Michael A. Werthmann, PE, PTOE Principal

Similar documents
Michael A. Werthmann, PE, PTOE Principal Luay R. Aboona, PE Principal. DATE: February 22, Revised April 30, 2012

Traffic Study North Shore School District 112

TRAFFIC IMPACT ANALYSIS

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

U.S. Equities Realty. Luay R. Aboona, PE Principal. Traffic and Parking Evaluation Fourth Presbyterian Church of Chicago Chicago, Illinois

TRAFFIC IMPACT STUDY CRITERIA

THIS PAGE LEFT BLANK INTENTIONALLY

Highway 111 Corridor Study

TRAFFIC ASSESSMENT River Edge Colorado

Harrah s Station Square Casino

D.13 Transportation and Traffic

Shockoe Bottom Preliminary Traffic and Parking Analysis

Chapter 16: Traffic and Parking A. INTRODUCTION

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

Transportation Impact Study for Abington Terrace

Bridge Street Corridor Study Report

Gateway Transportation Study

Henderson Avenue Mixed-Use Development

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Waterford Lakes Small Area Study

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

Chapter 4 Traffic Analysis

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

Mission Street Medical Office Development

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Marina Loft (DRC 51-R-12)

3.9 - Transportation and Traffic

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

Figure 1: Vicinity Map of the Study Area

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

CDOT s Transportation Plan for the Obama Presidential Center in Jackson Park

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

JACKSON PARK REVITALIZATION TRAFFIC IMPACT STUDY FINAL REPORT

6060 North Central Expressway Mixed-Use Site Dallas, Texas

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

Glenn Avenue Corridor Traffic Operational Evaluation

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

APPENDIXB. Traffic Operations Technical Memorandum

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

TABLE TRAFFIC ANALYSIS SCENARIOS

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California

List of Exhibits...ii

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

TAKOMA METRO STATION

APPENDIX E: Transportation Technical Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Low Level Road Improvements Traffic Analysis. Report

4.10 TRAFFIC AND CIRCULATION

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

3 ROADWAYS 3.1 CMS ROADWAY NETWORK 3.2 TRAVEL-TIME-BASED PERFORMANCE MEASURES Roadway Travel Time Measures

Traffic Impact Study for Rolling Ridge Redevelopment

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

DUNBOW ROAD FUNCTIONAL PLANNING

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Joe Rocca P.Eng., Traffic and Asset Management Supervisor. Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater Sudbury

Traffic Circulation & Pedestrian Safety Study

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

Project Description Form 8EE

Corporation of the Town of Oakville. December 16, 2013

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

EXECUTIVE SUMMARY. Page 1 of 6

MEMORANDUM. Our project study area included the following locations:

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

WOLF POINT DEVELOPMENT COMMUNITY MEETING DECEMBER 20, 2012

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

TRANSPORTATION IMPACT STUDY

Meadow Woods Elementary School

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Focused Traffic Analysis for the 200 Nellen Avenue Project

Transcription:

9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 MEMORANDUM TO: FROM: Brian Lorenc GHB-630, LLC Michael A. Werthmann, E, TOE rincipal Luay R. Aboona, E rincipal DATE: May 27, 2011 SUBJECT: Traffic Impact Study 410 East Grand Avenue Chicago, Illinois This memorandum summarizes the methodologies, results, and findings of a traffic impact study conducted by Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) for a proposed apartment development to be located in Chicago, Illinois. The site, which currently contains a surface parking lot, is located on the east side of McClurg Court bounded by Ohio Street on the north and Grand Avenue on the south. As proposed, the development is to consist of 528 apartments, approximately 9,000 square feet of commercial space and a 296-space parking garage. Access to the parking garage and service area is proposed to be provided on Ohio Street and Grand Avenue. The purpose of this study was to examine background traffic conditions, assess the impact that the proposed development will have on traffic conditions in the area, and determine if any street or access improvements are necessary to accommodate traffic generated by the development. The sections of this report present the following. Existing conditions A description of the proposed development Directional distribution of the development generated traffic Vehicle trip generation for the proposed development Future traffic conditions including access to the site Traffic analyses for the weekday morning, weekday evening and Saturday midday peak hours Recommendations with respect to adequacy of the site access system and adjacent street network KLOA, Inc. Transportation and arking lanning Consultants

