IDOT Highway District 2:
|
|
- Irma Norris
- 5 years ago
- Views:
Transcription
1 State of Illinois Pat Quinn, Governor Illinois Department of Transportation Ann L. Schneider, Secretary IDOT Highway District 2: JODAVIESS COUNTY US 20 east of East Dubuque; one lane open in each direction as two bridge over the Sinsinawa River and Menominee Road are replaced. LEE COUNTY US 30 just west of I-39. Replacement of the bridge over Green River; one lane open and controlled by temporary traffic signals. OGLE COUNTY I-39 over I-88; one lane open in each direction as the bridges are being painted. ROCK ISLAND COUNTY IL 84 over a culvert at the south edge of Cordova is restricted to one lane and controlled by temporary traffic signals. I-80 over the Mississippi River at Rapids City. Westbound I-80 is restricted to one lane as repairs are made to the structure. STEPHENSON COUNTY US Business 20 east of Freeport. Traffic is restricted to one lane in each direction as the bridge deck is replaced on the structure carrying Bus US 20 over the CC&P RR. WINNEBAGO COUNTY I-90 from Rockton Road to the Wisconsin State line at South Beloit. Two lanes are open in each direction on the northbound lanes as the southbound pavement is being removed and replaced.
2 IL 2 (South Main Street) from north of Beltline Road to north of Harrison Avenue in southwest Rockford. Restricted to one lane open in each direction as the pavement is removed and replaced. IL 2 (North Main Street) from Elmwood Road to Latham Road north of Rockford. The east Latham Road approach is closed and traffic detoured on county highways as the intersection is reconstructed as part of the project to expand IL 2 from two lanes to four lanes. BUS US 20 (West State Street) from Sunset Avenue to Kent Creek in Rockford. Roadway is closed with detour route in place while the roadway reconstruction is completed. Detour is on City streets using Horace Ave, Preston Ave, Avon Street, Cedar Street and Wyman Ave. IDOT Highway District 1: COOK COUNTY New lane closure was implemented at Willow Road, between Shermer Road and Patriot Blvd in Northbrook and Glenview. One lane is open to traffic for next 6 weeks. IL Route 1 (Halsted St) at Ridge Road and north of 183 rd St. in Homewood one lane open in each direction. Bridge reconstruction. Expect delays. 71 CSX RR; Bridgeview; roadway reconstruction; roadway closed detour posted. Il 58 at New Wilke Road in Rolling Meadows has one lane open in each direction with a left turn lanes at signalized intersections. Walnut Lane in Schaumburg is northbound only between IL 58 and Bode. Hassell Road in Hoffman Estates closed to thru traffic from Kensington Lane to Park View Circle West detour posted. One lane in each direction open on Hassell Road from Barrington Road to Kensington Lane. Van Buren St. One lane northbound only from Williams to IL 58 in West Dundee. Willow Road from IL 43 (Waukegan Road) to I-94, there will be one lane in each direction open to through traffic. That includes the traffic on IL 43 (Waukegan Road) at Willow Road. Longmeadow Lane in Hanover Park is closed between IL 19 and Westchester Maple Avenue, from 47 th Street to Burlington Avenue in Brookfield. Road is closed to through traffic and detour signs are posted to direct traffic.
3 71 st street, from Roberts Road to Harlem avenue in Bridgeview grade separation improvement: road closed to all traffic; detour signs posted. 76 th Avenue, from 131 st Street to 127 th Street in Palos Heights Road closed to through traffic and detour signs are posted to direct traffic. Central Ave and I-55 one lane in each direction on Central. Exit Ramp from NB I-55 to Central and Entrance Ramp to SB I-55 are CLOSED Expect delays. Touhy Avenue bridge/i-94 (Edens Expressway) will be reduced to one lane in each direction until July Orchard Drive from Sauk Trail to US 30 I Park Forest is closed to traffic in the southbound direction. Northbound direction is opened to traffic. Detour signs are posed to direct traffic. Thorn Creek Drive over Thorn Creek in the Village of Park Forest. One lane will be shared for north bound and south bound equally; with traffic signals. Please watch traffic signals for your turn. Walnut Lane in Schaumburg is northbound only between IL 58 and Bode. IL Route 83, Western Ave./Dixie Highway to Kedzie Ave., one lane open in each direction. Expect delays. Holmes Way in Schaumburg is westbound only between Barrington Rd. and Meribel Court. Nightly Lane Closures Only on Friday July 5 th and Saturday July 6 th Dan Ryan (I-90/94) from 31 st to 95 th, EB & WB, Express lane 1 & 2 DUPAGE COUNTY IL Rte. 56 (Butterfield Road) between Herrick Road and IL Rte 59, 1 lane open in each direction. IL 53 Roadway reconstruction from Army Trail Rd to Elgin O Hare Expressway in Addison & Itasca; one lane open in each direction. IL route 38 is permanent closures leaving one lane in each direction from Kirk Road to east of Kress Road in Geneva and West Chicago. (in Kane and DuPage Counties) Joliet Street in West Chicago is closed between IL 59 and IL 38. KANE COUNTY IL Route 64 from west IL 59 to west of 7 th Ave., one lane open in each direction.
