Traffic Signals at Bike Boulevards
|
|
- Thomasina Andrews
- 6 years ago
- Views:
Transcription
1 Traffic Signals at Bike Boulevards A Review of Eight Locations in Seattle Presented at ITE Western District Annual Meeting July 13 th, 2016
2 Introduction What? Analysis of eight intersections before and after signal installation or modifications (six more than the prior case study) All intersections were along a bike boulevard Review of potential crossing treatments Why? To determine whether the 2012 Case Study findings were consistent to other sites.
3 Site Locations Fremont Ave N & N 105 th St Fremont Ave N & N 80 th St 15 th Ave NW & NW 58 th St 12 th Ave NE & NE 50 th St 17 th Ave NW & NW Market St Dock St & Leary Way Holgate & Beacon Ave S 15 th Ave SW & SW Holden St
4 Standard Signals with Turn Restrictions Fremont Ave N & N 80 th St Fremont Ave N & N 105 th St 12 th Ave NE & NE 50 th St
5 Enhanced Pedestrian Half Signals Dock St & Leary Way 15 th Ave SW & SW Holden St
6 Existing Traffic Signal with Modifications NW 58 th St & 15 th Ave NW Floating curb bulb on one side
7 Existing Traffic Signal with Modifications NW 58 th St & 15 th Ave NW Floating curb bulb on one side S Hanford St & Beacon Ave S New median island & turn restrictions
8 Existing Traffic Signal with Modifications NW 58 th St & 15 th Ave NW Floating curb bulb on one side S Hanford St & Beacon Ave S New median island & turn restrictions 17 th Ave NW & NW Market St New turn restrictions
9 Crossing Treatment Analysis 2009 MUTCD Warrant Analysis Pedestrian Hybrid Warrant Analysis NCHRP Report 562/TCRP Report 112
10 Before Crossing Treatment Analysis Intersection 2009 Signal Warrants Pedestrian Hybrid Beacon NCHRP 562 Fremont & 80 th St Not Met Not Met No Treatment Fremont & 105 th St Not Met Met Red 12 th Ave & 50 th St Not Met Met Red 15 th Ave & Holden St Not Met Not Met No Treatment Dock St & Leary Way Not Met Met Red 58 th St & 15 th Ave Met Met Red 17 th Ave & Market St Met Met Red Hanford St & Beacon Ave Met* Met Red
11 Volume Changes New Signal Intersection Bicyclists Pedestrians Motor Vehicles Before After Before After Before After Fremont Ave N & N 80 th St N/A Fremont Ave N & N 105 th St th Ave NE & NE 50 th St NW Dock St & NW Leary Way th Ave SW & SW Holden St Change 139% Increase 236% Increase 5.7% Increase
12 New Riders or Just Rerouted Existing Ones?» 15 th Ave SW & SW Holden St New Signal 16 th Ave SW & SW Holden St Before After 13 5 Existing Signal 15th Ave SW & SW Holden St Before After 1 0
13 New Riders or Just Rerouted Existing Ones?» 12 th Ave NE & NE 50 th St New Signal Roosevelt/11 th Ave NE & NE 50 th St Before After Before 12th Ave NE & NE 50th St After 9 19 Existing Signals
14 Volume Changes Modified Signal Intersection Bicyclists Pedestrians Motor Vehicles Before After Before After Before After NW 58 th St & 15 th Ave NW th Ave NW & NW Market St S Hanford St & Beacon Ave S Change 255% Increase 9.2% Decrease 29% Decrease
15 Collision Analysis - Rates Intersection 3-year Before Collision Rate 1-year After Collision Rate 3-year (ish) After Collision Rate Fremont Ave N & N 80 th St Fremont Ave N & N 105 th St th Ave NE & NE 50 th St N/A NW 58 th St & 15 th Ave NW S Hanford St & Beacon Ave S *Rate in Million Entering Vehicles
16 Collision Analysis - Severity Intersection 3-year Before Severity Index 1-year After Severity Index 3-year (ish) After Severity Index Fremont Ave N & N 80 th St 1.75 N/A 1.00 Fremont Ave N & N 105 th St th Ave NE& NE 50 th St N/A NW 58 th St & 15 th Ave NW 1.50 N/A 1.33 S Hanford St & Beacon Ave S Severity Index = 5.8*(# of fatal crashes) + 2*(# of crashes involving injury) + (# of PDO crashes) Total Number of Crashes
17 Operational Issue: Thru Traffic Intersection Thru Traffic Percentage Fremont & 80 th St 9.3% / 15.4% Fremont & 105 th St 20.8% / 24.3% 12 th Ave & 50 th St 2.8% / 4.3% 15 th Ave & Holden St 0.0% / 0.0% Dock St & Leary Way 40.9% / 8.3% 58 th St & 15 th Ave 0.0% / 38.2% 17 th Ave & Market St 22.8% / 20.5% Hanford St & Beacon Ave 8.3% / 11.5%
18 Conclusions Bike and pedestrian volumes increased while motor vehicle volumes remained relatively constant Collision rates decreased at all locations following signal installation Collision rates remained constant at locations with existing signals after modifications Severity of collisions at both signals decreased following the signal installation
19 What s Next?» More sites are being reviewed Tucson, Arizona Long Beach, California Portland, Oregon» Do you know of a site? Please let me know!
