1 SCOTTSDALE ROAD HAWK 2012 Spring ITE / IMSA Conference Presenter: Phillip Kercher, City of Scottsdale

2 Introduction HAWK = High-intensity Activated crosswalk Pedestrian Hybrid Beacon Not traffic signal per MUTCD Location: Scottsdale Road south of GreenwayHayden, north of Greenway Parkway Scottsdale had installed three HAWK s prior to this installation.

3 Why Is This Location Unique? Scottsdale Road is a six-lane arterial carrying over 36,000 vehicles a day. This pedestrian crossing connects two major mixed-use centers - Kierland Commons and Scottsdale Quarter. The west landing is in Phoenix; the east landing is in Scottsdale. It is a two-stage crossing. Located midway between traffic signals spaced 1,100 feet apart.

4 Location Scottsdale Road Westin Kierland Kierland Blvd. Kierland Commons Scottsdale Road Greenway-Hayden Loop Scottsdale Quarter Greenway Pkwy. Butherus Dr.

5 Why HAWK Is Needed + =

6 HAWK Preliminary Design

7 HAWK Warrant Analysis Videotaped the crossing area on Sept. 16, 2010 from 11 a.m. to 7 p.m. Observed 105 ped. crossings in 8 hour period. Observed 20 mid-block pedestrian crossings during the 5 to 6 p.m. hour. Traffic volume for 5 to 6 p.m. period was 1,986 vehicles. Crosswalk length is 100. Met Pedestrian Hybrid Beacon warrant. # Pedestrians per hour

8 Coordination with Phoenix & Kierland Concerns about parking, aesthetics, visibility. Agreed to jointly fund a study to review options. Study was performed by Kimley-Horn. Options reviewed: 1. Do nothing. 2. Construct barrier in median. 3. Construct two-stage HAWK. 4. Construct two-stage HAWK with left turns allowed. 5. Construct traffic signal with left turns allowed. 6. Construct grade separated pedestrian crossing. 7. Construct a single stage HAWK or signal.

9 Coordination (Continued) Study recommended further consideration of median barrier, two-stage HAWK, and singlestage HAWK or signal. Still met resistance from Kierland ownership; COP recommended median barrier. COS began looking at design alternatives that would not require Phoenix/Kierland participation. Eventually all parties agreed upon two-stage HAWK.

10 HAWK Design and Construction Todd Taylor (COS) prepared HAWK design. Roy Herrington (COS) prepared median improvement plans ped. pathway, landscaping, and shade structures. Construction began on Oct. 12, (Conduit was installed during a street overlay in July, 2010). HAWK was activated on Nov. 23, Construction cost was $325,000; Glimcher (Scottsdale Quarter) contributed $157,625.

11 HAWK Construction

12 Finished Product

13 Finished Product

14 Finished Product

15 Post Construction Observations Videotaped the crossing area on Thurs., Dec. 8, 2011 (9 a.m. to 11 p.m.) and Sat., Dec. 10, 2011 (11 a.m. to 6 p.m.) Observed 391 HAWK ped. crossings on Sat. from 2 p.m. to 3 p.m. 1,960 HAWK ped. crossings during the 7 hour period on Saturday. Collisions 2 minor rear-end in Dec Main concern is drivers not understanding yield condition under the flashing red.

16 Thanks to Those Who Contributed Mike Cynecki, COP John Siefert, COP Paul Porell, COS Dave Meinhart, COS Todd Taylor, COS Chris Perkins, COS Brian Cluff, COS Margo Conley, Glimcher Scott Nelson, Macerich Tove White, KHA George White, KHA John Bartlett, KHA Steve Ramsey, COS COS Signal Crew Griff Hepner, COS Jen Bohac, COS Dave Richert, COS David Cavazos, COP

17 Timeline of Events 2/10: COS mtg. with City Manager 4/10: Contacted Glimcher 7/10: Check from Glimcher 7/10: Began corresp. With COP re. HAWK 7/10: Conduit installed 9/10: Warrant study 10/10: Agreed to fund independent study 1/11: NTP to Kimley-Horn 2/11: Study completed 4/11: COP endorses barrier option 8/11: Notification COS moving ahead w/ HAWK 9/11: COP agrees to HAWK 9/11: Press release 10/11: Construction starts 11/11: HAWK energized