4 US 20 over McLean Blvd traffic change on Interchange reconstruction in Elgin; two lanes open in each direction. IL METRA RR Bridge rehabilitation in Elgin; one lane open in each direction. Van Buren in East Dundee is northbound traffic only between IL 72 and Williams Place. IL 47 over Virgil ditch #2 One lane traffic utilizing temporary traffic signals. LAKE COUNTY IL 132 (Grand Ave.) box culvert over Millennium Trail Pass detour consisting of lane shift will be in place through May IL 21 from south of IL 120 to south of IL 137; one lane of traffic in each direction on IL 21 and one lane of traffic in each direction on IL 137 at the intersection with IL 21. Permanent closures on I-94 from IL 173 to the Wisconsin State Line; three lanes will be open throughout the whole project. The IL 173 Bridge over I-94 will be reduced to one lane in each direction for the entire project. MCHENRY COUNTY IL 31 at IL 176 and at Terra Cotta Ave. in Crystal Lake, Nunde Township and unincorporated McHenry County, one lane open in each direction. Algonquin Bypass project, IL 31 from south Junction to north junction has 1 lane open in each direction. Algonquin Road (IL 62) will remain one lane open in each direction from Meyer Drive to IL 31. WILL COUNTY 5.39 miles of roadway reconstruction, there will be one lane open in each direction on US Rte. 30 in New Lenox, Mokena, and Frankfort miles of roadway reconstruction, one lane open in each direction on US 30 in Frankfort and Frankfort Township. Weber Road at Renwick Road one lane open in each direction. US 30 from Williams St. to Harlem Ave. (IL 43) in New Lenox, Frankfort & Mokena one lane open in each direction.
5 IDOT Highway District 3: BUREAU COUNTY I-80, MP 56 to MP 61, one lane closed in each direction for bridge replacements. FORD COUNTY Illinois 9, west of Gibson City, one lane closed for bridge repairs, traffic controlled by signals. Illinois 54, southwest of Onarga, one lane closed for culvert repairs. Traffic controlled by signals. Illinois 115, between Piper City and Illinois 116, closed for bridge deck replacements, detour posted. IROQUOIS COUNTY I-57, MP 300, between Clifton and Chebanse, one lane closed in each direction for bridge replacements. US 45/52, at Kankakee/Iroquois County Line, closed for culvert replacement, detour posted. LASALLE COUNTY US 6, just west of Seneca, closed for culvert replacement, detour posted. LIVINGSTON COUNTY Illinois 116, east edge of Pontiac, one lane closed for bridge repairs, traffic controlled by signals. IDOT Highway District 4: McDONOUGH US 67 is reduced to one lane in each direction just south Good Hope. TAZEWELL Eastbound and westbound Interstate 474 will be reduced to one lane west of Interstate 74 near Morton.
