CHAPTER 1 PURPOSE OF AND NEED FOR ACTION

Size: px
Start display at page:

Download "CHAPTER 1 PURPOSE OF AND NEED FOR ACTION"

Transcription

1 CHAPTER 1 PURPOSE OF AND NEED FOR ACTION This chapter describes the current and proposed project area and summarizes the Proposed Action, the Purpose of and Need for the action, the decisions to be made, and the regulatory requirements that govern the Proposed Action and this analysis. 1.1 BACKGROUND The Montana Snowbowl Ski and Summer Resort (MSB) is an alpine ski and summer resort located on both private and federal land approximately 12 miles north of Missoula, Montana. The federal land is administered by the Lolo National Forest (LNF). The existing ski area includes 1,138 acres of federal land administered by and under permit with the LNF and 80 acres of private land (owned by MSB) located at the base area (Figures 1-1 and 1-2). The base area is the location of the lodge and other administrative facilities at which skiers and other MSB users congregate and from which MSB is managed. The MSB currently operates a full winter (five to seven days per week) and limited summer schedule (Friday, Saturday, and Sunday). Existing facilities on LNF land include ski trails, lifts (both surface and chairlifts), small buildings, buried water and power lines, a snowmaking reservoir, hiking trails, mountain bike trails, and a folf (disc golf) course. Facilities on adjacent private land include ski trails, lifts, a rope tow, buildings, buried water and power lines, a snowmaking reservoir, hiking trails, a mountain bike trail, a potable water system, wastewater disposal systems, and parking areas. The proposed expansion area is on LNF land called TV Mountain. TV Mountain is adjacent to and immediately west of the existing permit area. The west side of TV Mountain is the location of the original Snow Park Ski Area, which was the predecessor to the current MSB. Snow Park operated on LNF land during the 1950s and closed in The ski area was then moved to the Butler Creek drainage and re-opened in 1961 due to the availability of higher elevation terrain, better snow conditions, and greater vertical drop. In addition to the original Snow Park Ski Area, the proposed expansion area includes areas of past timber harvest, existing roads, and utilities. The summit of TV Mountain is a designated communications site (under permit with the LNF) with numerous television, radio, and microwave facilities and would be surrounded by the proposed expansion area. The MSB has operated on the LNF under a Special Use Permit (SUP) since The MSB currently has a 40-year SUP (to expire in 2044). All of the existing SUP area on LNF land was assigned to Management Area (MA) 8 (ski areas) in the 1986 LNF Land and Resource Management Plan (United States Forest Service [USDA] 1986), referred to hereinafter as the Forest Plan. Approximately 706 acres of the proposed expansion area are currently assigned to MA 16 (timber production), and 399 acres are assigned to MA 25 (timber production within the constraint of achieving a visual quality standard of Partial Retention). Previous National Environmental Policy Act Decisions In 1993, the MSB submitted a Master Development Plan (MDP) to the LNF. The LNF evaluated this plan in an Environmental Assessment (EA) that was finalized in January 1995 (USDA 1995a). The LNF issued a Decision Notice and Finding of No Significant Impact in April 1996 Draft EIS 1-1 Montana Snowbowl

2 Figure 1-1. Montana Snowbowl Vicinity Map Draft EIS 1-2 Montana Snowbowl

3 Figure 1-2. Base Area Map Draft EIS 1-3 Montana Snowbowl

4 (USDA 1996) approving an increase in the SUP area to the current 1,138 acres and the addition of several lifts, ski trails, a hiking/biking trail, and the expansion of the snowmaking operation. Since the 1996 decision, the MSB has delayed or modified some of the remaining projects approved in that decision based on economic considerations and the requirement by the LNF to complete improvements to Snowbowl Road/Forest Road (FR) 698 (herein identified as simply Snowbowl Road); the LNF stipulated that MSB could implement only projects that enhanced beginner or intermediate skiing until Snowbowl Road was widened. Improvements (i.e., projects) that were approved in the 1996 decision but delayed would be delayed pending the approval of the proposed MSB expansion onto TV Mountain (the Proposed Action in this Environmental Impact Statement [EIS]). Improvements that were modified were subsequently included in the MDP (MSB 2004). Those activities are part of the Proposed Action and are therefore analyzed in this EIS. In summary, if an improvement action was approved in the 1996 LNF authorization but not yet implemented, it is analyzed in this EIS as either a Connected Action or a part of the Proposed Action. 1.2 PROPOSED ACTION The MSB is proposing to expand its alpine ski and summer resort to LNF land on TV Mountain in the general location of where the original Snow Park Ski Area was permitted and operated (Section 1.1). This expansion proposal is summarized in a revised MDP (MSB 2004) that was accepted by the LNF on December 6, The proposed expansion would increase the existing SUP area by 1,105 acres to 2,243 acres (Figure 1-1). New facilities on LNF land would include ski trails, lifts, buried lines (power, water, and wastewater), a snowmaking reservoir, hiking and mountain bike trails, two wastewater drainfields, a maintenance building, and a lodge. Chapter 2 provides a comprehensive listing of the elements of the Proposed Action and a tabular comparison of project components. A new SUP would be required to implement the Proposed Action. This SUP would authorize additional development, construction, and operation of resort facilities on Forest Service land (in this case, Forest Service land administered by the LNF). The SUP would be granted under the authority of the National Forest Ski Area Permit Act of 1986 (16 United States Code [USC] 497b). This Act authorizes the Forest Service to issue term ski area permits for the use and occupancy of suitable Nordic and alpine skiing operations and purposes (Section 3(b)). The Act also states that a permit shall encompass such acreage as the Forest Service determines sufficient and appropriate to accommodate the permittee s needs for ski operations and appropriate ancillary facilities (Section 3(b)). The Proposed Action includes an amendment to the Forest Plan. This amendment would change approximately 706 acres from MA 16 (timber production) and 399 acres from MA 25 (timber production) to MA 8 (ski areas). The total new SUP area would be 2,243 acres with this addition of 1,105 acres of LNF land in the proposed expansion. The current SUP allows MSB to operate on 1,138 acres of LNF land. Draft EIS 1-4 Montana Snowbowl

