CITY OF ORINDA TRAFFIC SAFETY ADVISORY COMMITTEE MINUTES. July 16, 2018

Size: px
Start display at page:

Download "CITY OF ORINDA TRAFFIC SAFETY ADVISORY COMMITTEE MINUTES. July 16, 2018"

Transcription

1 CITY OF ORINDA TRAFFIC SAFETY ADVISORY COMMITTEE MINUTES July 16, 2018 A REGULAR MEETING OF THE TRAFFIC SAFETY ADVISORY COMMITTEE (TSAC) WAS HELD ON THE ABOVE DATE IN THE SARGE LITTLEHALE COMMUNITY ROOM, 22 ORINDA WAY, ORINDA, CALIFORNIA. A. CALL TO ORDER Chair Bisesto called the meeting to order at 7:00 p.m. B. ROLL CALL COMMITTEEMEMBERS: Laura Bisesto, Ivo Gustetich, Greg Haet, Lary Hanshaw, David Libby, Mark Roberts, Steve Schnier City Staff: Public Works and Engineering Services Director Larry Theis; Assistant Engineer Kevin McCourt; Police Officer Dave Sandy C. TRAFFIC SAFETY ADVISORY COMMITTEE MEETING MINUTES June 18, 2018 Committeemember Roberts requested that the meeting minutes be corrected to indicate that his absence was excused; he also noted the he would abstain from the motion as he had not been present at the June meeting. MOTION: By Committeemember Libby, seconded by Committeemember Hanshaw, to approve the TSAC Meeting Minutes of June 18, 2018, as amended. The motion carried by a voice vote of (Roberts abstain). D. PUBLIC FORUM - None E. DISCUSSION BIKE RODEO/BICYCLE SAFETY DAY Chair Bisesto advised that she had not yet sent out the Bike Rodeo survey; an Orinda resident has offered to help draft the survey, which Chair Bisesto will distribute through the Orinda Association, the local newspaper, , as well as other potential outlets. Director Theis offered that the Orinda Outlook could be used; also she may want to use the Orinda News, which publishes monthly and the Lamorinda Weekly, which publishes bi-weekly; while Nextdoor may be an option, a survey cannot be directly placed there, only a link to a survey. Chair Bisesto thought the use of a link would be a good idea, as is distributing on the Orinda Outlook. 1 July 16, 2018

2 This item was continued to the next TSAC meeting. F. DISCUSSION S/B CAMINO PABLO / HIGHWAY 24 UNDERPASS DIRECTIONAL SIGNAGE Assistant Engineer McCourt distributed a handout showing the mapped location, the westbound Highway 24 overpass, the BART vehicle overpass, the BART pedestrian overpass (used for the Banner program), Caltrans signage, and the arrow-marked vehicle lanes. Committeemember Libby noted that there is no signage on the westbound Highway 24 overpass; however, there is directional signage on the BART vehicle overpass for the Number 1 and Number 2 Lanes (left and middle), and a Caltrans sign in the right-of way for the Number 3 Lane. Committeemember Schnier recommended that since there is signage currently for the Number 1 and Number 2 Lanes on the BART vehicle overpass, there should be a third sign for the Number 3 Lane for consistency. Chair Bisesto questioned whether the City could install signage on the first overpass (Highway 24). Director Theis advised that signage cannot be installed on the Highway 24 overpass without permission from Caltrans; it would be difficult to install signage at that location because it would be necessary to prove that it would not significantly damage the bridge. Committeemember Roberts questioned the Thru Traffic Merge Left sign that is on the right-hand side of the street but meant for vehicles in the far left lane. Vehicles in the right lane are able to continue straight or merge onto Highway 24. Committeemember Henshaw questioned if signage could be installed in the center median. Director Theis stated that the center median is narrow and any signage would need to not impact traffic. Committeemember Schnier commented that drivers cannot see arrow markings on the ground fast enough, so it would be easier to look up at a sign; he asked if a sign could be painted instead of drilled onto the Highway 24 overpass. Director Theis advised that because it would be elevated without much light, any painted sign would be difficult to see. Officer Sandy warned that adding additional signage in a 40 mph section on Camino Pablo that also has an entrance and exit to BART and the Highway may overwhelm drivers and potentially increase collisions. 2 July 16, 2018