6 Near Morton, eastbound and westbound Interstate 74 will have one lane dedicated to through traffic and one lane dedicated to ramp traffic east of the Morton Avenue overpass. Near Morton, westbound Interstate 74 will be reduced from three lanes to two west of the Interstate 155 interchange and the ramp from northbound I-155 to westbound I-74 will be required to yield to oncoming traffic at the merger. Near Morton, the eastbound I-74 ramp to southbound I-155 will be reduced to one lane. PEORIA The ramp from WB I-474 to IL 116/Maxwell Road and the ramp from IL116/Maxwell Road to WB 474 will be closed. Detour routes are in effect and are marked. IDOT Highway District 5: CHAMPAIGN COUNTY Champaign County Highway 50 (Lake of the Woods Road) over I-74. Traffic signals are being utilized. Windsor Road over I-57. Traffic signals are being utilized. VERMILION COUNTY Illinois 49 over a tributary to Stoney Creek 3 miles northwest of Fithian. Traffic signals are being utilized. IDOT Highway District 6: LOGAN COUNTY Interstate 55 over the ICRR and Kickapoo Creek Overflow located north of IL 10 near Lincoln (MM 129 to 131); bridge reconstruction reduces northbound and southbound lanes to one lane. MACOUPIN COUNTY IL 16 over COOP Branch, located one mile east of Shipman. Bridge reconstruction reduces traffic to one lane controlled by traffic signals. IL 111 over Macoupin Creek, located 2.3 miles north of Summerville Road near Medora. Bridge rehabilitation reduces traffic to one lane controlled by traffic signals.
7 IDOT Highway District 7: COLES COUNTY Illinois Route 16 east of Charleston; bridge replacement; stage construction with one lane open, concrete barriers and traffic signals in place. Operations Illinois Route 16 west of Ashmore; box culvert work; stage construction with one lane open, barrier wall and traffic signals in place. CUMBERLAND COUNTY Interstate 70 between Greenup and Casey; major road reconstruction; stage construction with one lane open in each direction. Interstate 70 just west of Greenup; bridge removal and rehabilitation; stage construction with one lane open in each direction utilizing median crossovers and concrete barrier in place. EFFINGHAM COUNTY Interstate 70 at the Montrose Interchange; bridge rehabilitation; stage construction with one lane open in each direction and concrete barriers in place. Interstate 57/70 around Effingham; major road reconstruction; stage construction with two lanes open in each direction, concrete barriers in place and some ramp detours. MACON COUNTY Illinois Route 48 northeast of Decatur; box culvert replacement; stage construction with one lane open, concrete barriers and traffic signals in place. IDOT Highway District 8: MADISON COUNTY IL 157 structure over Sugar Creek, just north of Edwardsville. IL 157 will be restricted to one lane to replace the structure in stages. IL 143 structure over SIUE North Access Road, west of IL 159 in Edwardsville, will be restricted to one lane, in each direction, to allow the installation of the waterproof membrane on the concrete deck.
8 Lane reductions will be in both the north and southbound lanes of I-255 between Collinsville Road and Horseshoe Lake Road. Two of the three lanes will be closed at all times to complete necessary pavement repairs, resurfacing, and bridge work. US 67 will have two lanes open in the southbound lanes but only one in the northbound lanes between Godfrey and South of Delhi. ST. CLAIR COUNTY The right lane of southbound IL 203 will be closed to allow construction associated with the New Mississippi River Bridge. The ramp from westbound I-55/70 to northbound IL 3/eastbound I-64 will be closed to all traffic in E. St. Louis. A detour will be in place while the ramp is being reconstructed. The ramp from westbound I-64 to eastbound I-70/northbound I-55 will be closed to all traffic in E. St. Louis. A detour will be in place while the ramp is being reconstructed. 9 th Street will be closed to all traffic from St. Clair Avenue to Baugh Avenue in East St. Louis to replace the bridge carrying 9 th Street over I-64. A detour will be in place while the 9 th Street bridge is being reconstructed. 10 th Street over I-64 will be removed and closed indefinitely to all traffic from St. Clair Avenue to Baugh Avenue in East St. Louis. 9 th street, when completed, will become two-way traffic in order to continue the flow of traffic from St. Clair Avenue to Baugh Avenue in East St. Louis. A detour will be in place while the 9 th Street bridge is being reconstructed. IL 15/IL158, Belleville, both the eastbound and westbound on-ramps from IL 158 on to IL 15 will be closed through September 30, Closure needed for roundabout construction. IL 15/IL158, Belleville, the westbound IL 15 exit ramp on to IL 158 will be closed through September 30, Closure needed for roundabout construction. IL 13 under IL 15, Belleville, closed to all traffic through winter Closure needed to construct new structures. IL 15 bridges over IL 13, Belleville, one lane closed in each direction of bridges through winter This lane restriction is needed to construct the new Eastbound IL 15 structure. RANDOLPH COUNTY
