New Airfield Risk Assessment / Categorisation

Similar documents
1.0 PURPOSE 2.0 REFERENCES

Safety Standards Acknowledgement and Consent (SSAC) CAP 1395

Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed)

Workshop to Generate Guidelines For the Implementation of: 1 - Step 1 of State Safety Program (SSP) and 2 - Phases 1 & 2 of ICAO SMS

Aeronautical studies and Safety Assessment

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA

A GUIDE TO WRITING A RISK ASSESSMENT FOR A BMAA EVENT

Marine Risk Assessment

RFFS Procedures. Airside Operational Instruction 18. Content

Safety Risk Assessment Worksheet Title of Risk Assessment Risk Assessment Performed By: Date: Department:

A GUIDE TO RISK ASSESSMENT IN SHIP OPERATIONS

COSCAP-South Asia ADVISORY CIRCULAR FOR AIR OPERATORS

Employ The Risk Management Process During Mission Planning

Aerodrome Safeguarding Airside Operational Instruction 16. AOI Owner - Operations Developments & Safety Manager

FLIGHT TEST RISK ASSESSMENT THREE FLAGS METHOD

Safety Management System and Aerodrome Resource management for AFIS Operators'

Guidance on the Conduct of Hazard Identification, Risk Assessment and the Production of Safety Cases

BRITISH GLIDING ASSOCIATION SAFETY MANAGEMENT SYSTEM MANUAL

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Federal Aviation Administration Safety & Human Factors Analysis of a Wake Vortex Mitigation Display System

AN APPROACH FOR HOLISTIC FATIGUE RISK MONITORING AND CONTROL

Mountain Fury Mountain Search Flying Course Syllabus Fourth Sortie : High Altitude Search

Agenda Item 6-ATM Coordination (Airspace restructuring, AIS and SAR agreements)

Incident Reporting and Investigation

Risk Management. Definitions. Principles of Risk Management. Types of Risk

Continuous Descent Final Approach

Safety-Critical Systems

HINDSIGHT SITUATIONAL EXAMPLE. unexpected runway crossing

ALIGNING MOD POSMS SAFETY AND POEMS ENVIRONMENTAL RISK APPROACHES EXPERIENCE AND GUIDANCE

Advisory Circular (AC)

APPENDIX J REQUIRED NAVIGATION PERFORMANCE IMPACTS EVALUATION REPORT

IVAO International Virtual Aviation Organization Training department

PRACTICE WILDLIFE RISK ASSESSMENT AND ANALYSIS. This Recommended Practice has been developed by the Australian

Applicazione della Metodologia RAMCOP ORAT Runway Incursion. Italo Oddone Carlo Cacciabue

Stabling Point Risk Assessments Wakefield Kirkgate sidings

Certification Memorandum. Parts Detached from Aeroplanes

HAZARD MANAGEMENT PROCEDURE

Drinking Water Safety Plans, Disinfection of Drinking Water & Revised EPA Disinfection Manual

An atc-induced runway incursion

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

IFE Level 3 Diploma in Fire Science and Fire Safety

FLIGHT CREW TRAINING NOTICE

Risk Assessment Advice for Ice Skating

Unit 5: Prioritize and Manage Hazards and Risks STUDENT GUIDE

Hazard Management Making your workplace safer

ABBEYFIELD STAIR AND CHAIR LIFT RISK ASSESSMENT

Enhanced Discussion of Requirements for Commercial Fishing Vessels

The Honourable Company of Air Pilots

Mandatory Briefing Bardufoss (ENDU)

Memorandum for the Joint Committee on New Aircraft in Japan (MV-22)

INSTRUCTIONS FOR USING THE RISK ASSESSMENT FORM

Pre-control risk estimate. Likelihood Risk

Transformational Safety Leadership. By Stanley Jules

innova-ve entrepreneurial global 1

Activity Hazard Analysis (AHA) EM A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING

AERODROME ADVISORY CIRCULAR

Hazard Training Guide

Basketball Risk Assessment for AoC Sport National Championships 2018 Nottingham University

CREW COMMANDER INCIDENT COMMAND INITIAL

CAP 232 Surveys. Airside Operational Instruction 17

Circuit Considerations

FALCON SERVICE ADVISORY

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

Aerodrome Inspectors Workshop

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

Safety Risk Management

Advisory Circular (AC)