20 Thank you for your time Questions? Contact Information Mike Hendrix, PE, PTOE
21 Operational Issue: Violations» Fremont Ave N & N 105th St 27 of 232 (11.6%) bicyclists went directly for pedestrian push button.» Fremont Ave N & N 80th St Roughly same proportion
22 Case Study»Unwarranted signals are BAD» They: Increase collisions Increase red-light running Increase delay Increase noise and air pollution Lead to increased maintenance costs Lead to a potential increase in cut-through traffic
23 Case Study 2011 Pinellas County Study: 273% annual increase in collisions 2008 Kentucky Study: 28.3% increase in collisions 221.7% increase in rear-end collisions 1989 New York City Study: 65% increase in collisions 1979 Purdue University Study: 3,200 to 4,200 vehicle hours of delay
24 Site 1 Fremont Avenue N & N 80 th Street Fremont Ave N 25 wide residential street N 80 th St 1 lane each direction with on-street parking on north side 15,500 vpd (N 80 th St) 700 vpd (Fremont Ave N) Signal turn-on 11/16/2007
25 Site 2 - Fremont Avenue N & N 105th Street Fremont Ave N 25 wide residential street N 105th St 2 lanes each direction with no on-street parking 23,000 vpd (N 105th St) 900 vpd (Fremont Ave N) Signal Turn on 10/7/2010
26 Operational Issue: Violations» Fremont Ave N & N 105th St 27 of 232 (11.6%) bicyclists went directly for pedestrian push button.» Fremont Ave N & N 80th St Roughly same proportion
27 Delay Intersection Pedestrian Delay (seconds) Motor Vehicle Side Street Delay (seconds) Bikes as Motor Vehicles Side Street Delay (seconds) NB SB NB SB Bikes as Pedestrians Side Street Delay (seconds) Fremont Ave N & N 80 th St Not Available 52.2 Fremont Ave N & N 105 th St 5,
28 Site 2 - Fremont Avenue N & N 105th Street Span Wire Sign Pavement Marking
29 Pre-Signal Conditions
30 Fremont & N 80th St - Before Collision History 3 Years Before Correctable Crashes 11 Non-Correctable Crashes 2 Crash Rate (Crashes per MEV) Severity Index 1.77
31 Before Collison History 3 Years Before Correctable Crashes 11 Non-Correctable Crashes 2 Crash Rate (Crashes per MEV) Severity Index 1.77
32 Post-Signal Conditions
33 Fremont Ave N & N 80th St - After Collision History 3 Years Before 3 Years After Correctable Crashes 11 0 Non-Correctable Crashes 2 3 Crash Rate (Crashes per MEV) Severity Index
34 Fremont Ave N & N 105th St - After Collision History 3 Years Before 1 Year After Correctable Crashes 3 0 Non-Correctable Crashes 5 1 Crash Rate (Crashes per MEV) Severity Index
Improving Pedestrian Safety at Unsignalized Crossings. Shawn Turner, P.E. Texas A&M Transportation Institute
Improving Pedestrian Safety at Unsignalized Crossings Shawn Turner, P.E. Texas A&M Transportation Institute Overview of Presentation What are the issues/problems? Framework for crossing treatments Marked
More informationPEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC.
PEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC. Pedestrian Safety 2017 Pedestrian Crashes in Ohio Crash Severity Number % Fatal Crash 141 4.9% Injury Crash 2546 89.1% Property
More informationDesigning for Pedestrian Safety in Washington, DC
Designing for Pedestrian Safety in Washington, DC February 25, 2014 George Branyan Pedestrian Program Coordinator District Department of Transportation DC Journey to work mode split: 2012 Means of Transportation
More informationLessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice
Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice By: Min Zhou, P.E., Principal/Vice President KOA Corporation 1 What is a Cycle Track (Class IV) TYPICAL BIKEWAY CLASSIFICATION CLASS
More informationPedestrian & Bicycle Safety Innovations & Applications
Pedestrian & Bicycle Safety Innovations & Applications County Engineers Association of Maryland Spring, 2017 Conference May 25, 2017 George Branyan Pedestrian Program Coordinator District Department of
More informationFHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report
FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report August 2, 2010 Table of Contents Preface... 1 Problem Statement... 1 Study Objectives... 2 Data Collection Methods...
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationBoston Post Road Design Feasibility Study
Boston Post Road Design Feasibility Study Prepared for the City of Rye Final Report July 18, 2007 Prepared by: Buckhurst Fish & Jacquemart (BFJ) 115 Fifth Avenue New York, NY 10003 www.bfjplanning.com
More informationRE: City of Portland Request to Experiment with HAWK/Bike signal
October 4, 2005 Regina S. McElroy, Director Office of Transportation Operations HOTO Room 3401 400 7 th Street, S.W. Washington, D.C. 20590 RE: City of Portland Request to Experiment with HAWK/Bike signal
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationHAWK Signal. Pedestrian Safety. Illinois Traffic Engineering & Safety Conference Thursday, October 21, 2010
HAWK Signal Pedestrian Safety Illinois Traffic Engineering & Safety Conference Thursday, October 21, 2010 Background Information High-intensity Activated crosswalk Developed by the City of Tuscon, AZ First
More informationBoudart, Foster, Koonce, Maus, & Okimoto 1 IMPROVING THE BICYCLE DETECTION PAVEMENT MARKING SYMBOLS TO INCREASE COMPREHENSION AT TRAFFIC SIGNALS
Boudart, Foster, Koonce, Maus, & Okimoto 0 0 0 0 IMPROVING THE BICYCLE DETECTION PAVEMENT MARKING SYMBOLS TO INCREASE COMPREHENSION AT TRAFFIC SIGNALS Jesse Boudart, E.I. * Kittelson & Associates, Inc.
More informationBicycle Facilities Planning
Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists
More informationBicycle Boulevards and Neighborhood Greenways
Bicycle Boulevards and Neighborhood Greenways Traffic Safety is Improving for Everyone 90 80 70 60 50 40 30 20 10 0 PORTLAND: TOTAL TRAFFIC FATALITIES 1986-2008 1986 1987 1988 1989 1990 1991 1992 1993
More informationBy Dan Burden, Executive Director Walkable and Livable Communities Institute
By Dan Burden, Executive Director Walkable and Livable Communities Institute Is this the landscape we want to leave our children? LaJolla Boulevard, Birdrock, San Diego, CA 78 Feet Speeds above
More informationFOURTH PLAIN BOULEVARD RE-STRIPING PROJECT. Post Implementation Report 1.2. Transportation Services. October 2004 DEMONSTRATION
FOURTH PLAIN BOULEVARD DEMONSTRATION RE-STRIPING PROJECT Post Implementation Report 1.2 October 2004 Transportation Services Table of Contents GENERAL INTRODUCTION 1 PROJECT BACKGROUND 1 PURPOSE OF 3-LANE
More informationTRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)
Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC
More informationIMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS. Guidelines for Marked Crosswalks
IMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com Guidelines for Marked Crosswalks Source: FHWA, Safety Effects of Marked
More informationBicycle-Specific Traffic Control Is it "Bicycle-Friendly"?
