1 Traffic Signals at Bike Boulevards A Review of Eight Locations in Seattle Presented at ITE Western District Annual Meeting July 13 th, 2016

2 Introduction What? Analysis of eight intersections before and after signal installation or modifications (six more than the prior case study) All intersections were along a bike boulevard Review of potential crossing treatments Why? To determine whether the 2012 Case Study findings were consistent to other sites.

3 Site Locations Fremont Ave N & N 105 th St Fremont Ave N & N 80 th St 15 th Ave NW & NW 58 th St 12 th Ave NE & NE 50 th St 17 th Ave NW & NW Market St Dock St & Leary Way Holgate & Beacon Ave S 15 th Ave SW & SW Holden St

4 Standard Signals with Turn Restrictions Fremont Ave N & N 80 th St Fremont Ave N & N 105 th St 12 th Ave NE & NE 50 th St

5 Enhanced Pedestrian Half Signals Dock St & Leary Way 15 th Ave SW & SW Holden St

6 Existing Traffic Signal with Modifications NW 58 th St & 15 th Ave NW Floating curb bulb on one side

7 Existing Traffic Signal with Modifications NW 58 th St & 15 th Ave NW Floating curb bulb on one side S Hanford St & Beacon Ave S New median island & turn restrictions

8 Existing Traffic Signal with Modifications NW 58 th St & 15 th Ave NW Floating curb bulb on one side S Hanford St & Beacon Ave S New median island & turn restrictions 17 th Ave NW & NW Market St New turn restrictions

9 Crossing Treatment Analysis 2009 MUTCD Warrant Analysis Pedestrian Hybrid Warrant Analysis NCHRP Report 562/TCRP Report 112

10 Before Crossing Treatment Analysis Intersection 2009 Signal Warrants Pedestrian Hybrid Beacon NCHRP 562 Fremont & 80 th St Not Met Not Met No Treatment Fremont & 105 th St Not Met Met Red 12 th Ave & 50 th St Not Met Met Red 15 th Ave & Holden St Not Met Not Met No Treatment Dock St & Leary Way Not Met Met Red 58 th St & 15 th Ave Met Met Red 17 th Ave & Market St Met Met Red Hanford St & Beacon Ave Met* Met Red

11 Volume Changes New Signal Intersection Bicyclists Pedestrians Motor Vehicles Before After Before After Before After Fremont Ave N & N 80 th St N/A Fremont Ave N & N 105 th St th Ave NE & NE 50 th St NW Dock St & NW Leary Way th Ave SW & SW Holden St Change 139% Increase 236% Increase 5.7% Increase

12 New Riders or Just Rerouted Existing Ones?» 15 th Ave SW & SW Holden St New Signal 16 th Ave SW & SW Holden St Before After 13 5 Existing Signal 15th Ave SW & SW Holden St Before After 1 0

13 New Riders or Just Rerouted Existing Ones?» 12 th Ave NE & NE 50 th St New Signal Roosevelt/11 th Ave NE & NE 50 th St Before After Before 12th Ave NE & NE 50th St After 9 19 Existing Signals

14 Volume Changes Modified Signal Intersection Bicyclists Pedestrians Motor Vehicles Before After Before After Before After NW 58 th St & 15 th Ave NW th Ave NW & NW Market St S Hanford St & Beacon Ave S Change 255% Increase 9.2% Decrease 29% Decrease

15 Collision Analysis - Rates Intersection 3-year Before Collision Rate 1-year After Collision Rate 3-year (ish) After Collision Rate Fremont Ave N & N 80 th St Fremont Ave N & N 105 th St th Ave NE & NE 50 th St N/A NW 58 th St & 15 th Ave NW S Hanford St & Beacon Ave S *Rate in Million Entering Vehicles