5 The improvements described in the Proposed Action in this analysis would not all be constructed during a single year, but would be constructed over an approximately 11-year timeframe (Appendix A, Implementation Schedule). 1.3 SCOPE OF THIS ANALYSIS The analysis of effects disclosed in this EIS includes any effects occurring from implementing the entire project, including those identified in Section 1.5 of this EIS. Scope is defined in 40 Code of Federal Regulations (CFR) as the range of actions, alternatives, and effects, such as connected and cumulative actions and effects, considered in this EIS. In addition to the Proposed Action, which is described briefly in Section 1.2 and in detail in Chapter 2, Connected Actions and past, present, and reasonably foreseeable actions are analyzed in this EIS. Connected Actions. Connected Actions are closely related to the Proposed Action. Actions are connected if they: Automatically trigger other actions that may require environmental analysis; Cannot or would not proceed unless other actions are taken previously or simultaneously; Are independent parts of a larger action and depend on the larger actions for their justification. The Proposed Action includes activities necessary to fulfill the Purpose and Need (Section 1.4). Connected Actions for this project include (1) all activities on private land that would be completed in conjunction with the proposed expansion described in Chapter 2 of this EIS, and (2) some improvements in the existing SUP area that were approved under a 1996 decision by the LNF but have not yet been implemented (Section 1.1) (USDA 1996). Table 1-1 summarizes the improvements in the existing SUP area that were approved in 1996 (USDA 1996), have not yet been implemented, would be completed if the Proposed Action were approved, and therefore are Connected Actions. Chapter 2 provides a comprehensive list of proposed and planned improvements. Table 1-1. Improvements Approved in 1996 Analyzed as Connected Actions in this EIS Approved in LNF (1996) and a Planned Improvement Connected Action Ski trail capacity (SAOT) skiers Ski trails: acreage 20 acres Ski trails: number 8 trails Ski trail capacity (SAOT): beginner/intermediate 190 skiers Ski trail acreage: beginner/intermediate 19 acres Tree removal for new ski trails and new lifts only 14 acres Total tree removal 14 acres Maximum water withdrawal rate for snowmaking 115 gpm 2 1 skiers at one time 2 gallons per minute Draft EIS 1-5 Montana Snowbowl

6 Other Connected Actions include new facilities/improvements planned on adjacent private land: Expanded parking (30 more spaces, or 75 more SAOT, created by moving the existing maintenance building) Continuous shuttle service on busy days Buried utility lines (power, water, and wastewater) Services building that would house bathrooms, ticket sales, and food sales Construction of a flow monitor on Butler Creek, maintenance of 30 gpm in Butler Creek at the flow monitor during snowmaking, and monitoring and annual reporting to the LNF. For this analysis, the actual end result and effect of the Proposed Action cannot be accurately disclosed without including the additive improvements that would be implemented as Connected Actions (Table 1-1). Therefore, in this EIS the existing improvements are defined as all improvements that have already been constructed/completed in the existing SUP area. The components specific to the Proposed Action are discussed, but the cumulative totals related to the Proposed Action plus Connected Actions in the proposed new SUP area (and/or private land) are also identified. Past actions. Past actions include those known management actions (regardless of land ownership) that could potentially have similar effects as identified as resulting from the Proposed Action and No Action alternatives. Past actions include the Snow Park Ski Area located on LNF land on the west side of TV Mountain, the construction of the existing MSB resort on LNF land and private land, and an SUP area expansion and improvements approved in 1996 by the LNF (USDA 1996). Other past actions are the 2003 closure of the Marshall Mountain Ski Area, timber harvest, and related road construction. Present actions. Present actions include road maintenance and communications site operation on TV Mountain. Other present actions are vegetative and restoration treatments conducted within and adjacent to the LNF land by the Forest Service and private landowners. Reasonably foreseeable actions. Reasonably foreseeable actions include road maintenance and vegetative or restoration treatments (such as weed control) anticipated to occur inside of and adjacent to the proposed expansion area during the next 11 years. The Grant Creek Fuel Reduction Project was approved by the LNF in a 2007 Decision Notice (USDA 2007a). Although this project has already been approved, there are no implementation plans at this time or in the future (Paulsen 2010 personal communication). That project is therefore not included in the scope of this analysis. 1.4 PURPOSE AND NEED The Purpose of and Need for this project is based on the goal of the Forest Plan (USDA 1986) to provide recreation opportunities including developed and year-round recreation. These opportunities include: Providing additional ski terrain Providing additional beginner and intermediate ski terrain Enhancing summer use and balancing summer and winter use. These opportunities are discussed below and in Sections 3.10 and 4.10 of this EIS. Draft EIS 1-6 Montana Snowbowl

7 Forest Plan Standard 6 states in part: The LNF will provide for a wide spectrum of Forest-related dispersed recreation and range of skill levels available to Forest visitors including the elderly and handicapped. The program will provide for use of the Forest on a year-round basis in areas that will minimize conflicts between user groups and other Forest resources. Forest Plan Standard 7 states in part: Emphasis will be placed on increasing the use of existing sites by making them usable by a wide segment of society.the private sector and other agencies will be encouraged to provide for increased public needs on National Forest System land and on lands adjacent to the Forest. If and when development proposals are received for expansion of existing or construction of new ski areas, they will be evaluated according to the normal procedures for determining ski area feasibility. The Proposed Action would increase outdoor recreation opportunities for both dispersed recreation (e.g., hiking and mountain biking) and developed recreation (e.g., skiing, snowboarding, folf, and lift-supported mountain biking). It would also increase skier recreation opportunities for beginner and intermediate skill levels. The Proposed Action would increase year-round use in an area already used for hiking, mountain biking, folf, and winter sports. It would expand the use of an existing developed winter recreation site by making more beginner and intermediate terrain available. The Proposed Action would allow the private sector to increase recreation opportunities on public and adjacent private land. Note that this EIS uses the term skier to refer to both skiers and snowboarders. Snowboarders are a significant part of the population using MSB and other ski areas. Snowboarders also represent a significant portion of the growth in alpine recreation in the past two decades. The Purpose of and Need for the Proposed Action is intended to increase year-round recreation opportunities on the LNF while maintaining or improving resource values. The specific actions for meeting this need are: Providing additional ski terrain to meet current and future demand due to increased population; Providing additional beginner and intermediate terrain to create a terrain mix that offers a wider range of skier opportunities and better matches the skill mix of the current and future skier population; Enhancing summer use and balancing winter and summer uses by increasing hiking and biking opportunities and by improving support facilities Providing Additional Ski Terrain Providing additional ski terrain at MSB for all skill levels would help achieve the LNF standard of providing developed recreation opportunities at existing sites. The current ski trails cannot accommodate increasing demand from all ski levels. The 1996 approval of improvements to MSB by the LNF (USDA 1996) did not substantially help to meet this standard because many of the 1996 improvements have not yet been implemented. Draft EIS 1-7 Montana Snowbowl