9 150/IL 4, Steeleville, bridge over Cox Creek is reduced to one lane of traffic through Fall This lane restriction is needed to perform bridge repairs. IDOT Highway District 9: HARDIN IL 146. Two miles east of Elizabethtown. One lane traffic, controlled by signals for staged bridge repairs. JACKSON IL 13 -east edge of Murphysboro. Lane closures/shift with median crossover for bridge replacement. JEFFERSON I-64 eastbound lane and I-57 southbound lane. Traffic reduced to one lane prior to the I-57 / I-64 merge north of Mt. I-64 westbound lane. Traffic reduced to one lane prior to merge with NB I-57 south of Mt. I-57 southbound. Traffic reduced to one lane at entrance ramp from IL 15 at Mt. Union - Pulaski I-57. Mile Marker 19 to Mile Marker 25. Northbound driving lane closed for rubblization. IL 37 at Bonnie. One lane bridge construction, temporary signals in place. POPE IL 145 at intersection with IL 146. Traffic reduced to one lane controlled by temporary signals. IL 146. Seven miles northeast of Golconda. One lane traffic controlled by signals over Big Grand Pierre Creek for staged bridge repairs. WHITE IL 1. Two miles north of Carmi. One lane bridge construction, temporary signals in place. ###
IDOT Suspends Non-Emergency Road Work for Memorial Day Holiday Weekend Lanes Opened to Improve Traffic Flow
State of Illinois Bruce Rauner, Governor Illinois Department of Transportation Randall S. Blankenhorn, Acting Secretary FOR IMMEDIATE RELEASE: CONTACT: May 21, 2015 Brian Williamsen 309.671.4854 Carson
More information2016 IHDA Opportunity Areas (October 2015) County Census Tract (if Applicable) Expiration Year COOK
AHPAA 17031802900 2018 17031803005 2018 17031803500 2018 17031803901 2018 17031805107 2018 17031803008 2019 Arlington Heights 17031803012 2019 17031803400 2019 17031802801 2019 17031803016 2019 17031803017
More informationHighway Construction
Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;
More information09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:
MONTANA ROAD CONSTRUCTION REPORT 09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: US 191 - WARM SPRINGS CREEK BRIDGE MILE POST 10.0 TO 10.1 SITE IS 10 MILES NORTH OF LEWISTOWN, MT. CONTRACTOR
More informationPopulation Change during Trying Times: Illinois New Demographic Reality
Change during Trying Times: Illinois New Demographic Reality Dr. Matthew Hall IGPA Faculty Member Assistant Professor of Sociology, University of Illinois at Chicago Highlights 1. Illinois grew by 411,399
More informationWelcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.
BRIDGE REHABILITATION Welcome 53 Avenue Overpass over Whitemud Drive Rehabilitation Public Information Session Wednesday, March 9, 2016 4:30-8:00 p.m. Tonight you can: Learn about the 53 Avenue Overpass
More informationInterstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017
EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses
More information2015 Polychlorinated Biphenyl (PCB), Chlordane and Dioxin Fish Advisory
2015 Polychlorinated Biphenyl (PCB), Chlordane and Dioxin Fish Advisory Water Fish Species 1 meal/week 1 meal/month 6 meals/year Do Not Eat Border Waters *Lake Michigan (P) Cook and Lake counties Brown
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationFY ' 06 Apiary Inspection Report Illinois Department of Agriculture (July 1, 2005 through June 30, 2006)
FY ' 06 Apiary Inspection Report Illinois Department of Agriculture (July 1, 2005 through June 30, 2006) The Apiary Inspection Section of the Illinois Department of Agriculture administers the Illinois
More informationFY ' 04 Apiary Inspection Report Illinois Department of Agriculture (July 1, 2003 through June 30, 2004)
FY ' 04 Apiary Inspection Report Illinois Department Agriculture (July 1, 2003 through June 30, 2004) The Apiary Inspection Section the Illinois Department Agriculture administers the Illinois Bees and
More informationThe Illinois DA List
Brad Paisley Christian County Courthouse, 101 South Main Taylorville, IL 62568 Phone (217) 824-4747 Fax (217) 824-4815 Brian J. Towne Lasalle County 707 East Etna Road, Rm. 251 Ottawa, IL 61350 Phone (815)
More informationIL Route 71 Construction Update
100 Parkers Mill Oswego, IL. 60543 (630) 554-3618 4.20.16 IL 71 TRAFFIC ADVISORY: Tentatively scheduled for April 21st A new traffic pattern from Paradise to Wolf Crossing on IL 71 will be in use. The
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationILLINO PRODUCTION NOTE. University of Illinois at Urbana-Champaign Library Large-scale Digitization Project, 2007.
