1 DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee 2100 Clarendon Boulevard, Suite 700, Arlington, VA TEL FAX SITE PLAN REVIEW COMMITTEE MEETING SUMMARY SP #13 Crystal Houses III SPRC Meeting #3, September 11, 2017 Planning Commissioners in Attendance: James Lantelme (Chair), Nancy Iacomini, James Schroll, Jane Siegel. MEETING AGENDA This was the third Site Plan Review Committee (SPRC) meeting for a proposed site plan amendment at the Crystal Houses at 1900 South Eads Street. The meeting was preceded by a walking tour of the site, led by the development team. The tour walked around and through the Crystal Houses block. The following was the agenda for the meeting: The meeting began with introductions and a refresher on SPRC ground rules and procedure. The applicant presented architectural changes that had been made in response to comments since the last SPRC meeting. SPRC DISCUSSION Architectural Revisions/ Applicant Answers to previous questions The developer revised the ground floor to create a bike entrance closer to elevators and a more direct access from the ground floor to the bike room in G1. The developer also added building recesses along the Eads Street façade. Added doors to the garage Added 8 electric vehicle charging stations. The grade to the garage entrance is 5%. Moved transformer interior of site. Nancy Iacomini asked how pedestrian access could be changed from 18 th street? o Applicant responded that pedestrians could access the rear drive and walk along it. Would there be a conflict between cars coming out of Crystal Houses II & II at the same time, would they be able to see each other o Applicant responded that there would be stop bars. Traffic consultant thought only 30 cars per hour would leave there.
2 SITE PLAN REVIEW COMMITTEE MEETING SUMMARY Page 2 Question about lighting of the internal drives. Consider that pedestrians might be using the space as well. o Developer answered that it would be probably the same ground based lighting fixtures as currently. They admit they haven t thoroughly looked at site lighting. Open Space The applicant then made a presentation on open space, including the saving of three additional existing trees in the park. How large is the great lawn space? o About 60 x 100 feet. Are dogs allowed? o They will, but must be on leash. There will be accommodation for waste on site. There are private dog accommodations on the property for residents only. Statements from several community members that large lawn area would encourage dog owners, so if they are not discouraged they may dominate use of the park. Jane Siegel noted staff encouragement to reduce surface parking to save mature trees, and that staff can support a lower parking ratio here. Is the applicant s proposal final, or can they find room to reduce? Also, to staff, what is the status of the Residential Parking Study? Also, encouraged for the Planning Commission presentation on the tree preservation efforts. o Staff responded that the Residential Parking Study is tentatively scheduled for October Request to Advertise. Nancy Iacomini also would like to see tree replacement/removal details for the PC meeting. Also, feels surface parking can be reduced to preserve trees. Also, a shame to remove trees in an area that will be a park. Natasha Atkins requested a percentage of existing and proposed tree canopy on the site. The proposed park seems formal and prescriptive. James Schroll also suggested that the central lawn be enlarged by moving he walkways. Chris Slatt of the Transportation Commission stated that the new proposed parking spaces negatively impact the internal circulation. Judy Freshman also stated that if the park was more informal, could trees be saved? Also, since existing surface parking will be taken over for construction, will temporary surface parking spaces be created? The representative of the Pedestrian Advisory Commission requested a 7 foot minimum sidewalk along 18 th Street South. Also suggested remove the plantings at the 18 th Street entrance and expand the sidewalk. ARCA asked if there was handicapped parking in front of the lobby?
