Gold Action #1: Instream and Floodplain Habitat Restoration

Size: px
Start display at page:

Download "Gold Action #1: Instream and Floodplain Habitat Restoration"

Transcription

1 Gold Action #1: Instream and Floodplain Habitat Restoration Action Type: Recovery Threat addressed: Severity: Significant Spawning/egg incubation, Pre/post spawning migrations, Juvenile rearing Action Description Work with public and private landowners in lower Gold Creek to develop and implement restoration projects that improve instream, riparian and floodplain habitat conditions. Proposed work includes extensive LWD placement, development of flood channels, floodplain revegetation and more. Justification/Background The assessment identified past wood removal and ongoing channel widening and simplification as major contributors to poor habitat conditions and dewatering in lower Gold Creek. Key Partners: USFS; USFWS; USBR; YBFWRB; KCT Time to Implement: 1-3 years Time to Benefit: 5+ years Cost Estimate: Cost Derivation Life stage(s) affected: Link to Threats Table: $3 million per BOR- summarize from steps Status Notes Currently proposed in USBR Bull Trout Enhancement package. Associated USFWS RUIP Actions: Links to Other Plans: Associated BOR Bull Trout LIST OF NEXT STEPS: Step# 1 Step# 2 Step# 3 Step# 4 Step# UPDATE NOTES: Title update: Instream and Floodplain Habitat Restoration Status: In Progress Improve access and timing of use of spawning areas that are naturally dewatered Maintain, restore, and protect riparian zones and stream channels associated with bull trout habitat Implement stream restoration in degraded stream reaches Reduce cumulative impacts in FMO to populations that are impacted during natural dewatering of spawning and rearing areas Reduce cumulative impacts to populations with limited habitat Conduct a hydrogeomorphic study BTWG Priority: 9 Complete design and permitting of Gold Creek instream habitat project development Fund and implement instream work in Gold Creek Monitor project outcomes Monitor bank protection activities BTWG Priority: 2 Page 1

2 Gold Action #1: Instream and Floodplain Habitat Restoration Next Step # 1 Conduct a hydrogeomorphic study Conduct an assessment of the hydrologic, hydraulic, habitat, and geomorphic conditions within the lower three miles of Gold Creek to better understand the causal mechanisms contributing to habitat degradation and seasonal dewatering, and the associated impacts to Gold Creek bull trout. Additional 2-D Flood modeling being completed as part of Next Step # Status: Complete Lead: KCT Point Person: Mitch Long Timeline: Completed in 2015 by KCT. Budget Estimate: BTWG Priority: 9 Hydrologic monitoring and habitat surveys were conducted during the summer of 2013 and 2014 to evaluate the spatial and temporal character of dewatering in Gold Creek, and to determine the mechanisms contributing to seasonal dewatering in the creek. Next Step # 2 Complete design and permitting of Gold Creek instream habitat project development Design work for instream habitat restoration is being completed by KCT. Additional funding is needed to complete permitting and conduct outreach to stakeholders Status: In Progress Lead: KCT Point Person: Mitch Long Timeline: 18 months? Budget Estimate: $240,000 Need to secure ~$100,000 to complete work Preliminary designs completed spring Project implementation may involve multiple phases; focus on getting landowner and other key stakeholder support. Page 2

3 Gold Action #1: Instream and Floodplain Habitat Restoration Next Step # 3 Fund and implement instream work in Gold Creek Secure funding and begin implementation of instream habitat restoration designs (see next step #2) Status: Proposed Lead: KCT Point Person: Mitch Long Timeline: Construction of one or more phases in 2017 Budget Estimate: Intial estimate of $3,000,000 total cost for all phases Project implementation may involve multiple phases; need to assure balancing of project benefits with any short term impacts. NSD developed conceptual designs to meet the restoration objectives to restore perennial flow and improve instream habitat in Gold Creek. KCT is working with landowners to ensure support of final designs. Next Step # 4 Monitor project outcomes Develop monitoring protocols for pre- and post-project implementation to determine if the project is meeting objectives for improving instream, riparian and floodplain habitat conditions. Lead: KCT Point Person: Mitch Long Timeline: Budget Estimate: TBD Discuss with Mitch Long Page 3

4 Gold Action #1: Instream and Floodplain Habitat Restoration Next Step # 5 Monitor bank protection activities Evaluate landowner-implemented projects directly impacting the stream, including residential bank stabilization. Provide technical assistance and ensure all actions are properly permitted and legally conducted. Monitor instream actions on the creek via permit applications and annual photo documentation. Lead: Kittitas County; WDFW Point Person: Timeline: Ongoing Budget Estimate: Included in BTTF scope of work. For land use see Gold Action #4, next step #2. BTWG Priority: 2 Page 4

5 Gold Action #2: Restore Groundwater Hydrology Action Type: Recovery Threat addressed: Dewatering Severity: Significant Spawning/egg incubation, Pre/post spawning migrations, Juvenile rearing Action Description The hydrologic monitoring identified several mechanisms contributing to seasonal dewatering in Gold Creek, the largest being the capture of groundwater by the Gold Creek Pond. This action focuses on restoring groundwater hydrology and perennial flow in Gold Creek. Justification/Background Dewatering occurs annually in the late summer and early fall in a one-to-two mile reach. Primary spawning habitat is above the dry reach and can be inaccessible for weeks or more at a time. Dewatering also strands and causes mortality of adult and juvenile fish, reduces invertebrate biomass, and decreases habitat complexity (the loss of pool holding habitat is of particular concern). Key Partners: USFS; USFWS; USBR; KCT Time to Implement: 3-5 years Time to Benefit: 5+ years Cost Estimate: Cost Derivation TBD Life stage(s) affected: Link to Threats Table: Status Notes Currently proposed in USBR Bull Trout Enhancement package. Associated USFWS RUIP Actions: Links to Other Plans: Associated BOR Bull Trout & LIST OF NEXT STEPS: Step# 1 Step# 2 Step# 3 Reduce cumulative impacts in FMO to populations that are impacted during natural dewatering of spawning and rearing areas Improve access and timing of use of spawning areas that are naturally dewatered 2016 UPDATE NOTES: Title update: Restore Groundwater Hydrology Status: Proposed Develop specific proposals for filling or modifying Gold Creek Pond Implement Gold Creek Watershed Actions in USFS Upper Yakima EA BTWG Priority: 2 Access and implement changes to the drainage system Page 5

