US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Similar documents
David Agacinski FDOT District One Bicycle & Pedestrian Coordinator Daniels Parkway Ft. Myers, Florida 33913

US 41 (Tamiami Trail) Corridor Study. Roadway Safety Audit

Thank you for attending

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Waterford Lakes Small Area Study

MASTER BICYCLE AND PEDESTRIAN PLAN

Chapter 5 Future Transportation

North Shore Transportation Improvement Strategy

Performance Criteria for 2035 Long Range Transportation Plan

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Multimodal Analysis in the 2010 Highway Capacity Manual

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Transportation Planning Division

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

WELCOME Public Information Centre

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Board of Supervisors February 27, 2017

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Complete Streets: Planning, Policy & Performance

Executive Summary Route 30 Corridor Master Plan

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Road Diets FDOT Process

Plant City Walk-Bike Plan

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

The current document is revised based on the comments received on:

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

C C C

OCALA/MARION TPO CITY OF BELLEVIEW CORRIDOR PLAN STUDY PRESENTATION TO THE BELLEVIEW CITY COMMISSION JANUARY 25, :00 PM

Project Description Form 8EE

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Bay to Bay Boulevard Complete Streets Project

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Waterford Lakes Small Area Study

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

Broadway Complete Streets Project

Welcome! San Jose Avenue Open House August 25, 2015

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Moving Towards Complete Streets MMLOS Applications

CORAL RIDGE COUNTRY CLUB ESTATES NEIGHBORHOOD MOBILITY MASTERPLAN

US 1 Express Lanes Public Kick-Off Meeting

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Lincoln Avenue Road Diet Trial

Financial Project ID No(s).: and ETDM No(s).: and 14181

Route 29 Solutions Projects

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

Completing the Vision

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

Albany Shaker Road Corridor Study Public Meeting # 2

Central Avenue Corridor Study FPID Number:

Arlington Public Schools Abingdon Elementary School Site Evaluation Preliminary Transportation Findings

2016 TELL THE TPO SURVEY

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Santa Clara I-280 CORRIDOR STUDY

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Key objectives of the survey were to gain a better understanding of:

Edenbrook Hill Drive Traffic Calming Study

CHAPTER 3: Vision Statement and Goals

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Terwillegar Drive Expressway Draft Concept Plan

TABLE OF CONTENTS. Executive Summary

TRANSPORTATION NEEDS ASSESSMENT

Upper Market Street Bike Lane Project

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

APPENDIX D. May 22, 2002 Open House Summary and Materials

RM 620 FEASIBILITY STUDY

2.0 LANE WIDTHS GUIDELINE

Completing the Street: Denning Drive

BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Parks Highway: MP Lucus Road to Big Lake Road

Strategic Plan for Active Mobility Phase I: Bicycle Mobility

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

CONNECTING PEOPLE TO PLACES

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Community Transportation Plan

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Transcription:

41 US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue EXECUTIVE SUMMARY DRAFT FEBRUARY 2019 Project Overview The US 41 Complete Streets Corridor Planning Study, from University Parkway to Whitfield Avenue, evaluated existing multimodal corridor needs, existing and future regional travel needs, safety, and the community vision and desires for this portion of the US 41/Tamiami Trail Scenic Highway. Based upon an understanding of regional and corridor needs, the study team identified a system of intersection and cross-section modifications that support the goals identified by the local stakeholders. Project Goals Improve comfort and safety for all users Improve access to destinations along the corridor USF Sarasota- Manatee Maintain mobility through the corridor Beautify the corridor New College of Florida Study Corridor County Line Limits Asolo Repertory Theatre The John and Mable Ringling Museum of Art 1

Existing & Future Conditions VEHICULAR TRAFFIC C/F B/D B/C B/B B/D B/B F/F D/F ANNUAL AVERAGE DAILY TRAFFIC 2017 39,000 2040 48,000 VEHICULAR TRAFFIC ESTIMATED TO GROW 0.9% ANNUALLY In general, the corridor provides acceptable vehicular Level of Service (LOS). Motorists experience delays during the AM and PM periods, most notably at the intersection with University Parkway. Based on data reported by Google (TM) Map travel times, during a typical weekday in March 2018 from south of University Parkway intersection through Tallevast Road, travel times vary from 4.7 minutes to 6.5 minutes. Traffic Signal Study Limits VEHICULAR LOS AM/PM Existing (2017) VEHICULAR LOS AM/PM Future (2040) X/X X/X The Sarasota/Manatee MPO Bicycle, Pedestrian and Trails Master Plan (2013) identifies two multi-use trail projects within the study area: MULTIMODAL TRAVEL Bayshore Treewalk to Sarasota Bay Trail Corridor (rank 10) 5 miles from SR 70 to Sarasota County line, parallel to the study corridor. University Parkway Sarasota Bay Trail 13 miles from University Parkway at Braden River Trail to Bayshore Gardens at El Conquistador. The trail crosses US 41. 2 EXISTING CORRIDORWIDE MULTIMODAL LEVEL OF SERVICE BICYCLE = C PEDESTRIANS = D TRANSIT = C The bicycle and pedestrian LOS are calculated using ARTPLAN software based on HCM methodologies. Existing Shoulder Proposed Trail/Shared Use Path Existing Bike Lanes Existing Trail/Shared Use Path Existing Shoulder Proposed Trail/Shared Use Path