3 SITE PLAN REVIEW COMMITTEE MEETING SUMMARY Page 3 o The applicant stated that they didn t want stopping right at the entrance and block the internal drive. Handicapped parking would be behind the building with a back entrance to the lobby. ARCA responded that it seemed it would be inconvenient. Jim Lantelme stated that the internal sidewalks had missing curb ramps. This area would be the access to the park from the community west of Fern Street. The PRC chair asked if the park would be open 24 hours, and if there would be signage. Also, suggested that they think about doing public art in the park. Also, would the applicant be constructing the other park recommended by the Sector Plan (at the northeast corner of Eads and 22 nd Street)? o The applicant stated that the park would be open at least the usual park hours (sunrise to sunset). Had not thought about signs on the property, but would be willing to work with DPR on signs. The applicant also stated that they would not be building the other park with this development. It would be with any potential future development on that end of the property. Will do enhanced landscaping in this area. Natasha Atkins stated that there was a need in this area for dog exercise areas. ARCA representative stated that the internal driveways should be lighted for pedestrians. Can planting or artwork make the drive behind the building more attractive? Chairman stated that striping would help guide pedestrians through the area. James Schroll asked if the outdoor space was 31,000 or 33,000 square feet. o Applicant stated roughly that, based on rough measurements. The plat of dedication would have an exact square footage. Arthur Fox asked how circulation from other buildings to the Metro lobby of this building would work. o Applicant stated that there is a door in the northeast corner of Crystal House North, then a short walk to the rear door into the Metro lobby, then out the front entrance. Arthur Fox suggested that applicant look at a way that existing tenants can access an east west sidewalk without walking on the driveway. Community Benefits Chairman stated that no bonus density was being requested. Applicant has choice after approval to contribute to public art fund or commission on site public art. Parks and Rec representative suggested that art be placed at the entrance. Construction Issues
4 SITE PLAN REVIEW COMMITTEE MEETING SUMMARY Page 4 With regard to temporary parking, the applicant stated that they would try to accommodate all displaced parking on site or on the lot across 22 nd street. Perhaps temporary parking on the existing site on gravel surfaces. Many members of SPRC stated that temporary on site parking should not negatively impact open space or trees to be saved. Question if school bus stop will be moved? o APS sets own school bus stop locations, separate from a site plan process. Will 18 th And 20 th Street entrances and access remain open? o Applicant stated existing entrances will remain open during construction except for short periods of utility work. Group recommended that no sidewalks be closed during construction and that covered pedestrian passageways be built if necessary. James Schroll asked if material laydown would be on site, or would the bike lane be affected? o Applicants replied they had no detailed plans yet about the locations of materials, but any impact to the bike lane would be temporary. Staff was asked if the County s 18 th Street project would commence either before or during this site plan s construction. o Staff responded that the County project would be after this. Would materials be placed on existing parking spaces? o The applicant stated they had not thought it through yet, but possibly. Wrap Up James Schroll asked for less surface parking. Thanks for improved bike access. Jane Siegel also requested less surface parking, save trees. Encourage redesign park to save trees. Would like tree preservation plan to be explained at Planning Commission. Parks and Recreation Commission representative agreed with statements on saving trees. Pedestrian Advisory representative asked for Wider sidewalks on 18 th Street. ARCA representative stated that applicant should think about how pedestrians circulate internally. Transportation Commission representative stated that it looks as if the internal pedestrian sidewalks along the internal drives as proposed seems to make a pedestrian switch sides a couple times, which is inconvenient. Also, requested staff and applicant to consider requesting the applicant upgrade the existing Eads Street bike lane instead of upgrading traffic signal. Judy Freshman of Crystal City Civic Association stated that was disappointed in the size of the proposed building and preferred the original two building plan. Also, that the proposed park could accommodate dogs, but set clear rules and enforce them. Chairman Lantelme then gave a wrap up of the past three SPRC issues, identifying areas for follow up, especially concerns about the length of the building; the garage access might be an issue but the applicant s presentation tonight showed improvement; there were concerns about delivery vehicle and passenger pickup/drop off locations and the practicality of the
5 SITE PLAN REVIEW COMMITTEE MEETING SUMMARY Page 5 applicant s proposed solutions; perhaps improve the bike lanes; reduce the amount of surface parking to save trees; open space may be too prescriptive; widen the 18 th Street sidewalk, hoped for pedestrian access easement through the site.
ARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 15, 2016 DATE: October 7, 2016 SUBJECT: Adoption of amendments to the Master Transportation Plan (MTP) to create a new Pedestrian
More informationJune 29, Dear Mr. Walter:
From: CountyBoard@arlingtonva.us To: chickandsandy@msn.com Subject: County Board Response Regarding the Arlington Ridge Road Improvement Project (Intranet Quorum IMA00252707) Date: Wed, 29 Jun 2011 08:09:53-0400
More information/ ARLINGTON COUNTY, VIRGINIA
/ ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 24, 2016 DATE: August 11, 2016 SUBJECT: Amendment of the Master Transportation Plan (MTP) Streets Element to include new local
More informationFOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)
FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights
More informationTRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.
TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary
More informationR o s s l y n, A r l i n g t o n C o u n t y, V i r g i n i a. S i t e P l a n R e v i e w C o m m i t t e e M e e t i n g # 5
1 4 0 1 W i l s o n B o u l e v a r d & 1 4 0 0 K e y B o u l e v a r d R o s s l y n, A r l i n g t o n C o u n t y, V i r g i n i a S i t e P l a n R e v i e w C o m m i t t e e M e e t i n g # 5 1 2.
