1 Proceedings of the 6 th International Conference on the Application of Physical Modelling in Coastal and Port Engineering and Science (Coastlab16) Ottawa, Canada, May 10-13, 2016 Copyright : Creative Commons CC BY-NC-ND 4.0 PHYSICAL MODELLING OF EMERGENCY REPAIRS TO THE MAIN BREAKWATER OF CALSHOT HARBOUR ON TRISTAN DA CUNHA ISLAND JOHAN KIEVIET 1, PAUL BOUTON 2, FRANS VAN EEDEN 2 1 Council for Scientific and Industrial Research, South Africa, jkieviet@csir.co.za 2 WSP Group Africa (Pty) Ltd, South Africa, paul.bouton@wspgroup.co.za, frans.vaneeden@wspgroup.co.za ABSTRACT The main breakwater of Calshot Harbour on Tristan da Cunha Island was severely damaged by major storms. Quasi 3D stability testing for the emergency repairs of the main breakwater was carried out at the hydraulics laboratory of the Council for Scientific and Industrial Research (CSIR) in Stellenbosch, South Africa. The option to repair the damaged section of trunk, close to the roundhead, with 10 t dolos units was tested. A 4m wide Quasi 3D flume was used for the stability tests at a scale of 1:42.8. The construction method used, in particular the fence post packing method and interlocking of armour units into the core as well as roughening of the bathymetry profile makes the physical model tests presented in this manuscript unique. KEWORDS: Physical model, Emergency repairs, Breakwater, Calshot Harbour, Tristan da Cunha. 1 PROJECT BACKGROUND 1.1 Harbour History Leading to Emergency Repairs Being Required Access to the island was originally gained by longboats landing on a gravel beach. The gravel beach was however covered by lava flows during a volcanic eruption in The islanders were evacuated and returned in Calshot Harbour was then constructed in 1965 for the re-establishment of the crayfish industry. The new harbour was located to the west of the original gravel beach (Tristan da Cunha Government & the Tristan da Cunha Association, 2015). The newly constructed harbour was protected by gabions and opened in The harbour was however shallow and resulted in even modest waves, breaking in and around the entrance. This resulted in the harbour being closed on most days of the year (Vonk et al., 2007). By 1990, small seaward extensions were built on both breakwaters and a dolos layer added on the seaward side. The dolos breakwaters were then extended even further seaward between Harbour quay walls and a slipway was also added during this time (DFID, 2011). Although 3.5 t dolosse was mainly used for armouring, 2.5 t dolosse was placed on the base of the trunk and 1.77 t dolosse in front of the splash wall at the root of the breakwater (Vonk et al., 2007). Following a near failure of the western breakwater, a decision to carry out a structural survey of the harbour and breakwaters as well as to design for the rehabilitation and improvements of both structures was made in In part of the rehabilitation process involved thickening the capping, repairing quay walls and adding 3.5 t dolosse above water on both breakwaters. Nine months after the repairs took place, new dolosse were already missing (DFID, 2011). In August 2010, a storm removed the dolos armouring on the western breakwater head. This resulted in core material being exposed and a portion of capping being undermined and lifted. Any further undermining of the capping and erosion of core material at such a stage of damage could lead to a collapse of the roundhead and total breakwater failure. This led to an emergency repair exercise being planned to start in early A picture of Calshot Harbour after the 2010 storm is shown in Figure 1. WSP Africa Coastal Engineers (Pty) LTD was commissioned by the Department for International Development (DFID) in assisting with proving a workable solution for the emergency repairs. WSP Africa then requested the CSIR Coastal and Hydraulics Laboratory to conduct stability tests for the emergency repairs. 1

2 Western Breakwater Eastern Breakwater 1.2 Wave Climate Figure 1. Calshot Harbour after the August 2010 storm (Tritan Survey, 2016). To properly understand the performance of the breakwater and repair options tested in the physical model, it is important to get an idea of the sea conditions experienced prior to the emergency repairs being required. Calshot Harbour is located on the northern side of Tristan da Cunha with the harbour being exposed to westerly storm conditions. Shallow reefs to the west of the breakwaters, causes waves to be depth limited, resulting in shoaling and refraction at the western breakwater head. Besides making the harbour unusable, the wave action from breaking waves causes constant movement and abrasion on the beach and armour units on the roundhead. The pebbles on the beach and roundhead rocks in deeper water are testimony of this (Vonk et al., 2007). Calshot Harbour being exposed to westerly storm conditions can be seen from photographs in the storm of June 2006 (Figures 2 and 3). Figure 2. Storm waves breaking off the breakwater in the storm of June Figure 3. Sequence of waves breaking into entrance channel (Vonk et al., 2007). 2

3 1.3 How the Breakwater was Originally Built It was reported that during construction the dolosse were placed on the rocky reef and built up from either side before the rock core was placed in the middle. This had the effect of locking the dolosse into the core of the breakwater, but also resulted in the outer flukes of the dolosse being upright in a steep fence post pattern. During a survey conducted by the CSIR in 2006, it was found that slope measurements for the eastern and western breakwaters were steeper than 1:1 compared to a standard breakwater slope of 1:1.5. Some slope measurements on the western breakwater were even found to be closer to 2:1. Compared to a conventionally randomly packed dolos breakwater, the steepness and fence post packing pattern used for the Calshot Harbour results in less wave absorption. The 3.5 t loosely packed dolosse for Calshot Harbour would not be able to remain stable if it was not for the unique construction method and interlocking of dolosse into the core. (Vonk et al., 2007). Figure 4, presents photographs showing the fence post pattern. Figure 4. Side view showing fence post pattern (left) Top view showing interlocking and capping (right). 2 PHYSICAL MODEL 2.1 Objectives of the Model Study Placement detail of the armour units was provided by WSP Africa. The model testing was required to confirm the placement detail of the armour units in the breakwater repair and to assess the stability of different repair options of which the packing is described more in section 2.5. The model study addressed the following: Interlocking of 10 t dolos units with the existing 3.5 t units; The stability of the 10 t dolos layer; Toe stability of the repaired section; and Integrity of the repair section in relation to the existing unrepaired structure. The outcome of the model testing would confirm repair options, as well as, the stability for a storm with return period of 10 years. 2.2 Model Overview The Calshot Harbour model tests were performed at an undistorted scale ε, of 1:42.8 at the CSIR Hydraulics Laboratory in Stellenbosch, South Africa. Due to basin and wavemaker availability with the urgent time constraint, only a 4m wide basin was available. This resulted in a quasi 3D model being proposed, which incorporates the bathymetry in one direction with a portion of the breakwater and harbour being constructed for testing. The 4m wide flume is 32m long and 1m deep. All effects of free surface gravity waves were scaled in the physical model by applying Froude scaling (Hughes, 1995). The following scaling factors were applied: Length ε 1 : 42.8; Time ε 1 : 6.54; Velocity ε 1 : 6.54; and Mass ε 3 1 : Wave Conditions and Test Criteria Storm waves coming from 342 and 364 North, were seen as the most severe. WSP Africa provided wave conditions for these wave directions to be tested. The model layouts for the two different wave directions are presented in Figure 5. A Jonswap spectrum with gamma of 3.3 was used. Table 1, specifies the wave conditions used. Initially two test conditions were selected for each wave direction, after which a third test condition was selected for the 364 wave direction. 3