6 Gold Action #2: Restore Groundwater Hydrology Next Step # 1 Develop specific proposals for filling or modifying Gold Creek Pond The Gold Creek Assessment identified Gold Creek Pond as the major contributor to seasonal dewatering in Gold Creek. Key partners need to work together to identify possible solutions that reduce groundwater capture by the pond, build support for preferred alternatives, and enter into design phase Status: Proposed Lead: KCT; USFS Point Person: Mitch Long Timeline: Budget Estimate: TBD; USFWS funding already committed to support. KCT planning a landscape charette for fall 2016 Initial assessment of Gold Creek Pond is complete. KCT has committed to convene a meeting of key partners focused specifically on pond next steps and who takes the lead. Need to work with both Mt. Baker Snoqualmie and Okanogan-Wenatchee National Forest. Potential to use fill from USFS bridge (Gold Action 5) should be considered as alternatives are developed. Next Step # 2 Implement Gold Creek Watershed Actions in USFS Upper Yakima EA USFS identified specific actions to improve hydrology and fish habitat in the Upper Yakima Restoration Environmental Assessment. Once NEPA is complete, USFS should work with partners to fund and implement these actions in Gold Creek. Restoration actions may include the removal of legacy dikes and road fill from the gravel pit operation, relocation of ADA accessible trail away from Gold Creek, relocation of the footbridge out of floodplain, and restoration of hydraulic connectivity through the parking area. Lead: USFS Point Person: Patty Garvey-Darda; Bill Ehinger Timeline: Budget Estimate: TBD Talk to Patty and Bill regarding status and details BTWG Priority: 2 Page 6

7 Gold Action #2: Restore Groundwater Hydrology Next Step # 3 Access and implement changes to the drainage system The Gold Creek Assessment found a buried drain pipe network that intercepts groundwater and delivers it to the pond, and may be contributing to dewatering of Gold Creek. The next step focuses on first, identifying if it is a problem and how to fix it in a way that landowners support, and then, implementing proposed solutions. 3.1 Lead: KCT Point Person: Mitch Long Timeline: 1-5 years Budget Estimate: TBD; 25k of USFWS funding secured. Page 7

8 Gold Action #3: Long Term Habitat Protection in the Gold Creek Valley Action Type: Recovery Threat addressed: Development (residential and urbanization) Severity: Unknown significant Spawning/egg incubation, Pre/post spawning migrations, Juvenile Rearing Action Description Development of recreational residences in the Gold Creek floodplain can negatively affect restoration and protection opportunities. Floodplain acquisitions and/or easements and effective application of development requirements can play an important role in protecting habitat in the lower Gold Creek valley. Justification/Background Adverse impacts on bull trout habitat are possible as a result of residential/recreational development on private land holdings. Key Partners: WSDOT; USFS; USFWS; Kittitas County; KCT; Forterra Time to Implement: 5-10 years Time to Benefit: 5+ years Cost Estimate: $1-3 million Life stage(s) affected: Link to Threats Table: Cost Derivation Cost estimate is based on initial discussions with land owners in the lower creek corridor and associated appraisal values. Status Notes Associated USFWS RUIP Actions: Links to Other Plans: Associated BOR Bull Trout LIST OF NEXT STEPS: Step# 1 Step# UPDATE NOTES: Title update: Long term habitat protection in the Gold Creek valley Status: Proposed Protect land within the Gold Creek watershed Ensure appropriate regulatory framework is used to guide development BTWG Priority: 2 Page 8

9 Gold Action #3: Long Term Habitat Protection in the Gold Creek Valley Next Step # 1 Protect land within the Gold Creek watershed Support ongoing efforts to purchase and protect land adjacent to Gold Creek through acquisitions and easements as opportunities arise. Status: In Progress Lead: Forterra; KCT; USFWS Section 6 staff; WDFW; Kittitas County FCZD Point Person: Charlie Raiens, Forterra; Mitch Long, KCT Timeline: Ongoing Budget Estimate: TBD Next Step # 2 Ensure appropriate regulatory framework is used to guide development Ensure new development within the Gold Creek Valley is properly permitted and regulatory requirements are being followed. Promote land use policies and regulations (SMA, Critical Areas, zoning, etc) that protect aquatic habitat. Provide technical input and assistance in permitting process. Lead: WDFW; Kittitas County Point Person: Timeline: Ongoing Budget Estimate: Discuss with appropriate WDFW Region 3 Habitat Program staff and County staff. BTWG Priority: 2 Page 9

10 Gold Action #4: Monitor and Improve Passage Conditions in Gold Creek Action Type: Monitoring/Recovery Life stage(s) affected: Pre/post spawning migrations Threat addressed: Passage Barriers, Dewatering Severity: Unknown significant Action Description Low flow conditions and recreational dams can limit upstream passage of bull trout to spawning areas in Gold Creek. Use the Bull Trout Task Force to monitor for developing passage problems and to address the occasional problems associated with recreational dams (e.g. educating the public about, monitoring for presence, and dismantling when found). There is strong evidence that there are passage problems across the reservoir bed in many years. Work with USBR to ensure passage conditions on the reservoir bed are monitored and addressed when needed and address impacts of unmanaged recreation on migration bull trout. Justification/Background Field observations indicate that there are potential passage problems into the creek from the lake. Recreational dams have also occasionally been observed in the lower reaches of Gold Creek. Key Partners: USFS; USFWS; WDFW; USBR; BTTF Time to Implement: 1-5 years Time to Benefit: Immediate Cost Estimate: Link to Threats Table: Changes annually; $ ,000 Cost Derivation Monitoring of passage conditions and for recreation dams is included in the cost estimate for the Bull Trout Task Force (Multiple Pop #1). Status Notes Currently proposed in USBR Bull Trout Enhancement package. Associated USFWS RUIP Actions: Links to Other Plans: Associated BOR Bull Trout 3.1, Mitigation Measure 8.1 LIST OF NEXT STEPS: Step# 1 Step# 2 Step# 3 Reduce cumulative impacts in FMO to populations that are impacted during natural dewatering of spawning and rearing areas Improve access and timing of use of spawning areas that are naturally dewatered 2016 UPDATE NOTES: Status: Proposed Use Bull Trout Task Force to remove recreational dams in Gold Creek Monitor and address reservoir bed passage isssues in Gold Creek Reduce Keechelus Reservoir Bed Access BTWG Priority: 2 Page 10