3 Committeemember Henshaw opined that earlier notification is better as the slow traffic in the left lane makes it difficult to switch to the faster moving middle lanes later in the decision making process. Officer Sandy pointed out that because traffic usually doesn t back up extremely far, this may not be an issue. Committeemember Roberts agreed with Officer Sandy that traffic at most is backed up to the pedestrian overpass in the evenings during rush hour. Committeemember Libby asked for clarification on whether the Committee wanted signs on Lane 3 and the BART pedestrian overpass. Director Theis and Officer Sandy mentioned that putting any signage on the BART pedestrian overpass could face opposition as many organizations use that area to hang banners; placing signage on the BART pedestrian overpass would require the Banner Program to be halted. Committeemember Libby stated that he would not make a recommendation to place signage on the westbound Highway 24 overpass based upon Officer Sandy s comments. G. TRAFFIC CALMING UPDATES AND ACTIONS 1. Briefing from Police Chief SLOW DOWN ORINDA/Traffic Citations Report Officer Sandy could not provide a printout of the DUI numbers; he stated that there were two DUIs in June and eight collisions; the number of collisions had decreased from the previous months. Vice-Chair Haet asked for information on a collision he had witnessed on Camino Pablo. Officer Sandy stated that a person traveling southbound fell asleep and crossed the double yellow line striking two other vehicles; the driver was likely traveling 65 to 70 mph; there were no serious injuries. Officer Sandy added that he had been splitting his time between traffic and covering for other officers; he has noticed an increase in pedestrian traffic downtown and in the Brookwood areas and has been giving tickets for not observing Stop signs to prevent pedestrian-vehicle collisions. Committeemember Libby asked what the age range for handheld devices is and if the Committee should do outreach to the high schools. Officer Sandy advised that that he has only written two cell phone tickets to high school students; the worst offenders likely range from 35 to 45 year old adults with children in the vehicle; roughly 70% of those drivers are texting on their phones. 3 July 16, 2018

4 2. Traffic Calming Request No new requests 3. Accessibility Issues Director Theis advised that the City is improving accessibility and safety around paths with added handrails to conform to the American with Disabilities Act (ADA). H. STAFF REPORT 1. Update Current Balance of Traffic Calming Improvements Program FY 2019 expenditures: $0 to date; $40,000 budget = remaining balance $40, Update Sundown Terrace Speed Cushion Installation Director Theis reported that the City Council approved an expenditure of $6,000 for four speed-cushions on Sundown Terrace. Assistant Engineer McCourt advised that the order for the speed cushions has been placed, but it could take up to two months for delivery. Director Theis clarified that the $6,000 is part of the $40,000, which leaves $34,000 remaining unencumbered; the $6,000 covers the speed cushions, the signage, and some of the stripping; installation will be scheduled upon receipt of the cushions. 3. Update Rheem Boulevard Traffic Calming Request Assistant Engineer McCourt advised that he had sent out another set of potential locations for placement of the radar feedback signs; thus far he has not received any comments from the residents; he would like the Neighborhood Action Team (NAT) to meet to finalize the two locations to present it to the Committee. 4. Update Orindawoods Drive Traffic Calming Request Assistant Engineer McCourt advised that the Orindawoods Drive traffic calming request had been withdrawn by the residents; resident Chet Martine had informed Assistant Engineer McCourt that he had submitted the request on behalf of other residents and they had been very motivated to have a crosswalk, the request for which had been denied; Mr. Martine emphasized his disappointment with the withdrawal. Director Theis noted that staff will send Mr. Martine an to confirm withdrawal of the request; he noted that Mr. Martine had presented police data from the Stalker radar device at the City Council meeting; his main point had been concern with the cut-through traffic along Orindawoods Drive coming off of Highway 24, which increases during certain times of day. Assistant Engineer McCourt stated that Mr. Martine wanted to know why the Stalker radar usage was not implemented more frequently. Chair Bisesto asked whether Mr. Martine wanted to use his own personal feedback sign. 4 July 16, 2018

