Westside Transportation Access Needs Assessment - Short and Long Term Improvements

Similar documents
Wilshire Boulevard Bus Rapid Transit Project

SANTA MONICA BOULEVARD CORRIDOR

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

CHAPTER 1 A 1 PURPOSE AND NEED

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

Possible Bike Sharing Stations in UCLA. -Given the Arriving Purple Line Subway UP M206A. March Tsai-wei Wen. Department of Public Policy

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

WESTSIDE EXTENSION TRANSIT CORRIDOR STUDY Project No. PS Task 3.4 Final Initial Alternatives Screening Report (20c) Prepared for:

I-105 Corridor Sustainability Study (CSS)

Greater Cleveland Regional Transit Authority

PEDESTRIAN ACTION PLAN

Flyaway Bus: GIS Analysis on Current and Potential Ridership, Revenue, and Prospective Stations

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Chapter 3 BUS IMPROVEMENT CONCEPTS

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

Appendix A-1: Purpose and Need Statement

PEDESTRIAN ACTION PLAN

METRO RTA TRANSIT MASTER PLAN. May 25-26, 2011

Regional Transportation Needs Within Southeastern Wisconsin

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

PEDESTRIAN ACTION PLAN

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Metro Bike/Bus Interface Study

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Metropolitan Council Transportation Committee

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

I-35W Solutions Alliance Project Update July 13, 2017

Transportation Master Plan Advisory Task Force

Bus Rapid Transit Plans

Project Narrative. Albuquerque, NM. July 31, 2015

Crenshaw Transit Corridor Study. Working Group Meetings March 2009

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

Dear City Council Members,

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Key objectives of the survey were to gain a better understanding of:

Exceeding expectations: The growth of walking in Vancouver and creating a more walkable city in the future through EcoDensity

SMART 1 Public Meeting #1. February 24, 2016

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

CONNECTING PEOPLE TO PLACES

MIDCOAST MAINE TRANSIT STUDY. In Association with: MORRIS COMMUNICATIONS

Peterborough Council on Aging

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher

Item B1 November 19, 2009

DON MILLS-EGLINTON Mobility Hub Profile

Arterial Transitway Corridors Study. Ave

Building a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

Planning Regionally With Transit

Typical Rush Hour Commute. PennyforTransportation.com

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

East San Fernando Valley Transit Corridor. Draft EIS/EIR Public Hearing (September 1 thru October 16, 2017

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

Overview: Phase 3 Draft Development and Circulation Plans, White Bear Station

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

2. Context. Existing framework. The context. The challenge. Transport Strategy


Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

NEWMARKET CENTRE Mobility Hub Profile

ORANGE LINE BUS RAPID TRANSIT SUSTAINABLE CORRIDOR IMPLEMENTATION PLAN

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

North Coast Corridor:

Traffic Engineering and Operations for BRT in Los Angeles

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

Appendix A-K Public Information Centre 2 Materials

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

South King County High-Capacity Transit Corridor Study

VISION. Introduction WHAT S INSIDE. One Region, Focusing on Our Future

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Appendix A-2: Screen 1 Alternatives Report

DON MILLS-SHEPPARD Mobility Hub Profile

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House

Konstantin Glukhenkiy Economic Affairs Officer

Chapter 6 Transportation Plan

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Chapter 5 Future Transportation

2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION

Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project

Markham Sports, Entertainment and Cultural Centre Transportation Overview

North Hollywood to Pasadena BRT Corridor Technical Study. Eco-Rapid Transit/Orange Line Development Authority March 8, 2017

Metro Bike Program. Westside/Central Metro Service Council Meeting Wednesday, November 13, :00 7:00 pm

METRO Light Rail: Changing Transit Markets in the Phoenix Metropolitan Area

North Shore Transportation Improvement Strategy

7.0 COMPARATIVE ANALYSIS OF ALTERNATIVES

Fixed Guideway Transit Outcomes on Rents, Jobs, and People and Housing

INFRASTRUCTURE: Using the Grid to Create a more Self-Sustaining Downtown. Studio Spring 2013

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Pedestrian Project List and Prioritization

Everett Transit Action Plan. Community Open House November 16, 2015

June Multimodal Mobility: Linking the Westside Cities to the Future Venice/Robertson Light Rail Station