Existing & Future Conditions SAFETY VEHICULAR TRAVEL SPEED 64 MPH 85TH PERCENTILE TRAVEL SPEED MEASURED NEAR SOMERSET AVENUE Speeding is an issue along the corridor. While the posted speed varies from 45 MPH to 50 MPH, the 85th percentile travel speed near Somerset Avenue was measured at 64 MPH. During the days that speed data was collected, over 600 vehicles a day were traveling over 70 MPH near Somerset Avenue. 50 MPH Posted Speed 45 MPH Posted Speed County Line CRASH HISTORY (2011-2015) Issues identified from the crash data include: Lighting - A high proportion of non-daylight crashes occur at the University Parkway intersection, US 41 from University Parkway to College Drive/General Spaatz Boulevard, US 41 from Braden Avenue to Tallevast Road, and US 41 from Tallevast Road to Whitfield Avenue Lack of Raised Median - A high proportion of left-turn crashes and pedestrian/bicycle crashes occur on the segment of US 41 from Edwards Drive to Braden Avenue Speeding - A high proportion of run-off-the-road crashes occur on the segment of US 41 from Braden Avenue to Tallevast Road Concentrations of crashes at University Parkway - A high number of crashes occur at the intersection of US 41 and University Parkway 3

Existing & Future Conditions SUMMARY OF ISSUES & OPPORTUNITIES SARA BAY COUNTRY CLUB 41 Tallevast Rd SPEEDING IN NORTHBOUND DIRECTION McARTHUR PARK WHITFIELD PARK 85th PERCENTILE SPEED IN NORTHBOUND DIRECTION 64 MPH Number of Vehicles Traveling Over 70 MPH (daily) >600 INTERSECTION FAILING DURING PM PEAK PERIOD EXISTING LOS in PM F peak hour IMPROVE ACCESS TO USFSM USF Sarasota-Manatee Sarasota-Bradenton International Airport IMPROVE MULTIMODAL CONNECTIONS THROUGHOUT THE CORRIDOR, WITH EMPHASIS ON CONNECTING USFSM AND NEW COLLEGE HIGH CRASH INTERSECTION 172 CRASHES Limits US 41 @ University Pkwy MANATEE COUNTY SARASOTA COUNTY Ringling Circus Museum College Dr New College of Florida University Pkwy N FEET 0 2,000 4

Survey The study team hosted an online survey from September to December 2018. 772 surveys were collected. About half of the responses were from people who live along the corridor, and the other half represented residents from across the region. The majority of respondents, 90%, either live or work along US 41 or commute through the corridor. 64% of respondents travel the corridor daily, and 27% travel the corridor weekly. 5% of respondents attend New College and 8% of respondents attend USFSM. 772 SURVEYS Survey respondents showed a preference to modify the roadway cross-section. Only 18% of respondents supported the existing cross-section. Of the alternative cross-sections presented, no one cross-section was overwhelmingly supported more than the others. Generally, there was a preference for alternatives that provided separate, dedicated bicycle and pedestrian facilities. WHAT MODE(S) DO YOU USE WHEN TRAVELING ON US 41? WHAT ISSUES DO YOU SEE WHEN TRAVELING ALONG US 41? Other 2% Bus 5% Taxi/Uber/Lyft 10% Carpool 17% Walk 17% Bicycle 22% Drive Alone 94% WHAT IMPROVEMENTS WOULD YOU SUPPORT ALONG US 41? Safety High Crash Potential Excessive Vehicular Speeding Quality of Bicycle Facilities Poor Streetscaping/ Landscaping Quality of Sidewalks Access to Properties along the Corridor Other (Please Specify) Poor Lighting Quality of Transit Stops 64% 60% 49% 44% 37% 29% 26% 21% 18% Improve Bicycle Facilities Add Medians/Access Management Roadway Design Changes to Reinforce the Posted Speed Improve Landscaping Add Capacity at Congested Intersections Wider Sidewalks Increase Law Enforcement Improve Lighting Improve Transit Stops Other (Please Specify) Safety Education 43% 42% 41% 41% 40% 32% 32% 28% 21% 17% 57% WOULD YOU SUPPORT REDUCING A TRAVEL LANE IN EACH DIRECTION ALONG US 41 BETWEEN THE SARASOTA/MANATEE COUNTY LINE (EDWARDS DRIVE) AND TALLEVAST ROAD? Support reducing travel lane in each direction Yes Yes, if accompanied with congestion relief at University Parkway and Tallevast that would allow for similar or reduced vehicular travel times through the corridor YES 33% NO 39% 28% YES 5

