1 4A Eves Drive Suite 114 Marlton, NJ Complete Streets in NJ: Lessons Learned March 2011 Prepared by: Cross County Connection Transportation Management Association

2 March 2011 Cross County Connection TMA was formally incorporated in 1989 through the efforts of a group of southern New Jersey business leaders, local government officials, and representatives from the New Jersey Department of Transportation (NJDOT) and New Jersey Transit Corporation (NJ TRANSIT) to address mobility issues in the region and reduce the number of vehicles on state and local roadways. Today, Cross County Connection is a non-profit organization, which partners with NJDOT, NJ TRANSIT, Federal Highway Administration and its members to provide solutions to complex transportation problems for counties, municipalities, employers and commuters in our seven-county region. 4A Eves Drive Suite 114 Marlton, NJ This Cross County Connection Transportation Management Association publication is funded by the New Jersey Department of Transportation and the U.S. Department of Transportation Federal Highway Administration. The Federal Government and the State of New Jersey assume no liability for the contents.

3 TABLE OF CONTENTS Introduction Community Profiles Common Threads Motivations Concerns Policy Language Keys to Adoption Next Steps to Implementation Funding Sources Resources i

4 FIGURE Figure 1: Areas in New Jersey with Complete Streets Policies Figure 2: Hoboken City, Land Use Figure 3: Lawrence Township, Land Use Figure 4: Linwood City, Land Use Figure 5: Montclair Township, Land Use Figure 6: West Windsor Township, Land Use Figure 7: Monmouth County, Land Use Figure 8: Red Bank Borough, Land Use Figure 9: Netcong Borough, Land Use TABLE Table 1: Hoboken City Population & Land Table 2: Lawrence Township Population & Land Table 3: Linwood City, Population & Land Table 4: Montclair Township, Population & Land Table 5: West Windsor Township, Population & Land Table 6: Monmouth County, Population & Land Table 7: Red Bank Borough, Population & Land Table 8: Netcong Borough, Population & Land ii

5 Introduction There is a growing movement in New Jersey s transportation community to consider the transportation needs of all road users, and in doing so, increase the safety and livability of their communities. Towards these goals, the New Jersey Department of Transportation (NJDOT) adopted their Complete Streets Policy in December The policy requires consideration of the needs of bicyclists, pedestrians, and transit users in the planning, design, construction, maintenance and operation of new and retrofit transportation facilities on state and federally funded roadways. A Complete Street as defined by NJ- DOT is one that provide[s] safe access for all users by designing and operating a comprehensive, integrated, connected multi-modal network of transportation options. 1 NJDOT has set an excellent statewide example in passing their Complete Streets Policy last winter, and it represents a significant step in changing how we think about our roadways. However, over ninety-one percent of roads in New Jersey are under county and municipal jurisdiction. 2 For there to be a meaningful commitment to safe and inclusive transportation in this state, municipalities and counties will need to join the complete streets movement. Figure 1. Areas in New Jersey with Complete Streets Policies. Adopting Municipality Adopting County Lawrence Netcong Linwood Montclair West Windsor Hoboken Monmouth County Red Bank 1 NJDOT Policy No < 2 Per NJDOT roadway classification. (2008). < hpms2008/njprmbj_08.pdf> 1

6 This resource began as a companion to Cross County Connection s Safe and Sustainable Transportation in South Jersey workshop held on October 21, 2010, but was expanded to include additional resources. It is meant to assist New Jersey municipalities and counties in adopting complete streets resolutions by drawing on the experiences of other areas in New Jersey that have already adopted such policies. Additional strategies are included to assist current and future implementation efforts. The information and experiences of local policy adoption presented in this report are based on published materials and interviews conducted with planners, engineers, and others representing Montclair Township, Linwood City, Hoboken City, Lawrence Township, Netcong Borough, Red Bank Borough, West Windsor Township, and Monmouth County about their experiences in adopting these resolutions. Community Profiles At the time of writing, there are seven municipalities and one county in New Jersey that have adopted complete streets policies. Figure 1 shows the locations of these areas throughout the state. All but one of these early adopters have, or are located adjacent to, significant public transit infrastructure, including NJ TRANSIT bus and rail service. The eight early adopters are a diverse group: one county, and seven municipalities ranging in population from under 3,300 to over 50,000 people, and sized from less than one square mile to 26 square miles. Despite their diversity, these communities share a serious concern for the safety and health of their residents, as well as for the environmental and monetary costs of their roads. Land use maps are included for each municipality to give an indication of the area s built environment. Hoboken City Hoboken is a small, but as seen in Figure 2, densely populated city located directly across from New York City on the Hudson River waterfront. The city is served by six NJ TRANSIT rail lines, NJ TRANSIT bus service, NJ TRANSIT Hudson-Bergen Light Rail service, and PATH subway service with direct access to lower Manhattan. It is the most urban setting of New Jersey adopting municipalities and also has the highest share of transit commuters with 56% of workers commuting to work using public transportation. 3 Figure 2. Hoboken City, Land Use & Statistics «78 [ Data source: NJDEP Table 1. Hoboken City Population & Land Population 50,005 Area 1.3 sq. mi. Pop. Density 38,465 / sq. mi. US Census American Community Survey 5-year Estimates, < 2

7 Complete Streets in NJ: Lessons Learned Lawrence Township Lawrence Township is a large suburban community, shown in Figure 3, with a diverse array of road types and land uses from active farmland, single-family residential development, and village-type commercial centers to the autocentric commercial corridor along heavily trafficked U.S. Route 1. Lawrence is served by NJ TRANSIT bus service, and is located within three miles of the Trenton Transit Center, a terminal for SEPTA Regional Rail, RiverLINE Light Rail, and NJ TRANSIT Northeast Corridor rail service; and the Hamilton Station on NJ TRANSIT s Northeast Corridor. The township has several major arterial roads including U.S. Route 1, Interstate 95/295, and U.S. Route 206. Nearly 6% of workers commute by transit. Figure 3. Lawrence Township, Land Use & Statistics « [ Table 2. Lawrence Township Population & Land Population Area Pop. Density Data source: NJDEP 31, sq. mi. 1,427 / sq. mi. ACS Estimate Linwood City Figure 4. Linwood City, Land Use & Statistics Linwood City, shown in Figure 4, is a small municipality located near the Atlantic County shore that is largely dominated by single-family housing. U.S. Route 9 travels through the western portion of the city, while a bike path runs the entire length of Linwood parallel to Route 9 and extends to adjacent municipalities. 9 [ 152 «Table 3. Linwood City Population & Land Population Area Pop. Density Data source: NJDEP 7, sq. mi. 1,909 / sq. mi. ACS Estimate