11 Gold Action #4: Monitor and Improve Passage Conditions in Gold Creek Next Step # 1 Use Bull Trout Task Force to remove recreational dams in Gold Creek The Bull Trout Task Force has found recreational rock dams early in summer before the stream dewaters. The BTTF will periodically visit and remove any rock dams and educate recreationists about the impacts of recreational dams. Removing any potential barriers is key to allowing fish to migrate upstream before instream flow issues limit movement. 3.4 Status: In Progress Lead: MCFEG Point Person: Cassandra Weekes Timeline: Ongoing Budget Estimate: Included in BTTF scope of work. BTTF is currently funded through YBIP. There is potential for BTTF to expand to two crews, Upper Yakima and Naches. Two crews would require additional funding. Next Step # 2 Monitor and address reservoir bed passage isssues in Gold Creek Passage problems which preclude or hinder passage across the exposed reservoir bed into Gold Creek are the responsibility of the USBR. Work with the USBR to monitor passage conditions across the reservoir bed and provide passage. Build an official and solidly funded program (possibly an expanded contract with WDFW and a role for the Bull Trout Task Force). 8.1 Mitigation Measures Status: In Progress Lead: USBR; WDFW; USFWS; BTTF Point Person: Timeline: Budget Estimate: TBD Need to develop options and a plan. Page 11

12 Gold Action #4: Monitor and Improve Passage Conditions in Gold Creek Next Step # 3 Reduce Keechelus Reservoir Bed Access When Keechelus is low, vehicles access and drive on the reservoir bed and along the Gold Creek channel. This may lead to habitat impacts and harassment and/or poaching of fish that are highly exposed in the shallow and unvegetated channel. USBR and USFS are looking at options to restrict access to this area, including installing a guardrail and gate to block access to reservoir bed. Changing relevant policies if needed (e.g. adjusting designated recreation area boundaries), and signing areas to indicate access restrictions, and associated enforcement. BTTF and others to educate users about possible impacts of their activities. Lead: USFS; USBR Point Person: Patty Garvey-Darda Timeline: 1-2 years Budget Estimate: TBD; add cost estimates from USFS and BTTF BTWG Priority: 2 Review rules and regulations for vehicle access to reservoirs. Discuss with USFS and USBR on who enforces access and whether policy changes or improved enforcement are needed. Follow up with USFS regarding the proposal to relocate the boat ramp. Page 12

13 Gold Action #5: Replace USFS Road 4832 Bridge Over Gold Creek Action Type: Recovery Threat addressed: Passage Barriers Severity: Significant Spawning/egg incubation, Pre/post spawning migrations, Juvenile rearing Action Description Construction of I-90 and Forest Service Road 4832 altered the hydrology and floodplain function of Gold Creek. The original roads were constructed on fill across most of the historical floodplain, and bridges confined Gold Creek to a single active channel. Expanding the remaining Gold Creek USFS Road 4832 bridge would restore the Gold Creek floodplain and enhance connectivity of bull trout habitat within Gold Creek and between Gold Creek and Keechelus Reservoir. Justification/Background The bridge artificially constrains the floodplain and creek channel, resulting in scouring and sediment deposition patterns that prevent natural habitat processes from occurring (USDA, 2011). I-90 has a new long-span bridge over Gold Creek that allows full floodplain function and wildlife migration; the primary remaining constriction is the USFS bridge immediately upstream of the I-90 bridge. Key Partners: USFS Time to Implement: 1-5 years Time to Benefit: >10 years Cost Estimate: Cost Derivation Life stage(s) affected: Link to Threats Table: $7,000,000 for construction and implementation Status Notes Currently proposed in USBR Bull Trout Enhancement package. Associated USFWS RUIP Actions: Links to Other Plans: Associated BOR Bull Trout 3.2 LIST OF NEXT STEPS: Step# 1 Step# 2 Reduce habitat and floodplain impacts Reduce impacts to adjacent instream habitat, and remove passage barriers Reduce impacts from transportation networks. Improve management practices for maintenance and construction of roads 2016 UPDATE NOTES: New action developed in Status: Proposed Finish FS Road 4832 Gold Creek bridge design Fund and implement USFS Gold Creek bridge replacement Page 13

14 Gold Action #5: Replace USFS Road 4832 Bridge Over Gold Creek Next Step # 1 Finish FS Road 4832 Gold Creek bridge design The Forest Service has completed 90% designs and NEPA for a new 800 foot bridge over the Gold Creek floodplain. The USFS is currently looking for $30,000 to complete 100% designs. 3.2 Status: In Progress Lead: USFS Point Person: Patty Garvey-Darda Timeline: Budget Estimate: Construction costs are estimated at between $6 and 10 million. At the February 2016 Yakima Bull Trout Working Group meeting Patty Garvey-Darda agreed to coordinate a meeting with a broad group of stakeholders. To review funding options. Fill could be used as part of the Gold Creek Pond Project (see Action #2); summary of spreadsheet results. Additional monitoring will be needed on sediment transport and movement. Next Step # 2 Fund and implement USFS Gold Creek bridge replacement Work with USFS to fund and implement the Gold Creek bridge replacement and include habitat restoration in the floodplain. 3.2 Status: Proposed Lead: USFS Point Person: Patty Garvey-Darda Timeline: TBD Budget Estimate: $7,000,000 for construction and implementation Page 14

15 Gold Action #6: Passage at Keechelus Dam Action Type: Recovery Life stage(s) affected: Spawning/egg incubation Threat addressed: Passage Barriers Severity: Significant Link to Threats Table: G6 Action Description Construct permanent upstream and downstream fish passage facilities at Keechelus Dam. Justification/Background An entrainment study was conducted at Keechelus Dam in Although no bull trout were captured, bull trout have been found during spawning and snorkel surveys downstream of the dam and it is believed these fish originated from Keechelus Lake. They cannot return since upstream passage is not available at the dam. The Gold Creek population is small and cannot afford to lose potential spawners. Key Partners: USBR; DOE; Yakama Nation Time to Implement: 9-12 years Time to Benefit: >10 years Cost Estimate: $ million Cost Derivation Approximate estimate included in YRBWEP budget. Status Notes See Broad Scale Action #3: Passage at Keechelus Dam. Associated USFWS RUIP Actions: Links to Other Plans: Associated BOR Bull Trout LIST OF NEXT STEPS: Step# 1 Step# 2 Improve fish passage at at all BOR dams, smaller diversions, and at road crossings Improve migratory life history connectivity Design and permitting of Keechelus Dam passage facilities Develop interim trap and haul proposal 2016 UPDATE NOTES: New action developed in Page 15

16 Gold Action #6: Passage at Keechelus Dam Next Step # 1 Design and permitting of Keechelus Dam passage facilities Assessment being conducted, proposed for implementation in future YBIP phases. Lead: USBR; USFWS; WDFW; YN Point Person: Joel Hubble; Richard Visser Timeline: Budget Estimate: From appraisal Next Step # 2 Develop interim trap and haul proposal Develop short term options including trap and haul and/or capturing fish isolated below the dam for propagation. Lead: USBR; USFWS Point Person: Timeline: TBD Budget Estimate: TBD Funding in 2017 USBR ESA budget Page 16