18 Conclusion Questions?

19 MUTCD HAWK Warrant

20 Kimley-Horn Study Evaluation Factors: Ped. & veh. safety along Scottsdale Road Traffic operations within the two developments Pedestrian access between KC and SQ Preserving Scottsdale Rd. traffic flow Traffic operations at adjacent signalized intersections Parking availability and customer convenience Construction costs Aesthetics

21 HAWK Crossing Observations

22 HAWK FHWA Safety Study FHWA-HRT July 2010

23 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) Pedestrian Transfer by Effective Refuge On Displaced Area Controlled Through Yielding Lanes Steven L. Ramsey, P.E. Senior I.T.S. Engineer I.T.S. Team City of Scottsdale, AZ

24 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE Goals Challenges Concept Solutions Testing Operations Results OUTLINE Background (by Phil Kercher) Operational Goals Challenges Conceptual Operation Solutions Testing Field Operations Results Questions

25 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE GOALS Goals Challenges 450 Concept Solutions Testing 450 Operations Results

26 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE Goals Challenges Concept Solutions Testing GOALS Minimize disruptions to Scottsdale Rd. traffic. Maintain / Improve Progression. Minimize wait for Pedestrians Serve Pedestrians as often as possible. Improve Pedestrian Safety. Minimize Construction Costs. Operations Results

27 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE Goals Challenges Concept Solutions Testing Operations Results CHALLENGES Signal spacing too close High Traffic Volumes, >47,000 vpd, High rate of J-Walking, High Latent Demand New Controllers, Econolite ASC-3 Unfamiliarity with less-used functions Unusual Operation, Flashing, Wig-Wag Unusual Phasing, intervals, etc Need same intervals to occur twice per cycle in some scenarios. Street Width: 6 thru lanes, 2 RT Lanes, Median Long Walk distance. Used slower, Ped speed; 3.5 fps

28 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE CONCEPT Goals Challenges Concept Solutions Testing Operations Results

29 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE Goals Challenges OPERATIONAL COMBINATIONS Working within set Cycle Lengths Fixed Offset Pt. NB Indications SB Indications Yield Pt. CONCEPT Time needed for single crossing Concept Solutions Testing Operations Results Main Street thru movement Hawk dark Time needed for full dual crossing Time Permitting Complete Crossing Westbound Dual Crossing Eastbound Dual Crossing Simultaneous WB & EB Dual Crossing Time Permits single side crossing only. East-side Single Crossing West-side Single Crossing Independent East-side & West-side Single Crossings

30 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE SOLUTIONS Goals 11 7 Ph 5 12 Ph 8 Ph 4 SCENARIO #1 SINGLE WB PED Ph 4 Challenges Ph 6 Ph Concept Ph 2 Ph 1 Solutions Testing Operations PHASES ACTUATED BUT ONLY TIMING, NO OUTPUTS Ph 3 Wk Ph 3 FDW OUTPUTS Ph 4&8 4 FY 4Y Ph 4&8 R wig/wag OUTPUTS ACTIVATED BY LOGIC STATMENTS Ph 1 NB (dark) 1Y 1 Ph 9 Wk Ph 9 FDW AR Ph 5 SB (dark) 5Y 5 Dummy Ph 11 timing AR OUTPUTS 9Y 9 AR Y AR Dummy Ph 10 timing Ph 12 Wk Ph 12 FDW OUTPUTS ACTIVATED BY LOGIC STATMENTS Ph 2&6 2 FY 2Y Ph 2&6 R wig/wag Ph 7 Wk Ph 7 FDW 10Y 10AR 12Y 12AR Results

31 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE SOLUTIONS Goals 11 7 Ph 5 12 Ph 8 Ph 4 SCENARIO #2 SINGLE EB PED Ph 4 Challenges Ph 6 Ph Concept Ph 2 Ph 1 Solutions Testing Operations PHASES ACTUATED BUT ONLY TIMING, NO OUTPUTS OUTPUTS Ph 1 NB (dark) Ph 5 SB (dark) OUTPUTS 1Y 1 AR 5 Y 5 AR 2 FY Dummy Ph 9 timing Ph 11 Wk Ph 11 FDW OUTPUTS ACTIVATED BY LOGIC STATMENTS 2Y Ph 2&6 R Ph 2&6 wig/wag Ph 7 Wk Ph 7 FDW 4 FY 4Y Ph 4&8 R Ph 4&8 wig/wag 9Y 9 AR Ph 3 Wk Ph 3 FDW OUTPUTS ACTIVATED BY LOGIC STATMENTS 11Y 11 AR Ph 10 Wk Ph 10 FDW Dummy Ph 12 timing 10Y 10AR 12Y 12AR Results