16 Collision Analysis - Severity Intersection 3-year Before Severity Index 1-year After Severity Index 3-year (ish) After Severity Index Fremont Ave N & N 80 th St 1.75 N/A 1.00 Fremont Ave N & N 105 th St th Ave NE& NE 50 th St N/A NW 58 th St & 15 th Ave NW 1.50 N/A 1.33 S Hanford St & Beacon Ave S Severity Index = 5.8*(# of fatal crashes) + 2*(# of crashes involving injury) + (# of PDO crashes) Total Number of Crashes

17 Operational Issue: Thru Traffic Intersection Thru Traffic Percentage Fremont & 80 th St 9.3% / 15.4% Fremont & 105 th St 20.8% / 24.3% 12 th Ave & 50 th St 2.8% / 4.3% 15 th Ave & Holden St 0.0% / 0.0% Dock St & Leary Way 40.9% / 8.3% 58 th St & 15 th Ave 0.0% / 38.2% 17 th Ave & Market St 22.8% / 20.5% Hanford St & Beacon Ave 8.3% / 11.5%

18 Conclusions Bike and pedestrian volumes increased while motor vehicle volumes remained relatively constant Collision rates decreased at all locations following signal installation Collision rates remained constant at locations with existing signals after modifications Severity of collisions at both signals decreased following the signal installation

19 What s Next?» More sites are being reviewed Tucson, Arizona Long Beach, California Portland, Oregon» Do you know of a site? Please let me know!

20 Thank you for your time Questions? Contact Information Mike Hendrix, PE, PTOE

21 Operational Issue: Violations» Fremont Ave N & N 105th St 27 of 232 (11.6%) bicyclists went directly for pedestrian push button.» Fremont Ave N & N 80th St Roughly same proportion

22 Case Study»Unwarranted signals are BAD» They: Increase collisions Increase red-light running Increase delay Increase noise and air pollution Lead to increased maintenance costs Lead to a potential increase in cut-through traffic

23 Case Study 2011 Pinellas County Study: 273% annual increase in collisions 2008 Kentucky Study: 28.3% increase in collisions 221.7% increase in rear-end collisions 1989 New York City Study: 65% increase in collisions 1979 Purdue University Study: 3,200 to 4,200 vehicle hours of delay

24 Site 1 Fremont Avenue N & N 80 th Street Fremont Ave N 25 wide residential street N 80 th St 1 lane each direction with on-street parking on north side 15,500 vpd (N 80 th St) 700 vpd (Fremont Ave N) Signal turn-on 11/16/2007

25 Site 2 - Fremont Avenue N & N 105th Street Fremont Ave N 25 wide residential street N 105th St 2 lanes each direction with no on-street parking 23,000 vpd (N 105th St) 900 vpd (Fremont Ave N) Signal Turn on 10/7/2010

26 Operational Issue: Violations» Fremont Ave N & N 105th St 27 of 232 (11.6%) bicyclists went directly for pedestrian push button.» Fremont Ave N & N 80th St Roughly same proportion

27 Delay Intersection Pedestrian Delay (seconds) Motor Vehicle Side Street Delay (seconds) Bikes as Motor Vehicles Side Street Delay (seconds) NB SB NB SB Bikes as Pedestrians Side Street Delay (seconds) Fremont Ave N & N 80 th St Not Available 52.2 Fremont Ave N & N 105 th St 5,

28 Site 2 - Fremont Avenue N & N 105th Street Span Wire Sign Pavement Marking

29 Pre-Signal Conditions

30 Fremont & N 80th St - Before Collision History 3 Years Before Correctable Crashes 11 Non-Correctable Crashes 2 Crash Rate (Crashes per MEV) Severity Index 1.77

31 Before Collison History 3 Years Before Correctable Crashes 11 Non-Correctable Crashes 2 Crash Rate (Crashes per MEV) Severity Index 1.77

32 Post-Signal Conditions

33 Fremont Ave N & N 80th St - After Collision History 3 Years Before 3 Years After Correctable Crashes 11 0 Non-Correctable Crashes 2 3 Crash Rate (Crashes per MEV) Severity Index

