Brifen TL-4 Wire Rope Safety Barrier

Size: px
Start display at page:

Download "Brifen TL-4 Wire Rope Safety Barrier"

Transcription

1 Brifen TL-4 Wire Rope Safety Barrier Product and Installation Manual Ph or visit April 2016 / Page 1

2 Table of Contents 1.1 Introduction Limitations and Warnings Before Installation Safety Statements General Safety Brifen WRSB Safety Statements Geotechnical Warning Limited Warranty System Overview Brifen Anchor System Overview Surface Mounted Anchors TL-4 Terminal and Anchor System Anchor Design Anchor Foundation Shape Anchor Foundation Sizes Post Foundation Sizes Post Sockets Important Notes and Definitions of Brifen Fences Length of Need Point of Need Influence of Batter Slopes Influence of Fence Length and Post-Rope Interaction Fence Length Protecting an Obstruction Post spacing Curvature of road alignment Post Selection.14 Design Requirements 2.1 Scope Precedence Set back Clearance Limitations on Use Transitions Between Barrier Systems Length of Fence Design of WRSB in Medians Design of Overlapping Installations 19 General Installation 3.1 Mark out Allowable Deviation in Measurement Local Factors Influencing the Set out of a Fence Constructing Anchor Foundations General Comments on Excavation for Anchor Concrete and Concrete Quality Finishing of Concrete Anchor Constructing Post Foundations Construction of Post Foundations.. 24 Ph or visit April 2016 / Page 2

3 Assembling the Ropes 4.1 Assembling the Ropes Rope Supply Handling Reels Rope Installation and Connection to Anchors Connections to Anchors Rope Connection Installation Procedure.. 29 Annexures to Manual Post Foundation Site Testing Procedure General Post Foundation Test Wire Rope Tensioning Procedure Initial Checks Determining the Tension Determining the AADT Tensioning the Ropes Notes mm Galvanised Wire Rope Swaging Procedure Personal Protection Equipment Operation Site Safety Inspections Hose Inspections Bleeding Air from the System Generator Fuel Level Generator Oil Level Generator Operation Swaging Unit Operation Attachment of the End Fitting Swaging the End Fitting Troubleshooting. 48 Upgrade of Existing Single & Double Terminal Ends to TL Existing Single and Double Terminal End upgrade to TL Background TL-3 Terminal End Installation upgrade procedure for single anchor block option Installation upgrade procedure for double anchor block option Checklist.54 Ph or visit April 2016 / Page 3

4 1.1 Introduction The Brifen Wire Rope Safety Barrier (WRSB) is a high tension cable barrier and is distinctive due to its interwoven rope construction. Brifen s patented interweaving of the wire ropes are used to contain & redirect errant vehicles by preventing the vehicles from crossing the barrier or deflecting back into the traffic flow. Brifen WRSB is designed to absorb the energy of an impact, minimising injury to passengers and damage to vehicles. Due to the weaves interaction with the post, Brifen can achieve tighter radius than other products at the same post spacing. The Brifen WRSB has been designed and tested to provide acceptable structural adequacy, minimal occupant risk and safe trajectory as set forth in NCHRP 350 for longitudinal barriers. When impacted with a 820kg, 2000kg and 8000kg vehicle at speeds of up to 100kph and side on entry angles of up to 25 degrees, the impacting vehicle is re-directed in a safe manner. 1.2 Limitations and Warnings Brifen WRSB has been rigorously tested and evaluated per the evaluation criteria in the NCHRP 350 guidelines for a longitudinal barrier. The impact conditions recommended in NCHRP 350 are intended to address typical in-service collisions. Brifen WRSB allow an impacting vehicle to be re-directed in a safe and predictable manner under the NCHRP 350 impact conditions. It is imperative that the system is installed as per manufacturers specification. Vehicle impacts that vary from the NCHRP 350 impact conditions described for longitudinal barriers may result in significantly different results than those experienced in testing. Vehicle impact characteristics different than, or in excess of, those encountered in NCHRP 350 testing (weight, speed and angle) may result in system performance that may not meet the NCHRP 350 evaluation criteria Before Installation Design, selection and placement of the Brifen WRSB shall be in accordance with the Road Controlling Authority s guidelines and the details shown in the construction drawings. Installation shall be in accordance with the installation instructions supplied for this product. Note: Concrete foundations will have to be designed by a local geotechnical engineer if soil conditions on site do not meet the required level described in the manual. Depending on the application, post spacing and conditions on site, installation and assembly of the system should take a three person crew less than four hours to cast the piles, install the posts and place the cables for a 100m section. Brifen WRSB is a highly engineered safety device made up of a relatively small number of parts. Before starting installation ensure that one is familiar with the makeup of the system. Ph or visit April 2016 / Page 4

5 1.3 Safety Statements General Safety All required traffic safety precautions should be complied with. All workers should wear required safety clothing. (Examples, and not limited to, include: high visibility vests, steel capped footwear, gloves etc.) Only authorised trained personnel should operate any machinery. Where overhead machinery is used, care must be taken to avoid any overhead hazards. Before drilling or excavation always ensure that the area is clear of underground services. (The appropriate service providers may need to be contacted) Brifen WRSB Safety Statements All installers must be well clear of drilling or excavating machinery operating. The cable and reel are extremely heavy so it is recommended that the cable is run out from a single axis spindle. Do not place hands or fingers in or around moving parts. Only trained personnel can use the swaging machine. All installers must be extremely careful they are clear of moving parts when the machine is being operated Geotechnical Warning The Brifen WRSB line post concrete foundations require sufficient strength from the supporting soil and guidelines contained within this manual on foundation sizes relate specifically to the corresponding soil strength. If it is determined that soil conditions on site do not meet or exceed these requirements, alternative size foundations must be designed by a local geotechnical engineer for use at that location. Ph or visit April 2016 / Page 5

6 1.4 Limited Warranty CSP Pacific has tested the impact performance of its barriers and crash cushion systems, and other highway safety hardware under controlled conditions, however, CSP Pacific does not represent nor warrant that the results of those controlled conditions would necessarily avoid injury to persons or property. CSP PACIFIC EXPRESSLY DISCLAIMS ANY WARRANTY OR LIABILITY FOR CLAIMS ARISING BY REASONS OF DEATH OR PERSONAL INJURY OR DAMAGE TO PROPERTY RESULTING FROM ANY IMPACT, COLLISION OR HARMFUL CONTACT WITH THE PRODUCTS OR NEARBY HAZARDS OR OBJECTS BY ANY VEHICLE, OBJECTS OR PERSONS. CSP Pacific warrants that any product or component part manufactured by CSP Pacific will be free from defects in material or workmanship. CSP Pacific will replace free of cost any Product or component part manufactured by CSP Pacific that contains such a defect. THE FOREGOING WARRANTY IS IN LIEU OF AND EXCLUDES ALL OTHER WARRANTIES NOT EXPRESSLY SET FORTH HEREIN, WHETHER EXPRESS OR IMPLIED BY OPERATION OF LAW OR OTHERWISE, INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. CSP PACIFIC S LIABILITY UNDER THIS WARRANTY IS EXPRESSLY LIMITED TO REPLACEMENT FREE OF COST OF PARTS SUPPLIED BY CSP PACIFIC ONLY (IN THE FORM AND UNDER THE TERMS ORIGINALLY SHIPPED), OR TO REPAIR OR TO MANUFACTURE BY CSP PACIFIC, PRODUCTS OR PARTS NOT COMPLYING WITH CSP PACIFIC SPECIFICATIONS, OR, AT CSP PACIFIC S ELECTION, TO THE REPAYMENT OF AN AMOUNT EQUAL TO THE PURCHASE PRICE OF SUCH PRODUCTS OR PARTS, WHETHER SUCH CLAIMS ARE FOR BREACH OF WARRANTY OR NEGLIGENCE. CSP PACIFIC SHALL NOT BE LIABLE FOR ANY INCIDENTAL, CONSEQUENTIAL OR SPECIAL LOSSES, DAMAGES OR EXPENSES OF ANY KIND, INCLUDING, WITHOUT LIMITATION, ANY SUCH LOSSES, DAMAGES OR EXPENSES ARISING DIRECTLY OR INDIRECTLY FROM THE SALE, HANDLING OR USE OF THE PRODUCTS FROM ANY OTHER CAUSE RELATING THERETO, OR FROM PERSONAL INJURY OR LOSS OF PROFIT. Any claim by the Buyer with reference to Products sold hereunder for any cause shall be deemed waived by the Buyer unless CSP Pacific is notified in writing, in the case of defects apparent on visual inspection, within ninety (90) days from the delivery date, or, in the case of defects not apparent on visual inspection, within twelve (12) months from the said delivery date. Products claimed to be defective may be returned prepaid to CSP Pacific s plant for inspection in accordance with return shipping instructions that CSP Pacific shall furnish to the Buyer forthwith upon receipt of the Buyer s notice of claim. If the claim is established, CSP Pacific will reimburse that Buyer for all carriage costs incurred hereunder. The forgoing warranty benefits shall not apply to (i) any Products that have been subject to improper storage, accident, misuse or unauthorised alterations, or that have not been installed, operated and maintained in accordance with approved procedures and (ii) any components manufactured by the Buyer. Ph or visit April 2016 / Page 6

7 1.5 System Overview The Brifen TL-4 WRSB consists of four tensioned galvanised steel wire ropes with an average height above ground level of 705mm. Galvanised or white powder coated steel posts support the wire ropes. The rope arrangement for the Brifen TL-4 WRSB has three inter woven ropes along the fence between each post and one straight rope in the notch in the top of each post. The ropes are joined and tensioned by means of rigging screws provided at intervals not exceeding 308 metres. The ends of the ropes are attached to anchors embedded in the ground. The connection between the ropes and anchors are designed to be a gating action which allows the ropes to uncouple when a vehicle impact occurs in the vicinity of the anchor. A safety check rope then restrains the movement of the ropes. Figure 3. Brifen TL-4 Post and Rope Heights 1.6 Brifen Anchor System Overview The Brifen TL-3 Tested Anchor is used on the TL-4 system. The Anchor consists of one large anchor block with all four ropes connecting to the anchor. The anchor can be either cast insitu or surface mounted. The connection of the ropes to the anchor is designed to uncouple when a vehicle impact occurs in the vicinity of the anchor. A safety check rope connected to the anchor restrains the movement of the rereleased rope. Four terminal posts are set out at 2m intervals. The first post is referred to as the deflection post and is installed at an 11 degree angle (to the vertical). The remaining posts are installed vertically. The following figures detail the anchor and also the different terminal posts for the tested system. These posts can be used for both the flared and straight terminals. Ph or visit April 2016 / Page 7