CLEARED AND GRADED AREA (CGA): CRITICAL ANALYSIS AND PROPOSAL OF A CRITERION FOR GRADING ITS BEARING CAPACITY

HANDLINGSENSE LEAFLET 1 TWIN PISTON AEROPLANES

Risk Assessment Form

Cross Border Area Safety Assessment Overview

MINISTRY OF DEFENCE MILITARY AIRCRAFT ACCIDENT SUMMARY

Procedure: Work health and safety hazard management

FLIGHT OPERATIONS PANEL

RISK MANAGEMENT B020083XQ STUDENT HANDOUT

SYSTEM SAFETY REQUIREMENTS

Work Health and Safety Risk Management Procedures

EUROPEAN AVIATION SAFETY AGENCY ELECTRONIC FLIGHT BAG (EFB) SOFTWARE EVALUATION REPORT

Local Rules for Radiography: Ionising Radiation Regulations Working Instructions Staff MUST Follow

Risk Assessment Form

Policy for Evaluation of Certification Maintenance Requirements

-JHA- Job. For Science and Engineering. Hazard Assessment

Go around manoeuvre How to make it safer? Capt. Bertrand de Courville

Mandatory Instruction

Civil Air Patrol. Summary of Aircrew Professionalism Content. Kevin Conyers Chief, Stan/Eval Aug 2018 Anaheim, CA

PROCEDURE DOCUMENTATION

Preliminary System Safety Analysis for the Controller Access Parameter service delivered by Mode S Enhanced Surveillance

OBSTACLE DEPARTURE PROCEDURES Part 3

Risk Management Qualitatively on Railway Signal System

FL009 FL009. He was aware that there was a Robinson R22 leaving the cct and that the other cct traffic was aware of their position.

Annex B: Range Specification Requirements

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls

HS329 Risk Management Procedure

SCANDINAVIAN AVIATION EDUCATION PROGRAM. Risk Management Course

Aerodrome Design Manual

Exercise IARD. Risk Assessment & Management Plan

TECHNIQUES FOR OFF AIRPORT OPERATIONS

Risk Assessment for Geophysical Operations (Health and Safety and Environment)

SAFETY INFORMATION NOTICE

ADVISORY MATERIAL JOINT AMJ

Transcription:

New Airfield Risk Assessment / Categorisation Airfield Risk Assessment Prior to commencing operations to a new airfield, airfield risk assessment and categorisation will take place. For continued operations to an airfield which has undergone a significant change to systems or procedures, a new risk assessment will be completed. The procedures for carrying out airfield risk assessments are based on the guidance material on the Seven-Step Risk Assessment and Mitigation Process published in CAP 760, and airfield categorisation as detailed in Part C Section 10. The airfield categorisation and risk assessment must be checked and authorised by the fleet managers and chief pilots office. Operations to airfields with identified hazards which have a risk classification following mitigation, at review must be authorised by the Flight Operations Director. Operations will not be conducted to airfields with a risk classification following mitigation of unacceptable. Completed risk assessment templates and airfield categorisation checklists should be returned to the flight operations supervisor for filing. Airfield Risk Assessment Airfield risk assessment is carried out by completing the Airfield Risk Assessment Template using the following guidance. Step 1 System Description Describe in detail the airfield, and facilities available. In particular the runway characteristics, approach aids, lighting, PCN, rescue and fire services, and associated operational environment. The operational environment would include security, alternates, meteorology local topography and ATC considerations, looking at both Arrivals and Departures. Pre-existing contingency procedures and other non normal operations should be considered. As an aid to this, a list of items to be considered is included with the system description for the risk assessment, however, this list may not include all items and any items not included should be added. At this stage hazards should have been identified. Step 2-6 Identification and Mitigation Table The Identification and Mitigation Table allows the assessor to carry out steps 2-6 of the risk assessment in a concise and ordered manner, from hazard identification through risk classification and result to mitigation and reassessment. Step 2 - Identification and Consequence From the system description list the possible hazards associated with operations to the airfield. s can be identified using historical analysis, brainstorming or a systematic review. Appropriate staff should be consulted in identifying hazards including pilots, training staff, operations flight safety and navigation / performance. Page 1 of 11