8 Missoula County represents the population closest to MSB and provides most of its ski clientele. Between 1990 and 2006, the population of Missoula County grew from 79,080 to 104,095, an increase of nearly 32 percent. During this same period, per capita income in inflation-adjusted terms for Missoula County residents increased by approximately 33 percent (U.S. Bureau of Economic Analysis [BEA] 2007) (Section 3.12). These increases in population and per capita personal income in Missoula County could translate into greater skier demand. Three-year rolling averages of total skier visits to MSB are shown in Figure 1-3. Using three-year rolling averages removes some of the year-to-year variability caused by weather and offers a clearer picture of the overall trend in skier use. Similar figures are also shown for nearby Marshall Mountain Ski Area (rolling average is shown, but the Marshall Mountain Ski Area closed in 2003). 70,000 60,000 50,000 Three-year Rolling Average Visitation Skier Visitation 40,000 30,000 20,000 10,000 Snowbowl Marshall - '89-'91 '90-'92 '91-'93 '92-'94 '93-'95 '94-'96 '95-'97 '96-'98 '97-'99 '98-'00 '99-'01 '00-'02 '01-'03 '02-'04 '03-'05 '04-'06 '05-'07 '06-'08 '07-'09 Three-Year Period Figure 1-3. Three-year Periods for Annual Averages The three-year average of skier visits to MSB for 1989 through 1991 was 43,667 total visits; the same average for 2002 through 2004 was 66,333, an increase of more than 50 percent. Several years of low snowpack included in the period 2004 through 2009 reduced the ending three-year average of skier visits to 61,350. In summary, these figures suggest that increases in population and per capita income, coupled with the closing of the Marshall Mountain Ski Area in 2003, are translating into increased MSB usage by area skiers, and this demand is anticipated to grow. The MSB currently has 52 ski trails, including 3 trails constructed in 2008 and 2 trails constructed in Eight additional ski trails were approved in 1996 (USDA 1996) and are included in this analysis as Connected Actions. The Proposed Action would add another 20 ski trails, for a cumulative total of 80 ski trails, and increase the acreage of ski trails to 441 acres (currently 255 acres). These new ski trails would increase the cumulative total capacity of ski trails to 3,066 SAOT (currently 1,500 SAOT). Draft EIS 1-8 Montana Snowbowl

9 If the Proposed Action were approved, the lift capacity would increase from 1,408 to 2,345 SAOT. The ski trail capacity is higher than the lift capacity for two reasons: (1) the ski industry desires less crowded ski trails for skier safety, and (2) increasing the beginner/intermediate ski trails without closing the existing advanced/expert trails would cumulatively add to the ski trail capacity at MSB Providing Additional Beginner and Intermediate Ski Terrain Providing additional beginner and intermediate ski terrain at MSB would help meet the LNF standard of providing developed recreation opportunities at existing sites that are usable by a wide segment of society with a range of skill levels. It would also help meet the standard to minimize conflicts between user groups. The current ski terrain at MSB does not provide sufficient beginner/intermediate capacity for its users, and it creates skill level conflicts and skier congestion. The MSB has historically been regarded as a ski area for more advanced skiers. The existing terrain predominantly consists of advanced and expert trails (Table 1-2). This forces skiers of all skill levels to use the same terrain, which results in conflicts. The 2004 MDP identifies one of the primary objectives of the proposed expansion as increasing the amount of beginner and intermediate terrain. This increase in beginner and intermediate terrain would better reflect the actual skill mix of the skier population. In conjunction with Connected Actions (Table 1-1), the Proposed Action would increase the acreage of beginner/intermediate ski trails by 144 acres (from 105 acres), for a total of 249 acres. These new ski trails would increase the capacity of beginner/intermediate ski trails to 2,490 SAOT (from 1,050 SAOT). Table 1-2. Comparison of Existing, Proposed and Planned * Ski Trail Classifications Proposed and Planned Trails (Acres) Proposed and Planned Trails SAOT Potential Cumulative Total Trails SAOT Existing % Total SAOT Potential Cumulative % Total SAOT Ability Level Existing Trails (Acres) Existing Trails SAOT Beginner/ Intermediate ,050 1,440 2, Advanced/ Expert Total ,500 1,566 3, * Planned indicates Connected Actions approved in Source: MSB (2004) and information provided by MSB general manager and owner Enhancing Summer Use and Balancing Summer and Winter Use Providing additional summer use opportunities at MSB would help achieve the LNF standard of providing developed recreation at existing sites and on a year-round basis. Summer operations have become essential to ski area economics and provide a wide range of additional recreational opportunities for Forest users. Mountain biking, hiking, folf, nature viewing, recreational berry picking, and weddings have increased at MSB in recent decades. Additional opportunities for these activities and facilities to support them are needed at MSB. Under the Proposed Action, approximately 1 mile of new mountain biking trail would be constructed on TV Mountain, and an additional 2 miles of new ski trails and existing roads would be designated for biking. Other existing roads in the proposed expansion area would also be Draft EIS 1-9 Montana Snowbowl

10 available for biking or hiking as demand increased. Improved facilities such as buildings, wastewater systems, and maintenance buildings would support these summer uses in addition to winter uses. 1.5 DECISIONS TO BE MADE This EIS documents the site-specific effects of the Proposed Action and the No Action alternative. It is not a general management plan, nor is it a programmatic analysis of a broad agency action. No further decisions would need to be made under the National Environmental Policy Act of 1969 (NEPA) before the selected alternative could be implemented. Pursuant to the 1996 Omnibus Parks and Public Lands Management Act (Section 701(j), Title VII, Division I), all lands within the boundaries of permitted ski areas are automatically withdrawn from mineral entry. The following decisions will be made by the Deciding Officer, the LNF Supervisor: Whether to allow the expansion of MSB to TV Mountain Whether to amend the 1986 Forest Plan Whether to modify the existing proposal What mitigation to require. 1.6 REGULATORY REQUIREMENTS Regulatory requirements are defined by the laws, regulations, policies, and other factors that apply to potential actions. Federal and state laws, the Forest Plan, and Forest Service policies provide important guidance under which projects are designed and evaluated. The standards specific to each resource are described in the introductions for each resource in Chapter 3. National Environmental Policy Act The proposed project is subject to an environmental review process dictated by NEPA. In the EIS analysis, the federal agency (LNF) assesses whether a proposed major federal action is likely to significantly affect the quality of the human environment. The agency also analyzes the effects of alternatives to the Proposed Action, including a No Action alternative. National Forest Management Act The National Forest Management Act (NFMA) of 1976 requires the Forest Service to prepare Forest Plans and regulations to guide development in National Forests. The Forest Service Land and Resource Management Plans provide strategic direction for management of a National Forest developed through agency and public involvement. Land and resource management direction consists of goals, objectives, and management requirements (standards and guidelines). Goals and objectives provide broad, overall direction regarding the types and amounts of goods and services the National Forests provide and focus on achieving ecosystem health and ecological integrity. Management requirements set minimum standards that must be met or exceeded while achieving the goals and objectives. Administrative requirements also establish broad multiple-use management direction and generally apply to all areas of the National Forests. Standards are actions that must be followed or are required limits to activities in order to achieve objectives. Site-specific deviations from standards must be analyzed and documented in management plan amendments. Draft EIS 1-10 Montana Snowbowl