32 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE SOLUTIONS Goals 11 7 Ph 5 12 Ph 8 Ph 4 SCENARIO #3 SIMULTANEOUS EB & WB PEDS Ph 4 Challenges Ph 6 Ph Concept Ph 2 Ph 1 Solutions Testing Operations PHASES ACTUATED BUT ONLY TIMING, NO OUTPUTS OUTPUTS Ph 1 NB (dark) Ph 5 SB (dark) OUTPUTS Ph 3 Wk Ph 3 FDW 4 FY 4Y Ph 4&8 R Ph 4&8 wig/wag OUTPUTS ACTIVATED BY LOGIC STATMENTS 1Y 1 AR 5 Y 5 AR OUTPUTS ACTIVATED BY LOGIC STATMENTS 2 FY Ph 9 Wk Ph 9 FDW Ph 11 Ph 11 Wk FDW 2Y Ph 2&6 R Ph 2&6 wig/wag Ph 7 Wk Ph 7 FDW Ph 3 Wk Ph 3 FDW 4 FY 4Y Ph 4&8 R Ph 4&8 wig/wag OUTPUTS ACTIVATED BY LOGIC STATMENTS Ph 10 9Y 9 AR Ph 10 10Y 10AR Wk FDW Ph 12 Ph 12 12Y 12AR Y AR Wk FDW OUTPUTS ACTIVATED BY LOGIC STATMENTS 2 2Y FY Ph 2&6 R Ph 2&6 wig/wag Ph 7 Wk Ph 7 FDW Results

33 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE SOLUTIONS Goals 11 7 Ph 5 12 Ph 8 Ph 4 Ph 4 SCENARIO #4 SINGLE ES AND/OR WS PEDS Challenges Ph 6 Ph Concept Ph 2 Ph 1 Solutions Testing Operations Results PHASES ACTUATED BUT ONLY TIMING, NO OUTPUTS OUTPUTS OUTPUTS Ph 3 Wk Ph 3 FDW 4 FY 4Y Ph 4&8 R Ph 4&8 wig/wag OUTPUTS ACTIVATED BY LOGIC STATMENTS Ph 10 Ph 10 Ph 1 NB (dark) 1Y 1 AR Wk FDW Ph 5 SB (dark) 5 Y 5 Ph 12 AR Wk 2 FY 10Y 10AR Ph 12 FDW OUTPUTS ACTIVATED BY LOGIC STATMENTS 2Y Ph 2&6 R Ph 2&6 wig/wag Ph 7 Wk Ph 7 FDW 12Y 12AR

34 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) SOLUTIONS OUTLINE Goals Challenges Concept Solutions Testing Operations Results

35 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) SOLUTIONS OUTLINE Goals Challenges Concept Solutions Testing Operations Results

36 AND PED DETECTOR 1 ON THEN SET LOGIC FLAG 7 65 IF PHASE TIMING ON PHASE 10 ON Double AND PED DETECTOR HAWK 3 ON Pedestrian Crossing THEN SET LOGIC FLAG 9 ( aka; PTERODACTYL ) 66 IF LOCAL CYCLE TIMER,, <2 AND LOGIC FLAG 8 ON THEN SET LOGIC FLAG 2 ON THEN DELAY FOR.6 SEC THE SET LOGIC FLAG 8 OFF OUTLINE Goals Challenges Concept Solutions Testing Operations Results 67 IF LOCAL CYCLE TIMER,, <2 AND LOGIC FLAG 10 ON THEN SET LOGIC FLAG 6 ON THEN DELAY FOR.6 SEC THE SET LOGIC FLAG 10 OFF 68 IF LOCAL CYCLE TIMER,, <2 AND LOGIC FLAG 9 ON THEN SET LOGIC FLAG 5 ON THEN DELAY FOR.6 SEC THE SET LOGIC FLAG 9 OFF 69 IF LOCAL CYCLE TIMER,, <2 AND LOGIC FLAG 7 ON THEN SET LOGIC FLAG 1 ON THEN DELAY FOR.6 SEC THE SET LOGIC FLAG 7 OFF 70 IF LOGIC FLAG 1 IS ON OR LOGIC FLAG 2 IS ON THEN SET LOGIC FLAG 5 OFF THEN SET LOGIC FLAG 6 OFF 71 IF LOGIC FLAG 15 OFF AND LOGIC FLAG 6 OFF AND PED DETECTOR 5 ON THEN SET LOGIC FLAG 8 72 IF LOGIC FLAG 15 OFF AND LOGIC FLAG 5 OFF AND PED DETECTOR 1 ON THEN SET LOGIC FLAG 7 SOLUTIONS LOGIC PROCESSOR