Recommendations: Intersection Improvements 41 OVERALL CORRIDOR TRAVEL TIME PM PEAK HOUR NORTHBOUND (MINUTES) NO BUILD BUILD 2022 5.2 5.2 2040 10.2 8.2 TALLEVAST ROAD Recommend closing Ponce De Leon from US 41 to Tallevast Road Tallevast Rd EXISTING AND FUTURE TRAFFIC ANALYSIS SHOWS THAT DELAYS OCCUR AT THE MAJOR INTERSECTIONS. INCREASING CAPACITY AT THE INTERSECTIONS WILL IMPROVE TRAVEL TIME. A 4- LANE DIVIDED FACILITY WILL BE ABLE TO ACCOMMODATE FUTURE TRAFFIC DEMANDS. Sarasota-Bradenton International Airport BRADEN AVENUE Tallevast Rd Sarasota-Bradenton International Airport USFSM ENTRANCE USF Sarasota-Manatee MANATEE COUNTY SARASOTA COUNTY 1 USF Sarasota-Manatee Limits MANATEE COUNTY SARASOTA COUNTY LEGEND Tallevast College RdDr New College of Florida Ringling Circus Museum UNIVERSITY PARKWAY Intersection Modifications University Pkwy Proposed Additional Turn Lanes Limits Ringling Circus Museum College Dr New College of Florida University Pkwy Sarasota-Bradenton International Airport 000 6 USF Sarasota-Manatee Proposed Roundabout N FEET 0 2,000

Recommendations: Potential Typical Sections 4-LANE CROSS-SECTION ALTERNATIVE FROM EDWARDS AVENUE TO TALLEVAST ROAD 45 MPH DESIGN SPEED Four Vehicular Lanes and Buffered Bike Lanes with Wide Median 5 3 3 5 94 Approximate ROW 120 5 18 2 2 35 35 1 2 79 8 2 Approximate ROW 120 Four Vehicular Lanes with Buffered Bike Lanes with Narrow Median 8 Four Vehicular Lanes with Cycle Track 2 8 80 Four Vehicular Lanes with Wide Sidewalk 18 5 1 30 2 30 74 Approximate ROW 120 5 13 2 1 30 Approximate ROW 120 FROM UNIVERSITY PARKWAY TO EDWARDS AVENUE 45 MPH DESIGN SPEED INSIDE EXISTING ROW OUTSIDE EXISTING ROW Four Vehicular Lanes with Wide Sidewalk Four Vehicular Lanes with Buffered Bike Lane 1 18-24 2 24 68 Max - 71' Approximate ROW 90-9 2 9 Four Vehicular Lanes with Wide Sidewalk 9 2 1-21 21 65 2 Max - 68' Approximate ROW 90-9 1 1-2 2 80 Max - 83' Approximate ROW 90-9 Four Vehicular Lanes with Cycle Track 3 9 2 1-21 21 65 2 1 4 5 Max - 68' Approximate ROW 90-9 7

Recommendations The intent of the Corridor Study was to evaluate the existing and future quality of travel along the roadway for all modes of travel and identify a system of improvements that will support regional mobility, safe and comfortable travel by all modes, and development goals of the major cultural and educational institutions and employers along the corridor. The Study documented support for multimodal improvements along US 41 from University Parkway to Tallevast Road. Stakeholders and residents support the implementation of bicycle facilities, intersection improvements, landscaping, and access management. This study did not identify one preferred typical-section for the corridor, but rather defined a framework for investments. Each recommendation will involve additional analysis and public engagement to develop a final design. FDOT will work in partnership with the Sarasota-Manatee MPO and local governments to prioritize and fund improvements. Recommendations: Program intersection improvements at University Parkway as an individual project: Add turn lanes, introduce pedestrian crossing on north leg, improve pedestrian crossing on east leg, improve signage, and provide traffic separator in southbound direction. Advance a Project Development and Environment (PD&E) Study for the corridor currently scheduled for 2021/22 to an earlier year. Work with the MPO and local governments to examine if some recommendations can be included as part of the programmed resurfacing project scheduled for 2022/2023. For elements recommended by the PD&E that are not included in the resurfacing project, prioritize improvements through the MPO prioritization process. 8