Wellington Public Transport Spine Study

Similar documents
Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Wellington s transport history. April 2016

2. Context. Existing framework. The context. The challenge. Transport Strategy

Regional Bus Priority

Keeping you connected

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Bus Rapid Transit Plans

Northern Beaches Bus Rapid Transit (BRT) Pre-Feasibility Study. Summary Report

VOLUME 5 Technology and Option Evaluation

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

Metropolitan Council Transportation Committee

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

Bus Riders of Saskatoon Meeting with City of Saskatoon Utility Services Department October 23, :30pm 2:30pm th Street West, Saskatoon

Durham Region Long Term Transit Strategy

Arterial Transitway Corridors Study. Ave

Transportation Master Plan Advisory Task Force

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

Aurora Corridor to E Line

Previous Transit Studies MTTF MEETING #

Community engagement guide May 2018

DON MILLS-EGLINTON Mobility Hub Profile

Spring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

South King County High-Capacity Transit Corridor Study

ABERDEEN: CITY OF THE FUTURE

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

Arterial Transitway Corridors Study

Technical Report 1: Description of Options

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

DON MILLS-SHEPPARD Mobility Hub Profile

NEWMARKET CENTRE Mobility Hub Profile

Standing Committee on Policy and Strategic Priorities

Appendix 1 Transit Network Analysis

Regional Cycling Plan

Joseph Iacobucci. James Czarnecky, AICP

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19

Appendix A-K Public Information Centre 2 Materials

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

2017 The first stage of the DFS was completed and Interim Public Consultation is launched Study Background

Bristol City Council has produced a draft Bristol Transport Strategy document.

Light Rail Transit in North Central Calgary Open House and Workshop Summary. Summer 2013

DUNDAS WEST-BLOOR Mobility Hub Profile

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

Evaluation of Alternatives and Final Screening Results November 20 and 21, 2013

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Arterial Transitway Corridors Study. Sept. 26, 2011

North Coast Corridor:

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

Findings: Socio-economical and networking issues

Seattle Transit Master Plan

Nottingham Cycle City Frequently Asked Questions

Public Consultation Centre For. Transportation Master Plan Update. Information Package

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh

I-66 Corridor Improvements Route 15 to I-495. November 2014

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

NORTH YORK CENTRE Mobility Hub Profile

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Bus and Transit Lane Review Update

York Scarborough Bridge Economic Appraisal Update Technical Note

Note this page is intentionally left blank for page layout purposes

Park & Ride Implications for TRICS Users. TRICS UGM, June 2009

Cambridge Access and Capacity Study

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

to the Public Information Centre for the Downtown Traffic Study

MANNERS/DIXON/VICTORIA/WlLLlS STREETS TRAFFIC AND STREETSCAPE IMPROVEMENTS

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Operational Comparison of Transit Signal Priority Strategies

Final Study Recommendations AMES TRANSIT FEASIBILITY STUDY. For Public Review and Comment. October Ames Transit Feasibility Study

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Frequently Asked Questions (FAQ)

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

Public Event 1 Community Workshops

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

Sacramento Grid 2.0. The Downtown Transportation Study

July 23, Transit Workshop

5. RUNNINGWAY GUIDELINES

Priced Managed Lanes in America. October 2013

Bus Lanes Improving Travel Time or Reliability

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

BRT in Scandinavia. Henrik Juul Vestergaard Project manager, Public transport planning

CITY PLANNING ADMINISTRATION. The walkable city. Michael Erman, City of Stockholm Vienna/CORP 2012, 15 May 2012

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

REYKJAVÍK - NEW MOBILITY OPTIONS

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

PIMMS CAPITAL Import Visit 2012 Ostrava Czech Republic 17 th January 2012

Anzac Street West Precinct Plan Change Integrated Transport Assessment - Appendices. National and Regional Strategic Assessment

Regional Transportation Needs Within Southeastern Wisconsin

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

Charlotte Region Fast Lanes Study Phase III

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

Service Business Plan

Transcription:

Wellington Public Transport Spine Study

Study purpose Feasibility study Options for a high quality, high frequency PT system Key action from Ngauranga to Airport Corridor Plan (2008) Long-term outlook

Study area Focus Railway station to Hospital Considered possible connections north and south Study area extended to south-east to Kilbirnie

Study process

Study engagement (so far) Surveys - online, on-street, focus groups, stakeholder interviews Reference Group Transport Operator Advisory Group Emails to wider stakeholder group All reports on website as developed Now in public consultation phase until 30 Sept

Options Full range of options considered A range of route options also considered Multi-criteria analysis to refine options to a short list Shortlist options compared to a base case

Short list mode options Bus Priority o Standard buses o 64 passenger capacity o Electric or hybrid or diesel Bus Rapid Transit o Modern low floor articulated/double-decker buses o 100+ passenger capacity o Electric or hybrid or diesel Light Rail Transit o Modern low-floor trams o 180+ passenger capacity o Electric (underground induction or overhead wires)

Short list route options Extensions to north (ie Johnsonville) considered but limited benefits and high costs Extension to south found potential for mode shift, travel time savings, and improved integration between modes Eastern sub-options considered: - Via Haitaitai bus tunnel to Kilbirnie - Via Constable Street to Kilbirnie - Via new tunnel from the Zoo to Kilbirnie - Via SH1 corridor (Mt. Victoria tunnels) to Kilbirnie