37 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE Goals Challenges Concept Solutions TESTING Extensive testing to look for potentials conflicts. Set up and testing of Conflict Monitor. Tried various combinations of activations at different points in cycle. Found a few minor glitches some easier to fix than others. Testing Operations Results

38 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE Goals FIELD OPERATIONS ( INSERT VIDEO CLIP HERE ) Challenges Concept Solutions Testing Operations Results

39 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) OUTLINE Goals Challenges Concept Solutions Testing Operations Results PEDESTRIAN CROSSING RESULTS Date Hour East to West West to East No Push Total/Hour 12/8/ * * * * * Total /10/ * ** Total

40 Double HAWK Pedestrian Crossing ( aka; PTERODACTYL ) QUESTIONS?

RE: City of Portland Request to Experiment with HAWK/Bike signal

RE: City of Portland Request to Experiment with HAWK/Bike signal October 4, 2005 Regina S. McElroy, Director Office of Transportation Operations HOTO Room 3401 400 7 th Street, S.W. Washington, D.C. 20590 RE: City of Portland Request to Experiment with HAWK/Bike signal

More information

FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report

FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report August 2, 2010 Table of Contents Preface... 1 Problem Statement... 1 Study Objectives... 2 Data Collection Methods...

More information

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team Impact of the New MUTCD on Pedestrians and Bicyclists Bruce Friedman and Scott Wainwright FHWA MUTCD Team Development of the 2009 MUTCD NPA published in the Federal Register on January 2, 2008 Received

More information

Introduction to Traffic Signal Timing

Introduction to Traffic Signal Timing Introduction to Traffic Signal Timing Course No: C-7 Credit: PDH Jeffrey W. Buckholz, Ph.D., P.E., PTOE Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 98 P: (877) -58

More information

Flashing Yellow Left Turn Arrows Scottsdale s Experience

Flashing Yellow Left Turn Arrows Scottsdale s Experience Flashing Yellow Left Turn Arrows Scottsdale s Experience 2013 ITE Western District Conference July 16, 2013 Todd Taylor, P.E., PTOE City of Scottsdale Senior Traffic Engineer FYLTA Review Question NCHRP

More information

Pedestrian Timing Strategies at Large Signalized Intersections

Pedestrian Timing Strategies at Large Signalized Intersections Pedestrian Timing Strategies at Large Signalized Intersections Zong Tian, Ph.D., P.E. Department of Civil & Environmental Engineering University of Nevada Reno Reno, NV 89557 OVERVIEW Safety Efficiency

More information

Designing for Pedestrian Safety in Washington, DC

Designing for Pedestrian Safety in Washington, DC Designing for Pedestrian Safety in Washington, DC February 25, 2014 George Branyan Pedestrian Program Coordinator District Department of Transportation DC Journey to work mode split: 2012 Means of Transportation

More information

Flashing Yellow Left Turn Arrows: Scottsdale Experience

Flashing Yellow Left Turn Arrows: Scottsdale Experience Flashing Yellow Left Turn Arrows: Scottsdale Experience 2011 Arizona Spring Conference AZITE/IMSA March 9, 2011 Paul Porell, P.E. Traffic Engineering Manager Innovation Demonstration Project: Presentation

More information

SCOPE Application, Design, Operations,

SCOPE Application, Design, Operations, SCOPE Application, Design, Operations, Maintenance, etc.: Typical Traffic Control Signals Pedestrian Hybrid Beacons Emergency Vehicle One-Lane/Two-Way Facilities, Freeway Entrance Ramps, and Movable Bridges

