1 COUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA (707) FAX (707) DATE: February 17, 2012 TO: Board of Supervisors FROM: Blake Hillegas, Project Planner :6.71." SUBJECT: Recent correspondence regarding Paseo Vista; General Plan item 4 scheduled for February 21, 2012, PLP Despite substantial revisions to the project in response to two joint City/County Design Review Committee meetings there remain a number of concerns expressed by the City in the attached letter dated February 9, City staff is primarily concerned with the proposed street and sidewalk design and long term maintenance of a landscape strip adjacent to the Sonoma Marin Area Rail Transit (SMART) corridor. The City suggests that all public and private streets include planter strips with street trees and sidewalks on both sides of the street in accordance with their Design Guidelines. The design parameters for public streets are subject to adopted City street standards, while the design parameters for private streets are less stringent. As noted in the staff report, the project is within a City/County agreement area where the City agrees to provide water service through its Utility Certificate process. In order to obtain a City Utility Certificate, the project must comply with City development standards and the recommended conditions of approval include that requirement. While City staff have indicated several areas where the project does not fully comply with certain standards, the City also has a public improvement variance process that allows a developer to seek approval of a different configuration. The developer has indicated that he will seek such a variance from the City and is actively discussing these requirements with City staff. The County's conditions of approval require that the project meet City standards, which would include standards approved through the City's public improvement variance process. Proposed Public Streets and sidewalks The proposal includes the dedication of a half-street right-of-way on Dutton Avenue to include a future continuous left turn lane, a travel lane, a bike lane, a planter strip with street trees, and a sidewalk along the project's southerly frontage. A looped public street system (Street A, Vanderford Drive and Leo Drive) is provided through the project and connects to Dutton Avenue at tvlojocations. Vanderford and Leo Drives include planter strips with street trees and sidewalks on both sides of the street. Street A includes contiguous sidewalk on the north side of the street and a portion of the south side of the street. Public sidewalk is not provided for 11 lots on street A. Proposed public sidewalks in the project would connect to existing public sidewalks and crosswalks in the surrounding neighborhood and provide access to the local elementary school and neighborhood grocery store. Proposed Private Streets and sidewalks For internal private streets, contiguous sidewalk is provided on one side of the street, such that 36 units would access the on-site pedestrian circulation network by crossing the street. On private streets, street trees are proposed behind the contiguous sidewalk, or curb line where no sidewalk is proposed. Summary of City Comments and s The following is a summary of City comments as numbered in their letter: City Public Works - Engineering and Development Services 1. All public streets shall have sidewalks on both sides ofthe street. Private streets shall connect to public streets with City standard driveway approaches.
2 Date: 2/17/12 File No. PLP Page 2 The applicant is fully aware of City standards requiring sidewalk on both sides of public streets and intends to request a public improvement variance as part of their application for a City Utility Certificate for City water. The project is conditioned to comply with City standards, which would include the provision of City standard driveway approaches at the private street connections to public streets. 2. Dutton Avenue shall be improved to include a 7 foot portion ofa continuous left turn lane, a 12 foot travel lane, a 5 foot bike lane, a 8 foot parking lane, a 8 foot planter strip, and a 5 foot sidewalk. The current design meets this standard, except for the 8 foot parking lane. The applicant also intends to request a public improvement variance from the parking lane requirement. As proposed, the project would include a parking lane on Dutton Avenue until such time as a future continuous center turn lane is coordinated and installed on Dutton Avenue. The project meets City and County on-site parking requirements and parking requirements as prescribed by state density bonus law, without the need for additional parking on Dutton Avenue. 