sour Service Capability Available in NACE configurations that comply with NACE MR0175/MR0103. Environmental limits
More informationSeries 203 Granville-Phillips Variable Leak Valve
Series 203 Granville-Phillips Variable Leak Valve Instruction Manual Instruction manual part number 203026 Revision B - November 2016 Series 203 Granville-Phillips Variable Leak Valve Customer Service
More informationFlexible Metal Hose Products
Flexible Metal Hose Products Specialty Flexible Hose Solutions of Stainless Steel The AEROCOM Advantage Aerocom offers engineered solutions that address specific flexible piping challenges such as vibration,
More informationBMW proposal for. Technical requirements concerning LIQUID HYDROGEN STORAGE SYSTEMS. for the use in hydrogen powered road vehicles
BMW Draft, based on TRANS/WP.29/GRPE/2003/14 page 1 SGS 3-8 BMW proposal for Technical requirements concerning LIQUID HYDROGEN STORAGE SYSTEMS for the use in hydrogen powered road vehicles BMW Draft, based
More informationSAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE
SAPAG IMPORTANT NOTICE Contents Important notice 1 0 Valve identification 2 1 Storage 2 2 Installation 2 3 Operation 2 4 Maintenance 3 4.1 Dismantling 3 4.2 Inspection 3 4.3 Repair 3 4.4 Assembly 4 4.5
More informationINSTALLATION AND OPERATING INSTRUCTIONS
INSTALLATION AND OPERATING INSTRUCTIONS For 3D Instruments Direct Drive Pressure Gauges 3D Instruments Inc., 15542 Chemical Lane, Huntington Beach, CA, 92649, U.S.A. Tel. (714) 894-5351, Fax. (714) 895-4309
More informationTri-Safem Model I1 Regulator. INSTRUCTIONS and PARTS
Tri-Safem Model I1 Regulator INSTRUCTIONS and PARTS USER RESPONSIBILITY This equipment will perform in conformity with the description thereof contained In this manual and accompanying labels andlor inserts
More informationAPPENDIX 1. PART 10: Leak Detection Inspector, Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL. 3 rd Edition, February 2016
CERTIFICATION SCHEME FOR PERSONNEL Document No. CSWIP-ISO-NDT-11/93-R Requirements for the Certification of Personnel Engaged in Non- Destructive Testing in accordance with the requirements of BS EN ISO
More informationQUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7
QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7 1.0 Purpose The purpose of this specification is to establish the minimum quality assurance requirements
More informationROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6
Sub Section INDEX Page Number 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6 6. INSTALLATION AND OPERATION 6 7. MAINTENANCE 8 8. REPAIR 9 9. ASSEMBLY 10 10.
More informationSample C ylinde rs, Acce ssorie s, and O utage Tube s
www.swagelok.com Sample C ylinde rs, cce ssorie s, and O utage s Features Sizes from 10 to 3785 cm 3 (1 gal) Working pressures up to 5000 psig (344 bar) 304L and 316L stainless steel and alloy 400 2 Sample
More informationManual. Bypass Feeder. Installation Maintenance Repair Manual. Chemical Addition and Filtering
Manual Bypass Feeder Chemical Addition and Filtering Installation Maintenance Repair Manual Advantage Controls P.O. Box 1472 Muskogee, OK 74402 Phone: 918-686-6211 Fax: 918-686-6212 www.advantagecontrols.com
More informationFLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS
CHAPTER 35 FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS SECTION 3501 GENERAL 3501.1 Scope. The storage and use of flammable gases shall be in accordance with this chapter. Compressed gases shall also
More informationTown of Wells Vehicle Bid Package
Town of Wells Vehicle Bid Package One (1) - 2018 Ford Utility Police Interceptor Vehicle January 19, 2018 2018 Ford Utility Police Interceptor Vehicle Bid Page 2 TOWN OF WELLS INVITATION FOR BID PROPOSALS
More informationInstruction Manual Contact Pressure Vacuum Gauge
MS10 Instruction Manual Contact Pressure Vacuum Gauge Table of Contents 1. Safety Instructions 2. Intended Applications 3. Product Description and Functions 4. Installation 5. Commissioning 6. Maintenance
More informationCOMPONENTS MANUFACTURING
COMPONENTS MANUFACTURING ASSEMBLY TESTING Manifolds Valex Manifolds PCW, CFOS, UHP Configurations with ball valve, diaphragm valve & bellows valve options Main run lengths up to 24 feet & 12 inch in diameter
More informationTechnical Specifications of Hydrogen Isotope Handling and Recovery System
SECTION - C TECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS. Technical Specifications of Hydrogen Isotope Handling and Recovery System INSTITUTE FOR PLASMA RESEARCH GANDHINAGAR, GUJARAT 382428 ANNEXURE-I
More informationPRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL
PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL Company Registered Office: Crown House, Stockport, Cheshire, SK13RB No. 850 0700 67 Registered in England and Wales No. 05058855
More informationAND OPERATION INSTRUCTIONS