More information

Retrofitting Urban Arterials into Complete Streets

Retrofitting Urban Arterials into Complete Streets Retrofitting Urban Arterials into Complete Streets John N. LaPlante, P.E., P.T.O.E., T.Y. Lin International Prepared for: Illinois Traffic Engineering & Safety Conference Urbana, Illinois October 18, 2007

More information

HAWK Signal. Pedestrian Safety. Illinois Traffic Engineering & Safety Conference Thursday, October 21, 2010

HAWK Signal. Pedestrian Safety. Illinois Traffic Engineering & Safety Conference Thursday, October 21, 2010 HAWK Signal Pedestrian Safety Illinois Traffic Engineering & Safety Conference Thursday, October 21, 2010 Background Information High-intensity Activated crosswalk Developed by the City of Tuscon, AZ First

More information

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Intersections are the physical component of the roadways where two highways intersect. They are the most complex element of roadways, since it requires more

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/

More information

Actuated Signal Timing Design CIVL 4162/6162

Actuated Signal Timing Design CIVL 4162/6162 Actuated Signal Timing Design CIVL 4162/6162 Session Objective Explain terms related to actuated signals Explain why and where actuated signals are used Determine detector locations given traffic conditions

More information

Pedestrian Hybrid Beacon Guide Recommendations and Case Study. FHWA Safety Program.

Pedestrian Hybrid Beacon Guide Recommendations and Case Study. FHWA Safety Program. Pedestrian Hybrid Beacon Guide ecommendations and Case Study FHWA Safety Program http://safety.fhwa.dot.gov A pedestrian hybrid beacon (PHB) is a traffic control device similar to a European pedestrian

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

Pedestrian Safety Guide for Transit Agencies

Pedestrian Safety Guide for Transit Agencies Pedestrian Safety Guide for Transit Agencies FDOT/FTPA/CUTR Professional Development Workshop June 15, 2010 1 Purpose Presentation Overview Bus Stop Location and Design Process/Partnership 2 Purpose Every

More information

Designing for Pedestrian Safety

Designing for Pedestrian Safety Designing for Pedestrian Safety Treatments at Unsignalized Pedestrian Crossings Presented by: Charlie Zegeer PBIC Director August 17, 2010 Crossing Crashes Part 1: General Principles 3 2 Why do people

More information

Pedestrian & Bicycle Safety Innovations & Applications

Pedestrian & Bicycle Safety Innovations & Applications Pedestrian & Bicycle Safety Innovations & Applications County Engineers Association of Maryland Spring, 2017 Conference May 25, 2017 George Branyan Pedestrian Program Coordinator District Department of

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

Taking a Step back, can we make crossing the street less chancy? Kerry Wilcoxon City of Phoenix Street Transportation Department

Taking a Step back, can we make crossing the street less chancy? Kerry Wilcoxon City of Phoenix Street Transportation Department Taking a Step back, can we make crossing the street less chancy? Kerry Wilcoxon City of Phoenix Street Transportation Department What are the realities? Pedestrian Source - Neighborhood - Bus Stop - Business

More information

Session 76 Pedestrians and Intersections

Session 76 Pedestrians and Intersections Session 76 Pedestrians and Intersections Moderator: Meg Storrow, RLA Storrow Kinsella Associates Andrew Gast-Bray, PhD, AICP Storrow Kinsella Associates (former) Michael Koslow, PE Storrow Kinsella Associates

More information

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever

More information

INTERCHANGES. Module 7

INTERCHANGES. Module 7 INTERCHANGES Module 7 Learning Outcomes 7-2 At the end of this module, you will be able to: Identify how land uses around freeway interchanges create pedestrian trips Explain how and why pedestrian crashes

More information

DPS 201 RECTANGULAR RAPID FLASHING BEACON (RRFB)

DPS 201 RECTANGULAR RAPID FLASHING BEACON (RRFB) DPS 201 RECTANGULAR RAPID FLASHING BEACON (RRFB) WHY? PEDESTRIANS NEED TO CROSS CASE STUDY: RRFB (ST. PETERSBURG, FL) St. Petersburg, FL Problem/Background Multi-lane, high-speed roadways Conflicts at