34 Fremont Ave N & N 105th St - After Collision History 3 Years Before 1 Year After Correctable Crashes 3 0 Non-Correctable Crashes 5 1 Crash Rate (Crashes per MEV) Severity Index

Improving Pedestrian Safety at Unsignalized Crossings. Shawn Turner, P.E. Texas A&M Transportation Institute

Improving Pedestrian Safety at Unsignalized Crossings. Shawn Turner, P.E. Texas A&M Transportation Institute Improving Pedestrian Safety at Unsignalized Crossings Shawn Turner, P.E. Texas A&M Transportation Institute Overview of Presentation What are the issues/problems? Framework for crossing treatments Marked

More information

PEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC.

PEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC. PEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC. Pedestrian Safety 2017 Pedestrian Crashes in Ohio Crash Severity Number % Fatal Crash 141 4.9% Injury Crash 2546 89.1% Property

More information

Designing for Pedestrian Safety in Washington, DC

Designing for Pedestrian Safety in Washington, DC Designing for Pedestrian Safety in Washington, DC February 25, 2014 George Branyan Pedestrian Program Coordinator District Department of Transportation DC Journey to work mode split: 2012 Means of Transportation

More information

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice By: Min Zhou, P.E., Principal/Vice President KOA Corporation 1 What is a Cycle Track (Class IV) TYPICAL BIKEWAY CLASSIFICATION CLASS

More information

Pedestrian & Bicycle Safety Innovations & Applications

Pedestrian & Bicycle Safety Innovations & Applications Pedestrian & Bicycle Safety Innovations & Applications County Engineers Association of Maryland Spring, 2017 Conference May 25, 2017 George Branyan Pedestrian Program Coordinator District Department of

More information

FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report

FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report August 2, 2010 Table of Contents Preface... 1 Problem Statement... 1 Study Objectives... 2 Data Collection Methods...

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Boston Post Road Design Feasibility Study

Boston Post Road Design Feasibility Study Boston Post Road Design Feasibility Study Prepared for the City of Rye Final Report July 18, 2007 Prepared by: Buckhurst Fish & Jacquemart (BFJ) 115 Fifth Avenue New York, NY 10003 www.bfjplanning.com

More information

RE: City of Portland Request to Experiment with HAWK/Bike signal

RE: City of Portland Request to Experiment with HAWK/Bike signal October 4, 2005 Regina S. McElroy, Director Office of Transportation Operations HOTO Room 3401 400 7 th Street, S.W. Washington, D.C. 20590 RE: City of Portland Request to Experiment with HAWK/Bike signal

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

HAWK Signal. Pedestrian Safety. Illinois Traffic Engineering & Safety Conference Thursday, October 21, 2010

HAWK Signal. Pedestrian Safety. Illinois Traffic Engineering & Safety Conference Thursday, October 21, 2010 HAWK Signal Pedestrian Safety Illinois Traffic Engineering & Safety Conference Thursday, October 21, 2010 Background Information High-intensity Activated crosswalk Developed by the City of Tuscon, AZ First

More information

Boudart, Foster, Koonce, Maus, & Okimoto 1 IMPROVING THE BICYCLE DETECTION PAVEMENT MARKING SYMBOLS TO INCREASE COMPREHENSION AT TRAFFIC SIGNALS

Boudart, Foster, Koonce, Maus, & Okimoto 1 IMPROVING THE BICYCLE DETECTION PAVEMENT MARKING SYMBOLS TO INCREASE COMPREHENSION AT TRAFFIC SIGNALS Boudart, Foster, Koonce, Maus, & Okimoto 0 0 0 0 IMPROVING THE BICYCLE DETECTION PAVEMENT MARKING SYMBOLS TO INCREASE COMPREHENSION AT TRAFFIC SIGNALS Jesse Boudart, E.I. * Kittelson & Associates, Inc.