17 Gold Action #7: Supplementation, Fish Salvage and/or Translocation Action Type: Research/Recovery Life stage(s) affected: Adult Threat addressed: Low Abundance (increased risk of extirpation) Severity: Varied Action Description A supplementation, fish salvage/reconditioning, or translocation project may be required to enhance the Gold Creek bull trout population. Conduct a feasibility study to determine if supplementation is a viable course of action. Justification/Background The effective population size of the Gold Creek bull trout population is chronically low based on annual redd counts. Key Partners: WDFW; USFWS; Yakama Nation Time to Implement: 1-5 years Time to Benefit: >10 years Cost Estimate: Cost Derivation $100,000 per year for 20 years Link to Threats Table: Status Notes See Multiple Pops Action #4: Evaluate Supplementation. Associated USFWS RUIP Actions: Links to Other Plans: Associated BOR Bull Trout 3.8 LIST OF NEXT STEPS: Step# 1 Step# 2 Develop habitat baseline information for feasibility assessments for reintroduction/translocation and development of priority habitat projects Develop feasibility assessment for introduction/translocation of bull trout 2016 UPDATE NOTES: New action developed in Fish salvage and rearing USGS Modeling of Gold Creek Page 17

18 Gold Action #7: Supplementation, Fish Salvage and/or Translocation Next Step # 1 Fish salvage and rearing Develop a salvage plan to explore the potential of rearing or transporting salvaged bull trout from Gold Creek in order to increase survival and productivity. Lead: WDFW; USFWS Point Person: Eric Anderson Timeline: TBD Budget Estimate: TBD On option is salvaging bull trout parr in Gold Creek as pools go dry and raise them to 10+ before releasing them back into Gold Creek. Discuss specific next steps with the Bull Trout Working Group; a small group will meet to brainstorm salvage options for Gold Creek and other populations. Next Step # 2 USGS Modeling of Gold Creek USGS is building a Decision Support Model of the Upper Yakima. The model will serve as a tool to make the best use of resources for recovery actions, including salvage. The model will outline fundamental objectives for persistence of bull trout, help to identify alternatives with regard to recovery tasks, including salvage, and assist to facilitate management decisions. Status: In Progress Lead: USGS; USFWS Point Person: Judy Neibauer Timeline: Fall 2016 Budget Estimate: USFWS funding Page 18

19 Gold Action #8: Identify and Implement Passage and Habitat Projects in Keechelus Action Type: Monitoring/Recovery Life stage(s) affected: Juvenile, subadult Threat addressed: Limited extent of habitat, passage barriers Severity: Unknown Action Description Recent data shows that juvenile and subadult bull trout are rearing in numerous tributaries to Keechelus Lake. Cold, Coal, Resort, Rocky Run and other Keechelus tributaries may provide significant rearing and subadult habitat for bull trout. Identify and implement projects that provide passage and improve habitat in these tributaries. Justification/Background Central Washington University monitored several Keechelus tributaries as part of the WSDOT I-90 project. From Paul James, CWU Biology Professor, found two juvenile bull trout in Coal Creek, one juvenile bull trout in Cold Creek, one juvenile bull trout in Resort Creek, and one juvenile in Rocky Run Creek. The WSDOT I-90 project will provide funding to correct passage barriers in several tributaries. Key Partners: KCT; MCFEG; CWU; USFS Time to Implement: 1-5 years Time to Benefit: >10 years Cost Estimate: Cost Derivation Status Notes Link to Threats Table: TBD, cost estimate will be specific to individual tributaries. Associated USFWS RUIP Actions: Links to Other Plans: Associated BOR Bull Trout 3.3 LIST OF NEXT STEPS: Step# 1 Step# 2 Step# 3 Connect FMO and spawning and rearing habitat 2016 UPDATE NOTES: New action developed in Assess and design passage project at Cold Creek John Wayne Trail crossing BTWG Priority: 2 Fix passage barriers in Rocky Run Creek BTWG Priority: 3 Assessment of Meadow, Coal, Cold and Resort Creeks BTWG Priority: 2 Page 19

20 Gold Action #8: Identify and Implement Passage and Habitat Projects in Keechelus Next Step # 1 Assess and design passage project at Cold Creek John Wayne Trail crossing The culvert was built and washed out in Rebuilding a structure has been proposed, but there is some concern that habitat is insufficient to support significant bull trout use. There's a need to reassess habitat values before implementing. Incorporate monitoring of subsequent fish use to document benefit and evaluate if passage is a priority. 3.3 Lead: USFS; USBR Point Person: Patty Garvey-Darda Timeline: Budget Estimate: $1,850,000 Conceptual design completed by Paul Tappel and commissioned by KCT. BTWG Priority: 2 Need to review, identify lead and pursue development of final design. Brown trout established in Upper Twin Lake in Cold Creek headwaters. Previous monitoring found <.5 cfs in flow in summer; ¾ mile up a natural barrier. Next Step # 2 Fix passage barriers in Rocky Run Creek The Forest Service Road 4832 crossing over Rocky Run Creek was impacted after a post-storm flood event in November The result of this post-storm event provides evidence that the structure is most likely a velocity barrier to juvenile and subadult bull trout at higher flows. Lead: USFS Point Person: Patty Garvey-Darda Timeline: Implementation in Budget Estimate: $260,000 Work with USFS to determine how much available habitat opended up. Project is listed in Oka-Wen NF Fish Habitat Projects biennium funding proposal. BTWG Priority: 3 Page 20

21 Gold Action #8: Identify and Implement Passage and Habitat Projects in Keechelus Next Step # 3 Assessment of Meadow, Coal, Cold and Resort Creeks Determine bull trout habitat suitability and potential restoration opportunities in Meadow, Coal, Cold and Resort Creeks. Lead: KCT, MCFEG, USFS Point Person: Timeline: Budget Estimate: BTWG Priority: 2 Meadow Creek evaluation conducted in 2000 found warm temperatures after recent clear cutting; conditions may have improved; more flow and habitat than Cold Creek. May need to reevaluate temperatures. Reference: Hydrologic and water temperature investigation of tributaries to Keechelus Reservoir by Jeff Thomas, USFWS, March Page 21

Bull Trout Recovery Plan Implementation

Bull Trout Recovery Plan Implementation Bull Trout Recovery Plan Implementation June16, 2016 Judy Neibauer, USFWS, Central WA Field Office Bull Trout Recovery Coordinator Overview: History Maps Recovery Strategy Recovery Criteria Plan Scales

