Managing Our Legacy Together
|
|
- Karin Fox
- 5 years ago
- Views:
Transcription
1 TO: FROM: Chair and Members Engineering and Public Works Committee Craig Douglas, P.Eng. Manager of Engineering Services DATE: January 22, 2014 SUBJECT: Proposed Georgian Bay Cycling Route REPORT NO: PW RECOMMENDATION THAT the Georgian Bay Cycling Route proposed by the LaCloche Manitoulin Business Assistance Corporation be supported in principle. ORIGIN In November 2013, The District Municipality of Muskoka was approached regarding input into the development of a cycling route around Georgian Bay and was subsequently asked for a letter of support. ANALYSIS In 2012, the concept of a continuous cycling route around Georgian Bay was developed by the Manitoulin Cycling Advocates. A feasibility study was initiated in 2013 by the LaCloche Manitoulin Business Assistance Corporation (LAMBAC) with funding received from FedNor, Ontario Ministry of Tourism, Culture and Sport, and the Heart & Stroke Foundation. The feasibility study is being carried out by a consultant team (Transportation Options) reporting to LAMBAC s Steering Committee. The 900 km circular route touches on seven upper tier municipalities. The study consultants are now asking the municipalities for their support of the Georgian Bay Cycling Route prior to finalizing their report back to the Steering Committee. Appendix A contains materials created by Transportation Options and includes their Overview & Support Request and maps of the Muskoka portion of the cycling route. The Muskoka portion of the cycling route primarily uses the District of Muskoka road system. Starting in the north it follows Muskoka Road 169 south through Bala to Torrance where it turns south along Muskoka Road 13 (Southwood Drive) before heading west on Muskoka Road 49 (Canning Road) into Simcoe County. Managing Our Legacy Together Page 1
2 Two side loops are also proposed. The first is a detour into MacTier and would use Muskoka Road 11 (High Street). This loop would serve to provide access to a service centre between Parry Sound and Bala. The second loop in the Port Severn area provides riders with access to identified Township of Georgian Bay tourist destinations, such as Port Severn, Honey Harbour and the Georgian Bay Islands. This loop would use Muskoka Roads 5 (Honey Harbour Road), Muskoka Road 48 (South Bay Road), and Muskoka Road 34 (White s Falls Road). With the exception of Muskoka Road 5, the proposed cycling route follows Muskoka Roads that have not been identified on the Active Transportation network. Muskoka has limited north-south connecting roads in the west which is why the route needs to travel so far inland from Georgian Bay. The proposed route has its challenges, particularly north of Parry Sound and in the Sudbury region where, at this point, connectivity can only be provided along high-volume provincial facilities. The issues of paved shoulders and signage have not been fully studied at this preliminary stage of the study. At this point, LAMBAC s Steering Committee is only looking for support in principle. FINANCIAL CONSIDERATIONS There are no costs associated with this report. STRATEGIC PRIORITIES This subject of this report relates directly to Muskoka s July 2012 Strategic Priority 3.2 to Encourage and support initiatives aimed at strengthening the tourism industry in Muskoka. COMMUNICATIONS Following adoption by District Council, notice of the Committee s decision regarding this matter will be provided to LAMBAC s Steering Committee and to Muskoka s Area Municipalities. Respectfully submitted, Craig Douglas, P.Eng. Manager of Engineering Services A.J. White, P. Eng Commissioner of Engineering and Public Works Page 2
3 - Appendix A Cycle Tourism Icon Active Transportation Economic Development Healthy Communities Georgian Bay Cycling Route Highlights 900km Signature Cycling Route around Georgian Bay Uses existing roads and trails where possible Will be signed throughout Start with one core route Future loops and fingers to include communities, attractions and designated bike routes Will evolve as new bike lanes and trails are developed Target cyclists: touring, experienced, recreational Route selection: safe, close as possible to Georgian Bay, Uses existing roads and trails where possible 7 Districts/Counties: Manitoulin, Sudbury, Parry Sound, Muskoka, Simcoe, Grey, Bruce Feasibility Study 2013 Funded by FedNor, OMTCS and the Heart & Stroke Foundation Oversight by Steering Committee, LAMBAC Concept Study 2012 Manitoulin Island Cycling Advocates (MICA) Denis Baldwin Initial routing & many letters of support Partner support wil help make this Si nature Cycling Route a reality Please send your letters of support to: Georgian Bay Cycling Route Steering Committee c/o LAMBAC 30 Meredith St Gore Bay, ON POPlHO info@lambac.ot -g --_ ~- ~ - Questions? Please contact the GBCyR Consulting Team Louisa Mursell Projects Director Transportation Options Imursell@transportationoptions.or~ / Peggy Staite-Wong & Robert Wong Partners RMCG ww w.rrncg. ca Cycle Tourism Icon Active Transportation Economic Development Healthy Communities
4 I
5 .-M I:
6
ONTARIO BIKE SUMMIT 2012 Louisa Mursell Projects Director Phone: /
ONTARIO BIKE SUMMIT 2012 Louisa Mursell Projects Director Phone: 416-392-1556 / 1-866-333-4491 Email: lmursell@transportationoptions.org www.welcomecyclists.ca 2012 Transportation Options Cycle Tourism
More informationOntario Cycling Events & Tourism Impact Project - Cross Event Report -
Ontario Cycling Events & Tourism Impact Project - Cross Event Report - Cyclists, Tourism Researchers, Strategists Funded in part by Cycling Events in Ontario Background Over the past few years, Ontario
More information3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE
3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following report dated December
More informationCYCLE TOURISM DESTINATION DEVELOPMENT
CYCLE TOURISM DESTINATION DEVELOPMENT Louisa Mursell Projects Director Phone: 416-827-2774 / 1-866-701-2774 Email: lmursell@transportationoptions.org www.welcomecyclists.ca 2013 Transportation Options
More informationTransportation Master Plan Advisory Task Force
Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved
More informationOntario By Bike Industry Partnership Advisory Committee Web Conference February 9,
Ontario By Bike Industry Partnership Advisory Committee Web Conference February 9, 2015 www.transportationoptions.org/obbip Web Conference Agenda: 1. Welcome and Introductions 2. Ontario By Bike and OBBIP
More information(centre) Destination Ontario; and (right) Great Lakes Waterfront Trail (GLWT)/ Simon Wilson/ Waterfront Regeneration Trust..
Province-wide Cycling Network Study Report April 2018 Cover page photo sources: Current page photo source: (left) Destination Ontario; (centre) Destination Ontario; and (right) Great Lakes Waterfront Trail
More informationCycle Tourism Regional Research Project 2016 Counters: An Important Part of Methodology
Cycle Tourism Regional Research Project 2016 Counters: An Important Part of Methodology National Bicycle Tourism Conference November 2016 www.ontariobybike.ca 2016 Transportation Options ONTARIO, CANADA
More informationLake to Lake LAKE YORK. CYCLING ROUTE and WALKING TRAIL FEASIBILITY and DESIGN STUDY LAKE. CITY of REGION ONTARIO SIMCOE TORONTO
LAKE SIMCOE Lake to Lake CYCLING ROUTE and WALKING TRAIL FEASIBILITY and DESIGN STUDY YORK REGION Overview Report JUNE 2013 CITY of TORONTO LAKE ONTARIO Table of Contents Study background 2 Study Background............................
More informationPurpose. Process. Recommendations
Summary Document Purpose The was developed to increase safety, mobility, and recognition of cycling in the High Country region (Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey Counties).
More informationClimate Change Action Plan: Transportation Sector Discussion Paper: Cycling
Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling ontario.ca/climatechange Contents 1. Minister of Transportation s message... 3 2. Introduction... 5 3. Sector Overview and Support
More informationTO\fH,:>-1 0 ::: 'l, Regional Clerk's Office
YLgion I TO\fH,:>-1 0 ::: E 'l, Regional Clerk's Office A;..::S:_:T_G:::::":.!.W~I~L~l:'!IM~B~U~R!JYC..'.J Corporate Services Department March 27, 2015 Mr. Fernando Lamanna Town Clerk Town of East Gwillimbury
More informationCycle Tourism: Destination Burlington
Cycle Tourism: Destination Burlington TOURISM BURLINGTON AGM May 24, 2018 Louisa Mursell Executive Director www.ontariobybike.ca 2018 Transportation Options What We Do Industry Standards & Certification
More informationShifting Gears for a Healthier City
Shifting Gears for a Healthier City Mississauga s Cycling Master Plan is an ambitious strategy that sets out to transform Mississauga into a city that is conducive to cycling for daily transportation needs.