Existing Conditions Existing transportation conditions in the vicinity of the site were documented based on a field visits conducted by KLOA, Inc. in order to obtain a database for projecting future conditions. The following provides a description of the geographical location of the site, physical characteristics of the area street system including lane usage and traffic control devices, an inventory of the alternative modes of transportation serving the area and existing peak hour vehicle and pedestrian volumes. Site Location The site, which currently contains a public parking lot with approximately 182 spaces, is bounded by Ohio Street on the north, Lake Shore laza to the east, Grand Avenue on the south, and McClurg Court on the west. Land uses in the immediate area consist primarily of residential, office, hotel, and retail land uses. Figure 1 shows and aerial photo of the site. Area Streets The principal streets in the site vicinity that provide access to the site are described in the following paragraphs and shown in Figures 2 and 3. Ohio Street is a major one-way eastbound arterial street that forms a one-way pair with Ontario Street. The Ohio-Ontario pair provides direct access to/from the Kennedy Expressway (I-94) via the Ohio Street feeder ramp. Ohio Street generally has three moving lanes, with parking permitted on both sides of the street. Traffic signals are located at most intersections along Ohio Street including the intersections of Columbus Drive and McClurg Court. Illinois Street is a major one-way eastbound arterial street that forms a one-way pair with Grand Avenue. The Illinois-Grand pair provides direct access to/from Lake Shore Drive via the Illinois Street, Grand Avenue, and Lake Shore Drive interchange. Between Columbus Drive and Lower Lake Shore Drive, Illinois Street has three moving lanes with parking generally prohibited on both sides of the street. Traffic signals are located at most intersections along Illinois Street including the intersections of Columbus Dr, McClurg Ct, eshtigo Ct, and Lower Lake Shore Drive. Grand Avenue is a major one-way westbound arterial street that forms a one-way pair with Illinois Street. Between Lake Shore Drive and Columbus Drive, Grand Avenue has four moving lanes with parking generally permitted on the north side of the street and prohibited on the south side of the street. Traffic signals are located at most intersections along Grand Avenue, including the intersections of Lower Lake Shore Drive, eshtigo Court, McClurg Court, and Columbus Drive. McClurg Court is a north-south, local street that extends from Huron Street south to River Drive. McClurg Court is generally a two-way street except the section between Ontario Street and Ohio Street, which is a one-way northbound street. arking is generally prohibited on both sides of McClurg Court except south of Illinois Street and on the west side of the street between Ohio Street and Grand Avenue. 2

Site Location Figure 1 3

SITE Area Street System Figure 2 4

McCLURG CT OHIO SITE (EXIING ARKING LOT) BS L GRAND AVE LEGEND - TRAFFIC SIGNAL - ARKING - NO ARKING L - LOADING - BIKE LANE BS - BUS O L ILLINOIS BS L ROJECT: TITLE: ROJECT NO: 11-050 410 EA GRAND CHICAGO, ILLINOIS EXIING REET CONDITIONS FIGURE NO: 3

Alternative Modes of Transportation Accessibility to and from the area is enhanced by the various alternative modes of transportation serving the area as summarized below. ublic Transportation. The area is served by the CTA Red (Howard/Dan Ryan) rapid transit line which extends from the Howard Street station located on the City s northern border to the 95 th /Dan Ryan station located along the Dan Ryan Expressway at 95 th Street. A local stop is provided at State Street and Grand Avenue (Grand Avenue Station) which is located approximately ½ mile from the site. In addition, the following bus routes serve the immediate area and all have stops adjacent to the site. Route Number 2 - Hyde ark Express generally runs along Lake Shore Drive, State Street and Michigan Avenue between Hyde ark and the River North and Streeterville neighborhoods. Service is provided Monday through Friday during the morning and evening peak periods. Route Number 29 - State generally runs along State Street between the Red Line s 95 th /Dan Ryan station and the Illinois/Grand corridor. Service is provided seven days a week and on holidays. Route Number 65 - Grand generally runs along Grand Avenue between Navy ier and Nordic Avenue (7000 West Grand Avenue). Service is provided seven days a week and on holidays. Route Number 66 - Chicago generally runs along Chicago Avenue between Navy ier and Austin Avenue (6000 West Chicago Street). Service is provided seven days a week and on Holidays. Route Number 120 - Ogilvie/Wacker Express generally runs along Wacker Drive and the Illinois/Grand corridor between the Ogilvie Metra Station and Navy ier. Service is provided Monday through Friday during the morning and evening peak periods. Route Number 121 - Union/Wacker Express generally runs along Wacker Drive and the Illinois/Grand corridor between the Union Station and Navy ier. Service is provided Monday through Friday during the morning and evening peak periods. Route Number 124 - Navy ier runs along Wacker Drive, Illinois Street, Grand Avenue and Madison Street between Navy ier and Ogilvie and Union Stations. Service is provided seven days a week and on Holidays. Lastly, numerous additional bus routes run along Michigan Avenue with bus stops located within walking distance of the project. 6