More information

Bicycle Facilities Planning

Bicycle Facilities Planning Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists

More information

Bicycle Boulevards and Neighborhood Greenways

Bicycle Boulevards and Neighborhood Greenways Bicycle Boulevards and Neighborhood Greenways Traffic Safety is Improving for Everyone 90 80 70 60 50 40 30 20 10 0 PORTLAND: TOTAL TRAFFIC FATALITIES 1986-2008 1986 1987 1988 1989 1990 1991 1992 1993

More information

By Dan Burden, Executive Director Walkable and Livable Communities Institute

By Dan Burden, Executive Director Walkable and Livable Communities Institute By Dan Burden, Executive Director Walkable and Livable Communities Institute Is this the landscape we want to leave our children? LaJolla Boulevard, Birdrock, San Diego, CA 78 Feet Speeds above

More information

FOURTH PLAIN BOULEVARD RE-STRIPING PROJECT. Post Implementation Report 1.2. Transportation Services. October 2004 DEMONSTRATION

FOURTH PLAIN BOULEVARD RE-STRIPING PROJECT. Post Implementation Report 1.2. Transportation Services. October 2004 DEMONSTRATION FOURTH PLAIN BOULEVARD DEMONSTRATION RE-STRIPING PROJECT Post Implementation Report 1.2 October 2004 Transportation Services Table of Contents GENERAL INTRODUCTION 1 PROJECT BACKGROUND 1 PURPOSE OF 3-LANE

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

IMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS. Guidelines for Marked Crosswalks

IMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS. Guidelines for Marked Crosswalks IMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com Guidelines for Marked Crosswalks Source: FHWA, Safety Effects of Marked

More information

Bicycle-Specific Traffic Control Is it "Bicycle-Friendly"?

Bicycle-Specific Traffic Control Is it Bicycle-Friendly? Bicycle-Specific Traffic Control Is it "Bicycle-Friendly"? Richard C. Moeur, P.E. In the United States, the Uniform Vehicle Code and most state laws treat bicyclists as having much the same rights and

More information

The DC Pedestrian Master Plan

The DC Pedestrian Master Plan The DC Pedestrian Master Plan September 28, 2010 George Branyan Pedestrian Program Coordinator District Department of Transportation Presentation Agenda Scope of the Plan Methodology Recommendations Implementation

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report

Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report MPO Board July 8, 2015 2 Crash Data Collection Motorcycle drove between stopped cars, ran a red light and collided with a

More information

Flanders Crossing. Save Lives Save Money Saving Our Environment. Portland City Council April 30, 2008

Flanders Crossing. Save Lives Save Money Saving Our Environment. Portland City Council April 30, 2008 Flanders Crossing Save Lives Save Money Saving Our Environment Portland City Council April 30, 2008 NWSTELBRG-GLISANSTRAMP Expanding Portland s Bicycle Boulevards NW NAITO PKY Why this project? Part of

More information

Road Diets and Roundabouts

Road Diets and Roundabouts Road Diets and Roundabouts Paul Zykofsky, AICP Local Government Commission Sacramento, CA Classic Road Diet 4 to 3 lanes San Antonio TX On-street parking Median Bike Lanes Center Turn-Lane Seattle WA Road

More information

TECH MEMOS #3 & #4 EXISTING AND FUTURE TRAFFIC CONDITIONS TRAVEL FORECASTING APPROACH CITY OF NOVI THOROUGHFARE MASTER PLAN

TECH MEMOS #3 & #4 EXISTING AND FUTURE TRAFFIC CONDITIONS TRAVEL FORECASTING APPROACH CITY OF NOVI THOROUGHFARE MASTER PLAN TECH MEMOS #3 & #4 EXISTING AND FUTURE TRAFFIC CONDITIONS TRAVEL FORECASTING APPROACH CITY OF NOVI THOROUGHFARE MASTER PLAN January, 2016 1. Introduction This report is prepared as part of the 2016 Novi

More information

Downtown Signals Traffic Analysis

Downtown Signals Traffic Analysis Downtown Signals Traffic Analysis City of St. Mary s April 16, 2018 Presented by: Allan Heitbrink, P.E. & Craig Eley, P.E. Who We Are Craig Eley, P.E o o o Previously the ODOT D7 Traffic and Safety Engineer.