4 Displaced Dolos Displaced Dolos The wave conditions selected for this study were based on discussions with WSP. Wave Direction Table 1. Model Test Criteria (In Prototype) Storm condition Water Level(CD) Target Hmo in front of Structure Peak Period 342 1:10 yr m 5.0 m :10 yr m 5.0 m :10 yr m 5.6 m :10 yr m 5.6m :10 yr m 5.6 m 12 The test duration for each test was 3200 waves. When severe damage was observed, the test was stopped. If wave conditions only induced minor or no visible damage to the roundhead or trunk section, the tests were run for the full test cycle. The storm duration tested was ± 10 hours for a peak period of 14 seconds and ±8.5 hours for 12 seconds (prototype). Construction for 342 wave direction (Green & Purple Bathymetry) Displaced Dolos Construction for 364 wave direction (Only Green Bathymetry) Figure 5. Model layout for 364 wave direction and 342 wave direction. 4

5 2.4 Model Construction and Bathymetry The model was constructed for wave directions from 342 and 364. The bathymetry for the wave direction of 364 was constructed first, after which the bathymetry for waves coming from 342, which was shallower, was constructed on top of the original bathymetry. A red arrow on the left image in Figure 6, illustrates the rocky seabed at Calshot harbour. Ideally, the bathymetry should have been constructed with protrusions to best simulate the coast line. Protrusions were however difficult to construct with the construction method followed. In an effort to simulate the surface of the volcanic rock outcrops found surrounding the steep coast, small depressions were made on the model bathymetry. The roughened seabed helped to model the pattern of wave breaking in shallow water more accurately. Photographs taken at low tide were used to get an indication of the rough seabed. The average size of the roughened holes created, had a diameter of 3 cm (model scale) and a depth of 5 mm to 1 cm (model scale). This relates to 1.3 m in diameter and a depth of 0.2 m to 0.5 m which is similar to what is seen in prototype. An indication of the size and depth of the roughened holes created during construction is shown in Figure 6. Figure 6. Sea bottom roughened up to best incorporate bathymetric and seabed features. At the offshore deep water side of the flume (with a water depth of 30 m prototype) the wave generator was located on the boundary of the model. This was used to generate irregular waves. A long section of the flume is shown schematically in Figure 7 Construction Height (m) 0 1 Basin Floor 342 deg Bathy 364 deg Bathy Flume Chainage (m) Figure 7. Section of the Quasi 3D model. The breakwater roundhead and portion of the trunk was constructed from typical cross-sections of the trunk and roundhead provided by WSP Africa. The core material and armour of the breakwater was then packed simultaneously to best reproduce the original packing method used on Tristan da Cunha. Packing of the trunk section was done with the aid of cross sections while the packing of the round head was done with cross sections as well as photographs taken. The toe and rubble sections consisting of 0-2 t rock were then also placed according to the templates. Together with WSP Africa, the assumption was made that the core was impermeable and solid, therefore to ensure the centre of the core remained stable during testing; the capping of the breakwater was constructed with bricks that were screed to the correct level. The image in Figure 8 gives an indication of how the construction was done. Testing of the core for the breakwater was not part of the scope, however to pack the 3.5 t dolosse realistically, core material was placed between the bricks and dolosse (to simulate the original prototype packing of the breakwater). 5

6 Figure 8. Breakwater Construction Images. To help dampen the effect of reflective waves onto the lee side of the structure and back to the wave generator, two features were added to the model. The first addition was to construct the outline for the rest of the harbour with loosely placed bricks that had 2 t or greater rock placed in front, to absorb wave energy. The second was to construct two channels on either side of the structure. These channels were constructed to direct wave energy that had already passed the structure to the absorption beach at the back of the flume. Both methods were incorporated Figure 9, shows the loosely placed bricks in black and the absorption channels which are indicated with red arrows. Figure 9. Model additions to reduce the effect of reflection. 2.5 Model Test Results This section describes the structural stability of the area of breakwater to be repaired with 10 t dolos units. The stability of the armour units was determined by comparing photographs taken before and after each test. Two digital cameras were 6

7 mounted at fixed positions with a view angle perpendicular to the seaward slope. The areas of interest were the repaired section and the roundhead. Figure 10 indicates the two camera stations. 1 2 Figure 10. Camera Stations. Camera station 1 was used to determine the stability of the 10 t dolosse units. This covered the section of armour where the core material had become severely exposed and threatened the survival of the structure. Stability results for the 3.5 t dolosse on the roundhead (camera station 2) were also taken but only in the form of observations. For the measurement of damage to the armour units as well as the toe, the armour track method was used as described by Phelp & Tulsi (2006). The two images were analysed using software developed by CSIR to assess armour unit damage. The displacements were classified as follows: 0.25*H-0.5*H = settlement; 0.5*H-1*H = rocking + potential damage; > 1.0*H = full displacement; and H = The height of the dolos unit. These classifications are derived from Phelp, (2000). Model dolos units are made of polyester resin which do not break and do not have the strength of a prototype unit. However rocking units during model testing might break in prototype and therefore have to be accounted for in the calculation of damage. A total of nine tests were carried out to evaluate the stability of the emergency repair section (shakedown and additional tests excluded). Before every repair option to be tested, the round head consisting of 3.5 t dolosse were repacked. This included recreating the damage as per photographs taken after the August 2010 storm. The repair option to be tested was then constructed. Each repair consisted of placing 10 t dolosse over the section to be repaired. The dolosse were then stitched into the 3.5 t armour layer. The repair options differed mainly in size and shape of the placement footprint. It however also differed in packing density and armour layers packed. Due to the remoteness and logistical aspects of getting material to Tristan da Cunha, a limited number of 10 t dolosse (75 in total) were available for each repair option to be tested. Table 2 presents the wave conditions and test information while Table 3 presents the armour unit packing for the different tests. Figure 11 shows how one of the repair options was constructed. It was found that the start of failure was always on the section of roundhead not being repaired. For this reason a separate test with no repair was undertaken to determine if the cause of the roundhead failure during the tests are indirectly caused by the section repaired with the 10 t dolosse, (Test 010). For this test the damaged mass capping at the front of the roundhead was also modelled using 4 individual pieces of flat rock that were screed together with rock set cement. The mass of the individual pieces were 135 t, prototype. Note that this is slightly conservative in terms of breakwater stability, with the existing cap having an estimated weight of about 110 t. 7

8 Test No. Wave Direction Table 2. Wave and Test Information (Prototype) WL (CD) Waves *Hm0 H1/3 Tp Test Duration Test m m 5.7 m 14 s Stopped 2 hours and 50 minutes into a 10 hour storm Test m m 5.8 m 14 s Stopped 7 hours into a 10 hour storm Test m m 5.7 m 14 s Stopped 9 hours and 25 minutes into a 10 hour storm Test m m 5.1 m 14.5 s Full test cycle (10 hour storm) ** Test m m 6.8 m 14.8 s Full test cycle (3.1 hour storm) Test m m 6.8 m 14 s Stopped 1 hour and 40 minutes into a 10 hour storm Test m m 5.5 m *** Full test cycle (8.5 hour storm) ** Test m m 13.7 s Full test cycle (2.7 hour storm) Test m m 5.2 m *** Full test cycle (8.5 hour storm) ** Test m m 5.4 m *** Full test cycle (2.7 hour storm) Test m m 5.8 m *** Stopped 3 hours and 57 minutes into a 8.5 hour storm * This is the H m0 in front of the structure ** The test was carried out with an output gain of 20% larger than calibrated *** False wave period measurements caused by wave plunging near the probe Figure 11. Breakwater Construction Images for Test

