Spring/Summer Traffic and Construction Technical Briefing

Similar documents
Fall Technical Briefing 2016

ANNEX A: Rapid Transit, Transit Priority, and Road Projects

CPC Parking Lot Riverside Drive. Transportation Rationale

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim

Chapter 8 - Implementation

Estimated People & Jobs Total Short-Term ~2031. (Density) 12,400. = 45% of long-term People & Jobs estimate, as shown in column F).

Building a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville

Hospital Link Project Project Update November 2017

1. Provide a dedicated westbound approach bus lane at the intersection;

Hospital Link Project Project Update September 2017

Having held a public hearing, that Council approve:

CastleGlenn Consultants Inc.

Chapter 2 Current and Future Conditions

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Bank Street Widening Class EA Study Leitrim Road to Rideau Road. Gloucester South Seniors Centre, 4550 Bank Street

Road Network Development Report

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Draft North Industrial Area-Wide Traffic Plan

Terwillegar Drive Expressway Draft Concept Plan

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

to the Public Information Centre for the Downtown Traffic Study

Functional, Preliminary Design and Detailed Design

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Bicycle Master Plan Goals, Strategies, and Policies

WELCOME. The following materials and resources are available to you:

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

19 July 2016 OUR REF:

Tunnel Reconstruction South 5 th Street Association October 16, 2018

122 Avenue: 107 Street to Fort Road

Guide to travelling to and around Panmure April 2013

ECONOMY PEOPLE ENVIRONMENT

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

York Region Population and Employment Growth

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

Parking Lot P6C Transportation Impact Assessment

FDOT Treasure Coast Traffic Impact Report

Why invest in the 1 Street S.W. Corridor?

2018 Transportation Survey October 17, Prepared by:

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

FDOT Treasure Coast Traffic Impact Report

We want to hear from you!

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

The Bike Buzz in Richland. November 2017 Carl Berkowitz

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

An Easier Commute. Learn how to use I-77 Express to save you time.

TRANSPORTATION TRAINING TOPICS. April 6, 2010

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Capital Beltway HOT Lanes - Frequently Asked Questions

Plant City Walk-Bike Plan

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

PROJECT FACT SHEET March 21, 2018

Building Great Neighbourhoods BONNIE DOON

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

San Jose Transportation Policy

Appendix A-K Public Information Centre 2 Materials

SUMMARY OF TRANSPORTATION INVESTMENTS

Providing an Efficient and Multi-modal Transportation System

Glebe Neighbourhood Cycling Plan

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

CITY OF SPOKANE VALLEY Request for Council Action

Welcome to the McKenzie Interchange Project Open House!

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

McKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

Engineering - Bicycle and Pedestrian

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

Bay to Bay Boulevard Complete Streets Project

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

PROJECT FACT SHEET May 25, 2018

Building Great Neighbourhoods QUEEN ALEXANDRA

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

CPC Parking Lot Riverside Drive. Transportation Brief

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Changing the Climate of Mobility: Bellingham s Multimodal Transportation Networks

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

Pre-Construction Meeting

KING STREET TRANSIT PILOT

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Barrhaven South Urban Expansion Study Area Community Design Plan

Transcription:

Spring/Summer Traffic and Construction Technical Briefing 1

1. Introduction 2. Infrastructure Investments 3. Impacts to Mobility 4. Transit Operations 5. Mitigation Measures 6. Wrap-Up Overview 2

Infrastructure Investments 3

Infrastructure Investment Highlights Priority is renewing City transportation infrastructure. $540 million in funds for renewal in all service areas Renewal planned at over 375 sites 240 km placed end to end Over $51 million in citywide road resurfacing Project Type Number of projects KM Bridge, Structures and Culverts (including Transitway) 95 0 Roads and Roads related 5 5.5 Resurfacing (including Transitway) 125 190 Sidewalk Renewal 15 5.5 Road Sewer and Water 55 21 Sewer 65 13.5 Water 15 8 4

Infrastructure Investment Highlights Renewal work is balanced with new and facilities to meet growth and improvements. $127 million in capital funds for growth 80 new and improved projects scheduled for 2014 50 km placed end to end $4 million to improve highly congested intersections $2 million for new cycling facilities Project Type Number of projects KM Bridge Structures and Culverts 2 0 Roads and Road Related 25 20.5 Cycling and Multi-Use Pathways 13 6.5 Sidewalks 9 4.5 Traffic and Transit Priority 29 16.5 Sewer 8 3 Water 11 11 5