5 Director Theis stated that Mr. Martine had purchased a feedback sign and wanted the City to install it; the City had declined; if the Committee did not wish to continue pursuing this item, staff would send an stating that no further action will be taken. Chair Bisesto confirmed that no further action would be taken. Director Theis stated that depending on how the Rheem Boulevard traffic calming request proceeds, and now that the Sundown Terrace traffic calming is complete, the Committee can begin engaging the neighborhoods new requests, based upon the order which they were received. 5. Donald Drive Signage and Speed Cushion Installation (ON HOLD) 6. Postponed Rheem Boulevard at Zander Drive 3-Way Stop Sign (ON HOLD) Director Theis advised that an intersection study is being completed by an outside consultant and will require review. 7. Postponed East Altarinda Road Signage (ON HOLD) No update. 8. Postponed Northwood Drive Speed Cushion Request (ON HOLD) No update. 9. Postponed Lost Valley Drive Signage/Striping/Radar Feedback Request (ON HOLD) No update. I. MATTERS INITIATED Vice-Chair Haet stated that the City Council had approved the consultant contract for the Downtown Streetscape Master Plan, which will try to improve the connection between the two sides of Orinda and improve the overall beauty and safety of the downtown; he asked if staff could give guidance on how the Committee could provide input on the project. Director Theis advised that there are significant transportation elements to the project and the Public Works and Engineering Services Department has requested that the project be named to indicate it is a transportation project; the main features that will be controversial are the installation of a roundabout in Santa Maria and Camino Pablo and removing one lane in the southbound direction on Camino Pablo and making it a bicycle lane. Vice-Chair Haet stated that the most controversial item would be closing off the freeway on-ramp to eastbound Highway 24. Director Theis stated a subset of residents have pushed to eliminate the on-ramp to eastbound Highway 24; this will likely be integrated because it does not largely affect the main plan of the project which is to improve connectivity to downtown for pedestrians and bicyclists. The City is currently trying to determine how to survey residents for 5 July 16, 2018

6 project input. If the Committee would like to comment on the plans, he will set up a time for the project team to attend a TSAC meeting, as there are currently no plans to gather such input; he advised the Committee to provide any input after draft designs are initially proposed. Committeemember Henshaw asked if Director Theis knew the time to expect an official draft. Director Theis responded that official draft designs may be prepared within four to six months. Director Theis stated that he does not know the exact scope, but he has no objection to the Planning Department involving the TSAC; residents can send in personal comments, however if the Committee wants to submit comments it would need to be agenized for one of the meetings. Chair Bisesto stated that she would like the project team to come to a TSAC meeting. Vice-Chair Haet said he was a little conflicted because the Committee is not an advocacy organization; however, it is good to get involved early in the process to be aware of what is being considered. Committeemember Henshaw stated that if the project team comes to a TSAC meeting too early in the process, there would not be anything to discuss. Committeemember Roberts stated that two residents had told him about the idea of allowing the northbound Moraga Way traffic onto the cloverleaf to get to eastbound Highway 24 three or four years ago. Director Theis noted that there is another group of residents requesting the City look into the idea and the Chamber of Commerce has been asked for input; based upon the data, there has not been many accidents at this location due to relatively slow traffic speed; there would most likely be an impact to business patrons, but not a large impact to pedestrians. Director Theis stated that there are many ideas that will be discussed on how to improve connectivity. Chair Bisesto asked about pedestrian access along Moraga Way. Director Theis stated that pedestrian access along Moraga Way will not be in the Downtown Streetscape Master Plan; the City recently implemented the first Residential Parking Program that will displace BART parkers from the Brookwood Road area; the City could possibly rent out church parking lots for residents that take BART. There is concern that there is not adequate parking for employees working in Theatre Square - the City may also initiate a parking permit program for them. The City will engage BART to 6 July 16, 2018

7 see if they intend to utilize a stack parking program to double park cars in their parking lot; although this may be unlikely, the Orinda BART Station is one of the least utilized stations, so they may be willing to consider the idea. Director Theis asked if the Committee wants to hold the regular August TSAC meeting. Committeemember Haet suggested that the TSAC could decide on whether to hold the August meeting depending upon what information could be provided by the Planning Department regarding the Downtown Streetscape Master Plan. Chair Bisesto asked if the Committee could re-assess possibly cancelling the August meeting in two weeks. Director Theis stated that the August meeting could be cancelled if they determine there is nothing new to discuss. K. ADJOURNMENT MOTION: By Committeemember Henshaw, seconded by Committeemember Libby, to adjourn the meeting at 7:57 p.m. The motion carried by unanimous voice vote. The next Regular Meeting of the Traffic Safety Advisory Committee will be 7:00 p.m., September 17, 2018, in the Sarge Littlehale Community Room, 22 Orinda Way, Orinda, California. Prepared by: K. McCourt 7 July 16, 2018