JOINT PARTNERSHIPS: Working Together To Support Light Rail in Santa Monica

1 PROJECT DESCRIPTION PROBLEM STATEMENT PROJECT PURPOSE AND NEED Study Purpose Study Need... 4

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

Transcription:

ABSTRACT The Los Angeles County Metropolitan Transportation Authority (MTA) adopted the 2001 Long Range Transportation Plan (LRTP), which sets out the County s transportation investments for the next 20-25 years. The Westside of Los Angeles is a unique part of the Los Angeles area, with a high number of activity centers and medium to high density housing interspersed with prominent shopping, cultural, recreational and educational institutions. The Westside sub-region covers an area of about 102 square miles and is bounded by Mulholland Drive to the north, the Pacific Ocean to the west, LAX to the south and the Central Los Angeles to the east. Some of the Westside cities almost triple in population during the day (Beverly Hills, West Hollywood and Santa Monica) and include neighborhoods that have population densities almost 10 times the county average in parts of Santa Monica, West Hollywood, Westwood and Venice. The Westside cities cannot accommodate any more road capacity without serious community impacts. Research Question Does the Westside Sub-Region have greater than average transit needs than the rest of Los Angeles? How can GIS be used to help tell the Westside Story? This study focuses on two sub-groups: transit dependents and choice riders. Transit dependents are defined as people who are too young, too old, can t afford or do not have access to a personal automobile and rely on transit to reach their destinations. The MTA identifies tracts that may have a large concentration of transit dependent residents by the following Transit Dependency Index :{ [Pop] = [zero_car_hholds] and [<15,000 hhld income] and [>1000 65+_yrs] and [>1000 0-15_yrs]}. Choice riders are people who have access to an automobile but choose to take transit either regularly or occasionally as an alternative to driving. They are not expressed as a formula but are used as part of the discussion in this report. Data Sets This analysis uses 1990 and 2000 Census Population, Housing and Employment Census data, original data sets created from the MTA s databases on transit speeds, transit ridership and travel directions and data sets from municipal operators. Timothy Papandreou UP Master s Candidate 2004 1

Findings The analysis shows that the transit dependent and working poor are traveling in an arc pattern in the morning from the southern parts of the County northwards into downtown and then westward to the job rich areas of the Westside. This is a skills spatial mismatch that cannot be corrected without large scale coordination from land use and transportation authorities and community activists groups. The housing imbalance is clearly identified; however addressing this problem is outside the scope of this analysis, which is more concerned with the issue of job access with reliable transit to get to the potential opportunities that these employment centers may offer. Conclusion The analysis shows that the Westside is completely disconnected from the regional fixed guideway transit system, which results in lengthy rides over an hour, by bus transit. Using GIS, I have been able to answer the questions that are argued continually regarding the lack of Westside access to fixed guideway transit. Apart from being politically unpopular and environmentally unsustainable, road and freeway widening is not possible without serious community impacts, and politicians currently won t offer leadership for congestion pricing or truly internalizing the costs of driving. The argument will no longer need to be about how and where to put a fixed guideway system but when. As the Westside increases its density, the solo-driver mode will further exacerbate travel for all coming to and from the Westside. Fixed guideway transit connections to the activity centers coupled with Sustainable Mobility Centers (attended bicycle parking, electric bicycle, scooter and car rentals, anchored to a transit center) will provide equitable, rapid and comfortable access for the transit dependent while at the same time providing residents and choice riders with sustainable transportation options other than solo-driving, thereby enhancing both the Westside and Los Angeles communities livability. Timothy Papandreou UP Master s Candidate 2004 2

Employment Access Speeds by Transit Mode Although LA County s transit network is vast and extensive, it is not equally accessible. The speed access map was created using the MTA s LRTP and Scheduling department as references. The data was tabulated and according to the MTA, the average countywide local bus speed is around 12 miles per hour (19kmh). A separate set of data was available for fixed guideway such as urban rail and busways, and Commuter rail. The map shows that Metrolink by far provides the fastest access to most parts of the county at over 45 mph. Ridership by Transit Mode It is easy to see that although Metrolink is the fastest mode it is almost invisible when using line weights to show ridership by line. The data was collected from SCAG and the MTA s countywide transportation departments. The ridership figures are for 2002 and are expanded based on a monthly average. The cohorts were divided into 4 tiers. This map clearly shows that transit is heavily used in the Westside subregion. What is not known is whether it is used primarily by the transit dependent population or by choice riders. Further analysis of the ridership by line shows that there is a definite inbound travel pattern from the south into downtown with an equally strong travel pattern (based on boardings) heading west in the morning and east and south in the evenings. Timothy Papandreou UP Master s Candidate 2004 3