9 Table 3. Dolos Packing for Tests Test No. Test 002 Test 004 Test 005 Test 007 Test 008 Test 010 Test 012 Test 013 Test 015 Test 016 Test 019 Packing 3.5 t dolos units placed to best reproduce existing profile, layer thickness and interlocking of the head, trunk and damaged area of the breakwater. Dolos units on the trunk section were packed in a fence post formation. The roundhead was packed randomly with the top armour of the breakwater packed loosely. The section to be repaired was packed with 75, 10 t dolos units stitched into the 3.5 t armour layer. The repair dolosse were packed double layer with a density of roughly Armour layer on seaward side of roundhead packed randomly as in Test_002 but slightly denser. The leeward side of the roundhead the armour layer was packed using a fence post method instead of the random packing method used for Test_002. Although the packing of the 3.5 t armour layer was more realistic for Test_002, the main focus was the 10 t dolosse on the repaired section and not the roundhead. Therefore the roundhead was packed slightly denser for Test_004 in the hope that if the roundhead failed it would not have such a great influence on the stability results of the repaired section as in Test_002. The repair section had the same packing placement and density as in Test_002. This was an additional test, most of the 3.5 t armour layer on the roundhead was replaced with an additional 75, 10 t units packed randomly. The repair section was again packed in the same manner as for Test_002 and Test_004. The repair section had the same packing placement and density as in Test_002. The main reason for undertaking this test was to determine the stability for the toe of the 10 t repair dolosse. Because of this, most of the roundhead was packed with a fence post method. The repair section had the same packing placement and density as in Test_002. Overload condition, No repacking of the roundhead and trunk was done; the test was run directly after Test_007. Main reason for test was to determine if the cause of the roundhead failure during tests 002, 004 and 005 are indirectly as a result of the section repaired with the 10 t dolosse. As for Test_002 the armour layer was packed realistically, using survey photographs with single layer areas on the roundhead to recreate the damage caused by the previous storms. The roundhead was packed randomly with the top armour of the breakwater packed loosely. The section to be repaired was constructed using survey photographs taken after the previous storms. The 3.5 t dolosse packed as for Test_004. The 10 t dolosse were not packet all the way up to the mass capping but had three rows of random placed dolosse at the top. The repair section had the same packing placement and density as in Test_002. During Test_012 the main integrity of the structure survived the full 8.5 hour storm duration. Test_013 was setup as an overload condition for Test_012. While the roundhead and trunk section was not repaired for the Test_013, The 10 t dolosse were repacked onto the section being repaired. During the repacking of the 10 t dolosse it is important to note that unlike for Test-012, the dolosse were packed right up against the mass capping. As for Test_013, the dolosse were packed to right up against the mass capping. The strip of 75, 10 t dolosse were more densely packed together with 2 to 3 fewer units per row. The repair dolosse were packed double layer with a density greater than During Test_015 the section repaired with 10 t units was still intact with the roundhead of the breakwater damaged. Test_016 was set-up as an overload condition for Test_015. The packing of the armour units was done in the same manner as for Test_012, but with some 3.5 t units now placed randomly on the top half of the roundhead. 3 CONCLUSIONS Because of the unique construction methods used to build the existing breakwater for Calshot Harbour on Tristan da Cunha, it was important to try and recreate this in the physical model. This included the fence post packing of the 3.5 t dolosse and the cementing of the top rows of dolosse into the mass capping. The damaged section, including broken dolosse, exposed mass capping and core rock were reproduced using photographs of the actual breakwater. Although a lot of settling of dolos units took place for both of the wave directions tested, only a few units were displaced a distance lager than 0.5xH for each test. Table 4 illustrates the average number of dolosse displaced more than 0.5xH for all the tests at the same water level and condition. When more than 5 units were displaced a distance of 0.5xH or greater, it was usually as a result of the roundhead failing up to the repaired section. For both wave directions of 342 and 364 the toe of the 10 t repair sections were found to be stable. The stitching between the 3.5 t and 10 t dolosse, sustained little or no damage during all the tests. When some damage occurred between 9

10 the stitching on the roundhead side, it was mostly because of the roundhead failing. When the roundhead remained intact, no displacements were observed. The stitching between the 3.5 t and 10 t units on the trunk side of the repaired section showed a minimum number of 10 t units which came dislodged for all the tests. The general conclusion which can be drawn from the model tests is that the planned repairs using 75, 10 t dolosse will be successful as an emergency repair to protect the existing damaged area from a 1:10 year storm. Some settlement can be expected as the new heavier dolosse shake down into the smaller dolosse and rock slope beneath. Although the stitching between the 3.5 t and 10 t dolosse, sustained little or no damage during all the tests, the stability of surrounding 3.5 t dolosse is of concern, especially that of the roundhead. This was not the focus of the tests and report, results did however indicate how vulnerable the roundhead is in its current state. Table 4. Summary of displacements greater than half the dolos height H Water Level m (CD) Normal condition\ m (CD) Overload Condition m (CD) Normal Condition m (CD) Overload Condition +2.0 m (CD) Extreme condition 342 wave direction 364 wave direction Section of interest Between 0.5H - H >H Between 0.5H - H >H All 75 units 5 units 11 units 1 units 2 units Toe Section 1 unit 0 unit 0 units 0 units Roundhead stitching 0 units 5 units 0 units 0 units Trunk stitching 1 units 2 units 2 units 0 units All 75 units units 6 units Toe Section units 0 units Roundhead stitching units 0 units Trunk stitching units 5 units All 75 units 1 unit 0 unit 0 unit 1 unit Toe Section 0 units 0 units 0 units 0 units Roundhead stitching 0 units 0 units 0 units 0 units Trunk stitching 1 unit 0 unit 0 unit 1 unit All 75 units 0 units 4 units 1 units 3 units Toe Section 0 units 0 units 0 units 0 units Roundhead stitching 1 unit 0 unit 0 units 0 units Trunk stitching 0 units 3 units 1 units 3 units All 75 units units 1 units Toe Section units 0 units Roundhead stitching unit 1 unit Trunk stitching units 0 units ACKNOWLEDGEMENT The authors wish to acknowledge the late Dave Phelp who passed away on 29 October Dave Phelp was the Group Leader for the Coastal Engineering and Port Infrastructure group at the CSIR. As the breakwater stability expert at the CSIR his contribution was invaluable. REFERENCES DFID, Ongoing maintenance of Calshot Harbour, Tristan da Cunha, [Online], Available: [13 January 2015]. Hughes, S.A., Physical Models and Laboratory Techniques in Coastal Engineering, World Scientific, Singapore. ISBN-10: Phelp, D. & Tulsi, K., Digital Image Technology as a Measurement Tool in Physical Models, Coastal Lab st International Conference on the Application of Physical Modelling to Port and Coastal Protection, Porto, Portugal. Phelp, D & Zwamborn, J. A., Correlation between Model and Prototype Damage of Dolos Breakwater Armouring, Coastal Engineering th Conference on Coastal Engineering, Sidney, Australia. Tristan da Cunha Government and the Tristan da Cunha Association, Calshot Harbour [Homepage of The Tristan da Cunha Website], [Online]. Available: [21 December 2015]. Tritan Survey, Close Ramge Photogrammetry [Homepage of Tritan Survey], [Online]. Available: [13 January 2016]. Vonk, R., Phelp, D., Boysons, C., Edries, R., Survey of the old dolos breakwaters, Tristan da Cunha, Coastal Structures th International Conference, Venice, Italy,

BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY

BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY Bâtiment Infrastructures municipales Transport Industriel Énergie Environnement BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY N. Guillemette 1, C. Glodowski 1, P.