More information

Angelo Rao, PE Director, Local Government Services BCC Engineering, Inc.

Angelo Rao, PE Director, Local Government Services BCC Engineering, Inc. Angelo Rao, PE Director, Local Government Services BCC Engineering, Inc. A presentation to the Florida Section Institute of Trasnportation Engineers FSITE Leading Pedestrian Interval What are you doing

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

By: Bill Baranowski, PE TRAFFIC CALMING EXAMPLES IN SUGARHOUSE, DAYBREAK, AND WEST JORDAN CITY

By: Bill Baranowski, PE TRAFFIC CALMING EXAMPLES IN SUGARHOUSE, DAYBREAK, AND WEST JORDAN CITY By: Bill Baranowski, PE TRAFFIC CALMING EXAMPLES IN SUGARHOUSE, DAYBREAK, AND WEST JORDAN CITY 1977 HIGHLAND RUGBY TOUR 1945 WHERE??? What is more contentious than traffic calming? 1951 LOOKING SOUTHEAST

More information

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever

More information

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

FEDERAL HIGHWAY ADMINISTRATION APPLICATION FEDERAL HIGHWAY ADMINISTRATION APPLICATION REQUEST FOR PERMISSION TO EXPERIMENT WITH A BICYCLE BOX INTERSECTION TREATMENT Submitted by: City of Columbus Department of Public Service Date: June 26, 2009

More information

Dell Range Boulevard Corridor Study Powderhouse Road to College Drive. Prepared for: Cheyenne Metropolitan Planning Organization

Dell Range Boulevard Corridor Study Powderhouse Road to College Drive. Prepared for: Cheyenne Metropolitan Planning Organization Dell Range Boulevard Corridor Study Powderhouse Road to College Drive Prepared for: Cheyenne Metropolitan Planning Organization Draft August 2014 Dell Range Boulevard Corridor Study (Powderhouse Road to

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

2018 AASHTO BIKE GUIDE

2018 AASHTO BIKE GUIDE 2018 AASHTO BIKE GUIDE Your presenter Rob Burchfield, PE NW Regional Engineering Director 35 years of experience in traffic engineering and bicycle facility design Toole Design Group Toole Design Group

More information

Road Diets FDOT Process

Road Diets FDOT Process Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local

More information

INTERSECTION DESIGN. Bicycle Facility Workshop Intersections 4-1

INTERSECTION DESIGN. Bicycle Facility Workshop Intersections 4-1 INTERSECTION DESIGN 4-1 Intersections Avoid unusual conflicts Provide direct path for cyclists, close to that of motor vehicles Bicyclists should be visible; their movements should be predictable Simple

More information

Bike Planning: A New Day

Bike Planning: A New Day Bike Planning: A New Day Josh Sikich, AICP, LEED AP Chicago Office Director Alta Planning + Design 312-265-0628 joshuasikich@altaplanning.com cities of all sizes are changing Illinois Bike Summit October

More information

Pedestrian Hybrid Beacon Guide Recommendations and Case Study. FHWA Safety Program.

Pedestrian Hybrid Beacon Guide Recommendations and Case Study. FHWA Safety Program. Pedestrian Hybrid Beacon Guide ecommendations and Case Study FHWA Safety Program http://safety.fhwa.dot.gov A pedestrian hybrid beacon (PHB) is a traffic control device similar to a European pedestrian

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

MUTCD (HAWK) 2016 & Adapting the Pedestrian Hybrid Beacon (HAWK) to Facilitate Bicycle Use. ITE-IMSA March, 2014

MUTCD (HAWK) 2016 & Adapting the Pedestrian Hybrid Beacon (HAWK) to Facilitate Bicycle Use. ITE-IMSA March, 2014 MUTCD (HAWK) 2016 & Adapting the Pedestrian Hybrid Beacon (HAWK) to Facilitate Bicycle Use Presented By Richard Nassi, P.E., Ph.D. PAG Engineering Consultant Services, CA 0344 Traffic Engineering Gabriel