Bicycle Routes. The following streets within the vicinity of the site have been recommended as bike routes by the Chicago Department of Transportation (CDOT). Both Illinois Street and Grand Avenue between Navy ier/lakeside Trail and Wells Street with bike lanes provided along both streets. McClurg Court between Illinois Street and Ohio Street. Ohio Street between McClurg Court and the pedestrian underpass under Lake Shore Drive. Lastly, the Lakefront Trail is located less than a quarter of a mile from the site and extends along Lake Michigan for 18 miles between Hollywood Avenue on the north and 71st Street on the south. The Grand Avenue and Illinois Street bike lanes provide direct access between the site and the Lake Front Trail. It should be noted that (CDOT) is planning to grade separate the Lake Front Trail over the Chicago River and Lower Lake Shore Drive. The Navy ier Flyover is proposed to run along the eastern edge of Lake Shore Drive extending from just south of the river to just north of Jane Addams Memorial ark. According to the CDOT, construction could begin as soon as 2012. edestrian Facilities. All of the streets within the immediate area have sidewalks on both sides of the street. In addition, as previously noted, the Lakefront Trail is located less than a quarter of a mile from the site. Lastly, crosswalks and pedestrian traffic signals are generally provided at all of the intersections within the immediate area, with countdown pedestrian traffic signals provided at the intersections of Grand Avenue/McClurg Court and Illinois Street/McClurg Court. Year 2000 census data and surveys conducted by the Illinois-Grand Transportation Management Association (TMA) have shown that only approximately 33 percent of the residents within the southern portion of Streeterville drive a car to work. The majority of the residents within the area use the alternative forms of transportation to commute to/from work. Therefore, the proximity of Streeterville within the downtown area and the alternative forms of transportation serving the area has resulted in a significant reduction in the traffic generated by area residential developments, particularly during the critical weekday morning and evening commuter peak periods. Existing Traffic Volumes In order to determine current traffic conditions in the vicinity of the site, KLOA, Inc. conducted peak period vehicle and pedestrian counts at the following intersections. Ohio Street with McClurg Court Grand Avenue with McClurg Court Illinois Street with McClurg Court Ohio Street with the access drive serving the parking lot located on the subject site Grand Avenue with the access drive serving the parking lot located on the subject site 7

The traffic counts were conducted on Thursday, April 7, 2011 during the morning (7:00 A.M. to 9:00 A.M.) evening (4:00.M. to 6:00.M.) peak periods and on Saturday, April 9, 2011 during the midday (Noon to 2:00.M.) peak period. Based on the results of the traffic counts, the weekday morning peak hour of traffic occurs from 8:00 A.M. to 9:00 A.M., the weekday evening peak hour of traffic occurs from 5:00.M. to 6:00.M., and the Saturday midday peak hour occurs from 12:30.M. to 1:30.M. It should be noted that the updated traffic volumes were compared with previous traffic counts conducted by KLOA, Inc. To provide a conservative (worst case) analysis, the highest traffic volume for each movement and each time period were generally used for this study. Figure 4 illustrates the existing peak hour traffic volumes and Figure 5 illustrates the existing pedestrian volumes. Traffic Characteristics of the roposed Development In order to properly evaluate future traffic conditions in the surrounding area, it was necessary to determine the traffic characteristics of the proposed development including the directional distribution and volumes of traffic that it will generate. roposed Development lan As proposed, the development is to consist of 528 apartments, approximately 9,000 square feet of commercial space and a 296-space parking garage. Access to the parking garage is proposed to be provided via an inbound only access drive on Ohio Street and an inbound and outbound access drive on Grand Avenue. All service loading will occur internally and will be provided via a one-way southbound service drive that will extend from Ohio Street to Grand Avenue. Lastly, a drop-off/pick-up lane is proposed to be provided along McClurg Court. Directional Distribution of Site Traffic The directions from which the development-generated traffic will approach and depart the site were estimated based on the existing travel patterns as determined from the traffic counts and previous studies conducted in the area. Figure 6 illustrates the directional distribution for the development. Site Traffic Generation The peak hour traffic volumes that will be generated by the apartments were estimated based on the Apartment (Land-Use Code 220) and Specialty Retail Center (Land-Use Code 814) trip rates provided in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 8 th Edition. However, the traffic estimated to be generated by the development was based on suburban rates where the primary mode of transportation is the automobile. Therefore, given the location of the development within a dense, urban area and its proximity to alternative modes of transportation, the estimated number of trips generated by the development was reduced by 67 percent. Table 1 shows the estimated peak hour traffic to be generated by the proposed development. 8