Investing in Road Resurfacing $51 million in road resurfacing projects Over 185 km of repaved roadway by the end of the 2014 construction season Baseline Road Leitrim Road Slater Street St. Laurent Boulevard St. Patrick Street Stonehenge Crescent 6

Investing in Major Road Construction Albert Street Belfast Road Campeau Drive extension Churchill Avenue East-West bikeway First Avenue Gladstone Avenue Greenbank Road Jockvale Road widening Preston Street Prince of Wales Overpass Princeton Avenue Queen Street Rideau Street Sussex Drive Highway 417 expansion 7

Investing in Major Projects Belfast Yard Maintenance and Storage Facility Coventry Road Pedestrian and Cycling Bridge Confederation Line Hunt Club interchange New Park and Ride spots Orleans Watermain Link O-Train expansion Strandherd-Armstrong Bridge Rideau River Pedestrian and Cycling Bridge 8

Impacts to Mobility

City Wide Trim Road Widening Fall 2012 Fall 2014 St. Joseph full closure July 2014 Fall 2014 OR 174 Resurfacing Spring / Summer 2014 Hwy 417 Widening Fall 2011 - Fall 2014 Pinecrest Interchange June 2014 November 2014 SEE CORE SLIDES Carp Overpass Construction April 2014 November 2014 Greenbank Widening May 2014 - November 2015 Castlefrank Ramp Closure May 2014 June 2014 Baseline Resurfacing Spring / Summer 2014 Orleans Watermain Link Impacts to Youville, St. Joseph & Jeanne d Arc Dates TBD Hunt Club Interchange Construction Fall 2011 Fall 2014 Jockvale Bridge Spring 2012 - Fall 2014 IMPACT: High (more than 15 minutes delay) Medium (5 to 15 minutes delay) Low (under 5 minutes delay) Bank at Conroy Intersection Modifications May 2014 November 2014 Schedules are subject to change

Rideau St Development Project Core Area - April Macdonald Cartier Bridge Rehabilitation Sussex Minto Bridge Rehabilitation Chaudière Crossing Rehabilitation Rideau St Albert St Rehabilitation Hwy 417 Widening Churchill Hwy 417 Ramp Closure Riverside northboundto-westbound IMPACT: High (more than 15 minutes delay) Medium (5 to 15 minutes delay) Low (under 5 minutes delay) Schedules are subject to change

Albert St Rehabilitation Chaudière Crossing Rehabilitation Rideau St Development Project Queen Street Watermain Core Area - May Macdonald Cartier Bridge Rehabilitation Sussex Minto Bridge Rehabilitation Rideau St Coventry watermain Ogilvie watermain Gladstone Sewer Hwy 417 Widening Churchill Elgin Lane Reductions Hwy 417 Weekend Ramp Closures Vanier southbound-toeastbound St. Laurent southboundto-eastbound Belfast/Tremblay LRT Construction Montreal Watermain IMPACT: High (more than 15 minutes delay) Medium (5 to 15 minutes delay) Low (under 5 minutes delay) Schedules are subject to change

Rideau St Development Project Queen Street Watermain Core Area June Macdonald Cartier Bridge Rehabilitation Sussex Minto Bridge Rehabilitation Rideau St Albert St Rehabilitation Coventry watermain Montreal Watermain Ogilvie watermain Gladstone Sewer Hwy 417 Widening Churchill Elgin Lane Reductions Belfast/Tremblay LRT Construction Hwy 417 Ramp Closures St. Laurent northboundto-westbound St. Laurent southboundto-eastbound IMPACT: High (more than 15 minutes delay) Medium (5 to 15 minutes delay) Low (under 5 minutes delay) Schedules are subject to change

Rideau St Development Project Core Area - July Macdonald Cartier Bridge Rehabilitation Sussex Minto Bridge Rehabilitation St. Patrick Rehabilitation Rideau St Albert St Rehabilitation Coventry watermain St. Laurent Watermain Crossing Ogilvie watermain Highway 174 lane reductions Gladstone Sewer Hwy 417 Widening Churchill Elgin Lane Reductions Montreal Watermain Lees Lees Bridge Replacement Belfast/Tremblay LRT Construction IMPACT: High (more than 15 minutes delay) Medium (5 to 15 minutes delay) Low (under 5 minutes delay) Schedules are subject to change