More information

CHAPTER 132. Roundhead Stability of Berm Breakwaters

CHAPTER 132. Roundhead Stability of Berm Breakwaters CHAPTER 132 Roundhead Stability of Berm Breakwaters Jergen Juhl 1, Amir Alikham, Peter Sloth, Renata Archetti Abstract Three-dimensional (3D) model tests were carried out for studying the stability of

More information

methods and construction sequences for the modifications and

methods and construction sequences for the modifications and CONSTRUCTION SEQUENCE MODELLING FOR HARBOUR BREAKWATER ROGER W HENDRY* Pr Eng BSc MICE MSAICE Abstract Gansbaai fishing and pleasure craft harbour is situated approximately 160km east of Cape Town. Modifications

More information

LABORATORY EXPERIMENTS FOR WAVE RUN-UP ON THE TETRAPOD ARMOURED RUBBLE MOUND STRUCTURE WITH A STEEP FRONT SLOPE

LABORATORY EXPERIMENTS FOR WAVE RUN-UP ON THE TETRAPOD ARMOURED RUBBLE MOUND STRUCTURE WITH A STEEP FRONT SLOPE Proceedings of the 6 th International Conference on the Application of Physical Modelling in Coastal and Port Engineering and Science (Coastlab16) Ottawa, Canada, May 10-13, 2016 Copyright : Creative Commons

More information

HARBOUR SEDIMENTATION - COMPARISON WITH MODEL

HARBOUR SEDIMENTATION - COMPARISON WITH MODEL HARBOUR SEDIMENTATION - COMPARISON WITH MODEL ABSTRACT A mobile-bed model study of Pointe Sapin Harbour, in the Gulf of St. Lawrence, resulted in construction of a detached breakwater and sand trap to

More information

Stability of Cubipod Armoured Roundheads in Short Crested Waves Burcharth, Hans Falk; Andersen, Thomas Lykke; Medina, Josep R.

Stability of Cubipod Armoured Roundheads in Short Crested Waves Burcharth, Hans Falk; Andersen, Thomas Lykke; Medina, Josep R. Aalborg Universitet Stability of Cubipod Armoured Roundheads in Short Crested Waves Burcharth, Hans Falk; Andersen, Thomas Lykke; Medina, Josep R. Published in: Coastal Engineering 2010 Publication date:

More information

PHYSICAL MODELLING INVESTIGATION FOR DIKKOWITA FISHERY HARBOUR

PHYSICAL MODELLING INVESTIGATION FOR DIKKOWITA FISHERY HARBOUR 8 th INTERNATIONALCONFERENCEONCOASTALANDPORT ENGINEERINGINDEVELOPINGCOUNTRIES COPEDEC2012,IITMadras,Chennai,INDIA. 2024Feb.2012 PHYSICAL MODELLING INVESTIGATION FOR DIKKOWITA FISHERY HARBOUR I. G. I. Kumara

More information

Physical Modelling of A-Jacks Units in Wave Flume Stage 2

Physical Modelling of A-Jacks Units in Wave Flume Stage 2 Physical Modelling of A-Jacks Units in Wave Flume Stage 2 Report MHL1901 March 2009 PHYSICAL MODELLING OF A-JACKS UNITS IN WAVE FLUME STAGE 2 Report No. MHL1901 Department of Commerce Manly Hydraulics

More information

CHAPTER 134 INTRODUCTION

CHAPTER 134 INTRODUCTION CHAPTER 134 NEW JETTIES FOR TUNG-KANG FISHING HARBOR, TAIWAN Chi-Fu Su Manager Engineering Department Taiwan Fisheries Consultants, Inc. Taipei, Taiwan INTRODUCTION Tung-Kang Fishing Harbor, which is about

More information

Nearshore Placed Mound Physical Model Experiment

Nearshore Placed Mound Physical Model Experiment Nearshore Placed Mound Physical Model Experiment PURPOSE: This technical note describes the migration and dispersion of a nearshore mound subjected to waves in a physical model. The summary includes recommendations

More information

Update: UNSW s Research Program for Extreme Waves on Fringing Reefs. Matt Blacka,Kristen Splinter, Ron Cox

Update: UNSW s Research Program for Extreme Waves on Fringing Reefs. Matt Blacka,Kristen Splinter, Ron Cox Update: UNSW s Research Program for Extreme Waves on Fringing Reefs Matt Blacka,Kristen Splinter, Ron Cox Overview Research Area 1: Extreme wave and water level processes for fringing reef coastlines Research

More information

INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA)

INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA) INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA) Abdelazim M. Ali Researcher, The Hydraulics Research Institute, National Water Research Center,

More information

LABORATORY STUDY ON TSUNAMI REDUCTION EFFECT OF TEIZAN CANAL

LABORATORY STUDY ON TSUNAMI REDUCTION EFFECT OF TEIZAN CANAL Proceedings of the 6 th International Conference on the Application of Physical Modelling in Coastal and Port Engineering and Science (Coastlab16) Ottawa, Canada, May 10-13, 2016 Copyright : Creative Commons

More information

Simulating Long Waves in a Coffs Harbour 3D Physical Model Using Short Wave Spectra

Simulating Long Waves in a Coffs Harbour 3D Physical Model Using Short Wave Spectra Journal of Shipping and Ocean Engineering 6 (2016) 15-21 doi 10.17265/2159-5879/2016.01.002 D DAVID PUBLISHING Simulating Long Waves in a Coffs Harbour 3D Physical Model Using Short Wave Spectra Indra

More information

OECS Regional Engineering Workshop September 29 October 3, 2014

OECS Regional Engineering Workshop September 29 October 3, 2014 B E A C H E S. M A R I N A S. D E S I G N. C O N S T R U C T I O N. OECS Regional Engineering Workshop September 29 October 3, 2014 Coastal Erosion and Sea Defense: Introduction to Coastal Dynamics David

More information

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other

More information

CHAPTER ONE HUNDRED SIXTY SIX

CHAPTER ONE HUNDRED SIXTY SIX CHAPTER ONE HUNDRED SIXTY SIX ABSTRACT STABILITY OF BREAKWATERS WITH VARIATIONS IN CORE PERMEABILITY G.W. Timco*, E.P.D. Mansard* and J. Ploeg* In setting-up a breakwater test in a laboratory flume, the

More information

Appendix E Cat Island Borrow Area Analysis

Appendix E Cat Island Borrow Area Analysis Appendix E Cat Island Borrow Area Analysis ERDC/CHL Letter Report 1 Cat Island Borrow Area Analysis Multiple borrow area configurations were considered for Cat Island restoration. Borrow area CI1 is located

More information

INTRODUCTION TO COASTAL ENGINEERING

INTRODUCTION TO COASTAL ENGINEERING The University of the West Indies Organization of American States PROFESSIONAL DEVELOPMENT PROGRAMME: COASTAL INFRASTRUCTURE DESIGN, CONSTRUCTION AND MAINTENANCE A COURSE IN COASTAL DEFENSE SYSTEMS I CHAPTER

More information

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy OTC-24699-MS Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy Copyright 2014, Offshore Technology Conference This paper was prepared for presentation

More information

TRANSPORT OF NEARSHORE DREDGE MATERIAL BERMS

TRANSPORT OF NEARSHORE DREDGE MATERIAL BERMS Proceedings of the 6 th International Conference on the Application of Physical Modelling in Coastal and Port Engineering and Science (Coastlab16) Ottawa, Canada, May 10-13, 2016 Copyright : Creative Commons