8 Complete Streets in NJ: Lessons Learned Montclair Township Figure 5. Montclair Township, Land Use & Statistics Montclair is an Essex County township with a classic New Jersey main street downtown, seen in orange along Bloomfield Avenue in Figure 5. It has a high share of transit use, with 25% of the workers in Montclair commuting by transit.4 The township has an active bicycle and pedestrian advocacy group, Bike & Walk Montclair, which was cofounded in 2002 by the current mayor, Jerry Fried. 23 «[ Table 4. Montclair Township Population & Land Population Area Pop. Density Data source: NJDEP 36, sq. mi. 5,959 / sq. mi. ACS Estimate West Windsor Township West Windsor is a large suburban township that contains both low-volume suburban roads and high-volume Route 1, as seen in Figure 6. The southern portion of the township is dominated by low density residential development with limited road connectivity, while the northern area contains the commercial-oriented Route 1 corridor. The highly trafficked Princeton Junction commuter rail station is also located in West Windsor, where nearly 18% of workers commute by transit.5 Figure 6. West Windsor Township, Land Use & Statistics [ Table 5. West Windsor Township Population & Land Population Area Pop. Density 130 Data source: NJDEP 26, sq. mi. 1,005 / sq. mi. ACS Estimate American Community Survey 5-year estimates, < American Community Survey 5-year estimates, < 4

9 Complete Streets in NJ: Lessons Learned Monmouth County Monmouth County is located on New Jersey s northern shore, and covers a range of landscapes from shore towns to rural areas. General statistics can be seen in Figure 7. NJ TRANSIT s North Jersey Coast Line provides service from fourteen stations in Monmouth County into Hoboken and New York Penn Station. Figure 7. Monmouth County, Land Use & Statistics Land Use GREEN SPACE URBAN WATER 18 «95 35 «34 « « [ Data source: NJDEP Table 6. Monmouth County Population & Land Population Area Pop. Density 641, sq. mi. 1,360 / sq. mi. ACS Estimate Red Bank Borough Figure 8. Red Bank Borough, Land Use & Statistics Red Bank, located in Monmouth County, has a vibrant cultural and arts community and a vital downtown. The borough is dominated by both commercial retail and medium to high density residential land uses, evident in Figure 8. Nearly 12% of commuters use transit to travel to work while over 10% walk to work.6 35 «[ Table 7. Red Bank Borough Population & Land Population Area Pop. Density Data source: NJDEP 11, sq. mi. 6,623 / sq. mi. ACS Estimate U.S. Census, < 5

10 Netcong Borough Netcong is a small, walkable community in Morris County characterized by single family housing, a small commercial corridor which can be seen in Figure 9, and a rail station. The station is served by NJ TRANSIT s Morristown and Montclair-Boonton lines, though the share of commute trips by transit is minimal. 7 Figure 9. Netcong Borough, Land Use & Statistics « [ Table 8. Netcong Borough Population & Land Population 3,241 Area 0.8 sq. mi. Pop. Density 4,051 / sq. mi. ACS Estimate Data source: NJDEP Common Threads A common thread between these early adopters is a well-organized, informed, and very vocal constituency. Existing citizen groups like the West Windsor Bicycle and Pedestrian Alliance and Bike & Walk Montclair were organized well before adoption of complete streets policies, and in both cases helped drive safety improvements in West Windsor and Montclair, respectively. These groups worked collaboratively with the Townships in directing transportation improvements through consistent contact with municipal engineering and planning staff, and town councils. Other organizations like the Monmouth County Transportation Council, Linwood Environmental Commission, Sustainable Lawrence and the Netcong Green Team which both pursued a complete streets resolution in part because of Sustainable Jersey certification, and Safe Routes to School groups were formed in partnership with government staff. Many early supporters of complete streets, including public staff, attended complete streets education and training events and listed these education efforts as an integral catalyst to increased buy-in and passage of their complete streets policy. These groups have been key players in closely examining safety issues in their areas, and generating the political and public support to begin to address them. These areas have begun to turn their attention to the long-term health, both physical and fiscal, of their communities. They have begun to ask themselves: 7 American Community Survey 5-year estimates, < 6

11 Credit: VTC Complete streets education efforts were held across New Jersey in 2010, such as the NJ Complete Streets Summit (left) and the Safe & Sustainable Transportation in South Jersey event (right). What do we want our community to look like? How are residents going to get around? Energy prices continue to rise, traffic congestion continues to be a concern, and our senior population is increasing. What do we value? Motivations These early adopters identified several motivating factors in why they chose to pursue adoption of complete streets policies. Safety of their residents was the highest priority. In particular, they mentioned the safety of vulnerable populations like schoolchildren, seniors, pedestrians, and bicyclists. Several of these municipalities and the County expressed concern about the future costs of not having a complete streets policy in place. Another important factor mentioned consistently was improving the quality of life afforded to their residents. They were interested in providing amenities, reducing congestion and environmental impacts, and increasing the attractiveness of their community. Future Costs Costs are a concern now more than ever as state and local governments face shrinking budgets. Some early adopters identified complete streets policies as a way to potentially reduce future expenditures. As development has slowed, it has given these areas the opportunity to shift some of the costs of safety and accessibility improvements to developers if and when development activity resumes. These early adopters wanted to have a complete streets policy in place so that it would be incorporated into their development review process as projects began moving forward. Netcong for instance noted that they have two designated redevelopment zones, and while there was currently little interest in the sites, they wanted the policy in place when development did occur. These areas were proactive in their approach to land use and transportation. 7

12 In addition, safety improvements are much less expensive when included as a part of road construction and maintenance procedures rather than the ad hoc retrofits. Like the adage measure twice, cut once, taking a comprehensive view of an area s transportation needs can yield significant savings in the long term. The downturn in development activity is an opportunity for municipalities and counties to update policies and regulations to reflect the vision they have for their communities today, not the vision of twenty years ago that has created a congested and dangerous landscape in much of the state. Having a complete streets policy in place as a favorable element in transportation funding requests was also a consideration for several municipalities. While there is not yet any explicit weighting of complete streets policies in the NJDOT funding application review process, the Department strongly encourages the adoption of similar policies by regional and local jurisdictions who apply for funding through Local Aid programs. 8 Having such a policy in place can only benefit a grant application. There are indications that both NJDOT and New Jersey MPO s are considering modifications favoring complete streets to funding selection criteria in the near future. Monmouth County and Netcong voiced concerns about the costs of school bussing. In many areas of the state, bussing is a necessity because the walking conditions around schools are hazardous. Due to budget constraints, many towns have been forced to cut or eliminate courtesy bussing, increasing the number of cars driving to the school and creating even more traffic congestion as a consequence. Several of these communities, often along with local Safe Routes to School committees, see complete streets as a way to reduce dependency on bussing. Making sure children have safe walking environments is important for many reasons: preventing accidents, ensuring that communities raise healthy, active children, but also to help make sure that school-funded transportation is not the only option for children to get to school. The future cost of healthcare for inactive residents was not mentioned by these early adopters, but should certainly be a concern when considering implementing complete streets. Safety Regardless of whether the most trafficked road had 12,000 or 77,000 annual average daily traf- Credit: VTC Complete streets create a safe walking environment for children to reach schools and other destinations. 8 NJDOT. (2009). Complete Streets Policy. < pdf> 8