More information

Citywide Sidewalk and Crosswalk Programs

Citywide Sidewalk and Crosswalk Programs Citywide Sidewalk and Crosswalk Programs Council Meeting October 20, 2015 Presented by Rita Hu and Jamal Mahmoud Program Goals Implement the City s comprehensive plan. Provide pedestrian with safe walking

More information

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study

More information

Government of the District of Columbia Department of Transportation

Government of the District of Columbia Department of Transportation Government of the District of Columbia Department of Transportation November 1, 2017 Stephen Gardner Advisory Neighborhood Commission 3D P.O. Box 40846 Palisades Station Washington, DC 20016 3D06@anc.dc.gov

More information

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay Stephen L. Benson, AICP, CNU-A FDOT District Seven Safety Office Presentation Overview Safety

More information

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT OVERVIEW This chapter describes a cohesive set of strategies to create a bicycle boulevard, namely to make streets safer and more efficient for bicycle

More information

Bicycle + Pedestrian Connectivity Gap Analysis

Bicycle + Pedestrian Connectivity Gap Analysis Accelerated Bridge Program Bicycle + Pedestrian Connectivity Gap Analysis Tuesday, October 11 Shriners Hospital, Boston 6:30-8:00 PM Thursday, October 13 Community Rowing, Brighton 6:30-8:00 PM Tuesday,

More information

Safety Effectiveness of Pedestrian Crossing Treatments

Safety Effectiveness of Pedestrian Crossing Treatments Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 10-13-2017 Safety Effectiveness of Pedestrian Crossing Treatments Christopher Monsere

More information

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and

More information

Dec 2, Dear Tri Ong, Sam Woods, and Scott Kubly,

Dec 2, Dear Tri Ong, Sam Woods, and Scott Kubly, Dec 2, 2014 Dear Tri Ong, Sam Woods, and Scott Kubly, Thank you for providing us with the 2015 Arterial Asphalt and Concrete (AAC) repaving project 60% plan for Roosevelt Way NE. It's exciting to see the

More information

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer 5. PARKR ROAD AT MISSISSIPPI AVN CROSSIN xisting Conditions The High ine Canal trail crosses Parker Road near the Mississippi Avenue intersection (crossing location #3 on Figure 1). South of Parker, the

More information

A Summary of Recent Evaluations of Cycling Facilities in Portland, OR

A Summary of Recent Evaluations of Cycling Facilities in Portland, OR A Summary of Recent Evaluations of Cycling Facilities in Portland, OR Christopher Monsere, Ph.D., P.E. Civil & Environmental Engineering Jennifer Dill, Ph.D. Urban Studies & Planning Nathan McNeil Center

More information

2018 AASHTO BIKE GUIDE

2018 AASHTO BIKE GUIDE 2018 AASHTO BIKE GUIDE Your presenters Jessica Fields, PE Denver Office Director Sagar Onta, PE, PTOE Denver Engineering Director 35 years of combined experience street design, transportation planning,

More information

PEDESTRIAN CROSSING TREATMENTS

PEDESTRIAN CROSSING TREATMENTS PEDESTRIAN CROSSING TREATMENTS BEST PRACTICES Presented by: Doug Enderson, P.E., PTOE Cody Salo, P.E. 1 PRESENTER INTRODUCTIONS Doug Enderson, P.E., PTOE Ped Crossing Experience: ADA Design-Build ADA Inventory

More information

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President December 17, 2012 Mr. Steve Tweed City of Long Beach, Department of Public Works Traffic & Transportation Bureau, 10 th Floor City Hall 333 West Ocean Boulevard Long Beach, CA 90802 Subject: Broadway and