Bicycle-Specific Traffic Control Is it "Bicycle-Friendly"? Richard C. Moeur, P.E. In the United States, the Uniform Vehicle Code and most state laws treat bicyclists as having much the same rights and
More informationThe DC Pedestrian Master Plan
The DC Pedestrian Master Plan September 28, 2010 George Branyan Pedestrian Program Coordinator District Department of Transportation Presentation Agenda Scope of the Plan Methodology Recommendations Implementation
More informationVT15 / Allen Martin Drive Intersection Scoping Study
VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives
More informationPinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report
Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report MPO Board July 8, 2015 2 Crash Data Collection Motorcycle drove between stopped cars, ran a red light and collided with a
More informationFlanders Crossing. Save Lives Save Money Saving Our Environment. Portland City Council April 30, 2008
Flanders Crossing Save Lives Save Money Saving Our Environment Portland City Council April 30, 2008 NWSTELBRG-GLISANSTRAMP Expanding Portland s Bicycle Boulevards NW NAITO PKY Why this project? Part of
More informationRoad Diets and Roundabouts
Road Diets and Roundabouts Paul Zykofsky, AICP Local Government Commission Sacramento, CA Classic Road Diet 4 to 3 lanes San Antonio TX On-street parking Median Bike Lanes Center Turn-Lane Seattle WA Road
More informationTECH MEMOS #3 & #4 EXISTING AND FUTURE TRAFFIC CONDITIONS TRAVEL FORECASTING APPROACH CITY OF NOVI THOROUGHFARE MASTER PLAN
TECH MEMOS #3 & #4 EXISTING AND FUTURE TRAFFIC CONDITIONS TRAVEL FORECASTING APPROACH CITY OF NOVI THOROUGHFARE MASTER PLAN January, 2016 1. Introduction This report is prepared as part of the 2016 Novi
More informationDowntown Signals Traffic Analysis
Downtown Signals Traffic Analysis City of St. Mary s April 16, 2018 Presented by: Allan Heitbrink, P.E. & Craig Eley, P.E. Who We Are Craig Eley, P.E o o o Previously the ODOT D7 Traffic and Safety Engineer.
More informationAngelo Rao, PE Director, Local Government Services BCC Engineering, Inc.
Angelo Rao, PE Director, Local Government Services BCC Engineering, Inc. A presentation to the Florida Section Institute of Trasnportation Engineers FSITE Leading Pedestrian Interval What are you doing
More informationToronto and East York Community Council. Director, Transportation Services, Toronto and East York District
No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity
More informationCity of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY
4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after
More informationBy: Bill Baranowski, PE TRAFFIC CALMING EXAMPLES IN SUGARHOUSE, DAYBREAK, AND WEST JORDAN CITY
By: Bill Baranowski, PE TRAFFIC CALMING EXAMPLES IN SUGARHOUSE, DAYBREAK, AND WEST JORDAN CITY 1977 HIGHLAND RUGBY TOUR 1945 WHERE??? What is more contentious than traffic calming? 1951 LOOKING SOUTHEAST
More informationORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS
ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever
More informationFEDERAL HIGHWAY ADMINISTRATION APPLICATION
FEDERAL HIGHWAY ADMINISTRATION APPLICATION REQUEST FOR PERMISSION TO EXPERIMENT WITH A BICYCLE BOX INTERSECTION TREATMENT Submitted by: City of Columbus Department of Public Service Date: June 26, 2009
More informationDell Range Boulevard Corridor Study Powderhouse Road to College Drive. Prepared for: Cheyenne Metropolitan Planning Organization
Dell Range Boulevard Corridor Study Powderhouse Road to College Drive Prepared for: Cheyenne Metropolitan Planning Organization Draft August 2014 Dell Range Boulevard Corridor Study (Powderhouse Road to
More informationCaltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns
Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various
More informationPEDESTRIAN SAFETY STUDY
PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation
More information2018 AASHTO BIKE GUIDE
2018 AASHTO BIKE GUIDE Your presenter Rob Burchfield, PE NW Regional Engineering Director 35 years of experience in traffic engineering and bicycle facility design Toole Design Group Toole Design Group
More informationRoad Diets FDOT Process
Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local
More informationINTERSECTION DESIGN. Bicycle Facility Workshop Intersections 4-1
INTERSECTION DESIGN 4-1 Intersections Avoid unusual conflicts Provide direct path for cyclists, close to that of motor vehicles Bicyclists should be visible; their movements should be predictable Simple
More informationBike Planning: A New Day
Bike Planning: A New Day Josh Sikich, AICP, LEED AP Chicago Office Director Alta Planning + Design 312-265-0628 joshuasikich@altaplanning.com cities of all sizes are changing Illinois Bike Summit October
More informationPedestrian Hybrid Beacon Guide Recommendations and Case Study. FHWA Safety Program.