13 fic, every municipality was concerned about the safety of roads in their jurisdiction. 9 Safety of schoolchildren was again a particular focus. Often programs focusing on child walking safety were already in place, like Netcong s Walk & Roll program which arranges designated walk-to-school days each month, and the federal Safe Routes to School program which has active committees in these areas and around the state. At the NJ Complete Streets Summit held by NJDOT and the Alan M. Voorhees Transportation Center, Ian Sacs, the Director of Transportation and Parking for Hoboken, pointed to New York City Department of Transportation s finding that controlling for other factors, pedestrian KSI [killed or severely injured] crashes on streets with bike lanes were ~40% less deadly as other streets [in Manhattan]. 10 Other Factors Environmental considerations such as reducing vehicle emissions and promoting sustainable transportation options like biking and walking were mentioned by each of the early adopters. In this respect, complete streets are a component of the larger movement towards sustainable transportation and away from the autocentric paradigm that has been dominant in New Jersey transportation. Previous to the passing of Lawrence Township s complete streets ordinance, the Township adopted a Sustainability Element to their Master Plan which specifically called for complete streets in Lawrence. 11 By improving pedestrian and bicycle infrastructure, these areas are likely to increase the use of bicycles and walking for short trips and significantly reduce local greenhouse gas emissions. Linwood City representatives mentioned the desire to provide additional links to their existing bicycle infrastructure. Lawrence, Linwood, and West Windsor each have significant pieces in their bicycle network such as the Lawrence Hopewell Trail and Linwood Bicycle Path that may be better used through implementation of complete streets. Increasing the access to community amenities such as parks and bicycle facilities will only add value to these community investments and increase the desirability of the area. An additional issue mentioned was increasing the inclusiveness of the local transportation system. Complete streets help ensure that residents have the choice to walk or bike to a variety of recreational and commercial destinations. Whether it is someone that wants to exercise, someone that does not or cannot drive, or someone that wants to get out into their community, complete streets allow them to do so safely. There is a tendency to forget those people that are unable or do not want to drive to get to their destination, but it is often those people who are injured and killed on our roads as pedestrians and bicyclists. Complete streets are inclusive by design, and can make a substantial and potentially life-saving difference in the lives of those people while also making an area more attractive. 9 Per NJDOT traffic counts. (2008). < 10 New York City Department of Transportation. (2010). The New York City Pedestrian Safety Study & Action Plan. < 11 Clark Caton Hintz. (2010). The Green Buildings and Environmental Sustainability Element of the Master Plan, Lawrence Township, NJ. < ity%20element.pdf> 9

14 Economic development and revitalization associated with complete streets was another a motivating factor. Creating walkable and bikeable areas can increase foot traffic to businesses and retail areas, and help revitalize main streets in New Jersey. Studies from around the country have shown that creating safer, more walkable communities improves property values and is a benefit to business West Windsor and Netcong mentioned that their complete streets resolution was in part an effort to reduce the parking needs. West Windsor has experience significant parking demand increases due to Princeton Junction rail station commuters. When pedestrian and bicycle travel is made more safe and attractive through complete streets, parking demand will likely be reduced as residents decide to walk or bike to nearby destinations rather than drive. Concerns Some common concerns with complete streets policies and bicycle/pedestrian infrastructure in general are costs and liability. The liability concerns have been limited mainly to bikeways, but it is a common stumbling block that has also come up outside of complete streets policies. Costs Credit: VTC Complete streets improvements often create attractive, economically vibrant pedestrian spaces like the one pictured above. For these early adopters, cost was often a major concern when considering their complete streets resolutions. However, some of these areas remarked that the costs to date associated with complete streets improvements has not been a significant issue. Making streets safer by design does not necessarily have to be expensive. Paint and signage can be very effective before moving on to more expensive brick and mortar improvements. Several adopters saw long-term cost savings in complete streets through reducing expensive ad hoc retrofits and cost shifts to developers. 12 Cortright, Joe. (2009). Walking the Walk: How Walkability Raises Home Values in U.S. Cities. Impresa, Inc., for CEOs for Cities. < 13 The National Complete Streets Coalition. The Benefits of Complete Streets 7. < org/webdocs/factsheets/cs-revitalize.pdf> 10

15 Costs will vary greatly depending on community characteristics and context-specific issues. How and when an area is built out, street width, speed limits, intersection layouts are all going to be factors in determining what treatments will be most effective. West Windsor Township, for example, is a suburban community with transit and highway access that saw much of its development in the 1980s. The township has many wide right-of-ways that allow them to install bike lanes and traffic calming measures fairly easily in many places. However, as they move forward with their bicycle and pedestrian improvements, the Township is now having to face more difficult and expensive projects after picking the low hanging fruit. These more difficult situations require some creativity and local judgment to realize success. Implementing complete streets often comes down to local judgment, flexibility and creative solutions. Liability Liability was not a consistent concern among the early adopters regarding complete streets policy adoption, however Montclair did have to address some concerns which remain unresolved. Tort claims for negligent design of bikeways are reported to be rare across the country. Nationally, most of the claims are based on alleged maintenance issues, and public entities prevailed in nearly all cases. 14 New Jersey s design immunity statute provides perpetual immunity for a public entity or employee on injuries caused by the plan or design of public property, as long as the representative of that public entity is exercising discretionary authority. 15 New Jersey also has a recreational use statute which limits liability for bikeways. 16 Facilities should be designed to applicable standards (e.g. AASHTO, MUTCD, ITE) or approved by the proper government entities such as NJDOT or the county engineer. Provisions for maintenance must also be made, however this requirement makes no difference if the area was a shoulder or a bicycle lane. 17 In short, New Jersey has fairly strong statutory insulation protecting public entities from liability. Considering the liability impacts of not providing safe facilities for bicyclists and pedestrians should also be taken into account when deciding on safety improvements. Policy Language The specific language of the adopted resolutions all share similar considerations as the NJDOT policy, though there are some significant differences among them. Each features a commitment to creating a comprehensive, integrated, connected street network that safely accommodates all road users of all abilities for all trips. A compilation of New Jersey state, county, and municipal policies has been made by the Alan M. Voorhees Transportation Center, and is available at the New Jersey Bicycle 14 Larry W. Thomas and James B. McDaniel. (2010). NCHRP Legal Research Digest 53 Liability Aspects of Bikeways. < ity_aspects_of_bikeways.pdf> 15 N.J. S.A., tit. 59: N.J. S.A. tit. 2A:42A-2, et seq. 17 Alan M. Voorhees Transportation Center. (2011). NJ Complete Streets Summit Summary Report. < policy.rutgers.edu/vtc/bikeped/completestreets/final%20complete%20streets%20summary%20report. pdf> 11

