LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

Similar documents
2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

::~-~ w ANNUAL LIST OF PALM BEACH MPO PRIORITY PROJECTS FY Adopted July 20, '"',, - ==~"'c;;f'";~":?:'!""

DRAFT TENTATIVE WORK PROGRAM FY

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

Transit Initiatives 1

Westgate/Belvedere Homes Community Redevelopment Agency. Belvedere Heights. Streetlights & Sidewalks Improvements Project.

TPA Committee Meetings May 2018

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

Florida Redevelopment Association 2015 Annual Conference

Technical Advisory Committee (TAC)

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

HIA Working Group Meeting #4 September 27, 2017

Belvedere Heights Streetlights & Sidewalks Improvements Project

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

Agenda. US-1 Corridor Study and HIA Update. Pathway Diagram / Primary Indicators. Research Questions. Linking Multimodal Improvements to Indicators

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

VISION ZERO ACTION PLAN

2012 PRIORITY TRANSPORTATION PROJECTS

Completing the Vision

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

Typical Rush Hour Commute. PennyforTransportation.com

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

1000 FRIENDS OF FLORIDA PALM BEACH COUNTY 2070 OCTOBER 2018

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Non-Motorized Transportation 7-1

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

City of Charlottesville Bicycle and Pedestrian Master Plan Update

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

West End Connectivity Master Plan

VIII. Project Prioritization & Implementation

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

CHARLOTTE COUNTY PUNTA GORDA MPO

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Basalt Creek Transportation Refinement Plan Recommendations

Road Diets FDOT Process

Chapter 4: Funding and Implementation

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

Financial Project ID No(s).: and ETDM No(s).: and 14181

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

BICYCLE, TRAILWAYS AND PEDESTRIAN ADVISORY COMMITTEE (BTPAC) AGENDA. DATE: Thursday, February 8, 2018

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

DeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights

CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BICYCLE/PEDESTRIAN ADVISORY COMMITTEE (BPAC)

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Amelia Island Trails (AIT) Progress and Proposed 5-YR Plan JANUARY 16, 2018

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Transportation Planning Division

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

Central Avenue Corridor Study FPID Number:

Bay to Bay Boulevard Complete Streets Project

Bicycle and Pedestrian Plans and Improvements

Welcome to the Quebec Alternatives Analysis Public Meeting

Palm Beach MPO Complete Streets Working Group

Plant City Walk-Bike Plan

Performance Criteria for 2035 Long Range Transportation Plan

San Jose Transportation Policy

DRAFT- LMS Prioritized Project List

RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Bicycle Master Plan Goals, Strategies, and Policies

2016 TELL THE TPO SURVEY

HIA Working Group Meeting #5 November 29, 2017

T A B L E O F C O N T E N T S

Palm Beach County Traffic Report November 16 through November 23, 2018

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

The Transformation of Portland into a Two-Wheeled Mecca. Mia Birk, Principal, Alta Planning + Design

GOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

FUNDING SOURCES CHAPTER 6

Chapter 5 Future Transportation

LANE ELIMINATION PROJECTS

Complete Streets Initiative Update

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

The Bike Buzz in Richland. November 2017 Carl Berkowitz

Needs Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Route 29 Solutions Projects

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1)

Enhancing Downtown

Orange County s Transportation Planning and Multimodal Corridor Plan

Transcription:

LIST OF PRIORITY PROJECTS FY 2020-2024 TPA Committee Meetings & Board Review September 2018

MISSION To collaboratively plan, prioritize, and fund the transportation system. El Rio Trail Boca Raton, May 2018

Timeline to the FY 20-24 TIP TPA adopts Priority List for FY 20-24 - September 2018 - Today FDOT evaluates available funds and costs Fall 2018 TPA reviews FDOT Draft Tentative Work Program - December 2018 TPA reviews Draft TIP May 2019 TPA adopts Final TIP June 2019 Operating under FY 20-24 TIP July 1, 2019 to June 30, 2020 Draft FDOT WP Dec 2018

Priority List project types Project Category Source of Projects Funding Major Projects Local Initiatives LRTP Cost Feasible List Annual Competitive Application $40 million/yr Primarily State Funds (District Dedicated Revenue-DDR, Statewide Fuel Tax-DS, Public Transit Office-DPTO); Some Fed Surface Transportation Funds SA $20 million/yr Primarily Federal Funds (Surface Transportation Program suballocated to TPA SU) Transportation Alternatives Annual Competitive Application $3 million/yr Additional Federal Surface Transportation Program Funds for non-motorized projects

Status Reports Cost Feasible projects with LRTP rank, score, and current status Local Initiatives and Transportation Alternatives with ranking, staff score, and current status *Includes all 2018 applications with explanations for those not proposed for inclusion on Priority List* Example:

TPA Major Projects Prioritized annually from the Cost Feasible list in LRTP Five Year Target: ~$200M FY 19-23 TIP: ~$100M Current Priorities need $646 million for full implementation HIGHLIGHTS Split US 1 corridor to show all Tier 1 projects from study (~$20M) Three are lane repurposing: Lake Worth, North Palm, West Palm Need Local Resos & FDOT approval No suggested additions allow more time to vet/advance the three new projects added in 2017