SARGE LITTLEHALE COMMUNITY ROOM 22 ORINDA WAY

SARGE LITTLEHALE COMMUNITY ROOM 22 ORINDA WAY **LOCATION OF MEETING ** SARGE LITTLEHALE COMMUNITY ROOM 22 ORINDA WAY CITY OF ORINDA 22 ORINDA WAY ORINDA, CA 94563 (925) 253-4200 A. Call to Order TRAFFIC SAFETY ADVISORY COMMITTEE AGENDA SPECIAL MEETING

More information

TRAFFIC SAFETY ADVISORY COMMITTEE AGENDA REGULAR MEETING MONDAY, MARCH 18, :00 P.M.

TRAFFIC SAFETY ADVISORY COMMITTEE AGENDA REGULAR MEETING MONDAY, MARCH 18, :00 P.M. **LOCATION OF MEETING ** SARGE LITTLEHALE COMMUNITY ROOM 22 ORINDA WAY CITY OF ORINDA 22 ORINDA WAY ORINDA, CA 94563 (925) 253-4200 A. Call to Order B. Roll Call TRAFFIC SAFETY ADVISORY COMMITTEE AGENDA

More information

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION City Hall - Council Chambers 1000 San Pablo Avenue, Albany, CA 94706 Wednesday, November 30, 2016, 7:00 PM 1. CALL TO ORDER The meeting was called to order

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

Moraga Pedestrian and Bicycle Master Plan Update and Wayfinding Plan. Citizens Advisory Committee Meeting July 21, 2015

Moraga Pedestrian and Bicycle Master Plan Update and Wayfinding Plan. Citizens Advisory Committee Meeting July 21, 2015 Moraga Pedestrian and Bicycle Master Plan Update and Wayfinding Plan Citizens Advisory Committee Meeting July 21, 2015 Planning process Inventory of existing conditions 2 of 21 Planning process Inventory

More information

City of Davis East Covell Corridor Plan

City of Davis East Covell Corridor Plan Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed

More information

AGENDA ITEM G-2 Public Works

AGENDA ITEM G-2 Public Works AGENDA ITEM G-2 Public Works STAFF REPORT City Council Meeting Date: 12/6/2016 Staff Report Number: 16-214-CC Regular Business: Approve the Oak Grove University Crane Bike Improvement Concept Plan, authorize

More information

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1 BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

Orinda Bicycle, Trails and Walkways Master Plan

Orinda Bicycle, Trails and Walkways Master Plan Orinda Bicycle, Trails and Walkways Master Plan Public Meeting October 15, 2008 Presented by: Ian Moore, Alta Lauren Ledbetter, Alta Bruce Wolff, Alta Introductions City of Orinda Monica Pacheco, Assistant

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT City of San Luis Obispo, News Release DATE: August 1, 2017 RELEASE: Immediate CONTACT: Luke Schwartz (805) 781-7190 Transportation Planner-Engineer, Public Works CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

Public Meeting #1 Comment Summary

Public Meeting #1 Comment Summary Public Meeting #1 Comment Summary This summary includes comments received on comment forms and during conversations between attendees and project team staff at the February 18, 2016 public open house.

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

PUBLIC COMMENTS ITEMS FOR CONSIDERATION/ACTION

PUBLIC COMMENTS ITEMS FOR CONSIDERATION/ACTION ATTACHMENT D Page 1 of 5 MINUTES OF THE COMPLETE STREETS COMMISSION (FORMERLY THE BICYCLE AND PEDESTRIAN ADVISORY COMMISSION) OF THE CITY OF LOS ALTOS, HELD ON WEDNESDAY, MAY 23, 2018 AT 7:00 P.M. AT THE

More information

TABLE OF CONTENTS. Executive Summary

TABLE OF CONTENTS. Executive Summary Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting

More information

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

Residential Traffic Calming Program Guide. Town of Ashland, Virginia Residential Traffic Calming Program Guide Town of Ashland, Virginia August 1, 2006 TABLE OF CONTENTS A. INTRODUCTION... 1 B. GOALS... 1 C. CRITERIA... 1 D. IDENTIFYING NEIGHBORHOOD TRAFFIC CONCERNS...