More informationTable #6 VISION CHARACTERISTICS
Table #6 VISION White Flint is a place to live, work, play, shop, and walk with sufficient density to encourage quality redevelopment. Vibrant streets and consistent streetscapes are important. CHARACTERISTICS
More information12/13/2018 VIA
12/13/2018 VIA EMAIL Daniel Abbes, Assistant Planner City of Sacramento community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: Bruceville Apartments (P18-073) Dear Mr.
More informationBallston Station Multimodal Study WMATA and Arlington County. Meeting Minutes
Date of Meeting: June 10, 2010 Location: Ballston Metrorail Station and NRECA Building 4301 Wilson Blvd, Arlington, VA Subject: Ballston Station Multimodal Study Stakeholder Meeting #1 Summary: This first
More informationVirginia Hospital Center Expansion
Virginia Hospital Center Expansion Site Plan Amendment (SP #177) SPRC Meeting #2 Dennis Sellin Arlington County DES/Transportation February 5, 2018 1 Arlington County Master Transportation Plan Goals Move
More informationCrystal City Citizen Review Council Meeting. July 10, 2013
Crystal City Citizen Review Council Meeting July 10, 2013 Topics to be covered Overview of Crystal City Transportation Projects Capital Program Investments Regional Coordination 9 Program Overview Crystal
More information11TH & VERMONT SPRC MEETING 4 1/25/ th & North Vermont. Ballston, VA R2L:ARCHITECTS 1 PROJECT TEAM
PROJECT TEAM DEVELOPER/OWNER NVR Inc. 11700 Plaza America Drive Suite 500 Reston, VA. 20190 T: 703-956-4775 Contact: John Halak Jay Johnson ATTORNEY Mcguire Woods, LLP 1750 Tysons Boulevard 18th Floor
More informationObey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST
THE VILLAGE AT PEDESTRIAN CIRCULATION MAIN STREETS NORTH/SOUTH MAIN STREETS EAST/WEST SLIP STREET CREEK SIDE LANE PEDESTRIAN CIRCULATION DESCRIPTION: Circulation through the downtown of is organized by
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationcomplete streets design and construction standards public primer City of Edmonton
complete streets design and construction standards public primer City of Edmonton introduction Complete Streets are streets for everyone: people who walk, wheel, bike, take transit, or drive. They are
More informationComplete Streets. Designing Streets for Everyone. Sarnia
Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the
More informationArlington s Master Transportation Plan
Arlington s Master Transportation Plan The Master Transportation Plan (MTP) Adopted in eight parts Goals & Policies element and MTP Map adopted in 2007 Bicycle, Pedestrian and Demand and Systems Management
More informationTypical Cross Section: DOWNTOWN (Observer Highway - 8th Street)
Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks
More information7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811
7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:
More informationRIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community
Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER
More informationRoad Alterations - Wellington Street East, Church Street, and Front Street Intersection
REPORT FOR ACTION Road Alterations - Wellington Street, Church Street, and Front Street Intersection Date: November 1, 2016 To: Toronto and York Community Council From: Director, Public Realm Section,
More informationChapter 3: Multi-Modal Circulation and Streetscapes
CHAPTER 3: MULTI-MODAL CIRCULATION AND STREETSCAPES Chapter 3: Multi-Modal Circulation and Streetscapes Overview Streetscape improvements have already been completed for Depot Street between Main Avenue
More informationWHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.
CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED
More informationIllustrated Principles of Good Planning
Illustrated Principles of Good Planning The Miami 21 Zoning Code incorporates time-tested planning principles into the zoning regulations of our City. These are principles that make for better neighborhoods,
More informationVDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations
VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66
More informationCITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL
ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE
More informationDavid Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA
June 13, 2016 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 959811 RE: Fire Station 14 (DR16-128) Dear Mr.
More informationWelcome! Public Open House on UBC s Transportation Plan
1 Welcome! Public Open House on UBC s Transportation Plan Public open house hours: to When it comes to on-campus transportation, what do you think is working well and what are some opportunities for improvement?