3. Having no sidewalks along the frontages ofhomes is problematic. ADA accessible sidewalks shall be. provided ifat all possible on all house frontages. There is some opportunity to provide additional sidewalks. However, the project would need to be redesigned.to accommodate sidewalk on all home frontages. 4. All streets shall meet City of Santa Rosa Public Street Standards or alternatively shall be private streets. The private streets shall be a minimum of24 feet wide curb to curb. Where the proposecl public streets do not comply with City standards (public sidewalk for 11 lots and parking lane on Dutton Avenue), the applicant intends to apply for a variance from. City public improvement standards as noted above. The proposed private streets would be 25 feet in width. 5. Please show typical revised street sections for the private and public streets. The current plans include revised typical street sections. 6. Perpendicular parking off of an interior street will only be allowed if the interior street will be private. The interior streets, where perpendicular parking is proposed, are private streets. City Fire Department 1. The project is located in the Roseland Fire Protection District and must meet Santa Rosa Fire Department standards for access and water supply. Condition #15 requires the project to comply with City of Santa Rosa Fire Department standards for access and water supply. 2. The configuration ofinternal private streets and limited parking, combined with the lack ofparking enforcement, will result in on-street parking and obstruction offire access. There is an opportunity to improve circulation by connecting dead end streets. The internal private street configuration and on-site parking has been designed to meet City and County
3 Date: 2/17/12 File No. PLP Page 3 standards. Condition #122 requires that private streets be posted with "no parking" signs and curbing be painted red. In addition, condition of approval #120 requires the project Conditions, Covenants, and Restrictions prohibit parking on private streets and require residents to maintain their garages for parking. The current design has reduced dead-end streets to 3 short private driveways. 3. A collector street or bifurcation ofthe project by Waterford Drive (neighborhood street to south) would provide a less circuitous route to remote portions ofthe development. The current street circulation plan is a result of a number of design revisions required by the joint City/County Design Review Committee to improve access throughout the site. Except for the absence of sidewalks and a proposed parking lane on Dutton Avenue as mentioned above, the proposed street circulation and configuration comply with City and County design standards. A collector street within the development would require substantial land area and reduce the number of affordable units inconsistent with affordable housing goals of both the County and City of Santa Rosa. 4. A temporary emergency vehicle access is needed in the Southeast corner ofthe development until such time the roadway is connected to the south.. The City Fire Department has confirmed that emergency vehicle access is no longer necessary because of improvements to on-site circulation. City Recreation, Parks, & Community Services Department The park strip along Vanderford Drive is unacceptable to the City unless it is a separate parcel with a.public access easement and the developer provides a means to fund the maintenance ofthe parcel. A back up maintenance alternative capable ofassuming maintenance funding shall be subject to approval by the City Attorney and Director ofrecreation and Parks. Recognizing that the park strip betweem Vanderford Drive and the SMART corridor would not be excepted by the County or City due to maintenance liability, condition # 102 requires that a public use easement be shown on the Final Map and recorded. The proposed Homeowners Association is required to maintain this property. 1. To be in compliance with the American Disabilities Act (ADA) the neighborhood park requires accessible parking. Consistent with the City of Santa Rosa General, the 1 acre public park is proposed to be offered for dedication, but would not be improved at this time. ADA accessibility would need to be considered at the time the park is developed. 2. On the neighborhood park site, provide stub-outs for electrical and potable water. The park site shall have positive drainage. Condition of approval #93 requires that irrigation and domestic water service be provided to the 1 acre park site. This condition can be amended to require electrical service also be provided. The applicant has agreed to provide positive drainage for the parks site. 3. No construction stock piles, spoils or storage shall be allowed on the neighborhood park site. A condition can be added that explicitly prohibits stock piles, spoils, or storage from occurring on the neighborhood park site during and after project construction.