16 and Pedestrian Resource Center. 18 Exemption cases can be a contentious issue when considering complete streets policies. An exemption case outlines when a project may be exempt from considering complete streets improvements. A policy should not just pay lip service to bicycle and pedestrian safety while doing very little to impact street design. However, a policy should also not be so inflexible and unrealistic that it becomes unworkable in application. Striking the balance that reflects complete streets values and outcomes while also being flexible enough to produce implementable solutions is a real key to having a successful complete streets policy. An example of exemption cases shared by NJDOT, Monmouth County, and Red Bank are listed below: NJDOT Exemptions: 1) Non-motorized users are prohibited on the roadway. 2) Scarcity of population, travel and attractors, both existing and future, indicate an absence of need for such accommodations. 3) Detrimental environmental or social impacts outweigh the need for these accommodations. 4) Cost of accommodations is excessively disproportionate to cost of project, more than twenty percent (20%) of total cost. 5) The safety or timing of a project is compromised by the inclusion of Complete Streets. The exemption cases run from straightforward, such as exempting roads that do not permit nonmotorized vehicles, to case-specific and subjective concerns like the scarcity of present and future population, travel, and attractors; adverse environmental and social impacts that might outweigh the improvements; and the safety or timing of the project. Depending on the policy and how clear the exemption case, supporting evidence is required. Similar to NJDOT, Hoboken, Netcong, Monmouth County, and Red Bank require supporting evidence of the exception to be submitted to the county engineer, mayor, or council for approval. Requiring high-level approval for exceptions is recommended. An exemption that can be particularly contentious is the cost exemption. NJDOT s policy extends an exemption when safety accommodations amount to more than 20% of the total project cost. Montclair lists in its exemptions that bicycle, pedestrian, or transit improvements that would increase locally funded project costs by more than 5% need council approval prior to bidding. For Montclair, the cost exemption was a serious stumbling block, and an important negotiating tool to make their complete streets policy politically feasible. Monmouth County, Red Bank, and Netcong all use the phrase excessively disproportionate to guide their cost exemption. Hoboken set its cost threshold at an increase of 15% in total for pedestrian, public transit, and/or bicycle facilities, as determined by engineering estimates, that would have to be funded with local tax dollars. The resolutions passed in Montclair, Netcong, Lawrence, Hoboken, and West Windsor did not include the provision that: in rural areas, paved shoulders or a multi-use path shall be included in all new construction and reconstruction projects on roadways used my more than 1,000 vehicles per day, 18 Alan M. Voorhees Transportation Center. (2010). Complete Streets in New Jersey: A Compilation of State, County and Municipal Policies. < php> 12

17 Credit: bikepedimages.org / Bob Byce Credit: bikepedimages.org / Laura Sandt Credit: bikepedimages.org / Jennifer Campos There is no one picture of a complete street. Each complete street pictured above offers very different amenities to ensure the safety of road users. which is included in the NJDOT, Monmouth County, and Red Bank policies. While this provision is not particularly important to urbanized areas, it is very appropriate to many areas in South Jersey. The picture of a rural complete street can be quite different from an urban complete street, and it is important to pay attention to the treatment of rural roads in policy language since so many roads in New Jersey are rural. Keys to Adoption Several common themes are apparent in speaking to municipal and county staff about keys to adopting their complete streets policy: educating local leaders, staff, and residents on what complete streets are, what they are not, and how they can change a community; focusing on the safety benefits and value of the policy; consideration of the policy s timing; and perseverance in addressing concerns, passing, and implementing complete streets. A complete streets policy is a set of values, not a set of rigid design standards. It is a commitment 13

18 to making communities safe for people when they are outside of their cars. Educating public staff, community groups, businesses, and residents about complete streets and their benefits is a major key to adoption and implementation. Outreach and education efforts to these groups are important to make sure that all participants in the conversation are coming to the table educated on the implications, costs and benefits of complete streets. For instance, Monmouth County confronted municipal concerns about effects on the rural character of their towns, and if they would be required to put in sidewalks. The County addressed these concerns with education (none, and not necessarily, respectively) and moved on from there. That is an important lesson in preventing what could have been a politically and emotionally charged conflict. Perseverance and informed decision-making can help in avoiding many preventable roadblocks. Accurately outline benefits in cost-benefit discussions. When asked of his response to you can t do that in regard to complete streets improvements, Ian Sacs of Hoboken responded that one should always make the case for safety and use numbers to engage opposition. 19 While the safety benefits of complete streets are apparent and extremely important, there are many more benefits that might not be as obvious or easy to quantify or monetize. When considering complete streets policies, it is important to spotlight the wide-range of benefits that result from complete streets policies: Greater Safety Increased Transportation Options and Flexibility Emission Reductions Improved Community Health Reduced Reliance on School Bussing Enhanced Economic Development More Desirable Communities & Increased Property Values Better Quality of Life Some of these benefits may be difficult to place on a balance sheet, but their impacts are no less significant to the long term safety and sustainability of communities. Next Steps to Implementation New Jersey has much work ahead in transforming its roadways. Local and county governments will need to work to ensure that beyond policy adoption, complete streets principles are integrated into existing plans, policies and operating procedures. It is also vital for communities to evaluate the deficiencies and opportunities that make up their local transportation system in order to determine where improvements are needed. Consider creating an implementation plan to help guide efforts, set goals 19 Alan M. Voorhees Transportation Center. (2011). NJ Complete Streets Summit Summary Report. < Report.pdf> 14

19 and establish milestones. Education of staff and public, integration with operations and policy, and performance measures and analysis should be cornerstones for any implementation plan. Education Staff training is another important component to consider in ensuring that complete streets policy and principles are implemented. Ensure that staff departments know what complete streets are and how the adopted principles impact their operations. The electronic presentations made available by NJDOT are an excellent educational resource to introduce complete streets to staff. 20 More in-depth education may be needed for planners and engineers. NJDOT, for example, has held training workshops for state engineering staff to ensure that every member of their team is prepared to work towards completing state roadways. The education resources listed at the end of this document provide a starting point for such efforts. Integration Be explicit in incorporating complete streets into municipal planning and guidance documents. A complete streets policy can quickly become lip service when not institutionalized into transportation, development and land use processes. Municipalities should include bicycle and pedestrian travel into the circulation element of the municipal master plan and ideally include a comprehensive bicycle and pedestrian plan element. Consider including complete streets principles into the stated goals of comprehensive and location-specific plans. Ensure that bicycle and pedestrian connectivity is also incorporated in municipal regulatory language such as zoning codes, subdivision codes and site plan 20 NJDOT. NJDOT Complete Streets Presentations. (2010). < &func=viewpub&tid=7&pid=17> 15

20 requirements. For example, subdivision codes in much of southern New Jersey encourage the development of street networks that discourage through traffic and provide for maximum privacy. 21 When not coupled with provisions for bicycle and pedestrian accommodations, these requirements reduce the connectivity of road networks and increase travel distances for walking and biking. Often it is merely a matter of modifying guiding provisions of planning and regulatory procedures that can yield the most successful results. Strive to institutionalize safety provisions for all modes of transportation by taking a strategic look at municipal and county operations, and exploring modifications that will pave the way for complete streets. Checklists Consider creating a complete streets checklist for use in project review, corridor evaluation and studies. A common criticism of complete streets policies is their lack of integration in planning and review processes and the perception that bicycle and pedestrian considerations are optional, not included as routine accommodation. A checklist will help ensure that bicycle and pedestrian safety is consistently considered, and will direct attention to design and regulatory concerns in a simple, straightforward manner. Both Monmouth County and Red Bank policies call for the creation of a checklist of pedestrian, bicycle, and transit accommodations that should be considered in each project. Beyond a list of accommodations, elements in such a checklist should include these considerations: Existing Conditions What pedestrian and bicycle accommodations are located in and around the project area, such as bikeways, bicycle lanes, sidewalks, crosswalks, pedestrian lighting, etc.? What obstacles to bicycle and pedestrian travel are present in the area? What deficiencies could be addressed with this project? Where are transportation conflicts and bicycle/pedestrian collisions occurring? Current and Future Demand Credit: bikepedimages.org / Bill Daly Creation of complete streets facilities like the one pictured above are due in part to checklists like the San Francisco Bay Area s Metropolitan Transportation Commission Complete Streets Checklist. What existing and future trip generators are in and around the project area? Do any of these 21 Evesham Township, New Jersey, Municipal Code art. III,