More information

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior

More information

WEDNESDAY, SEPTEMBER 6, :00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069

WEDNESDAY, SEPTEMBER 6, :00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069 MINUTES Meeting of the San Marcos Traffic Commission WEDNESDAY, SEPTEMBER 6, 2017 6:00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069 CALL TO ORDER: Vice Chairman Rico called the

More information

Borough of Danville, PA Traffic Calming Program Guidelines

Borough of Danville, PA Traffic Calming Program Guidelines Borough of Danville, PA Traffic Calming Program Guidelines Adopted by Borough Council on 1 INTRODUCTION Speeding Traffic is a major concern in the Borough of Danville because of its detrimental impacts

More information

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_ AGENDA ITEM SUMMARY AGENCY: City Council MEETING DATE: June 25, 2012 DEPARTMENT: Community Dev PREPARED BY: T Spade DEPT. DIR. APPROVAL: MJ CITY MGR. APPROVAL: LR PRESENTED BY: T Spade TITLE: RECEIVE REPORT

More information

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego

More information

Albany Shaker Road Corridor Study Public Meeting # 2

Albany Shaker Road Corridor Study Public Meeting # 2 Albany Shaker Road Corridor Study Public Meeting # 2 Scope / Meeting Purpose This project is a CDTC Linkage Study. The Linkage Program is designed to implement the adopted planning and investment principles

More information

Downey Road. Transportation Improvement Study

Downey Road. Transportation Improvement Study Downey Road Transportation Improvement Study Workshop 2 Participant Handbook Workshop 1 May 18 and 19, 2016 Workshop 2 June 23 and 28, 2016 Prepared By: City of Guelph Paradigm Transportation Solutions

More information

California DMV Test. Mark the correct answers

California DMV Test. Mark the correct answers California DMV Test Mark the correct answers 1. When you leave your lane to pass another vehicle, you know you have enough room to return to your driving lane when you: Have passed the other vehicle's

More information

Thank you for attending

Thank you for attending Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather

More information

URBANA TRAFFIC COMMISSION Tuesday, November 12, 2013

URBANA TRAFFIC COMMISSION Tuesday, November 12, 2013 URBANA TRAFFIC COMMISSION Tuesday, November 12, 2013 MEMBERS PRESENT: Michael Madigan, City Council Member, Ward 6, Chair Joe Smith, Senior Civil Engineer Pat Connolly, Police Chief MEMBERS ABSENT: None

More information

RM 620 FEASIBILITY STUDY

RM 620 FEASIBILITY STUDY RM 620 FEASIBILITY STUDY Sections 5 & 6 December 7, 2015 STUDY PROCESS Study Purpose and Goals The RM 620 Feasibility Study was launched by the Texas Department of Transportation (TxDOT) to analyze transportation

More information

TRAFFIC ACTION PLAN. Central Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Central Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Central Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

PISMO BEACH COUNCIL AGENDA REPORT

PISMO BEACH COUNCIL AGENDA REPORT PISMO BEACH COUNCIL AGENDA REPORT Agenda Item 8.E SUBJECT/TITLE: TRAFFIC SAFETY COMMITTEE RECOMMENDATIONS TO CITY COUNCIL RECOMMENDATION: Adopt a Resolution approving the Traffic Safety Committee s recommendation

More information

TOWN OF MORAGA. CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019

TOWN OF MORAGA. CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019 TOWN OF MORAGA CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019 Edric Kwan, Public Works Director April Malvino Miller, BKF Project Design Manager Shawn

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

Station 1: Street & Sidewalk Upgrades

Station 1: Street & Sidewalk Upgrades Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO

More information

Foothill Expressway Improvements Between El Monte and San Antonio

Foothill Expressway Improvements Between El Monte and San Antonio Foothill Expressway Improvements Between El Monte and San Antonio June 29, 2017 - Los Altos Community Meeting Introduction Project Background Agenda Visit Stations: Provide Input and Ask Questions Reconvene:

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

AGENDA CITY OF HALF MOON BAY BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE (BPAC) MEETING

AGENDA CITY OF HALF MOON BAY BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE (BPAC) MEETING AGENDA CITY OF HALF MOON BAY BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE (BPAC) MEETING Thursday, January 18, 2018 6:30 pm Emergency Operations Center 537 Kelly Avenue, Half Moon Bay, CA 94019 This agenda

More information

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders. Most decisions about whether or not to use transit involve time and cost, and most transit services are slower than travel by private vehicle. However, when transit is faster or nearly as fast as travel

More information

TRAFFIC ACTION PLAN. North Shoreview Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. North Shoreview Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN North Shoreview Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations

More information

San Rafael School District. Task Force Meeting Notes. November 5, 2012

San Rafael School District. Task Force Meeting Notes. November 5, 2012 San Rafael School District Task Force Meeting Notes November 5, 2012 Attendees (8) Wendi Kallins Program Director for Safe Routes to Schools; Laura Kelly Volunteer Liaison for Safe Routes to Schools; Leslie

More information

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts PROJECT OVERVIEW Project Goal and Description The goal of the is to increase pedestrian safety and comfort along Lower Great Highway by evaluating and implementing near- and medium-term pedestrian improvements

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

Community Transportation Plan

Community Transportation Plan Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The

More information

Traffic Signs and Signals

Traffic Signs and Signals CHAPTER FOUR Traffic Signs and Signals Traffic signs control traffic flow, making streets and highways safer for drivers, bicyclists and pedestrians. These signs, which are posted by the Indiana Department

More information

Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda

Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda CITY OF ROHNERT PARK Development Services Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda 5:30 PM, Monday, October 23, 2017 Rohnert Park City Hall, Conference Room 2A 130 Avram Avenue,

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

Identify the letter of the choice that best completes the statement or answers the question.

Identify the letter of the choice that best completes the statement or answers the question. Chapter 02 - Practice Questions Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1) No-parking zones often are near a. fire hydrants, curves,

More information

Key objectives of the survey were to gain a better understanding of:

Key objectives of the survey were to gain a better understanding of: 3 COMMUNITY INPUT Community input is an essential part of corridor studies. For the SR 87 corridor study, VTA staff conducted an extensive online survey of people living and commuting along the corridor.

More information

Poplar Avenue, US101 to Humboldt, Traffic Improvements Small Group Reports Community Workshop May 20, 2010

Poplar Avenue, US101 to Humboldt, Traffic Improvements Small Group Reports Community Workshop May 20, 2010 Poplar Avenue, US101 to Humboldt, Traffic Improvements Small Group Reports Community Workshop May 20, 2010 Group 1 Facilitated by Ken Chin, PUBLIC WORKS Latino population Schools SEMIs/Commercial Burlingame

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee

More information

Subject: Bike Project Field Trial Must Validate Bike Safety Claims

Subject: Bike Project Field Trial Must Validate Bike Safety Claims April 12, 2017 To: Menlo Park City Council Subject: Bike Project Field Trial Must Validate Bike Safety Claims A few weeks ago, a collision between my road bike and a white pick-up truck on Woodside Road

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards Replacement Project Community Connections Phase 2 Consultation Appendix 3: Open House Display Boards November 2016 Welcome! Welcome to the Replacement Project Public Open House We Want to Hear from You

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

COWETA HIGH SCHOOL AND EAST HIGHWAY 51 COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to

More information

Traffic Signal Phasing Study Summary & Staff Recommendations

Traffic Signal Phasing Study Summary & Staff Recommendations Traffic Signal Phasing Study Summary & Staff Recommendations Consultant Study by Skipper Consulting, Inc. Staff Committee Recommendations by Randy Pewitt, Executive Director of Emergency Mgt. and Safety

More information

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate

More information

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St) PROJECT OVERVIEW In 2014, San Francisco adopted Vision Zero as City policy, with a commitment to eliminate all traffic deaths in the City by 2024. nue Project Limits (Lincoln Way to St) Collision data

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

INNOVATIVE INTERSECTION DESIGN

INNOVATIVE INTERSECTION DESIGN INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

CITY OF ST. AUGUSTINE, FLORIDA. Lincolnville Community Redevelopment Area Steering Committee May 1, 2017