4 Date: 2/17/12 File No. PLP Page4 Cc: Pete Parkinson, PRMD Director Jennifer Barrett, PRMD Deputy Director Dean Parsons, PRMD Project Review Manager Erin Morris, City Project Planner File Attachment: City of Santa Rosa Correspondence; February 9, 2012
5 February 9,2012 Charlie Traboulsi TDG Consulting Engineers 3289 Regional Parkway Santa Rosa, CA Dear Mr. Traboulsi: RE: City File No. UC Paseo Vista at 1960, 2000 and 2290 Dutton Avenue_.._ Assessor's Parcel Numbers: , -015 and , -046 Thank you for providing the final revised plans and a cover letter outlining the changes to the Paseo Vista project on January 16, City staff has reviewed the plans and we have identified significant issues with the redesigned project. Based on these issues, it is staff'sposition that the Utility Certificate cannot be approved unless the project is redesigned to meet City standards. (, COMMUNITY DEVELOPMENT - PLANNING The lack of sidewalks and planter strips in front of many of the proposed homes (located on both public and private streets) is inconsistent with the City's Design Guidelines for neighborhood design. The Design Guidelines state that streets should be designed to J accommodate the pedestrian as well as bicycle and automobile use. A planter strip with street' trees should be provided between the street and the sidewalk (see Section -1.3). The Design Guidelines also state that on-street parking should be provided as a buffer between traffic and the pedestrian. PUBLIC WORKS - ENGINEERING DEVELOPMENT SERVICES 1. Leo Drive, "Street A" and Vanderford Drive at a minimum shall be public streets. All public streets shall have sidewalks on both sides of the street. All private streets shall be separated from the public streets by standard driveway approaches per City Standard 250A. Please revise the Tentative Map showing driveway approaches to the private streets. 2. Dutton Avenue shall be improved to City of Santa Rosa Avenue Standards. Improvements to the project side of street centerline shall consist of a 7 foot portion of a continuous left turn lane, a 12 foot travel lane, a 5 foot bike lane and an 8 foot parking lane, for 32 feet from centerline to curb face. Right of way shall be 8 feet behind face of curb. A 5 foot sidewalk shall be constructed behind an 8 foot planter strip. 3. Having no sidewalks along the frontages of homes is problematic. ADA accessible 100 Santa Rosa Avenue, Room 3 Santa Rosa, CA Phone: (707) Fax: (707)
6 ....;.~;. Paseo Vista February 9, 2012 Page 2 of3 sidewalks shall be provided if at all possible on all house frontages. 4. All streets shall meet City of Santa Rosa Public Street Standards or alternatively shall be private streets. The private interior streets shalf be a minimum of 24 feet wide, curb to curb. 5. Please show typical revised street sections for the private and public streets. 6. Perpendicular parking off of an interior street will only be allowed if the interior street will be private. FIRE DEPARTMENT 1. This project is located in the Roseland Fire Protection District, with primary emergency response by Santa Rosa Fire Department Engine Companies 8 and 10. As such, it must. meet Santa Rosa Fire Department standards for fire apparatus access and water supply The configuration of internal streets presents several difficulties: a. "Private" streets lack Vehicle Code enforcement by CHP, Sheriff or Sant.a Rosa Police Department. Narrow streets, limited parking and scarce enforcement (only by complaint) create prolonged obstructions.to access routes.. b. Lack of available parking which will promot~ residents and visitors to park on the narrow streets. One vehicle will obstruct the narrow fire lane. c. There are opportunities to improve circulation which would avoid delays in emergency vehicle response times, Le. connecting dead end streets to entrance streets.. '.. 3. A collector street or bifurcation of the project by Waterford Drive would provide aless circuitous route to remote 'portions of the development. 4. A temporary EVA is needed in the SE corner of the development until such time the roadway is connected to the south. RECREATION, PARKS, & COMMUNITY SERVICES DEPARTMENT The "Public Park" strip along Vanderford Drive is unacceptable to the City Recreation and Parks Department unless the developer provides a means to fund the maintenance, such as a special tax district, CC&R's, or property owners associations. In order to make the Vanderford Drive strip acceptable, it must be a separate parcel with a public access easement and use easement. The easement may be conveyed to the City. The parcel(s) shall not be dedicated to the City. In the event the developer chooses a method of assuring perpetual maintenance which is subject to revocation by the property owners by an election or other means of termination, developers shall establish a backup alternative which will be capable of automatically assuming the maintenance funding obligation in the event the primary method is no longer available. The documents creating the method for permanent maintenance and any necessary backup alternative(s) shall be subject to and have been approved by the City Attorney and the Director of the Recreation and Parks and in place prior to city acceptance. The landscaping 100 Santa Rosa Avenue, Room 3 Santa Rosa, CA Phone: (107) Fax: (707)