11 The 1986 Forest Plan identifies Forest-wide goals in Section II-A and Forest-wide standards in Section II-E. The Forest Plan also designates MAs across the Forest with individual goals and standards for each as discussed in Section III of the Forest Plan. The regulatory requirements discussed in Chapter 3 of this EIS for each resource are limited to those that would be directly affected by the Proposed Action. These regulatory requirements were identified by comparing all components of the Proposed Action with all Forest-wide and MA-specific goals and standards. Additional regulatory requirements were identified based on other laws, regulations, and policies that affect activities on LNF land. The Proposed Action includes the change of approximately 706 acres from MA 16 (timber production) and 399 acres from MA 25 (timber production within the constraint of achieving a visual quality standard of Partial Retention), for a total of 1,105 acres to MA 8 (ski areas). Figure 1-4 shows current MA designations in the MSB area. Goals and standards for MA 16 and MA 25 are identified in Chapter 3, but all evaluations of effects are based on the goals and standards of the proposed redesignation to MA 8. Draft EIS 1-11 Montana Snowbowl

12 Figure 1-4. Lolo Forest Management Areas Draft EIS 1-12 Montana Snowbowl

Mount Snow Disc Golf Course and Mountain Bike Race Course Project

Mount Snow Disc Golf Course and Mountain Bike Race Course Project United States Department of Agriculture Forest Service Eastern Region Mount Snow Disc Golf Course and Mountain Bike Race Course Project Scoping Information May 2017 Manchester Ranger District Green Mountain

More information

SOLITUDE MOUNTAIN RESORT MASTER DEVELOPMENT PLAN AMENDMENT PROPOSAL

SOLITUDE MOUNTAIN RESORT MASTER DEVELOPMENT PLAN AMENDMENT PROPOSAL SOLITUDE MOUNTAIN RESORT MASTER DEVELOPMENT PLAN AMENDMENT PROPOSAL 6/02/14 INTRODUCTION Solitude Mountain Resort s (Solitude) current Master Development Plan (MDP) was accepted by the Wasatch-Cache National

More information

Tahoe National Forest; Placer County, California; Squaw Valley to Alpine Meadows. Notice of intent to prepare an environmental impact statement.

Tahoe National Forest; Placer County, California; Squaw Valley to Alpine Meadows. Notice of intent to prepare an environmental impact statement. This document is scheduled to be published in the Federal Register on 04/29/2016 and available online at http://federalregister.gov/a/2016-09672, and on FDsys.gov [3410-11- P] DEPARTMENT OF AGRICULTURE

More information

File Code: 1950:2720 Date: March 21, Dear Interested Party,

File Code: 1950:2720 Date: March 21, Dear Interested Party, United States Department of Agriculture Forest Service White River National Forest 900 Grand Ave Glenwood Springs, CO 81601-3602 File Code: 1950:2720 Date: March 21, 2017 Dear Interested Party, The White

More information

Taos Ski Valley s 2010 Master Development Plan Phase 1 Proposed Projects

Taos Ski Valley s 2010 Master Development Plan Phase 1 Proposed Projects Taos Ski Valley s 2010 Master Development Plan Phase 1 Proposed Projects Background The majority of Taos Ski Valley s (TSV) lift and trail network is located on National Forest System (NFS) lands administered

More information

Medicine Bow Routt National Forest and Thunder Basin National Grassland; Routt. County; Colorado; Steamboat Ski Resort, Steamboat EIS

Medicine Bow Routt National Forest and Thunder Basin National Grassland; Routt. County; Colorado; Steamboat Ski Resort, Steamboat EIS This document is scheduled to be published in the Federal Register on 09/06/2016 and available online at http://federalregister.gov/a/2016-21236, and on FDsys.gov [3411-15-P] DEPARTMENT OF AGRICULTURE

More information

VAIL HOMEOWNERS ASSOCIATION, INC. VHA Action Notice: Update on Golden Peak Proposal April 10, 2017

VAIL HOMEOWNERS ASSOCIATION, INC. VHA Action Notice: Update on Golden Peak Proposal April 10, 2017 Existing view of Golden Peak - note cut to the summit, made in the 1960 s, for a lift that was never built Approximate view of Golden Peak once construction of proposed race course and lift to the summit

More information

TABLE V-4: CALCULATION OF COMFORTABLE CARRYING CAPACITY UPGRADING PLAN

TABLE V-4: CALCULATION OF COMFORTABLE CARRYING CAPACITY UPGRADING PLAN C. COMFORTABLE CARRYING CAPACITY The calculation of Mount Sunapee s Upgrading Plan CCC is described in the following table. As illustrated, the upgrading program increases the CCC of the lift and trail

More information

KICKING HORSE MOUNTAIN RESORT APPLICATION TO AMEND THE EXISTING CONTROLLED RECREATION AREA

KICKING HORSE MOUNTAIN RESORT APPLICATION TO AMEND THE EXISTING CONTROLLED RECREATION AREA KICKING HORSE MOUNTAIN RESORT APPLICATION TO AMEND THE EXISTING CONTROLLED RECREATION AREA September 19, 2017 File: 4403694 Reg Nolander Sr. Manager, Major Projects Mountain Resorts Branch Ministry of

More information

Briefing Paper: ONE Wasatch Ski Interconnect Concept

Briefing Paper: ONE Wasatch Ski Interconnect Concept Briefing Paper: ONE Wasatch Ski Interconnect Concept Purpose and Audience The purpose of this briefing paper is to provide information on the ONE Wasatch proposal for discussion purposes. The intent is