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

Cycle Tracks: Concept and Design Practices. February 17, 2010

Cycle Tracks: Concept and Design Practices. February 17, 2010 Cycle Tracks: Concept and Design Practices February 17, 2010 Today s webinar presenters APBP Board Member Host Brett Hondorp, Principal, Alta Planning + Design Guest Moderator Zach Vanderkooy, Bicycling

More information

TRAFFIC CALMING TOOLBOX

TRAFFIC CALMING TOOLBOX TRAFFIC CALMING TOOLBOX Traffic control devices are those official signs and striping placed in the public right-of-way and recognized by the public such as STOP signs, curve warning signs, centerline

More information

SAFE ROUTES TO SCHOOL (SR2S)

SAFE ROUTES TO SCHOOL (SR2S) SAFE ROUTES TO SCHOOL (SR2S) In partnership with Burbank Unified School District (BUSD) & City of Burbank George Washington Elementary School Thomas Jefferson Elementary School John Muir Middle School

More information

System Performance Innovation FACT Sheet Hawk Pedestrian Beacon

System Performance Innovation FACT Sheet Hawk Pedestrian Beacon Hawk Pedestrian Beacon Description of the Challenge or Opportunity Hawk Pedestrian Beacon Understanding the motivation. Describe the pre-existing product/process that is the subject of the innovation:

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

Pedestrian Safety Guide for Transit Agencies

Pedestrian Safety Guide for Transit Agencies Pedestrian Safety Guide for Transit Agencies FDOT/FTPA/CUTR Professional Development Workshop June 15, 2010 1 Purpose Presentation Overview Bus Stop Location and Design Process/Partnership 2 Purpose Every

More information

MEMORANDUM INTRODUCTION AREA DESCRIPTION. DATE: December 8, 2017

MEMORANDUM INTRODUCTION AREA DESCRIPTION. DATE: December 8, 2017 7719 SOUTH MAIN STREET MIDVALE, UT 84047 P 801.307.3400 MEMORANDUM DATE: December 8, 2017 TO: FROM: SUBJECT: PROJECT NUMBER: 344-7517-003 PROJECT NAME: Keith Ludwig, P.E. Midvale City Lesley Burns, Midvale

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master. Bike Routes Assessment: 95 Ave, 106 St & 40 Ave Replace with appropriate image in View > Master. Transportation Committee October 15, 2014 City Council Direction What we are trying to achieve The Way Ahead:

More information

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

GLOSSARY CROSSWALK. CROSSING TYPES

GLOSSARY CROSSWALK.   CROSSING TYPES CROSSWALK The part of a roadway at an intersection included within the connections of the lateral lines of the sidewalks on opposite sides of the street measured from the curbs, or in the absence of curbs

More information

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug 2017 Crosswalk Guidelines Warrants for Uncontrolled Crosswalk Locations Crosswalks at Midblock Locations

More information

Safety at Unsignalized Intersections. Unsignalized Intersections

Safety at Unsignalized Intersections. Unsignalized Intersections Safety at FHWA Safety Focus Areas 2 National Statistics 3 National Statistics There were 41,059 highway fatalities in 2007. Where did they occur? Non-Intersections 79% About half of all crashes and half

More information

Retrofitting Urban Arterials into Complete Streets

Retrofitting Urban Arterials into Complete Streets Retrofitting Urban Arterials into Complete Streets John N. LaPlante, P.E., P.T.O.E., T.Y. Lin International Prepared for: Illinois Traffic Engineering & Safety Conference Urbana, Illinois October 18, 2007

More information

Guidelines for Pedestrian Treatments at Uncontrolled Locations January 18, 2018

Guidelines for Pedestrian Treatments at Uncontrolled Locations January 18, 2018 Est. Dec. 2014 Guidelines for Pedestrian Treatments at Uncontrolled Locations January 18, 2018 Presented by: Kyle Armstrong, Illinois DOT Yan Qi, Southern Illinois University Webinar Logistics Duration

More information

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Nathan Roseberry, Senior Engineer Pam Broviak, Project Manager July 24, 2014 Agenda Project Goals Existing Roadway Conditions Traffic