The consequences of hazards are determined by analysing what could happen if the hazard manifests itself into an accident or incident. Each hazard identified, should be recorded on the risk assessment template. The consequences of each hazard should be detailed and the severity of hazard consequences entered. Step 3 Estimation of the Severity of the Consequences Once the hazards and consequences have been identified, the severity of hazard consequences should be estimated using the severity classification scheme detailed below. The hazard severity is entered on the risk assessment template. consequence category: Description Catastrophic Accident Serious loss or substantial damage to aircraft or facilities. Serious injury or death. Significant An event where an accident nearly occurs. No safety barriers remaining. The outcome is not under control and could very likely lead to an accident. Damage to aircraft or facilities. Moderate An incident I which the safety of the aircraft may have been compromised. A large reduction in safety margins. The outcome is controllable by use of existing non normal procedures and or equipment. Safety barriers are very few approaching none. Minor injuries or minor damage may occur. Minor An accident, serious or major incident could have occurred if the risk had not been managed within safety margins or if another aircraft had been in the vicinity. A significant reduction in safety margins may occur but several barriers remain to prevent an accident. There will be a reduction in the ability of the flight crew to cope with the increased workload as a result of the conditions impairing their efficiency. Only on rare occasions would the occurrence develop into an accident. A nuisance to occupants or others in the vicinity occurs. Negligible No immediate effect on safety. Existing safety barriers come into play to avoid the event turning into a significant incident. Page 2 of 11

Step 4 Probability of Consequences Occurring Once the hazards and consequences have been identified, and the severity of hazard consequences estimated, the probability of the hazard consequences occurring should be classified. Probability classification is detailed in the table below. Where several hazards lead to the same consequence the probability of occurrence for each hazard should be summed to get an overall likelihood of the hazard occurring. The probability classification associated with Consequences is entered in the risk assessment template. Probability of Occurrence Definitions Inconceivable Rare Unlikely Likely Frequent Almost inconceivable that the event will occur, or it is eradicated by control measures. Very Unlikely to occur Unlikely to occur during the total operational life of the system May occur once during the total operational life of the system May occur several times during operational life Step 5 Evaluation of the Risk At this stage the hazard number is entered into the Risk Classification / Tolerability Matrix on the risk assessment template in order to evaluate the risk. Once stage 6 is completed and the item is reassessed this should be re-entered on the matrix and an arrow added showing the movement from initial to final risk assessment. The consequence will fall in one of the three regions: Acceptable the consequence is so unlikely or not severe enough to be of concern. The risk is tolerable and the Safety Objective has been met. Review the consequence and or likelihood is of concern. Measures to mitigate the risk should be sought. The risk may be acceptable provided that the risk is understood and has the endorsement of the Flight Operations Director. Unacceptable the likelihood and or severity of the consequence is intolerable. Page 3 of 11

Step 6 Risk Mitigation and Safety Requirements At this stage attempts are required to mitigate any risks identified as unacceptable. The hazards resulting in unacceptable risks are entered into the Risk Mitigation section of the Identification and Mitigation Table, and boundaries identified such that the risk is mitigated to a suitable level are recorded. Examples of the systems boundaries to be enforced such that risks are mitigated as acceptable include: Modification of operational procedures Training Developing emergency or contingency procedures Changes to staffing arrangements Not commencing / ceasing operations Proposed risk mitigation measures must be assessed closely to ensure new hazards are not introduced. It may be necessary to repeat previous steps in an iterative manner such that the optimised outcome is achieved. Step 7 Risk Summary and Operating requirements At this stage the airfield risk assessment should be summarised with details of any mitigating requirements. The overall airfield assessment is detailed as acceptable, review or unacceptable. Requirements to be met prior to operations must be clearly stated. The assessor should then sign off the document and forward it to the relevant fleet manager and chief pilot. The responsibility of the fleet manager and chief pilot is to check the document for mistakes and errors and ensure that it is acceptable prior to final sign off. If it is not so then it should be returned with guidance for corrective action. Once it has been signed off by the fleet manager and chief pilot the assessment is then passed to the Director of Flight Operations for final approval. The authorising signatories are included in this section. Airfield Categorisation The Airfield Risk Assessment together with the Airfield Categorisation guidance list below should be used to categorise the Airfield. The Airfield Risk Assessment and Airfield Categorisation should tie closely together and any items highlighted during the categorisation that have not been included in the Airfield Risk Assessment should result in a review of the Risk Assessment. The Airfield Risk Summary and Specific Operational Requirements as listed in the Airfield Risk Assessment should be used to drive the airfield brief. If the airfield brief is coming from the BA route manual, then careful consideration must be given to ensure that any items highlighted during the Airfield Risk Assessment in addition to those already listed in the brief are included. Page 4 of 11