7 improvement plans and standards for maintenance shall be subject to approval by the Department of Recreation and Parks. Paseo Vista February 9,2012 Page 3 of3 1. To be in compliance with the American Disability Act the neighborhood park requires accessible parking spaces. 2. On the neighborhood park site, provide stub-outs for electrical and potable water. The park site shall have positive drainage. 3. No construction stock piles, spoils or storage shall be allowed on neighborhood park site during any phase of construction.. Next Steps The proposed Utility Certificate cannot be approved because the project is inconsistent with City design standards and City Council Policy A resolution of denial of the Utility Certificate will be prepared by the end of next week. Sincerely, ~~ ERIN MORRIS Senior Planner --:" Cc: Lee Taylor, Public Works - Engineering Development Services Rob Sprinkle, Public Works - Traffic Engineering Mark Pedroia, Fire Department Lisa Grant, Recreation, Parks, and Community Services Rich Hovden, Recreation, Parks, and Community Services Lisa Bayanat, Police Department Blake Hillegas, County PRMD Mitch Simson, County PRMD 100 Santa Rosa Avenue, Room 3 Santa Rosa, CA Phone: (707) Fax: (707)
SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No
SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 15-031 WHEREAS, Transportation Code Division II, Section 909 authorizes the Director of Transportation to install and permit
More informationBPP / SUB
Development Services Department Project/File: Lead Agency: Site address: Millwell Place Subdivision/ BPP15-0031/ SUB15-0064 This is a preliminary plat application to allow for the development of 68 building
More informationBradford s Landing. Preliminary Plan Abandonment AB753 & AB754 MONTGOMERY COUNTY PLANNING DEPARTMENT
Bradford s Landing Preliminary Plan 120170060 Abandonment AB753 & AB754 1 Overview Staff recommends Approval of Preliminary Plan 120170060 with revised conditions and Adoption of the Resolution. 244 lots
More informationRoadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004
Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3
More informationACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP / PP-07-16/ RZ-12-16/ CPA-01-16/ A-07-16
Development Services Department DATE: December 14, 2016 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP16-0012/ PP-07-16/ Executive Summary: This is an annexation,
More informationStreet Paving and Sidewalk Policy
City Commission Policy 600 Street Paving and Sidewalk Policy DEPARTMENT: Public Works DATE ADOPTED: June 7, 1995 DATE OF LAST REVISION: December 10, 2014 Policy No. 600.01 AUTHORITY: PASS City of Tallahassee-Leon
More informationItem to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines
Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have
More informationDRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections
Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including
More information10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer
10A DATE: October 5, 2016 TO: PREPARED BY: SUBJECT: Pedestrian and Bicycle Advisory Committee Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer Discussion and Provide Comments, Associated
More informationThis chapter describes the proposed circulation system and transportation alternatives associated with
5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing
More information12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)
12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.
More informationDavid Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA
June 13, 2016 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 959811 RE: Fire Station 14 (DR16-128) Dear Mr.
More informationREMOVE BARRIERS TO, ENCOURAGE CREATION OF AND PROVIDE GUIDELINES FOR SAFE ROUTES (ALL DISTRICTS)
Ordinance 2009-98 AN ORDINANCE OF THE BOARD OF SUPERVISORS OF PIMA COUNTY, ARIZONA; RELATING TO ZONING; AMENDING THE PIMA COUNTY ZONING CODE TITLE 18 BY AMENDING SECTION 18.03.020 (DEFINITIONS) TO ADD
More information11/28/2016 VIA
11/28/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, Ca 95811 RE: Natomas Corporate Center Commercial Building
More informationWHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.
CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED
More informationTraffic Impact Memorandum. May 22, 2018
BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared
More informationWELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.