ADI 2111-D Certified ISO 9001 MEDICAL FLOWMETER (Back Pressure Compensated Thorpe Tube) INSTALLATION AND OPERATION INSTRUCTIONS Before Installing or Operating, Read and Comply with These Instructions Controls
More informationCF-SERIES HIGH FLOW REGULATORS
CF-SERIES HIGH FLOW REGULATORS Owner s Manual Printed in U.S.A February 2014 Publication No. OM-CA-3 REV.4 1.3 Copyright Notice 1.0 Introduction The CF-Series are high flow regulators for critical applications
More informationPERFORMANCE SPECIFICATION PROPELLANT, HYDROGEN
METRIC 17 May 2013 SUPERSEDING MIL-PRF-27201D 07 February 2007 PERFORMANCE SPECIFICATION PROPELLANT, HYDROGEN This specification is approved for use by all Departments and Agencies of the Department of
More informationCLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)
Page 1 of 10 CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) 1. SCOPE 1.1 To provide definitive requirements for HIGH PRESSURE PNEUMATIC testing of piping systems according to ASME B31.3. This
More informationInstallation Instructions JATCO Environmental Protection Tank Model J-5000CX
Installation Instructions JATCO Environmental Protection Tank Model J-5000CX The JATCO Environment Tank must be installed at a level which will allow the waste liquids to be disposed of to gravity flow
More informationRegulated Oil and Gas Companies under National Energy Board Jurisdiction
File 185-A000-41 8 August 2003 Regulated Oil and Gas Companies under National Energy Board Jurisdiction Dear Sir / Madam: Guidance Notes for Pressure Equipment under National Energy Board Jurisdiction
More informationP-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints
Guideline No.P-04 (201510) P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS
More information61R2 STANDARD REGULATOR COMPACT REGULATOR. Phone Fax
6R STANDARD REGULATOR COMPACT REGULATOR 496 Phone 7.63.888 Fax 7.63.690 6R AND 496 REGULATORS General Information The Model 6R and 496 Compact Regulator (CR) are designed to deliver reliable and safe regulation
More informationINSTALLATION, OPERATION AND MAINTENANCE MANUAL. Model Sanitary Vent SECTION I
INSTALLATION, OPERATION AND MAINTENANCE MANUAL Model 1100 Sanitary Vent IOM-1100 03-17 ISO Registered Company SECTION I I. DESCRIPTION AND SCOPE The Model 1100 is a stainless steel sanitary vent designed
More informationNotice for Pressure Special Equipment Manufacture Licensing
AQSIQ Notice No.151 (2012) Notice for Pressure Special Equipment Manufacture Licensing To further enhance the implementation of the manufacture licensing system to imported pressure special equipment,
More informationInstallation Instructions and valve Maintenance Rev. 0 of 21/09/15
ASSEMBLING PROCEDURE AND VALVE MAINTENANCE 1.0.... Safety Information 2.0.. INTRODUCTION 3.0 VARIATIONS 4.0..ASSEMBLING PROCEDURE FOR THE STEM 5.0 ASSEMBLING PROCEDURE FOR OUTLET CONNECTIONS 6.0 PROCEDURE
More informationLUDLUM MODEL 239-1F FLOOR MONITOR. Revised December 2010
LUDLUM MODEL 239-1F FLOOR MONITOR Revised LUDLUM MEASUREMENTS, INC. 501 OAK ST., P.O. BOX 810 SWEETWATER, TX 79556 325/235-5494 FAX: 325/235-4672 STATEMENT OF WARRANTY Ludlum Measurements, Inc. warrants
More informationModel MTB-ASME Vertical Bladder Tanks
DATA SHEET Model MTB-ASME Vertical Bladder Tanks Features n UL Listed for use with various proportioners and foam concentrates n 175 psi (12.1 bar) maximum allowable working pressure (design pressure)
More informationMade in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:
Submittal Sheet Materials: 2 Schedule 40 Steel Pipe (2.375 OD) Finishes: Galvanized An after fabrication hot dipped galvanized finish is available Powder Coat Our powder coat finish assures a high level
More informationHYDROVEX TTT Membrane Flow Regulator
HYDROVEX TTT Membrane Flow Regulator INSTALLATION, OPERATION AND MAINTENANCE MANUAL PROJECT EQUIPMENT LOCATION EQUIPMENT DESCRIPTION HYDROVEX TTT REFERENCE N OF THE SUPPLIER MODEL N SERIAL N DATE OF FABRICATION
More informationModel MTB-ASME Horizontal Bladder Tanks
DATA SHEET Model MTB-ASME Horizontal Bladder Tanks Features n UL Listed and FM Approved for use with various proportioners and foam concentrates n 175 psi (12.1 bar) maximum allowable working pressure
More informationModel MTB-ASME Vertical Bladder Tanks
DATA SHEET Model MTB-ASME Vertical Bladder Tanks Features n UL Listed for use with various proportioners and foam concentrates n 175 psi (12.1 bar) maximum allowable working pressure (design pressure)
More informationGAS SUPPLY DESIGN GUIDE
GAS SUPPLY DESIGN GUIDE Natural Gas, Propane Gas, or Dual Fuel Fired Modulating, Condensing Boilers BENCHMARK Series Gas-Fired Boilers For models: BMK750 to BMK6000 Last Update: 06/20/2014 PR1 06/20/14
More informationGuide for Evaluating Your Hose Assembly Supplier
Guide for Evaluating Your Hose Assembly Supplier Supplier Evaluation Checklist, and How to Clearly Define Application Requirements Safe, reliable hose assemblies require appropriate specification work
More informationOther Si min/max. Cr min/max. 0.4/ / / / Bal.