8 1.6.1 Surface Mounted Anchors Below are diagrams of the Brifen TL-3 Surface Mounted Anchor. The Surface Mounted End Anchor is used when the regular anchor may not be suitable. For example if a concrete footing block will not fit in the area required or if underground services are present and concrete foundations already exist in the area, the concrete block may be modified by a structural engineer s certification. Figure 4. Surface Mounted End Anchor Ph or visit April 2016 / Page 8

9 1.6.2 TL-3 Terminal and Anchor System The TL-3 Terminal posts are detailed below. Figure 5. Terminal Post details Type of Fence Type of Anchor Anchor Terminal TL-4 TL-3 Anchor 4 x Anchor Posts Figure 6. TL-4 Terminal End Anchor Setup Ph or visit April 2016 / Page 9

10 1.7 Anchor Design End terminals are of cast in or of surface mounted design, and are designed to detach the rope connectors when an errant vehicle collides with the fence upstream of the departure anchor. For contracts requiring surface mounted terminals, the terminal unit is bolted to a cast-in fixing, the fasteners are to be specified by specialist engineers using austenitic stainless steel components (refer Ramset or Hilti or a qualified Structural Engineer). When installing Catch ropes, please ensure they are tied (using cable ties) to the ropes at mid span to prevent the catch ropes becoming a hazard to pedestrian traffic. The Brifen anchor can be installed as either a flared arrangement or the standard straight line installation. The Brifen anchor was tested on a flare of 600mm as shown in the following diagram. When constructing the anchor, if the site batter slope geometry does not permit a 600mm flare, then the minimum flare on the approach side is 300mm. It is not required that the anchor be flared on the departure side unless a vehicle can impact the anchor at an angle of 180. The end anchor is essentially a dead-man or a laterally loaded pile. Soil conditions influence the design of the anchor system. Please refer to section for standard anchor foundation size or contact CSP Pacific for advice. Figure 7. Anchor and Post Ph or visit April 2016 / Page 10

11 1.7.1 Anchor Foundation Shape There are two shapes for the anchor foundation, block and cylindrical. The Block shape is indicated in the diagram below and is the most common form of anchor foundation. Both types of anchor foundations must have a vertical face for an even bearing capacity Anchor Foundation Sizes Figure 8. Anchor and Section Isomeric The standard foundation size for the anchor block is 900mm W x 900mm L x 1200mm D is for use when the soil conditions on site are compacted road base with a shear strength of 40-50kPa with a recommended concrete strength of 25MPa. Anchor blocks are an essential structural component of the fence and it is important that the minimum dimensions of all anchor blocks be constructed as specified. The vertical bearing face of the anchor must be constructed vertical and square. The Anchor Block dimensions can vary from site to site depending upon the soil type and the cross-section geometry of the carriageway (proximity to embankment, slope of embankment). The end anchor is essentially a dead-man or a laterally loaded pile and soil conditions influence the design of the anchor system. The Anchor block shape and dimensions can vary to suit site conditions: batter slopes, ground conditions, presence of services, etc. All end anchors must be designed and checked to make sure they are constructed to suit the specific site conditions. In some cases a site specific design may be required designed by a local geotechnical/ structural engineer. CSP Pacific can be contacted for advice on site specific anchor sizes. Ph or visit April 2016 / Page 11

12 1.8 Post Foundation Sizes The size of the post foundation used is based on the soil conditions present within the project area. The standard recommended post foundation size is 250mm dia x 750mm depth for use in a compacted road base with a shear strength of kpa. The concrete to be used for a post foundation must have at least 25 MPa strength. For alternate soil conditions such as soft or loose soils or when rock is encountered then a larger or smaller post foundation may be required. If an alternative post foundation is required then the following processes to be followed: a) Geotechnical testing conducted to determine the existing conditions. b) A suitably qualified Engineer to design and detail the post foundations. For initial detailing, end or deflection post foundations must be designed to resist the effects of a horizontal shear of 10.26kN, combined with a bending moment of 6.0kNm at a height of 600mm in a plane at 90 degrees to the fence line. c) Non-standard post foundations must be tested in accordance with the standard load test. This testing is detailed in the Annexes of this manual. Note: It is the responsibility of both the Contractor and the Supervising Engineer to assess the soil conditions to access what size post foundations are used. Soil profiles are not consistent and can be subject to large variation in a short distance. A post foundation that breaks or rotates may influence the performance of the installation. If under any circumstances there is uncertainty, CSP Pacific is to be contacted for advice Post Sockets Brifen uses plastic sockets specific for post installation. The socket is 100mm x 55mm x 425mm deep and is installed into the foundation with a supporting reinforcement ring. 1.9 Important Notes and Definitions of Brifen Fence Length of Need A fence consists of two parts, the Anchor Terminal section and the Length of Need. The Anchor section design is gating and allows the vehicle to pass through the Anchor, with the greatest possible stability. The purpose of the length of need (the main body of the fence) is to safely restrain, contain and redirect the vehicle. The Length of Need is defined as that part of the fence between the Points of Need. Figure 9. Length of Need Ph or visit April 2016 / Page 12

13 1.9.2 Point of Need The Point of Need is the first point of the fence that contains a vehicle upon impact. Any point of impact (upstream for approach and downstream for departure) from the Point of Need is considered gating when locating the fence and shall not be considered as protecting a hazard. The point of need for the Brifen WRSB is 9.6m from the anchor. To define the Point of Need with respect to a Hazard, please refer to the local Road Controlling Authority s guidelines Influence of Batter Slopes Figure 10. Point of Need for Terminal NCHRP 350 recommends that the lateral extent of the soil, outside an envelope of the embedded portion of the test article, be approximately 1.3 times the embedment length. Therefore where the post and/or anchor foundations are to be constructed within 1.5 metres of a batter slope, the foundations may be required to be deeper than the standard depth and a site specific design may be required to be designed by a local geotechnical/ structural engineer taking into consideration the site soil conditions. CSP Pacific can be contacted for advice on site specific post and anchor sizes Influence of Fence Length and Post-Rope Interaction The combinations of the inter-woven lower ropes and the linear upper rope delivers two energy-absorbing actions, namely: Linear stretching of the upper rope; and Mechanical action of the lower woven ropes exerting frictional force acting on the steel post and using the deformation of the posts to absorb impact energy into the fence system. Working together in tandem, these two energy-absorbing actions result in a significant reduction in total fence deflection and fence damage during an impact. The complex interaction of rope and post ensures rapid transfer of the vehicle kinetic energy into the fence and then into the ground. Brifen s patented system combines the attributes of both wire rope configurations: the straight rope to provide the initial resistance to the impact; and the woven ropes to both localize and control the impact by making most efficient use of the supporting posts. The benefit of incorporating woven ropes into the fence design is best realised on longer lengths of fence. As the fences length increases, the fence anchors have reducing influence on the fence performance therefore on short fence lengths (50 metres to 150 metres) the end anchors tend to do the bulk of the work. Ph or visit April 2016 / Page 13

14 1.9.5 Fence Length Protecting an Obstruction The Brifen installation is extended at full height for a minimum distance great enough to provide a clear zone behind the terminal, with redirection of the system occurring after 7.5m. If the obstruction can be approached from two directions then the point of need on both sides will be at a distance great enough from the obstruction to create a clear zone behind the terminal end. On embankments of 6m or more in height, the installation length should be extended beyond the 6 m high section, this will ensure that vehicles leaving the carriageway at places of lesser drop will not reach the 6 m high section. On curves, further extension may be needed to avoid the risk of vehicles passing behind the fence Post spacing When the post spacing is reduced on a WRSB system, the deflection will decrease due to the post/rope friction increasing, Brifen WRSB s regular post spacing is 3.2 metres. Custom post spacing may be required depending on the deflection requirements of the WRSB fence and may be subject to the local Road Controlling Authorities requirements Curvature of road alignment If the road curvature has a horizontal radius of less than 200 metres or vertical sag of less than 3000 metres, the WRSB may not be installed unless post spacing is reduced. For further details please contact CSP Pacific for assistance. When a road heads into a sharp curve it is important to make sure the impact zone will be within the length of need and not in the terminal for maximum performance Post Selection The selection of the correct posts is determined by where the WRSB fence is located. If it is located in the verge, the post cross section will be a Z shape. This is so vehicles do not impact the posts on the sharp edge. Alternatively, the median side will require S shaped posts. Also the posts must be for the correct system to be installed. The figure below is a simple illustration to show the post shape in reference to the travelled path: Figure 11. Post Selection Diagram Ph or visit April 2016 / Page 14

15 Design Requirements 2.1 Scope The wire rope safety fence described in this design document is anchored to the ground and is designed to resist a specified impact loading. This document sets down the essential layout requirements and limitations on the use of Brifen Wire Rope Safety Barrier TL Precedence The following comments are on design and are general in nature. Each local Road Controlling Authority has different requirements in their specifications and those specific requirements will take precedence over these general rules unless otherwise stated by the Road Controlling Authorities specifications. If there is any doubt on the question of precedence contact CSP Pacific. 2.2 Set Back Set-back is the unobstructed horizontal dimension between the traffic face of the wire rope safety fence and the edge of the: a) Paved surface adjacent to the verge; (the paved surface comprises the carriageway, hard shoulder or hard strip) b) Carriageway adjacent to the median. Layout requirements for Setback at a verge: The minimum setback shall normally be not less than 1.2m. It may be reduced locally to: a) 1.0 m adjacent to a hazard b) 0.6 m adjacent to a hard-strip, hard shoulder or road having a posted speed limit below 80 km/h. Layout requirements for Setback on a Median: a) Where there are no obstructions and only one safety fence in the median between carriageways, the desirable minimum setback will be the maximum deflection of the fence calculated under the contract design conditions. b) In other situations, for example, where a dual fence line is present, the setback needs to be calculated and will depend not only on type of fence but the distance between the two adjacent fences. Suitable guidance is available from CSP Pacific. Ph or visit April 2016 / Page 15