CITY OF ST. AUGUSTINE, FLORIDA. Lincolnville Community Redevelopment Area Steering Committee May 1, 2017 CITY OF ST. AUGUSTINE, FLORIDA Lincolnville Community Redevelopment Area Steering Committee The Lincolnville Community Redevelopment Steering Committee met in formal session at 7:00 P.M., Monday,, at the

More information

Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda

Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda CITY OF ROHNERT PARK Development Services Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda 5:30 PM, Monday, December 18, 2017 Rohnert Park City Hall, Conference Room 2A 130 Avram Avenue,

More information

PLANNING COMMISSION MEETING MINUTES May 17, 2017 CITY COUNCIL CHAMBER 7:00 P.M.

PLANNING COMMISSION MEETING MINUTES May 17, 2017 CITY COUNCIL CHAMBER 7:00 P.M. PLANNING COMMISSION MEETING MINUTES May 17, 2017 CITY COUNCIL CHAMBER 7:00 P.M. I. CALL TO ORDER The meeting was called to order at 7:05 p.m. II. ROLL CALL Present: Absent: Staff: C. Zuellig, A. Bedogne,

More information

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia TRAFFIC CALMING TOOLBOX For the residents of the City of Decatur, Georgia 2 City of Decatur Traffic Calming Toolbox Public Works Department 2635 Talley Street Decatur, GA 30030 404.377.5571 3 Welcome to

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

Santa Clara I-280 CORRIDOR STUDY

Santa Clara I-280 CORRIDOR STUDY Santa Clara I-280 CORRIDOR STUDY OCTOBER 2017 PREPARED BY: 1.1 Background The I-280 Corridor Study within Santa Clara County is a high-level highway planning study led by the Santa Clara VTA, in partnership

More information

Display Boards Including Five Refined Design Concepts

Display Boards Including Five Refined Design Concepts APPENDIX D Workshop Session 3 Sign-in sheets Agenda Booklet Display Boards Including Five Refined Design Concepts PowerPoint Presentation Questions Recorded Discussion of Preference Exercise AGENDA

More information

Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18)

Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18) Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18) Overview: On August 14, 2018, the Planning Commission considered plans for the middle section of the Anholm Bikeway Plan, focusing on the

More information

SFMTA PROJECT TIMELINE

SFMTA PROJECT TIMELINE SFMTA PROJECT TIMELIE Internal SFMTA Processes Opportunities for Public Input Data Collection and Analysis Car and bike volumes, safety (collision) data Roadway and intersection geometry June 2016 Pop

More information

Traffic Calming & Cyclists

Traffic Calming & Cyclists Traffic Calming & Cyclists In the planning, design, and operation of transportation facilities bicyclists and pedestrians should be included as a matter of routine and the decision not to accommodate them

More information

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking SAC Meeting Plan #3 for September Walking and 12, Biking 2018 » Draft Recommendations» Discussion» Next Steps Plan for Walking and Biking » Stakeholder and Public Outreach» Background data collection and

More information

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice By: Min Zhou, P.E., Principal/Vice President KOA Corporation 1 What is a Cycle Track (Class IV) TYPICAL BIKEWAY CLASSIFICATION CLASS

More information

Pennsylvania Avenue (CR 484) Design Alternatives Study

Pennsylvania Avenue (CR 484) Design Alternatives Study MEMORANDUM Pennsylvania Avenue (CR 484) Design Alternatives Study Prepared for: APRIL 2016 Prepared By TABLE OF CONTENTS Project Background... 2 Previous Concept... 2 Existing Conditions... 4 New Alternatives...

More information

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities I MOVE that the Council: AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities 1. INSTRUCT the Department of City Planning to amend the proposed Mobility Plan to include the following;

More information

City of Oakland Mayor's Commission on Persons with Disabilities (MCPD) Monday, February 26, Minutes

City of Oakland Mayor's Commission on Persons with Disabilities (MCPD) Monday, February 26, Minutes City of Oakland Mayor's Commission on Persons with Disabilities (MCPD) Monday, February 26, 2018 I. Call to Order at 5:34 p.m. Minutes II. Roll Call 9 Commissioners present: Garner, Gregory, Harrington,

More information

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes Minutes Approved as Submitted Date: 8/10/17 Initials: EC BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes June 8, 2017 The Bicycle and Trails Advisory Commission was called to order at 4:00 p.m.