McCLURG CT OHIO 189 (140) [109] 17 (4) [0] 260 (340) [163] 220 (180) [316] 250 (156) [174] 145 (108) [157] 1 (8) [0] SITE (EXIING ARKING LOT) 82 (87) [82] 145 (100) [139] 290 (130) [175] 1210 (740) [995] 2 (51) [4] 169 (160) [200] GRAND AVE 59 (178) [100] 105 (134) [156] LEGEND - TRAFFIC SIGNAL 00 - WEEKDAY MORNING EAK HOUR (00) - WEEKDAY EVENING EAK HOUR 181 (112) [168] 133 (148) [171] [00] - SATURDAY MIDDAY EAK HOUR ILLINOIS 99 (240) [167] 412 (1105) [1055] 53 (56) [50] 65 (72) [89] 65 (86) [41] ROJECT: TITLE: ROJECT NO: 11-050 410 EA GRAND CHICAGO, ILLINOIS EXIING EAK HOUR VEHICULAR VOLUMES FIGURE NO: 4

McCLURG CT 175 (254) [239] 53 (56) [110] 70 (74) [68] 214 (238) [125] OHIO SITE (EXIING ARKING LOT) 175 (273) [234] 158 (254) [769] 133 (217) [312] 182 (230) [225] GRAND AVE LEGEND - TRAFFIC SIGNAL 00 (00) - WEEKDAY MORNING EAK HOUR - WEEKDAY EVENING EAK HOUR [00] - SATURDAY MIDDAY EAK HOUR 113 (125) [183] 55 (126) [275] 108 (184) [350] 73 (133) [164] ILLINOIS ROJECT: TITLE: ROJECT NO: 11-050 410 EA GRAND CHICAGO, ILLINOIS EXIING EAK HOUR EDERIAN VOLUMES FIGURE NO: 5

McCLURG CT (10%) OHIO 40% (10%) SITE (40%) 40% GRAND AVE LEGEND - TRAFFIC SIGNAL 00 (00) - INBOUND TRAFFIC - OUTBOUND TRAFFIC 20% (40%) ILLINOIS ROJECT: TITLE: ROJECT NO: 11-050 410 EA GRAND CHICAGO, ILLINOIS DIRECTIONAL DIRIBUTION FIGURE NO: 6

Table 1 ROJECTED SITE-GENERATED TRAFFIC VOLUMES Weekday Morning eak Hour Weekday Evening eak Hour Saturday Midday eak Hour Land Use In Out In Out In Out Apartments 18 70 67 36 40 40 Commercial Space 5 5 10 14 16 15 Total 23 75 77 50 56 55 It should be noted that the site contains an approximate 182-space parking lot that is currently generating traffic. Therefore, the traffic projected to be generated by the proposed development will not be all new traffic to the area as it will be replacing the existing parking lot. However, to provide a worst case analysis, the total development-generated trips were not reduced to account for the traffic generated by the existing public parking lot. rojected Traffic Volumes The estimated peak hour traffic volumes that will be generated by the proposed development were assigned to the street system in accordance with the previously described directional distribution. Figure 7 illustrates the development generated traffic volumes. In addition to the developmentgenerated traffic, the study also included the traffic that will be generated by the following developments proposed in the area. The proposed apartment development to be located on the east side of eshtigo Court between Grand Avenue and Illinois Street. The second residential tower proposed for the arkview West development to be located on the west side of eshtigo Court between Grand Avenue and Illinois Street. The proposed Northwestern Memorial Hospital arking Garage to be located between Ontario Street and Ohio Street just east of the site. Further, to account for other growth in the area, the existing traffic volumes were increased by ten percent. Figure 8 shows the total peak hour volumes which include the existing traffic volumes, the development-generated traffic volumes and other growth projected in the area. 12