16 2.3 Clearance Clearance is the unobstructed horizontal dimension between the rear of the wire rope safety fence and: a) The face of an obstruction; b) The top of an embankment; c) The toe of a cutting; d) The opposite carriageway on a median where there are no obstructions and there is only one safety fence between the carriageways. The deflection of a Wire Rope Safety Barrier is dependent on a number of variables which can be project specific. The selection will take into account post spacing, anchors spacing and speed environment when determining the clearance/deflection of the system in accordance with the local Road Controlling Authority guidelines. The deflection measurements from NCHRP compliance testing are as follows: Test 3-10: 820kg small car, 100kph at 20 degrees (NCHRP 350 TL-3) Post Spacing Dynamic Deflection 3.2m 1.35m Test 3-11: 2000kg pickup truck, 100kph at 25 degrees (NCHRP 350 TL-3) Post Spacing Dynamic Deflection 2.4m 1.65m Test 4-12: 8000kg pickup truck, 80kph at 15 degrees (NCHRP 350 TL-4) Post Spacing Dynamic Deflection 3.2m 2.21m Note: Deflection is influenced by cable temperature, post spacing, soil stability, barrier length and barrier curvature. Consequentially, allowance should be made for barriers to deflect more than that shown during one particular test. The deflection listed above should only be used as an indication of what deflection measurement to expect. Ph or visit April 2016 / Page 16

17 2.4 Limitations on Use Limitation for Minimum Length In terms of overall length of the barrier, the minimum length of the TL-4 system is 78m Horizontal Curves The Brifen system can be used on horizontal curves of less than 200m. This is due to the woven rope system which makes it suitable for use on curves down to 60m radius. Prior to proceeding with a design/installation of <200m radius, please contact CSP Pacific to ensure suitability and advise on minimum radius so that post pitch, anchor spacing etc. can be calculated Sag Vertical Curves Vertical sag curves of less than a 3000m radius are not recommended for WRSB. However for the right site conditions Brifen can be installed at less using careful design and specially designed hold down posts, for designs requiring this application please contact CSP Pacific for assistance Height of Ropes Where the horizontal distance from the traffic face of the fence to the edge of the adjacent paved surface is less than 1.5m, the heights of the ropes shall be measured from the level of the paved surface adjacent. Elsewhere, the heights of the ropes will be measured from the general ground level below the fence Rope Height Tolerance A tolerance of ±30mm shall apply to the specified rope heights at any point in the system Kerb in front of Brifen WRSB While it is desirable to have a level transverse region before and after the WRSB, it is not always possible. The kerb before the fence line can depress the vehicle suspension causing a ramping of the vehicle. For this reason the following general guidelines should be followed: a) If the kerb height is no greater than 100mm, locate the WRSB immediately behind the kerb. b) If the kerb height is greater than 100mm, locate the WRSB at an alignment 1500mm or greater from the face of the kerb. c) If the kerb height is greater than 100mm and the WRSB cannot be relocated contact CSP Pacific Kerb behind Brifen WRSB It is not uncommon to locate a kerb behind the WRSB on highways for surface water diversion. When these drains are located in the deflection area by WRSB they can influence the passage of the vehicle. It is desirable that the kerb face is either sloped at an angle of 45 or flatter, or, that the kerb be less than 100mm high. Contact CSP Pacific for assistance if required. Ph or visit April 2016 / Page 17

18 2.5 Transitions Between Barrier Systems Transitions from Brifen WRSB to other types of barriers are possible and details are available on request. Please contact CSP Pacific. 2.6 Length of Fence Where Brifen WRSB is protecting an obstruction, the leading Point of Need will be located not less than the distance required for the creation of a clear zone after the terminal and as per the local Road Controlling Authority guidelines. If the obstruction can be approached from both sides then both sides will be treated as a leading Points of Need, and must include provision of a clear zone at the terminal. The system is redirecting after 7.5m. 2.7 Design of WRSB in Medians Brifen use S Shaped posts for median applications where in the event of a vehicle impact, the vehicle shall make contact with the post on the rounded edge and not the sharp edge. If the median has a batter to the centre line and the median is less than 10 metres in width, the WRSB should be located in the centre of the median. Figure 12. Median impact for medians of 10 metres or less If the median has a batter to the centre line and the median is greater than 10 metres in width, the WRSB can either be installed in the centre of the median or adjacent to the traffic lane. Ph or visit April 2016 / Page 18

19 Figure 13. Median impact for medians greater than 10 metres 2.8 Design of Overlapping Installations The desirable minimal distance between the fence lines (denoted D ) is 2000mm but this is not always achievable due to the width of median or steepness of batter slope. The minimum separation distance between the fences (denoted D ) is 200mm however every attempt should be made to maximize the separation. A separation distance of D>2000mm is considered ideal for NCHRP350 TL-3 impact conditions. Figure 14. Overlapping of WRSB fence (Points of Need are adjacent) Ph or visit April 2016 / Page 19

20 General Installation 3.1 Mark Out a) Establish location of the datum, this may be the point of need or the centre of the outermost anchor block. b) Establish location of the end anchor blocks. c) Establish the fence alignment. d) Mark out the anchor locations at the required offsets Allowable Deviation in Measurement a) The post spacing should not deviate more than ±50mm in location as measured from the starting anchor face. b) The post location must not deviate more than ±20mm from the fence alignment Local Factors Influencing the Set out of a Fence The nominal post spacing may need to be varied slightly during construction. Typical variations include underground services or drainage pipes. The deflection performance of the Brifen WRSB is tolerant of the variation of a single post spacing. All variations must be referred to the Road Controlling Authority for advice before proceeding with installation of the Brifen WRSB. 3.2 Constructing Anchor Foundations Before any construction commences, be clear what anchor foundations are required. Specifically it must be known (a) the dimensions of the anchor foundation (b) the type of anchor to be used and (c) they are suitable for the site soil conditions. The standard dimension for the concrete anchor foundation for the TL-3 tested 4 rope terminal is 900mm W x 900mm L x 1200mm D. This foundation size is designed for compacted road base, if other soil conditions exist, please consult section of this manual. Ph or visit April 2016 / Page 20

21 3.2.1 General Comments on Excavation for Anchor a) All excavations for concrete post foundations and anchor blocks shall have vertical sides and shall be formed to the line and level detailed in the design plans. b) Where the vertical faces cannot be kept vertical, temporary formwork shall be provided. c) The minimum dimensions of the excavation shall be at least as large as those specified in the standard drawings. d) All spoil should be removed from any hole. Where this cannot be achieved, ensure that the minimum depth is achieved and that the spoil at the bottom of the hole is tamped and compacted as tightly as possible. e) Where the specified minimum depth cannot be attained due to the presence of rock the supervising engineer and CSP Pacific must be consulted. f) Where the specified minimum depth cannot be attained due to the presence of services the supervising engineer and CSP Pacific must be consulted. g) Where the fence line requires that the anchor and/or post foundations are located in fill batters the supervising engineer and CSP Pacific must be consulted. h) Where the fence line requires that the anchor and/or post foundations are located in very hard deep pavement the supervising engineer and CSP Pacific must be consulted to revise the minimum excavation depths. i) Some excavation may require a rock breaker to assist the auguring process. j) In general, there will not be any variation in the minimum dimensions of the anchor block after work on the project has commenced. Figure 1. Excavation for Brifen Anchor Block Ph or visit April 2016 / Page 21

22 3.2.2 Concrete and Concrete Quality a) All concrete shall be minimum 25MPa. b) No additional reinforcement is required unless it is a requirement of a site specific design due to soil conditions. c) All anchor frames shall be secured against displacement during placing of the concrete. d) Concrete shall be poured from an appropriate height to prevent segregation of aggregates. e) All concrete shall be adequately vibrated to produce a dense mass substantially free from voids. f) All surfaces shall be free from voids, honeycombing or other defects. Small blemishes caused by entrapped air or water are acceptable. g) Exposed concrete surfaces shall be hand toweled. h) Adjacent ground shall be shaped to prevent ponding of surface water, which may later saturate and weaken the soil profiles. i) Concrete shall be left to cure for a minimum of seven (7) days. Figure 2. Vibrating the concrete when pouring Ph or visit April 2016 / Page 22

23 3.2.3 Finishing of Concrete Anchor Figure 3. Adjusting the slope of the anchor face When finishing the Brifen concrete end anchor ensure the following: The recess at the rear of the anchor has a one-way fall away from the centre of the fence. The recess facilitates the entry of the wire ropes into the anchor. The fall ensures water is dissipated away from the bearing place. So that water does not pool at the anchor face, ensure the surface of the concrete falls away from the exposed anchor face. The concrete should be kept clear of the anchor frame face. Figure 4. Finished anchor frame and A Post (at 11 degree slope) Ph or visit April 2016 / Page 23

24 3.3 Constructing Post Foundations Before any construction commences, be clear what post foundations are required. Specifically the dimensions of the post foundation. The standard dimension for the concrete post foundation is 250mm dia. x 750mm deep. This foundation size is designed for compacted road base, if other soil conditions exist, please consult section 1.8 of this manual. Figure 5.Excavator with augur attachment to drill post foundations This foundation size is designed for compacted road base, if other soil conditions exist, please consult section 1.8 of this manual Construction of Post Foundations a) Establish post center referenced from the datum and excavate foundation, ensuring requirements in terms of foundation size and depth and socket length are as specified. (The post/socket position to be central within the foundation). b) Where the sides of excavations cannot be maintained vertical until concrete is placed, suitable permanent or temporary casings shall be used. The casings shall be installed immediately after excavation and any lateral over break of the excavation shall be filled with concrete. c) Place concrete as a monolithic mass and vibrate for compaction. Specified concrete grade is a minimum of 25MPa. The curing period must not be less than four days. d) Ensure that the post is of the correct type. e) Set post and/or socket and reinforcing ring in wet concrete to the specified height, setback and post spacing, ensuring that post and/or socket and reinforcing ring remain in the correct position. It is best practice to place the reinforcement ring into concrete when the level is about 60mm below the ground level and then complete the pour prior to the insertion of the plastic socket. Ph or visit April 2016 / Page 24