More informationSue Shikaze Health Promoter, HKPR District Health Unit Chair, Haliburton County Communities in Action Committee
Sue Shikaze Health Promoter, HKPR District Health Unit Chair, Haliburton County Communities in Action Committee Healthy Communities by Design webinar, July 2013 1 Presentation Overview Background Strategies
More informationWe support several of Regional Municipality of Durham Transportation Master Plan Directions such as
OATAC-17-26 Relates to Item 1 of the O.A.T.A.C. Report (DS-17-164) We support several of Regional Municipality of Durham Transportation Master Plan Directions such as Direction 3: Make walking and cycling
More informationBicycling Routes on Provincial Roads Policy
Bicycling Routes on Provincial Roads Policy Policy Statement Rationale To support bicycling in Nova Scotia, the Department of Transportation and Infrastructure Renewal (TIR) may designate some portions
More informationOntario By Bike Industry Partnership Advisory Committee Web Conference October 14,
Ontario By Bike Industry Partnership Advisory Committee Web Conference October 14, 2015 www.transportationoptions.org/obbip Web Conference Agenda: 1. Welcome and Introductions 3. Regional and Organization
More informationShifting Gears for a Healthier City.
Shifting Gears for a Healthier City. Mississauga s Cycling Master Plan is an ambitious strategy that sets out to transform Mississauga into a city that is conducive to cycling for daily transportation
More informationCity of Perth Cycle Plan 2029
Bicycling Western Australia s response City of Perth Cycle Plan 2029 2012-2021 More People Cycling More Often ABOUT BICYCLING WESTERN AUSTRALIA Bicycling Western Australia is a community based, not-for-profit
More informationBrockville Cycling Advisory Committee Meeting Thursday, May 08, 2014, 5:00 pm City Hall, Boardroom
Committee Minutes Brockville Cycling Advisory Committee Meeting Thursday, May 08, 2014, 5:00 pm City Hall, Boardroom Members Present: Mr. Alan Medcalf, Chair Mr. Hugh Campbell, Vice Chair Ms. Kathleen
More informationTO: FROM: SUBJECT: RECOMMENDATION POLICY BACKGROUND Park Board Review
October 13, 2015 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: IRONMAN 5i50 Vancouver Triathlon Special Event RECOMMENDATION THAT the Vancouver
More informationActive Transportation Master Plan
Prepared by: BT Engineering Inc. 100 Craig Henry Drive, Suite 201 Ottawa, Ontario K2G 5W3 June 2017 Table of Contents TABLE of CONTENTS Introduction... 1 Tourism... 2 Health... 3 Safety... 4 Environment...
More informationCallander Mountain Bike Trails Feasibility Study Executive Summary January 2015
Callander Mountain Bike Trails Feasibility Study Executive Summary January 2015 Client : Callander Community Development Trust & Callander Mountain Bike Trails Date : 26 January 2015 Status : FINAL Executive
More informationCity of Waterloo Complete Streets Policy
City of Waterloo Complete Streets Policy Chris Hodgson P. Eng City of Waterloo Complete Streets Forum 2011 April 28-29 Toronto Waterloo context: Current population Major employers Universities and student
More informationBrockville Cycling Advisory Committee Thursday, June 12, 2014, 5:00 pm City Hall, Boardroom
AGENDA Brockville Cycling Advisory Committee Thursday, June 12, 2014, 5:00 pm City Hall, Boardroom Page Disclosure of Interest Approval of the Agenda THAT the Agenda of the June 12, 2014 meeting of the
More informationRequest for Decision. Ontario Municipal Commuter Cycling Program Grant. Resolution. Presented: Tuesday, Feb 13, 2018
Presented To: City Council Request for Decision Ontario Municipal Commuter Cycling Program Grant Presented: Tuesday, Feb 13, 2018 Report Date Wednesday, Jan 24, 2018 Type: Presentations Resolution Resolution
More informationWELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input
WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith
More informationDurham Region Cycling Coalition DRCC
Durham Region Cycling Coalition DRCC Promoting Safe Cycling Throughout Durham Region WHO ARE WE? Founded in 2015, as a voice for the Region s 5 largest cycling club (1,500 + active members) Oshawa Cycling
More informationCITY OF KINGSTON INFORMATION REPORT TO ENVIRONMENT, INFRASTRUCTURE & TRANSPORTATION POLICIES COMMITTEE Report No.: EITP
CITY OF KINGSTON INFORMATION REPORT TO ENVIRONMENT, INFRASTRUCTURE & TRANSPORTATION POLICIES COMMITTEE TO: FROM: RESOURCE STAFF: Chair and Members of Environment, Infrastructure & Transportation Policies
More informationProposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017
WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed
More informationPeterborough Council on Aging
Peterborough Council on Aging Discussion paper series #4, 2015 Transportation Transportation, including accessible and affordable public transport is a key factor influencing active aging. in particular,
More information*Presenter at the 2008 TAC Conference
York Region Pedestrian and Cycling Master Plan Towards a More Sustainable Region Robert Grimwood, P.Eng. Project Engineer, MMM Group Ltd.* Dave McLaughlin, MCIP, RPP Senior Project Manager, MMM Group Ltd.