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

APPENDIX 3: EAGLECREST MASTER PLAN PUBLIC OPINION SURVEYS

APPENDIX 3: EAGLECREST MASTER PLAN PUBLIC OPINION SURVEYS APPENDIX 3: EAGLECREST MASTER PLAN PUBLIC OPINION SURVEYS Eaglecrest Master Plan Public Opinion Surveys Prepared for Eaglecrest Ski Area Board of Directors Prepared by McDowell Group Inc. Eaglecrest Master

More information

Montana Snowbowl Ski Area Master Development Plan. Environmental Impact Statement. Specialist Report Fisheries Resources

Montana Snowbowl Ski Area Master Development Plan. Environmental Impact Statement. Specialist Report Fisheries Resources Master Development Plan Environmental Impact Statement Specialist Report Fisheries Resources 1.0 INTRODUCTION Eric Reiland Fisheries Biologist Revised February 2011 This document describes the existing

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

The Code of Federal Regulation (CFR) at 40 CFR directs the agency to discuss the direct and indirect impacts of all alternatives.

The Code of Federal Regulation (CFR) at 40 CFR directs the agency to discuss the direct and indirect impacts of all alternatives. Mt. Hood Meadows Parking Improvements Project Final Environmental Impact Statement (FEIS) Objection Statements and Responses Mt. Hood National Forest April 2014 Objectors Friends of Mt. Hood (FOMH) Carl

More information

HOUSE BILL NO. HB0032. Sponsored by: Joint Travel, Recreation, Wildlife & Cultural Resources Interim Committee A BILL. for

HOUSE BILL NO. HB0032. Sponsored by: Joint Travel, Recreation, Wildlife & Cultural Resources Interim Committee A BILL. for 0 STATE OF WYOMING LSO-00 HOUSE BILL NO. HB00 Ski Safety Act. Sponsored by: Joint Travel, Recreation, Wildlife & Cultural Resources Interim Committee A BILL for AN ACT relating to skiing; imposing duties

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Prepared for: August 4 th, Presented by: Eric Callender Ecosign VP Adam Schroyen Resort Planner

Prepared for: August 4 th, Presented by: Eric Callender Ecosign VP Adam Schroyen Resort Planner TAHOE DONNER PHASE 1 & 2 INVENTORY AND TECHNICAL ASSESSMENT Prepared for: August 4 th, 2017 Presented by: Eric Callender Ecosign VP Adam Schroyen Resort Planner ECOSIGN RESORT PLANNERS (2016) LTD. Whistler,

More information

TABLE IV-4: CALCULATION OF COMFORTABLE CARRYING CAPACITY EXISTING CONDITIONS. Access Role. Hourly Capacity. Oper. Hours

TABLE IV-4: CALCULATION OF COMFORTABLE CARRYING CAPACITY EXISTING CONDITIONS. Access Role. Hourly Capacity. Oper. Hours C. COMFORTABLE CARRYING CAPACITY The daily carrying capacity of a resort is described as the Comfortable Carrying Capacity (CCC). CCC is not a cap on visitation, but is rather a design standard defined

More information

Page 1. To: City of Durango - Parks and Recreation Advisory Board - Natural Lands Preservation Advisory Board Highland Avenue Durango, Colorado

Page 1. To: City of Durango - Parks and Recreation Advisory Board - Natural Lands Preservation Advisory Board Highland Avenue Durango, Colorado Page 1 To: City of Durango - Parks and Recreation Advisory Board - Natural Lands Preservation Advisory Board From: John Norton 2009 Highland Avenue Durango, Colorado Date: October 27, 2014 Regarding: Natural

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

PROPOSED RULEMAKING GAME COMMISSION

PROPOSED RULEMAKING GAME COMMISSION PROPOSED RULEMAKING GAME COMMISSION [ 58 PA. CODE CH. 141 ] Hunting and Trapping; Prohibited Devices its October 5, 2010, meeting, proposed to add 141.68 (relating to prohibited devices) to specifically

More information

NOTICE OF 30-DAY OPPORTUNITY TO COMMENT March 20, 2013

NOTICE OF 30-DAY OPPORTUNITY TO COMMENT March 20, 2013 NOTICE OF 30-DAY OPPORTUNITY TO COMMENT March 20, 2013 COMMENTS WELCOME The U.S. Forest Service (USFS) Sawtooth National Forest - Ketchum Ranger District is seeking public comments specific on proposal

More information

SipaPu ski & Summer REsort MASTER DEVELOPMENT PLAN. Prepared by Sipapu

SipaPu ski & Summer REsort MASTER DEVELOPMENT PLAN. Prepared by Sipapu SipaPu ski & Summer REsort MASTER DEVELOPMENT PLAN Prepared by Sipapu APRIL 2012 Ski and Summer Resort Sipapu Ski and Summer Resort Master Development Plan Submitted April 2012 Submitted by: Sipapu Ski

More information

Tamara Shannon Teacup Chapter of the Oregon Nordic Club 228 Woods Street Santa Cruz, CA 95062

Tamara Shannon Teacup Chapter of the Oregon Nordic Club 228 Woods Street Santa Cruz, CA 95062 United States Department of Agriculture Forest Service Mt. Hood National Forest 16400 Champion Way Sandy, OR 97055-7248 503-668-1700 FAX# 503-668-1641 File Code: 1570 Date: April 22, 2014 Tamara Shannon

More information

Description of Road Management Objectives, Existing Use, and Proposed Use:

Description of Road Management Objectives, Existing Use, and Proposed Use: Engineering Report White River National Forest Eagle-Holy Cross Ranger District Analysis of Road # 700 Red Sandstone Road for Motorized Mixed Use Designation Page 1 of 12 Forest: White River District:

More information

Wildlife Introduction

Wildlife Introduction Wildlife Introduction The wildlife section of this chapter is divided into sections for various habitats and groups of species. Old growth, snags and downed wood, and riparian areas are unique habitats

More information

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN Indian Nations Council of Governments August 2005 CONTACTING INCOG In developing the Destination 2030 Long Range Transportation Plan, INCOG s Transportation

More information

AMERICAN MOUNTAIN GUIDES ASSOCIATION

AMERICAN MOUNTAIN GUIDES ASSOCIATION SCOPE OF PRACTICE Approved April 7, 2017 Note: The American Mountain Guide Association (the AMGA ) Scope of Practice (the SOP ) applies to all AMGA Professional Members and AMGA Accredited Businesses.