More information

FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets

FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets Florida Department of TRANSPORTATION FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets Billy L. Hattaway, PE District One Secretary Secretary s Pedestrian Safety Initiative Dangerous by Design

More information

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps Public information meeting #4 4 to 7 p.m., September 30, 2009 Hales Corners Welcome Thank you for attending this public information meeting for the WIS 100 Corridor Study. Your interest and comments are

More information

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH OVERVIEW N 51 ST BOULEVARD N 51 ST BOULEVARD 12,100 44,700 W CAPITOL DRIVE 52,600

More information

EVALUATION OF HAWK SIGNAL AT GEORGIA AVENUE AND HEMLOCK STREET, NW IN THE DISTRICT OF COLUMBIA FINAL REPORT. August 30, 2010

EVALUATION OF HAWK SIGNAL AT GEORGIA AVENUE AND HEMLOCK STREET, NW IN THE DISTRICT OF COLUMBIA FINAL REPORT. August 30, 2010 EVALUATION OF HAWK SIGNAL AT GEORGIA AVENUE AND HEMLOCK STREET, NW IN THE DISTRICT OF COLUMBIA FINAL REPORT August 30, 2010 Submitted to: Mr. George Branyan Pedestrian Program Manager Policy, Planning

More information

Who is Toole Design Group?

Who is Toole Design Group? 2018 AASHTO Bike Guide Status Update NCHRP 15 60 Amalia Leighton Cody, PE, AICP & Kenneth Loen, PE Washington APWA October 4, 2018 Who is Toole Design Group? TDG is a full service engineering, planning

More information

Freeway ramp intersection study

Freeway ramp intersection study Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

Making Signals Work for Bicyclists and Pedestrians

Making Signals Work for Bicyclists and Pedestrians Making Signals Work for Bicyclists and Pedestrians Peter Koonce, PE Portland, OR October 18, 2017 PBIC Webinar pedbikeinfo.org @pedbikeinfo Housekeeping Problems with audio? Dial into the phone line instead

More information

Transforming Traffic Signals to Support Sustainability: Applications, Ideas, & Research

Transforming Traffic Signals to Support Sustainability: Applications, Ideas, & Research Transforming Traffic Signals to Support Sustainability: Applications, Ideas, & Research MARCH 4, 2011 Presented by: Peter Koonce, PE Division Manager, City of Portland Signals, Street Lighting, & ITS Overview

More information

Rebecca Szymkowski, P.E., PTOE Wisconsin Department of Transportation. ITE Midwestern District Annual Meeting June 30, 2015

Rebecca Szymkowski, P.E., PTOE Wisconsin Department of Transportation. ITE Midwestern District Annual Meeting June 30, 2015 Rebecca Szymkowski, P.E., PTOE Wisconsin Department of Transportation ITE Midwestern District Annual Meeting June 30, 2015 Strategic Highway Safety Plan (SHSP) Roundabout Safety Analysis J-turn Experiences

More information

Overview of Pinellas County Pedestrian Safety Programs and Initiatives

Overview of Pinellas County Pedestrian Safety Programs and Initiatives Overview of Pinellas County Pedestrian Safety Programs and Initiatives FHWA Pedestrian Safety Peer Exchange Miami, FL August 2, 2012 Peter Hsu, P.E. District Safety & Special Projects Engineer Florida

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM

LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM TO: FROM: Christa Johnson, Assistant City Manager Jason C. Kravetz, Captain DATE: January 16, 2015 SUBJECT: Laguna Canyon Road Collision Analysis Within the last

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

The Transformation of Portland into a Two-Wheeled Mecca. Mia Birk, Principal, Alta Planning + Design

The Transformation of Portland into a Two-Wheeled Mecca. Mia Birk, Principal, Alta Planning + Design The Transformation of Portland into a Two-Wheeled Mecca Mia Birk, Principal, Alta Planning + Design Development of Portland s Bikeway Network 1990 Early 1990s Infrastructure Growing Public Support Growing

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information