ILLINO S UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN PRODUCTION NOTE University of Illinois at Urbana-Champaign Library Large-scale Digitization Project,. ADMINISTRATIVE REPORT HUNTER ACTIVITY AND WILDLIFE
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationImportant Lane Closures for Jan , 2012
Jan. 19, 2011 CONTACT: Marcia McAllister T: 703-572-0506 C: 571-730-9117 marcia.mcallister@dullesmetro.com Important Lane Closures for Jan. 22-28, 2012 Bridge Construction along Median of Route 7 Continues,
More informationConstruction Update. Local Officials Briefing March 2016
Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS
More informationI-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.
RIDGELAND AVE OAK PARK AVE AUSTIN BLVD UP-RR BRC-RR ASHLAND AVE Study Area Map I-290 Phase I Study Area 294 UP RR Metra UP-W Illinois Prairie Path 38 Berkeley WOLF RD Hillside MANNHEIM RD Bellwood 290
More informationEXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative
EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationWelcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting.
Welcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting www.idothsr.org Corridor Map Summit Chicago Station Rehabilitation Underway Joliet New Station Open New Station Under Construction Dwight Pontiac
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationPasture Cash Rental Rates
$/acre Pasture Cash Rental Rates One of the most common questions fielded by Extension pertains to rental rates. In Illinois, pasture land can be variable not just county to county, but also farm to farm.
More informationPlanned Improvements from Sector & Area Plans that have been added to the MTP
Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle
More informationTRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE February 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-039 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationSTIP Scoping and Design Projects November Administrative Amendment
NW Dekalb US 36 1P3237 Scoping for pavement and shoulder improvements in the westbound lanes from east of Rte. 31 (north) to Rte. C. Project includes eastbound lanes shoulder improvements from Rte. 33
More informationUS 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)
US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationLINCOLNWOOD POLICE DEPARTMENT
LINCOLNWOOD POLICE DEPARTMENT 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 (847) 673-2167 Robert LaMantia Chief of Police September 19, 2017 Illinois Department of Transportation Traffic Operations Bureau
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationHarrah s Station Square Casino
Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationWELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.
WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm
More informationApproval of February 26, 2019 Meeting Minutes (Attachment A) Action Requested: Approval of Minutes
NORTHWEST MUNICIPAL CONFERENCE 1600 East Golf Road, Suite 0700 Des Plaines, Illinois 60016 (847) 296-9200 Fax (847) 296-9207 www.nwmc-cog.org MEMBERS Antioch Arlington Heights Bannockburn Barrington Bartlett
More informationCITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES
CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new
More information2016 Special Mercury Advisory
2016 Special Mercury Advisory Water Fish Species Size Women beyond childbearing age and males more than 15 years old Pregnant or nursing women, women of childbearing age, and children less than 15 years
More informationCORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION
CORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION 301 SW 4 th Street, Suite 240 Corvallis, Oregon 97333 Phone: 541-758-1911 Fax: 541-758-1903 www.corvallisareampo.org PROJECT ADVISORY COMMITTEE (PAC) Friday,
More informationLake Zurich Police Department Traffic Safety Division 200 Mohawk Trail Lake Zurich, IL 60047
Lake Zurich Police Department Traffic Safety Division 200 Mohawk Trail Lake Zurich, IL 60047 Telephone (847) 719-1690 Fax (847) 719-1691 January 15, 2015 This report is being submitted regarding the implementation
More informationBelow normal 7-day average streamflow of basins in the United States as compared to historical streamflow for the day of the year
Below normal 7-day average streamflow of basins in the United States as compared to historical streamflow for the day of the year Explanation - Percentile classes New low < 5 6-9 10-24 Extreme Severe Hydrologic
More informationWork Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager
Agenda Item # 4 Work Session Meeting Date September 8, 2015 Prepared By Approved By Daryl Braithwaite Public Works Director Suzanne R. Ludlow City Manager Discussion Item Background Temporary Neighborhood
More informationChicago Department of Transportation Bikeways - Year in Review
Chicago Department of Transportation 2015 - Year in Review -protected bike lane on Division Street east of Damen Avenue Table of Contents 2015 Achievements 01 Barrier- Bike Lanes 03 07 11 - Bike Lanes
More informationPurpose and Need Statement
Purpose and Need Statement Interstate 55 Interstate 355 (Veterans Memorial Tollway) to I-90/94 (Dan Ryan Expressway) October 2017 1.0 Purpose of the Proposed Action The proposed action is to provide an
More informationOverview. Updated pictures of the intersection are shown in Exhibits 1 thru 4, and the aerial photo provided by Google Maps is shown in Exhibit 5.