More information

SNOWBASIN MASTER DEVELOPMENT PLAN IMPROVEMENT PROJECTS ENVIRONMENTAL ASSESSMENT

SNOWBASIN MASTER DEVELOPMENT PLAN IMPROVEMENT PROJECTS ENVIRONMENTAL ASSESSMENT SNOWBASIN MASTER DEVELOPMENT PLAN IMPROVEMENT PROJECTS ENVIRONMENTAL ASSESSMENT INTRODUCTION On February 17, 2015, the Ogden Ranger District of the Uinta-Wasatch-Cache National Forest (UWCNF) received

More information

Spearfish Canyon State Park & Bismarck Lake

Spearfish Canyon State Park & Bismarck Lake Spearfish Canyon State Park & Bismarck Lake Land Exchange Between the U.S. Forest Service and the State of South Dakota July 12, 2016 Background In 2006, the State of South Dakota received title to several

More information

3.0 ENVIRONMENTAL CONSEQUENCES 3.3 TRANSPORTATION

3.0 ENVIRONMENTAL CONSEQUENCES 3.3 TRANSPORTATION 3.0 ENVIRONMENTAL CONSEQUENCES 3.3 TRANSPORTATION INTRODUCTION This section analyzes the potential use of the proposed Ski Back Trail in the context of the physical design and both the existing and future

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Resident Outdoor Recreation for Fremont County, WY July 1999

Resident Outdoor Recreation for Fremont County, WY July 1999 UNIVERSITY OF WYOMING 'P.O. Box 3354 Cooperative Extension Service Laramie, WY 82071-3354 College of Agriculture Phone: 307-766-2386 Department of Agricultural and Applied Economics Fax: 307-766-5544 Resident

More information

Broken Bar W Ranch TETON VALLEY, IDAHO. Hunting Ranching Fly Fishing Conservation

Broken Bar W Ranch TETON VALLEY, IDAHO. Hunting Ranching Fly Fishing Conservation Broken Bar W Ranch TETON VALLEY, IDAHO Hunting Ranching Fly Fishing Conservation Broken Bar W Ranch TETON VALLEY, IDAHO Introduction: The Broken Bar W Ranch is located in Driggs, Idaho, the county seat

More information

Planning and Design Nomenclature

Planning and Design Nomenclature PREFACE This Mountain Resort Master Development Plan (MDP) is intended to be the guiding document for future development at Nordic Valley Ski Resort. Illustration 1 is a visual representation of the process

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Executive Summary. General Overview of Business

Executive Summary. General Overview of Business Executive Summary Project Vision The Murray Ridge Ski Area was established in 1975 to provide affordable skiing opportunities for the residents of Fort St. James and surrounding area. This vision continues.

More information

MASTER DEVELOPMENT PLAN April 2010

MASTER DEVELOPMENT PLAN April 2010 MASTER DEVELOPMENT PLAN April 2010 Prepared By: Taos Ski Valley 2010 Master Development Plan Taos, New Mexico April 2010 Accepted By: Kendall Clark Forest Supervisor Carson National Forest Date Prepared

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

Chincoteague National Wildlife Refuge and Wallops Island National Wildlife

Chincoteague National Wildlife Refuge and Wallops Island National Wildlife This document is scheduled to be published in the Federal Register on 09/11/2015 and available online at http://federalregister.gov/a/2015-21925, and on FDsys.gov Billing Code 4310-55 DEPARTMENT OF THE

More information

Giles Run Connector Road

Giles Run Connector Road Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment

More information

Mining & Petroleum Focus Group Southern Rocky Mountain Management Plan. Synopsis of Focus Group Key Issues

Mining & Petroleum Focus Group Southern Rocky Mountain Management Plan. Synopsis of Focus Group Key Issues Southern Rocky Mountain Management Plan Page 1 of 6 Synopsis of Focus Group Key Issues Sectors who brought forth issues are listed after the issue in brackets. I. Timeline Completing the plan by June,

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

City of Memphis On-Street Parking Modification Guidelines

City of Memphis On-Street Parking Modification Guidelines City of Memphis Effective Date: December 1, 2013 Bicycle/Pedestrian Program 125 N. Main Street Memphis, TN 38103 (901) 576-6710 www.bikepedmemphis.com City of Memphis Executive Summary It is current practice

More information

UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION [RC0ZCUPCA0, 155R0680R1, RR ]

UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION [RC0ZCUPCA0, 155R0680R1, RR ] This document is scheduled to be published in the Federal Register on 07/07/2015 and available online at http://federalregister.gov/a/2015-16600, and on FDsys.gov DEPARTMENT OF THE INTERIOR UTAH RECLAMATION

More information

RE: Notice of Intent to Prepare a DEIS for the Proposed Squaw Valley- Alpine Meadows Base-to-Base Gondola Project NEPA Scoping Comments

RE: Notice of Intent to Prepare a DEIS for the Proposed Squaw Valley- Alpine Meadows Base-to-Base Gondola Project NEPA Scoping Comments May 31, 2016 Eli Ilano, Forest Supervisor c/o NEPA Contractor P.O. Box 2729 Frisco, CO 80443 RE: Notice of Intent to Prepare a DEIS for the Proposed Squaw Valley- Alpine Meadows Base-to-Base Gondola Project

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another. Non-Motorized Transportation Plan (NMTP) Draft Vision, Goal and,, Tri-County Regional Planning Commission (TCRPC) Purpose The purpose of the Tri-County Regional Planning Commission (TCRPC) Non-Motorized

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric This document is scheduled to be published in the Federal Register on 05/08/2013 and available online at http://federalregister.gov/a/2013-10931, and on FDsys.gov Billing Code: 3510-22-P DEPARTMENT OF

More information

The proposed mountain bike trails and skills park pose individually direct, indirect and cumulatively significant impacts on this historic resource.