25 Figure 6. Post and foundation arrangement with Reinforcing ring location f) Re-compact concrete. Slope concrete away from post/socket to prevent formation of corrosion pockets. Finish to level and cure. A 20mm crown or dome should be formed on the top surface to encourage water dissipation. Figure 7: Use of finishing tool to create dome (Left) Finished post foundation (Right) g) Install post in socket and fill void with safety non-setting passive filler to a level slightly above the top of the socket, ensuring that the radius edge of the post faces oncoming traffic. Important Positioning of the posts is critical. Measure each post center and relevant distance from the point of setback. Double check all dimensions before setting posts and sockets in concrete. Ph or visit April 2016 / Page 25

26 Do Not: Cast footing in two separate pours. Ram a post into the socket to push it into position in the concrete, since this could push the bottom out of the plastic socket. Figure 8. Vibrating concrete in posthole Ph or visit April 2016 / Page 26

27 Assembling the Ropes 4.1 Assembling the Ropes The installation of the ropes is to be conducted in accordance with the following guidelines to ensure that the correct weave pattern will be installed along the length of the barrier Rope Supply Ropes are supplied as one continuous length on reels without any fittings attached. It is recommended to swage one fitting so that attachment to one of the anchors is possible. Run out the wire in its final position under as much tension as possible. Over-cut the length at the other anchor, and repeat for the other four (4) ropes Handling Reels The reel should be mounted on a reel stand on the back of a truck or trailer. The reel stand should not have bearings so that the rope remains reasonably taut while it is being run off. Figure 9. Rope being run off from reel Ph or visit April 2016 / Page 27

28 4.2 Rope Installation and Connection to Anchors Connections to Anchors The connection consists of a swage fitting and M16 threaded rod being coupled together by means of a fuse coupling fitting. The M16 threaded bar is then fixed to the anchor. The order of item connection to the anchor is as follows: 60 x 60 Nylon washer, 60 x 60 Steel washer, Tapered washer, M16 galvanised washer and 2 x M16 galvanised Nuts. Figure 10. Fuse coupling/threaded bar connection Ph or visit April 2016 / Page 28

29 4.3 Rope Connection Installation Procedure The following procedure outlines the steps required to install the ropes along the entire length of the fence: a) Support reel of rope on a suitable reel carrier. As a minimum arrangement the reel should be mounted on a reel stand on the back of a truck or trailer. The reel stand should not have bearings so that the rope remains reasonably taut while it is being run off. b) Starting with the rope end terminal in the anchor frame slot, using a washer, nut and locknut, connecting the safety check rope to the terminal and the anchor frame. c) Move reel carrier down fence line, paying out the rope from the reel and weaving the rope around the posts, locating the rope on the locating pegs until the point where a rigging screw connection is required. d) Connect the paid out length of rope to the next length of rope on the reel, using a rigging screw. A length of not less than 30mm of each terminal end should be inserted in end of the rigging screw. e) Continue down the fence line connecting all the ropes in a similar manner until the next anchor block. f) Attach a safety check rope to the rope and the rope end to the anchor frame using a washer and two nuts or a mechanical fitting. Connect the safety check rope to the anchor frame. g) Repeat (a) to (g) for remaining ropes. h) Place caps on tops of posts. i) Remove slack in the safety check rope by clipping it to the end of the rope using suitable plastic clips or ties. The removal of slack avoids the safety check rope causing a tripping hazard. j) Ensure that rigging screws/threaded terminals are no closer than 100mm to any post after tensioning. To ensure that the ropes are within the correct position in the fence line, the following steps detail the connection procedure. Step 1 Rope Identification Standing at the anchor block facing the terminal posts and along the length of need, the rope on the far left hand is rope number 1 and the rope on your far right is rope number 4. (See Fig 11). Figure 11. Rope Identification Ph or visit April 2016 / Page 29

30 Step 2 Starting the Weave of the Rope For the below details, refer to Fig 12 for visual locations. Rope 1 is to extend to the middle hook on the LHS of the first post. Rope 2 is to extend to the top hook on the LHS of the first post. Rope 3 is to extend to the bottom hook on the RHS of the first post. Rope 4 is to extend to the middle hook on the RHS of the first post. Step 3 Weaving after the First Rope TL-4 Weave Pattern Figure 12. Rope Locations Rope 1 continues to weave along the second from the top location to the far end of the fence. Rope 2 weaves along the upper level until at post 4 of the terminal it sits in to the slot at the top of the post and continues straight to the end terminal. Rope 3 continues to weave along the bottom location to the far end of the fence. Rope 4 continues to weave along the second from the bottom location to the far end of the fence. Figure 13. Rope Locations Ph or visit April 2016 / Page 30

31 Step 4 Ending the Weave The weave pattern continues along the entire length of need and through the far terminal in the same manner as the start of the weave. Stand at the far anchor block looking back along the woven fence. The ropes come back in to the anchor in exactly the same manner as the ropes went from the first anchor. (See Fig 14 below). Figure 14. Rope Locations for End Treatment Note: Figure 14 above is a representation of both the approach and trailing end treatment. The weave pattern is the same for both. Also, for a median installation, the longitudinal reverse is to take place to ensure that rope #4 is still closest to the roadway. Ph or visit April 2016 / Page 31

32 Annexures to Manual Post Foundation Site Testing Procedure 5.1 General To enable Brifen WRSB to perform as designed it is imperative that the post can yield. Concrete foundations can have two functions, the first being ground strengthening (these foundations have an allowable amount of movement) and the second is to enable repair of the Brifen WRSB after a vehicle impact without having to repair the ground. It is recommended that before installation begins posts should be installed in sockets and the destructive test carried out to ensure the post yields before the foundation moves. 5.2 Post Foundation Test The concrete foundation should require no maintenance for the life of the Brifen WRSB. The post may be damaged and may be replaced several times, but the foundation should be stable and incur no maintenance cost. Prior to starting construction a series of load tests can be undertaken to check the size of the post foundation is suitable for the site soil conditions. Post foundations are constructed at depth of 750mm when installed in compacted road base, if other soil conditions exist, please consult section 1.8 of this manual. A load test is required when: 1. Stipulated in the contract or by the road controlling authority. 2. When non-standard foundation sizes are used (the standard foundation size for compacted road base is 250mm dia x 750mm depth). Ph or visit April 2016 / Page 32

33 Methodology a) Ensure that the concrete has partially cured for at least 4 days and that the concrete strength is at least 18MPa prior to conducting the load test. b) Place a post into the plastic socket of the concrete foundation. c) Attach a sling (synthetic is preferred to avoid post damage) to the post 600mm above ground level and a load cell to this sling. d) Rig a lever hoist or equivalent to the load cell and anchor the apparatus to a truck parked alongside. e) Using the lever hoist, generate a force of 10kN as read off the calibrated load cell. f) This method applies a bending moment of 6kNm. If the foundations can withstand this bending moment with minimal horizontal movement (3mm) at ground level, then the foundation it is proven to be acceptable. g) A typical arrangement for the load test is shown in the following picture. The equipment is simply a mechanical or digital load gauge in line with mechanical or hydraulic tensioning device coupled to a solid object one end and to an assembly (in this case a chain sling) to load the post 600mm above ground level. Ph or visit April 2016 / Page 33

34 Product & Install Manual : Brifen Wire Rope Safety Barrier A photo-sequence of the test follows: Prepare post load assembly In this case a digital load gauge is shackled to the post and to a chain block. A concreter s truck provides the resistance. Prepare the reference point In this case a string line is set across the post foundation at a known distance from the edge of the plastic socket insert into the post foundation. Check all measurements In this case a certified testing facility was engaged for an independent assessment of the post foundation capacity to resist the load imposed by the post. Ph or visit April 2016 / Page 34

35 Load the post Once all the measurements are checked apply a load of 10 kn. Determine the result Once the load of 10 kn has been applied at 600mm above ground level, then measure the deflection. A result of 0-3mm is deemed acceptable. Movement of >3mm must be assessed in relation to further load tests on adjacent posts. Records and Results The result of all tests should be recorded by location with photographs and the attached test report sheets. If a single result is greater is >3mm then load test the adjacent post foundations to determine if it is a unique result or not. If the fence is in a high impact zone (middle of a highway) that is expensive to affect lane closure then the contract may require ALL test results to be >3mm (to ensure minimal maintenance in the future). If the fence is on a bend in a country road with low traffic volume and the result was 10 tests with seven passes and three readings in the range 3mm-6mm then the Supervisor may deem a satisfactory result. Ph or visit April 2016 / Page 35

36 Ph or visit April 2016 / Page 36

37 Ph or visit April 2016 / Page 37

38 Wire Rope Tensioning Procedure 6.1 Initial Checks Before continuing to tension the ropes you must perform the following checks: Ensure that the threaded terminal ends are securely placed in the anchor blocks and threaded terminals fitted with nut and locking nut. There should be at least three threads showing on the outside of the locking nut. (Temporary locking wire passed through the holes provided in the anchor plate will ensure ropes are not dislodged during tensioning). Ensure that all rigging screw threads are lubricated before assembly to facilitate adjustment and/or removal during maintenance or repair of the Brifen WRSB and have a minimum thread engagement of 30 mm before tensioning. Ensure that all ropes are correctly located and are placed on the appropriate terminal posts. Ensure that the upper rope(s) are in the slots of the posts and are led to the anchor frame from the correct slot in the terminal post. Safely remove initial installation slack by tensioning each of the fence ropes from one end anchorage by means of a three tonne rated rope grip and 1.5 tonne rated strop. Tighten nuts and lock nuts on threaded terminals to remove slack from system. Ph or visit April 2016 / Page 38