Airfields are categorised as detailed in the Part C section 10.0, as either a Category A, Category B or Category C airfield. A Category A airfield satisfies all of the following requirements: (a) (b) (c) (d) An approved instrument approach procedure. At least on runway with Published circling minima not higher than 1000ft Night operations capability A Category B airfield is an airfield which does not satisfy all of the Category A airfield requirements, or which requires extra considerations such as: (a) (b) (c) (d) Non Standard Approach aids and / or approach patterns, or Unusual local weather conditions or Unusual characteristics or performance limitations, or Any other relevant considerations including obstructions, physical layout, lighting etc. A Category C airfield requires additional considerations to a Category B aerodrome and is considered to pose certain problems for the approach and / or landing and / or take-off. Airfield categorisation is authorised by the Chief pilot, or in his absence the fleet manager. Steps required for airfield categorisation (1) Review airfield charts, meteorology, ATC services and Vistair Briefing (2) Request airfield performance information from Nav / Performance manager (3) Complete the airfield categorisation checklist (4) Produce an airfield brief (Cat A or B airfields). (5) Disseminate the airfield brief by Notice to Aircrew or manual amendment as required. The Notice or manual amendment should include all information required for inclusion in Part C sections 12.3 and 12.4. (6) Have the airfield categorisation authorised. Page 5 of 11

System Description Date 1) Within AOC Region 2) Instrument Approach (review both ends) 3) PCN satisfactory (include taxiways and apron) 4) Night Ops 5) Terrain considerations within SID/STARS and 25nm 6) SID 7) STAR 8) Missed Approach climb gradient 9) RFF 10) Opening Hours 11) Weather Considerations 12) Cat III capability 13) Performance Restrictions for T/O and Landing 14) Emergency Turns 15) Special Procedures-i.e. missed approaches/visual approaches/noise abatement etc. 16) EGPWS Database 17) Alternates for T/O and Landing 18) Circling minima > 1000ft 19) Class of Airspace 20) FMC database 21) Political Situation 22) Fuel availability 23) De-icing facilities 24) Incident/Accident Review 25) Runway and Apron Layout 26) Variation 27) Radar 28) Other Page 6 of 11

Risk Classification / Tolerability Matrix Probability of Occurrence Definitions Inconceivable Rare Unlikely Likely Frequent Catastrophic Review Review Unacceptable Unacceptable Unacceptable Significant Acceptable Review Review Unacceptable Unacceptable Moderate Acceptable Acceptable Review Review Unacceptable Minor Acceptable Acceptable Acceptable Review Review Negligible Acceptable Acceptable Acceptable Acceptable Review Page 7 of 11

Identification and Mitigation Table No. 1 Description Consequence Consequence Severity Probability Result Mitigation Revised Consequen ce Severity Revised Probability New Result 2 3 4 5 Page 8 of 11

Risk Assessment Template Risk Summary and Operating requirements Risk Summary Specific Operational Requirements Airfield Risk Assessment Prepared by: Airfield Risk Assessment Reviewed by: (Chief Pilot / Fleet Manager) Airfield Risk Assessment Approved by: (Director of Flight Operations) Page 9 of 11

Categorisation Checklist Airfield Details ICAO IATA Y N Runway Details: Airfield is within AOC (Part A section 1.1.1) Approved instrument procedure exists Runway performance restricted. (Take-of and landing) Published Circling minima higher than 1000ft above aerodrome. Night operations capability. (A) (A) (A) (A) Airfield categorised as Cat A (A) Cat A airfield requirements Page 10 of 11

Y N Non Standard approach aids or approach patterns Unusual local weather conditions Unusual characteristics or performance limitations. Other considerations (obstructions, physical layout, lighting etc) Details: Details: Details:. Details: Airfield Categorised as Cat B Additional Considerations Airfield Categorised as Cat C Categorisation authorised by: Page 11 of 11