City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for
More information11/3/2017 VIA . RE: River Oaks Phase 2 (P17-051)
11/3/2017 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 98811 RE: River Oaks Phase 2 (P17-051) Dear Mr. Meltzer:
More informationFinal Sidewalk Feasibility Study
Garfield Drive From Anastasia Drive to Elizabeth Place City of South Daytona July 23, 2009 Final Sidewalk Feasibility Study Prepared for: Prepared by: Final Sidewalk Feasibility Study Garfield Drive 2
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets Division BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic and parking modifications to install
More informationThis Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.
4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency
More informationWest Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road
West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationRECOMMENDED MOTION: I MOVE TO PASS SECOND READING AND ADOPT ORDINANCE 556, TO REMOVE NE 173RD STREET FROM THE DESIGNATED PEDESTRIAN-ORIENTED STREETS.
CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 wvvw.ci.woodinville.wa.us To: Honorable City Council Date: 02/05/2013 From: Richard A. Leahy, City Manager
More informationSt. Francis Drive through the City of Santa Fe Corridor Study
VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City
More information7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811
7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:
More informationExhibit 1 PLANNING COMMISSION AGENDA ITEM
Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:
More informationTown of Siler City - Unified Development Ordinance ARTICLE XIV - Streets and Sidewalks
ARTICLE XIV - Streets and Sidewalks 193 Street Classification (a) In all new subdivisions, streets that are dedicated to public use shall be classified as provided in 193(b) (1) The classification shall
More informationCommunity Transportation Plan
Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The
More informationSan Jose Transportation Policy
San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland
More informationChapter 3 DESIGN SPECIFICATIONS
Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically
More informationRegional School District #19 Transportation Policy
Regional School District #19 Transportation Policy I. Scope of Policy Many students attending E.O. Smith High School are transported by local boards of education, through written agreements with those
More informationSection 7 Complete Green Street Guidelines DRAFT
Section 7 Complete Green Street Guidelines DRAFT 1 Section: 7.0 COMPLETE GREEN STREET GUIDELINES These guidelines serve as options to mitigate the environmental impact of a project as well as guide the
More informationDevelopment Services Department Project/File: Lead Agency: Site address: Fall Creek Subdivision (MPP-12-016) This is a preliminary plat application to subdivision approximately 110 acres into 296 residential
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More informationCommitted to Service
Development Services Department Committed to Service January 19, 2016 TO: FROM: SUBJECT: ACHD Board of Commissioners Mindy Wallace, AICP Planner III Kirsten Subdivision/BPP15-0023 Executive Summary: The
More information5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811
5/31/2016 VIA EMAIL Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: El Pollo Loco (P16-028) Dear Ms. Wacht: WALKSacramento has reviewed
More informationConfirmation of Levels of Service for Winter Maintenance of Bikeways, Windrow Opening, Sidewalks and AODA Compliance
STAFF REPORT ACTION REQUIRED Confirmation of Levels of Service for Winter Maintenance of Bikeways, Windrow Opening, Sidewalks and AODA Compliance Date: March 17, 2014 To: From: Wards: Reference Number:
More informationNon-Motorized Transportation 7-1
Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel
More informationCounty of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program
County of Greenville South Carolina Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program (rev) August 2008 I. PURPOSE The potential negative impacts from vehicular traffic
More informationRZC Appendix 8A Marymoor Subarea Street Requirements
RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS
More informationTransportation Policy Manual
March 4, 2013 EXHIBIT 2 Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area A Comprehensive Guide to Adopted Metropolitan Transportation Planning Organization for the
More informationCity of Seattle Edward B. Murray, Mayor
City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown
More informationChapter 2: Standards for Access, Non-Motorized, and Transit
Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More information12/13/2018 VIA
12/13/2018 VIA EMAIL Daniel Abbes, Assistant Planner City of Sacramento community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: Bruceville Apartments (P18-073) Dear Mr.