More information

Ormsby Place Traffic Calming Pilot Project

Ormsby Place Traffic Calming Pilot Project About the project Traffic shortcutting is an issue in communities, with residents expressing concerns about safety and their quality of life. City Council has heard these concerns, and in response, has

More information

Prepared By: Town of Waxhaw Traffic Calming Policy

Prepared By: Town of Waxhaw Traffic Calming Policy Policy For Resolutions for Town Meetings Prepared By: Town Manager Michael McLaurin Director Greg Mahar CPD Waxhaw N.C. Community Planning &Development Administrative Department Department: Date Approved

More information

c. continue onto the expressway and use the next exit ramp.

c. continue onto the expressway and use the next exit ramp. Chapter 11 - Practice Questions Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1) The exit ramp you want to use is entirely blocked by traffic.

More information

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION 5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs

More information

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS PAGE 01 CHAPTER 12 INTERSECTIONS You will cross many intersections while driving. Intersections are especially dangerous because vehicles are crossing each other s driving path. Many crashes happen at

More information

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Speed Limits Study and Proposal. Public Input Session: 8/14/13 Speed Limits Study and Proposal Public Input Session: 8/14/13 Why is Decatur a unique place for this project? First Community Transportation Plan in the nation with a Health Impact Assessment. Strong sense

More information

Monroe Street Reconstruction

Monroe Street Reconstruction Total participants: 45+ Monroe Street Reconstruction Cross Section Workshop Notes September 29, 2016, Wingra School Workshop Orientation, Technical and Functional Considerations: The workshop began with

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

DRIVING ON EXPRESSWAYS/ INTERSTATE CHAPTER 11

DRIVING ON EXPRESSWAYS/ INTERSTATE CHAPTER 11 DRIVING ON EXPRESSWAYS/ INTERSTATE CHAPTER 11 SECTION 1- CHARACTERISTICS OF EXPRESSWAY DRIVING AN EXPRESSWAY IS A LIMITED-ACCESS OR CONTROLLED ACCESS HIGHWAY. VEHICLES CAN ONLY ENTER AND LEAVE AT INTERCHANGES.

More information

North Shore Transportation Improvement Strategy

North Shore Transportation Improvement Strategy North Shore Transportation Improvement Strategy Preliminary, Near-term Recommendation 2016 April Transportation Improvement Strategy (TIS) Comprehensive and Analytical A multi-modal transportation strategy

More information

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH OVERVIEW N 51 ST BOULEVARD N 51 ST BOULEVARD 12,100 44,700 W CAPITOL DRIVE 52,600

More information

COMMUNITY PARTICIPATION CHAPTER 8

COMMUNITY PARTICIPATION CHAPTER 8 COMMUNITY PARTICIPATION CHAPTER 8 8.1 ROLE OF THE CITY S BICYCLE ADVISORY COMMISION 8.2 BICYCLE TRANSPORTATION PLAN STAKEHOLDERS 8.2.1 Stakeholders 8.2.2 Stakeholders Letters of Recommendations 8.3 CITY

More information

PISMO BEACH COUNCIL AGENDA REPORT SUBJECT/TITLE: STATUS REPORT OF THE TRAFFIC SAFETY COMMITTEE SEPTEMBER 11 AND OCTOBER 6, 2014

PISMO BEACH COUNCIL AGENDA REPORT SUBJECT/TITLE: STATUS REPORT OF THE TRAFFIC SAFETY COMMITTEE SEPTEMBER 11 AND OCTOBER 6, 2014 PISMO BEACH COUNCIL AGENDA REPORT SUBJECT/TITLE: STATUS REPORT OF THE TRAFFIC SAFETY COMMITTEE SEPTEMBER 11 AND OCTOBER 6, 2014 RECOMMENDATION: On Consent Calendar, City Council to approve the recommendation

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

CLOSED. Highlights of the Final Concept Design:

CLOSED. Highlights of the Final Concept Design: The final Concept Design is the result of many months of listening, learning, creating, balancing, and understanding different needs and viewpoints, as well as incorporating technical requirements and

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information