Local Initiatives Annual competitive application process ~$20M/yr in fed & state funds 2018 Applications 6 proposed for inclusion on priority list 2 did not submit resolutions of support 3 have design/feasibility issues Addition of funds to support TPA Planning & Administration Modifications to Existing Priority Projects Sandalfoot Dr and New England Blvd bridge replacements deleted Video detection at signalized intersections reduced from 27 to 15 Congress Ave from C-15 canal to Atlantic Ave withdrawn by City

Local Initiatives 2018 Applications 1 of 2 ~$20M/yr in fed & state funds Rank Applicant Location Description Total Cost Score Project Status Roadway repurposing to add Westgate Ave from Congress Ave to 1 Westgate CRA designated bike lanes and widen $2,407 43.3 On Priority List Wabasso Dr sidewalks Install ITS technology on 200 buses & 2 Palm Tran Palm Tran onboard buses & paratransit $4,792 42.0 No resolution 250 paratransit buses 3 West Palm Beach Parker Avenue from Forest Hill Blvd to Nottingham Blvd Install separated bicycle lanes, pedestrian lighting and street trees $5,000 37.2 On Priority List 4 Palm Beach County Lyons Rd/Sansbury Way from Forest Hill to Okeechobee Blvd Install separated bicycle lanes $4,352 36.0 On Priority List 5 Delray Beach Linton Blvd between Federal Highway and A1A Install separated bicycle lanes $998 34.8 No agreement with Palm Beach County for ROW 6 Boynton Beach Boynton Beach Blvd from I-95 to US 1 Install 4' designated bike lanes and widen to 9' sidewalks $2,232 33.9 On Priority List

Local Initiatives 2018 Applications 2 of 2 ~$20M/yr in fed & state funds Rank Applicant Location Description Total Cost Score Project Status 7 Boca Raton Yamato Rd and 20 Intersections in the downtown area Adaptive Control Systems $2,202 28.0 On Priority List 8 Wellington Greenbrier Blvd from Aero Club Dr to Greenview Shores Blvd 4' designated bike lanes $1,095 26.8 No Resolution 9 Delray Beach Germantown Rd from Old Germantown Rd to Congress Ave Install 6' separated bike lanes & 6' sidewalks $5,000 26.0 On Priority List 10 Boca Raton St Andrews Blvd from Glades Rd to Palmetto Park Rd Construct 10' shared use path $1,017 18.8 Withdrawn by City 11 Royal Palm Beach La Mancha Ave to Okeechobee Blvd La Mancha Ave road and pedestrian extension $2,085 13.1 Requires PD&E and ROW phases - not eligible

Transportation Alternatives Annual competitive application process ~$3/yr in fed & state funds 2018 Applications for 2018 4 proposed for inclusion on priority list 1 not prioritized, 2 no resolution of support, 1 design/feasibility issues Modifications to Existing Priority Projects Tamarind Ave from Banyan Blvd to Palm Beach Lakes Blvd FDOT cancelled funding Belle Glade sidewalks reduction in total sidewalk length Anchorage Dr between north and south US 1 intersections Village withdrew project *Add project* Lake Worth Rd from Raulerson Dr to Palm Beach St College Ent Add multimodal improvements to FDOT FY 21 resurfacing project

Transportation Alternatives 2018 Applications ~$3/yr in fed & state funds Rank Applicant Location Description 1 West Palm Beach 2 PalmTran Fixed-route 3 Greenacres 4 Boca Raton 5 Westgate CRA Trailway on NW side of Clear Lake connecting Okeechobee Blvd to Palm Beach Lakes Blvd Dillman Trail from Forest Hill Blvd to Dillman Rd SW 18th St from E of SW 6th Ter to SW 4th Ave Bridgeman Dr, Wellington Rd, Prairie Rd within Westgate CRA Construct 10' shared use path on west side of Clear Lake Install three-rack bicycle racks on entire fleet Total Cost Score Project Status $1,000 67.8 On Priority List $400 64.0 No resolution Construct 12' shared use path $561 59.3 On Priority List 6' sidewalk along the southside of the roadway Install 5' sidewalks and pedestrian scale lighting - Phase II $1,000 61.3 Withdrawn by City $956 54.9 On Priority List 6 Palm Beach County CR A1A/Ocean Drive Pedestrian Crossing Enhancements $629 55.0 On Priority List 7 Wellington 8 Delray Beach Greenview Shores Blvd from Binks Forest Dr Designated bike lanes $681 49.2 No resolution to Wellington Trc Brant Bridge Loop - Carl Bolter Dr from Lindell Not prioritized 6' separated bike lanes & 6' sidewalks $536 47.5 Blvd to Blue Jay Turn inadequate funds

SUN Trail Program Annual state application process US 1 (Broadway Ave) from 25 th St to 42 nd street Project deleted and City can resubmit to FDOT for SUN Trail program funding