More informationPlant City Walk-Bike Plan
Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked
More informationSouthwest Ontario Tourism Corporation 2017 Cycling Market Research Report
Southwest Ontario Tourism Corporation 2017 Cycling Market Research Report Table of Contents: 1. Introduction 2. Background of Adventure Cycling 3. Key Takeaways 4. Survey Results 5. Conclusion 1. Introduction:
More informationRegional Cycling Plan
Adopted December 2008 Quality for Life Adopted December 2008 For more information, contact: Greater Wellington 142 Wakefield Street PO Box 11646 Manners Street Wellington 6142 T 04 384 5708 F 04 385 6960
More informationThe study area for this project is the entire County of Oxford including both the urban centres and rural areas.
INTRODUCTION In July 2013 Oxford County initiated a study to develop a long term Trails Master Plan. The study is now being undertaken collaboratively with the County, the consultant team from MMM Group
More informationEncouragement. Chapter 4. Education Encouragement Enforcement Engineering & Facilities Evaluation & Planning. Encouragement Chapter 4
Encouragement Education Encouragement Enforcement Engineering & Facilities Evaluation & Planning Photo above: Children show off their ribbons at the Tour de Virginia Beach. Virginia Beach Bikeways and
More informationBrockville Cycling Advisory Committee Thursday, January 12, 2017, 5:00 pm City Hall, Boardroom
Brockville Cycling Advisory Committee Thursday, January 12, 2017, 5:00 pm City Hall, Boardroom AGENDA Page Disclosure of Interest Approval of the Agenda THAT the Agenda of the January 12, 2017 meeting
More informationTrans Canada Trail Véloroute Voyageur Cycling Route WAYFINDING SIGNAGE PLAN for Low to Moderate Volume Highways
Trans Canada Trail Véloroute Voyageur Cycling Route WAYFINDING SIGNAGE PLAN for Low to Moderate Volume Highways Roadway Trail Section: Markstay-Warren, St. Charles, French River and West Nipissing Road
More informationPROVINCIAL MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS AMENDMENTS 2018 RECOMMENDATION
TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018 KELLY SCHERR, P.ENG, MBA, FEC MANAGING DIRECTOR OF ENVIRONMENTAL AND ENGINEERING SERVICES AND CITY ENGINEER PROVINCIAL
More informationNOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL
CITY OF KAMLOOPS Junior Council Meeting Agenda March 12, 2018, at 3:30 pm in Council Chambers, 7 Victoria Street West, Kamloops, BC Page 1. APPROVAL OF THE AGENDA 2. MINUTES Attachment Recommendation:
More informationTxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017
AGENDA ITEM 6 TxDOT Bicycle Tourism Trails Study Update April 2017 BAC Meeting April 10, 2017 Agenda Approval of interim products o Present study vision statement, goals, and study objectives o Present
More informationImplementing Active Transportation (AT) Facilities in Small Communities
Implementing Active Transportation (AT) Facilities in Small Communities Dave McLaughlin M.ES, MCIP, RPP, Partner & Senior Project Manager Presenters: Jay Cranstone, MLA, OALA, CSLA, Associate & Senior
More informationNorth Channel Cycling Route Study
Sault Ste. Marie Sudbury Lake Huron North Channel Cycling Route Study FINAL REPORT March 2013 D16-12-032 TABLE OF CONTENTS Acknowledgements Executive Summary 1.0 Introduction... 1 1.1 What is the Lake