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton
More informationCity of Saline. Complete Streets Ordinance
City of Saline Complete Streets Ordinance September 13 and 20, 2010 CARLISLE/WORTMAN ASSOCIATES What Are Complete Streets? Complete streets are designed to serve everyonemotorists as well as pedestrians
More informationMAJOR THOROUGHFARE PLAN
MAJOR THOROUGHFARE PLAN Adopted by City Commission On November 21, 2005 Per Resolution No. 4420 Amendment to the Comprehensive Community Development Plan City of Hobbs City of Hobbs MAJOR THOROUGHFARE
More informationCOMPLETE STREETS CHECKLIST City of Philadelphia The City of Philadelphia's Complete Streets policies are designed ensure that city streets are safe, comfortable and convenient for people of all ages and
More informationRecommended Roadway Plan Section 2 - Land Development and Roadway Access
Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines
More informationAccess Management Regulations and Standards
Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving
More informationENFIELD BOARD OF EDUCATION ENFIELD, CONNECTICUT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 ENFIELD BOARD OF EDUCATION ENFIELD, CONNECTICUT TRANSPORTATION
More informationItem B1 November 19, 2009
November 19, 2009 Planning and Development Department Land Use Planning Division DATE: November 19, 2009 STAFF REPORT TO: FROM: SUBJECT: Members of the Transportation Commission Elizabeth Greene Senior
More informationBicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013
Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas
More informationSummary: Mercer County Princeton Avenue & Spruce Street Study January 2009
Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More informationINTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS
INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with
More information3.1 TRAFFIC CALMING PROCESS SUMMARY
SECTION 3 3.0 TRAFFIC CALMING 3.1 TRAFFIC CALMING PROCESS SUMMARY Traffic calming is a means in which to reduce speeds and minimize vehicular traffic on local neighborhood streets. Citizen involvement
More informationTraffic Circulation & Pedestrian Safety Study
Lyons Township High School North Campus La Grange, Illinois Parking Lot Vaughan Building N Main Building Prepared for: Prepared by: July 23, 2015 Contents List of Figures, iii 1. Introduction...1 2. Existing
More informationTown of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy
Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC
More information4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:
4404 St. Peter Street New Orleans, LA 70119 (504) 861-4022 info@bikeeasy.org April 13 th, 2014 To Whom It May Concern: We are writing to present a design solution for Lakeshore Drive. Earlier this month,
More information5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)
5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village
More informationTable of Contents City of Shelbyville Unified Development Ordinance
City of Shelbyville Unified Development Ordinance 2012, Bradley E. Johnson, AICP Table of Contents 1: Ordinance Foundation 1.01 Title... 1-2 1.02 Unified Development Ordinance... 1-2 1.03 Defined Words...
More informationMidway City Council 15 January 2019 Regular Meeting. Homestead Villas / Preliminary Approval
Midway City Council 15 January 2019 Regular Meeting Homestead Villas / Preliminary Approval CITY COUNCIL MEETING STAFF REPORT DATE OF MEETING: January 15, 2018 NAME OF PROJECT: NAME OF APPLICANT: AGENDA
More information4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811
4/14/2017 VIA EMAIL Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811 RE: Mack & Franklin Development (P17-016) Dear Ms. Lim:
More informationSECTION 1 - TRAFFIC PLANNING
SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification
More informationAPPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:
APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET I. GENERAL INFORMATION A. Project name: B. Subdivision/Site Development Plan/Grading Permit Name and Number: C. Project address: D. Project
More informationTHE SCHOOL DISTRICT OF TORRINGTON, CONNECTICUT TRANSPORTATION POLICY 6200
THE SCHOOL DISTRICT OF TORRINGTON, CONNECTICUT TRANSPORTATION Statement of Policy The Board of Education will provide transportation for students under provisions of state law and regulations. In determining
More informationTRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN North Central Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations
More informationC C C
C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.