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationBicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013
Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:
More informationFONTAINE AVENUE STUDY Final Report
FONTAINE AVENUE STUDY Final Report March 28, 2005 FONTAINE AVENUE STUDY City of Charlottesville March 28, 2005 Renaissance Planning Group Kenneth Schwartz, FAIA, AICP Director of Design Leigh Wilkerson,
More informationMemorandum. Sunday, July 13, Saturday, July 19, 2014
Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn
More informationRehabilitation Institute of Chicago s New Research Hospital
Rehabilitation Institute of Chicago s New Research Hospital Follow-up Community Meeting March 18, 2013 Rehabilitation Institute of Chicago Heyworth Room AGENDA Introductions & Purpose of new Research Hospital
More informationTECHNICAL MEMORANDUM. Introduction
TECHNICAL MEMORANDUM To: From: John M. Welsh Chris Furlong AHC, Inc. Andrew T. Smith, P.E. Edward Y. Papazian, P.E. Kimley-Horn and Associates, Inc. Date: July 6, 2017 Subject: 200 9 th reet South Redevelopment
More informationPrince George s County plans, policies, and projects
Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail
More informationSummary: Mercer County Princeton Avenue & Spruce Street Study January 2009
Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street
More informationCURBSIDE ACTIVITY DESIGN
5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented
More informationRoadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004
Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3
More informationWhy invest in the 1 Street S.W. Corridor?
Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with
More informationUDC Street Cross Sections
UDC Street Cross Sections Local Street - Downtown Local Street Mountable Curb Local Street Vertical Curb Alley Major Arterial Minor Arterial Residential Lane Residential Collector Residential Collector
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee
More informationDOWNTOWN TENINO. Goal: Get more People in Downtown. A Pamphlet of Concepts for
A Pamphlet of Concepts for DOWNTOWN TENINO The Tenino Planning Commission believes that the highest potential for economic development and business development in the City of Tenino (in the short-term)
More information9/21/2016 VIA . RE: The Knot (DR16-270)
9/21/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: The Knot (DR16-270) Dear Mr. Norman:
More informationCitizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.
Citizen Advisory Group Meeting #8 May 5, 2010 Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.ORG Meeting Agenda Handouts: o Meeting Agenda o Summary of East Seventh
More informationStation Plan: Penn & 43rd Avenue
Station Plan: Penn & 43rd Avenue This station will serve the northern portion of the Penn Avenue corridor, including the commercial node at 44th Avenue. Ridership and roadway geometry support station siting
More information15 April CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility
15 April 2016 CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility AGENDA What We Heard Campus Framework & Open Space Network Mobility Approach Supporting the Pedestrian Environment Mobility & Sustainability
More informationOcean Park Boulevard Green Street Project Alternatives & Trade Offs
Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs
More information122 Avenue: 107 Street to Fort Road
: 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed
More informationAgenda. 7:00 pm Welcome Charles Monfort, Chair 7:05 pm Upcoming Schedule Park Master Plan Area Plan
Agenda 7:00 pm Welcome Charles Monfort, Chair 7:05 pm Upcoming Schedule Park Master Plan Area Plan 7:10 pm Review of Area Plan Comment Matrix Brief Overview Q&A 7:50 pm Review of Revisions to Draft Area
More informationMission-Geneva Transportation Study Community Workshop 2 July 8, 2006
Community Workshop 2 July 8, 2006 Small Group Workbook 1 Basic Improvements on Mission Street Streetscape. Pedestrian-scale lighting; landscaping; community art on utility boxes; more (possibly unique)
More informationCommunity Bicycle Planning
Community Bicycle Planning City of Mentor s Bicycle Facility Plan Allen E. Pennington, P.E. Civil Engineer - Traffic Office of the Mentor City Engineer Why has Mentor participated in bicycle planning?
More informationCrystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update
Enforcement Ordinance & Construction Update December 2015 Project Purpose Provide high-capacity, high-quality transit service Support redevelopment in Crystal City and in Potomac Yard in Alexandria and
More informationGRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015
GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 Welcome! Meeting Agenda Project update presentation Up to 15 minutes for Pulse Q&A about project design. (Please reserve
More informationCRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN
CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,
More informationSee Figure 38, Existing Nonmotorized Connections.