McCLURG CT OHIO 9 (31) [22] 7 (5) [5] 8 (5) [6] 12 (20) [17] 14 (46) [34] SITE 15 (10) [11] 30 (20) [22] 75 (50) [55] 30 (20) [22] 9 (31) [22] GRAND AVE 5 (15) [12] LEGEND - TRAFFIC SIGNAL 30 (20) [22] 00 (00) [00] - WEEKDAY MORNING EAK HOUR - WEEKDAY EVENING EAK HOUR - SATURDAY MIDDAY EAK HOUR 5 (15) [12] ILLINOIS ROJECT: TITLE: ROJECT NO: 11-050 410 EA GRAND CHICAGO, ILLINOIS SITE-GENERATED EAK HOUR VOLUMES FIGURE NO: 7

McCLURG CT OHIO 208 (154) [120] 445 (470) [242] 253 (210) [255] 294 (189) [210] 222 (153) [189] 645 (577) [397] 14 (46) [34] SITE 90 (96) [90] 170 (122) [170] 380 (175) [210] 1445 (917) [1211] 216 (196) [242] 75 (50) [55] 9 (31) [22] 1966 (1238) [1608] GRAND AVE 65 (196) [110] 136 (167) [189] LEGEND - TRAFFIC SIGNAL 00 - WEEKDAY MORNING EAK HOUR 199 (123) [185] 187 (195) [227] (00) [00] - WEEKDAY EVENING EAK HOUR - SATURDAY MIDDAY EAK HOUR ILLINOIS 129 (284) [201] 524 (1294) [1260] 58 (62) [55] 72 (79) [98] 72 (95) [45] ROJECT: TITLE: ROJECT NO: 11-050 410 EA GRAND CHICAGO, ILLINOIS TOTAL EAK HOUR VOLUMES FIGURE NO: 8

Traffic Analysis Traffic analyses were performed for the intersections within the study area to determine the operation of the existing street system, evaluate the impact of the proposed development, and determine the ability of the existing street system to accommodate projected traffic demands. Analyses were performed for the existing and the projected traffic volumes. The traffic analyses were performed using Synchro 7 computer software, which is based on the methodologies outlined in the Transportation Research Board s Highway Capacity Manual (HCM), 2000. The ability of an intersection to accommodate traffic flow is expressed in terms of level of service, which is assigned a letter grade from A to F based on the average control delay experienced by vehicles passing through the intersection. Control delay is that portion of the total delay attributed to the traffic signal or stop sign control operation and includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. Level of Service A is the highest grade (best traffic flow and least delay), Level of Service E represents saturated or at-capacity conditions, and Level of Service F is the lowest grade (oversaturated conditions, extensive delays). For two-way stop controlled (TWSC) intersections, levels of service are only calculated for the approaches controlled by a stop sign (not for the intersection as a whole). The Highway Capacity Manual definitions for levels of service and the corresponding control delay for signalized intersections and unsignalized intersections are shown in the Appendix. The results of the capacity analysis are summarized in Table 2 for the existing traffic volumes and Table 3 for the projected traffic volumes. Table 2 CAACITY ANALYSIS RESULTS EXIING TRAFFIC CONDITIONS Weekday A.M. eak Hour Weekday.M. eak Hour Saturday Midday eak Hour Intersection LOS Delay LOS Delay LOS Delay McClurg Court with Ohio Street B 11.0 B 11.5 A 8.0 McClurg Court with Grand Avenue B 13.1 B 14.3 B 14.7 McClurg Court with Illinois Street B 16.3 C 21.6 C 20.1 LOS - Level of Service Delay - Measured in Seconds 15