More informationChapter 3.9 Timbercrest Elementary School. Volusia County MPO. November 2008
Chapter 3.9 Timbercrest Elementary School Deltona, FL Volusia County MPO November 2008 Volusia County MPO School Bicycle and Pedestrian Review Study, Phase 3B School Summary Timbercrest Elementary School
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More information122 Avenue: 107 Street to Fort Road
: 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed
More informationOmaha s Complete Streets Policy
Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets
More informationItem No. 14 Town of Atherton
Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY
More informationDevelopment Services Department Project/File: Lead Agency: Site address: Applicant: Memory Ranch / KPP15-0003 / 15-02-AN / 15-01-S The applicant is requesting annexation of approximately 10 acres, rezoning
More informationMINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY
MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationCURBSIDE ACTIVITY DESIGN
5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented
More informationCitywide Sidewalk and Crosswalk Programs
Citywide Sidewalk and Crosswalk Programs Council Meeting October 20, 2015 Presented by Rita Hu and Jamal Mahmoud Program Goals Implement the City s comprehensive plan. Provide pedestrian with safe walking
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationAugust 3, Bay Trail Connection With The Community
Ms. Lina Velasco, Senior Planner City of Richmond Planning Division P.O. Box 4046 Richmond, CA 94804 Dear Ms. Velasco: August 3, 2009 73 Belvedere Ave. Richmond, CA 94801 Phone/Fax: 510-235-2835 Email:tracbaytrail@earthlink.net
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationHidden Oaks Elementary School
Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More information6.4 RECOMMENDED IMPROVEMENTS
6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More information10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014
10/8/2014 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: CVS Pharmacy
More informationcomplete streets design and construction standards public primer City of Edmonton
complete streets design and construction standards public primer City of Edmonton introduction Complete Streets are streets for everyone: people who walk, wheel, bike, take transit, or drive. They are
More informationMontgomery County Life Sciences Center Loop Trail
Montgomery County Life Sciences Center Loop Trail Advisory Committee Meeting #1 February 10, 2015 Agenda 1. Project Background 2. Existing Conditions Analysis 3. Examples from Elsewhere 4. Discussion Project
More informationCrosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans. Presentation to Sanibel City Council July 16, 2013
Crosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans Presentation to Sanibel City Council July 16, 2013 Outline Crosswalk Policy Revisions Minimum Standards Goals and Objectives Pedestrian
More informationNew Planning Code Summary: Better Streets Plan and Curb Cut Restrictions
New ning Code Summary: Better Streets and Curb Cut Restrictions Amended Sections: 138.1, 155(r) and 303(y) Case Number: 2018-008862PCA Board File/Enactment #: 180914/277-18 Initiated by: Supervisors Kim
More informationEnvironment and Public Works Committee Presentation
Mixed Use Centers Complete Streets Guidelines Project Environment and Public Works Committee Presentation December 10, 2008 Project Objectives: Conduct an inter-departmental and agency process to study
More informationTENW Transportation Engineering NorthWest
TENW Transportation Engineering NorthWest MEMORANDUM DATE: May 16, 2018 PRELIMINARY DRAFT TO: FROM: SUBJECT: Angelie Stahlnecker City of Fircrest Jeff Schramm TENW Response to Comments from City of Tacoma
More information3.1 TRAFFIC CALMING PROCESS SUMMARY
SECTION 3 3.0 TRAFFIC CALMING 3.1 TRAFFIC CALMING PROCESS SUMMARY Traffic calming is a means in which to reduce speeds and minimize vehicular traffic on local neighborhood streets. Citizen involvement
More informationMission-Geneva Transportation Study Community Workshop 2 July 8, 2006
Community Workshop 2 July 8, 2006 Small Group Workbook 1 Basic Improvements on Mission Street Streetscape. Pedestrian-scale lighting; landscaping; community art on utility boxes; more (possibly unique)
More informationRE:comment on CF / Transportation Committee 7/27/11 Meeting I Apron Parking
John White RE:comment on CF10-1673/ Transportation Committee 7/27/11 Meeting I Apron Parking 1 message Christopher McKinnon Tue, Jul 26, 2011 at 5:11
More information