Overview The (here in after referred to as the Village ) is submitting the follow up interim RLRC Safety Report for the intersection of Lincoln Highway (US 30) at Orchard Drive. Additional reports, as
More informationPUBLIC INFORMATION MEETING
PUBLIC INFORMATION MEETING Bridge Rehabilitation Project Project Identification Number 5134.45 NY Route 5 Buffalo Skyway I-190 North Ramp, Pearl Street Ramp Wednesday, April 18, 2018 4:00 p.m. to 7:00
More informationNews Release Eastern Oregon Region 5
News Release Eastern Oregon Region 5 Morrow, Umatilla, Wallowa, Union, Baker, Grant, Harney, and Malheur Counties Oregon Department of Transportation Date: May 22, 2015 NR number: 150522015 For more information:
More informationA number of inferences have been drawn from the observations, each of which is discussed below.
Technical Memo To: Steve Gramm, Study Advisory Team From: Rick Laughlin Project: I-190/Silver St. CC: Date: 4/4/2011 Job No: RE: Special event observation HDR conducted an observation of special event
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationComprehensive Collection of Stakeholder Alternatives by Mode
2011 Illinois Department of Transportation Comprehensive Collection of Stakeholder Alternatives by Mode October 2009 January 2011 www.dot.il.gov www.eisenhowerexpressway.com FILEY RD FILEY RD IHB RR 2
More informationBlair/Williamson Intersection Expressed Needs
Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationWEEKLY HIGHWAY ALERT RICHMOND DISTRICT
HIGHWAY ALERT VirginiaDOT.org CONTACT: Public Affairs Oct.3, Richmondinfo@VirginiaDOT.org WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Road construction that is expected to cause delays from
More informationA: PLANNED P ROJECTS PROJECTS
Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of
More informationI-290 Phase I Study Village of Forest Park November 9, of 25
I-290 Phase I Study Village of Forest Park November 9, 2015 1 of 25 I-290 Study Area Reconstruction Section (9 miles) Re-striping Section (4 miles) 13 miles West of Mannheim Road to Racine Avenue Connects
More informationOffset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico
Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationTable 3. Summary of Proposed Roadway and Intersection Improvements. Suggested Sponsoring Agency Township Deficiency Noted
22nd 22nd 55th and Holmes Intersection s 1 Table 3 Summary of Proposed way and Intersection s Sponsoring Agency Deficiency Noted Briarcliffe Boulevard to Park Wheaton, Glen Ellyn MIL Poor roadway Glen
More informationState Route 160 (Blue Diamond Highway)
State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.
More informationTraffic Technical Environmental Study
Traffic Technical Environmental Study US Department of Transportation Federal Highway Administration New Jersey Department of Transportation Table of Contents I. Introduction Project Background. 1 Purpose
More informationINTERSTATE 540 IMPROVEMENT STUDY
INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY APRIL, 2006 INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY April, 2006 Prepared by Parsons Transportation Group
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More informationDIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)
More informationKalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission
FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort
More information2012 Capital Budget Capital Improvement Program
2012 Capital Budget Capital Improvement Program Agency Name: Eng. - Bicycle and Pedestrian Agency Number: 53L Capital Budget Future Year Estimates Project Name 2012 2013 2014 2015 2016 2017 1 Bikeways
More informationCHAPTER 20 SPEED ZONES
CHAPTER 20 SPEED ZONES 20.01 STATUTORY INVESTIGATION 20.02 EFFECTIVE DATE 20.03 SPEED LIMITS (1) Town of Greenbush (2) Town of Herman (3) Town of Holland (4) Town of Lima (5) Town of Mosel (6) Town of
More informationPERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3
PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 Install Remove Repair 613 IMPACT ATTENUATOR ACTIVITY DESCRIPTION Repair, install, remove and maintain
More informationMandan Commission Meeting August 2, 2016 Mandan City Hall
Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August
More informationDeck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge
Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge US 1 NB & Ramps Chelsea September 11, 2017 Maurice J. Tobin Memorial Bridge Big Mystic Truss Current Project Little Mystic Truss Toll
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More informationMASTER BICYCLE AND PEDESTRIAN PLAN
WELCOME! PLEASE FEEL FREE TO REVIEW THE EXHIBITS THE PRESENTATION WILL BEGIN AT 6:00 PM VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT EXISTING CONDITIONS REPORT AND PUBLIC MEETING WELCOME!