39 6.2 Determining the Tension To determine the correct rope tension, first a Tension Vs Temperature chart is needed for the region the fence is being built in. The correct tension for the Average Annual Daily Temperature (AADT) is 22.25kN. The following table shows the tension variation with 5 C increments in temperature. Determine the difference for the site temperature at time of tensioning to the AADT and then work out the required tension and allowable tension range from this table. Site Temperature Standard Tension (kn) for AADT Allowable Minimum Tension (kn) Allowable Maximum Tension (kn) -20 C C C C AADT C C C Table 1. Tension of WRSB determined by Average Annual Daily Temperature Determining the AADT Average annual daily temperatures range from 9 C in the south to 16 C in the north of New Zealand. The coldest month is usually July and the warmest month is usually January or February. There are relatively small variations between summer and winter temperatures, although inland and to the east of the ranges the variation is greater (up to 14 C). Temperatures also drop about 0.7 C for every 100 m of altitude. The AADT for New Zealand is found from the National Institute of Water and Atmospheric Research (NIWA) web site The table below gives the AADT for most New Zealand locations and was correct at the release date of this manual. Ph or visit April 2016 / Page 39

40 LOCATION Average Annual Daily Temperature C Highest Daily Temperature C Lowest Daily Temperature C KAITAIA WHANGAREI AUCKLAND TAURANGA HAMILTON ROTORUA GISBORNE TAUPO NEW PLYMOUTH NAPIER WANGANUI PALMERSTON NORTH MASTERTON, WELLINGTON NELSON BLENHEIM WESTPORT KAIKOURA HOKITIKA CHRISTCHURCH MT COOK LAKE TEKAPO TIMARU MILFORD SOUND QUEENSTOWN ALEXANDRA MANAPOURI DUNEDIN INVERCARGILL Table 2. Average Annual Temperatures for New Zealand locations Ph or visit April 2016 / Page 40

41 6.3 Tensioning the Ropes The following steps will outline the process involved in tensioning the ropes to the correct tension required: Step 1 Starting at one end of the fence in the vicinity of the first rigging screw, turn the meter on by pressing the on-off button and pulling out the pin. Open the lever arm and hang the metre on one of the ropes (See Fig 2 below). Ensure that all three rollers are riding on the rope, then close the lever arm and lock it in position. The centre roller will deflect the rope. Read the rope tension in the display. Record the tension in the tension log provided. Figure 1. Left: Tension meter in box Figure 2. Right: Tension Meter attached to Brifen Rope Step 2 Check the air temperature and determine the tension range required for that time of day. Refer to Section 4.2 for details on the determination of the Average Annual Daily Temperature and how this effects the tension of the system. Step 3 Commence tensioning: Ideally in early morning, at the rigging screws nearest to one end anchor. Remove the rope tension indicator and adjust the rigging screw to achieve desired rope tension. The rope tension indicator should be removed from the rope between each reading; if this is not done an inaccurate reading will be produced because the deflection in the rope caused by the metre will not be removed by the increased or decreased tension. The two terminal ends should be held steady with wrenches whilst the rigging screw is rotated. Protect the galvanised finish with leather or heavy cloth strips under the wrench jaws. See Fig 3 below for visual indication of the setup. After tensioning, re-attach rope tension indicator and check tension. Figure 3. Tension Setup Ph or visit April 2016 / Page 41

42 Step 4 Repeat Step 3 for each rope until the tensile force, as measured by the tension indicator, is at the required reading. Recheck that rigging screw/terminal ends have a minimum thread engagement of 30mm. Note: The ambient air temperature must be checked on a regular basis and the appropriate tension used. Proceed along the fence to each group of rigging screws and repeat the above procedure. Upon completion of tensioning the following checks must be conducted: Check for any movement in the anchor blocks and deflection posts. If any movement is observed in any of the foundations, larger blocks are required. Ensure that no part of the threaded terminal is closer than 100mm to a post. The Tension Log Is provided to record all information throughout the tensioning process to ensure uniformity throughout the system. Date Region AADT Current Temp Time Tension (kn) Rigging Screw A B C D Tension Log Table 3. Tension Log Table Ph or visit April 2016 / Page 42

43 6.4 Notes Appropriate tension settings must be determined using the rope tension table. The rigging screws should be lubricated before assembly to facilitate adjustment and/or removal during maintenance or repair of the safety fence. If lubricant is needed, a copper anti-seize lubricant is recommended. Care should be taken to ensure that tension is consistent throughout the system. It has been found that the appropriate tension may be obtained by applying an initial force of approximately 120% of that required and vibrating the ropes by rapping the line posts with a rubber mallet of by use of a mechanical vibrator. This accelerates the creep and redistribution of the tensile force by reducing the friction between the posts and the interwoven ropes. When a tensile force of +/-20% of the Rope Tension Table value is recorded along the length of the rope, the procedure is complete. Due to the natural settling and redistribution of tension in the ropes, a second tensioning is recommended after approximately a two to three week period. Use the tensions listing on the rope tension table for the rope temperature, and record findings in the tension log. Future checks of tension should be within approximately +/-20% of these values. Future tension checks at varying locations after installation can have significant variation from the Tension Table values but this is normal and expected. As long as the ropes are tight enough to prevent droop in the ropes between posts, the system will operate as designed. In coastal locations it is recommended that tape be used to ensure the threads are maintained in good condition. Ph or visit April 2016 / Page 43

44 19mm Galvanised Wire Rope On Site Swaging Procedure 7.1 Personal Protection Before operating the swaging and tensioning equipment read all instructions and follow the safe operating procedures. While operating this equipment it is recommended that the following personal protective equipment be worn: Long sleeve shirt and trousers or overalls. High visibility vest or high visibility component included in clothing. Gloves. Safety glasses/ face shield or other appropriate eye protection. Steel capped protective footwear. To avoid personal injury keep hands and feet away from moving components during operation. Always keep your body to the side of the swaging operation, and ensure guards are in place during operation. Be sure there is adequate ventilation when the generator is in use. Running the generator will cause the engine and exhaust to become hot. Keep body parts clear until components have cooled. Ensure that the equipment is in proper working order and the guards are all in place; cycle the equipment at least once without a swage fitting in the dies before commencing the job. Read all instructions, warnings and cautions carefully. Follow all safety precautions to avoid personal injury or property damage during system operation. CSP Pacific cannot be held responsible for damage or injury resulting from unsafe product use or incorrect product and/or system operation. Contact CSP Pacific when in doubt regarding safety precautions and operations. 7.2 Equipment Operation The CSP Pacific swaging unit is designed for the swaging of CSP supplied swage fittings, keep free of kinks and keep away from fire. All other use is prohibited. Avoid kinking or twisting the hoses and avoid contact with fire. 7.3 Site Safety Identify the area where work is to be completed and clear area of debris so there are no trip hazards or other obstructions which may prevent the work being conducted in a safe manner and ensure suitable traffic control is in place. Select a safe area where the swaging and tensioning unit will sit during the duration of the process. Make sure the area complies with the site safe working conditions. Observe weather conditions and operate the equipment out of the rain, or cover if using in the rain to protect the equipment. Keep the swaging area clean and clear of debris. Ph or visit April 2016 / Page 44

45 7.4 Inspections Hose Inspections Before operating the swaging unit, check that all hose connections are tight with the proper tools. If loose, tighten using proper tools. Do not over tighten. Connections need only be tightened securely and leak free. The hydraulic hoses are fitted with protective sheathing to prevent escaping hydraulic fluid from causing injury. Do not operate the swaging tool if the sheathing is damaged or missing Hydraulic Fluid Level Check the fluid level in the hydraulic reservoir through the oil level gauge. The power supply is to be disconnected when adding fluid to the reservoir. Only use approved Enerpac hydraulic fluid to fill the reservoir Bleeding Air from the System Air can accumulate in the hydraulic system during the initial set-up or after prolonged use, causing the cylinder to respond slowly or in an unstable manner. To remove the air: 1. Loosen a fitting that is situated higher than the rest of the fittings in the system. 2. Run the pump until the oil is flowing freely. 3. Tighten the fitting Generator Fuel Level The Honda engine is designed to run on unleaded fuel. Check the fuel level before starting the generator. If refuelling is required, refuel when the engine is not running. Do not over fill, and wipe away any spilled fuel. Avoid getting water or dirt in the fuel tank. Ensure fuel is stored in an approved container Generator Oil Level Oil is a major factor affecting performance and service life. Check the engine oil level with the engine stopped and in a level position. Use Honda 10W-30 or equivalent. 1. Remove the oil filler cap/dipstick and wipe it clean. 2. Insert the oil filler cap/dipstick into the oil filler neck, but do not screw it in, then remove it to check the oil level. 3. If the oil level is near or below the lower limit mark on the dipstick, fill to the upper limit mark. Do not overfill. 4. Reinstall the oil filler cap/dipstick. Ph or visit April 2016 / Page 45

46 7.5 Generator Operation A generator is used as the power source to the hydraulic pump. To operate the generator: 1. Turn the fuel valve ON and turn the key to the on position. 2. Move the throttle lever to the MAX position. 3. Using the pull cord, pull the cord and start the engine 4. Move the throttle lever away from the MAX position, about 2/3 of the way toward the MIN position. 5. Turn pendant switch to the swaging position, far right as indicated. 6. Position the throttle lever for the desired engine speed. To stop the generator in an emergency, simply push the emergency stop button (red button). When transporting the generator, ensure the fuel lever valve isswitched OFF. If left ON, fuel may gather in the engine crankcase and dilute the engine oil. This will reduce the lubrication properties of the oil and can cause severe engine damage. Ph or visit April 2016 / Page 46