More information

LABORATORY EXPERIMENTS ON WAVE OVERTOPPING OVER SMOOTH AND STEPPED GENTLE SLOPE SEAWALLS

LABORATORY EXPERIMENTS ON WAVE OVERTOPPING OVER SMOOTH AND STEPPED GENTLE SLOPE SEAWALLS Asian and Pacific Coasts 23 LABORATORY EXPERIMENTS ON WAVE OVERTOPPING OVER SMOOTH AND STEPPED GENTLE SLOPE SEAWALLS Takayuki Suzuki 1, Masashi Tanaka 2 and Akio Okayasu 3 Wave overtopping on gentle slope

More information

SELECTION OF THE PREFERRED MANAGEMENT OPTION FOR STOCKTON BEACH APPLICATION OF 2D COASTAL PROCESSES MODELLING

SELECTION OF THE PREFERRED MANAGEMENT OPTION FOR STOCKTON BEACH APPLICATION OF 2D COASTAL PROCESSES MODELLING SELECTION OF THE PREFERRED MANAGEMENT OPTION FOR STOCKTON BEACH APPLICATION OF 2D COASTAL PROCESSES MODELLING C Allery 1 1 DHI Water and Environment, Sydney, NSW Abstract This paper presents an approach

More information

PARAMETRIZATION OF WAVE TRANSFORMATION ABOVE SUBMERGED BAR BASED ON PHYSICAL AND NUMERICAL TESTS

PARAMETRIZATION OF WAVE TRANSFORMATION ABOVE SUBMERGED BAR BASED ON PHYSICAL AND NUMERICAL TESTS Proceedings of the 6 th International Conference on the Application of Physical Modelling in Coastal and Port Engineering and Science (Coastlab16) Ottawa, Canada, May 10-13, 2016 Copyright : Creative Commons

More information

Structure Failure Modes

Structure Failure Modes US Army Corps Monitoring and Maintenance of Coastal Infrastructure Structure Failure Modes Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and Development Center Waterways

More information

OECS Regional Engineering Workshop September 29 October 3, 2014

OECS Regional Engineering Workshop September 29 October 3, 2014 B E A C H E S. M A R I N A S. D E S I G N. C O N S T R U C T I O N. OECS Regional Engineering Workshop September 29 October 3, 2014 Coastal Erosion and Sea Defense: Introduction to Coastal/Marine Structures

More information

A New Generator for Tsunami Wave Generation

A New Generator for Tsunami Wave Generation Journal of Energy and Power Engineering 10 (2016) 166-172 doi: 10.17265/1934-8975/2016.03.004 D DAVID PUBLISHING Tetsuya Hiraishi 1, Ryokei Azuma 1, Nobuhito Mori 2, Toshihiro Yasuda 2 and Hajime Mase

More information

Low-crested offshore breakwaters: a functional tool for beach management

Low-crested offshore breakwaters: a functional tool for beach management Environmental Problems in Coastal Regions VI 237 Low-crested offshore breakwaters: a functional tool for beach management K. Spyropoulos & E. Andrianis TRITON Consulting Engineers, Greece Abstract Beach

More information

PHYSICAL MODELLING AND DESIGN FOR A NEW MEGA-YACHT MARINA

PHYSICAL MODELLING AND DESIGN FOR A NEW MEGA-YACHT MARINA PHYSICAL MODELLING AND DESIGN FOR A NEW MEGA-YACHT MARINA S. BAKER (1), G. FRANK (2), D.WILLIAMSON (2), K. MACINTOSH (2) & A. CORNETT (1) (1) Ocean, Coastal and River Engineering, National Research Council

More information

Hydrodynamic and hydrological modelling to support the operation and design of sea ports

Hydrodynamic and hydrological modelling to support the operation and design of sea ports Hydrodynamic and hydrological modelling to support the operation and design of sea ports Data needs and examples Martijn de Jong (port/nautical requirements, waves, currents) Sofia Caires (mean and extreme

More information

CHAPTER 68. RANDOM BREAKING WAVES HORIZONTAL SEABED 2 HANS PETER RIEDEl. & ANTHONY PAUL BYRNE

CHAPTER 68. RANDOM BREAKING WAVES HORIZONTAL SEABED 2 HANS PETER RIEDEl. & ANTHONY PAUL BYRNE CHAPTER 68 RANDOM BREAKING WAVES HORIZONTAL SEABED 2 HANS PETER RIEDEl. & ANTHONY PAUL BYRNE ABSTRACT According to wave theories the depth limited wave height over a horizontal seabed has a wave height

More information

Shoreline Evolution Due to Oblique Waves in Presence of Submerged Breakwaters. Nima Zakeri (Corresponding Author), Mojtaba Tajziehchi

Shoreline Evolution Due to Oblique Waves in Presence of Submerged Breakwaters. Nima Zakeri (Corresponding Author), Mojtaba Tajziehchi Shoreline Evolution Due to Oblique Waves in Presence of Submerged Breakwaters Nima Zakeri (Corresponding Author), Mojtaba Tajziehchi Department of Civil Engineering, Faculty of Engineering, University

More information

Cove Point Beach Restoration: Utilization of a Spawning Habitat by Horseshoe Crabs (Limulus polyphemus)

Cove Point Beach Restoration: Utilization of a Spawning Habitat by Horseshoe Crabs (Limulus polyphemus) Cove Point Beach Restoration: Utilization of a Spawning Habitat by Horseshoe Crabs (Limulus polyphemus) Paul Bushmann, Jessica Peterson, Bethany Enyeart and Deborah Smith Anne Arundel Community College

More information

Cross-shore sediment transports on a cut profile for large scale land reclamations

Cross-shore sediment transports on a cut profile for large scale land reclamations Cross-shore sediment transports on a cut profile for large scale land reclamations Martijn Onderwater 1 Dano Roelvink Jan van de Graaff 3 Abstract When building a large scale land reclamation, the safest

More information

MODELING OF CLIMATE CHANGE IMPACTS ON COASTAL STRUCTURES - CONTRIBUTION TO THEIR RE-DESIGN

MODELING OF CLIMATE CHANGE IMPACTS ON COASTAL STRUCTURES - CONTRIBUTION TO THEIR RE-DESIGN Proceedings of the 14 th International Conference on Environmental Science and Technology Rhodes, Greece, 3-5 September 2015 MODELING OF CLIMATE CHANGE IMPACTS ON COASTAL STRUCTURES - CONTRIBUTION TO THEIR

More information

CMS Modeling of the North Coast of Puerto Rico

CMS Modeling of the North Coast of Puerto Rico CMS Modeling of the North Coast of Puerto Rico PRESENTED BY: Dr. Kelly Rankin Legault, Ph.D., P.E. 1 Dr. Alfredo Torruella, Ph.D. 2 1 USACE Jacksonville District 2 University of Puerto Rico October 2016

More information

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016 # Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016 Surf Mitigation Management Plan 1 1 Not less than 6 months prior to the commencement of the construction

More information

BEACH EROSION COUNTERMEASURE USING NEW ARTIFICIAL REEF BLOCKS

BEACH EROSION COUNTERMEASURE USING NEW ARTIFICIAL REEF BLOCKS BEACH EROSION COUNTERMEASURE USING NEW ARTIFICIAL REEF BLOCKS Kyuhan Kim 1, Sungwon Shin 1, Chongkun Pyun 2, Hyundong Kim 3, and Nobuhisa Kobayashi 4 Two-dimensional and three-dimensional laboratory experiments