Pedestrian Hybrid Beacon Guide ecommendations and Case Study FHWA Safety Program http://safety.fhwa.dot.gov A pedestrian hybrid beacon (PHB) is a traffic control device similar to a European pedestrian
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationMUTCD (HAWK) 2016 & Adapting the Pedestrian Hybrid Beacon (HAWK) to Facilitate Bicycle Use. ITE-IMSA March, 2014
MUTCD (HAWK) 2016 & Adapting the Pedestrian Hybrid Beacon (HAWK) to Facilitate Bicycle Use Presented By Richard Nassi, P.E., Ph.D. PAG Engineering Consultant Services, CA 0344 Traffic Engineering Gabriel
More informationCitywide Sidewalk and Crosswalk Programs
Citywide Sidewalk and Crosswalk Programs Council Meeting October 20, 2015 Presented by Rita Hu and Jamal Mahmoud Program Goals Implement the City s comprehensive plan. Provide pedestrian with safe walking
More informationMINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY
MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study
More informationGovernment of the District of Columbia Department of Transportation
Government of the District of Columbia Department of Transportation November 1, 2017 Stephen Gardner Advisory Neighborhood Commission 3D P.O. Box 40846 Palisades Station Washington, DC 20016 3D06@anc.dc.gov
More informationSafety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay
Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay Stephen L. Benson, AICP, CNU-A FDOT District Seven Safety Office Presentation Overview Safety
More informationChapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT
Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT OVERVIEW This chapter describes a cohesive set of strategies to create a bicycle boulevard, namely to make streets safer and more efficient for bicycle
More informationBicycle + Pedestrian Connectivity Gap Analysis
Accelerated Bridge Program Bicycle + Pedestrian Connectivity Gap Analysis Tuesday, October 11 Shriners Hospital, Boston 6:30-8:00 PM Thursday, October 13 Community Rowing, Brighton 6:30-8:00 PM Tuesday,
More informationSafety Effectiveness of Pedestrian Crossing Treatments
Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 10-13-2017 Safety Effectiveness of Pedestrian Crossing Treatments Christopher Monsere
More informationCalifornia Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016
California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and
More informationDec 2, Dear Tri Ong, Sam Woods, and Scott Kubly,
Dec 2, 2014 Dear Tri Ong, Sam Woods, and Scott Kubly, Thank you for providing us with the 2015 Arterial Asphalt and Concrete (AAC) repaving project 60% plan for Roosevelt Way NE. It's exciting to see the
More informationApproximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer
5. PARKR ROAD AT MISSISSIPPI AVN CROSSIN xisting Conditions The High ine Canal trail crosses Parker Road near the Mississippi Avenue intersection (crossing location #3 on Figure 1). South of Parker, the
More informationA Summary of Recent Evaluations of Cycling Facilities in Portland, OR
A Summary of Recent Evaluations of Cycling Facilities in Portland, OR Christopher Monsere, Ph.D., P.E. Civil & Environmental Engineering Jennifer Dill, Ph.D. Urban Studies & Planning Nathan McNeil Center
More information2018 AASHTO BIKE GUIDE
2018 AASHTO BIKE GUIDE Your presenters Jessica Fields, PE Denver Office Director Sagar Onta, PE, PTOE Denver Engineering Director 35 years of combined experience street design, transportation planning,
More informationPEDESTRIAN CROSSING TREATMENTS
PEDESTRIAN CROSSING TREATMENTS BEST PRACTICES Presented by: Doug Enderson, P.E., PTOE Cody Salo, P.E. 1 PRESENTER INTRODUCTIONS Doug Enderson, P.E., PTOE Ped Crossing Experience: ADA Design-Build ADA Inventory
More informationDear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President
December 17, 2012 Mr. Steve Tweed City of Long Beach, Department of Public Works Traffic & Transportation Bureau, 10 th Floor City Hall 333 West Ocean Boulevard Long Beach, CA 90802 Subject: Broadway and
More informationMEMORANDUM. Charlotte Fleetwood, Transportation Planner
MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering
More informationCycle Tracks: Concept and Design Practices. February 17, 2010
Cycle Tracks: Concept and Design Practices February 17, 2010 Today s webinar presenters APBP Board Member Host Brett Hondorp, Principal, Alta Planning + Design Guest Moderator Zach Vanderkooy, Bicycling
More informationTRAFFIC CALMING TOOLBOX
TRAFFIC CALMING TOOLBOX Traffic control devices are those official signs and striping placed in the public right-of-way and recognized by the public such as STOP signs, curve warning signs, centerline
More informationSAFE ROUTES TO SCHOOL (SR2S)
SAFE ROUTES TO SCHOOL (SR2S) In partnership with Burbank Unified School District (BUSD) & City of Burbank George Washington Elementary School Thomas Jefferson Elementary School John Muir Middle School
More informationSystem Performance Innovation FACT Sheet Hawk Pedestrian Beacon
Hawk Pedestrian Beacon Description of the Challenge or Opportunity Hawk Pedestrian Beacon Understanding the motivation. Describe the pre-existing product/process that is the subject of the innovation:
More informationCITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study
CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final
More informationPedestrian Safety Guide for Transit Agencies
Pedestrian Safety Guide for Transit Agencies FDOT/FTPA/CUTR Professional Development Workshop June 15, 2010 1 Purpose Presentation Overview Bus Stop Location and Design Process/Partnership 2 Purpose Every
More informationMEMORANDUM INTRODUCTION AREA DESCRIPTION. DATE: December 8, 2017
7719 SOUTH MAIN STREET MIDVALE, UT 84047 P 801.307.3400 MEMORANDUM DATE: December 8, 2017 TO: FROM: SUBJECT: PROJECT NUMBER: 344-7517-003 PROJECT NAME: Keith Ludwig, P.E. Midvale City Lesley Burns, Midvale
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationMilitary Road Safety Improvements
Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and
More informationBroad Street Bicycle Boulevard Design Guidelines
Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationBike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.
Bike Routes Assessment: 95 Ave, 106 St & 40 Ave Replace with appropriate image in View > Master. Transportation Committee October 15, 2014 City Council Direction What we are trying to achieve The Way Ahead:
More informationMineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st
Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationWelcome! San Jose Avenue Open House August 25, 2015
Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an
More informationNorthbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project
Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationREGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES
REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction
More informationGLOSSARY CROSSWALK. CROSSING TYPES
CROSSWALK The part of a roadway at an intersection included within the connections of the lateral lines of the sidewalks on opposite sides of the street measured from the curbs, or in the absence of curbs
More informationAddendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines
Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug 2017 Crosswalk Guidelines Warrants for Uncontrolled Crosswalk Locations Crosswalks at Midblock Locations
More informationSafety at Unsignalized Intersections. Unsignalized Intersections
Safety at FHWA Safety Focus Areas 2 National Statistics 3 National Statistics There were 41,059 highway fatalities in 2007. Where did they occur? Non-Intersections 79% About half of all crashes and half
More informationRetrofitting Urban Arterials into Complete Streets
Retrofitting Urban Arterials into Complete Streets John N. LaPlante, P.E., P.T.O.E., T.Y. Lin International Prepared for: Illinois Traffic Engineering & Safety Conference Urbana, Illinois October 18, 2007
More informationGuidelines for Pedestrian Treatments at Uncontrolled Locations January 18, 2018
Est. Dec. 2014 Guidelines for Pedestrian Treatments at Uncontrolled Locations January 18, 2018 Presented by: Kyle Armstrong, Illinois DOT Yan Qi, Southern Illinois University Webinar Logistics Duration
More informationClybourn Ave. Protected Bike Lane Study Halsted St. to Division St.
Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Nathan Roseberry, Senior Engineer Pam Broviak, Project Manager July 24, 2014 Agenda Project Goals Existing Roadway Conditions Traffic
More informationFDOT Bicycle/Pedestrian Focused Initiative & Complete Streets
Florida Department of TRANSPORTATION FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets Billy L. Hattaway, PE District One Secretary Secretary s Pedestrian Safety Initiative Dangerous by Design
More informationInformation on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps
Public information meeting #4 4 to 7 p.m., September 30, 2009 Hales Corners Welcome Thank you for attending this public information meeting for the WIS 100 Corridor Study. Your interest and comments are
More informationCAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH
CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH OVERVIEW N 51 ST BOULEVARD N 51 ST BOULEVARD 12,100 44,700 W CAPITOL DRIVE 52,600
More informationEVALUATION OF HAWK SIGNAL AT GEORGIA AVENUE AND HEMLOCK STREET, NW IN THE DISTRICT OF COLUMBIA FINAL REPORT. August 30, 2010
EVALUATION OF HAWK SIGNAL AT GEORGIA AVENUE AND HEMLOCK STREET, NW IN THE DISTRICT OF COLUMBIA FINAL REPORT August 30, 2010 Submitted to: Mr. George Branyan Pedestrian Program Manager Policy, Planning
More informationWho is Toole Design Group?
2018 AASHTO Bike Guide Status Update NCHRP 15 60 Amalia Leighton Cody, PE, AICP & Kenneth Loen, PE Washington APWA October 4, 2018 Who is Toole Design Group? TDG is a full service engineering, planning
More informationFreeway ramp intersection study
Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More informationMaking Signals Work for Bicyclists and Pedestrians
Making Signals Work for Bicyclists and Pedestrians Peter Koonce, PE Portland, OR October 18, 2017 PBIC Webinar pedbikeinfo.org @pedbikeinfo Housekeeping Problems with audio? Dial into the phone line instead
More informationTransforming Traffic Signals to Support Sustainability: Applications, Ideas, & Research
Transforming Traffic Signals to Support Sustainability: Applications, Ideas, & Research MARCH 4, 2011 Presented by: Peter Koonce, PE Division Manager, City of Portland Signals, Street Lighting, & ITS Overview
More informationRebecca Szymkowski, P.E., PTOE Wisconsin Department of Transportation. ITE Midwestern District Annual Meeting June 30, 2015
Rebecca Szymkowski, P.E., PTOE Wisconsin Department of Transportation ITE Midwestern District Annual Meeting June 30, 2015 Strategic Highway Safety Plan (SHSP) Roundabout Safety Analysis J-turn Experiences
More informationOverview of Pinellas County Pedestrian Safety Programs and Initiatives
Overview of Pinellas County Pedestrian Safety Programs and Initiatives FHWA Pedestrian Safety Peer Exchange Miami, FL August 2, 2012 Peter Hsu, P.E. District Safety & Special Projects Engineer Florida
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee
More informationS.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project
Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library
More informationLAGUNA BEACH POLICE DEPARTMENT MEMORANDUM
LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM TO: FROM: Christa Johnson, Assistant City Manager Jason C. Kravetz, Captain DATE: January 16, 2015 SUBJECT: Laguna Canyon Road Collision Analysis Within the last
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,
More informationThe Transformation of Portland into a Two-Wheeled Mecca. Mia Birk, Principal, Alta Planning + Design
The Transformation of Portland into a Two-Wheeled Mecca Mia Birk, Principal, Alta Planning + Design Development of Portland s Bikeway Network 1990 Early 1990s Infrastructure Growing Public Support Growing
More informationDraft North Industrial Area-Wide Traffic Plan
Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block
More information