More information

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project # Burns Paiute Tribe Fisheries Department Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project # 199701900 Prior to 1990 Technical and/or scientific background Malheur population,

More information

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP Mid-Columbia Fisheries Enhancement Group MISSION STATEMENT The Mid-Columbia Fisheries Enhancement Group is a non-profit organization dedicated to restoring selfsustaining salmon and steelhead populations

More information

The Effects of Seasonal Stream Dewatering on Bull Trout, Salvelinus confluentus

The Effects of Seasonal Stream Dewatering on Bull Trout, Salvelinus confluentus The Effects of Seasonal Stream Dewatering on Bull Trout, Salvelinus confluentus Thesis Presentation and Defense By William R. Meyer Central Washington University Introduction Bull trout life history The

More information

Chagrin River TMDL Appendices. Appendix F

Chagrin River TMDL Appendices. Appendix F Appendix F The following are excerpts from the Eastern Brook Trout Joint Venture s Conservation Strategy (Working Draft v.6), Conserving the Eastern Brook Trout: Strategies for Action Found at: http://www.easternbrooktrout.org/constrategy.html

More information

COLUMBIA LAKE DAM REMOVAL PROJECT

COLUMBIA LAKE DAM REMOVAL PROJECT COLUMBIA LAKE DAM REMOVAL PROJECT Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

5B. Management of invasive species in the Cosumnes and Mokelumne River Basins

5B. Management of invasive species in the Cosumnes and Mokelumne River Basins 5B. Management of invasive species in the Cosumnes and Mokelumne River Basins Cosumnes River The Cosumnes River basin has a number of distinct habitat types that require different management strategies

More information

MCCAW REACH RESTORATION

MCCAW REACH RESTORATION Final Report MCCAW REACH FISH RESTORATION PHASE B Jack McCaw Inland Empire Action Coalition http://www.wwccd.net/ Phone: 509-956-3777 Hours: 8:00-4:30 Walla Walla County Conservation District Snake River

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc. Fish Habitat Restoration and Monitoring in Southeast Washington Andy Hill Eco Logical Research, Inc. Fish Habitat Restoration and Monitoring in Southeast Washington Talk overview: Restoration projects

More information

Union Pacific Railroad

Union Pacific Railroad Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity

More information

Sub-watershed Summaries

Sub-watershed Summaries Project Description The Salmon Drift Creek Watershed Council (SDCWC) has focused their efforts in the Salmon River estuary for the past few years. The multifaceted partnership effort is nearing completion

More information

Klamath Lake Bull Trout

Klamath Lake Bull Trout Klamath Lake Bull Trout Existing Populations The Klamath Lake Bull Trout SMU is comprised of seven existing populations and four populations classified as extinct or functionally extinct (Table 189). Populations

More information

Little Kern Golden Trout Status:

Little Kern Golden Trout Status: Little Kern Golden Trout Status: The Little Kern Golden trout (LKGT) was proposed for federal listing as Threatened under the Endangered Species Act (ESA) on September 1, 1977 by the U. S. Fish and Wildlife

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project The Columbia Lake dam located 1/4 mile upstream of the Paulins Kill River's confluence with the Delaware River in Knowlton Township, Warren County has been proposed for

More information

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006 Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006 Mission Statement The mission of the Mid-Columbia Fisheries Enhancement Group is to restore self-sustaining

More information

Don Pedro Project Relicensing

Don Pedro Project Relicensing Don Pedro Project Relicensing M ODESTO I RRIGATION D ISTRICT TURLOCK I RRIGATION D ISTRICT FERC PROJECT N O. 2299 Resident Fish in Don Pedro Reservoir Don Pedro Reservoir Fish Stocking (1971-Present) CDFG

More information

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December 2007 Grand Valley Ranger District Grand Mesa, Uncompahgre, Gunnison National Forests Prepared

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds The mission of the Fish Passage Forum is

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative Kootenai River Habitat Restoration Program Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative Decline of native species Kootenai River White Sturgeon ENDANGERED

More information

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ OKANAGAN RIVER RESTORATION INITIATIVE - FAQ Initiative background: The health of the q awsitk w (Okanagan River) has been severely impacted by the channelization works that occurred in the mid-1950 s.

More information

Yakima/Klickitat Fisheries Project

Yakima/Klickitat Fisheries Project Yakima/Klickitat Fisheries Project Lower Yakima River Supplementation and Research Project Operations and Maintenance Annual Report 2002-2003 March 2004 DOE/BP-00006677-1 This Document should be cited

More information

Klickitat County Shoreline Master Program Update. Open House March 15, 2017

Klickitat County Shoreline Master Program Update. Open House March 15, 2017 Klickitat County Shoreline Master Program Update Open House March 15, 2017 Agenda 6:00 6:10 Welcome 6:10 6:40 Presentation SMP Update Process Shoreline Analysis review 6:40 8:00 Open House Topics SMP Process

More information

Lake Merwin and Swift Creek Reservoir Tributaries. Bull Trout Limiting Factors Analysis

Lake Merwin and Swift Creek Reservoir Tributaries. Bull Trout Limiting Factors Analysis Lake Merwin and Swift Creek Reservoir Tributaries Bull Trout Limiting Factors Analysis Study Objectives Answer Key? s Do other tributaries to Swift Creek Reservoir and Lake Merwin not known to support

More information

Eastern Brook Trout. Roadmap to

Eastern Brook Trout. Roadmap to Eastern Brook Trout Roadmap to CONSERVATION Our Brook Trout heritage he wild Brook Trout is an American symbol of persistence, adaptability, and the pristine wilderness that covered North America prior

More information

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

PRE- PROPOSAL FORM - Lewis River Aquatic Fund PRE- PROPOSAL FORM - Lewis River Aquatic Fund 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest 2. Organization purpose Resource management agency 3. Project manager (name,

More information

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Executive Summary. Map 1. The Santa Clara River watershed with topography. Santa Clara River Steelhead Trout: Assessment and Recovery Opportunities December 2005 Prepared By: Matt Stoecker and Elise Kelley, Ph.D. University of California, Santa Barbara Prepared For: The Santa

More information

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1. Please find attached a response from The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO) for Project # 2008-301-00, Habitat Restoration Planning, Design and Implementation within

More information

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho Susan Ireland, Kootenai Tribe of Idaho Future of our Salmon Conference Technical Session August 2016 Healthy Floodplains,

More information

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16 2016 SRFB Grant Round Version: 2/19/16 Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region The Project Funding Process Presented by the Snake River Salmon Recovery Lead Entity