47 7.6 Swaging Unit Operation Attachment of the End Fitting Only end fittings supplied by CSP Pacific are to be used. 1. Identify the location where the end fitting is to be attached to the wire rope. 2. Cut the wire rope at the required location. This can be achieved by using a wire cutter or a disk grinder. If using a disk grinder the following is to be observed; i. The operator is to be fitted with a full face shield and PPE as noted under Personal Protection at the beginning of this section. ii. The wire rope is to be appropriately clamped or secured. The wire rope should NOT be held by hand when cutting. iii. Care is to be taken not to contact the wire rope downstream of the cutting location. 3. When the wire rope is cut to its correct length, remove any burrs with a file and ensure the rope is correctly twisted. 4. Insert the wire rope into the end fitting. Making sure the wire rope is driven hard into the back of the fitting. Ph or visit April 2016 / Page 47

48 7.6.2 Swaging the End Fitting 1. Turn the generator on in accordance with Section Remove the nut from the end fitting. 3. Feed the end fitting through the roller die area so that the threaded section of the end fitting passes through the cross bar. 4. Reattach the end-fitting nut so that the thread of the end fitting is flush with the back of the nut. Refer above. 5. Gripping the end fitting, pull back to ensure a tight connection with the cross. 6. Close the roller heads against the end fitting so they rest onthis and insert the safety key to begin the swaging operation. 7. Operate the hydraulic ram by pressing the button on the pendant control. Ph or visit April 2016 / Page 48

49 8. Pressure around the end fitting will increase as the hydraulic ram moves and the roller dies rotate. The end fitting will pull through the roller dies. 9. Once the swage is complete, rotate the roller dies to the front of the swaging unit. 10. Remove the end fitting from the cross bar by releasing the nut. 11. Return the nut to the end fitting. To stop the hydraulic pump in an emergency press the emergency stop buttons located on the unit. Under normal conditions turn the main switch on the control box to the OFF position. Completed process - Swaged wire Ph or visit April 2016 / Page 49

Safence. Wire Rope Safety Barrier. Product Manual

Safence.  Wire Rope Safety Barrier. Product Manual Safence Wire Rope Safety Barrier Product Manual Safence is licensed to Ingal Civil Products by Blue Systems Inc. of Sweden www.ingalcivil.co.nz Safence Wire Rope Safety Barrier 1.0 Introduction The superior

More information

Flexfence. Wire Rope Safety Barrier. Product Manual

Flexfence.  Wire Rope Safety Barrier. Product Manual Flexfence Wire Rope Safety Barrier Product Manual Flexfence is licensed to Ingal Civil Products by Blue Systems Inc. of Sweden www.ingalcivil.com.au Flexfence Wire Rope Safety Barrier 1.0 Introduction

More information

2000 lb manual winch

2000 lb manual winch 2000 lb manual winch Model 41694 Operation Instructions Due to continuing improvements, actual product may differ slightly from the product described herein. 3491 Mission Oaks Blvd., Camarillo, CA 93011

More information

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles. Policy Statement Subject Placement of Rigid Distribution Poles Along Roads With Speed Limits Exceeding 70KM/H Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised

More information

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion The SMART Steel Crash Cushion is accepted for use on the New South Wales classified road network. The acceptance is based on the determination

More information

A N C H O R T A B S N O R T H W E S T ANCHOR TAB VF. Patented. User Instructions

A N C H O R T A B S N O R T H W E S T   ANCHOR TAB VF. Patented. User Instructions A N C H O R T A B S N O R T H W E S T www.anchortabs.com ANCHOR TAB VF Patented User Instructions National standards, and state, provincial, and federal laws, require installer/user of this product to

More information

OWNERS MANUAL. Model Shown with optional Primary Mooring Cleats. Portable Mooring System SAFETY OPERATION MAINTENANCE PARTS

OWNERS MANUAL. Model Shown with optional Primary Mooring Cleats. Portable Mooring System SAFETY OPERATION MAINTENANCE PARTS OWNERS MANUAL Model 2400 Shown with optional Primary Mooring Cleats. Portable Mooring System SAFETY OPERATION MAINTENANCE PARTS CAUTION: Before using your new Pier Tender, read rules for Safety, Operation,

More information

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc.

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc. User Instruction Manual Zorbit Energy Absorber Kits for Horizontal Lifeline Systems This manual is provided as the Maunfacturer s Instructions, and should be used as part of an employee training program

More information

OPERATION AND INSTRUCTION MANUAL Flat Roof Anchor Model: FRA250L-10X-CTS

OPERATION AND INSTRUCTION MANUAL Flat Roof Anchor Model: FRA250L-10X-CTS OPERATION AND INSTRUCTION MANUAL Flat Roof Anchor Model: FRA250L-10X-CTS (Patent Pending) WARNING: ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT

More information

INSTALLATION INSTRUCTIONS AT-SERIES ANCHOR ASSEMBLY PART NUMBER: F-04CAJP 450 LB. [204kg] MAXIMUM CAPACITY (PRO POOL LIFT)

INSTALLATION INSTRUCTIONS AT-SERIES ANCHOR ASSEMBLY PART NUMBER: F-04CAJP 450 LB. [204kg] MAXIMUM CAPACITY (PRO POOL LIFT) INSTALLATION INSTRUCTIONS AT-SERIES ANCHOR ASSEMBLY PART NUMBER: F-04CAJP 450 LB. [204kg] MAXIMUM CAPACITY (PRO POOL LIFT) - WARNING- IMPORTANT SAFETY INSTRUCTIONS 1. READ AND FOLLOW ALL INSTRUCTIONS.

More information

600 / 600FC OWNER'S MANUAL

600 / 600FC OWNER'S MANUAL PROGRESSION 600 / 600FC OWNER'S MANUAL Issue 2 / Version E - Dec. 10, 1997 Copyright 1997 GAMMA Sports - All Rights Reserved PROGRESSION 600 / 600FC OWNER'S MANUAL TABLE OF CONTENTS PAGE 1... WARRANTY

More information

Technical Briefing Note

Technical Briefing Note Technical Briefing Note Subject Date Issued Revision Glossary of Terms 14th Nov 2017 Rev 3 The purpose of this Technical Briefing Note is to provide a glossary of terms commonly used in fall injury prevention

More information

Triple Tine Mechanical Grapple

Triple Tine Mechanical Grapple Attachment Solutions Triple Tine Mechanical Grapple Operators Manual KENCO Mechanical Grapple Operation Manual 1 TABLE OF CONTENTS 170 State Route 271 Section I. General Information.... 3 Section II. Safety...

More information

Access Management Standards

Access Management Standards Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards

More information

OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: HD26248

OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: HD26248 OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: HD26248 IMPORTANT!!! ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS INJURY OR DEATH.

More information

IMPORTANT: RECEIVING INSTRUCTIONS:

IMPORTANT: RECEIVING INSTRUCTIONS: Instruction Sheet Sidewinder Mechanical Bender IMPORTANT: RECEIVING INSTRUCTIONS: Visually inspect all components for shipping damage. If any shipping damage is found, notify carrier at once.shipping damage

More information

SMART STEEL CRASH CUSHION

SMART STEEL CRASH CUSHION APRIL 2015 DETAIL SHEET SMART STEEL CRASH CUSHION VicRoads Requirements Refer to Austroads - Safety Barrier System Acceptance Conditions for the SMART Steel Crash Cushion. All requirements listed by Austroads

More information

COMPACT METAL bender 99826

COMPACT METAL bender 99826 COMPACT METAL bender 99826 Set up And Operating Instructions Distributed exclusively by Harbor Freight Tools. 3491 Mission Oaks Blvd., Camarillo, CA 93011 Visit our website at: http://www.harborfreight.com

More information

SASK-A-POLE OWNERS AND USERS MANUAL

SASK-A-POLE OWNERS AND USERS MANUAL SASK-A-POLE OWNERS AND USERS MANUAL GENERAL INFORMATION The Saskatchewan Abilities Council s Sask-a-Pole accessibility and transfer aid is designed to help provide safe and easy access to chairs, beds,

More information

GUIDELINES FOR USE GUARD

GUIDELINES FOR USE GUARD GUIDELINES FOR USE GUARD G Guard Range of Load Arrestors Retractable Fall Arrest Safety Line for Protection of Machinery & Sensitive Loads GLOBESTOCK MILE OAK INDUST. ESTATE, MAESBURY ROAD, OSWESTRY, SHROPSHIRE

More information

Index Table. Model 794. Installation, Operating and Maintenance Instructions

Index Table. Model 794. Installation, Operating and Maintenance Instructions CLOCKWISE MANUAL MAKING INTO CCW TABLE Index Table Model 794 Installation, Operating and Maintenance Instructions Black & Webster Products Division 545 Hupp Ave. P.O. Box 831, Jackson, Michigan 49204 2009

More information

Instruction Manual LIMITED 1 YEAR WARRANTY. Hydraulic Punch Driver Read this material before using this product.