1990-2000 Change in Transit Dependency and Transit Infrastructure. The areas identified as Transit Dependent have shifted north and west, in the San Fernando Valley. It is interesting to note that parts of Long Beach, Burbank and Hollywood have reduced their transit dependency, probably due to gentrification of new infill housing. Westside Transit Boardings at Key Intersections/Transfer Points The data for these intersections were geo-coded from the MTA 2001 on/off ridership counts. It shows high boardings on the northbound routes in the eastern part of the study area which is primarily transit dependent. However, the east west routes have high boarding volumes all the way to Santa Monica. All the east-west boulevards have high transit boardings in both the eastern and western part of the study area. This map clearly shows that transit is heavily used in the Westside sub region. What is not known is whether it is used primarily by the transit dependent population or by choice riders. Further analysis of the ridership counts at time points shows that there is a definite inbound travel pattern from the south into downtown with an equally strong travel pattern (based on boardings) heading west in the morning and east and south in the evenings. The large number of transit dependent people can explain this reverse commute population residing in this section of the county. It is highly likely that this arc like travel pattern is a way of correcting the jobs skills housing mismatch in the county. As higher paying professional jobs tend to cluster around the Westside downtowns, service and lower skilled jobs are needed but cannot be filled by locals as they could not afford to live on the wages that are being offered, more affordable accommodation in the central part of the county with its fewer amenities requires this commuting pattern. Timothy Papandreou UP Master s Candidate 2004 4

Wilshire Transit Access Improvements. The purple lines represent the implementation of the proposed Westside Metro Rapid. The new 1 hour buffer is stretched out to the 16 mile mark as the average speed improvements from local bus to Metro Rapid is about 25%. Introducing articulated vehicles will increase that performance to about 35% faster service than previous local bus service. The blue dashed lines are the ultimate build out to the Metro Redline to UCLA and the Exposition Light Rail line from Downtown LA to downtown Santa Monica in about 40 minutes and an LAX Green line extension/brt to UCLA and the Valley (LRTP strategic section). Either of these two lines would form the backbone of an already heavily used and well-integrated transit system. While funding and geopolitical obstacles hold up the implementation of the fixed guideway projects, a fully implemented Metro Rapid BRT system would provide the vertebrae for the spine i.e.: the Redline or Expo line. The second map shows the priority intersections that, based on transfers would be ideal candidates for transit station amenities (shelters, Next Bus Display, Metro Information Maps, Improved Crosswalks, Bicycle parking & Car Sharing facilities) Timothy Papandreou UP Master s Candidate 2004 5

Wilshire Boulevard Relief Alignments. The Westside sub-region will need ancillary routes other than Wilshire Blvd due to the high volume corridors. Starting from Vermont, I used network analyst to find the best routes that connect the activity centers. Options that could be used are the East West and North South Boulevards. Using network analyst, I then determined the best route option for the northern activity centers and for the southern activity centers. I then determined the shortest route from Vermont Ave as this is the highest transit transfer point in the study area. The network analyst chose Santa Monica and Vermont Metro Rail station to get to Santa Monica Downtown. The route length is 13.54 miles. The Current MTA schedule times this segment at 67 minutes. Conversion to Metro Rapid will improve that number to 53 minutes. Conclusion The implementation of the Metro Rapid system with the above mentioned improvements would set the groundwork for a more equitable and accessible Westside until the fixed guideway projects can bolster the connection to the regional system. Sources: LACMTA Long Range Transportation Plan 2001 SOURCES: LACMTA Mid-City Westside Draft Environmental Impact Report 2001 LACMTA Mid-City Wilshire BRT Environmental Impact Report 2002 SCAG Regional Transportation Plan 2001 US Population & Housing Census 1990 and 2000 RTF3 and RTF1. LACMTA 2001 Transit Boardings On/Offs Expanded Passengers Counts. LACMTA and Municipal Operators Bus routes & Schedules. Timothy Papandreou UP Master s Candidate 2004 6