More information

Chapter 10 Lecture Outline. The Restless Oceans

Chapter 10 Lecture Outline. The Restless Oceans Chapter 10 Lecture Outline The Restless Oceans Focus Question 10.1 How does the Coriolis effect influence ocean currents? The Ocean s Surface Circulation Ocean currents Masses of water that flow from one

More information

BYPASS HARBOURS AT LITTORAL TRANSPORT COASTS

BYPASS HARBOURS AT LITTORAL TRANSPORT COASTS BYPASS HARBOURS AT LITTORAL TRANSPORT COASTS by K. Mangor 1, I. Brøker 2, R. Deigaard 3 and N. Grunnet 4 ABSTRACT Maintaining sufficient navigation depth in front of the entrance at harbours on littoral

More information

THE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE

THE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE THE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE Toon Verwaest, Flanders Hydraulics Research, toon.verwaest@mow.vlaanderen.be Sarah Doorme, IMDC, sarah.doorme@imdc.be Kristof Verelst, Flanders Hydraulics Research,

More information

LARGE-SCALE MODEL TESTS ON SCOUR AROUND SLENDER MONOPILE UNDER LIVE-BED CONDITIONS

LARGE-SCALE MODEL TESTS ON SCOUR AROUND SLENDER MONOPILE UNDER LIVE-BED CONDITIONS Proceedings on the Second International Conference on the Application of Physical Modelling to Port and Coastal Protection LARGE-SCALE MODEL TESTS ON SCOUR AROUND SLENDER MONOPILE UNDER LIVE-BED CONDITIONS

More information

E. Agu, M. Kasperski Ruhr-University Bochum Department of Civil and Environmental Engineering Sciences

E. Agu, M. Kasperski Ruhr-University Bochum Department of Civil and Environmental Engineering Sciences EACWE 5 Florence, Italy 19 th 23 rd July 29 Flying Sphere image Museo Ideale L. Da Vinci Chasing gust fronts - wind measurements at the airport Munich, Germany E. Agu, M. Kasperski Ruhr-University Bochum

More information

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Prepared For: Woodard & Curran 95 Cedar Street, Suite 100 Providence, RI 02903

More information

WAVE OVERTOPPING OF RUBBLE MOUND BREAKWATERS

WAVE OVERTOPPING OF RUBBLE MOUND BREAKWATERS WAVE OVERTOPPING OF RUBBLE MOUND BREAKWATERS Mogens Hebsgaard 1, Peter Sloth 1, and tegen Juhl 2 Abstract A general expression for the overtopping discharge of a rubble mound breakwater has been derived

More information

SPH applied to coastal engineering problems

SPH applied to coastal engineering problems 2 nd Iberian Workshop Ourense, 3 rd and 4 th December 2015 SPH applied to coastal engineering problems (validating the SPH concept) ALTOMARE, CRESPO, DOMINGUEZ, SUZUKI http://www.flandershydraulicsresearch.be/

More information

PHYSICAL MODELING SUPPORTING DESIGN AND CONSTRUCTION OF LOW CRESTED BREAKWATER FOR THE AYIA NAPA MARINA, CYPRUS

PHYSICAL MODELING SUPPORTING DESIGN AND CONSTRUCTION OF LOW CRESTED BREAKWATER FOR THE AYIA NAPA MARINA, CYPRUS PHYSICAL MODELING SUPPORTING DESIGN AND CONSTRUCTION OF LOW CRESTED BREAKWATER FOR THE AYIA NAPA MARINA, CYPRUS M. WESSON 1, M. PROVAN 2, J. COX 3,P. KNOX 4 1 SmithGroupJJR, Madison, USA, Mauricio.Wesson@SmithgroupJJR.com

More information

The Islands. Barbados. A prefeasibility study. R. Drieman M. Hinborch M. Monden E.A.J. Vendrik

The Islands. Barbados. A prefeasibility study. R. Drieman M. Hinborch M. Monden E.A.J. Vendrik The Islands Barbados A prefeasibility study R. Drieman M. Hinborch M. Monden E.A.J. Vendrik General notice to the reader: In the academic programme for Hydraulic Engineering we have in the 4th year (i.e.

More information

Taranaki Tsunami Inundation Analysis. Prepared for Taranaki Civil Defence Emergency Management Group. Final Version

Taranaki Tsunami Inundation Analysis. Prepared for Taranaki Civil Defence Emergency Management Group. Final Version Taranaki Tsunami Inundation Analysis Prepared for Taranaki Civil Defence Emergency Management Group Final Version June 2012 AM 12/07 HBRC Plan Number 4362 Asset Management Group Technical Report Prepared

More information

Lecture Outlines PowerPoint. Chapter 15 Earth Science, 12e Tarbuck/Lutgens

Lecture Outlines PowerPoint. Chapter 15 Earth Science, 12e Tarbuck/Lutgens Lecture Outlines PowerPoint Chapter 15 Earth Science, 12e Tarbuck/Lutgens 2009 Pearson Prentice Hall This work is protected by United States copyright laws and is provided solely for the use of instructors

More information

Appendix M: Durras Lake Tailwater Conditions

Appendix M: Durras Lake Tailwater Conditions Appendix M: Durras Lake Tailwater Conditions M.1 Preamble WRL has completed a tailwater condition assessment for the entrance to Durras Lake, to be used as an ocean boundary condition for a future flood

More information

CHAPTER 135. Influence of the core configuration on the stability of berm breakwaters. Nikolay Lissev 1 AlfT0rum 2

CHAPTER 135. Influence of the core configuration on the stability of berm breakwaters. Nikolay Lissev 1 AlfT0rum 2 CHAPTER 135 Influence of the core configuration on the stability of berm breakwaters Nikolay Lissev 1 AlfT0rum 2 Abstract An experimental study has been carried out to investigate the concept of extending

More information

PHYSICAL AND NUMERICAL MODELLING OF WAVE FIELD IN FRONT OF THE CONTAINER TERMINAL PEAR - PORT OF RIJEKA (ADRIATIC SEA)

PHYSICAL AND NUMERICAL MODELLING OF WAVE FIELD IN FRONT OF THE CONTAINER TERMINAL PEAR - PORT OF RIJEKA (ADRIATIC SEA) PHYSICAL AND NUMERICAL MODELLING OF WAVE FIELD IN FRONT OF THE CONTAINER TERMINAL PEAR - PORT OF RIJEKA (ADRIATIC SEA) DALIBOR CAREVIĆ (1), GORAN LONČAR (1), VLADIMIR ANDROČEC (1) & MARIN PALADIN (1) 1.