Nonmotorized Connections Existing Nonmotorized Connections Pedestrian, vehicle and bike traffic access and movements are confined primarily to Penny Drive on campus. Due to the steep slope along the length
More informationCapital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report
Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered
More informationChapter 2: Standards for Access, Non-Motorized, and Transit
Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing
More informationCOUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA (707) FAX (707)
COUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA 95403 (707) 565-1900 FAX (707) 565-1103 DATE: February 17, 2012 TO: Board of Supervisors FROM: Blake Hillegas,
More informationNiantic Center Elementary School
Niantic Elementary School is located in the Northwest corner of the intersection of West Main Street and East Pattagansett Road, as so noted on the Facility Location Map. location Overview: The site is
More informationSidewalk Cafe City of St. Petersburg City Code Chapter 16, Land Development Regulations
Section 16.50.370 Sidewalk Café Sections: 16.50.370.1 Generally 16.50.370.2 Declarations 16.50.370.3 Definitions 16.50.370.4 Permit Required 16.50.370.5 Application, Permit and Fee 16.50.370.6 Liability
More informationIncentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction
Incentive Zoning Zoning Ordinance Advisory Committee June 21, 2018 Pam Thompson, Senior Planner, Sustainable Development and Construction Presentation Overview Stakeholder questions Updated charts Design
More informationYour views are important. Please fill in a form before you leave. Or alternatively
Drum Property Group is delighted to welcome you to this exhibition which sets out our initial proposals for a mixed-use development at Stead s Place, Edinburgh. We are keen to hear the views of local people
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationAppendix B - Street Sections
Appendix B - Street Sections 6TH STREET CORRIDOR PLAN STREET SECTIONS The street sections in Appendix B include recommended improvements to streets for North Glenwood. They include existing conditions
More informationArlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016
Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation Thomas Jefferson BLPC / PFRC Meeting July 27, 2016 1.Review of Analysis 2.Key Transportation Issues 3.Recommendations
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationCapital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report
Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project
More informationAGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_
AGENDA ITEM SUMMARY AGENCY: City Council MEETING DATE: June 25, 2012 DEPARTMENT: Community Dev PREPARED BY: T Spade DEPT. DIR. APPROVAL: MJ CITY MGR. APPROVAL: LR PRESENTED BY: T Spade TITLE: RECEIVE REPORT
More informationInter River Sub Area Transportation Study District of North Vancouver Stakeholder Meeting #2b Meeting Minutes
Inter River Sub Area Transportation Study District of North Vancouver Stakeholder Meeting #2b Meeting Minutes Held at: Municipal Hall - Meeting Room A Date/Time: June 2 nd 2016 at 7:00pm Adjourned: 8:30pm
More informationClassification Criteria
SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed
More informationPolk Streetscape Project
What is this project? The Polk Streetscape Project is an effort to improve safety for everyone traveling on Polk Street between Union and McAllister streets. Also included in this project are paving, sewer
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationSTREETSCAPE CONCEPTS
STREETSCAPE S CARGO WAY CARGO WAY CYCLE TRACK Streetscape Concepts JENNINGS ST Illustrative Plan EVANS AVE PG&E BAY TRAIL HERON S HEAD PARK The recommended improvements build off the planned improvements
More informationMontgomery County Life Sciences Center Loop Trail
Montgomery County Life Sciences Center Loop Trail Advisory Committee Meeting #1 February 10, 2015 Agenda 1. Project Background 2. Existing Conditions Analysis 3. Examples from Elsewhere 4. Discussion Project
More informationMTP BICYCLE ELEMENT UPDATE. November 2017
MTP BICYCLE ELEMENT UPDATE November 2017 TIME FOR AN UPDATE Bicycle Element adopted in July 2008 Almost 10 years old Many planned facilities have been implemented 10 years more experience in planning,
More informationRE: Natomas Landing (P99-091)
August 2, 2008 David Hung, Associate Planner Current Planning Division Development Services Department 300 Richards Boulevard, 3rd Floor Sacramento, CA 95811 RE: Natomas Landing (P99-091) Dear Mr. Hung:
More informationALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS
ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS FEBRUARY 2019 EXECUTIVE SUMMARY Starting in 2019, Alberta Avenue will see the replacement and enhancement of its aging collector and local
More informationTable of Contents City of Shelbyville Unified Development Ordinance
City of Shelbyville Unified Development Ordinance 2012, Bradley E. Johnson, AICP Table of Contents 1: Ordinance Foundation 1.01 Title... 1-2 1.02 Unified Development Ordinance... 1-2 1.03 Defined Words...