21 generators justify consideration of special safety treatments such as safety zones with reduced speeds and traffic calming? Plans, Policies, Guidelines What plans have been adopted which include bicycle, pedestrian, transportation, land use, recreation or safety components that apply to part or all of the project area? Does the project fulfill these plans? What local, county, state or federal policies exist pertaining to the design and inclusion bicycle and pedestrian facilities? Have these policies and design guidelines been followed? Project Impacts What impacts are anticipated in the project area on travel behavior and safety for pedestrian and bicycle travel? Elements that may negatively impact bicycle and pedestrian safety include increased vehicle volumes, greater vehicle speeds, increased turning movements/speeds, narrowing of shoulders, longer pedestrian crossing distances, and removal of bicycle and pedestrian facilities, among others. Does the project include bicycle and pedestrian facilities that improve the quality and safety of travel? If bicycle and pedestrian facilities are not included or the project would negatively impact bicycle and/or pedestrian travel, provide justification on why the project is being proposed as designed. Opportunities Are there opportunities to improve the bicycle- and pedestrian-friendliness of the project area that have not been considered? Does the area have adequately timed and placed signals for pedestrian crossings? Are there a surplus of curb cuts that can be reduced for safety? Is there adequate pedestrian lighting to make walking safe and attractive? Should lane widths and configuration be reexamined for retrofitting of bicycle lanes? Research is mounting that narrowing streets (<12 ft. lane width) increases crossing safety and allows for installation of bicycle travel facilities without necessarily increasing vehicle crash frequencies Construction Accommodations What provisions will be made to maintain pedestrian and bicycle access during project construction? Maintenance Who is responsible for maintenance of bicycle and pedestrian facilities in the project area? How will maintenance for these facilities be integrated into existing maintenance plans? The Pennsylvania Department of Transportation, Mid-Ohio Regional Planning Commission, and the San Francisco Bay Area s Metropolitan Transportation Commission have each created complete 22 Ingrid B. Potts, Douglas W. Harwood, Karen R. Richard. Transportation Research Board. (2007). Relationship of Lane Width to Safety for Suburban Arterials. < 23 Harwood, D.W. Transportation Research Board. (1990). NCHRP Report 330 Effective Utilization of Street Width on Urban Arterials. < 17

22 streets checklists that have informed the elements listed above and are included in the resources section at the end of this document. Measure Progress Establishing goals and measuring performance are important factors in implementing complete streets policies. While it is important to establish the vision for a community through goal statements in a complete streets policy, it is extremely valuable to establish measures to evaluate performance. Establishing these performance measures can help spur action and direct efforts to physical results while providing benchmarks of progress. Goals and performance measures may also improve the competitiveness of county and local grant applications for state and federal funding by demonstrating a comprehensive, measurable commitment to sustainable transportation. Performance measures for complete streets may be based on the number of facilities or amenities installed, consistent evaluation criteria of infrastructure such as level of service, or outcome indicators related to facility usage and travel behavior. Facility-Based Measures Roanoke, Virginia for example, has established performance measures as total miles of on-street bicycle routes, linear feet of new pedestrian accommodations, and number of street trees and curb ramps installed. 24 An advantage to facility-based performance measures is that they are simple to report, however they do not account for the placement or usage of these facilities. Infrastructure Evaluation Measures Traditionally, level of service measures have been associated with automobile facilities, but multimodal level of service indicators have recently been established that may be used to evaluate the completeness of streets and measure progress using consistent criteria. Criteria have been published by the Transportation Research Board, the Florida Department of Transportation, and developed locally in Charlotte, North Carolina with much success. The evaluations developed by each use a number of factors such as motorized vehicle volumes, speeds, width of outside thru lanes, number of unsignalized conflicts, the presence of sidewalks or bicycle lanes, intersection characteristics, and pedestrian buffer areas. These models are straightforward in their application and have been included in the resources section of this document. Outcome Measures Policy implementation may also be measured through performance outcomes. These outcomes could be assessed by direct facility usage such as pedestrian and bicycle counts, or through indirect measures including surveys and trends observed in American Community Survey-based transportation demographic estimates. Some public organizations, such as the Delaware Valley Regional Planning Commission, periodically perform bicycle and pedestrian counts and may be 24 City of Roanoke. (2008). City of Roanoke Complete Streets Policy. < nokecompletestreetspolicy.pdf> 18

23 able to provide assistance. These counts may also be performed at low cost by partnering with community groups and volunteers. A health-related indicator that municipalities might also investigate is a health impact assessment (HIA). HIA s objectively evaluate the potential health effects of a project before it is built, and are being used increasingly at federal agencies. They may be performed by volunteers or consultants. Municipalities and counties should select the performance measures that best fit their area and capabilities. Funding Sources Funding for complete streets implementation is project-dependent and will likely come from a variety of different places, including municipal and county sources. Since complete streets improvements are often embedded in maintenance, reconstruction and development projects the costs may be included in an existing maintenance plan or project s scope and funded by the project s funding source. However, there are several potential funding sources beyond local funds for bicycle and pedestrian safety projects. State programs that may provide funding for projects creating complete streets include: NJDOT Municipal and County Aid NJDOT Bikeways Grant Program NJDOT Local Technical Assistance Planning NJDOT Safe Streets to Transit Program NJDOT Centers of Place Grant Program NJDOT Transit Village Grant Program NJDOT Local Aid Infrastructure Funds NJ Department of Environmental Protection Green Acres Program NJ Division of Highway Traffic Safety Grants NJ Department of Community Affairs Downtown Business Improvement (DBIZ) Loans 25 Federal programs that may provide funding for complete streets implementation include: Transportation Enhancement (TE) Program Surface Transportation Program Safe Routes to School National Recreational Trails Program HUD Community Development Block Grant (CDBG) Program Congestion Mitigation and Air Quality (CMAQ) Program Metropolitan Planning Organizations may also have additional funding programs available to areas in their region for complete streets improvements. 25 Administered through the State of New Jersey Department of Community Affairs grant management system. < 19

24 Special thanks to Nora Shepherd, Monmouth County; Francis Guzik, West Windsor Township; Kim Craft, Montclair Township; Pam Mount, Lawrence Township; Jim Rutala, Linwood Environmental Commission; and Ralph Blakeslee, Netcong Borough for graciously answering questions and sharing their experiences. For any assistance, questions, or feedback please call or Graydon Newman, Transportation Specialist