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

MUTCD (HAWK) 2016 & Adapting the Pedestrian Hybrid Beacon (HAWK) to Facilitate Bicycle Use. ITE-IMSA March, 2014

MUTCD (HAWK) 2016 & Adapting the Pedestrian Hybrid Beacon (HAWK) to Facilitate Bicycle Use. ITE-IMSA March, 2014 MUTCD (HAWK) 2016 & Adapting the Pedestrian Hybrid Beacon (HAWK) to Facilitate Bicycle Use Presented By Richard Nassi, P.E., Ph.D. PAG Engineering Consultant Services, CA 0344 Traffic Engineering Gabriel

More information

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions CONTENTS (MODULE 3) Introduction...1 Purpose...1 Goals and Learning Outcomes...1 Organization

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

Walk Friendly Communities Engineering Strategies. Carl Sundstrom Walk Friendly Communities Workshop Grandview, MO June 2015

Walk Friendly Communities Engineering Strategies. Carl Sundstrom Walk Friendly Communities Workshop Grandview, MO June 2015 Walk Friendly Communities Carl Sundstrom Walk Friendly Communities Workshop Grandview, MO June 2015 Module Overview Topics Background and purpose Sidewalks Crossings Traffic calming www.pedbikeimages.org

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

Roundabouts in Small-Medium Sized Communities: Why Consider Them?

Roundabouts in Small-Medium Sized Communities: Why Consider Them? Roundabouts in Small-Medium Sized Communities: Why Consider Them? PRESENTORS: Dave Kliewer, PE J-U-B Engineers, Spokane Manager Spencer Montgomery J-U-B Engineers, Transportation Planner Roger Krieger

More information

Simulation Analysis of Intersection Treatments for Cycle Tracks

Simulation Analysis of Intersection Treatments for Cycle Tracks Abstract Simulation Analysis of Intersection Treatments for Cycle Tracks The increased use of cycle tracks also known as protected bike lanes has led to investigations of how to accommodate them at intersections.

More information

Multiple Threat Crashes

Multiple Threat Crashes Uncontrolled Multi-Lane Crosswalks: Hazards, Screening, and Prioritization Joe Gustafson, PE, PTOE Minnesota Toward Zero Deaths Conference October 23 rd, 2018 Multiple Threat Crashes Image from Zegeer,

More information

Signal Timing Design CIVL 4162/6162

Signal Timing Design CIVL 4162/6162 Signal Timing Design CIVL 4162/6162 Summary of Signal Design Signal Phase Plans Treatment of Left Turns General Considerations Phase and Ring Diagrams Common Phase Plans and Their Use Vehicular Needs Change

More information

PEDESTRIAN CROSSING STATISTICS

PEDESTRIAN CROSSING STATISTICS PEDESTRIAN SAFETY UTILIZATION OF RRFB AND HYBRID BEACONS WILLIAM (BILL) MARSHALL PEDESTRIAN CROSSING STATISTICS STUDIES INDICATE CROSSWALK COMPLIANCE IS FROM 4% 30% HAWAII REPORTED 50 NON YIELDS TO PEDESTRIANS

More information

Innovative Intersections

Innovative Intersections Innovative Intersections Things You Need to Know About FDOT D-7 Safety Academy October 19, 2016 Mark Doctor FHWA Resource Center Atlanta, GA HOW DO YOU FEEL??? about innovative intersections??? Why is

More information

Rectangular Rapid Flashing Beacons

Rectangular Rapid Flashing Beacons Countermeasure Strategies for Pedestrian Safety Rectangular Rapid Flashing Beacons Mike Cynecki Lee Engineering November 5, 2015 Today s Presentation Introduction and housekeeping Audio issues? Dial into

More information

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy MEMORANDUM Date: 9/13/2016 Re: Citywide Crosswalk Policy Foreword Through the s Circulation Element and Complete Streets Policy, it is the City s goal to promote walking trips and provide safe facilities

More information

2014 FHWA Aging Road User Handbook. Recommendations to Accommodate Aging Pedestrians. Lifesaver National Conference. What is the Handbook?