Instruction Manual LIMITED 1 YEAR WARRANTY. Hydraulic Punch Driver Read this material before using this product. Instruction Manual Hydraulic Punch Driver 902-483 LIMITED 1 YEAR WARRANTY We make every effort to assure that its products meet high quality and durability standards, and warrant to the original purchaser

More information

Safe Work Practices (SWP) SWP (6) FALL PROTECTION PROGRAM

Safe Work Practices (SWP) SWP (6) FALL PROTECTION PROGRAM SWP (6) FALL PROTECTION PROGRAM The following information on Fall Protection has been based around the BC OHS Regulations, standards, policies and guidelines. Prior to starting work outside of BC, the

More information

Review of Guidelines for Cycleway Safety Fencing

Review of Guidelines for Cycleway Safety Fencing Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared

More information

UE- 90- X X X X X X O P E R AT I N G M A N UA L 0 TO 90 HYDRAULIC UPENDER

UE- 90- X X X X X X O P E R AT I N G M A N UA L 0 TO 90 HYDRAULIC UPENDER UE- 90- X X X X X X O P E R AT I N G M A N UA L ADDRESS 2230 Brush College Road Decatur, IL 62526 Phone: 217-423-6001 Fax: 217-422-1049 E-mail: sales@alignprod.com www.alignproductionsystems.com UE-90-XXXXXX

More information

User Instructions 1790 Rail Anchor

User Instructions 1790 Rail Anchor User Instructions 1790 Rail Anchor This document is intended to meet the Manufacturer s Instruction requirements as stated by ANSI Z359.1, and should be used as part of an employee training program as

More information

60 farm jack. Distributed exclusively by Harbor Freight Tools Mission Oaks Blvd., Camarillo, CA 93011

60 farm jack. Distributed exclusively by Harbor Freight Tools Mission Oaks Blvd., Camarillo, CA 93011 60 farm jack 66183 Set up And Operating Instructions Distributed exclusively by Harbor Freight Tools. 3491 Mission Oaks Blvd., Camarillo, CA 93011 Visit our website at: http://www.harborfreight.com Read

More information

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

BARRIER OFFSET 0 A 6 6 A 12 12 A 26 A 26 3A OR 4A L OR S * ** L OR S L OR S ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE

More information

Policy Statement. Objective. Context. References and Supporting Documentation

Policy Statement. Objective. Context. References and Supporting Documentation Policy Statement Subject Placement of Distribution Poles Along Roads With Speed Limits Not Exceeding 70km/h Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised

More information

FLANGED TWO-PIECE BALL VALVES

FLANGED TWO-PIECE BALL VALVES INTRODUCTION This instruction manual includes installation, operation, and maintenance information for FNW flanged split-body ball valves. This manual addresses lever operated ball valves only. Please

More information

BS Series Basket Strainer

BS Series Basket Strainer BS Series Basket Strainer Operating, Installation, & Maintenance Manual Corrosion Resistant Fluid and Air Handling Systems. Dated 04-26-12 PRESSURE DROP SIMTECH strainers are engineered to offer the lowest

More information

The Work At Height Safety Association

The Work At Height Safety Association The Work At Height Safety Association Technical Guidance Note 10 Guidance on the use and inspection of Mobile man anchors to BS EN 975 Class E A series of informative notes for all industries involved

More information

ATD /8 x 50 Retractable Air Hose Reel Owner s Manual

ATD /8 x 50 Retractable Air Hose Reel Owner s Manual ATD-31166 3/8 x 50 Retractable Air Hose Reel Owner s Manual Features Heavy-gauge, all-steel reel assembly 8-position ratchet mechanism locks reel at desired hose length 5-position adjustable roller outlet

More information

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard. 2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect

More information

Figure 1 - Parts Identification

Figure 1 - Parts Identification Instructions for the following series products: Zorbit Energy Absorber Kits (See back page for specific model numbers.) User Instruction Manual Zorbit Energy Absorber Kits for Horizontal Lifeline Systems

More information

602 STRINGING MACHINE OWNER'S MANUAL

602 STRINGING MACHINE OWNER'S MANUAL PROGRESSION 602 STRINGING MACHINE OWNER'S MANUAL AL Issue 1- April 2000 Copyright 2000 GAMMA Sports - All Rights Reserved PROGRESSION 602 STRINGING MACHINE TABLE OF CONTENTS PAGE 1... WARRANTY PAGE 2...

More information

FLANGED TWO-PIECE BALL VALVES

FLANGED TWO-PIECE BALL VALVES INTRODUCTION This instruction manual includes installation, operation, and maintenance information for FNW flanged split-body ball valves. This manual addresses lever operated ball valves only. Please

More information

OPERATION AND INSTRUCTION MANUAL

OPERATION AND INSTRUCTION MANUAL OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: SWS100N-316-CTS Patent US # 8,424,638 WARNING: ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT

More information

OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: SWY100N

OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: SWY100N OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: SWY100N IMPORTANT!!! ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS INJURY OR DEATH.

More information

RATCHET RELEASE SHACKLE

RATCHET RELEASE SHACKLE RATCHET RELEASE SHACKLE INNOVATIVE PILING EQUIPMENT HYDRAULIC PILING HAMMERS EURO RATCHET RELEASE SHACKLE FOR STEEL ERECTION OPERATORS INSTRUCTIONS & SPARE PARTS LIST EXCAVATOR MOUNTED VIBRATORS EXCAVATOR

More information

User Instruction Manual Fixed Beam Anchor

User Instruction Manual Fixed Beam Anchor Instructions for the following series products: FIXED BEAM ANCHOR Model Numbers: The Ultimate in Fall Protection 2108406 2108407 2108408 2108409 2108410 2108411 User Instruction Manual Fixed Beam Anchor

More information

MAKE BOLLARD IMPACT RESISTANT PROTECT FOUNDATIONS RE-USE BOLLARD

MAKE BOLLARD IMPACT RESISTANT PROTECT FOUNDATIONS RE-USE BOLLARD \\ PROTECT FOUNDATIONS In-ground or surface mount Impact Recovery System protects foundations from damage when bollards are impacted, need replacing or upgrading. Surface mount version uses Impact resistant

More information

LIFTING RIG Multi-Product Installation Rig

LIFTING RIG Multi-Product Installation Rig VISUAL INSPECTION CONDITION REPORT Review Date: Dec 13 LIFTING RIG Multi-Product Installation Rig Equipment Number Customer Dispatch/Receipt Date Out / / Date In / / Store Location Expected Return Date

More information

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device BC Shackle Made in the China Alloy Steel Anchor Shackle Instructions for handling and use - Please read in full before using this device Index 1.) Introduction 2.) Warnings / General Use Guidelines 3.)

More information

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control

More information

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian

More information

User Instruction Manual Fixed Beam Anchor

User Instruction Manual Fixed Beam Anchor User Instruction Manual Fixed Beam Anchor This manual is intended to meet the Manufacturer s Instructions as required by ANSI Z359.1 and ANSI A10.14, and should be used as part of an employee training

More information

Figure 1 - Cable Grip Horizontal Lifeline Termination ZORBIT ENERGY ABSORBER RELEASE TAB

Figure 1 - Cable Grip Horizontal Lifeline Termination ZORBIT ENERGY ABSORBER RELEASE TAB Instructions for the following series products: Cable Grip (See back pages for specific model numbers.) User Instruction Manual Cable Grip Kit for Horizontal Lifeline Systems This manual is provided as

More information

This document to be used with Hurley traditional Davits

This document to be used with Hurley traditional Davits ~ InstructIon Manual ~ This document to be used with Hurley traditional Davits WarnIngs WarnIng - Failure to install, maintain, protect, and operate the system properly can cause malfunction resulting

More information

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment OPERATOR S MANUAL FOR MORSE TILT-TO-LOAD DRUM ROTATOR SAFETY INFORMATION: While Morse Manufacturing Co. drum handling equipment is engineered for safety and efficiency, a high degree of responsibility

More information

30T A/Manual Hydraulic Shop Press

30T A/Manual Hydraulic Shop Press 30T A/Manual Hydraulic Shop Press Operation Manual 1 1. Important Information 1.1 Safety Information 1.1.1 Hazard Symbols Used in the Manuals This manual includes the hazard symbols defined below when

More information

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning GEMTOR, INC....when your life is on the line One Johnson Avenue Matawan, NJ 07747 732-583-6200 800-405-9048 Fax 732-290-9391 OWNER'S MANUAL Installation, Operating, Inspection and Maintenance Instructions

More information

Floor Mount Socket. T: +44 (0) F: +44 (0)

Floor Mount Socket. T: +44 (0) F: +44 (0) G-Davit : Floor Mount Socket USER INSTRUCTION MANUAL A davit socket for installation bolted to a high strength flooring material. Suitable for both fall arrest use and lifting. EN795 Class B, PPE Anchor

More information

Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet. Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet. Planning and regulatory requirements (Regulatory requirements) The role or duties

More information

ADA Operations Contact Info

ADA Operations Contact Info Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us

More information

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components

More information

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum Chapter 2 Rigging Cutting Wire Rope The wire rope must be tightly seized on both sides of the point where the wire rope will be cut, as shown in Figure 2-1. Seize the wire rope with either seizing wire

More information

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS GRAVITY BIKE RACK 94479 ASSEMBLY & OPERATING INSTRUCTIONS Due to continuing improvement, actual product may differ slightly from the product described herein. 3491 Mission Oaks Blvd., Camarillo, CA 93011

More information

Rescue Ladder Model: KT ft (5.48m)

Rescue Ladder Model: KT ft (5.48m) Rescue Ladder Model: KT36164 18ft (5.48m) IMPORTANT!!! ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS INJURY OR DEATH. USERS SHOULD BE

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Congratulations on your purchase of a JC Series Performer trike! The Performer JC Series is designed for everything from touring to commuting and

Congratulations on your purchase of a JC Series Performer trike! The Performer JC Series is designed for everything from touring to commuting and Congratulations on your purchase of a JC Series Performer trike! The Performer JC Series is designed for everything from touring to commuting and shopping in the city. The JC Series frames are made of

More information

OPERATION AND INSTRUCTION MANUAL ROLLER SLING Model: IN106.3FT & IN106.2FT

OPERATION AND INSTRUCTION MANUAL ROLLER SLING Model: IN106.3FT & IN106.2FT OPERATION AND INSTRUCTION MANUAL ROLLER SLING Model: IN106.3FT & IN106.2FT IMPORTANT!!! ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

User Instructions 1789 Parapet Wall Anchor

User Instructions 1789 Parapet Wall Anchor User Instructions 1789 Parapet Wall Anchor This manual is intended to meet the Manufacturer Instructions as required by ANSI Z359.1 and should be used as part of an employee training program as required

More information

Table of Contents. Introduction... 2 Product Overview...2 Safety Information...2 Safety Notes...2

Table of Contents. Introduction... 2 Product Overview...2 Safety Information...2 Safety Notes...2 Table of Contents Introduction... 2 Product Overview...2 Safety Information...2 Safety Notes...2 Design & Construct the Layout... 3 The Layout...3 Fixed Columns...4 Semi-Permanent (removable) Columns...4

More information

Parts & Operators Manual

Parts & Operators Manual Parts & Operators Manual (888) 317-5878 www.talet.ca To The Owner General Comments Congratulations on the purchase of your new Talet Mat Grapple. Your unit was carefully designed and manufactured to give

More information

VOLLEYBALL SPIKE TRAINER. Assembly Instructions. Owner s Manual. Model # VST-100. Club Volleyball Gear WARNING