More information2014 Review/2015 Business Plan
Cycling and Pedestrian Advisory Committee (CPAC) 2014 Review/2015 Business Plan PRESENTATION TO DEVELOPMENT SERVICES COMMITTEE March 24, 2015 Membership up to 20 members, supported by staff from Engineering
More informationNiagara Cycling Tourism. Presented by: Susan Morin Prepared by Karine Whittingham May 5th, 2014
Niagara Cycling Tourism Presented by: Susan Morin Prepared by Karine Whittingham May 5th, 2014 Agenda! Why Cycling Tourism! Economic Impact! Objective & Activities! Stakeholders! Product Development! Bicycle
More informationDurham Region Cycling Coalition DRCC. Promoting Safe Cycling Throughout Durham Region
Durham Region Cycling Coalition DRCC Promoting Safe Cycling Throughout Durham Region Who Are We? Founded in 2015, as a voice for the Region s 5 largest cycling clubs (1,500 + active members) Oshawa Cycling
More informationTrails that Transform: The Economic Impact of Bicycle Tourism
Trails that Transform: The Economic Impact of Bicycle Tourism September 2016 Economic Growth Summit Alta Planning + Design Nation s leading team of bicycle, pedestrian, greenways, and trails planning and
More informationMAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report
Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction
More informationCycling Study. Lanark County
Lanark County Cycling Study Prepared by: AECOM Canada Ltd. 302 1150 Morrison Drive, Ottawa, ON, Canada K2H 8S9 T 613.820.8282 F 613.820.8338 www.aecom.com Project Number: 108515 Date: May, 2009 Table of
More information12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)
12 RECOMMENDATIONS Recommendations are based on the technical analysis of existing and future road and active transportation conditions, the results of the review of existing City policies and public feedback.
More informationWalkBikeNC Plan. Presenters Anne Eshleman, EIT, LEED AP Led bike route analysis. Stephen Bzomowski, Planner Public input and data development
WalkBikeNC Plan Presenters Anne Eshleman, EIT, LEED AP Led bike route analysis Stephen Bzomowski, Planner Public input and data development WalkBikeNC Plan Presentation Outline WalkBikeNC Plan State Bike
More informationJEFFERSON COUNTY BIKE PLAN 2010: EMPHASIS SUMMARY
JEFFERSON COUNTY BIKE PLAN 2010: EMPHASIS SUMMARY Presented at Jefferson and Walworth County Bicycle Forum Series Summer 2011 By: Steve Grabow, Professor and Community Development Educator UW-Extension,
More informationTOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview
TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview NationalCyclingStrategFrameworkv3.indd 1 Potential for this modal shift can be found in municipalities of all sizes, in every population
More informationDurham Region Cycling Coalition DRCC
Durham Region Cycling Coalition DRCC Promoting Safe Cycling Throughout Durham Region WHO ARE WE? Founded in 2015, as a voice for the Region s 5 largest cycling club (1,200 + active members) Oshawa Cycling
More informationMASTER BICYCLE AND PEDESTRIAN PLAN
VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.
More informationTransportation Master Plan Public Meeting. Grey County Administration Building, Owen Sound. Friday, March 6, :00 p.m.