25 Resources Complete Streets Information & Policy NJDOT Complete Streets Presentations. NJDOT Complete Streets Fact Sheets. National Complete Streets Coalition NJ Complete Streets Summit Summary Report. The Alan M. Voorhees Transportation Center, Rutgers University New Jersey Complete Streets Policies. The Alan M. Voorhees Transportation Center, Rutgers University Street Design: Part 1 Complete Streets from Public Roads magazine. Robin Smith, Sharlene Reed, and Shana Baker. Federal Highway Administration (FHWA) Complete Streets: Best Policy and Implementation Best Practices Chapter 5: Making the Transition. Ed. Barbara McCann and Suzanne Rynne. Planners Advisory Service Report Policy Statement on Bicycle and Pedestrian Accommodation Regulations and Recommendations. United States Department of Transportation Complete Streets Checklists Complete Streets (Routine Accomodations). Metropolitan Planning Commission - San Francisco Bay Area. September MORPC Complete Streets Checklist for Project Sponsors. Mid-Ohio Regional Planning Commission Planning and Programming Checklist. PENNDOT ftp://ftp.dot.state.pa.us/public/pubsforms/forms/d-310.pdf 21

26 Design Guidelines NJDOT Planning and Design Guidelines for Bicycle Compatible Roadways and Bikeways. NJDOT NJDOT Planning and Design Guidelines for Pedestrian Facilities. NJDOT A Policy on Geometric Design of Highways and Streets, 5th Edition. American Association of State Highway and Transportation Officials (AASHTO) Guide for Development of Bicycle Facilities, 3rd Edition. AASHTO Guide for the Planning, Design, and Operation of Pedestrian Facilities, 1st Edition. AASHTO Manual on Uniform Traffic Control Devices. FHWA Performance Measure Resources NCHRP Web-Only Document 128: Multimodal Level of Service Analysis for Urban Streets: Users Guide. Richard Dowling. Transportation Research Board Quality/Level of Service Handbook. State of Florida Department of Transportation Urban Street Design Guidelines. City of Charlotte Department of Transportation Street%20Design%20Guidelines.aspx Health Impact Assessment. Centers for Disease Control and Prevention. Accessed Infrastructure & Design Resources Context Sensitive Solutions in Designing Major Urban Thoroughfares for Walkable Communities: An ITE Recommended Practice. Institute for Transportation Engineers (ITE)

27 Traffic Calming: State of the Practice. ITE U.S. Traffic Calming Manual. Reid Ewing and Steven J. Brown NACTO Urban Bikeway Design Guide. National Association of City Transportation Officials Constructing, Maintaining, and Financing Sidewalks in New Jersey. VTC and Charles R. Carmalt, AICP PBIC Case Study Compendium. Pedestrian and Bicycle Information Center Funding Funding Pedestrian and Bicycle Planning, Programs and Projects: A Compilation of Funding Sources. New Jersey Bicycle and Pedestrian Resource Center, VTC. March New Jersey Department of Transportation Division of Local Aid & Economic Development Federal Aid Handbook. Federal Aid Quality Improvement Team, NJDOT. May

WHEREAS, the New Jersey Department of Transportation' s Complete Streets

WHEREAS, the New Jersey Department of Transportation' s Complete Streets WHEREAS, the State Department of Transportation adopted a Complete Streets Policy ( Policy No. 703), effective December 3, 2009, for all projects funded through the Department' s Capital Program and strongly

More information

NJDOT s Complete Streets Policy

NJDOT s Complete Streets Policy NJDOT s Complete Streets Policy In December 2009, New Jersey became one of the first states in the country to adopt a Complete Streets Policy. Why did we adopt this type of policy? How did we develop the

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation

More information

AMATS Complete Streets Policy

AMATS Complete Streets Policy AMATS Complete Streets Policy Table of Contents: Section 1. Definition of Complete Streets Section 2. Principles of Complete Streets Section 3. Complete Streets Policy Section 4. Consistency Section 5.

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

Perryville TOD and Greenway Plan

Perryville TOD and Greenway Plan Perryville TOD and Greenway Plan Greenway Glossary Pathway: A bicycle and pedestrian path separated from motorized vehicular traffic by an open space, barrier or curb. Multi-use paths may be within the

More information

Complete Streets for Louisiana

Complete Streets for Louisiana Complete Streets for Louisiana Louisiana Transportation Conference 2011 Ellen W. Soll, AICP Planner Burk-Kleinpeter, Inc esoll@bkiusa.com 504.486.5901 x143 What is a Complete Street? What are Complete

More information

Morristown, NJ Complete Streets Policy

Morristown, NJ Complete Streets Policy Morristown, NJ Complete Streets Policy Introduction A Complete Street is defined as a means to provide safe access for all users by designing and operating a comprehensive, integrated, connected multi-modal

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

MnDOT Implementation of Complete Streets Policy. January 2014

MnDOT Implementation of Complete Streets Policy. January 2014 MnDOT Implementation of Complete Streets Policy January 2014 1 Prepared by Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000 Toll-Free:

More information

Real-Life Cost of Incomplete Streets

Real-Life Cost of Incomplete Streets Real-Life Cost of Incomplete Streets Presented by: Sheree Davis New Jersey Department of Transportation State Bicycle & Pedestrian Coordinator 609.530.6551 sheree.davis@dot.state.nj.us 2011 New Jersey

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

Chapter 5. Complete Streets and Walkable Communities.

Chapter 5. Complete Streets and Walkable Communities. Chapter 5. Complete Streets and Walkable Communities. 5.1 Description of Complete Streets. Cities throughout the world, and specifically the United States, are coming to embrace a new transportation and

More information

NJDOT s Complete Streets Policy

NJDOT s Complete Streets Policy 2012 NJDOT s Complete Streets Policy NJDOT s Complete Streets Policy NJDOT is confident that Complete Streets policies will pay off in terms of increased long-term safety for all users of New Jersey s

More information

BIKE PLAN CONTENTS GATEWAY

BIKE PLAN CONTENTS GATEWAY CONTENTS Acknowledgments...vii Great Rivers Greenway District Board of Directors... vii Great Rivers Greenway District Staff... vii Project Consultants... vii Committees... viii Citizens Advisory Committee

More information

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY STAFF REPORT MEETING DATE: September 13, 2016 TO: FROM: City Council Bob Brown, Community Development Director Russ Thompson, Public Works Director Patrick Filipelli, Management Analyst 922 Machin Avenue

More information

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete. Thank you for this opportunity to discuss with you how we can work together to make our streets more complete. 1 2 3 Thank you for this opportunity to discuss with you how we can work together to make

More information

INDOT Complete Streets Guideline & Policy

INDOT Complete Streets Guideline & Policy INDOT Complete Streets Guideline & Policy INTRODUCTION The Complete Streets guidelines build upon multiple efforts and promote a multimodal transportation system that is integrated and sustains land use

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

Time of Change We Are Growing We Are An Attractive Place To Live We Are Age Diverse + Living Longer 50000 40000 30000 20000 10000 0 2010 Census Job Density Housing Sheds Transit Sheds The Project FUNDING

More information

COMPLETE STREETS POLICY Exhibit A to Ordinance

COMPLETE STREETS POLICY Exhibit A to Ordinance CITY OF WENATCHEE COMPLETE STREETS POLICY Exhibit A to Ordinance 2016-24 Prepared and Reviewed By: City of Wenatchee Community & Economic Development Department City of Wenatchee Public Works Department

More information

7 Complete Streets & Roadway Aesthetics

7 Complete Streets & Roadway Aesthetics 7 Complete Streets & Roadway Aesthetics 7.1 OVERVIEW Our streets lay the foundation for how we interface with travel needs, physical exercise, social exchanges and access to goods and services. They are

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Complete Streets implementation in Chicagoland

Complete Streets implementation in Chicagoland Complete Streets implementation in Chicagoland presented by Active Transportation Alliance Chicago Metropolitan Agency for Planning National Complete Streets Coalition 1 Speakers: Paul Lippens, AICP Senior

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION BACKGROUND Active transportation, also known as nonmotorized transportation, is increasingly recognized as an important consideration when planning and

More information

Town of Babylon Sustainable Complete Streets Policy

Town of Babylon Sustainable Complete Streets Policy Town of Babylon Sustainable Complete Streets Policy Steve Bellone, Supervisor Adopted July 14, 2010 1 Table of Contents Vision... 3 Policy Statement... 3 Definition... 3 Road Users... 4 Network... 4 Roads...