2014 FHWA Aging Road User Handbook. Recommendations to Accommodate Aging Pedestrians. Lifesaver National Conference. What is the Handbook? 2014 FHWA Aging Road User Handbook Recommendations to Accommodate Aging Pedestrians Lifesaver National Conference March 17, 2015 Revised June 2014 1 What is the Handbook? 1998 1st Edition 2001 2nd Edition

More information

Improving Pedestrian Safety at Unsignalized Crossings. Shawn Turner, P.E. Texas A&M Transportation Institute

Improving Pedestrian Safety at Unsignalized Crossings. Shawn Turner, P.E. Texas A&M Transportation Institute Improving Pedestrian Safety at Unsignalized Crossings Shawn Turner, P.E. Texas A&M Transportation Institute Overview of Presentation What are the issues/problems? Framework for crossing treatments Marked

More information

Pedestrian Safety at Interchanges

Pedestrian Safety at Interchanges Countermeasure Strategies for Pedestrian Safety Pedestrian Safety at Interchanges Meghan Mitman Fehr and Peers December 10, 2015 Today s Presentation Introduction and housekeeping Audio issues? Dial into

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS A. Volume, Demand, and Capacity 2-1 B. Performance Measures 2-7 C. Critical Lane Volume Analysis 2-9 3. DATA COLLECTION 4. SIGNAL PHASING

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

PEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC.

PEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC. PEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC. Pedestrian Safety 2017 Pedestrian Crashes in Ohio Crash Severity Number % Fatal Crash 141 4.9% Injury Crash 2546 89.1% Property

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Attachment No. 4 Approved by National Committee Council

Attachment No. 4 Approved by National Committee Council Attachment No. 4 Approved by National Committee Council The Signals Technical Committee distributed a technical committee recommendation to sponsors concerning pedestrian hybrid beacons following the January

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016

More information

PEDESTRIAN CROSSING TREATMENTS

PEDESTRIAN CROSSING TREATMENTS PEDESTRIAN CROSSING TREATMENTS BEST PRACTICES Presented by: Doug Enderson, P.E., PTOE Cody Salo, P.E. 1 PRESENTER INTRODUCTIONS Doug Enderson, P.E., PTOE Ped Crossing Experience: ADA Design-Build ADA Inventory

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3

Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3 Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study April 11, 2013 Steering Committee Meeting #3 Meeting Agenda Welcome & Introductions Review Project Purpose & Needs Results

More information

IMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS. Guidelines for Marked Crosswalks

IMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS. Guidelines for Marked Crosswalks IMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com Guidelines for Marked Crosswalks Source: FHWA, Safety Effects of Marked

More information

Bicycle Facilities Planning

Bicycle Facilities Planning Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016 Designing for Pedestrian Safety Alabama Department of Transportation Pre-Construction Conference May 2016 1 Designing for Pedestrians Marking Crosswalks at Signalized intersections High Visibility Markings

More information

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013) Appendix P.1 STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013) The 2009 Pedestrian Master Plan establishes 21 core recommendations in three goal areas to improve pedestrian transportation in

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Fisher Ave and Snoqualmie Parkway Signal

Fisher Ave and Snoqualmie Parkway Signal Fisher Ave and Snoqualmie Parkway Signal Topics How does the City assess roadway conditions? What is the City s standard? What has occurred at Snoqualmie Parkway and Fisher Ave.? What are we currently

More information

Appendix A: Crosswalk Policy

Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

Crossing Solutions at Roundabouts for Pedestrians with Vision Disabilities

Crossing Solutions at Roundabouts for Pedestrians with Vision Disabilities Crossing Solutions at Roundabouts for Pedestrians with Vision Disabilities Recent Examples Protected Roundabout by Walkbike.org Bill Baranowski, PE, FITE ITE Jackson Hole, WY May 2016 Presentation Outline

More information

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018 Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road

More information

INNOVATIVE INTERSECTION DESIGN

INNOVATIVE INTERSECTION DESIGN INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study Advisory Committee Meeting #6 July 1, 2014 Agenda Concept Revisions based on Advisory Committee feedback Review of New Concept Scoring & Costs Concept Discussion/Questions Voting:

More information

GLOSSARY CROSSWALK. CROSSING TYPES

GLOSSARY CROSSWALK.   CROSSING TYPES CROSSWALK The part of a roadway at an intersection included within the connections of the lateral lines of the sidewalks on opposite sides of the street measured from the curbs, or in the absence of curbs

More information

Congestion Protection for Transit: Lessons from Europe and Application to MBTA Route 66