Short list route alignments Bus Priority BRT LRT

Short list evaluation Physical feasibility assessment of routes Transport modelling Costing capital and operational Social, environmental assessment Economic assessment

Physical feasibility Tested ability to fit within road reserve and through key pinch points Options modified to minimise impacts where possible Key impact = loss of on-street parking Limited property impacts along some sections of the route. Significant along SH1 corridor (ie Town Belt)

Benefits of options Passenger numbers (region) Ref Case Bus Priority BRT LRT 2021 35600 +200 +700 +200 2031 34000 +300 +800 +300 2041 35200 +300 +900 +400 Travel times Kilbirnie to rail station (total mins) 24-3 -11-11 Newtown to rail station 18-3 -6-7 PT user benefits $35m $95m $56m Highway benefits (negative) -$18m -$23m -$31m TOTAL NPV benefits $21m $90m $31m

Other benefits Journey time reliability Ref Case Bus Priority BRT LRT Low Moderate High High Golden Mile capacity (Number of PT vehicles/hour in am peak hour at Johnston Street both directions) Ref Case Bus Priority BRT LRT 168 168 106 100

Estimated costs Capital (millions) Bus Priority BRT LRT Changes to existing roads $49 $145 $235 LRT infrastructure $0 $0 $458 Vehicles $0 $28 $88 Design and contingencies $10 $35 $155 Total $59 $207 $938 Operational Km/annum (million) Bus BRT LRT $/annum (million) Reference Case 18.5 $88 Difference Bus Priority 18.5 $88 0 Bus Rapid Transit 16.2 1.6 $82-6 Light Rail Transit 17.4 0.8 $89 +1

Capital costs in detail ($m) Description Bus Priority BRT LRT Road alterations $26 $76 $94 Alterations to existing services $2 $15 $52 Traffic management $6 $19 $25 Rails and power 0 0 $119 Depots 0 0 $23 Tunnels 0 0 $316 General Allowances $15 $34 $65 Vehicles $0 $28 $88 Design and contingencies $10 (20%) $35 (20%) $156 (20%) TOTAL $59 $207 $938

Economic assessment Evaluation Framework Bus Priority BRT LRT EEM 0.57 0.87 0.05 EEM (new update) 0.81 1.49 0.05 Alternative approach 0.67 1.55 0.10 Range of BCRs depending on different values applied Wider economic benefits considered

Staging of implementation Bus Priority BRT LRT Existing road layout Independent of RoNS (2014-2022) Demand by 2021 Incremental Implementation Comprehensive Implementation Recommended Timeframe ASAP 2021-22 2021-22

Summary of key findings To grow PT mode share requires further investment Opportunities to grow mode share from south and east Wellington BRT has highest benefits, then LRT then Bus Priority LRT has highest costs (5x more than BRT) Bus Priority and BRT can be developed incrementally, LRT best developed comprehensively Technically feasible to build all options. Significant property impacts from BRT/LRT along SH1 corridor, and additional impacts from LRT tunnel Need to support preferred option by aligning policy (ie land use and parking) and ensure other earlier transport projects are designed to accomodate

Finding a Preferred Option Regional Transport Committee agreed its preferred option is BRT (subject to consultation) Public consultation July-Sept (closes 30 Sept) Submissions and hearing (Dec) www.gw.govt.nz/ptspinestudy for more details

Potential BRT Network Existing bus route BRT route Feeder bus route Interchange BRT

Potential impacts on Your Neighbourhood Depends on final option, route and detailed design, study only at concept feasibility level Preferred option (BRT) likely to provide for extended services to other suburbs like Island Bay, Miramar and Karori Some existing bus routes would become feeder services & transfers and interchange facilities required Could be some loss of on-street parking along the core routes Will deliver much faster, more reliable, higher quality public transport for most people in Wellington City

Funding Options Annual funding need: BP $2.7m; BRT $5.0m; LRT $47m (This takes account of capital and operational costs, fare revenue, interest and inflation) Options analysed: fares, rates, car park levies, road pricing, development contributions, value capture, Rates or fares unable to fund LRT (would require 50% increase in regional rates) Broad based tools (road pricing, fuel tax) generate most funding Corridor specific tools (development contributions, value capture) generate less funding

Integration with other transport projects PT Spine Study outcomes are interrelated with a number of other transport projects GWRC, WCC, NZTA are working together to ensure integrated approach to transport network development in Wellington

Strategic road network projects Improvements to state highway signalled in N2A Corridor Plan Basin Bridge project Buckle Street Underpass Inner City Bypass upgrades Mt Victoria Tunnel Duplication/Ruahine Street Upgrade

Links with strategic road network projects Public Transport Spine Study relies on Basin Bridge to separate E/W and N/S traffic and free up PT routes Mt Victoria Tunnel Duplication work slowed down to incorporate Public Transport Spine Study proposals for Ruahine Street and Wellington Road

Links with other projects Coordinated implementation with: WCC: Bus priority plan Transport Strategy review Cycle lane development (ie Island Bay to CBD) GWRC: Wellington Bus Review New bus service contracts