More information

Montclair s Complete Streets Experience

Montclair s Complete Streets Experience Presented by: Hon. Jerry Fried, Mayor Montclair Township About Montclair Six square miles Six commuter rail stations Four local bus routes (NJ Transit) Two private commuter bus routes Five business districts

More information

Michael Parmer, Management Aide, City Manager's Office

Michael Parmer, Management Aide, City Manager's Office P139 STAFF REPORT f CITY NL- NAGER' S OFFICE RANCHO Date: C;UCAMONGA To: From: Subject: Mayor and Members of the City Council John R. Gillison, City Manager Michael Parmer, Management Aide, City Manager's

More information

We believe the following comments and suggestions can help the department meet those goals.

We believe the following comments and suggestions can help the department meet those goals. The Honorable Secretary Anthony Foxx The Secretary of Transportation United States Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 August 30, 2013 Dear Secretary Foxx, Thank

More information

Active Transportation Infrastructure Investment A Business Case

Active Transportation Infrastructure Investment A Business Case Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Traffic Calming Policy

Traffic Calming Policy Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood

More information

Section 9. Implementation

Section 9. Implementation Section 9. Implementation The transportation system is just one of many aspects that must be carefully planned to maintain and enhance the quality of living in Cecil County. The Cecil County Bicycle Plan

More information

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

How to Develop a Pedestrian Safety Action Plan

How to Develop a Pedestrian Safety Action Plan How to Develop a Pedestrian Safety Action Plan Course Introduction Presented by: Peter Eun FHWA RC Safety Engineer Ryan Snyder President, Ryan Snyder Associates, LLC Paul Zykofsky Director, Land Use and

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

Plant City Walk-Bike Plan

Plant City Walk-Bike Plan Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked

More information

ACTIVE TRANSPORTATION

ACTIVE TRANSPORTATION ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion

More information

The Florida Bicycle and Pedestrian Partnership Council

The Florida Bicycle and Pedestrian Partnership Council The Florida Bicycle and Pedestrian Partnership Council Input to the Update of the Florida Transportation Plan March 2015 This document presents input from the Florida Bicycle and Pedestrian Advisory Council

More information

Policy 101. Vision & Context Project Development Funding

Policy 101. Vision & Context Project Development Funding Policy 101 Vision & Context Project Development Funding Vision & Context CS is fundamentally about a commitment to equity Needs of vulnerable road user Context is important Project Development Achieving

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Paoli Road Improvement Feasibility Study

Paoli Road Improvement Feasibility Study Paoli Road Improvement Feasibility Study & Public Participation Project March 24, 2015 Prepared for: Tredyffrin Township Prepared by: McMahon Associates, Inc. with Town Planning Partnership, LLC Glackin

More information

5. Pedestrian System. Accomplishments Over the Past Five Years

5. Pedestrian System. Accomplishments Over the Past Five Years 5. Pedestrian System Accomplishments Over the Past Five Years The Alamo Area Metropolitan Planning Organization (MPO) and its partner agencies recognize the importance of improving pedestrian mobility.

More information

Bicycle and Pedestrian Connectivity Study Phase 2

Bicycle and Pedestrian Connectivity Study Phase 2 Connectivity Study Phase 2 Process PROCESS OUTCOMES Phase Prepared By STEP I Public Participation and Outreach 1. RTP Outreach activities, and development of the Bike and Ped Task Force Phase 1 2011 OCPC

More information

4 Goals, Objectives & Actions

4 Goals, Objectives & Actions Chapter4 4 This chapter presents goals, objectives, and recommended actions to support the vision of making Overland Park a safer and easier place to ride a bicycle. 35 4.1 Recommendations Structure The

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

CHAPTER 3: Vision Statement and Goals

CHAPTER 3: Vision Statement and Goals Davidson Walks & Rolls: Active Transportation Master Plan CHAPTER 3 Contents: Overview Vision Statement Measurable Goals Public Outreach CHAPTER 3: Vision Statement and Goals Overview The vision statement

More information

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH RHODE ISLAND MOVING FORWARD BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH T AF CHAPTER 1 D R INTRODUCTION CHAPTER 3 ARTICULATES VISION Bicycling is safe, fun and practical in

More information

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet

More information

OLDER PEDESTRIANS AT RISK

OLDER PEDESTRIANS AT RISK OLDER PEDESTRIANS AT RISK A TEN-YEAR SURVEY AND A LOOK AHEAD August 0 The population of older adults is growing in the U.S. and in the tri-state region. According to AARP, one in three Americans is now

More information

Rochester Downtown Bicycle Study 2009

Rochester Downtown Bicycle Study 2009 Rochester Downtown Bicycle Study 2009 Relationship of ROCOG Long Range Transportation Plan to Rochester Comprehensive Plan Regional Long Range Transportation Plan (LRTP) is prepared under the auspices

More information

CSS and Complete Streets Partnering with Mn/DOT for Complete Streets. Scott Bradley Director of CSS April 27, 2010 CTS Research Conference

CSS and Complete Streets Partnering with Mn/DOT for Complete Streets. Scott Bradley Director of CSS April 27, 2010 CTS Research Conference CSS and Complete Streets Partnering with Mn/DOT for Complete Streets Scott Bradley Director of CSS April 27, 2010 CTS Research Conference What s The Fuss About Context Sensitive Solutions & Complete Streets

More information

City Council Agenda Item #6-A CITY OF ALAMEDA Memorandum. To: Honorable Mayor and Members of the City Council. John A. Russo City Manager

City Council Agenda Item #6-A CITY OF ALAMEDA Memorandum. To: Honorable Mayor and Members of the City Council. John A. Russo City Manager CITY OF ALAMEDA Memorandum To: From: Honorable Mayor and Members of the City Council John A. Russo City Manager Date: January 14, 2013 Re: Adopt a Resolution Approving a Complete Streets Policy, in Accordance

More information

Fargo Moorhead Metropolitan Area Complete Streets Policy Statement

Fargo Moorhead Metropolitan Area Complete Streets Policy Statement Fargo Moorhead Metropolitan Area Complete Streets Policy Statement Approved by the Fargo Moorhead Metropolitan Council of Governments Policy Board on November 18, 2010 1. Purpose The term Complete Streets

More information

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES December 2018 TABLE OF CONTENTS I. Executive Summary 3 II. When Is A Bicycle Pedestrian Transit Assessment (BPTA) Required? 4 III.