More informationPCH/DEL PRADO STREET IMPROVEMENTS PUBLIC OUTREACH MEETING
PCH/DEL PRADO STREET IMPROVEMENTS PUBLIC OUTREACH MEETING JANUARY 22, 2014 MEETING AGENDA 1. INTRODUCTION OF STAFF 2. PROJECT SCHEDULE 3. PROJECT SCOPE 4. GENERAL CONCERNS 5. COMMUNICATIONS 6. ODDS AND
More informationThesis Presentation. Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core. Brad Garcia Advisors: Jason Kost & Dominic Fischer
Thesis Presentation Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core Brad Garcia Advisors: Jason Kost & Dominic Fischer MOORHEAD, MN Red River Center Ave 8 TH St N FARGO, ND
More informationCITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION
CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION Meeting of TO: FROM: Bijan Vaziri, Senior Transportation Engineer SUBJECT: Traffic Engineer Quarterly Report Traffic Engineering Activities January 2014
More information6.4 RECOMMENDED IMPROVEMENTS
6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides
More informationPUBLIC COMMENTS ITEMS FOR CONSIDERATION/ACTION
ATTACHMENT D Page 1 of 5 MINUTES OF THE COMPLETE STREETS COMMISSION (FORMERLY THE BICYCLE AND PEDESTRIAN ADVISORY COMMISSION) OF THE CITY OF LOS ALTOS, HELD ON WEDNESDAY, MAY 23, 2018 AT 7:00 P.M. AT THE
More informationTHE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010
CONCEPT DESIGN COMMUNITY MEETING 3 JANUARY 28, 2010 AGENDA INTRODUCTION COMMUNITY INPUT ROADWAY STUDIES STREETSCAPE DESIGN STATIONS DISCUSSION SUMMARY AND DISCUSSION NEXT STEPS CLOSE INTRODUCTION SCHEDULE
More informationOcean Park Boulevard Green Street Project Community Workshop
Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,
More informationCommunity Meeting: Proposed Development 4520 Penn Ave. Notes January 30, :30-8:30pm
Community Meeting: Proposed Development 4520 Penn Ave. Notes January 30, 2017 6:30-8:30pm Attendance: 17 community members Welcome and Introductions- Christina Howell Christina introduced herself as the
More informationTRAFFIC CALMING POLICY & PROCEDURES
TRAFFIC CALMING POLICY & PROCEDURES AS ADOPTED BY MONTCLAIR TOWNSHIP COUNCIL AUGUST 4, 2009 TABLE OF CONTENTS 1. INTRODUCTION... 2 Purpose... 2 Traffic Calming Definition... 2 Statement Of Township Council
More informationTraffic Impact Memorandum. May 22, 2018
BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared
More informationWest Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road
West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,
More informationPoint Defiance Park. Master Plan
Point Defiance Park Master Plan Public Participation 1/29, 2/26, 3/26 & 4/23 Owen Beach Ferry Zoo Fort Nisqually Mildred Street Pearl Street Triangle Hare & Hare Master Plan - 1911 2008 Concept Plan Comments
More informationTRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationREAR YARDS - There shall be a rear yard no less than forty (40) feet.
ARTICLE VII - RESIDENCE R-2 DISTRICT 700-PURPOSE - The purpose of the R-2 District is to permit the establishment of medium density one and two family dwellings. 701-PERMITTED USES - After obtaining a
More informationConstruction Staging Area Vaughan Road
REPORT FOR ACTION Construction Staging Area - 109 Vaughan Road Date: May 25, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationCity of Davis East Covell Corridor Plan
Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems
More informationAurora Urban Street Standards For Transit Oriented Developments and Urban Centers
Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers I. Purpose These standards will be applied to create a safe, comfortable, pleasant and pedestrian-friendly multi-modal
More informationReport. Typical Sections. City of Middleton, WI
Report Typical Sections City of Middleton, WI December 2006 Report for City of Middleton, Wisconsin Typical Sections repared by: Traffic Associates LLC and STRAND ASSOCIATES, INC. 910 West Wingra Drive
More informationNeighborhood Design. City Council Update June 4, 2018
Neighborhood Design City Council Update June 4, 2018 Stakeholder Committee Stakeholder Meetings (7 meetings) Planning Commission Update City Council Update Stakeholder Committee Review / Revisions Council
More informationWelcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.
Welcome Welcome to the Transportation Master Plan Addendum December 4, 2012 6:00 p.m. to 8:00 p.m. Please sign-in Background PIC#1 Public Information Centre #1 (PIC#1) was held on June 25, 2012. Feedback
More information