VOLLEYBALL SPIKE TRAINER. Assembly Instructions. Owner s Manual. Model # VST-100. Club Volleyball Gear WARNING VOLLEYBALL SPIKE TRAINER Model # VST-100 Assembly Instructions Owner s Manual WARNING To ensure safety, do not attempt to assemble this system without following all instructions carefully. Check entire

More information

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Intent??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Fall Protection is an integral part of our commitment to a safe work

More information

Page 1 of 1 04/19/13 SBR

Page 1 of 1 04/19/13 SBR Office of Roadway Engineering - Plan Insert Sheets Number Title Date Number Title Date Number Title Date 201015 Extension of Anchor Bolts 07/20/12 207000 Bikeway Pavement Marking Details 01/18/13 202010

More information

Page 1. Single Scull Car Rack Assembly and User s Manual " "

Page 1. Single Scull Car Rack Assembly and User s Manual  Page 1 Single Scull Car Rack Assembly and User s Manual Page 2 Items in the box: (2) V cradles (2) 4 rails (1) 1 3/4 X 18 rail coupler (4) 1/4-20 X 4 1/2 bolts (2) 1/4-20 X 2 1/2 bolts (12) 1/4 flat washers

More information

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn Operations and Instruction Manual Might Swivel Model # 00238 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn Description: Zinc plated forged heat treated steel, Special design gives

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 6K Puller (M6K-M)

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 6K Puller (M6K-M) OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 6K Puller (M6K-M) READ AND UNDERSTAND ALL OF THE INSTRUCTIONS AND SAFETY INFORMATION IN THIS MANUAL BEFORE OPERATING OR 04/17 (M6K-M) SERVICING THIS TOOL TABLE

More information

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings OVERVIEW The Buckingham OX BLOCK is a rope snatch block with an integrated friction bar used for lowering loads, snubbing loads, and raising loads. It allows the rigging professional to handle loads with

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

IMPORTANT: Record the product identification information from the ID label in the inspection and maintenance log in section 9.0 of this manual.

IMPORTANT: Record the product identification information from the ID label in the inspection and maintenance log in section 9.0 of this manual. Instructions for the following series products: Vacuum Anchor HLL System (See back page for specific model numbers.) User Instruction Manual Vacuum Anchor Horizontal Lifeline System This manual is intended

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES CONTROL OF TRAFFIC C201 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C201 ISSUE: NO:1 October 2007 TABLE OF CONTENTS CLAUSE CONTENTS

More information

TITAN FLOW CONTROL, INC.

TITAN FLOW CONTROL, INC. PREFACE: This manual contains information concerning the installation, operation, and maintenance of Titan Flow Control (Titan FCI) Simplex Basket Strainers. To ensure efficient and safe operation of Titan

More information

Model No Product Name Handpiece Only Complete System

Model No Product Name Handpiece Only Complete System Ney QC 700 E 30,000 RPM IECE 30,000 R N HANDPIE IVEN HA R DRIV AIR D Owner & Operator's Manual Model No Product Name 7201326 Handpiece Only 7201325 Complete System Description Page Safety... 2 Setup...

More information

Model ASSEMBLY and OPERATING INSTRUCTIONS

Model ASSEMBLY and OPERATING INSTRUCTIONS QUICK CHANGE AIR BRUSH KIT Model 93506 ASSEMBLY and OPERATING INSTRUCTIONS Due to continuing improvements, actual product may differ slightly from the product described herein. 3491 Mission Oaks Blvd.,

More information

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 3K Puller (M3K-M)

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 3K Puller (M3K-M) OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 3K Puller (M3K-M) 04/17 (M3K-M) READ AND UNDERSTAND ALL OF THE INSTRUCTIONS AND SAFETY INFORMATION IN THIS MANUAL BEFORE OPERATING OR SERVICING THIS TOOL TABLE

More information

OPERATIONS MANUAL IMPORTANT SAFETY INFORMATION

OPERATIONS MANUAL IMPORTANT SAFETY INFORMATION OPERATIONS MANUAL IMPORTANT SAFETY INFORMATION Please read, understand and follow all safety information contained in these instructions prior to the use of this tool. Retain these instructions for further

More information

M S I C R A N E S C A L E

M S I C R A N E S C A L E 2 M E A S U R E M E N T S Y S T E M S I N T E R N A T I O N A L Table of Contents Forward...3 Safe Operating Guidelines...4 Operating Suggestions...4 Handling Hoist Motion...4 Safe Loading and Rigging

More information

Operating Instructions for BAIR22-6 AIR-POWERED CRIMPING TOOL

Operating Instructions for BAIR22-6 AIR-POWERED CRIMPING TOOL Operating Instructions for BAIR22-6 AIR-POWERED CRIMPING TOOL Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Table of Contents

More information

Traditional Basketball Set. Assembly & Installation Instructions

Traditional Basketball Set. Assembly & Installation Instructions Traditional & Pro Style Basketball Set Assembly & Installation Instructions Traditional Basketball Set Pro Style Basketball Set 3 0 5 0 S. A L V E R N O N W A Y T U C S O N, A Z 8 5 7 1 3 5 2 0. 7 9 0.

More information

INSTRUCTIONS FOR USE

INSTRUCTIONS FOR USE INSTRUCTIONS FOR USE 7100 Series Lanyards Complies with the current ANSI Z359.1-2007 and all applicable OSHA regulations and requirements. Reliance Industries P.O. Box 2046 Deer Park, TX 77536 Phone :

More information

TRAVSMART permanent single-cable horizontal lifeline system

TRAVSMART permanent single-cable horizontal lifeline system The Travsmart single-line system provides a smooth travel. It allows the traveler to move freely over the intermediate anchors, minimizing wear and eliminating user assistance. The user s hands remain

More information

Vertical Lifeline. Ladder Climb. User Instructions. 3M Occupational Health and Environmental Safety. Fall Protection Equipment

Vertical Lifeline. Ladder Climb. User Instructions. 3M Occupational Health and Environmental Safety. Fall Protection Equipment 3M Occupational Health and Environmental Safety Fall Protection Equipment Ladder Climb Vertical Lifeline User Instructions User Instructions for the 3M TM Ladder Climb Vertical Lifeline System. Important:

More information

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT! Guardian Fall Protection Kent, WA 800-466-6385 www.guardianfall.com GENERAL SYSTEM SELECTION CRITERIA: Selection of fall protection shall be made by a Competent Person. All fall protection equipment shall

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk SOFT LINE CUTTER SL55 PRODUCT CODE No. 980504 INSTRUCTIONS FOR INSTALLATION,

More information

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT! Guardian Fall Protection Kent, WA 800-466-6385 www.guardianfall.com GENERAL SYSTEM SELECTION CRITERIA: Selection of fall protection shall be made by a Competent Person. All fall protection equipment shall

More information

Owner s Manual & Safety Instructions

Owner s Manual & Safety Instructions Owner s Manual & Safety Instructions Save Save This This Manual Manual Keep manual for the safety warnings and precautions, assembly, Keep manual for the safety warnings and precautions, assembly, operating,

More information

INSTALLATION INSTRUCTIONS PUSH BAR PULLMAN PANIC BOLT DEVICE TO EN 1125 : 2008

INSTALLATION INSTRUCTIONS PUSH BAR PULLMAN PANIC BOLT DEVICE TO EN 1125 : 2008 INSTALLATION INSTRUCTIONS PUSH BAR PULLMAN PANIC BOLT DEVICE TO EN 1125 : 2008 0376/448/00 ISSUE 01 EMERGENCY PUSH PAD PULLMAN BOLT DEVICE TO EN 179 : 2008 1000mm MAXIMUM CLEAR OPENING HEIGHT WITH PUSH

More information

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower

More information

INSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures

INSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures INSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures MINT-0289-XX TABLE OF CONTENTS Limited Warranty... 3 User Responsibility... 3-4 General Service... 4 Safety Precautions.... 5 Physical Dimensions..

More information

KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS

KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS TOLL FREE: 1-800-476-7366 VOICE 651-665-9131 FAX 651-665-9130 EMAIL: INFO@POOLCLIMBINGWALLS.COM EVERLAST CLIMBING 1335 MENDOTA HEIGHTS ROAD MENDOTA HEIGHTS, MN 55120 2012 EVERACTIVE BRANDS Congratulations!

More information

Fall Protection Resource Guide P AGE 1

Fall Protection Resource Guide P AGE 1 Fall Protection Resource Guide P AGE 1 As a Home Builder, we do not self-perform any work. This section is a resource guide only and is not intended to put any requirements on the company. All subcontractors,

More information

Model C Pipe Line Strainer 6, 8 & 10 Inch (DN150, DN200 & DN250) 250 psi (17,2) General Description. Technical Data. Page of 6 MAY, 2006 TFP1644

Model C Pipe Line Strainer 6, 8 & 10 Inch (DN150, DN200 & DN250) 250 psi (17,2) General Description. Technical Data. Page of 6 MAY, 2006 TFP1644 Technical Services: Tel: (00) 31-9312 / Fax: (00) 791-5500 Model C Pipe Line Strainer 6, & 10 Inch (150, & 250) 250 psi (17,2) General Description The welded steel body Model C Pipe Line Strainers (Ref.

More information

GM-121: Container End Lock Anchor Wand Page 1 WINSAFE CORP. GM 121 CONTAINER END LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE

GM-121: Container End Lock Anchor Wand Page 1 WINSAFE CORP. GM 121 CONTAINER END LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE GM-121: Container End Lock Anchor Wand Page 1 WINSAFE CORP. GM 121 CONTAINER END LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE US Patent No. 6834745 This equipment conforms to 0321 EN795:1996

More information

USER MANUAL. DM65 Manual Flush/Tilt Combo Mount

USER MANUAL. DM65 Manual Flush/Tilt Combo Mount USER MANUAL DM65 Manual Flush/Tilt Combo Mount 1 D1_1.11.11.indd 1 ! CAUTION When using this mounting system, basic precautions should be followed, including: Follow the entire installation/user s manual

More information