More information

Present Practices in Design of Rubblemound Breakwaters for Coastal Harbours-A Review

Present Practices in Design of Rubblemound Breakwaters for Coastal Harbours-A Review International Journal of Current Engineering and Technology E-ISSN 2277 4106, P-ISSN 2347 5161 2018 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijcet Review Article Present

More information

Model Test Setup and Program for Experimental Estimation of Surface Loads of the SSG Kvitsøy Pilot Plant from Extreme Wave Conditions

Model Test Setup and Program for Experimental Estimation of Surface Loads of the SSG Kvitsøy Pilot Plant from Extreme Wave Conditions Model Test Setup and Program for Experimental Estimation of Surface Loads of the SSG Kvitsøy Pilot Plant from Extreme Wave Conditions according to Co-operation Agreement (phase 4) between WAVEenergy (Norway)

More information

WAVE OVERTOPPING AND RUBBLE MOUND STABILITY UNDER COMBINED LOADING OF WAVES AND CURRENT

WAVE OVERTOPPING AND RUBBLE MOUND STABILITY UNDER COMBINED LOADING OF WAVES AND CURRENT WAVE OVERTOPPING AND RUBBLE MOUND STABILITY UNDER COMBINED LOADING OF WAVES AND CURRENT Sepehr Eslami A. and Marcel R.A. van Gent Coastal structures such as breakwaters are usually studied under wave loading

More information

Breakwaters and closure dams CT 5308 Exercise 2011: Pointe Noire, Congo

Breakwaters and closure dams CT 5308 Exercise 2011: Pointe Noire, Congo Breakwaters and closure dams CT 5308 Exercise 2011: Pointe Noire, Congo The town of Pointe Noire is the main port city in the Republic of the Congo and sits on the south-western African coast some 150

More information

WAVE LOAD ACTING ON HORIZONTAL PLATE DUE TO BORE

WAVE LOAD ACTING ON HORIZONTAL PLATE DUE TO BORE Proceedings of the 6 th International Conference on the Application of Physical Modelling in Coastal and Port Engineering and Science (Coastlab16) Ottawa, Canada, May 10-13, 2016 Copyright : Creative Commons

More information

Nearshore Morphodynamics. Bars and Nearshore Bathymetry. Sediment packages parallel to shore, that store beach sediment

Nearshore Morphodynamics. Bars and Nearshore Bathymetry. Sediment packages parallel to shore, that store beach sediment Nearshore Morphodynamics http://coastal.er.usgs.gov/bier/images/chandeleur-xbeach-lg.jpg Bars and Nearshore Bathymetry Sediment packages parallel to shore, that store beach sediment Can be up to 50 km

More information

April 7, Prepared for: The Caribbean Disaster Emergency Response Agency Prepared by: CEAC Solutions Co. Ltd.

April 7, Prepared for: The Caribbean Disaster Emergency Response Agency Prepared by: CEAC Solutions Co. Ltd. April 7, 2006 Prepared for: The Caribbean Disaster Emergency Response Agency Prepared by: Introduction CEAC Solutions Co. Ltd was commissioned in May 2005 to prepare coastal beach erosion hazard maps for

More information

The Challenge of Wave Scouring Design for the Confederation Bridge

The Challenge of Wave Scouring Design for the Confederation Bridge 13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge

More information

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario Technical Brief - Wave Uprush Analysis RIGGS ENGINEERING LTD. 1240 Commissioners Road West Suite 205 London, Ontario N6K 1C7 October 31, 2014 Table of Contents Section Page Table of Contents... i List

More information

AGGREGATE DREDGING AND THE MARINE ENVIRONMENT

AGGREGATE DREDGING AND THE MARINE ENVIRONMENT AGGREGATE DREDGING AND THE MARINE ENVIRONMENT The marine Aggregate Levy Sustainability Fund ( marine ALSF ) programme represents one of the most substantial investments in UK marine research. The research

More information

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] October 25, 2016 Iris Hill Town Administrator Town of Edisto Beach 2414 Murray St Edisto Beach SC 29438 RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] Dear Iris, Hurricane

More information

Aalborg Universitet. Published in: Proceedings of Offshore Wind 2007 Conference & Exhibition. Publication date: 2007

Aalborg Universitet. Published in: Proceedings of Offshore Wind 2007 Conference & Exhibition. Publication date: 2007 Aalborg Universitet Design Loads on Platforms on Offshore wind Turbine Foundations with Respect to Vertical Wave Run-up Damsgaard, Mathilde L.; Gravesen, Helge; Andersen, Thomas Lykke Published in: Proceedings

More information

Available online at ScienceDirect. Procedia Engineering 116 (2015 )

Available online at  ScienceDirect. Procedia Engineering 116 (2015 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 116 (2015 ) 320 325 8th International Conference on Asian and Pacific Coasts (APAC 2015) Department of Ocean Engineering, IIT

More information

UPPER BEACH REPLENISHMENT PROJECT RELATED

UPPER BEACH REPLENISHMENT PROJECT RELATED ASSESSMENT OF SAND VOLUME LOSS at the TOWNSHIP of UPPER BEACH REPLENISHMENT PROJECT RELATED to the LANDFALL OF HURRICANE SANDY - PURSUANT TO NJ-DR 4086 This assessment is in response to Hurricane Sandy

More information

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015 Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015 Prepared for Port Otago Ltd Martin Single September 2015 Shore Processes and Management Ltd Contact

More information

IMPACTS OF COASTAL PROTECTION STRATEGIES ON THE COASTS OF CRETE: NUMERICAL EXPERIMENTS

IMPACTS OF COASTAL PROTECTION STRATEGIES ON THE COASTS OF CRETE: NUMERICAL EXPERIMENTS IMPACTS OF COASTAL PROTECTION STRATEGIES ON THE COASTS OF CRETE: NUMERICAL EXPERIMENTS Tsanis, I.K., Saied, U.M., Valavanis V. Department of Environmental Engineering, Technical University of Crete, Chania,

More information

INTRODUCTION TO COASTAL ENGINEERING AND MANAGEMENT

INTRODUCTION TO COASTAL ENGINEERING AND MANAGEMENT Advanced Series on Ocean Engineering Volume 16 INTRODUCTION TO COASTAL ENGINEERING AND MANAGEMENT J. William Kamphuis Queen's University, Canada World Scientific Singapore New Jersey London Hong Kong Contents

More information

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia T.R. Atkins and R. Mocke Maritime Group, Sinclair Knight Merz, P.O. Box H615, Perth 6001, Australia ABSTRACT

More information

The API states the following about tube rupture for a shell-and-tube heat exchangers:

The API states the following about tube rupture for a shell-and-tube heat exchangers: Tutorial This tutorial describes the theory and modeling process of a tube rupture event using the special element type Rupture element in BOSfluids. It covers the algorithm BOSfluids uses to model the

More information

Deep-water orbital waves

Deep-water orbital waves What happens when waves approach shore? Deep-water orbital waves Fig. 9.16, p. 211 Wave motion is influenced by water depth and shape of the shoreline wave buildup zone surf zone beach Wave base deepwater

More information

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL August 23 STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting

More information

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby Ping Wang and Tiffany M. Roberts Coastal Research Laboratory University of South Florida July 24, 2012 Introduction

More information

(Refer Slide Time: 1:01)

(Refer Slide Time: 1:01) Port and Harbour Structures. Professor R. Sundaradivelu. Department of Ocean Engineering. Indian Institute of Technology, Madras. Module-3. Lecture-11. Breakwater. So we have so far discussed 5 lectures,

More information

Risk Awareness Key to a Sustainable Design Approach for Breakwater Armouring

Risk Awareness Key to a Sustainable Design Approach for Breakwater Armouring Risk Awareness Key to a Sustainable Design Approach for Breakwater Armouring J.S. Reedijk, Delta Marine Consultants, Gouda, The Netherlands M. Muttray, Delta Marine Consultants, Gouda, The Netherlands

More information

Homework 2 Bathymetric Charts [based on the Chauffe & Jefferies (2007)]

Homework 2 Bathymetric Charts [based on the Chauffe & Jefferies (2007)] 1 MAR 110 HW-2 - Bathy Charts Homework 2 Bathymetric Charts [based on the Chauffe & Jefferies (2007)] 2-1. BATHYMETRIC CHARTS Bathymetric charts are maps of a region of the ocean used primarily for navigation

More information

Focus on New Sites for Caves and Reefs Issues Identified. Dr. Leyla Knittweis-Mifsud Department of Biology, Faculty of Science University of Malta