More information

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek. Minnesota F-29-R(P)-24 Area 315 Study 3 March 2016 Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries Stream Survey Report Luxemburg Creek 2015 Mark Pelham Sauk

More information

LIFE HISTORY DIVERSITY AND RESILIENCE

LIFE HISTORY DIVERSITY AND RESILIENCE LIFE HISTORY DIVERSITY AND RESILIENCE SPRING CHINOOK IN THE WILLAMETTE RIVER BASIN Kirk Schroeder Brian Cannon Luke Whitman Paul Olmsted Oregon Department of Fish and Wildlife Corvallis Research Lab Thanks

More information

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA TOPICS COVERED Aquatic Organism Passage (AOP) Benefits of AOP Crossings

More information

GRAND RAPIDS RESTORATION GRAND RAPIDS REVITALIZATION

GRAND RAPIDS RESTORATION GRAND RAPIDS REVITALIZATION GRAND RAPIDS RESTORATION RETURNING THE RAPIDS TO THE GRAND WHY IS THIS PLACE CALLED GRAND RAPIDS? We have been asking for over 100- years, where are the rapids? WHY IS THIS PLACE CALLED GRAND RAPIDS? compare

More information

OPPORTUNITIES & CONSTRAINTS

OPPORTUNITIES & CONSTRAINTS OPPORTUNITIES & CONSTRAINTS Grand Rapids Restoration August 2012 We have inherited the past; we can create the future Unknown TABLE OF CONTENTS ES-1 ES-1...... BACKGROUND CONCEPTUAL PLAN ES-2... OPPORTUNITIES

More information

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP FISHERIES A warming climate, by itself, substantially affects the hydrology of watersheds in the Blue Mountains. Among the key hydrologic changes projected under all scenarios for the 2040s and beyond

More information

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension Restoration Ecology: Rivers and Streams WFC 10 29 Nov 2010 Restoration of ecosystems often involves creating new systems with only partial resemblance to the original ecosystems Lisa Thompson Fisheries

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

Tuolumne River Gravel Introduction

Tuolumne River Gravel Introduction Tuolumne River Gravel Introduction 2000 2003 Tuolumne River La Grange Gravel Addition, Phase II Course Sediment Replenishment Program Tuolumne River Salmonid Habitat Improvement Project River Mile 49.9

More information

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River,

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River, Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River, 2005-2006 Interim Report for NOAA Fisheries Prepared by: California Department of Water Resources Division of Environmental Services

More information

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5 PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5 2. Organization purpose USFS-Resource management agency WDFW-Fish and Wildlife management

More information

Searsville Dam Removal

Searsville Dam Removal Searsville Dam Removal A unique opportunity for all Presented by the Beyond Searsville Dam Coalition San Francisquito Creek flows into the San Francisco Bay near the Palo Alto Airport and Golf Course seen

More information

Yakima River Basin Coho Reintroduction Feasibility Study

Yakima River Basin Coho Reintroduction Feasibility Study Yakima River Basin Coho Reintroduction Feasibility Study Yakima Klickitat Fisheries Project Goals and Mission The purposes of the YKFP are to: enhance existing stocks of anadromous fish in the Yakima and

More information

California Steelhead: Management, Monitoring and Recovery Efforts

California Steelhead: Management, Monitoring and Recovery Efforts California Steelhead: Management, Monitoring and Recovery Efforts Jonathan Nelson Steelhead Restoration & Management Program Oncorhynchus mykiss irideus California Steelhead Distinct Population Segments

More information

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013 Program - Aquatic Organisms and Stream Crossings Ecological Connectivity A watershed is a network of channels that drain a common boundary. Channel characteristics formed by interaction of precipitation,

More information

Yakima Basin Integrated Plan AWRA Summer Specialty Conference 2017 June 27, 2017 Tysons Corner, VA

Yakima Basin Integrated Plan AWRA Summer Specialty Conference 2017 June 27, 2017 Tysons Corner, VA Yakima Basin Integrated Plan AWRA Summer Specialty Conference 2017 June 27, 2017 Tysons Corner, VA EA Engineering, Science, and Technology, Inc., PBC Yakima Basin Overview Basin size: 6,155 sq. miles Population:

More information

David K. Hering and Mark W. Buktenica, Crater Lake National Park

David K. Hering and Mark W. Buktenica, Crater Lake National Park Eradication of Nonnative Trout and the Response of Threatened Bull Trout at Crater Lake National Park: Extending Conservation Across Park Boundaries to a Watershed Scale David K. Hering and Mark W. Buktenica,

More information

Climate Change Adaptation and Stream Restoration. Jack Williams;

Climate Change Adaptation and Stream Restoration. Jack Williams; Climate Change Adaptation and Stream Restoration Jack Williams; jwilliams@tu.org 1 Goals for this presentation Develop strategies for adapting streams to climate impacts by Thinking like a watershed Understanding

More information

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort Maryland Chapter Trout Unlimited Brook Trout Conservation Effort Photo by Matt Kline Portfolio of Recent Work MDTU Brook Trout Conservation Coordinator: Scott C. Scarfone, ASLA sscarfone@oasisdesigngroup.com

More information

Okanagan Sockeye Reintroduction

Okanagan Sockeye Reintroduction Okanagan Sockeye Reintroduction Backgrounder Elders accounts, and other forms of Traditional Ecological Knowledge (TEK) tell us that many species of salmon once came into the Okanagan Valley and tell us

More information

1. Project Title Bull Trout Habitat Restoration Project Identification Assessment. 3. Identification of problem or opportunity to be addressed

1. Project Title Bull Trout Habitat Restoration Project Identification Assessment. 3. Identification of problem or opportunity to be addressed PROPOSAL FORM - Lewis River Aquatic Fund 1. Project Title Bull Trout Habitat Restoration Project Identification Assessment 2. Project Manager Adam Haspiel USFS Abi Groskopf Mount S. Helens Institute (MSHI)

More information

COA-F17-F-1343 YEAR END REPORT

COA-F17-F-1343 YEAR END REPORT DAVE MARSHALL SALMON RESERVE RESTORATION, MAINTENANCE, AND UPGRADES YEAR END REPORT Prepared for: Fish and Wildlife Compensation Program Prepared by: Edith Tobe, RPBio, Executive Director Box 1791, Squamish,

More information

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORT F-20-50 2014 LAHONTAN CUTTHROAT TROUT STUDY WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION

More information

Shasta Dam Fish Passage Evaluation. Public Stakeholder Webinar

Shasta Dam Fish Passage Evaluation. Public Stakeholder Webinar Shasta Dam Fish Passage Evaluation Public Stakeholder Webinar 9-24-2015 Today s Topics 1. Introduction Craig Moyle (MWH) 2. Project Overview John Hannon (Reclamation) 3. Sacramento River Conditions and

More information

Management of headwater streams in the White Mountain National Forest

Management of headwater streams in the White Mountain National Forest Management of headwater streams in the White Mountain National Forest White Mountain National Forest Weeks Act of 1911 authorized the federal government to purchase lands east of the Mississippi River

More information

Hatchery Scientific Review Group Review and Recommendations

Hatchery Scientific Review Group Review and Recommendations Hatchery Scientific Review Group Review and Recommendations Lochsa River Spring Chinook Population and Related Hatchery Programs January 31, 2009 Lochsa River Spring Chinook Population Report Page - 1

More information

Study Update Fish Distribution and Species Composition

Study Update Fish Distribution and Species Composition Study Update Fish Distribution and Species Composition Goals and Study Area Gain a better understanding of fish species composition and abundance in waters associated with the Packwood Lake Hydroelectric

More information

Evaluate Bull Trout Movements in the Tucannon & Lower Snake Rivers. Mike Faler - USFWS, Ahsahka, ID Glen Mendel - WDFW, Dayton, WA

Evaluate Bull Trout Movements in the Tucannon & Lower Snake Rivers. Mike Faler - USFWS, Ahsahka, ID Glen Mendel - WDFW, Dayton, WA Evaluate Bull Trout Movements in the Tucannon & Lower Snake Rivers Mike Faler - USFWS, Ahsahka, ID Glen Mendel - WDFW, Dayton, WA Background Occurrence of bull trout at the Snake River dams is only incidentally

More information

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR PROJECT OVERVIEW PROJECT AREA FISH AND AQUATIC HABITAT COLLABORATIVE EFFORT (FAHCE) Fish Habitat Restoration Plan Project Area PROJECT OVERVIEW DOCUMENTS A Settlement Agreement Regarding Water Rights of

More information

Conserving the Forests, Lakes and Streams of Northeast Michigan

Conserving the Forests, Lakes and Streams of Northeast Michigan 4241 Old US 27 South, Suite 2, Gaylord, Michigan 49735 (989) 448-2293 www.huronpines.org info@huronpines.org Prioritized Restoration Projects in the AuSable River Watershed Summer 2015 Update from Huron

More information

Strategies for mitigating ecological effects of hatchery programs

Strategies for mitigating ecological effects of hatchery programs Strategies for mitigating ecological effects of hatchery programs Some case studies from the Pacific Northwest Kathryn Kostow Oregon Department of Fish and Wildlife Ecological risks occur when the presence

More information

Western native Trout Status report

Western native Trout Status report Bull trout (Salvelinus confluentus) Data: Draft Recovery Plan, USFWS, 2002; FR Final Critical Habitat Rule - 2005 Partners: ID, MT, OR, WA, NV, FWS, FS, BLM, NPS, Tribes, AK, Canada Species Status review:

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS The Monterey Peninsula Water Management District (MPWMD), in cooperation with

More information

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council Annual Report for Fiscal Year 2012-2013 and Future Plans for the Tillamook Bay Watershed Council A report prepared for the Tillamook County Board of Commissioners August 2013 Table of Contents: Recently

More information

Warner Lakes Redband Trout

Warner Lakes Redband Trout Warner Lakes Redband Trout Existing Populations Warner Valley is an endorheic basin that contains a complex series of interconnected lakes, marshes, sloughs, and potholes, all of which are remnants of

More information

Alberta Conservation Association 2009/10 Project Summary Report. Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment

Alberta Conservation Association 2009/10 Project Summary Report. Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment Alberta Conservation Association 2009/10 Project Summary Report Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment Fisheries Program Manager: Peter Aku Project Leader:

More information

Section II: Project Description

Section II: Project Description Project Funding 319 Funds Requested $89,700.00 Matching Funds State Cash Match $78,200.00 Local Cash Match $1,800.00 In-Kind Match $1,000.00 Total Match $81,000.00 Other Federal Funds $24,800.00 Total

More information

Water in the Deschutes Who needs it?

Water in the Deschutes Who needs it? Water in the Deschutes Who needs it? Rivers and streams over appropriation and flow alteration. Junior water right holders production agriculture. The Cities long-term supply for growing populations. Climate

More information

Chadbourne Dam Repair and Fish Barrier

Chadbourne Dam Repair and Fish Barrier Chadbourne Dam Repair and Fish Barrier Final Report for the Western Native Trout Initiative Prepared by: Carol Endicott Yellowstone Cutthroat Trout Conservation Biologist Montana Fish, Wildlife & Parks

More information

POLITICS A MONUMENTAL TASK FOR STREAM RESTORATION: AN EXAMPLE FROM TRAPPER CREEK OREGON

POLITICS A MONUMENTAL TASK FOR STREAM RESTORATION: AN EXAMPLE FROM TRAPPER CREEK OREGON POLITICS A MONUMENTAL TASK FOR STREAM RESTORATION: AN EXAMPLE FROM TRAPPER CREEK OREGON Bradley S. Houslet and Louis Wasniewski Deschutes National Forest TRAPPER CREEK, OR ODELL LAKE PROJECT OBJECTIVES

More information

FWCP External Projects Delivered by Stakeholders and First Nations

FWCP External Projects Delivered by Stakeholders and First Nations FWCP External Projects Delivered by Stakeholders and First Nations 2013-2014 For more information contact FWCP-Columbia program manager, Trevor Oussoren Trevor.oussoren@bchydro.com 250-365-4551 2013-2014

More information

Potlatch River Drainage: Salmonid Presence: Largest lower Clearwater River tributary

Potlatch River Drainage: Salmonid Presence: Largest lower Clearwater River tributary X Y Potlatch River Drainage: Largest lower Clearwater River tributary Area = 1500 km 2 Mouth ~ 13 km upstream of Snake/Clearwater confluence X Y Dominated by private land Salmonid Presence: Steelhead,

More information

The Blue Heron Slough Conservation Bank

The Blue Heron Slough Conservation Bank 1 The Blue Heron Slough Conservation Bank CONSERVATION BANKING July 19-23, 2010 CASE STUDY SERIES The Blue Heron Slough Conservation Bank (Washington) I. OVERVIEW & BACKGROUND: Location: Snohomish River

More information

Black Sturgeon Regional Plan

Black Sturgeon Regional Plan Black Sturgeon Regional Plan This is one of twenty Regional Plans that support implementation of the Lake Superior Biodiversity Conservation Strategy (Strategy). The Strategy, prepared and overseen by