Minutes Transportation Master Plan Public Meeting Grey County Administration Building, Owen Sound Friday, March 6, 2015 6:00 p.m. Present: Warden Kevin Eccles, Randy Scherzer, Director of Planning, Mike
More informationCity of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015
City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50
More informationSection 9. Implementation
Section 9. Implementation The transportation system is just one of many aspects that must be carefully planned to maintain and enhance the quality of living in Cecil County. The Cecil County Bicycle Plan
More informationHALIBURTON COUNTY CYCLING MASTER PLAN FINAL REPORT HALIBURTON COUNTY CYCLING MASTER PLAN FINAL REPORT
HALIBURTON COUNTY CYCLING MASTER PLAN FINAL REPORT HALIBURTON COUNTY CYCLING MASTER PLAN FINAL REPORT july 2008 project partners & sponsors This Project Supported by the Government of Ontario Acknowledgements
More informationAjax: The Road to Complete Streets
Ajax: The Road to Complete Streets Hubert Ng, Senior Transportation Planner Elysia Leung, Transportation Demand Management Coordinator Complete Streets Forum October 1, 2015 Overview 1 2 Introduction to
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 21, 2017
CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 21, 2017 Item 9, Report No. 39, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan
More informationP.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017
P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017 TO: Mayor Savage and Members of Halifax Regional Council SUBMITTED BY: Jacques Dubé, Chief Administrative
More informationSANDNES HEALTHY CITY
SANDNES HEALTHY CITY 56.000 inhabitants Part of a continuous conurbation of 190.000 Strong expansion rate (pop. growth 2% pr year) High car density Challenging topography Flyfoto THE REGION OF NORD-JÆREN
More informationWe support the following: Tom Davies Square 200 Brady Street Sudbury, Ontario
April 4, 2014 Tom Davies Square 200 Brady Street Sudbury, Ontario RE: Second Avenue Reconstruction Project and Panel Consultation Dear City of Greater Sudbury Mayor and Council: The (SMAP), a council appointment
More informationChapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions
Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation
More informationThe Corporation of the Town of Milton
Report To: From: Council Andrew Siltala, Economic Development and Strategic Initiatives Date: August 28, 2017 Report No: Subject: Canadian Open Recommendation: THAT Milton Council direct staff to include
More informationRegional Cycle Programme Update
Agenda Item 10 (ii) Regional Cycle Programme Update Glossary Auckland Council Auckland Transport Cycle Action Auckland New Zealand Transport Agency Regional Cycle Network (AC) (AT) (CAA) (NZTA) (RCN) Executive
More informationCommunity Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685
CD10.2 STAFF REPORT ACTION REQUIRED City of Toronto Outdoor Tennis Operations Date: February 19, 2016 To: From: Wards: Reference Number: Community Development and Recreation Committee General Manager,
More informationSpecial Event: IRONMAN Triathlon 2016
Special Event: IRONMAN Triathlon 2016 October 21, 2015 RECOMMENDATION THAT the Vancouver Park Board approve a request from IRONMAN, organizers of the IRONMAN 5i50 Vancouver Triathlon, for the following:
More informationCHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION Chapter Table of Contents THE 2017 HOUSTON BIKE PLAN 1-1 HOUSTON BIKEWAYS PROGRAM 1-2 HISTORY OF BICYCLE PLANNING IN HOUSTON 1-3 BICYCLE LEVEL OF COMFORT 1-3 EXISTING PLANS, PROGRAMS
More informationBrevard C2C/SJR2C Leadership Group 06/21/17
Brevard C2C/SJR2C Leadership Group 06/21/17 About the SJR2C - The 260 mile multi-use trail Biking Walking Running Outer Corners Palatka DeBary Traverses 5 Counties Brevard Volusia Flagler Strollers Wheelchairs
More informationUniversity of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description
University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support
More informationBicycle-Pedestrian Master Plan Update
Bicycle-Pedestrian Master Plan Update Planning & Zoning Commission November 29, 2017 Overview Project Purpose & Scope Project History Plan Vision & Goals Chapter 5: Making Connections-Beyond the Path Next
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More informationChapter 3 DESIGN SPECIFICATIONS
Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically
More informationTRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031
TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031 A summary of what s there, what more is needed, how to find information about your
More informationa) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations
Regional Municipality of Waterloo Planning and Works Committee Agenda Tuesday, April 4, 2017 9:30 a.m. (Following Closed Session) Regional Council Chamber 150 Frederick Street, Kitchener Media Release:
More informationADMINISTRATIVE REPORT
ADMINISTRATIVE REPORT Report Date: May 20, 2015 Contact: Richard Newirth Contact No.: 604.871.6455 RTS No.: 10976 VanRIMS No.: 08-2000-20 Meeting Date: June 23, 2015 TO: FROM: SUBJECT: Vancouver City Council
More informationTHE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH. COMMITTEES - 7:00 PM Monday, April 27, 2015 Council Chambers AGENDA
THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH COMMITTEES - 7:00 PM Monday, April 27, 2015 Council Chambers AGENDA 1. CALL TO ORDER 2. ADOPTION OF AGENDA 3. ADOPTION OF MINUTES 4. PRESENTATIONS AND
More informationCycling Tourism Growth Opportunities in Nova Scotia. Rum Runners Trail Team April 18, 2017
Cycling Tourism Growth Opportunities in Nova Scotia Rum Runners Trail Team April 18, 2017 Cycling Tourism Insights Where did we gather cycling tourism information? 2015 Nova Scotia Visitor Exit Survey.