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More informationAGENDA. II. Approval of March 18, 2014 Meeting Minutes (Attachment A) Action requested: Approval of minutes
NORTHWEST MUNICIPAL CONFERENCE 1616 East Golf Road Des Plaines, Illinois 60016 (847) 296-9200 Fax (847) 296-9207 www.nwmc-cog.org A Regional Association of Illinois Municipalities and Townships Representing
More informationReplace Bridge 51 on Blackiston Mill Dr. over Silver Creek,
INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north
More informationSouthwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.
Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW
More informationPRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET
PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. MARKET I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT JANUARY 23, 2017 Public Meeting & Open House #2 TODAY S MEETING Purpose:
More informationinformation, please contact the District 9 Offices at or
O hio s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible
More informationWill County 2020 Transportation Framework Plan
Will County 2020 Transportation Framework Plan Adopted December 21, 2000 Resolution #00-481 Prepared By Barton-Aschman Associates, Inc. Chicago, Illinois December 2000 Contents Introduction, iv 1 Plan
More informationProject Application. Project Location: Salem Drive (Federal Route 1101)
Project Application General Information Municipality/Lead Agency: Hoffman Estates 1. Contact Person: Michael Hankey 2. Contact Phone: 847 252-5801 3. Contact Email: mike.hankey@hoffmanestates.org Project
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationInitial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions
Initial Alternatives Identification and Evaluation Report ovember 2011 APPEDIX B Summary of Stakeholder Single Mode Suggestions 2011 Illinois Department of Transportation Summary of Stakeholder Alternatives
More informationARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY
ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,
More informationChicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)
Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS) Marshall Community High School and Faraday Elementary School Recommended Improvements Agenda Goals Related Programs Project Location/Area
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May5 th through May 11 th, 2016 Road Maintenance This Week Striping Maintenance:
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationUniversity Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns
ped at signalized East of U-Bay North of Campus on Farley Ave./ U-Bay & Westbound Campus North of on Farley Ave./ U-Bay Near VA on MB1: Dual Eastbound Left-Turn Lanes Generally compatible with BRT and
More informationMay 4, Dear Mr. Thomas and Mr. Snyder,
Daniel Thomas, Principal Planner Christopher Snyder, County Engineer DuPage County Division of Transportation 421 N County Farm Road Wheaton, IL 60187 May 4, 2016 Dear Mr. Thomas and Mr. Snyder, On behalf
More informationForest Grove Neighbourhood Traffic Review Minutes
Forest Grove Neighbourhood Traffic Review Minutes Date: Thursday, November 1 st, 2018 Time: Location: 7:00 9:00 pm St. Volodymyr School Gym (302 Kellough Road, Saskatoon) Attendees: Name Kathy Dahl Mitch
More informationPurple Line Extension. La Brea Decking Phase II Bus Detours Metro 720/20, 212/312 LADOT DASH Fairfax, Antelope Valley Transit
Purple Line Extension La Brea Decking Phase II Bus Detours Metro 720/20, 212/312 LADOT DASH Fairfax, Antelope Valley Transit La Brea Station Decking Schedule *Dates and work activities subject to change
More informationCincinnati Dayton Rd Widening
Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge
More informationIowa Highway 58 Corridor Improvement Study
1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project
More informationI-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT
I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate
More informationDraft North Industrial Area-Wide Traffic Plan
Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block
More informationAccess Routes from US 101 to the Richmond San Rafael Bridge
Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated
More informationRoundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA
Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA VDOT & FHWA Roundabout Workshop September 17, 2013 Chris Tiesler, PE Presentation Outline US 15/US
More informationNorth Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary
Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare
More information