More information

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report Ms. Jessica Gonzales April 15, 2015 Wenatchee Office Lead Central Washington Field Office U. S. Fish and Wildlife Service 215 Melody Lane, Suite 119 Wenatchee, WA 98801-5933 Subject: Wells Hydroelectric

More information

The Calawah River System

The Calawah River System The Calawah River System The Calawah River is the largest tributary of the Bogachiel River and is formed by the confluence of the north and south forks of the Calawah. The two forks of the Calawah, CALAWAH

More information

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0 Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL 26/02/2015 Version 2.0 1 Table of Contents List of Tables... 2 Introduction... 3 Methods... 4 Preliminary

More information

Clear Creek Fish Passage and Instream Flow Enhancement Phase II

Clear Creek Fish Passage and Instream Flow Enhancement Phase II Upper Columbia Regional Application 2017 Clear Creek Fish Passage and Instream Flow Enhancement Phase II Trout Unlimited 103 Palouse Street #14 509-888-0970 PRISM # 17-1192 HWS # 04-CHW-2017-02 Anticipated

More information

2016 Annual Work Plan

2016 Annual Work Plan Rocky Reach Hydroelectric Project FERC No. 2145 2016 Annual Work Plan 2015 Progress Report d per Rocky Reach Settlement Agreement, Sections 15.1.1 & 15.6.5 Reports provided by Chelan PUD Leads: Ray Heit

More information

Hydraulic Modeling of Stream Enhancement Methods

Hydraulic Modeling of Stream Enhancement Methods Hydraulic Modeling of Stream Enhancement Methods Matthew J. Curry John J. Levitsky Abstract Development within watersheds increases the amounts of runoff causing stream erosion and degradation of stream

More information

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River Prepared by: Phil Edwards, Rhode Island Department of Environmental

More information

Follow this and additional works at:

Follow this and additional works at: University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Draft Central Valley Salmon and Steelhead Recovery Plan

Draft Central Valley Salmon and Steelhead Recovery Plan Draft Central Valley Salmon and Steelhead Recovery Plan for Sacramento River winter-run Chinook salmon Central Valley spring-run Chinook Salmon Central Valley Steelhead National Marine Fisheries Service

More information

Project Name: Distribution and Abundance of the Migratory Bull Trout Population in the Castle River Drainage (Year 4 of 4)

Project Name: Distribution and Abundance of the Migratory Bull Trout Population in the Castle River Drainage (Year 4 of 4) Alberta Conservation Association (ACA) Date: 2014-2015 Project Name: Distribution and Abundance of the Migratory Bull Trout Population in the Castle River Drainage (Year 4 of 4) Fisheries Program Manager:

More information

New England Atlantic Salmon Programs DPS Delineations

New England Atlantic Salmon Programs DPS Delineations New England Atlantic Salmon Programs DPS Delineations (CA) Outer Bay of Fundy Gulf of Maine Central New England 6,000 5,000 4,000 3,000 2,000 1,000 GOM CNE LIS Long Island Sound 0 1967 1969 1971 1973 1975

More information

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA + 2 nd Steelhead Summit October 27 & 28, 2016 in San Luis Obispo, CA 1 + Session Overview Sponsors: California Trout City of San Luis Obispo Sustainable Conservation California Conservation Corps Cachuma

More information

Endangered Species Act and FERC Hydroelectric Projects. Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010

Endangered Species Act and FERC Hydroelectric Projects. Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010 Endangered Species Act and FERC Hydroelectric Projects Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010 Shortnose Sturgeon Federally listed as endangered in 1967 Listed under the sole

More information

Ecology of Columbia River redband trout (Oncorhynchus mykiss gairdneri) in high desert streams

Ecology of Columbia River redband trout (Oncorhynchus mykiss gairdneri) in high desert streams Ecology of Columbia River redband trout (Oncorhynchus mykiss gairdneri) in high desert streams Dry Creek October 2012 Chris A. Walser Ph.D., Professor of Biology Department of Biology and Environmental

More information

FINAL Caples Lake Fisheries Management Plan. Version 4.0

FINAL Caples Lake Fisheries Management Plan. Version 4.0 FINAL Caples Lake Fisheries Management Plan Version 4.0 August 15, 2008 Purpose The Caples Lake Fisheries Management Plan (Plan) outlines the stocking plan to reestablish a sport fishery in Caples Lake

More information

Newaukum Watershed Culvert Assessment

Newaukum Watershed Culvert Assessment Newaukum Watershed Culvert Assessment Water Resource Inventory Area 23 Lewis County Conservation District Final Report By: Kelly Verd and Nikki Wilson July 2002 Funded by: Chehalis Fisheries Restoration

More information

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell: From: To: Cc: Subject: Date: Attachments: Hemstrom, Steven "Lewis, Stephen" Sokolowski, Rosana 2014 Rocky Reach Bull Trout Report Wednesday, June 18, 2014 3:01:07 PM Final 2014 Rocky Reach Bull Trout Observations

More information

South Fork Chehalis Watershed Culvert Assessment

South Fork Chehalis Watershed Culvert Assessment South Fork Chehalis Watershed Culvert Assessment Water Resource Inventory Area 23 Lewis County Conservation District Final Report By: Kelly Verd and Nikki Wilson March 2003 Funded by: The Washington State

More information

Yakima Steelhead Recovery Plan

Yakima Steelhead Recovery Plan per Yakima Steelhead Recovery Plan Extracted from the 2005 Yakima Subbasin Salmon Recovery Plan with Updates September 30 th, 2009 Compiled by: Alex Conley, Yakima Basin Fish & Wildlife Recovery Board

More information

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Cold Spring Creek.

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Cold Spring Creek. Minnesota F-29-R(P)-24 Area 315 Study 3 March 2015 Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries Stream Survey Report Cold Spring Creek 2014 Mark Pelham Montrose

More information

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Big Spring Creek Habitat Enhancement and Fishery Management Plans Big Spring Creek Habitat Enhancement and Fishery Management Plans November 5, 2012 Big Spring Events and Activities Center Newville, PA Charlie McGarrell Regional Habitat Biologist Pennsylvania Fish and

More information

Fish Friendly Crossings- Examples from Nash Stream

Fish Friendly Crossings- Examples from Nash Stream Fish Friendly Crossings- Examples from Nash Stream Maggie Machinist- North Regional Forester, Division of Forests and Lands. Nash Stream Nash Stream Forest is 40,000 acres, owned and managed by NH Division

More information

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES Vision One of the first steps in developing this Plan was articulating a vision - a clear statement of what the Plan strives to achieve and what

More information