More informationRegional Bicycle System Master Study. Preliminary Results Update
Regional Bicycle System Master Study Preliminary Results Update Transportation Committee October 21, 2013 Introduction Study Goals Guiding Principles Bicycle Study System Elements Analysis Approach Proposed
More informationBy Anne-Julie Dubois, M. Urb candidate Universite de Montreal, Canada
Opportunities and Barriers for Innovative Cycling Planning in Small Towns: Learning From the Route Verte Network in Quebec Session: The benefits of Cycle Tourism at a Local Level By Anne-Julie Dubois,
More informationBICYCLE TOURISM: IDEAS FOR BEST PRACTICE
BICYCLE TOURISM: IDEAS FOR BEST PRACTICE Agenda Overview Understanding the Cycling Industry California Cycling Community Action for Best Practice Cycle California Coast Questions Overview Why Cycling Tourism?
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationA Bicycle Network for a North American Metropolis: The Case of Montreal
A Bicycle Network for a North American Metropolis: The Case of Montreal Marc Jolicoeur, Research Coordinator, Vélo Québec 1251 Rue Rachel Est, Montreal H2 J2J9, Canada marc-jolicoeur@velo.qb.ca Summary
More informationTable of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...
BICYCLE AND This plan was created through a grant from the Healthy Communities Program with the cooperation of the City of Cynthiana, Cynthiana Main Street, Cynthiana-Harrison County-Berry Joint Planning
More informationONTARIO BY BIKE NETWORK
Business Name: ONTARIO BY BIKE NETWORK Participant Registration Registration is also available and preferred on-line: www.ontariobybike.ca/join-the-network Business Category: Accommodations (incl. Campgrounds)
More informationCyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists
Cyclists and Bikeways: What s your match? guide to bikeway options for a variety of cyclists The workshop and this resource were made possible by funding from the Province of Ontario via the Ministry of
More informationDurham Region Long Term Transit Strategy
Durham Region Long Term Transit Strategy An adaptive, safe, reliable, frequent, accessible and desirable transit system that shapes and connects Durham Region and beyond in an economically and environmentally
More informationCOUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND
COUNCIL POLICY NAME: COUNCIL ADVISORY COMMITTEES - TERMS OF REFERENCE ISSUED: APRIL 3, 2006 AMENDED: NOVEMBER 27, 2006 NOVEMBER 23, 2009 JANUARY 11, 2010 DECEMBER 17, 2012 POLICY COUNCIL REFERENCE: 06/119
More informationENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting
ENGINEERING AND PUBLIC WORKS Transportation Improvements: Santa s Village Road (MR15) Public Meeting March 22, 2018 Agenda Welcome and Introductions Fred Jahn: Commissioner of Engineering and Public Works
More informationBICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016
BICYCLE PROGRAM IMPLEMENTATION UPDATE Transportation and Trinity River Project Council Committee Purpose 01 Provide background and a status update on onstreet bicycle facility planning and implementation
More informationBIKE!CORNELIUS BICYCLE MASTER PLAN. Cornelius, North Carolina EXECUTIVE SUMMARY PREPARED AUGUST 2015 FOR PREPARED BY EXISTING CONDITIONS
EXISTING CONDITIONS BICYCLE MASTER PLAN Cornelius, North Carolina EXECUTIVE SUMMARY PREPARED vi AUGUST 201 FOR PREPARED BY PLANNING PROCESS Bike!Cornelius, the Bicycle Master Plan of Cornelius is made
More informationBicycle Queensland s Brisbane Council Election Priorities
Bicycle Queensland s Brisbane Council Election Priorities Bicycle Queensland (BQ) acknowledges that the recent Brisbane City Council (BCC) administrations have provided consistent funding to provide bicycle
More informationAPPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY
APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose
More informationOuter Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015
Outer Cape Bicycle & Pedestrian Master Plan PUBLIC WORKSHOP #2 March 26, 2015 Introductions TODAY S DISCUSSION PRESENTATION: Project Background : Where have we been? Where are we now? Steering Committee
More informationPublic Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx
Ten Year Cycling Network Plan Date: May 3, 2016 STAFF REPORT ACTION REQUIRED PW13.11 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation Services
More informationCITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division
CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division TO: Chair and Members Public Works Committee COMMITTEE DATE: June 18, 2018 SUBJECT/REPORT NO:
More information