178.46 Specification 3AL seamless aluminum cylinders. (a) Size and service pressure. A DOT 3AL cylinder is a seamless aluminum cylinder with a imum water capacity of 1000 pounds and minimum service pressure
More information3800 SERIES END SUCTION PUMP REPAIR PARTS INDEX. Model Model 3804
Model 3801 Model 3804 3800 SERIES END SUCTION PUMP REPAIR PARTS INDEX NOTE! To the installer: Please make sure you provide this manual to the owner of the equip ment or to the responsible party who maintains
More informationGILMONT ACCUCAL FLOWMETERS
OPERATING MANUAL GILMONT ACCUCAL FLOWMETERS 28W092 Commercial Ave. Barrington, IL U.S.A. 60010-2392 (847) 381-4888 (847) 381-7053 (Fax) 800-962-7142 www.barnant.com e-mail: barnant@barnant.com A-1299-0766
More informationInstallation Instructions
Installation Instructions Durametallic MD-200 Series Gas Dual Cartridge Canister Seal for Mixers and Agitators Experience In Motion 1 Equipment Check 1.1 Follow plant safety regulations prior to equipment
More informationDUPLEX TECHNICAL INFORMATION FABRICATED DUPLEX STRAINERS
DUPLEX STRAINER TECHNICAL INFORMATION - 119 - SCREEN OPENINGS 100 Mesh - 30% O.A. 0.006 Openings 80 Mesh - 36% O.A. 0.008 Openings 60 Mesh - 38% O.A. 0.010 Openings 40 Mesh - 41% O.A. 0.016 Openings 30
More informationWafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1
Serial No. H-V066-E-3 Wafer Check Valve User s Manual Contents (1) Be sure to read the following description of our product warranty 1 (2) General operating instructions 2 (3) General instructions for
More informationTITAN FLOW CONTROL, INC.
PREFACE: This manual contains information concerning the installation, operation, and maintenance of Titan Flow Control (Titan FCI) Simplex Basket Strainers. To ensure efficient and safe operation of Titan
More information[Reserved] Packagings ICC 3 1 3AA 3AL 3AX 3A480X 3AAX
173.300 [Reserved] 173.301 General requirements for shipment of compressed gases and other hazardous materials in cylinders, UN pressure receptacles and spherical pressure vessels. (a) General qualifications
More informationPROCEDURE TWO-PLY TESTABLE BELLOWS D 1 OF 5 TWO PLY BELLOWS TEST PROCEDURE
PROCEDURE TWO-PLY TESTABLE BELLOWS D 1 OF 5 TWO PLY BELLOWS TEST PROCEDURE Prepared by: Pathway Piping Solutions Daniel L. Edgar, PE Pine Valley, Ca 91962 Phone: (619) 473-8248 FAX: (619) 473-8148 Pathway
More informationNB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE
NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE INSTALLATION, OPERATION & MAINTENANCE MANUAL INTERFACE DEVICES, INC. 230 Depot Road, Milford, CT 06460 Ph: (203) 878-4648, Fx: (203) 882-0885, E-mail: info@interfacedevices.com
More informationSERIES 30. Spring Operated Tank Blanketing Valve PROTECTOSEAL.
SERIES 30 PROTECTOSEAL 1 2" NPT inlet and outlet standard Direct acting valve mechanism Optional flanged or threaded inlet and outlet connections available Inlet gas pressures from 10 PSIG to 200 PSIG
More information