Congestion Protection for Transit: Lessons from Europe and Application to MBTA Route 66 Congestion Protection for Transit: Lessons from Europe and Application to MBTA Route 66 Peter G. Furth Chris Boll 1 Break the Vicious Cycle more people use cars congested streets slower transit X X congestion

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation Lincoln Way Multimodal Safety and Operations Study City and University Summary Presentation February 27, 2018 Agenda Introductions Study Overview: Phase 1 - Discovery Phase 2 Improvement Recommendations

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS

PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS WHY THEY WORK FOR PEDESTRIANS IF DESIGNED CORRECTLY Separated sidewalks direct peds to crosswalks Splitter island Slow speed exit Truck apron Crosswalk

More information

The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners. Arizona Department of Transportation

The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners. Arizona Department of Transportation The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners Arizona Department of Transportation New 2009 MUTCD 9 Parts (down from 10 in 2003) 816 pages (up

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study Public Involvement Meeting Tuesday, June 13, 2017 Albany Shaker Road Corridor Study Agenda / Meeting Outline 1. Introduce the project 2. Complete Streets 3. Share/confirm our findings 4. Your Opinion 5.

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Traffic Management Guidelines for Structure Rehabilitation Projects

Traffic Management Guidelines for Structure Rehabilitation Projects , Traffic Management Guidelines for Structure Rehabilitation Projects February 2009 1 Purpose & Background These guidelines were prepared in order to assist the Regional Structural Office in determining

More information

DRAFT Old Worthington Mobility Study Phase 2 High Street Pedestrian Crossings City of Worthington, Ohio

DRAFT Old Worthington Mobility Study Phase 2 High Street Pedestrian Crossings City of Worthington, Ohio DRFT Old Worthington Mobility Study Phase 2 High Street Pedestrian Crossings City of Worthington, Ohio Prepared By: DLZ OHIO, INC. DLZ Job No. 1521-1009-00 October 20, 2015 6121 Huntley Rd, Columbus, OH

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA VDOT & FHWA Roundabout Workshop September 17, 2013 Chris Tiesler, PE Presentation Outline US 15/US

More information

Traffic Signals at Bike Boulevards

Traffic Signals at Bike Boulevards Traffic Signals at Bike Boulevards A Review of Eight Locations in Seattle Presented at ITE Western District Annual Meeting July 13 th, 2016 Introduction What? Analysis of eight intersections before and

More information

Turning templates shall be shown on the signal plan for review during preliminary plan submittals.

Turning templates shall be shown on the signal plan for review during preliminary plan submittals. J. TRAFFIC SIGNALS The traffic signal system shall consist of the signal controller, signal poles, signal heads, cable, conduit, ehicle detectors and any other appurtenances required to proide a complete,

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Pedestrian Hybrid Beacons

Pedestrian Hybrid Beacons Pedestrian Hybrid Beacons Ronnie Bell Austin Transportation Department & NCUTCD Signals Technical Committee Pedestrian WHAT? What is it and why are we talking about it? FHWA issued new MUTCD - December

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

Ohio Department of Transportation Edition of the OMUTCD It s Here!

Ohio Department of Transportation Edition of the OMUTCD It s Here! Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2012 Edition of the OMUTCD It s Here! June 6, 2012 Here are reasons why we have a Manual of Uniform Traffic Control Devices

More information

2009 MUTCD New Provisions for Pedestrians and Bicyclists. Housekeeping

2009 MUTCD New Provisions for Pedestrians and Bicyclists. Housekeeping 2009 MUTCD New Provisions for Pedestrians and Bicyclists John LaPlante, P.E., PTOE Chief Traffic Engineer T.Y. Lin International Richard C. Moeur, P.E. Chair, NCUTCD Bicycle Technical Committee Housekeeping

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program City of El Cerrito San Pablo Avenue Specific Plan Capital Improvement Program May 2015 San Pablo Avenue Intersection Improvements San Pablo Avenue and Hill Street/Eastshore Boulevard Background Existing

More information

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24

More information

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017 CITY OF FRANKLIN, TENNESSEE Columbia Avenue Widening & Improvements Project Public Meeting May 16, 2017 Agenda 6:00 6:30 Formal Presentation 6:30 8:00 Town Hall Forum City of Franklin Columbia Avenue Alternatives

More information