Table 3 CAACITY ANALYSIS RESULTS ROJECTED TRAFFIC CONDITIONS Weekday A.M. eak Hour Weekday.M. eak Hour Saturday Midday eak Hour Intersection LOS Delay LOS Delay LOS Delay McClurg Court with Ohio Street B 17.8 B 14.7 B 10.7 McClurg Court with Grand Avenue B 14.4 B 15.7 B 15.0 McClurg Court with Illinois Street B 17.8 C 26.2 C 22.8 Grand Avenue with Access Drive 1 B 12.0 B 10.9 B 13.6 LOS - Level of Service Delay - Measured in Seconds 1 Represents operation of the approach under stop sign control. Evaluation of the Street Operations The results of the capacity analyses show that all of the intersections in the study area are currently operating at an acceptable level of service. With the addition of the development traffic and the other growth projected in the area, all of the intersections are projected to continue to operate at an acceptable level of service. The capacity analyses indicated that some queuing and delays are currently experienced on some approaches as well as certain individual movements, particularly on the north-south streets. However, field observation and the capacity analyses indicate that the queuing and delays are typically not excessive. The following outlines several of the factors that are contributing to the less than desirable operation on some approaches under existing conditions. 1. The north-south streets receive a limited amount of green time per signal cycle. This is because Grand Avenue and Illinois Street form a major one-way pair that provide access to/from the regional freeway system. As such, the signal timings at many of the intersections in the study area have been set to facilitate the east-west traffic movement. 2. The close spacing of the east-west streets within the area limits the available stacking (storage) distance between the intersections on the north-south streets. As a result, the queuing that occurs on the north-south streets, which is compounded by the limited green time, occasionally extends beyond mid-block access drives and downstream intersections, which contribute to the congestion and delay experienced during the peak periods at some of the intersection approaches on these streets. 3. Due to the high concentration of pedestrian movements in the area, particularly on weekends, the vehicle capacity of the intersections is limited. Turning vehicles yielding to pedestrian traffic in the crosswalks reduces the capacity of the intersections. It should be noted that the pedestrian and bicycle activity along the Lower Lake Shore Drive corridor will be significantly reduced with the proposed grade separation of the lakefront path over the Chicago River and Lower Lake Shore Drive. 16

As such, no additional capacity and/or street modifications are required to accommodate the additional traffic to be generated by the development. However, in order to enhance the operation of the Grand Avenue/McClurg Court intersection, it is recommended that the bus stop on the north side of Grand Avenue be relocated from the east (near) side to the west (far) side of the intersection. It is our understanding that the bus stop used to be located on the west (far) side of the intersection, but was relocated to the east (near) side during the construction of the second tower of The Streeter Apartments. Further, the CTA generally prefers far side as opposed to near side bus stops. Transportation Sustainability Recommendations The following summarizes measures to be implemented by the development and/or recommendations to further minimize the impact of the development, foster alternative modes of transportation other than the automobile, and to enhance pedestrian/bicycle safety. A minimum of 50 bike racks is proposed to be provided within the development. The McClurg Court sidewalk is proposed to be widened as part of the development. One to two parking spaces within the parking garage should be reserved for car-sharing vehicles. CDOT and the developer should consider implementing the following pedestrian safety improvements. The Ohio Street/McClurg Court traffic signal should be upgraded with countdown pedestrian signals. The existing crosswalks at the Ohio Street/McClurg Court, Grand Avenue/McClurg Court and Illinois Street/McClurg Court intersections are mostly faded and should be restriped. Site Access Access to the parking garage is proposed to be provided via one access drive on Ohio Street and one access drive on Grand Avenue. The following describes the design and locations of the access drives. The Ohio Street access drive is proposed to be located on the south side of the street along the eastern property line, maximizing the distance between the access drive and McClurg Court. This access drive is proposed to provide inbound only access via a one lane access drive. Given that Ohio Street is a one-way eastbound street, only inbound right-turn movements will be permitted at this access drive. The Grand Avenue access drive is proposed to be located on the north side of the street along the eastern property line, maximizing the distance between the access drive and McClurg Court. 17