Rideau St Development Project Core Area - August Macdonald Cartier Bridge Rehabilitation Sussex Minto Bridge Rehabilitation St. Patrick Rehabilitation Rideau St Albert St Rehabilitation Coventry watermain St. Laurent Watermain Crossing Ogilvie watermain Highway 174 lane reductions Gladstone Sewer Hwy 417 Widening Churchill Elgin Lane Reductions Montreal Watermain Lees Lees Bridge Replacement Belfast/Tremblay LRT Construction IMPACT: High (more than 15 minutes delay) Medium (5 to 15 minutes delay) Low (under 5 minutes delay) Schedules are subject to change

Summer Maintenance Operations Other road works that may have traffic impacts: Regular road and sidewalk maintenance: pothole repair; gravel roads; ditching; litter pickup Street Sweeping Tree planting and maintenance Motorcycle and beach parking Maintenance of parks, wading pools, beaches Graffiti Management, Cleaning the Capital 16

New Traffic Management Initiatives Construction Management Enhanced monitoring Dedicated traffic inspectors Improved coordination with other partners Transportation System Management Enhanced advanced traffic management system on Hwy 417 and OR 174 Continued prioritization of critical road network Ongoing monitoring from Traffic Control Centre

Transit Operations 18

Transit Service Detours Construction Area Route Detoured Timeline Churchill (Carling to Byron) Routes 16, 150 March - July Churchill (Princeton to Byron) Route 150 July - late 2014 Gladstone (Bank to Cartier) Route 14 mid-april - late 2014 Coventry/St-Laurent intersection Routes 5, 7, & 14 April - late 2014 Youville (Jeanne d Arc to St-Joseph) Routes 31, 131 April - late 2014 Belfast (Coventry to Tremblay) Route 18 Mid-May beyond 2014 Belfast (Tremblay to Trainyards) Routes 94, 95 AM service mid-may - beyond 2014 Queen Street (Metcalfe to Elgin) Routes 4, 9 & 12 May - June Lees Avenue (Main to Chestnut and 417 Overpass) Route 16 July - end of September St-Joseph (Tenth Line to Dairy) Route 122, 221 July - mid-september 19

Minimizing Transit Service Detours Impacts to customers minimized OC Transpo adjusts routes and schedules in construction zones to maintain service reliability Customer information: octranspo.com, by phone at 613-741-4390, 560560, My Transit iphone app, or other private iphone and Android apps 20

Presto Benefits Presto provides a number of convenient and practical customer features: Cards can be loaded online or by phone Monthly, automatic renewal So you don t have to stand in line! Eligible for the Federal Public Transit Tax Credit e-purse option for lower usage Cards are transferable and can be shared with family and friends in the same fare class or lower 21

Bike and Ride Rack & Roll program runs annually for about six months each year Racks installed on 540 buses Bikes can also be transported year-round on the O- Train Use the Advanced Planner at octranspo.com to see which trips have bike racks Bicycle racks have also been installed at O-Train stations and most Transitway stations to allow customers to park their bikes and ride 22

East End Transit Capacity Available Capacity to be available on all east-end express and Transitway routes Capacity to be available to carry 5200 more customers in the morning peak period (2100 in the busiest hour) Capacity to be available to carry 4600 more customers in the afternoon peak period (1800 in the busiest hour) 23

Park and Ride Availability Park and Ride Capacity Space Available? Trim 977 Yes Millenium 151 Yes Ray Friel Rec Complex 30 Yes Nepean Woods 342 Yes Fallowfield 1665 Yes Strandherd 366 Yes Leitrim 292 Yes Terry Fox 515 Yes Canadian Tire Centre 100 Yes 24

Mitigation Measures 25

Traffic Easing Measures New overhead signs on Highway 417/Highway 174 Additional traffic cameras Revamped OttawaRideMatch.com Working with major Ottawa employers Park and Ride Lots Ottawa Nav improvements Route planning Blackberry version 26

Plan around construction Give priority to emergency vehicles Avoid traveling during peak periods Consider carpooling Take advantage of transferable Presto card Tips for Commuters Walk, bike, take transit. Combine them if your commute is longer. Embrace technology in the workplace (e.g. Teleconference) Consider alternative work arrangements 27

City information: ottawa.ca octranspo.ca Stay in the Know Ottawa Nav mobile app Twitter: @ottawacity @ottawa_traffic @OC_Transpo 28