The proposed mountain bike trails and skills park pose individually direct, indirect and cumulatively significant impacts on this historic resource. July 28, 2010 Via Email to comments-pacificnorthwest-mthood-zigzag@fs.fed.us Bill Westbrook, District Ranger Mike Malone, Project Contact Zig Zag Ranger Station Mt. Hood National Forest Re: Timberline

More information

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements POLICY REPORT Report Date: April 23, 2018 Contact: Lon LaClaire Contact No.: 604.873.7722 RTS No.: 9944 VanRIMS No.: 08-2000-20 Meeting Date: May 16, 2018 TO: FROM: SUBJECT: Standing Committee on Policy

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

BACKGROUND INFORMATION FOR NEW SKI AREA TRANSFER PROPOSAL

BACKGROUND INFORMATION FOR NEW SKI AREA TRANSFER PROPOSAL BACKGROUND INFORMATION FOR NEW SKI AREA TRANSFER PROPOSAL Many local skiers, including Los Alamos Ski Club (LASC) members, believe that Pajarito Mountain is now owned and operated by a partnership between

More information

Hunting, Fishing, Recreational Shooting, and Wildlife Conservation Opportunities and Coordination with States, Tribes, and Territories

Hunting, Fishing, Recreational Shooting, and Wildlife Conservation Opportunities and Coordination with States, Tribes, and Territories THE SECRETARY OF THE INTERIOR WASHINGTON ORDER NO. 3356 Subject: Hunting, Fishing, Recreational Shooting, and Wildlife Conservation Opportunities and Coordination with States, Tribes, and Territories Sec.

More information

Eastern PA Trail Summit October 1, 2018

Eastern PA Trail Summit October 1, 2018 Eastern PA Trail Summit October 1, 2018 WHO WE ARE + WHY + WE RE * HERE * * * * * * Session Goals: Discuss how to coordinate planning and design in small, urbanized towns Consider how to develop alternative

More information

THE SUSAN JANE AVALANCHE PATH: A CASE STUDY IN SKI AREA PLANNING AND AVALANCHE PATH IDENTIFICATION. Chester Marler I Ann Fink II ABSTRACT

THE SUSAN JANE AVALANCHE PATH: A CASE STUDY IN SKI AREA PLANNING AND AVALANCHE PATH IDENTIFICATION. Chester Marler I Ann Fink II ABSTRACT THE SUSAN JANE AVALANCHE PATH: A CASE STUDY IN SKI AREA PLANNING AND AVALANCHE PATH IDENTIFICATION Chester Marler I Ann Fink II ABSTRACT Some of the planning efforts for a ski area expansion project are

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

Student Population Projections By Residence. School Year 2016/2017 Report Projections 2017/ /27. Prepared by:

Student Population Projections By Residence. School Year 2016/2017 Report Projections 2017/ /27. Prepared by: Student Population Projections By Residence School Year 2016/2017 Report Projections 2017/18 2026/27 Prepared by: Revised October 31, 2016 Los Gatos Union School District TABLE OF CONTENTS Introduction

More information

Upper Dublin Township Deer Management Program (DMP)

Upper Dublin Township Deer Management Program (DMP) Upper Dublin Township Deer Management Program (DMP) What is the goal of the Upper Dublin Township Deer Management Program? Reduction in the number of deer/human conflicts within Upper Dublin Township Pilot

More information

Summary of Water Access for Marinas and Public Boat Ramps

Summary of Water Access for Marinas and Public Boat Ramps Lake Tahoe Shoreline Plan Meeting Materials: Steering Committee Last Updated: 11-28-16 Summary of Water Access for Marinas and Public Boat Ramps Table 1: Marinas Buoy Field Assessment Marinas 1. North

More information

Public Hearing Document

Public Hearing Document Regulatory Amendment 1 to the Fishery Management Plan for the Dolphin and Wahoo Fishery of the Atlantic Modify commercial trip limits for dolphin Environmental Assessment Regulatory Impact Review Regulatory

More information

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE April, 2012 1 INTRODUCTION The need for transit service improvements in the Routes 42/55/676 corridor was identified during the Southern

More information

Job Title: Game Management, Subsection B Game Management Mountain Lion. SPECIES: Mountain Lion

Job Title: Game Management, Subsection B Game Management Mountain Lion. SPECIES: Mountain Lion SPECIES: Goal: Manage the mountain lion population, its numbers and distribution, as an important part of Arizona s fauna and to provide mountain lion hunting recreation opportunity while maintaining existing

More information

Proposed Amendment to the City-Wide Trails Plan

Proposed Amendment to the City-Wide Trails Plan Proposed Amendment to the City-Wide Trails Plan Planning and Zoning Commission June 23, 2015 Comprehensive Plan 2010 Sustainable Community Recommendations 2 Goal: Walking and Cycling are Encouraged throughout

More information

SANDRINGHAM GOLF LINKS PROJECT

SANDRINGHAM GOLF LINKS PROJECT SANDRINGHAM GOLF LINKS PROJECT STAKEHOLDER ENGAGEMENT BACKGROUND INFORMATION PAPER SEPTEMBER 2017 This paper provides information regarding the context for the concept proposal for the Sandringham Golf

More information

Tellico Reservoir Land Management Plan - Summary of Allocation Changes

Tellico Reservoir Land Management Plan - Summary of Allocation Changes Tellico Reservoir Land Management Plan - Summary of Allocation Changes Land use allocation changes on Tellico Reservoir that have occurred since the 2000 Tellico Reservoir Land Management Plan (RLMP) was

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN

DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN 1.0 INTRODUCTION The Marmot Basin Ski Area (Marmot Basin), owned by Rocky Mountain Skiing Inc. (Ski Marmot Basin), is located approximately 21 kilometers

More information

United States Department of the Interior

United States Department of the Interior United States Department of the Interior FISH AND WILDLIFE SERVICE Virginia Ecological Services Field Office 6669 SHORT LANE GLOUCESTER, VA 23061 PHONE: (804)693-6694 FAX: (804)693-9032 URL: www.fws.gov/northeast/virginiafield/

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

WORLD-CLASS LAKE TAHOE DEVELOPMENT OPPORTUNITY

WORLD-CLASS LAKE TAHOE DEVELOPMENT OPPORTUNITY WORLD-CLASS LAKE TAHOE DEVELOPMENT OPPORTUNITY 33441 KIRKWOOD MEADOWS DRIVE, KIRKWOOD, CA. Entitled Residential Project Slope-Side at Kirkwood Mountain Resort Multiple Development Options DEVELOPMENT SITE

More information

ALTERNATIVE WORKSHOP JULY

ALTERNATIVE WORKSHOP JULY WELCOME - ALTERNATIVE WORKSHOP JULY 27, 2017 MEETING GOALS ITD is committed to working collaboratively with stakeholders to ensure safe and efficient mobility through Island Park and Targhee Pass. TONIGHT

More information

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT 1.0 INTRODUCTION This chapter provides an overview of the purpose, authorization and focus of this Recirculated Draft Environmental Impact Report (EIR), an identification of the Lead Agency, an outline

More information

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3 Public Information Centre Summary Report Muskoka Road 15 (Santa s Village Road) Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village The District Municipality of

More information

Frequently Asked Questions and Answers Regarding the Draft Northern Continental Divide Ecosystem (NCDE) Conservation Strategy

Frequently Asked Questions and Answers Regarding the Draft Northern Continental Divide Ecosystem (NCDE) Conservation Strategy Frequently Asked Questions and Answers Regarding the Draft Northern Continental Divide Ecosystem (NCDE) Conservation Chris Servheen, USFWS, chris_servheen@fws.gov 5/1/13 Q1. What is the NCDE Conservation?