More information

Chapter 9: Pedestrians and Bicyclists

Chapter 9: Pedestrians and Bicyclists Chapter 9: Pedestrians and Bicyclists Walking and bicycling are essential modes of transportation. These modes allow people to travel without contributing to congestion and air pollution, to access other

More information

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST. VISION, MISSION, AND GOALS AND OBJECTIVES Chapter 3 The Plan s vision, mission, and goals and objectives were developed through a series of interactive exercises with the Citizens Advisory Committee (CAC)

More information

The Role of MPOs in Advancing Safe Routes to School through the Transportation Alternatives Program

The Role of MPOs in Advancing Safe Routes to School through the Transportation Alternatives Program The Role of MPOs in Advancing Safe Routes to School through the Transportation Alternatives Program In 2012, Congress made changes to Federal funding for Safe Routes to School that gave some metropolitan

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process Bicycle Transportation Plan Summary Madison Urban Area and Dane County Introduction September 2000 Bicycling is an important mode of transportation in the Madison urban area and countywide that is available

More information

EXECUTIVE SUMMARY November 2016

EXECUTIVE SUMMARY November 2016 EXECUTIVE SUMMARY November 2016 Purpose The New Jersey Bicycle and Pedestrian Master Plan presents a vision, goals, and strategies to achieve a transportation system in which walking and bicycling are

More information

TRAFFIC CALMING PLANNER S PORTFOLIO

TRAFFIC CALMING PLANNER S PORTFOLIO TRAFFIC CALMING PLANNER S PORTFOLIO ISSUE 8 January 2017 PLANNER S PORTFOLIO TRAFFIC CALMING 1 OVERVIEW 2 3 4 ENGINEERED TRAFFIC CALMING MEASURES SIGNS AND PAVEMENT MARKINGS EMERGENCY RESPONSE DELAYS 5

More information

2025 Comprehensive Plan for the City of Temple Terrace Florida. Mobility Element. Adopted by City Council June 30, 2009

2025 Comprehensive Plan for the City of Temple Terrace Florida. Mobility Element. Adopted by City Council June 30, 2009 2025 Comprehensive Plan for the City of Temple Terrace Florida Mobility Element Adopted by City Council June 30, 2009 Effective Date September 22, 2009 GOAL 2: To protect and promote the quality of life

More information

Designing for Pedestrian Safety

Designing for Pedestrian Safety Designing for Pedestrian Safety Introduction to Pedestrian Safety Design and Planning Principles Presented by: Craig Allred FHWA Resource Center Technical Specialist and Michael Ronkin Owner, Designing

More information

Evolving Roadway Design Policies for Walking and Bicycling

Evolving Roadway Design Policies for Walking and Bicycling Evolving Roadway Design Policies for Walking and Bicycling The 2016 Michigan Transportation Planning Conference Kalamazoo, MI July 13, 2016 Title 23 of the Code of Federal Regulations Title 23 was originally

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy

USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy { USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets Barbara McCann, USDOT Office of Policy 4 Steps from policy to practice Creating multi-modal streets means: 1. Change Decision-Making

More information

Chapter 7: Six-Step Implementation Process

Chapter 7: Six-Step Implementation Process Chapter 7: Six-Step Implementation Process The purpose of this chapter is to explain how the perspectives of all stakeholders interested in or affected by existing or future streets can be incorporated

More information

TABLE OF CONTENTS. Executive Summary

TABLE OF CONTENTS. Executive Summary Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting

More information

City of Saline. Complete Streets Ordinance

City of Saline. Complete Streets Ordinance City of Saline Complete Streets Ordinance September 13 and 20, 2010 CARLISLE/WORTMAN ASSOCIATES What Are Complete Streets? Complete streets are designed to serve everyonemotorists as well as pedestrians

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

Bicycle and Pedestrian

Bicycle and Pedestrian Bicycle and Pedestrian Planning for Bikeable and Walkable Communities W H O L E H E A L T H C O N F E R E N C E 0 3 / 2 2 / 2 0 1 6 R O Y G O T H I E P E N N D O T B I C Y C L E - P E D E S T R I A N C

More information

Small Town & Rural Multimodal Networks

Small Town & Rural Multimodal Networks Small Town & Rural Multimodal Networks Fred Young, PLA Andrea Clinkscales, AICP, PMP Alta Planning + Design Funding Partners Project Team Existing Design Guidance AASHTO Flexibility Guide 2004 AASHTO Bike

More information

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014) Chapter 14 PARLIER This chapter describes the current status and future plans for biking and walking in the City of Parlier. RELATIONSHIP TO CITY PLANS AND POLICIES The Parlier General Plan is the primary

More information

Favorable factors for bicycling and walking investments & plan implemtation. Road Map for Success

Favorable factors for bicycling and walking investments & plan implemtation. Road Map for Success Favorable factors for bicycling and walking investments & plan implemtation Road Map for Success Learning Objectives Identify opportunities for funding and support of bicycle and pedestrian projects Explore

More information

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another. Non-Motorized Transportation Plan (NMTP) Draft Vision, Goal and,, Tri-County Regional Planning Commission (TCRPC) Purpose The purpose of the Tri-County Regional Planning Commission (TCRPC) Non-Motorized

More information

Linking Transportation and Health in Nashville & Middle Tennessee

Linking Transportation and Health in Nashville & Middle Tennessee Linking Transportation and Health in Nashville & Middle Tennessee Fit Nation New Orleans CPPW Mentoring Grant Built Environment Program May 14, 2011 Local Transportation Planning Framework Federal U.S.

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives Capital and Strategic Planning Committee Item III - B April 12, 2018 WMATA s Transit-Oriented Development Objectives Page 24 of 76 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

East Burke Transportation, Safety and Capacity Improvements

East Burke Transportation, Safety and Capacity Improvements East Burke Transportation, Safety and Capacity Improvements The purpose of this project is to increase mobility and improve safety for pedestrians, cyclists, and motor vehicles along VT Route 114 in the

More information

City of Waterloo Complete Streets Policy

City of Waterloo Complete Streets Policy City of Waterloo Complete Streets Policy Chris Hodgson P. Eng City of Waterloo Complete Streets Forum 2011 April 28-29 Toronto Waterloo context: Current population Major employers Universities and student

More information

Multimodal Through Corridors and Placemaking Corridors

Multimodal Through Corridors and Placemaking Corridors 68 Multimodal Through Corridors and Placemaking Corridors Corridors have different functions in a region. Some corridors are used to get smoothly and rapidly through a region or to get quickly to major

More information

Vision to Action Community Coalition February 14, 2014 Briefing

Vision to Action Community Coalition February 14, 2014 Briefing Vision to Action Community Coalition February 14, 2014 Briefing Transportation and Transit Planning & Mass Transit Operations Strategic Growth Area Office Brian S. Solis Transportation & Transit Manager

More information

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009 Brian D. Hare, P.E. Bureau of Design PennDOT 2009 PA APA Annual Conference Investing in a Sustainable Future October 5, 2009 1 What is Smart Transportation? Photographer: heyjude. Used through license

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information