This access drive is proposed to provide inbound and outbound access via a two-lane lane access drive. Given that Grand Avenue is a one-way westbound street, only inbound and outbound right-turn movements will be permitted at this access drive. The outbound lane of the access drive should be under stop sign control and warning devices such as flashing lights should also be considered at this access drive. The provision of the two access drives will provide the development with greater site access flexibility as traffic will be able to directly enter the parking garage from both Ohio Street and Grand Avenue. This is very critical given the one-way nature of Ohio Street and Grand Avenue. As a result, traffic will not have to circle the block when traveling to the development, which will only reduce the impact of the development on the existing street system. The development is proposing to provide three loading docks that will be located internally within the development. Access to the service area will be provided via a one-way southbound service drive that will extend from Ohio Street south to Grand Avenue. All truck traffic will directly enter via Ohio Street and exit via Grand Avenue and will not have to back into the loading area. As such, the provision of the loading docks within the development and the one-way service drive will substantially minimize any impact that truck traffic will have on the area street system. The Ohio Street access drive is proposed to be located at approximately the middle of the site while the Grand Avenue access drive will be located adjacent to the parking garage access drive. The proximity of the two Grand Avenue access drive will not pose any operational issues given (1) the limited volume of traffic projected to use the access drives, particularly the service drive, (2) that outbound movements are only permitted from the service drive and (3) that Grand Avenue is a one-way westbound street. Lastly, warning devices such as flashing lights should also be considered at the Grand Avenue access drive. Lastly, a drop-off/pick-up area is proposed on the east side of McClurg Court with access provided via two one-way access drives on Grand Avenue. As proposed, the drop-off/pick up area will provide one-way northbound circulation with the southern access drive providing inbound access only and the northern access drive providing outbound only access. Both access drives will provide a one-lane cross section. Lastly, the drop off/pick up area will be able to accommodate approximately three to four vehicles and still provide a lane for circulation. Signs should be posted limiting the usage to drop off and pick up and prohibiting the parking of vehicles. Conclusion Based on the preceding analyses and recommendations, the following conclusions have been made. Accessibility to and from the area is enhanced by the various alternative modes of transportation serving the area as summarized below. The area is served by the CTA Red (Howard/Dan Ryan) rapid transit line which has a local stop ½ mile from the site. In addition, the five bus routes serve the immediate area and all have stops that are two to three blocks from the site. Lastly, on-street bike lanes are provided along Grand Avenue and Illinois Street providing access to the Lake Front Trail as well as other bicycle streets. 18

The amount of new traffic generated by the proposed development will be reduced due to (1) the proximity of development within the downtown area and the alternative modes of transportation serving the area and (2) the fact that the development is replacing an existing surface parking lot. The development-generated traffic can be accommodated efficiently without significant impact to the external street system. All of the intersections within the study limits are projected to operate at acceptable levels of service with the addition of the development generated traffic. In order to enhance the operation of the Grand Avenue/McClurg Court intersection, it is recommended that the bus stop on the north side of Grand Avenue be relocated from the east (near) side to the west (far) side of the intersection. CDOT and the developer should consider installing the following pedestrian safety improvements: (1) upgrade the Ohio Street/McClurg Court traffic signal to provide countdown pedestrian signals and (2) restriped the crosswalks at the intersections analyzed. The proposed site access system will be adequate to serve the traffic that will be generated by the proposed development. Furthermore, the following aspects of the site access system will significantly mitigate the impact of the development on the external street system. The provision of the two access drives serving the parking garage will provide the development with greater site access flexibility as traffic will be able to enter the parking garage from both Ohio Street and Grand Avenue. All service loading will occur within the site via three loading docks and will be served via a one-way southbound service drive that will extend from Ohio Street south to Grand Avenue. All truck traffic will enter via Ohio Street and exit via Grand Avenue and not have to back in to the loading docks. As part of the development plan, the McClurg Court sidewalk is proposed to be widened and a minimum of 50 bike parking spaces will be provided which will only further promote the use of alternative modes of transportation. 11-050 Lorenc 410 East Grand Avenue in Chicago May 27 2011 maw lra 19

Appendix

LEVEL OF SERVICE CRITERIA SIGNALIZED INTERSECTIONS Delay per Vehicle Level of Service Interpretation (seconds) A B C D E Very short delay, with extremely favorable progression. Most vehicles arrive during the green phase and do not stop at all. Good progression, with more vehicles stopping than for Level of Service A, causing higher levels of average delay. Light congestion, with individual cycle failures beginning to appear. Number of vehicles stopping is significant at this level though many still pass through the intersection without stopping. Congestion is more noticeable, with longer delays resulting from combination of unfavorable progression, long cycle lengths, or high V/C ratios. Many vehicles stop and the proportion of vehicles not stopping declines. High delays result from poor progression, high cycle lengths and high V/C ratios. 10.0 >10 and 20.0 >20 and 35 >35 and 55 >55 and 80 F Unacceptable delay occurring, with oversaturation. >80.0 LEVEL OF SERVICE CRITERIA UNSIGNALIZED INTERSECTIONS Level of Service Average Total Delay (SEC/VEH) A B C D E 10 >10 and 15 >15 and 25 >25 and 35 >35 and 50 Source: Highway Capacity Manual, 2000. F >50