More information

Fisheries Off West Coast States; Coastal Pelagic Species Fisheries; Annual. AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and

Fisheries Off West Coast States; Coastal Pelagic Species Fisheries; Annual. AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and This document is scheduled to be published in the Federal Register on 06/30/2017 and available online at https://federalregister.gov/d/2017-13685, and on FDsys.gov Billing Code 3510-22-P DEPARTMENT OF

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

Endangered and Threatened Wildlife and Plants; Recovery Plan for the. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce the

Endangered and Threatened Wildlife and Plants; Recovery Plan for the. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce the This document is scheduled to be published in the Federal Register on 09/30/2015 and available online at http://federalregister.gov/a/2015-24670, and on FDsys.gov Billing Code 4310 55 DEPARTMENT OF THE

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66

More information

Table 1: Original and adjusted slope gradients for each difficulty rating Traditional Ranges Adjusted Ranges

Table 1: Original and adjusted slope gradients for each difficulty rating Traditional Ranges Adjusted Ranges 1 Summary Nothing beats a day spent skiing. Except, of course, a day spent designing slopes for skiing. As winter looms closer, some wealthy investors are considering purchasing Wasatch Ranch in Utah.

More information

HANGING ROCK STATE PARK EXPANSION MASTER PLAN PHASE TWO INITIAL CONCEPTS INSTRUCTIONS

HANGING ROCK STATE PARK EXPANSION MASTER PLAN PHASE TWO INITIAL CONCEPTS INSTRUCTIONS ABOUT THE PROJECT The Master Plan for the Expansion of Hanging Rock State Park will create a vision for the nearly 750 acres of land added to the park in 2014. The new property includes Vade Mecum, which

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing

More information

An opportunity for summer revenue at the Camden Snow Bowl. Summer Snow Bowl Lift Serve Mountain Biking, Version 2

An opportunity for summer revenue at the Camden Snow Bowl. Summer Snow Bowl Lift Serve Mountain Biking, Version 2 An opportunity for summer revenue at the Camden Snow Bowl By: The Mountain Bike Subgroup of the Snow Bowl Four Season Committee Summer Snow Bowl Lift Serve Mountain Biking, Version 2 Summer Snow Bowl Lift

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information

VDOT BICYCLE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT April 2017

VDOT BICYCLE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT April 2017 VDOT BICYCLE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT April 2017 1 TABLE OF CONTENTS Topic Page(s) About this Guide 3 Encouraging development of bicycle and pedestrian plans by localities

More information

Draft Discussion Document. May 27, 2016

Draft Discussion Document. May 27, 2016 Draft Discussion Document May 27, 2016 Action to consider modifications to the sub-acl of GB haddock allocated to the Atlantic herring fishery and associated accountability measures AP/ CMTE Input 1. Review

More information

Transportation Element

Transportation Element The paradox of transportation in the late 20 th Century is that while it became possible to travel to the moon, it also became impossible, in many cases, to walk across the street. Joell Vanderwagen Vision:

More information

MSW Objective 1.1: Level of Service Standards To maintain the IMSWMS MSW collection system to meet or exceed established LOS standards.

MSW Objective 1.1: Level of Service Standards To maintain the IMSWMS MSW collection system to meet or exceed established LOS standards. INFRASTRUCTURE - MUNICIPAL SOLID WASTE PURPOSE The purpose of the Solid Waste section of the Infrastructure Element is to ensure that necessary sanitation facilities and services are in place to provide

More information

TABLE OF CONTENTS LIST OF TABLES NONE LIST OF FIGURES NONE

TABLE OF CONTENTS LIST OF TABLES NONE LIST OF FIGURES NONE TABLE OF CONTENTS 7.4 RIVER-RELATED RECREATION SURVEYS (REC 4)... REC 4-1 7.4.1 Study Objectives... REC 4-1 7.4.2 Study Area... REC 4-1 7.4.3 Methods... REC 4-1 7.4.4 Key Questions... REC 4-3 7.4.5 Results...

More information

San Luis Valley National Wildlife Refuge Complex, CO; Availability of Record of

San Luis Valley National Wildlife Refuge Complex, CO; Availability of Record of This document is scheduled to be published in the Federal Register on 12/11/2015 and available online at http://federalregister.gov/a/2015-31231, and on FDsys.gov Billing Code 4333 15 DEPARTMENT OF THE

More information

SPROUT SPRINGS SKI AREA

SPROUT SPRINGS SKI AREA PHILIP E HIGGINS P.C. Principal Broker OR & WA T 503.793.9039 C 503.793.9039 phiggins@pacificcrestrea.com SECTION 1 PROPERTY INFORMATION OFFERING SUMMARY Sale Price: $1,250,000 PROPERTY OVERVIEW Spout

More information

COMMENTS Draft Environmental Impact Statement McCloud Pit Hydroelectric Project (FERC No. 2106) P Applicant: Pacific Gas & Electric Company

COMMENTS Draft Environmental Impact Statement McCloud Pit Hydroelectric Project (FERC No. 2106) P Applicant: Pacific Gas & Electric Company COMMENTS Draft Environmental Impact Statement McCloud Pit Hydroelectric Project (FERC No. 2106) P-2106-059 Applicant: Pacific Gas & Electric Company Filed by: FERC Projects Director California Sportfishing

More information

Memorandum. Exhibit 60 SSDP To: Jenny Bailey, Senior Planner. From: Bill Schultheiss, P.E. (WA. P.E. #46108) Date: June 20, 2017

Memorandum. Exhibit 60 SSDP To: Jenny Bailey, Senior Planner. From: Bill Schultheiss, P.E. (WA. P.E. #46108) Date: June 20, 2017 Memorandum To: Jenny Bailey, Senior Planner From: Bill Schultheiss, P.E. (WA. P.E. #46108) Date: June 20, 2017 Re: East Lake Sammamish Trail, Segment 2B Review King County has asked Toole Design Group

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information