Focus on New Sites for Caves and Reefs Issues Identified. Dr. Leyla Knittweis-Mifsud Department of Biology, Faculty of Science University of Malta Focus on New Sites for Caves and Reefs Issues Identified Dr. Leyla Knittweis-Mifsud Department of Biology, Faculty of Science University of Malta Presentation Overview Areas of conservation potential within

More information

Assessment Schedule 2016 Earth and Space Science: Demonstrate understanding of processes in the ocean system (91413)

Assessment Schedule 2016 Earth and Space Science: Demonstrate understanding of processes in the ocean system (91413) NCEA Level 3 Earth & Space Science (91413) 2016 page 1 of 6 Assessment Schedule 2016 Earth and Space Science: Demonstrate processes in the ocean system (91413) Evidence Statement Q Evidence with with Excellence

More information

page - Laboratory Exercise #5 Shoreline Processes

page - Laboratory Exercise #5 Shoreline Processes page - Laboratory Exercise #5 Shoreline Processes Section A Shoreline Processes: Overview of Waves The ocean s surface is influenced by three types of motion (waves, tides and surface currents). Shorelines

More information

DUXBURY WAVE MODELING STUDY

DUXBURY WAVE MODELING STUDY DUXBURY WAVE MODELING STUDY 2008 Status Report Duncan M. FitzGerald Peter S. Rosen Boston University Northeaster University Boston, MA 02215 Boston, MA 02115 Submitted to: DUXBURY BEACH RESERVATION November

More information

Large-scale Field Test

Large-scale Field Test Vaskinn 1 Large-scale Field Test Kjetil Arne Vaskinn kav@trh.statkraftgroner.no Statkraft Grøner AS SUMMARY The objective the controlled failure of large-scale embankment is to monitor and record the failure

More information

Wave Breaking. Wave Breaking

Wave Breaking. Wave Breaking Wave Breaking The release of energy derived from the wind, along a narrow coastal zone - geomorphic work done by wind, really, translated through medium of water. Wave Breaking Wave breaking is responsible

More information

THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY

THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY Agenda: - Introduction - Tender - Project Planning - Survey - Processing - Delivery - Conclusion 2 Introduction We know less of the oceans at our feet,

More information

A: Formalities. DELOS WP 1.1 Inventory on LCS, questionnaire, detailed description, revision D AUTH GR. Participant code and who to contact.

A: Formalities. DELOS WP 1.1 Inventory on LCS, questionnaire, detailed description, revision D AUTH GR. Participant code and who to contact. A: Formalities Participant code and who to contact. AUTH GR J. Avgeris E-mail iavgeris@civil.auth.gr This date (today, mm:dd:yyyy) and revision number (A..Z). 17/09/01 Rev A Location of LCS. Patras Gulf,

More information

WAVE MECHANICS FOR OCEAN ENGINEERING

WAVE MECHANICS FOR OCEAN ENGINEERING Elsevier Oceanography Series, 64 WAVE MECHANICS FOR OCEAN ENGINEERING P. Boccotti Faculty of Engineering University of Reggio-Calabria Feo di Vito 1-89060 Reggio-Calabria Italy 2000 ELSEVIER Amsterdam

More information

ITTC Recommended Procedures and Guidelines

ITTC Recommended Procedures and Guidelines Page 1 of 6 Table of Contents 1. PURPOSE...2 2. PARAMETERS...2 2.1 General Considerations...2 3 DESCRIPTION OF PROCEDURE...2 3.1 Model Design and Construction...2 3.2 Measurements...3 3.5 Execution of

More information

COFFS HARBOUR SEDIMENT MODELLING AND INVESTIGATION

COFFS HARBOUR SEDIMENT MODELLING AND INVESTIGATION COFFS HARBOUR SEDIMENT MODELLING AND INVESTIGATION Luke McAvoy Undergraduate Engineer (Civil) Griffith School of Engineering, Griffith University, Gold Coast, Australia Daniel Rodger Senior Engineer Water

More information

COMBINED PHYSICAL AND NUMERICAL MODELLING TO INFORM OPTIMAL MARINA DESIGN

COMBINED PHYSICAL AND NUMERICAL MODELLING TO INFORM OPTIMAL MARINA DESIGN COMBINED PHYSICAL AND NUMERICAL MODELLING TO INFORM OPTIMAL MARINA DESIGN Vincenzo Albanese 1, Keith Powell 2 and Giovanni Cuomo 3 A new Marina, capable of hosting up to 1,000 boats, is being constructed

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

Measurement of vertical motions of bulk carriers navigating in port entrance channels

Measurement of vertical motions of bulk carriers navigating in port entrance channels HYDROGRAPHIC CONFERENCE Technical Awareness Seminar 2007 Cape Town, 19 21 June 2007 Measurement of vertical motions of bulk carriers navigating in port entrance channels J Moes CSIR, PO Box 320, Stellenbosch,

More information

Hydrographic Surveying at The Port of London

Hydrographic Surveying at The Port of London Hydrographic Surveying at The Port of London John Dillon-Leetch Port and Terminal Technology 2009 14 th October, Antwerp Overview Introduction Surveying the Thames Navigational Charting High Resolution

More information

The Dynamic Coast. Right Place Resources. A presentation about the interaction between the dynamic coast and people

The Dynamic Coast. Right Place Resources. A presentation about the interaction between the dynamic coast and people The Dynamic Coast Houses threatened by coastal erosion in California Right Place Resources A presentation about the interaction between the dynamic coast and people For the rest of the presentations in

More information

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI Capt. MVR MURTHY ABSTRACT The coastal city of Visakhapatnam had a long wide beach. Over past three decades, this beach has progressively

More information

LOCALLY CONCENTRATED SEVERE BEACH EROSION ON SEISHO COAST CAUSED BY TYPHOON T0709

LOCALLY CONCENTRATED SEVERE BEACH EROSION ON SEISHO COAST CAUSED BY TYPHOON T0709 F-4 Fourth International Conference on Scour and Erosion 2008 LOCALLY CONCENTRATED SEVERE BEACH EROSION ON SEISHO COAST CAUSED BY TYPHOON T0709 Yoshimitsu TAJIMA 1 and Shinji SATO 2 1 Member of JSCE, Associate

More information

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque RIGGS ENGINEERING LTD. 1240 Commissioners Road West Suite 205 London, Ontario N6K 1C7 June 12, 2013 Table of Contents Section Page Table

More information

Waves Part II. non-dispersive (C g =C)

Waves Part II. non-dispersive (C g =C) Waves Part II Previously we discussed Surface Gravity Waves Deep Water Waves Shallow Water Waves C g T 2 C g h dispersive (C g =C/2) Definitions: phase speed C= /T= /k non-dispersive (C g =C) group speed

More information

STUDY ON TSUNAMI PROPAGATION INTO RIVERS

STUDY ON TSUNAMI PROPAGATION INTO RIVERS ABSTRACT STUDY ON TSUNAMI PROPAGATION INTO RIVERS Min Roh 1, Xuan Tinh Nguyen 2, Hitoshi Tanaka 3 When tsunami wave propagation from the narrow river mouth, water surface is raised and fluctuated by long

More information

Re: Disposal of Maintenance Dredge Material and Impacts on Surfing Breaks and Coastal Processes.

Re: Disposal of Maintenance Dredge Material and Impacts on Surfing Breaks and Coastal Processes. ecoast Marine Consulting and Research PO Box 151 Raglan, New Zealand. Ph. +64 21 423 224 www.ecoast.co.nz info@ecoast.co.nz 25 August 2015 Reuben Fraser Consents Manager Bay of Plenty Regional Council

More information